[go: up one dir, main page]

DE1281975B - Extraction machine for coal or the like. - Google Patents

Extraction machine for coal or the like.

Info

Publication number
DE1281975B
DE1281975B DEB72565A DEB0072565A DE1281975B DE 1281975 B DE1281975 B DE 1281975B DE B72565 A DEB72565 A DE B72565A DE B0072565 A DEB0072565 A DE B0072565A DE 1281975 B DE1281975 B DE 1281975B
Authority
DE
Germany
Prior art keywords
machine
traction means
pillar
remaining
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEB72565A
Other languages
German (de)
Inventor
Jean Desire Ernest Binaut
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JEAN DESIRE ERNEST BINAUT
Original Assignee
JEAN DESIRE ERNEST BINAUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JEAN DESIRE ERNEST BINAUT filed Critical JEAN DESIRE ERNEST BINAUT
Publication of DE1281975B publication Critical patent/DE1281975B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C27/00Machines which completely free the mineral from the seam
    • E21C27/20Mineral freed by means not involving slitting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Earth Drilling (AREA)

Description

Gewinnungsmaschine für Steinkohle od. dgl. Die Erfindung bezieht sich auf eine unter der Wirkung eines Zugmittels arbeitende Gewinnungsmaschine für Steinkohle od. dgl., insbesondere für die steile Lagerung, die durch seitlich ausladende Gewinnungswerkzeuge in Abständen voneinander angeordnete Bohrlöcher erweitert.Extraction machine for coal or the like. The invention relates on a mining machine for hard coal working under the action of a traction mechanism Od. Like., In particular for the steep storage, caused by laterally projecting extraction tools spaced boreholes expanded.

Für den Abbau von Lagerstätten großer Mächtigkeit ist eine Gewinnungsmaschine bekanntgeworden, die innerhalb vorgebohrter und in entsprechenden Abständen voneinander angeordneter Bohrlöcher geführt wird und diese erweitert, so daß reihenweise nebeneinander oder versetzt zueinander verlaufende zylindrische Hohlräume in geringem Abstand voneinander in der Lagerstätte entstehen, zwischen denen wand- oder säulenartige Pfeiler stehenbleiben, deren Stärke der Standfestigkeit des Gebirges -und dem zu erwartenden Gebirgsdruck entsprechend bemessen wird. In jedes der Bohrlöcher wird ein festes, an seinen Enden in einer oberen und einer unteren Abbaustrecke verankertes Gestänge eingebaut; das der von einer dieser Strecken nach oben oder unten sich drehend bewegenden, das Bohrloch erweiternden Gewinnungsmaschine als Führung dient. Der Abbaubetrieb mit solchen Maschinen ist nicht kontinuierlich und wegen des Ein- und Ausbaues der Führungsgestänge in den Bohrlöchern sehr umständlich und zeitraubend. Außerdem ist er mit einem erheblichen maschinellen Aufwand und wegen der zwischen -:den :.einzelnen Hohlräumen verbleibenden, nicht mehr hereinzugewinnenden Pfeiler mit großen Abbauverlusten verbunden.For the mining of deposits of great thickness is a mining machine became known that within pre-drilled and at appropriate distances from each other arranged boreholes is guided and expanded so that rows next to each other or offset from one another cylindrical cavities at a small distance arise from each other in the deposit, between which wall-like or columnar Pillars remain standing, whose strength of the stability of the mountains - and that too expected rock pressure is measured accordingly. In each of the drill holes a solid one, anchored at its ends in an upper and a lower mining section Built-in linkage; that of one of these stretches up or down rotating extraction machine that widens the borehole serves as a guide. The mining operation with such machines is not continuous and because of the and removal of the guide rods in the boreholes is very cumbersome and time-consuming. In addition, he is with a considerable machine effort and because of the between -: the: .individual cavities remaining pillars that can no longer be extracted associated with large mining losses.

