DE1216341B - Method for aligning tracks progressively in the track direction, in particular track curves, and device for carrying out this method - Google Patents

Method for aligning tracks progressively in the track direction, in particular track curves, and device for carrying out this method

Info

Publication number
DE1216341B
DE1216341B DE1961P0028025 DEP0028025A DE1216341B DE 1216341 B DE1216341 B DE 1216341B DE 1961P0028025 DE1961P0028025 DE 1961P0028025 DE P0028025 A DEP0028025 A DE P0028025A DE 1216341 B DE1216341 B DE 1216341B
Authority
DE
Germany
Prior art keywords
track
carriage
measuring
arrow height
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE1961P0028025
Other languages
German (de)
Inventor
Franz Plasser
Ing Josef Theurer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of DE1216341B publication Critical patent/DE1216341B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/16Guiding or measuring means, e.g. for alignment, canting, stepwise propagation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Length Measuring Devices By Optical Means (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY

DEUTSCHESGERMAN

PATENTAMTPATENT OFFICE

AUSLEGESCHRIFTEDITORIAL

Int. CL:Int. CL:

EOIbEOIb

Deutsche KL: 19 a-29/34 German KL: 19 a -29/34

Nummer: 1216 341Number: 1216 341

Aktenzeichen: P 28025 V/19 aFile number: P 28025 V / 19 a

Anmeldetag: 13. Oktober 1961Filing date: October 13, 1961

Auslegetag: 12. Mai 1966Opening day: May 12, 1966

Die Erfindung betrifft ein Verfahren zum in Gleisrichtung fortschreitenden Ausrichten von Gleisen, insbesondere Gleisbögen, unter Verwendung dreier miteinander verbundener, auf dem Gleis mit gleichbleibendem Abstand verfahrbarer Wagen, von denen der mittlere ein Pfeilhöhenmeßgerät trägt, mit dem die Pfeilhöhe zwischen dem Gleis und einem zwischen dem vorderen und dem hinteren Wagen gespannten, als Bezugsgerade dienenden Draht oder dergleichen Glied gemessen wird und bei dem der gemessene Istwert mit dem Sollwert der Pfeilhöhe verglichen und sobald eine Differenz festgestellt wird, das Gleis so weit gerückt wird, bis Ist- und Sollwert übereinstimmen.The invention relates to a method for the progressive alignment of tracks in the track direction, especially curved tracks, using three interconnected ones, on the track with constant distance of movable carriages, of which the middle one carries an arrow height measuring device, with the arrow height between the track and one between the front and the rear Carriage tensioned, serving as a reference line wire or the like member is measured and in which the measured actual value is compared with the target value of the arrow height and as soon as there is a difference it is determined that the track is moved so far that the actual and target values match.

Bei einem vorbekannten Verfahren dieser Art befindet sich nur der hintere Wagen auf dem bereits ausgerichteten Gleis und wird das Gleis am mittleren Wagen gerückt, wobei sich das auf diesem mittleren Wagen befindliche Pfeilhöhenmeßgerät gegenüber dem ruhenden Draht od. dgl. verschiebt. Bei dieser Anordnung ergeben sich Ungenauigkeiten dadurch, daß die ungenaue Lage des vorderen Endes der Bezugsgeraden, das sich im noch nicht ausgerichteten Gleis befindet, in das Meßergebnis eingeht.In a previously known method of this type, only the rear carriage is on the already aligned track and the track on the middle car is moved, which is on this Middle car located arrow height measuring device od against the stationary wire. Like. Moves. In this arrangement, inaccuracies result from the fact that the imprecise position of the front end the reference straight line, which is located in the not yet aligned track, is included in the measurement result.

Es ist ferner auch schon ein Verfahren zum Ausrichten von Gleisen der Höhe nach an Hand einer Bezugsgeraden bekanntgeworden, bei dem vorerst die Sollage einzelner Punkte des auszurichtenden Gleises ermittelt und die Differenz dieser Sollage von der Istlage des Gleises festgestellt wird und dann die Bezugsgerade so angeordnet wird, daß sich ihr hinteres Ende auf einer bereits in Sollage befindlichen Stelle des Gleises befindet, während ihr vorderes Ende im noch nicht ausgerichteten Gleisbereich liegt, und zwar in der vorherbestimmten Sollage, worauf an Hand der derart in korrigierter Lage befindlichen Bezugsgeraden das Gleis ausgerichtet wird. Die Bezugsgerade wird bei diesem Verfahren von einem starren Längsträger eines Fahrgestelles verkörpert. Die Länge dieses Trägers ist naturgemäß begrenzt, und das Verfahren eignet sich schon aus diesem Grund nicht zum Ausrichten von Gleisbögen der Seite nach. Auch bei diesem Verfahren v/ird das Gleis etwa in der Mitte der Bezugsgeraden in seine Sollage verschoben. Um die Bezugsgerade in die korrigierte Lage zu bringen, sind zwei Bedienungsleute vorgesehen, und zwar einer am vorderen Ende der Bezugsgeraden, der dieses vordere Ende vorerst in seine Sollage bringt, und einer am hinteren Ende der Bezugsgeraden zum Ausgleichen allenfalls noch vorhandener Fehler in der Lage der Schienen.It is also already a method for aligning tracks in terms of height on the basis of a Reference straight line has become known, in which initially the target position of individual points of the track to be aligned determined and the difference between this target position and the actual position of the track is determined and then the Reference line is arranged so that its rear end is located on an already in target position Location of the track, while its front end is in the as yet unaligned track area is in the predetermined target position, whereupon on the basis of the position corrected in this way Reference line the track is aligned. With this method, the reference line becomes embodied by a rigid longitudinal member of a chassis. The length of this carrier is natural limited, and for this reason alone the method is not suitable for aligning track curves to the side. With this method, too, the track is roughly in the middle of the reference straight line moved to its target position. There are two operators to bring the reference line into the corrected position provided, namely one at the front end of the reference straight line, which this front Bring the end into its target position for the time being, and one at the rear end of the reference line to compensate possibly still existing faults in the position of the rails.

Verfahren zum in Gleisrichtung fortschreitenden
Ausrichten von Gleisen, irisbesondere Gleisbögen, sowie Vorrichtung zum Durchführen dieses
Verfahrens
Method for advancing in the direction of the track
Alignment of tracks, iris-specific track curves, as well as a device for carrying out this
Procedure

Anmelder:Applicant:

Franz Plasser, Bahnbaumasehmen, WienFranz Plasser, railway construction company, Vienna

Vertreter: -Representative: -

Dipl.-Ing. H. StehmannDipl.-Ing. H. Stehmann

und Dipl.-Phys. Dr. Schweinzer, Patentanwälte,and Dipl.-Phys. Dr. Schweinzer, patent attorneys,

Nürnberg, Essenweinstr. 4-6 .Nuremberg, Essenweinstr. 4-6.

