DE102022115300B4 - Pressure switch device, water extinguishing system and method for starting a pump test run - Google Patents
Pressure switch device, water extinguishing system and method for starting a pump test run Download PDFInfo
- Publication number
- DE102022115300B4 DE102022115300B4 DE102022115300.2A DE102022115300A DE102022115300B4 DE 102022115300 B4 DE102022115300 B4 DE 102022115300B4 DE 102022115300 A DE102022115300 A DE 102022115300A DE 102022115300 B4 DE102022115300 B4 DE 102022115300B4
- Authority
- DE
- Germany
- Prior art keywords
- pressure
- switching signal
- switching
- provision
- designed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C37/00—Control of fire-fighting equipment
- A62C37/50—Testing or indicating devices for determining the state of readiness of the equipment
Landscapes
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
Druckschaltvorrichtung (3) umfassendzwei hydraulisch miteinander gekoppelte Druckerfassungseinrichtungen (DS1, DS2),wobei die Druckschaltvorrichtung (3) oder die Druckerfassungseinrichtungen (DS1, DS2) ausgebildet und eingerichtet sind zum Anschluss an eine Zuleitung (18),wobei ferner die erste Druckerfassungseinrichtung (DS1) ausgebildet ist, bei einem vorbestimmten ersten Schwellenwert (p1) ein erstes Schaltsignal (S1) bereitzustellen unddie zweite Druckerfassungseinrichtung (DS2) ausgebildet ist, bei einem vorbestimmten zweiten Schwellenwert (p2) ein zweites Schaltsignal (S2) bereitzustellen,dadurch gekennzeichnet, dassdie Druckschaltvorrichtung (3) eine Unterbrechungseinheit (6) aufweist, wobei die Unterbrechungseinheit (6) ausgebildet und eingerichtet ist, die Bereitstellung des ersten Schaltsignals (S1) und/oder des zweiten Schaltsignals (S2) steuervariabel zumindest temporär zu unterdrücken.Pressure switching device (3) comprising two pressure detection devices (DS1, DS2) hydraulically coupled to one another, wherein the pressure switching device (3) or the pressure detection devices (DS1, DS2) are designed and configured for connection to a supply line (18), wherein the first pressure detection device (DS1) is further designed to provide a first switching signal (S1) at a predetermined first threshold value (p1) and the second pressure detection device (DS2) is designed to provide a second switching signal (S2) at a predetermined second threshold value (p2), characterized in that the pressure switching device (3) has an interruption unit (6), wherein the interruption unit (6) is designed and configured to suppress the provision of the first switching signal (S1) and/or the second switching signal (S2) in a controllable manner at least temporarily.
Description
Die Erfindung betrifft eine Druckschaltvorrichtung, eine Wasserlöschanlage sowie ein Verfahren zum Start eines Pumpentestlaufes.The invention relates to a pressure switching device, a water extinguishing system and a method for starting a pump test run.
Die vorliegende Erfindung betrifft eine Druckschaltvorrichtung umfassend, mindestens zwei hydraulisch miteinander gekoppelte eingerichtete Druckerfassungseinrichtungen, wobei die Druckschaltvorrichtung oder die Druckerfassungseinrichtungen ausgebildet und eingerichtet sind zum Anschluss an eine Zuleitung, wobei ferner die erste Druckerfassungseinrichtung ausgebildet ist, bei einem vorbestimmten ersten Schwellenwert ein erstes Schaltsignal bereitzustellen und die zweite Druckerfassungseinrichtung ausgebildet ist, bei einem vorbestimmten zweiten Schwellenwert ein zweites Schaltsignal bereitzustellen.The present invention relates to a pressure switching device comprising at least two pressure detection devices hydraulically coupled to one another, wherein the pressure switching device or the pressure detection devices are designed and configured for connection to a supply line, wherein the first pressure detection device is further designed to provide a first switching signal at a predetermined first threshold value and the second pressure detection device is designed to provide a second switching signal at a predetermined second threshold value.
Derartige Druckschaltvorrichtungen werden beispielsweise in Wasserlöschanlagen, insbesondere in Sprinkleranlagen, verwendet und mit der Druckschaltvorrichtung wird vorzugsweise eine Pumpe gestartet, welche ein Löschfluid zu den Düsen oder Sprinklern fördert. In der Praxis umfassen die Druckschaltvorrichtungen Druckerfassungseinrichtungen, die als Druckschalter ausgebildet sind. Solche Druckschalter erzeugen bei Druckabfall oder Druckanstieg, bei einem vordefinierten bzw. vorbestimmten Schwellenwert, ein Schaltsignal. Dieses Schaltsignal kann beispielsweise zur Initiierung weitere Vorgänge, beispielsweise zum genannten Start einer Pumpe oder mehrerer Pumpen verwendet werden. Auch kann das Schaltsignal als Meldesignal für einen Druckabfall oder Druckanstieg einer zentralen Steuereinheit zur Weiterverarbeitung zugeführt werden.Such pressure switching devices are used, for example, in water extinguishing systems, in particular in sprinkler systems, and the pressure switching device is preferably used to start a pump which conveys an extinguishing fluid to the nozzles or sprinklers. In practice, the pressure switching devices comprise pressure detection devices which are designed as pressure switches. Such pressure switches generate a switching signal when the pressure drops or increases at a predefined or predetermined threshold value. This switching signal can be used, for example, to initiate further processes, for example to start a pump or several pumps. The switching signal can also be fed to a central control unit for further processing as a signal for a pressure drop or increase.