Zum Stand der Technik gehört ferner ein Verfahren zur Gewinnung von Kohle aus steil gelagerten Flözen, bei dem ebenfalls zwischen einer oberen und einer unteren Abbaustrecke in Abständen voneinander mittels einer Großlochbohrmaschine Bohrlöcher vorgetrieben werden, deren Abstände voneinander etwa gleich der doppelten Schrämarmlänge einer doppelseitigen Schrämmaschine gewählt wird, die die Kohle am Hangenden und Liegenden schrämt und deren Maschinenkörper in dem Bohrloch geführt wird. Die schrämende, mannlose Gewinnung der zwischen zwei Bohrlöchern anstehenden Kohle erfolgt schwebend in Bohrlochrichtung, wobei die Schrämmaschine durch ein Zugmittel im Bohrloch zur oberen Strecke hin gezogen und die gelöste Kohle in einer Auffangvorrichtung der unteren Strecke abgeführt wird. Auch hier arbeitet die Schrämmaschine nicht kontinuierlich, sondern ausschließlich von unten nach oben, und sie muß nach Erreichen der oberen Abbaustrecke wieder im Leerlauf nach unten in die untere Strecke gebracht und in dieser unter das nächste Bohrloch bewegt werden. Außerdem arbeitet die Maschine lediglich in einem einzigen Gewinnungsabschnitt; der gegen den Alten Mann nicht durch Pfeiler gesichert ist.The prior art also includes a method for obtaining Coal from steep seams, also between an upper and a lower mining section at a distance from each other using a large hole drilling machine Boreholes are driven, the distances from each other approximately equal to twice Cutting arm length of a double-sided cutting machine is selected, which the coal on Cuts hanging and lying walls and their machine bodies are guided in the borehole will. The cutting, unmanned extraction of the pending between two boreholes Coal is floating in the direction of the borehole, with the cutting machine passing through Pulling means pulled in the borehole towards the upper section and the dissolved coal in a The collecting device of the lower section is discharged. The cutting machine also works here not continuously, but exclusively from the bottom up, and it must follow Reaching the upper mining section again in idle down to the lower section brought and moved in this under the next borehole. Also works the machine only in a single extraction section; the one against the old man Man is not secured by pillars.

Es ist auch versucht worden, in der steilen Lagerung von Großbohrlöchern aus die Kohle mit Hilfe eines an einem Bohrloch angesetzten, hin- und hergezogenen Kohlenhobels oder eines Hobels mit Eigenantrieb und Führungen hereinzugewinnen, wobei zwischen je zwei Bohrlöchern unter der Kohle gearbeitet wird. In diesem Fall ist es sehr schwierig, eine Hobelfront größerer Länge herzustellen. Die Bohrlöcher müssen zudem genau parallel verlaufen, damit die Hobelfront ihre anfängliche Lage beibehält und die stehenbleibenden Pfeiler in ihrer gesamten Länge gleich breit sind und dadurch das Hangende zuverlässig stützen. Diese Pfeiler können nachträglich nicht mehr abgebaut werden.Attempts have also been made in the steep storage of large boreholes from the coal with the help of a back and forth attached to a borehole Bring in a coal plane or a self-propelled plane and guides, working between two drill holes under the coal. In this case it is very difficult to make a planing front of greater length. The drill holes must also run exactly parallel so that the plane front is in its initial position and the remaining pillars are of the same width over their entire length and thus reliably support the hanging wall. These pillars can be retrofitted can no longer be dismantled.