Als Erfinder benannt:Named as inventor:

Franz Plasser,Franz Plasser,

Ing. Josef Theurer, WienIng.Josef Theurer, Vienna

Beanspruchte Priorität:Claimed priority:

Österreich vom 15. Dezember 1960 (A 9403/60)Austria from December 15, 1960 (A 9403/60)

Schließlich ist es auch schon bekannt, ein Gleis am vorderen Ende einer Bezugsgeraden auszurichten, die an ihrem hinteren Ende und in ihrer Mitte an dem bereits ausgerichteten Gleis abgestützt ist. Als Bezugsgerade wird ein vorstehender starrer Kragarm benutzt, der mit einem am vorderen freien Ende angeordneten Gleisheber zusammenwirkt und beim Richten in Ruhe verbleibt. Naturgemäß kann sich dieser Kragarm nur über eine verhältnismäßig geringe Gleislänge erstrecken; zum Ausrichten von Gleisbögen ist diese Einrichtung von vornherein ungeeignet. After all, it is already known to align a track at the front end of a reference line, which is supported at its rear end and in its center on the already aligned track. A protruding rigid cantilever arm is used as the reference line, which is connected to a free one at the front End arranged track lifter interacts and remains at rest when straightening. Naturally, can this cantilever arm only extend over a relatively short length of track; for aligning For curved tracks, this facility is unsuitable from the start.

Von einem Verfahren der eingangs bezeichneten Art ausgehend, besteht das wesentlichste Merkmal der vorliegenden Erfindung darin, daß das Gleis, während sich der hintere Wagen und der mittlere Wagen auf dem bereits ausgerichteten Gleis befinden, am vorderen Wagen gerückt wird, wodurch der vordere Endpunkt der Bezugsgeraden entsprechend seitlich verschoben und die Bezugsgerade gegenüber dem ruhenden Pfeilhöhenmeßgerät bewegt wird.The most essential feature is based on a method of the type mentioned at the beginning of the present invention is that the track, while the rear car and the middle Car on the already aligned track is moved on the front car, whereby the the front end point of the reference straight line is shifted laterally accordingly and the reference straight line is opposite the dormant arrow altimeter is moved.

Bei diesem Verfahren werden somit jene Ungenauigkeiten, die sich durch eine ungenaue Lage des vorderen Endes der Bezugsgeraden ergeben könnten, vermieden. Zur Durchführung des Verfahrens genügtWith this method, those inaccuracies that result from an imprecise position of the front end of the reference line could result, avoided. It is sufficient to carry out the procedure

609 568/111609 568/111

3 43 4

ein Bedienungsmann am vorderen Wagen, der das Gleispunkt 3 mit Lageabweichungen nach derBogen-Einstellen des jeweiligen Sollwertes der Pfeilhöhe außen- bzw. -Innenseite gezeigt. Bei solcher fehleram mittleren Wagen durch ein seitliches Verschie- haften Lage des Gleispunktes 3 wird das Gleis an ben des vorderen Endpunktes der Bezugsgeraden diesem Punkt soweit gerückt, bis die Sehne S1, deren relativ zum vorderen Wagen durchführt. Die an 5 vorderer Endpunkt zusammen mit dem Gleis verden Wagen verankerte Bezugsgerade kann sich schoben wird, durch den Punktet geht und damit über einen verhältnismäßig langen Abschnitt des die Sollage des Gleises im Punkt 3 hergestellt ist.
Gleises erstrecken, so daß im Verlauf dieses Ab- Bei jeder Änderung der Gleiskrümmung muß am schnittes ein guter Fehlerausgleich zustande kommt; Gleispunkt 2 ein anderer Sollwert / der Pfeilhöhe insbesondere ist das Verfahren deshalb zum Aus- io eingestellt, d.h. der Punkte quer zum Gleis verrichten von Gleisbogen geeignet. schoben werden.
an operator at the front car who shows track point 3 with position deviations after the arc setting of the respective target value of the arrow height on the outside or inside. In the event of such an error on the middle wagon due to a lateral shifting of the track point 3, the track at the front end point of the reference straight line is moved at this point until the chord S 1 passes through it relative to the front wagon. The reference straight line anchored at 5 front end point together with the track on the wagon can be pushed, through which the points go and thus over a relatively long section of the target position of the track at point 3.
Extend the track, so that in the course of this step, a good error compensation must be achieved with every change in the track curvature; Track point 2 a different nominal value / the arrow height, in particular, the method is therefore set for the off io, ie the points transverse to the track are suitable for curved track. be pushed.

Besonders vorteilhaft läßt sich das Verfahren Die F i g. 2 zeigt, wie dieses ständige EinstellenThe method The FIG. 2 shows how this constant adjustment

nach der Erfindung durchführen, wenn — nach der Pfeilhöhe .am Gleispunkt 2 vermieden werdenPerform according to the invention if - after the arrow height .at track point 2 are avoided

einem weiteren Erfindungsmerkmal — die Sollage kann. Die durchschnittliche Größe der im Gleis-Another feature of the invention - the target position can. The average size of the

des Gleises vorher für einzelne Punkte des Gleises, 15 bogen auftretenden Pfeilhöhen sei gleich derof the track beforehand for individual points of the track, 15 arcs occurring arrow heights is equal to the

die nicht weiter voneinander entfernt sein dürfen Strecke b zwischen den Punkten 2 und B. Diesewhich must not be further apart, route b between points 2 and B. This

als der Abstand zwischen dem vorderen und dem Strecke b wird nun nach der Erfindung auch beias the distance between the front and the line b is now also in accordance with the invention

mittleren Wagen, festgelegt und dann der Sollwert Änderungen der Gleiskriimmung nicht verändert,middle car, fixed and then the target value changes in the track skew not changed,

der Pfeilhöhe im Zuge der Richtarbeit an einzel- sondern konstant gehalten. Wenn im konkretenthe arrow height in the course of the straightening work at individual but kept constant. If in concrete

nen Meßpunkten mittels einer Meßgeraden, welche 20 Fall der Sollwert/ der Pfeilhöhe beispielsweise umnen measuring points by means of a measuring line, which 20 fall of the target value / the arrow height, for example