In Wasserlöschanlagen, insbesondere Sprinkleranlagen, öffnet sich im Brandfall eine Düse oder ein Sprinkler, so dass ein Löschfluid, vorzugsweise Wasser oder Wasser mit Zusätzen, zur Bekämpfung des Brandes ausgebracht werden kann. Durch das Öffnen eines Sprinklers oder einer Düse entsteht im löschfluidführenden Rohrsystem ein Druckabfall. Druckschaltvorrichtungen, insbesondere für Sprinklerpumpen, unterliegen unter anderem nationalen Normen und Richtlinien, beispielsweise der VdS CEA 4001 2000-04 : 2021-01 (07). Insbesondere sieht die Richtlinie vor, dass zum Starten jeder Pumpe zwei elektrisch in Serie geschaltete Druckschalter vorgesehen werden müssen. Maßgeblich sind hier auch die Normen EN 12845:2020-11 und EN 12845:2015+A1:2019.In water extinguishing systems, especially sprinkler systems, a nozzle or sprinkler opens in the event of a fire so that an extinguishing fluid, preferably water or water with additives, can be applied to fight the fire. Opening a sprinkler or nozzle causes a pressure drop in the pipe system carrying the extinguishing fluid. Pressure switching devices, especially for sprinkler pumps, are subject to national standards and guidelines, such as VdS CEA 4001 2000-04 : 2021-01 (07). In particular, the guideline stipulates that two pressure switches connected electrically in series must be provided to start each pump. The standards EN 12845:2020-11 and EN 12845:2015+A1:2019 are also relevant here.
Zur Erhaltung der Betriebsbereitschaft solcher Löschanlagen sind regelmäßige Kontrollen und Wartungen erforderlich. So schreibt die Richtlinie VdS 2212 z.B. wöchentliche Kontrollen durch den Anlagenbetreiber an der Wasserlöschanlage vor. Da der zuverlässige Start der Pumpe zum Fördern des Löschfluids essentiell für das Funktionieren der Löschanlage ist, umfassen die wöchentlichen Tests auch eine Kontrolle des Pumpenstarts der Pumpe. Hierfür muss ein Pumpentestlauf durchgeführt werden, welcher die Funktionsfähigkeit der gesamten Kette der Komponenten in ihrer Wechselwirkung, von der Erzeugung eines Druckabfalls, der korrekten Funktionsfähigkeit der Druckschaltvorrichtung bis zum Start der Pumpe bzw. der Pumpen, einschließt.Regular checks and maintenance are required to maintain the operational readiness of such extinguishing systems. For example, the VdS 2212 guideline prescribes weekly checks by the system operator on the water extinguishing system. Since the reliable start of the pump for pumping the extinguishing fluid is essential for the functioning of the extinguishing system, the weekly tests also include a check of the pump start. For this, a pump test run must be carried out, which includes the functionality of the entire chain of components in their interaction, from the generation of a pressure drop, the correct functionality of the pressure switch device to the start of the pump or pumps.
In der Praxis ist zu diesem Zweck in solchen Wasserlöschanlagen eine Druckschaltvorrichtung vorgesehen, welche zwei in Serie geschaltete Druckschalter als Druckerfassungseinrichtungen aufweist. Beide Druckschalter müssen in einem solchen Pumpentestlauf auf Funktionsfähigkeit getestet werden. Geprüft werden muss die Bereitstellung des Schaltsignals bei dem vorbestimmten Schwellenwert des Drucks für beide Druckschalter und das Starten der Pumpe durch Schaltsignal-Initiierung.In practice, a pressure switching device is provided for this purpose in such water extinguishing systems, which has two pressure switches connected in series as pressure detection devices. Both pressure switches must be tested for functionality in such a pump test run. The provision of the switching signal at the predetermined pressure threshold value for both pressure switches and the starting of the pump by switching signal initiation must be tested.