Durch die ebenfalls in vorgetriebenen Bohrlöchern geführte Gewinnungsmaschine nach der Erfindung werden die geschilderten Nachteile bekannter Abbauverfahren und -vorrichtungen dieser Art dadurch vermieden, daß die Maschine zwei auf einem Grundrahmen angeordnete, Bohr- oder Schrämköpfe tragende Getriebe aufweist, die in der horizontalen Ebene schwenkbar sind; in der schräg nach außen geschwenkten Stellung das Bohrloch erweitern und in gerader Stellung den zwischen den Erweiterungsbohrlöchern stehengebliehenenRestpfeiler gewinnen, wobei die Getriebe hinsichtlich der Lage des Schnittes im Flöz gleichzeitig in senkrechter Ebene verstellbar sind. -Durch die Erfindung' wird eine beim Erweitern der Bohrlöcher und beim anschließenden Auskohlen der zwischen diesen zunächst belassenen Pfeiler kontinuierlich arbeitende Maschine geschaffen, durch die infolge der zwischen`-den von ihr erweiterteü-Bohrlöchern hergestellten Pfeilerstreifen das Hangende schonend beeinflußt und damit eine große Sicherheit gewährleistet, gleichzeitig aber auch durch restlose Hereingewinnung. der Pfeilerstreifen jegliche Abbauverluste vermieden werden.Through the extraction machine, which is also guided in driven boreholes According to the invention, the disadvantages of known degradation processes and -devices of this type avoided by having the machine two on a base frame arranged, drilling or cutting heads bearing gear, which in the horizontal Level are pivotable; the borehole in the obliquely outwardly pivoted position expand and in a straight position between the expansion holes win the remaining pillars, with the gearbox in terms of location of the cut in the seam are adjustable in the vertical plane at the same time. -By the invention 'becomes one in widening the boreholes and in the subsequent carburizing the machine working continuously between these pillars created by the as a result of the inter`-the widened by her-drill holes produced pier strips gently affects the hanging wall and thus a large Security guaranteed, but at the same time also by winning completely in. of the pier strips any degradation losses can be avoided.

Die Umstellung- der erfindungsgemäßen Maschine von ihrer Erweiterungsfahrt auf ihre Fahrt in Gegenrichtung zum Hereingewinnen eines Restpfeilers wird dadurch vereinfacht und beschleunigt, daß die Maschine bei der Erweiterungsfahrt an einem Zugmittel und bei der Gewinnung eines Restpfeilers- an zwei Zugmitteln angeschlagen wird, wobei das Umwenden der Maschine von der Erweiterungsfahrt zur Gewinnungsfahrt durch Umhängen des vom Restpfeiler entfernter liegenden Zugmittels der beiden Zugmittel gegen ein jenseits des Restpfeilers befindliches Zugmittel erfolgt.The conversion of the machine according to the invention from its expansion trip on their journey in the opposite direction to winning in a remaining pillar is thereby Simplifies and accelerates that the machine on the extension run on one Traction means and when a remaining pillar is being obtained, attached to two traction means is turning the machine over from the expansion drive to the extraction drive by relocating the traction mechanism of the two traction mechanism that is further away from the rest of the pillar takes place against a traction device located on the other side of the remaining pillar.