die gleiche Länge wie die Bezugsgerade hat und das Maß α kleiner als die Strecke b ist, dann wirdhas the same length as the reference line and the dimension α is smaller than the distance b , then becomes

durch einen von dem mittleren Wagen zu einem vor gemäß Fig. 2 das vordere Ende der SehneS1 um dasby an average of the car to a front of Fig. 2 the front end of SehneS 1 about the

dem vorderen Wagen mit gleichbleibendem Ab- Maß 2 α von dem Punkt 3 nach dem Punkt 3' in diethe front car with constant dimension 2 α from point 3 to point 3 'in the

stand laufenden Vorwagen gespannten Draht oder Lage s„ relativ zum Gleis verschoben. Beim Rückenstood running front car of tensioned wire or position s "shifted relative to the track. On the back

dergleichen Glied gebildet ist, in der Weise ermit- 25 des Gleises am Gleispunkt 3 wird in diesem Fall sothe same link is formed in the way that the track at track point 3 is determined in this case

telt wird, daß der vordere Endpunkt der Meßgeraden weit gerückt, bis die Sehne S0 durch den Punkt B telt is that the front end point of the measuring line is moved far until the chord S 0 through the point B.

am Vorwagen jeweils bei Erreichen eines jener Gleis- gehton the front car each time one of the tracks is reached

punkte, deren Sollage bekannt ist, entsprechend der Nach diesem Rücken weist dann das Gleis einepoints, the target position of which is known, according to the

Sollage des Gleises seitlich verschoben und die züge- tatsächliche Pfeilhöhe mit dem Sollwert / auf. DasTarget position of the track shifted laterally and the actual train arrow height with the target value /. That

hörige Pfeilhöhe zwischen der Meßgeraden und dem 30 Einstellen des Sollwertes der Pfeilhöhe erfolgt da-The corresponding arrow height between the measuring line and the setting of the target value of the arrow height is

Gleis in ausgerichteter Lage gemessen wird. mit am Gleispunkt 3, an dem sich ohnehin eine Be-Track is measured in an aligned position. at track point 3, where there is already a

Bei dieser Ausgestaltung des Verfahrens kann dienungsperson befindet, die das Rücken des GleisesIn this embodiment of the method, the operator can be located at the back of the track

dann der jeweilige Sollwert der Pfeilhöhe zwischen steuert. Am Gleispunkt 2 sind keine Einstellungenthen the respective setpoint of the arrow height between controls. There are no settings at track point 2

den Meßpunkten, an denen er durch Messen der mehr vorzunehmen.the measuring points at which he can make by measuring the more.

Größe der Pfeilhöhe mit Hilfe der Meßgeraden er- 35 Die F i g. 3 zeigt den Abschnitt eines GleisbogensSize of the arrow height with the help of the measuring line. 35 The F i g. 3 shows the section of a curved track

mittelt worden ist, durch Interpolation von mit zwei Sehnen S1 und J2, von denen die erste alshas been averaged by interpolating with two chords S 1 and J 2 , the first of which as

Zwischenwerten festgelegt werden. . . Bezugsgerade und die zweite als Meßgerade dient.Intermediate values can be determined. . . Reference line and the second serves as a measurement line.

Zur Durchführung eines solchen Verfahrens eignet Der Gleisbogen G sei bis zum Punkt 3 bereits aussieh im Rahmen der Erfindung insbesondere eine gerichtet und soll nun weiter im Punkt 4 ausgerich-Vorrichtung, die einen hinteren Wagen, einen mirt- 4° tet werden. Für alle Meßpunkte 1, 2, 3 und 4, die leren Wagen und einen vorderen Wagen sowie ge- voneinander jeweils den gleichen Abstand haben, gebenenfalls einen Vorwagen aufweist, die durch sei das Örtlich erforderliche Verschiebungsmaß beGlieder, welche den gleichbleibenden Abstand reits vorher ermittelt und z. B. an der Schiene anzwischen den Wagen sichern, miteinander verbunden geschrieben worden.The track curve G is already suitable up to point 3 for carrying out such a procedure within the scope of the invention, in particular one directed and should now continue to align device in point 4, one of the rear wagons, one of which is being manned. For all measuring points 1, 2, 3 and 4, the The empty car and a front car as well as each have the same distance from each other, if necessary has a front carriage, which is made up of the locally required displacement dimension, which already determined the constant distance beforehand and z. B. on the rail secure the car, written linked to each other.

sind und von denen der vordere Wagen Richtwerk- 45 Um nun den Sollwert der Pfeilhöhe im Meßzeuge zum Rücken des Gliedes trägt. punkt 3 in bezug auf die Sehne s2 ermitteln zu kön-are and of which the front car straightening 45 Um now carries the target value of the arrow height in the measuring tool to the back of the limb. to be able to determine point 3 in relation to the chord s 2

Weitere Merkmale dieser Vorrichtung sind Ge- nen, muß das Ende dieser von einem SpanndrahtOther features of this device are genes, the end of this must be by a tension wire

genstand der Ansprüche 6 bis 8. od. dgl. verkörperten Sehne, die sich in den nochSubject of claims 6 to 8 or the like. embodied tendon, which is in the still

Im folgenden ist die Erfindung an Hand der nicht ausgerichteten Gleisbereich erstreckt, beimIn the following the invention is extended on the basis of the unaligned track area

Zeichnungen erläutert. In diesen Zeichnungen 50 Meßpunkt 4 gegenüber dem Gleis in einem AusmaßDrawings explained. In these drawings 50 measuring point 4 opposite the track to an extent

zeigt verschoben werden, welches der für diesen Meß-shows which of the

F i g. 1 bis 4 jeweils in schematischer Darstellung punkt bereits vorermittelten Differenz d zwischenF i g. 1 to 4 each in a schematic representation point already pre-determined difference d between

die Draufsicht auf einen Gleisbogen, der nach dem Soll- und Istlage des Gleises entspricht. Nach derthe top view of a track curve, which corresponds to the target and actual position of the track. After

Verfahren gemäß der Erfindung ausgerichtet wird, Verschiebung ihres vorderen Endes in den Punkt 4'Method according to the invention is aligned, shifting its front end to point 4 '

Fig. 5 die Draufsicht auf eine Vorrichtung zum 55 hat diese Sehnes2 die gestrichelt dargestellte Lages2',5 shows the top view of a device for 55, this tendon 2 has the position 2 'shown in dashed lines,