Eine solche aus dem Stand der Technik bekannte Druckschaltvorrichtung kann als Bestandteil einer Pumpentesteinrichtung betrachtet werden, welche die genannte zentrale Steuereinheit , insbesondere einen Pumpenschaltschrank, einen Sprinklerpumpenschaltschrank oder eine Kombination aus Brandmeldezentrale und Pumpenschaltschrank umfasst. Die Pumpentesteinrichtung ist eingerichtet, die Pumpe bei Erzeugung eines vordefinierten Druckabfalls zu starten.Such a pressure switching device known from the prior art can be considered as a component of a pump test device which comprises the central control unit mentioned, in particular a pump control cabinet, a sprinkler pump control cabinet or a combination of fire alarm control panel and pump control cabinet. The pump test device is designed to start the pump when a predefined pressure drop is generated.
Die Druckschalter der Druckschaltvorrichtung sind hierbei mit einer Zuleitung zu einer Hauptleitung versehen, welche das Löschfluid vom Pumpenausgang zum Rohrsystem mit den Düsen oder Sprinklern führt. Die Zuleitung stellt eine fluidleitende Verbindung von der Hauptleitung zu den beiden in Serie geschalteten Druckschaltern her. Sie teilt sich auf in eine erste Zuleitung zu einem ersten Druckschalter und in eine zweite Zuleitung zu einem zweiten Druckschalter. Die Zuleitung weist im Stand der Technik Absperrventile, vorzugsweise in Form eines ersten Absperrventil und eines zweiten Absperrventils auf, sowie Ventile zum Ablassen von Löschfluid zur Erzeugung des notwendigen Druckabfalls zum Start der Sprinklerpumpe sowie Manometer.The pressure switches of the pressure switching device are provided with a supply line to a main line, which leads the extinguishing fluid from the pump outlet to the pipe system with the nozzles or sprinklers. The supply line establishes a fluid-conducting connection from the main line to the two pressure switches connected in series. It is divided into a first supply line to a first pressure switch and a second supply line to a second pressure switch. In the prior art, the supply line has shut-off valves, preferably in the form of a first shut-off valve and a second shut-off valve, as well as valves for draining extinguishing fluid to generate the necessary pressure drop to start the sprinkler pump, and pressure gauges.
Gemäß dem Stand der Technik wird der wöchentliche Testlauf der Pumpe durch eine geschulte Person manuell ausgeführt.According to the state of the art, the weekly test run of the pump is carried out manually by a trained person.
Hierzu wird manuell ein erstes Absperrventil in der ersten Zuleitung betätigt, damit die fluidleitende Verbindung von der Hauptleitung zu dem ersten Druckschalter unterbrochen wird, damit bei Erzeugung eines Druckabfalls für den Testlauf, der erste Druckschalter diesen Druckabfall nicht erfasst und somit kein Schaltsignal erzeugen kann. Auf diese Weise wird ausschließlich die Funktion des zweiten Druckschalters und der nachfolgenden Komponenten getestet wird. Danach wird das Ventil in der zweiten Zuleitung zur Erzeugung eines Druckabfalls manuell geöffnet. Der zweite Druckschalter erzeugt nun bei dem erzeugten Druckabfall, bei einem bestimmten Schaltdruck-Messwert, welcher vom Wartungspersonal am Manometer abgelesen wird, ein Schaltsignal, welches über eine signalleitende Verbindung an die zentrale Steuereinheit zum Starten der Pumpe gesendet wird. Die Pumpe wird gestartet und in der Praxis wird der Testlauf beendet, wenn die normalen Betriebskennwerte der Pumpe erreicht sind.For this purpose, a first shut-off valve in the first supply line is manually operated so that the fluid connection from the main line to the first pressure switch is interrupted so that when a pressure drop is generated for the test run, the The first pressure switch does not detect this pressure drop and therefore cannot generate a switching signal. In this way, only the function of the second pressure switch and the subsequent components is tested. The valve in the second supply line is then opened manually to generate a pressure drop. The second pressure switch now generates a switching signal when the pressure drop is generated, at a certain switching pressure reading, which is read by the maintenance staff on the pressure gauge. This signal is sent via a signal-conducting connection to the central control unit to start the pump. The pump is started and in practice the test run is ended when the pump's normal operating parameters are reached.