Die Zeichnung veranschaulicht schematisch die Ausbildung und Arbeitsweise der erfindungsgemäßen Maschine. Es zeigt F i g. 1 die Arbeitsweise der Masdhine in der zeitlichen Aufeinanderfolge" der verschiedenen Arbeitsstufen, F i g. 2 die erfindungsgemäße Maschine beim Erweitern der Bohrung während ihrer Abwärtsfahrt, F i g. 3 die gleiche Maschine beim Hereingewinnen eines Pfeilers während der Aufwärtsfahrt, F i g. 4 Einzelheiten. der Maschine, wobei deren linke Hälfte in der Gewinnungsstellung und deren rechte Hälfte in der Stellung beim Erweitern des Bohrloches dargestellt ist, F i g. 5 einen Schnitt nach der Linie a-a in F i-g. 4; F i g: 6 einen Schnitt nach der Linie b-b in F i g. 4, F i g. 7 eine Stirnansicht der Maschine beim Erweiterungsbohren, F i g. 8 eine Stirnansicht der -Maschine beim Hereingewinnen eines Kohlenrestpfeilers, -F i g. 9 den im Abbau begriffenen Streb beim Erweitern der Bohrlöcher:- und F i g.10 den gleichen Streb beim Hereingewinnen eines Kohlenrestpfeilets: Aus F i g. 1, in der -mehrere parallele Bohrlöcher im Abstand d- voneinander dargestellt sind, ist ersichtlich, daß die Maschine, wie sie in F i g. 2 schematisch angedeutet ist;" von einem Haspel gezogen, das ursprüngliche Bohrloch zu einer Kammer 1 erweitert.. Wenn diese -Kammer die Kopfstrecke erreicht hat, wird mitdergleichen Maschine, die nunmehr im nächsten Bohrloch nach unten gezogen wird, die Kammer 2 duräh#.Erweitern dieses Bohrloches hergestellt. .-Zwischen den Kaitimern 1 und 2 verbleibt zunächst ein Pfeiler, der_. bei einer von der Grundstrecke ausgehenden Aufwärtsfahrt der gleichen Maschine, die hierzu in die Einstellung nach F i g. 3 gebracht wird, hereingewonnen wird.The drawing schematically illustrates the training and operation the machine according to the invention. It shows F i g. 1 the working method of the Masdhine in the chronological sequence "of the various work stages, FIG. 2 the machine according to the invention when widening the bore during its downward travel, F i g. 3 the same machine when winning in a pillar while going up, F i g. 4 details. of the machine, with its left half in the extraction position and its right half shown in the position when expanding the borehole is, F i g. 5 shows a section along the line a-a in F i-g. 4; Fig. 6 shows a section according to the line b-b in FIG. 4, fig. 7 is an end view of the machine during expansion drilling; F i g. 8 is an end view of the machine when a coal remnant pillar is being extracted; -F i g. 9 the longwall being mined when widening the boreholes: - and F i g.10 the same longwall when gaining in a coal residue arrow: From F i g. 1, in which several parallel drill holes are shown at a distance d from one another, it can be seen that the machine as shown in FIG. 2 is indicated schematically; " pulled by a reel, the original borehole expanded to a chamber 1 .. When this chamber has reached the head section, the same machine that is now pulled down in the next borehole, the chamber 2 duräh # .Expand made this borehole. .-Between the kayimers 1 and 2 there is initially a pillar that_. in the case of an upward journey starting from the basic route of the same machine, which for this purpose is in the setting according to FIG. 3 is brought in will.

Nachdem die Maschine in der Kopfstrecke angekommen ist, wird sie zur Herstellung der Kammer 4 eingesetzt. Danach --wird die Maschine "erneut gewendet, um den Pfeiler 5 hereinzugewinnen. Die weitere Reihenfolge der Arbeitsgänge ist: Kammer 6, Pfeiler 7, Kammer 8, Pfeiler 9 usw.After the machine arrives in the head section, it becomes the Manufacture of the chamber 4 used. Then - the machine is "turned over again, to win the pillar 5 in. The further sequence of operations is: Chamber 6, Pillar 7, Chamber 8, Pillar 9, etc.

.Der, Abstand. d zwischen zwei benachbarten Bohrlöchern entspricht der Erweiterungsbreite der _ Kammein zuzüglich der Pfeilerbreite, d. h. also, daß dieser Abstand der Summe aus Erweiterungsbreite und Gewinnungsbreite der Maschine entspricht und daß somit die Bauart der Maschine den Abstand d bestimmt..The distance. d corresponds to between two adjacent boreholes the widening width of the ridge plus the pillar width, d. H. so that this distance of the sum of the expansion width and the extraction width of the machine corresponds and that thus the type of machine determines the distance d.