Durchführen des Verfahrens, und die Pfeilhöhe zwischen den Punkten 3 und C Perform the procedure, and the arrow height between points 3 and C

Fig. 6 eine Seitenansicht der Vorrichtung nach erhält dadurch ihren richtigen Wert, der als SoIl-6 shows a side view of the device according to its correct value, which is used as a target

F i g. 5 und wert für die anschließende Korrektur des Gleisab-F i g. 5 and value for the subsequent correction of the track

F i g. 7 eine Einzelheit dieser Vorrichtung in schnittes 3-4 benutzt werden kann,F i g. 7 a detail of this device can be used in sections 3-4,

größerem Maßstab. 60 Wird nun die Bogensehne S1 allmählich gegen denlarger scale. 60 If the bowstring S 1 is now gradually against the

In der Fig. 1 ist mit ausgezogenen Linien der Meßpunkt4 hin bewegt, so soll sich die PfeilhöheIn Fig. 1, the measuring point 4 is moved with solid lines, so the height of the arrow should move

Gleisbogen G mit den Gleispunkten 1, 2 und 3 in z. B. linear allmählich vom Wert 2-A auf den WertTrack curve G with track points 1, 2 and 3 in z. B. linearly gradually from the value 2-A to the value

Sollage, d.h. mit bereits ausgerichtetem Gleis- 3-C ändern, damit der GleisbogenG entsprechendChange target position, i.e. with already aligned track 3-C, so that the GleisbogenG accordingly

punkt 3, zusammen mit der zugehörigen, als Be- der im Punkt 4 erforderlichen Verschiebung d rich-point 3, together with the associated, as loading of the required shift in the point 4 d RICH

zugsgerade dienenden Sehne S1 dargestellt. In diesem 65 tig ausgerichtet wird, sobald die wandernde The chord S 1 serving straight pull is shown. In this 65 tig is aligned as soon as the wandering

Fall geht die SehneS1 durch den Endpunkte der Sehne S1 aus ihrer ursprünglichen Lage zwischenCase, it is the SehneS 1 through the end points of the string S 1 from its original position between

Pfeilhöhe mit dem Sollwert /. Mit gestrichelten den Punkten 1 und 3 in die Lage zwischen denArrow height with the setpoint /. With dashed points 1 and 3 in the position between the

Linien sind fehlerhafte Gleislagen 3 α und 3 i am Punkten 2 und 4 gelangt ist. Der sich während desLines are faulty track layers 3 α and 3 i at points 2 and 4. During the

5 65 6

Wanderns ändernde Wert der Pfeilhöhe der Sehne S1 schoben, das der für den Punkt 4 ermittelten erfor-The wandering-changing value of the arrow height of the chord S 1 , that of the required determined for point 4

wird zweckmäßig auch an weiteren Gleispunkten, derlichen Verschiebung entspricht. Die Pfeilhöheexpediently also corresponds to the shift at other track points. The arrow height

die zwischen den Meßpunkten 2 und 3 liegen, zur der durch die Meßgerade 13 verkörperten Sehnewhich lie between the measuring points 2 and 3, to the chord embodied by the measuring line 13

Bestimmung des Rückmaßes herangezogen. erhält dadurch am Standort der Richtmaschine 10Determination of the back dimension used. thus receives 10 at the location of the straightening machine

In der F i g. 4 ist die Vereinigung der an Hand 5 den richtigen Wert, da sich ja die RichtmaschineIn FIG. 4 is the union of hand 5 is the correct value, since the straightener is

der F i g. 1 bis 3 erläuterten Maßnahmen darge- am Meßpunkt 3 genau in der Mitte der Meßgeradenthe F i g. 1 to 3 explained measures are shown at measuring point 3 exactly in the middle of the measuring line

stellt, was in der Praxis die Regel sein wird. 13, zwischen den Meßpunkten 2 und 4, befindet. Derrepresents what will be the rule in practice. 13, between measuring points 2 and 4, is located. Of the

Eine zur Durchführung des Verfahrens nach seitwärtsragende Arm 12 der Richtmaschine 10 ist F i g. 4 geeignete Vorrichtung ist in den F i g. 5 nun auf die Größe der Pfeilhöhe im Meßpunkt 3 bis 7 dargestellt und besteht aus der als vorderer i° z· B- mittels Schraubgewinde einstellbar und von Wagen dienenden Gleisrichtmaschine 10, die mit den früher ist auch die der Bezugsgeraden 14 zugeordbeispielsweise hydraulischen Richtwerkzeugen 11 nete Pfeilhöhe am Meßpunkt 2, dem Standort des irgend einer beliebigen Bauart ausgestattet ist. Die mittleren Wagens 19, bekannt.
Richtmaschine 10 weist einen seitwärts verstellbaren Läßt man nun die Bezugsgerade 14 mit der Richt-Arm 12 auf, dessen Ende auf die durch einen Spann- 15 maschine 10 und dem hinteren Wagen 20 allmähdraht verkörperte Meßgerade 13 einstellbar ist. Auf lieh gegen den Meßpunkt 4 wandern, so ist bloß dem Arm 12 ist ferner die Verankerung 15 der eben- dafür zu sorgen, daß sich während der Fahrt die falls durch einen Spanndraht verkörperten Bezugs- Soll-Pfeilhöhe der Bezugsgeraden 14 allmählich dem geraden 14 angeordnet. Diese Verankerung 15 ist Sollwert der Pfeilhöhe der Meßgeraden 13 an dem über ein Getriebe 16 längs der Achse des Armes 12 20 Meßpunkt 3 nähert und diesen Wert schließlich erverstellbar und wird vermittels dieses Getriebes 16 reicht. ^ Hierzu ist nun das Getriebe 16 vorgesehen, vom Fahrwerk der Richtmaschine 10 während der das mit dem Fahrwerk der Richtmaschine 10 ver-Fahrt in bestimmter Weise bewegt, um die längs bunden ist und den Teil des Armes 12, an dem die des Gleisbogens G von einem Meßpunkt zum Verankerung 15 der Bezugsgeraden 14 befestigt ist, anderen auftretenden Änderungen der Pfeilhöhe zu 25 in Abhängigkeit von dem von der Richtmaschine zuberücksichtigen, rückgelegten Weg längsverstellt.
An arm 12 of the straightening machine 10 projecting sideways to carry out the method is shown in FIG. 4 suitable device is shown in FIGS. 5 now au the magnitude of the sagittal height at the measuring point 3 f shown to 7 and consists of a front i ° z · B serving adjustable and carriage by means of screw-threaded track straightening machine 10 with the previously is also the reference line 14 zugeordbeispielsweise hydraulic straightening tools 11 Nete arrow height at measuring point 2, the location of any design is equipped. The middle car 19, known.
Straightening machine 10 has a laterally adjustable. If one leaves the reference line 14 with the straightening arm 12, the end of which can be adjusted to the measuring line 13 embodied by a tensioning machine 10 and the rear carriage 20. On borrowed hike towards the measuring point 4, the arm 12 must also have the anchorage 15 of the also to ensure that the reference target arrow height of the reference straight line 14, if embodied by a tension wire, gradually aligns with the straight line 14 during the journey . This anchorage 15 is the nominal value of the arrow height of the measuring line 13 at which 20 measuring point 3 approaches via a gear 16 along the axis of the arm 12 and this value can finally be adjusted and is reached by means of this gear 16. ^ For this purpose, the transmission 16 is now provided, from the chassis of the straightening machine 10 during which the ver-drive with the chassis of the straightening machine 10 moves in a certain way around which is longitudinally bound and the part of the arm 12 on which the curved track G of a measuring point for anchoring 15 of the reference straight line 14 is fixed, other changes occurring in the arrow height to 25 depending on the distance covered by the straightening machine to be taken into account.