Anschließend erfolgt der Testlauf mit dem Start der Pumpe über den ersten Druckschalter. Hierzu wird manuell ein zweites Absperrventil in der zweiten Zuleitung betätigt, damit die fluidleitende Verbindung von der Hauptleitung zu dem zweiten Druckschalter unterbrochen wird, damit bei Erzeugung eines Druckabfalls für den Testlauf, der zweite Druckschalter diesen Druckabfall nicht erfasst und kein Schaltsignal erzeugen kann. Danach wird das Ventil in der ersten Zuleitung zur Erzeugung eines Druckabfalls manuell geöffnet. Der erste Druckschalter erzeugt nun bei dem erzeugten Druckabfall, bei einem bestimmten Schaltdruck-Messwert, welcher vom Wartungspersonal am Manometer abgelesen wird, ein Schaltsignal, welches über eine signalleitende Verbindung an die zentrale Steuereinheit zum Starten der Pumpe gesendet wird. Die so erfassten Schaltdruck-Messwerte der beiden Druckschalter, werden dann vom Wartungspersonal mit den vorgegebenen Schwellenwerten der Druckschalter verglichen, um festzustellen, ob die erfassten Schaltdruck-Messwerte den vordefinierten Schwellenwerten innerhalb der erlaubten bzw. vorgegeben Toleranz entsprechen. The test run then takes place by starting the pump via the first pressure switch. To do this, a second shut-off valve in the second supply line is manually operated so that the fluid connection from the main line to the second pressure switch is interrupted so that if a pressure drop is generated for the test run, the second pressure switch does not detect this pressure drop and cannot generate a switching signal. The valve in the first supply line is then manually opened to generate a pressure drop. When the pressure drop is generated, at a specific switching pressure measurement value, which is read by the maintenance personnel on the pressure gauge, the first pressure switch generates a switching signal which is sent via a signal-conducting connection to the central control unit to start the pump. The switching pressure measurements of the two pressure switches recorded in this way are then compared by the maintenance personnel with the specified threshold values of the pressure switches to determine whether the switching pressure measurements recorded correspond to the predefined threshold values within the permitted or specified tolerance.
Aus dem Dokument
Nachteilig an den Lösungen gemäß dem Stand der Technik sind einerseits die hohe Anzahl von Komponenten zur Durchführung des Pumpentestlaufes, insbesondere zum Testen der Funktionsfähigkeit der Druckschaltvorrichtung. Andererseits sind zwei Absperrventile notwendig, um die Erzeugung des Schaltsignals des jeweils nicht zu testenden Druckschalters zu unterdrücken. Dies erfordert die Ausführung vieler zeitaufwendiger Schritte zum Durchführen des Pumpentestlaufes.The disadvantages of the solutions according to the state of the art are, on the one hand, the large number of components required to carry out the pump test run, in particular to test the functionality of the pressure switching device. On the other hand, two shut-off valves are required to suppress the generation of the switching signal of the pressure switch that is not to be tested. This requires the execution of many time-consuming steps to carry out the pump test run.
Der Erfindung liegt die Aufgabe zugrunde eine Druckschaltvorrichtung möglichst einfachen apparativen Aufwands zu schaffen. Die Aufgabe besteht auch darin, eine solche Druckschaltvorrichtung bereitzustellen, mit der ein Pumpentestlauf bzw. eine zuverlässige Überprüfung der Funktionstüchtigkeit einer solchen Druckschaltvorrichtung einfach und komfortabel durchführbar ist.The invention is based on the object of creating a pressure switching device with the simplest possible equipment outlay. The object is also to provide such a pressure switching device with which a pump test run or a reliable check of the functionality of such a pressure switching device can be carried out easily and conveniently.
Des Weiteren besteht die Aufgabe darin ein Verfahren zum Start einer Pumpe, insbesondere zum Start eines Pumpentestlaufes, zu schaffen, das bei hoher Zuverlässigkeit einfach und komfortabel durchführbar ist und zugleich einen möglichst geringen apparativen Aufwand erfordert.Furthermore, the task is to create a method for starting a pump, in particular for starting a pump test run, which can be carried out simply and conveniently with a high level of reliability and at the same time requires as little equipment as possible.
Es ist auch Aufgabe der vorliegenden Erfindung eine Wasserlöschanlage zu schaffen, mit der ein Pumpentestlauf bzw. eine zuverlässige Überprüfung der Funktionstüchtigkeit einer solchen Druckschaltvorrichtung einfach und komfortabel durchführbar ist.It is also an object of the present invention to provide a water extinguishing system with which a pump test run or a reliable check of the functionality of such a pressure switching device can be carried out easily and conveniently.
Die Aufgabe wird durch eine Druckschaltvorrichtung der eingangs genannten Art dadurch gelöst, dass die Druckschaltvorrichtung eine Unterbrechungseinheit aufweist, wobei die Unterbrechungseinheit ausgebildet und eingerichtet ist, die Bereitstellung des ersten Schaltsignals und/oder des zweiten Schaltsignals steuervariabel zumindest temporär zu unterdrücken. Vorteilhafter Weise ist es so möglich, jede der Druckerfassungseinrichtung separat auf ihre korrekte Funktionstüchtigkeit zu überprüfen. Der Apparative Aufwand ist gegenüber den aus dem Stand der Technik bekannten Lösung erheblich reduziert, das keine weiteren hydraulischen Komponenten benötigt werden, um die jeweils andere Druckerfassungseinrichtung hydraulisch zu entkoppeln. So kann die Prüfung der Funktionstüchtigkeit auf komfortable und besonders einfache Weise schnell und effizient durchgeführt werden.The object is achieved by a pressure switching device of the type mentioned at the outset in that the pressure switching device has an interruption unit, wherein the interruption unit is designed and configured to suppress the provision of the first switching signal and/or the second switching signal in a controllable manner, at least temporarily. Advantageously, it is thus possible to check each of the pressure detection devices separately for its correct functionality. The equipment required is significantly reduced compared to the solution known from the prior art, as no further hydraulic components are required to hydraulically decouple the other pressure detection device. The functionality check can thus be carried out quickly and efficiently in a convenient and particularly simple manner.
