DE1605862A1 - Voll- oder halbselbsttaetige Regelung der Zugfolge in Verbindung mit einer Linienzugbeeinflussung - Google Patents
Voll- oder halbselbsttaetige Regelung der Zugfolge in Verbindung mit einer LinienzugbeeinflussungInfo
- Publication number
- DE1605862A1 DE1605862A1 DE1968K0064526 DEK0064526A DE1605862A1 DE 1605862 A1 DE1605862 A1 DE 1605862A1 DE 1968K0064526 DE1968K0064526 DE 1968K0064526 DE K0064526 A DEK0064526 A DE K0064526A DE 1605862 A1 DE1605862 A1 DE 1605862A1
- Authority
- DE
- Germany
- Prior art keywords
- train
- control
- semi
- fully
- connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000001419 dependent effect Effects 0.000 description 3
- 230000036962 time dependent Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L3/00—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
- B61L3/16—Continuous control along the route
- B61L3/22—Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
- B61L3/225—Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation using separate conductors along the route
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L3/00—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
- B61L3/16—Continuous control along the route
- B61L3/22—Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
- B61L3/225—Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation using separate conductors along the route
- B61L2003/226—German inductive continuous train control, called 'Linienzugbeeinflussung' [LZB]
Landscapes
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Description
-
Regelungen zweiter Art für LZB sind bereits bekannt geworden (Patentanmeldung K 58 298 11 201 vom 2.2.1_966). Das wichtigste Kennzeichen dieser Regelungen besteht darin, daß sie nicht wie die bisherige OS und LZB nur ortsabhängig sondern zugleich noch zeitabhängig durchgeführt werden. Die außerdem verwen-Beten Regelungen erster Art sind dagegen ortsabhängig und weisen dazu noch eine geschwindigkeitsabhängige Korrektur auf. Die bisher bekannt gewordenen Ausführungen haben aber den Nachteil, daß für die Regelung des nachfolgenden Zuges Zug 2) ein festes Fahrprogramm bis zum jeweiligen Zielpunkt, beispiesweise in Form einer passenden Fahrsehaulinie,, gewählt wird. - Die Auswahl der Fahrechaulinie muß'eich nach der gegenwärtigen zeitlichen und örtlichen Lage des vorausfahrenden Zuges und gegebenenfalls nach dem weiteren vorausgeschätzten Fahrtverlauf richten, der ebenfalls durch eine Fahrschaulinie dargestellt werden kann.
- Die Verwendung von Fahrschaulinien für Zug 2 hat bei kurzer . Zugfolge den Xsehteil, daß für die unvermeidlichen Abweichungen der Züge von ihren Pahrechaulinien keine ausrechende Toleranz zur Verfügung steht. Ein weiterer Nachteil besteht darin, daß für jeden Halteabstand ein besonderer Satz Fahrechaulinien für den nachfolgenden Zug bazötigt wird und daß die Zahl der. .Fahrechaulinien eines jeden Satzes au$ Aufwandsgründen beschränkt ist und, da man auf die nächst folgende zurückgreifen muß, beim.Zielhalt von Zug 2 im Durchschnitt zusätzlich deträchtliche Zeitverluste entstehen, die man doch vermeiden mochte.
Claims (1)
-
Größen, insbesondere die Zugfolgezeit beziehungsweise die. Zugwechselzeit, sowie der jeweils gemessene Zielabstand von Zug 2 und die seit der Durchfahrt des Zuges 1 an dem vorbestimmten Fahrort jeweils gemessene Zeit in einem Rechner zur unmittelbaren und fortlaufenden Bestimmung der Sollgeschwindigkeit von Zug 2 äusgewertet werden.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE1968K0064526 DE1605862B2 (de) | 1968-01-23 | 1968-01-23 | Verfahren zur voll- oder halbselbsttaetigen regelung der zugfolge in verbindung mit einer linienzugbeeinflussung |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE1968K0064526 DE1605862B2 (de) | 1968-01-23 | 1968-01-23 | Verfahren zur voll- oder halbselbsttaetigen regelung der zugfolge in verbindung mit einer linienzugbeeinflussung |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| DE1605862A1 true DE1605862A1 (de) | 1971-05-13 |
| DE1605862B2 DE1605862B2 (de) | 1977-05-26 |
Family
ID=7231668
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE1968K0064526 Withdrawn DE1605862B2 (de) | 1968-01-23 | 1968-01-23 | Verfahren zur voll- oder halbselbsttaetigen regelung der zugfolge in verbindung mit einer linienzugbeeinflussung |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE1605862B2 (de) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3337392A1 (de) * | 1983-10-14 | 1985-04-25 | Aachener Forschungsgesellschaft Regelungstechnik, 5100 Aachen | Steuerungsverfahren fuer transportanlagen mit mehreren spurgebundenen transportfahrzeugen auf einer gemeinsamen fahrbahn |