Der Richtmaschine 10 vorgeordnet ist der Vor- Im Zuge der Vorwärtsbewegung der Richtma-The straightening machine 10 is preceded by the pre In the course of the forward movement of the straightening machine

wagenl7, der eine ebenfalls längsverstellbare seit- schine verschiebt sie dabei an jenen Stellen deswagenl7, which also has a longitudinally adjustable side slide, moves it at those points of the

wärtsragende Verankerung 18 für die Meßgerade Gleisbogens G, wo es erforderlich ist, das Gleis indownwardly projecting anchorage 18 for the measuring line Gleisbogenens G, where it is necessary, the track in

13 trägt. Mit dieser Verankerung 18 wird die Meß- 30 seine Sollage, wobei irgendeine Signaleinrichtung, gerade jeweils an den Meßpunkten in ihre vorer- z. B. rotes und grünes Licht, dem Bedienüngsmann mittelte Sollage verbracht. anzeigt, nach welcher Seite (Bogeninnen- oder13 carries. With this anchorage 18, the measuring 30 is its nominal position, with some signaling device, just in each case at the measuring points in their pre-z. B. red and green light, the operator average target position spent. indicates which side (inside or

Nachgeordnet sind der Richtmaschine 10 ein hin- -außenseite) das Gleis zu verschieben ist, je nach-Downstream of the straightening machine 10 are a back-outside) the track is to be moved, depending on the-

terer Wagen 20, der mit einem starren Träger 21 ver- dem, auf welcher Seite des Kontaktstückes 24 sichterer carriage 20, which with a rigid carrier 21 ver on which side of the contact piece 24 is

sehen ist, und ein mittlerer Wagen 19, der ein Pfeil- 35 der bewegliche Kontakt 25 des Überwachungsgliedescan be seen, and a middle carriage 19, which is an arrow 35 the movable contact 25 of the monitoring member

höhenmeßgerät 22 tragt. Der Träger 21 und der fest- 23 befindet. Das Verschieben des Gleisesä d. h. diealtimeter 22 carries. The carrier 21 and the fixed 23 is located. Moving the track - that is, the

stehende Teil des Meßgerätes 22 dienen zur Ver- Tätigkeit der Richtwerkzeuge 11 wird — wie schonThe stationary part of the measuring device 22 is used for processing the straightening tools 11 - as before

ankerung des hinteren Endes der Bezugsgeraden erwähnt — selbsttätig durch die gegenseitige Be-anchorage of the rear end of the reference line mentioned - automatically through the mutual

14 bzw. der Meßgeraden 13. rührung von Kontaktstück 24 und Kontakt 25 be-Am Pfeilhöhenmeßgerät 22 des mittleren Wagens 4° endet, sobald nämlich am jeweiligen Standort des14 or the measuring line 13. touching of contact piece 24 and contact 25 be-Am Arrow height measuring device 22 of the middle car 4 ° ends as soon as that is at the respective location of the

19 ist ein Überwachungsglied 23 verschiebbar ge- mittleren Wagens 19 die richtige Pfeilhöhe der Belagert. Wie die F i g. 7 in größerem Maßstab zeigt, zugsgeraden 14 erreicht ist. Sobald die Maschine 10 kann der feststehende Teil des Meßgerätes 22 als den nächsten Meßpunkt 4 erreicht hat, wiederholt Röhrchen zur Führung des verschiebbaren Über- sich der vorher beschriebene Vorgang, beginnend wachungsgliedes 23 ausgebildet sein. Das Führungs- 45 mit dem Verschieben des vorderen Endes der Meßröhrchen ist mit einem Kontaktstück 24 und das geraden 13.19 is a monitoring member 23 displaceable middle carriage 19 the correct arrow height of the siege. As the F i g. 7 shows on a larger scale, pulling straight line 14 has been reached. As soon as the machine 10 the fixed part of the measuring device 22 can have reached the next measuring point 4 repeatedly Tubes for guiding the sliding overhead - the process described above, beginning watchdog member 23 may be formed. The guide 45 with moving the front end of the measuring tube is with a contact piece 24 and the straight 13.

verschiebbare Überwachungsglied mit einem Kontakt Wie schon früher erwähnt, ist es ohne weiteresSlidable monitoring element with a contact As mentioned earlier, it is straightforward

25 versehen. Sobald das Meßgerät 22 die richtige möglich, mit einem Überwachungsglied 23 konstan-25 provided. As soon as the measuring device 22 the correct possible, constant with a monitoring element 23

Pfeilhöhe anzeigt, berühren sich der Kontakt und ter Länge zu arbeiten, dessen Länge unter Berück-Indicates the height of the arrow, the contact and the length to work touch each other, the length of which is

das Kontaktstück und fließt damit ein elektrischer 50 sichtigung einer durchschnittlichen Pfeilhöhe gewähltthe contact piece and thus flows an electrical 50 sighting an average arrow height selected

Strom, der die Tätigkeit der Richtwerkzeuge 11 ab- ist. Örtliche Abweichungen von diesem DurchschnittCurrent that the activity of the straightening tools 11 is from. Local deviations from this average

schaltet. müssen dann durch entsprechende Verschiebungenswitches. must then by appropriate shifts