Die Bereitstellung des ersten Schaltsignals und/oder der zweiten Schaltsignals mittels der Unterbrechungseinheit wird also unterdrückt, vorzugsweise wechselseitig. Anders ausgedrückt ist die Unterbrechungseinheit ausgebildet, die Bereitstellung der ersten und zweiten Schaltsignale wechselseitig zu unterdrücken. Die erfindungsgemäße Druckschaltvorrichtung ist insbesondere ausgebildet und eingerichtet, das erste Schaltsignal und das zweite Schaltsignal bereitzustellen, um eine Pumpe zu starten.The provision of the first switching signal and/or the second switching signal by means of the interruption unit is therefore suppressed, preferably alternately. In other words, the interruption unit is designed to alternately suppress the provision of the first and second switching signals. The pressure switching device according to the invention is in particular designed and configured to provide the first switching signal and the second switching signal in order to start a pump.
Die Unterbrechungseinheit ist hierbei bevorzugt in unmittelbarer Nähe der Druckerfassungseinrichtungen angeordnet. Bildet also vorzugsweise eine bauliche Einheit. In einer anderen bevorzugten Ausführungsvariante ist die Unterbrechungseinheit an oder in der zentralen Steuereinheit angeordnet, insbesondere in der Pumpensteuerung, beispielsweise im Sprinklerpumpenschaltschrank.The interruption unit is preferably arranged in the immediate vicinity of the pressure detection devices. It therefore preferably forms a structural unit. In another preferred embodiment, the interruption unit is arranged on or in the central control unit, in particular in the pump control, for example in the sprinkler pump control cabinet.
Bevorzugt ist die Unterbrechungseinheit ausgebildet, wahlweise die Bereitstellung des ersten Schaltsignals oder des zweiten Schaltsignals zu unterdrücken. Beispielsweise ist die Unterbrechungseinheit eingerichtet, über ein extern zugeführtes Steuersignal, die Bereitstellung des ersten Schaltsignals oder des zweiten Schaltsignals in Abhängigkeit des extern zugeführten Steuersignals zu unterdrücken.Preferably, the interruption unit is designed to selectively suppress the provision of the first switching signal or the second switching signal. For example, the interruption unit is designed to suppress the provision of the first switching signal or the second switching signal depending on the externally supplied control signal via an externally supplied control signal.
Steuervariables Unterdrücken des ersten Schaltsignals oder des zweiten Schaltsignals im Sine der vorliegenden Erfindung umfasst also sowohl das wechselseitige Unterdrücken der Bereitstellung der genannten Schaltsignale, als auch ein Unterdrücken auf Basis eines extern zugeführten Steuersignals, in dessen Abhängigkeit entweder das erste Schaltsignal oder das zweite Schaltsignal unterdrückt wird. Die Unterbrechungseinheit ist hierzu entsprechend ausgebildet und eingerichtet.Control-variable suppression of the first switching signal or the second switching signal in the sense of the present invention therefore includes both the mutual suppression of the provision of the switching signals mentioned, as well as suppression based on an externally supplied control signal, depending on which either the first switching signal or the second switching signal is suppressed. The interruption unit is designed and set up accordingly for this purpose.
In einer besonders bevorzugten Ausführungsvariante der Druckschaltvorrichtung sind der erste vorbestimmte Schwellenwert und der zweite vorbestimmte Schwellenwert identisch. Das erste und das zweite Schaltsignal werden somit bei gleichem Druck bereitgestellt.In a particularly preferred embodiment of the pressure switching device, the first predetermined threshold value and the second predetermined threshold value are identical. The first and second switching signals are thus provided at the same pressure.