Die in F i g. 4 bis 6 schematisch dargestellte Maschine besteht aus einem auf Kufen 11 gleitenden Grundrahmen 10, auf dem zwei. je in Gelenken 13 schwenkbare Reduziergetriebe 12 angeordnet sind, die in ihrer schrägen Stellung zum Erweitern des Bohrloches mit Hilfe von Schraubenbolzen 14 gehalten werden. Der Abstand zwischen den Gelenken 13 entspricht im wesentlichen der Breite jedes der Getriebe 12.The in F i g. 4 to 6 schematically shown machine consists of a base frame 10 sliding on runners 11 on which two. each pivotable in joints 13 Reduction gear 12 are arranged in their inclined position to expand of the borehole can be held with the aid of screw bolts 14. The distance between the joints 13 essentially correspond to the width of each of the gears 12.

Die Getriebe arbeiten auf pickenbesetzten Schrämkronen oder -rädern 15, die sich innerhalb jeder der Einzelgruppen - gegensinnig drehen,- um auf diese Weise die .erforderliche Richtungsstabilität in den Baugruppen 12 zu erzielen.The gears work on cutter heads or wheels fitted with picks 15, which turn within each of the individual groups - in opposite directions, - to this Way to achieve the required directional stability in the assemblies 12.

Unmittelbar hinter den Kronen sind senkrecht zum Liegenden angeordnete Druckzylinder 16 vorgesehen, die rin Schrämschnitt der Kronen bzw. Räder wirken und dazu dienen, den Schrämschnitt zwischen Hängendem und Liegendem höher oder tiefer- einzustellen. Die Zylinder 16 üben hierbei ihre Reaktionskraft auf die Getriebe aus, an denen sie angeordnet sind. -Beim Erweiterungsschrämen bzw. -bohren ist an dem Grundrahmen 10 eine-Führung 17 mit Kufen 18 angeordnet; die sich sowohl auf dem Liegenden als auch an den Seitenwänden des vorgebohrten Loches führt. Die Führung ist mittels eines Bolzens 19 und einer Schraube 20 an dem Grundrahmen 10 befestigt. Durch die Führung -wird eine auf beiden Seiten gleichmäßige Erweiterung des Bohrloches erzielt. An der Führung ist auch das Zugseil 21 angeschlagen. An der gegenüberliegenden. Seite: des -Grundrahmens sind die Seile 22 für die Aufwärtsfahrt befestigt.Immediately behind the crowns are provided pressure cylinders 16 arranged perpendicular to the horizontal plane, which act in an inclined section of the crowns or wheels and serve to set the inclined cut between the hanging and the horizontal plane higher or lower. The cylinders 16 exert their reaction force on the gears on which they are arranged. During extension cutting or drilling, a guide 17 with runners 18 is arranged on the base frame 10; which leads both on the lying surface and on the side walls of the pre-drilled hole. The guide is fastened to the base frame 10 by means of a bolt 19 and a screw 20. Due to the guidance, an even widening of the borehole is achieved on both sides. The pull rope 21 is also attached to the guide. On the opposite. On the side of the base frame, the ropes 22 are attached for the upward journey.

Zum Hereingewinnen des Kohlenrestpfeilers werden am Rahmen 10 Führungsarme 23 mittels Schrauben 24 befestigt, an denen die Zugseile 25 angreifen.In order to win the remaining coal pillar in, guide arms 23 are fastened to the frame 10 by means of screws 24 , on which the traction cables 25 engage.