Die Arbeitsweise bei der Korrektur eines Gleis- der vorderen Verankerung 15 berücksichtigt wer-The method of operation when correcting a track- the front anchorage 15 must be taken into account

bogens G nach F i g. 5 ist somit die folgende: den, wie dies an Hand der F i g. 2 erläutert ist. Diebogens G to F i g. 5 is thus the following: the, as shown on the basis of FIG. 2 is explained. the

Vorerst wird in üblicher Weise für eine Vielzahl 55 Einstellung der Verankerung 15 ist im übrigen inFor the time being, in the usual way for a variety 55 setting of the anchorage 15 is otherwise in

gleichweit voneinander entfernter Meßpunkte 1, 2, 3, Abhängigkeit vom wechselnden Verlauf der Meß-Equidistant measuring points 1, 2, 3, depending on the changing course of the measuring

4 usw. das jeweils örtlich erforderliche Verschie- geraden 13 leicht mechanisch regelbar. Es ist somit4 etc. the locally required displacement line 13 can be easily controlled mechanically. So it is

bungsmaß ermittelt und dieses Maß wird beispiels- gar nicht nötig, die Pfeilhöhe längs des Armes 12Exercise measure is determined and this measure is not necessary, for example, the height of the arrow along the arm 12

weise an dem Schienensteg angeschrieben. Es sei im Meßpunkt 3 zahlenmäßig zu messen. Die Einstel-wisely written on the rail web. It is to be measured numerically at measuring point 3. The setting

nun angenommen, daß der Gleisbogen G bis zum 60 lung des ausragenden Endes des Armes 12 auf dienow assumed that the track curve G to the 60 ment of the protruding end of the arm 12 on the

Meßpunkt 3 bereits ausgerichtet worden ist. Um nun Meßgerade 13 allein kann schon dazu dienen, dasMeasuring point 3 has already been aligned. To now measuring line 13 alone can serve to determine the

für den Meßpunkt 3, an dem sich die Richtmaschine Getriebe 16 für die Verstellung der Verankerung 15for the measuring point 3, at which the straightening machine gear 16 for the adjustment of the anchorage 15

10 befindet, den Sollwert der Pfeilhöhe festzustel- der Bezugsgeraden 14 in die richtige Ausgangsposi-10 is located, the setpoint of the arrow height to be determined- the reference straight line 14 in the correct starting position

len, der zum Ausrichten des Punktes 4 und auch tion zu bringen.len to bring the alignment of point 4 and also tion.

zum Interpolieren von Zwischenwerten zwischen 65 Die Vorrichtung gestattet somit auch in Gleis-for interpolating intermediate values between 65 The device thus also permits

den Punkten 3 und 4 benötigt wird, wird das im bögen ein kontinuierlich fortschreitendes ArbeitenPoints 3 and 4 are required, this is a continuously progressing work in the arch

noch unkorrigierten Gleis befindliche vordere Ende innerhalb der von den Meßpunkten begrenzten Gleis-still uncorrected track located front end within the track bounded by the measuring points

der Meßgeraden 13 um jenes Maß seitwärts ver- bogenabschnitte. An den Meßpunkten ist bloß einof the straight line 13 bent sideways by that amount. There is only one at the measuring points

Einstellen der verstellbaren Verankerung 18 und des Armes 12 auf den voreraiittelten bzw. ermittelbaren Wert erforderlich. Es genügen hierfür je ein Bedienungsmann auf der Richtmaschine 10 und auf dem Vorwagen 17. Innerhalb des Gleisbogens kann tatsächlich jeder beliebige Punkt korrigiert und in seine Sollage verbracht werden.Adjusting the adjustable anchorage 18 and the arm 12 to the predetermined or determinable Value required. One operator each on the straightening machine 10 and on is sufficient for this the front car 17. Within the curve any point can actually be corrected and in its target days are spent.

Claims (8)