Die Druckschaltvorrichtung, insbesondere die Druckerfassungseinrichtungen, ist bzw. sind vorzugweise eingerichtet, bei einem Druckabfall, der wie eingangs beschrieben bei einem Pumpentestlauf sowie bei einer Auslösung mindestens eines Sprinklers einer Sprinkleranlage, erzeugt wird, die jeweiligen Schaltsignale bereitzustellen. Insbesondere ist die Druckschaltvorrichtung ausgebildet und eingerichtet, die Schaltsignale an die genannte zentrale Steuereinheit zu übermitteln. Insbesondere werden die Schaltsignale zur Initiierung des Starts der Pumpe bereitgestellt.The pressure switching device, in particular the pressure detection devices, is or are preferably designed to provide the respective switching signals in the event of a pressure drop which, as described above, is generated during a pump test run and when at least one sprinkler of a sprinkler system is triggered. In particular, the pressure switching device is designed and set up to transmit the switching signals to the central control unit mentioned. In particular, the switching signals are provided to initiate the start of the pump.
Weiter bevorzugt entspricht die Größe des ersten Schwellenwertes der Größe des zweiten Schwellenwertes, so dass die Druckschaltvorrichtung, insbesondere die erste Druckerfassungseinrichtung und die zweite Druckerfassungseinrichtung, ausgebildet ist bzw. sind, das erste Schaltsignal bzw. das zweite Schaltsignal bei gleichem Druck bereitzustellen. Die beiden Druckerfassungseinrichtungen der Druckschaltvorrichtung sind also redundant ausgeführt.More preferably, the size of the first threshold value corresponds to the size of the second threshold value, so that the pressure switching device, in particular the first pressure detection device and the second pressure detection device, is or are designed to provide the first switching signal or the second switching signal at the same pressure. The two pressure detection devices of the pressure switching device are therefore designed redundantly.
Die Steuervariabilität der Unterdrückung des ersten und/oder zweiten Schaltsignals kann auf vielfältige Weise erfolgen. Bevorzugt umfasst die Unterbrechungseinheit Taster, über die die Bereitstellung des jeweiligen Schaltsignals bei Betätigung unterdrückt wird. Alternativ umfasst die Unterbrechungseinheit elektromechanische Schaltelemente, die mittels eines extern zugeführten Steuersignals betrieben werden. Die Unterbrechungseinheit kann wahlweise auch optoelektronische Bauteile, beispielsweise Optokoppler, oder Halbleiterbauelemente umfassen.The control variability of the suppression of the first and/or second switching signal can be achieved in a variety of ways. The interruption unit preferably comprises buttons, via which the provision of the respective switching signal is suppressed when actuated. Alternatively, the interruption unit comprises electromechanical switching elements that are operated by means of an externally supplied control signal. The interruption unit can optionally also comprise optoelectronic components, for example optocouplers, or semiconductor components.
Eine bevorzugte Weiterbildung der Erfindung zeichnet sich dadurch aus, dass die Unterbrechungseinheit ausgebildet und eingerichtet ist, zumindest während der Bereitstellung des ersten Schaltsignals die Bereitstellung des zweiten Schaltsignals zu unterdrücken. Weiter ist die Unterbrechungseinheit ausgebildet und eingerichtet, zumindest während der Bereitstellung des zweiten Schaltsignals die Bereitstellung des ersten Schaltsignals zu unterdrücken.A preferred development of the invention is characterized in that the interruption unit is designed and configured to suppress the provision of the second switching signal at least while the first switching signal is being provided. Furthermore, the interruption unit is designed and configured to suppress the provision of the first switching signal at least while the second switching signal is being provided.
Dies bietet den Vorteil, dass die erste und zweite Druckerfassungseinrichtungen unabhängig voneinander auf ihre Funktionsfähigkeit hin geprüft werden können. Die Unterbrechungseinheit ist hierzu derart eingerichtet, dass diese in eine Test-Betriebsart versetzbar ist und in dieser Test-Betriebsart die Bereitstellung der entsprechenden Schaltsignale, wie zuvor beschrieben, unterdrückt werden. Wird die Unterbrechungseinheit anschließend in den Normal-Betrieb versetzt, findet keine Unterdrückung des ersten und zweiten Schaltsignales mehr statt. Auf diese Weise ist die Unterbrechungseinheit eingerichtet, die Bereitstellung des ersten Schaltsignals oder des zweiten Schaltsignals steuervariabel zu unterdrücken. Vorzugweise findet dieses Unterdrücken nur temporär statt, beispielsweise für die Zeitdauer, in der sich die Unterbrechungseinheit in der Test-Betriebsart befindet. Die Unterbrechungseinheit ist gemäß einer alternativen Ausführung eingerichtet, bereits die Erzeugung des jeweiligen Schaltsignals zu unterdrücken.This offers the advantage that the first and second pressure detection devices can be tested independently of one another for their functionality. The interruption unit is set up in such a way that it can be put into a test operating mode and in this test operating mode the provision of the corresponding switching signals is suppressed, as described above. If the interruption unit is then put into normal operation, the first and second switching signals are no longer suppressed. In this way, the interruption unit is set up to suppress the provision of the first switching signal or the second switching signal in a control-variable manner. This suppression preferably only takes place temporarily, for example for the period in which the interruption unit is in the test operating mode. According to an alternative embodiment, the interruption unit is set up to suppress the generation of the respective switching signal.