Die -Abbauarbeit wird mit- Hilfe zweier Haspel durchgeführt, von denen der eine Haspel 26, der die Maschine beim Erweitern des Bohrloches nach unten zieht, mit einem Seil 27 ausgerüstet: ist (vgl. F i g.9). Der zweite Haspel 28; der ebenfalls zum Zurückziehen der Maschine bei der Erweiterungsarbeit::dienen kann, zieht an einem Seil 29, das mit zwei weiteren Seilen 30 verbunden ist. Am Ende der Erweiterungsfahrt wird das auf der vom stehengebliebenen Pfeiler abgewendeten Seite verlaufende Seil 31 von der Maschine gelöst. Beim Hereingewinnen des Pfeilers wird die Maschine mit Hilfedes Seiles: 30, dessen Befestigungspunkt an der Maschine verändert worden ist, sowie des Seiles 32: gezogen. Letzteres wird an der Stelle befestigt, an der vorher das; .Seil 31 angeschlagen war. Hierdurch. dreht- sich die Maschine mit ihren Werkzeugen 15 nach oben.The mining work is carried out with the aid of two reels, of which one reel 26, which pulls the machine downwards when the borehole is widened, is equipped with a rope 27 (see FIG. 9). The second reel 28 ; which can also be used to retract the machine during expansion work: pulls on a rope 29, which is connected to two other ropes 30. At the end of the extension run, the rope 31 running on the side facing away from the pillar that has stopped is released from the machine. When the pillar is being won in, the machine is pulled with the help of the rope: 30, the attachment point of which on the machine has been changed, and the rope 32 : . The latter is attached to the place where previously the; . Rope 31 was attached. Through this. the machine rotates with its tools 15 upwards.

Führungsrollen 33 dienen zur Umlenkung der Seile an den Stellen, an denen dies erforderlich ist.Guide rollers 33 are used to deflect the ropes at the points where this is necessary.

Die Haspel 26 und 28 können auch in der Maschine eingebaut sein.. In diesem Fall werden zwei Haspel 28 eingebaut, und die Zugseile werden unmittelbar an Festpunkten in der Kopf- und der Grundstrecke befestigt.The reels 26 and 28 can also be built into the machine. In this case there will be two Reel 28 installed, and the pull cables are attached directly to fixed points in the top and bottom sections.

Claims (2)

Patentansprüche: 1. Unter der Wirkung eines Zugmittels arbeitende Gewinnungsmaschine für Steinkohle od. dgl., insbesondere für die steile Lagerung,. die durch seitlich ausladende Gewinnungswerkzeuge in Abständen voneinander eingebrachte Bohrlöcher erweitert, gekennzeichnet durch zwei auf einem Grundrahmen (10) angeordnete, Bohr- oder Schrämköpfe (15) tragende Getriebe (12), die in der horizontalen Ebene schwenkbar sind, in der schräg nach außen geschwenkten Stellung das Bohrloch erweitern und in gerader Stellung den zwischen den Erweiterungslöchern stehengebliebenen Restpfeiler gewinnen, wobei die Getriebe (12) hinsichtlich der Lage des Schnittes im Flöz gleichzeitig in senkrechter Ebene verstellbar sind. Claims: 1. Working under the action of a traction device Extraction machine for coal or the like, especially for steep storage. which were brought in at a distance from one another by means of laterally projecting extraction tools Expanded boreholes, characterized by two arranged on a base frame (10), Drilling or cutting heads (15) carrying gear (12) in the horizontal plane are pivotable, expand the borehole in the obliquely outwardly pivoted position and in an upright position the remaining pillars that have remained between the expansion holes win, the gear (12) with regard to the position of the cut in the seam at the same time are adjustable in a vertical plane. 2. Maschine nach Anspruch 1, dadurch gekennzeichnet, daß sie bei der Erweiterungsfahrt an ein Zugmittel (27) und bei der Gewinnung des Restpfeilers an zwei Zugmittel (30,31) angeschlagen ist, wobei das Umwenden der Maschine beim übergang von der Erweiterungsfahrt zur Gewinnung des Restpfeilers durch Umhängen des vom Restpfeiler entfernter liegenden Zugmittels (31) der beiden Zugmittel (30,31) gegen ein jenseits des Restpfeilers befindliches Zugmittel (32) erfolgt. In Betracht gezogene Druckschriften: Deutsche Patentschrift Nr. 594 473; deutsche Auslegeschriften Nr. 1008 679, 1125 862; F r i t z s c h e, »Lehrbuch der Bergbaukunde«, Bd. 1I, 1958, S. 273, Abb. 230, und S. 289, Abb. 256.2. Machine according to claim 1, characterized in that it is attached to a traction means (27) during the expansion trip and to two traction means (30,31) when extracting the remaining pillar, the turning of the machine during the transition from the expansion trip to extraction of the remaining pillar is carried out by hanging the traction means (31) of the two traction means (30, 31) further away from the remaining pillar against a traction means (32) located on the other side of the remaining pillar. Documents considered: German Patent No. 594 473; German Auslegeschriften Nos. 1008 679, 1125 862; F ritzsche, "Textbook of Mining Studies", Vol. 1I, 1958, p. 273, fig. 230, and p. 289, fig. 256.
DEB72565A 1962-11-07 1963-07-05 Extraction machine for coal or the like. Pending DE1281975B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1281975X 1962-11-07