Patentansprüche: IOClaims: IO 1. Verfahren zum in Gleisrichtung fortschreitenden Ausrichten von Gleisen, insbesondere Gleisbogen, unter Verwendung dreier miteinander verbundener, auf dem Gleis mit gleichbleibendem Abstand verfahrbarer Wagen, von denen der mittlere ein Pfeilhöhenmeßgerät trägt, mit dem die Pfeilhöhe zwischen dem Gleis und einem zwischen dem vorderen und dem hinteren Wagen gespannten, als Bezugsgerade dienenden Draht oder dergleichen Glied gemessen wird, und bei dem der gemessene Istwert mit dem Sollwert der Pfeilhöhe verglichen und sobald eine Differenz festgestellt wird, das Gleis so weit gerückt wird, bis Ist- und Sollwert übereinstimmen, dadurch gekennzeichnet, daß das Gleis, während sich der hintere Wagen (20) und der mittlere Wagen (19) auf dem bereits ausgerichteten Gleis befinden, am vorderen Wagen (10) gerückt wird, wodurch der vordere Endpunkt der Bezugsgeraden (14) entsprechend seitlich verschoben und die Bezugsgerade gegenüber dem ruhenden Pfeilhöhenmeßgerät (22) bewegt wird.1. Procedure for advancing in the direction of the track Aligning tracks, especially curved tracks, using three interconnected, on the track with constant distance movable car, of which the middle one carries an arrow height measuring device, with the the arrow height between the track and one between the front and rear A wire or a similar element that is tensioned in the carriage and used as a reference line is measured, and in which the measured actual value is compared with the target value of the arrow height and as soon as a difference is determined, the track is moved until the actual and target value match, characterized in that the track while the rear carriage (20) and the middle carriage (19) are on the already aligned track, is moved on the front carriage (10), whereby the front End point of the reference straight line (14) shifted laterally accordingly and the reference straight line opposite the stationary arrow height measuring device (22) is moved. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Einstellen des jeweiligen Sollwertes der Pfeilhöhe durch seitliches Verschieben des vorderen Endpunktes der Bezugsgeraden (14) gegenüber dem vorderen Wagen (10) erfolgt.2. The method according to claim 1, characterized in that the setting of the respective Target value of the arrow height by shifting the front end point of the reference straight line to the side (14) takes place opposite the front carriage (10). 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Sollage des Gleises vorher für einzelne Punkte des Gleises, die nicht weiter voneinander entfernt sein dürfen als der Abstand zwischen dem vorderen Wagen (10) und dem mittleren Wagen (19), festgelegt und dann der Sollwert der Pfeilhöhe im Zuge der Richtarbeit an einzelnen Meßpunkten mittels einer Meßgeraden (13), welche die gleiche Länge wie die Bezugsgerade (14) hat und durch einen von dem mittleren Wagen (19) zu einem vor dem so vorderen Wagen (10) mit gleichbleibendem Abstand laufenden Vorwagen (17) gespannten Draht oder dergleichen Glied gebildet ist, in der Weise ermittelt wird, daß der vordere Endpunkt der Meßgeraden (13) am Vorwagen (17) jeweils bei Erreichen eines jener Gleispunkte,. deren Sollage bekannt ist, entsprechend der Sollage des Gleises seitlich verschoben und die zugehörige Pfeilhöhe zwischen der Meßgeraden (13) und dem Gleis in ausgerichteter Lage gemessen wird.3. The method according to claim 1 or 2, characterized in that the target position of the track beforehand for individual points on the track that must not be further apart than the Distance between the front carriage (10) and the middle carriage (19), set and then the target value of the arrow height in the course of the straightening work at individual measuring points using a measuring line (13), which has the same length as the reference line (14) and through a from the middle carriage (19) to a carriage (10) in front of it with a constant distance running front carriage (17) tensioned wire or the like link is formed in the manner it is determined that the front end point of the measuring line (13) on the front carriage (17) in each case at Reaching one of those track points. whose nominal position is known, corresponding to the nominal position of the track laterally shifted and the corresponding arrow height between the measuring line (13) and the Track is measured in an aligned position. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, daß der jeweilige Sollwert der Pfeilhöhe zwischen den Meßpunkten, an denen er durch Messen der Größe der Pfeilhöhe mit Hilfe der Meßgeraden (13) ermittelt worden ist, durch Interpolation von Zwischenwerten festgelegt wird.4. The method according to claim 3, characterized in that the respective setpoint of the Arrow height between the measuring points at which he was measured by measuring the size of the arrow height with With the help of the measuring line (13) has been determined, established by interpolation of intermediate values will. 5. Vorrichtung zum Durchführen des Verfahrens nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß sie einen hinteren Wagen (20), einen mittleren Wagen (19) und einen vorderen Wagen (10) sowie gegebenenfalls einen Vorwagen (17) aufweist, die durch Glieder, welche den gleichbleibenden Abstand zwischen den Wagen sichern, miteinander verbunden sind und von denen der vordere Wagen (10) Richtwerkzeuge (11) zum Rücken des Gleises trägt.5. Device for performing the method according to one of claims 1 to 4, characterized characterized in that they have a rear carriage (20), a middle carriage (19) and a front Carriage (10) and optionally a front carriage (17), which by links, which ensure the constant distance between the cars, are connected to each other and of which the front carriage (10) carries straightening tools (11) to the back of the track. 6. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß das Pfeilhöhenmeßgerät (22) am mittleren Wagen (19) ein durch den die Bezugsgerade (14) bildenden Draht oder dergleichen quer zum Gleis verschiebbares Überwachungsglied (23) aufweist, das einen elektrischen Kontakt (25) trägt, welcher derart mit einem Kontaktstück (24) an dem nicht verschieblichen Teil des Meßgerätes (22) zusammenwirkt, daß bei einer Differenz zwischen !stund eingestelltem Sollwert ein elektrischer Impuls abgegeben und nach dem Beseitigen dieser Differenz durch Rücken des Gleises die Richtwerkzeuge (11) selbsttätig abgeschaltet werden.6. Apparatus according to claim 5, characterized in that the arrow height measuring device (22) a wire or the like forming the reference line (14) on the middle carriage (19) has transversely to the track displaceable monitoring member (23) which has an electrical Contact (25) carries, which in such a way with a contact piece (24) on the non-displaceable Part of the measuring device (22) cooperates that with a difference between! Stund An electrical impulse is emitted after the setpoint has been set and after this has been eliminated Difference due to the back of the track the straightening tools (11) are switched off automatically. 7. Vorrichtung nach Anspruch 6 zur Durchführung des Verfahrens nach Anspruch 3 oder 4, dadurch gekennzeichnet, daß der Vorwagen (17) eine quer zum Gleis verstellbare Verankerung (18) für das vordere Ende des die Meßgerade (13) bildenden Drahtes od. dgl. aufweist und daß am vorderen Wagen (10) ein quer zum Gleis verstellbarer Arm (12) angeordnet ist, der auf diesen Draht eingestellt werden kann.7. Apparatus according to claim 6 for performing the method according to claim 3 or 4, characterized in that the front carriage (17) has an anchorage which can be adjusted transversely to the track (18) for the front end of the wire forming the measuring line (13) or the like an arm (12) which can be adjusted transversely to the track is arranged on the front carriage (10) and which is positioned on the latter Wire can be adjusted. 8. Vorrichtung nach Anspruch 7 zur Durchführung des Verfahrens nach den Ansprüchen 2 bis 4, dadurch gekennzeichnet, daß an dem vorderen Wagen (10) eine quer zum Gleis verstellbare Verankerung (15) für das vordere Ende des die Bezugsgerade (14) bildenden Drahtes od. dgl. sowie ein Getriebe (16) angeordnet ist, mittels dessen die Verankerung (15) synchron zur Fahrgeschwindigkeit des Wagens (10) derart verstellt werden kann, daß die von Meßpunkt zu Meßpunkt erfolgende Änderung des Sollwertes der Pfeilhöhe kontinuierlich berücksichtigt wird.8. Apparatus according to claim 7 for performing the method according to claims 2 to 4, characterized in that on the front carriage (10) an adjustable transverse to the track Anchoring (15) for the front end of the wire forming the reference line (14) or the like. and a transmission (16) is arranged, by means of which the anchorage (15) is synchronized with the driving speed of the carriage (10) can be adjusted in such a way that the change in the setpoint value occurring from measuring point to measuring point the arrow height is continuously taken into account. In Betracht gezogene Druckschriften:
Deutsche Patentschrift Nr. 957 576;
deutsche Auslegeschrift Nr. 1078 151;
schweizerische Patentschrift Nr. 343 427;
USA.-Patentschrift Nr. 2 962 979;
»Railway Track and Structures«, Oktober 1957, S. 48 bis 50.
Considered publications:
German Patent No. 957 576;
German Auslegeschrift No. 1078 151;
Swiss Patent No. 343 427;
U.S. Patent No. 2,962,979;
"Railway Track and Structures", October 1957, pp. 48 to 50.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings 609 568/111 5.66 © Bundesdruckerei Berlin609 568/111 5.66 © Bundesdruckerei Berlin
DE1961P0028025 1960-12-15 1961-10-13 Method for aligning tracks progressively in the track direction, in particular track curves, and device for carrying out this method Pending DE1216341B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT940360A AT241510B (en) 1960-12-15 1960-12-15 Method and device for aligning tracks, in particular track curves

Publications (1)

Publication Number Publication Date
DE1216341B true DE1216341B (en) 1966-05-12

Family

ID=3613830

Family Applications (2)

Application Number Title Priority Date Filing Date
DE1961P0028025 Pending DE1216341B (en) 1960-12-15 1961-10-13 Method for aligning tracks progressively in the track direction, in particular track curves, and device for carrying out this method
DE1961P0018916 Expired DE1936049U (en) 1960-12-15 1961-10-13 DEVICE FOR PROGRESSING RECEIVING IN THE TRACKING DIRECTION OR MONITORING THE POSITION OF A TRACK, IN PARTICULAR FOR THE ALIGNMENT OF TRACK ARROWS.