Mit der erfindungsgemäßen Unterbrechungseinheit geht der Vorteil einher, dass diese die Bereitstellung des jeweiligen ersten oder zweiten Schaltsignals für die nicht an der Überprüfung der ordnungsgemäßen Funktionstüchtigkeit teilnehmende Druckerfassungseinrichtung unterdrückt wird. Damit kann der andernfalls erforderliche Installation von mindestens zwei Absperrventilen sowie die erforderliche manuelle Bedienung der Absperrventile zur Durchführung der Überprüfung eingespart werden.The interruption unit according to the invention has the advantage that it suppresses the provision of the respective first or second switching signal for the pressure detection device not participating in the check of proper functionality. This means that the otherwise necessary installation of at least two shut-off valves and the necessary manual operation of the shut-off valves to carry out the check can be eliminated.
Gemäß einer vorteilhaften weiteren Ausführung der Erfindung weist die Unterbrechungseinheit eine erste Unterbrechungseinheit und eine zweite Unterbrechungseinheit auf. Die zweite Unterbrechungseinheit ist eingerichtet, die Bereitstellung des ersten Schaltsignals zumindest während der Bereitstellung des zweiten Schaltsignals zu unterdrücken. Ferner ist die erste Unterbrechungseinheit eingerichtet, die Bereitstellung des zweiten Schaltsignals, zumindest während der Bereitstellung des ersten Schaltsignals, zu unterdrücken.According to an advantageous further embodiment of the invention, the interruption unit a first interruption unit and a second interruption unit. The second interruption unit is configured to suppress the provision of the first switching signal at least during the provision of the second switching signal. Furthermore, the first interruption unit is configured to suppress the provision of the second switching signal, at least during the provision of the first switching signal.
Vorteilhafter Weise wird so die Bereitstellung des jeweiligen Schaltsignals der jeweils anderen Druckererfassungseinrichtung unterbunden, so dass beim Testen einer der Druckerfassungseinrichtungen, die jeweils andere der Druckerfassungseinrichten kein entsprechendes Schaltsignal bereitstellt. Auf diese Weise ist es möglich, jede der Druckerfassungseinrichtungen separat zu prüfen, ohne dass es einer vorherigen hydraulischen Absperrung der jeweils anderen der Druckerfassungseinrichtungen bedarf.Advantageously, the provision of the respective switching signal of the other pressure detection device is prevented, so that when testing one of the pressure detection devices, the other of the pressure detection devices does not provide a corresponding switching signal. In this way, it is possible to test each of the pressure detection devices separately without the need for a prior hydraulic shut-off of the other of the pressure detection devices.
Eine vorteilhafte Weiterbildung der Erfindung ist dadurch gekennzeichnet, dass die erste Unterbrechungseinheit und die zweite Unterbrechungseinheit als elektromechanische Betätigungselemente ausgebildet sind. Beispielsweise sind die Betätigungselemente als Schalter oder Taster, insbesondere als nicht-rastende Taster ausgebildet. Weiter bevorzugt sind die Taster als Öffner ausgebildet, so dass diese bei Betätigung das jeweilige der Schaltsignale unterbrechen und somit die Bereitstellung des ersten bzw. zweiten Schaltsignals steuervariabel für die Dauer der Betätigung unterdrücken. Die Betätigungselemente können alternativ auch als elektronisches Schaltelement, beispielsweise in Form eines Berührungsschalter oder dergleichen, ausgebildet sein.An advantageous development of the invention is characterized in that the first interruption unit and the second interruption unit are designed as electromechanical actuating elements. For example, the actuating elements are designed as switches or buttons, in particular as non-latching buttons. The buttons are also preferably designed as openers, so that when actuated they interrupt the respective switching signals and thus suppress the provision of the first or second switching signal in a controllable manner for the duration of the actuation. The actuating elements can alternatively also be designed as an electronic switching element, for example in the form of a touch switch or the like.
In einer weiteren bevorzugten Ausführungsvariante sind die erste Unterbrechungseinheit und/oder die zweite Unterbrechungseinheit als elektrisches Bauelement mit einem Kontaktschließer oder Kontaktöffner ausgebildet, beispielsweise als elektromechanisches Relais, Transistor, Analog- oder Digitalschalter-IC oder dergleichen. Vorzugsweise ist das elektrische Bauelement ferngesteuert betätigbar eingerichtet.In a further preferred embodiment, the first interruption unit and/or the second interruption unit are designed as an electrical component with a contact closer or contact opener, for example as an electromechanical relay, transistor, analog or digital switch IC or the like. The electrical component is preferably designed to be remotely operated.