Publications (1)

Publication Number Publication Date
DE1281975B true DE1281975B (en) 1968-11-07

Family

ID=9678626

Family Applications (1)

Application Number Title Priority Date Filing Date
DEB72565A Pending DE1281975B (en) 1962-11-07 1963-07-05 Extraction machine for coal or the like.

Country Status (1)

Country Link
DE (1) DE1281975B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE594473C (en) * 1932-04-30 1934-03-21 Braunkohlen Und Brikett Ind Ak Process for the dismantling of large deposits
DE1008679B (en) * 1953-07-08 1957-05-23 Demag Ag Process for the extraction of coal u. Like. From Floezen with a steep dip
DE1125862B (en) * 1954-07-30 1962-03-22 Beien Maschfab Process for mining coal or other minerals in dismantling

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE594473C (en) * 1932-04-30 1934-03-21 Braunkohlen Und Brikett Ind Ak Process for the dismantling of large deposits
DE1008679B (en) * 1953-07-08 1957-05-23 Demag Ag Process for the extraction of coal u. Like. From Floezen with a steep dip
DE1125862B (en) * 1954-07-30 1962-03-22 Beien Maschfab Process for mining coal or other minerals in dismantling

Similar Documents

Publication Publication Date Title
DE278881C (en)
DE2307413C2 (en) Device for the extraction of a floz-like deposit in longwall mining
DE970540C (en) Framework for progressive expansion in brown coal longwall mining
DE3141763C2 (en) Partial cut cutting machine
DE611738C (en) Device for dismantling floezen in civil engineering with a broad view
DE1284384B (en) Coal extraction plant with a frame arranged in the direction of the face
CH644933A5 (en) SCREWING UNIT ARRANGEMENT FOR A DRIVING MACHINE FOR ROUTES IN MINING AND FOR TUNNELS AND DRIVING MACHINE.
EP2395153B1 (en) Device and method for manufacturing wall panels in the floor
DE3729561C2 (en)
DE1002715B (en) Extraction machine movable along the coal face with a group of drill bits arranged on the face
DE1281975B (en) Extraction machine for coal or the like.
DE727683C (en) Device for extracting and conveying hard coal
DE19750484B4 (en) Extraction device, in particular for the coal production in unterertätigen extraction struts
DE2322259B1 (en) LINE EXPANSION FRAME FOR LINE FEEDING MACHINES
DE3102179C2 (en) Extraction machine
DE2004828C3 (en) Driving shield for tunnel construction
DE969742C (en) Peeling extraction device for coal and other minerals, preferably moved by a traction device in the face direction
DE2341002C3 (en) Mining extraction machine
DE2161291A1 (en) Movable ceiling support, especially for mining
DE3232906C2 (en)
DE812063C (en) Schraemmaschine
DE2920419C2 (en) Device for opening the machine shed
DE977137C (en) Guide and conveyor device for peeling extraction devices
DE977589C (en) Method for coal extraction by means of several extraction devices moved along the mining face by a traction device
DE440653C (en) Process for coal extraction by means of a chain of sprockets that can be moved in front of and back against the impact, extending over the entire length of the impact, rotating in one direction of rotation, in which the drive machine is to the side of the impact