| EP0554983A1 (de) * | 1992-02-06 | 1993-08-11 | Westinghouse Brake And Signal Holdings Limited | Regelung eines Schienenfahrzeuges |
| EP0615891A1 (de) * | 1993-03-17 | 1994-09-21 | Hitachi, Ltd. | Zugbeeinflussungsanlage |
| US7222083B2 (en) | 1994-09-01 | 2007-05-22 | Harris Corporation | Resource schedule for scheduling rail way train resources |
| US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
| US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
| US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
| US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
| US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
| US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102015214672A1 (de) * | 2015-07-31 | 2017-02-02 | Siemens Aktiengesellschaft | Verfahren zur Fahrkurvenoptimierung für Schienenfahrzeuge |
-
1968
- 1968-01-23 DE DE1968K0064526 patent/DE1605862B2/de not_active Withdrawn
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3337392A1 (de) * | 1983-10-14 | 1985-04-25 | Aachener Forschungsgesellschaft Regelungstechnik, 5100 Aachen | Steuerungsverfahren fuer transportanlagen mit mehreren spurgebundenen transportfahrzeugen auf einer gemeinsamen fahrbahn |
| EP0554983A1 (de) * | 1992-02-06 | 1993-08-11 | Westinghouse Brake And Signal Holdings Limited | Regelung eines Schienenfahrzeuges |
| US5440489A (en) * | 1992-02-06 | 1995-08-08 | Westinghouse Brake & Signal Holdings Ltd. | Regulating a railway vehicle |
| EP0615891A1 (de) * | 1993-03-17 | 1994-09-21 | Hitachi, Ltd. | Zugbeeinflussungsanlage |
| US5487516A (en) * | 1993-03-17 | 1996-01-30 | Hitachi, Ltd. | Train control system |
| US7340328B2 (en) | 1994-09-01 | 2008-03-04 | Harris Corporation | Scheduling system and method |
| US7222083B2 (en) | 1994-09-01 | 2007-05-22 | Harris Corporation | Resource schedule for scheduling rail way train resources |
| US7343314B2 (en) | 1994-09-01 | 2008-03-11 | Harris Corporation | System and method for scheduling and train control |
| US7558740B2 (en) | 1994-09-01 | 2009-07-07 | Harris Corporation | System and method for scheduling and train control |
| US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
| US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
| US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
| US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
| US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
| US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
Also Published As
| Publication number | Publication date |
|---|---|
| DE1605862B2 (de) | 1977-05-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE1605862A1 (de) | Voll- oder halbselbsttaetige Regelung der Zugfolge in Verbindung mit einer Linienzugbeeinflussung | |
| DE1285897C2 (de) | Koppelnavigations-Rechenaiage für ein automatisches Flugsicherungs- und Flugüberwac hungs s ys tem | |
| DE905888C (de) | Zeichenmassstab aus thermoplastischer Masse | |
| DE1605430A1 (de) | Zugsicherungssystem mit linienformiger Informationsuebertragung zwischen Zug und Strecke | |
| DE650989C (de) | Vorrichtung zum Foerdern von Briefsachen in Sammelstellen | |
| DE683760C (de) | Vorrichtung zum Befahren von Raddruckwaagen | |
| DE682194C (de) | Sichtkartei | |
| DE825341C (de) | Werbetafel, bei welcher die Vorder- und Rueckseite abwechselnd zur Schau gebracht werden | |
| DE2158249A1 (de) | Verkehrsampel | |
| DE435947C (de) | Schraffier-Zeichenwinkel | |
| DE475636C (de) | Lawinenschnur | |
| DE475287C (de) | Einrichtung an Journalbuchungsblaettern zur Kenntlichmachung falscher Eintragungen beim Durchschreiben | |
| DE399854C (de) | Gleiswaage | |
| DE518937C (de) | Buchhaltungsblattsatz | |
| AT107439B (de) | Registratureinrichtung. | |
| DE656098C (de) | Damenstrumpf | |
| AT128300B (de) | Einrichtung zur synoptischen Darstellung geschichtlich oder sonstwie zusammengehöriger Daten. | |
| DE707565C (de) | Einrichtung zum Schrumpfungsausgleich beim optischen Kopieren | |
| DE873161C (de) | Geraet zur Ermittlung der Entfernungen und Fahrpreise zwischen Stationen von Kraftomnibuslinien od. dgl. | |
| AT117638B (de) | Lawinenschnur. | |
| DE895610C (de) | Tischhebelwerk fuer Eisenbahn-Sicherungseinrichtungen | |
| DE967926C (de) | Einrichtung bei Stellwerken mit elektrischen Verschluessen | |
| DE1481994A1 (de) | Verfahren zur Darstellung der relativen Lage eines Flugzeuges zur vorgegebenen Bahn waehrend der Landung | |
| DE1636998U (de) | Nadelsucher. | |
| DE4032722A1 (de) | Verfahren zur vorgabe von fahrgeschwindigkeiten an lichtsignalen |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| BHN | Withdrawal |