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE1961P0018916 Expired DE1936049U (en) 1960-12-15 1961-10-13 DEVICE FOR PROGRESSING RECEIVING IN THE TRACKING DIRECTION OR MONITORING THE POSITION OF A TRACK, IN PARTICULAR FOR THE ALIGNMENT OF TRACK ARROWS.

Country Status (3)

Country Link
AT (1) AT241510B (en)
DE (2) DE1216341B (en)
GB (1) GB1005190A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1284440B (en) * 1963-08-02 1968-12-05 Plasser Bahnbaumasch Franz Device for the continuous alignment of tracks, in particular track arches
DE1285492B (en) * 1963-08-02 1968-12-19 Plasser Bahnbaumasch Franz Device for aligning tracks, in particular track curves, progressing in the direction of the track length

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT336065B (en) * 1975-02-07 1977-04-12 Plasser Bahnbaumasch Franz REFERENCE SYSTEM ARRANGEMENT FOR TRACK CONSTRUCTION MACHINERY
US4176456A (en) * 1977-10-25 1979-12-04 Canron, Inc. Automatic integrating liner
CN103132412B (en) * 2013-02-07 2014-12-03 中铁上海设计院集团有限公司 Track maintenance base point lateral deviation measuring method based on Helen formula
CN118273175B (en) * 2024-05-30 2024-08-16 中国铁建高新装备股份有限公司 Track line direction adjustment operation vehicle, operation method, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE957576C (en) * 1953-07-28 1957-02-07 Eberhard Schubert Dipl Ing Measuring device for a combined track lifting and tamping machine
CH343427A (en) * 1958-06-03 1959-12-31 Matisa Materiel Ind Sa Method and device for causing at least one row of rails to assume a predetermined shape and occupy a predetermined position on the ballast
DE1078151B (en) * 1958-01-31 1960-03-24 Ing Josef Theurer Device for lifting a track section in the direction of the track
US2962979A (en) * 1959-05-21 1960-12-06 William C Mccormick Method of correcting existing track and alignements and means for practicing it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE957576C (en) * 1953-07-28 1957-02-07 Eberhard Schubert Dipl Ing Measuring device for a combined track lifting and tamping machine
DE1078151B (en) * 1958-01-31 1960-03-24 Ing Josef Theurer Device for lifting a track section in the direction of the track
CH343427A (en) * 1958-06-03 1959-12-31 Matisa Materiel Ind Sa Method and device for causing at least one row of rails to assume a predetermined shape and occupy a predetermined position on the ballast
US2962979A (en) * 1959-05-21 1960-12-06 William C Mccormick Method of correcting existing track and alignements and means for practicing it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1284440B (en) * 1963-08-02 1968-12-05 Plasser Bahnbaumasch Franz Device for the continuous alignment of tracks, in particular track arches
DE1285492B (en) * 1963-08-02 1968-12-19 Plasser Bahnbaumasch Franz Device for aligning tracks, in particular track curves, progressing in the direction of the track length

Also Published As

Publication number Publication date
AT241510B (en) 1965-07-26
GB1005190A (en) 1965-09-22
DE1936049U (en) 1966-04-07

Similar Documents

Publication Publication Date Title
EP3743561B1 (en) Method for track position improvement by means of a track-movable track-tamping machine
DE1817894C3 (en) Track tamping machine
AT402308B (en) STAMPING MACHINE
AT390084B (en) SOFT WITH A HEART PIECE WITH A MOVABLE MAIN AND EXTRA TIP
DE3409851A1 (en) DEVICE FOR THE HIGH ALTITUDE AND TILT CORRECTION OF A TRACK
DE2114281C3 (en) Mobile track tamping machine, especially track leveling, straightening and tamping machine
DE1534078A1 (en) Mobile track tamping and leveling machine and method for correcting the position of a track
AT391502B (en) MOBILE TRACK, LIFTING AND LEVELING MACHINE FOR LIFTING AND / OR OR SHIFTING A TRACK IN THE SWITCH AND CROSSING AREA
DE4400807C2 (en) Machine arrangement and method for stuffing a track
DE2602162C2 (en) Reference system arrangement for track construction machines
AT390459B (en) METHOD AND TRACKABLE SWITCH LEVELING, TAMPING AND LEVELING MACHINE ARRANGEMENT FOR PROCESSING IN SWITCH AREAS
DE1216341B (en) Method for aligning tracks progressively in the track direction, in particular track curves, and device for carrying out this method
AT6220U2 (en) TAMPING UNIT TO PUSH A TRACK
DE2001498B2 (en) Device on track processing machines to monitor the correction of the position of a track to be processed
EP0731217A1 (en) Tamping machine, assembly and method for tamping a railway track
DE1271142B (en) Method for aligning tracks progressively in the direction of the track, in particular track curves, and device for carrying out the method
AT3876U2 (en) METHOD AND MACHINE FOR FILLING A TRACK
DE1213878B (en) Device for aligning tracks, in particular track curves
DE1784140C3 (en) Method and device for the lateral alignment of tracks
DE1658336A1 (en) Track straightening machine
DE1274152B (en) Method and device for leveling tracks
DE1784513C3 (en) Mobile device and method for continuously aligning a track sideways
DE1534083B2 (en) MOBILE TRACK POT MACHINE, IN PARTICULAR LEVELING TRACK POT MACHINE
DE1784512C3 (en) Device on mobile machines, in particular track straightening machines, for displaying, recording and / or correcting the position of a track
DE1534083C3 (en) Mobile track tamping machine, especially leveling track tamping machine