Eine vorteilhafte Weiterbildung zeichnet sich dadurch aus, dass die erste Druckerfassungseinrichtung zur Bereitstellung des ersten Schaltsignals einen ersten Druckschalter oder einen ersten Drucksensor umfasst und die zweite Druckerfassungseinrichtung zur Bereitstellung des zweiten Schaltsignals einen zweiten Druckschalter oder einen zweiten Drucksensor umfasst. Vorzugsweise sind die Druckschalter und/oder die Drucksensoren derart ausgebildet, dass der erste Schwellenwert und der zweite Schwellenwert, bei denen das erste Schaltsignal bzw. das zweite Schaltsignal bereitgestellt werden sollen, einstellbar bzw. vorgebbar sind. Die Drucksensoren umfassen vorzugsweise eine elektronische Auswerteeinrichtung, die eingerichtet ist bei dem vorbestimmten ersten Schwellenwert bzw. dem zweiten Schwellenwert die jeweiligen ersten und zweiten Schaltsignale bereitzustellen.An advantageous development is characterized in that the first pressure detection device for providing the first switching signal comprises a first pressure switch or a first pressure sensor and the second pressure detection device for providing the second switching signal comprises a second pressure switch or a second pressure sensor. The pressure switches and/or the pressure sensors are preferably designed such that the first threshold value and the second threshold value at which the first switching signal or the second switching signal are to be provided can be set or specified. The pressure sensors preferably comprise an electronic evaluation device which is set up to provide the respective first and second switching signals at the predetermined first threshold value or the second threshold value.
Gemäß einer bevorzugten Weiterbildung der Erfindung sind die Druckerfassungseinrichtungen in einem Gehäuse angeordnet sind. Vorteilhafterweise bilden die Druckerfassungseinrichten so eine kompakte bauliche Einheit.According to a preferred development of the invention, the pressure detection devices are arranged in a housing. The pressure detection devices thus advantageously form a compact structural unit.
Weiter bevorzugt weist das Gehäuse eine Montagebasis mit einem zum lösbaren hydraulischen Anschluss eingerichteten Verbindungselement auf. Zudem sind in der Montagebasis eine erste Messkammer der ersten Druckerfassungseinrichtung und eine zweite Messkammer der zweiten Druckerfassungseinrichtung angeordnet. Die Montagebasis ist ferner eingerichtet, mittels des Verbindungselement eine fluidleitende Verbindung der Messkammern mit der Zuleitung herzustellen. Vorteilhafter Weise sind die erste und zweite Messkammer integraler Bestandteil der Montagebasis. Es wird keine separate Verrohrung benötigt, sondern die Montagebasis selbst ist derart eingerichtet, dass die erste und zweite Messkammer fluidleitend miteinander verbunden sind. Das Verbindungselement ist zum Herstellen eines lösbaren hydraulischen Anschlusses eingerichtet, mittels dessen die Druckerfassungseinrichtungen beispielsweise mit einer Löschmittelleitung, wie der Hauptleitung einer Wasserlöschanlage, über die Zuleitung hydraulisch verbunden werden können.The housing further preferably has a mounting base with a connecting element designed for a detachable hydraulic connection. In addition, a first measuring chamber of the first pressure detection device and a second measuring chamber of the second pressure detection device are arranged in the mounting base. The mounting base is also designed to establish a fluid-conducting connection of the measuring chambers to the supply line by means of the connecting element. The first and second measuring chambers are advantageously an integral part of the mounting base. No separate piping is required, but the mounting base itself is designed in such a way that the first and second measuring chambers are connected to one another in a fluid-conducting manner. The connecting element is designed to establish a detachable hydraulic connection by means of which the pressure detection devices can be hydraulically connected, for example, to an extinguishing agent line, such as the main line of a water extinguishing system, via the supply line.
Vorzugsweise weist die Montagebasis einen Anschluss auf, der zur Aufnahme eines Manometers ausgebildet und eingerichtet ist und mit der ersten Messkammer und der zweiten Messkammer in hydraulisch Verbindung steht. Dies bietet den Vorteil, das beim Testen der erfindungsgemäßen Druckschaltvorrichtung der in den Messkammern herrschende Druck und insbesondere der Druck im Moment der Bereitstellung des jeweiligen ersten oder zweiten Schaltsignals unmittelbar an der Druckschaltvorrichtung abgelesen werden kann und so die Funktionstüchtigkeit vor Ort auf einfache und komfortable Weise überprüfbar ist. Weiter bevorzugt umfasst der Anschluss ein Innengewinde, so dass das Manometer in diesen einschraubbar ist.The mounting base preferably has a connection that is designed and configured to accommodate a pressure gauge and is hydraulically connected to the first measuring chamber and the second measuring chamber. This offers the advantage that when testing the pressure switching device according to the invention, the pressure prevailing in the measuring chambers and in particular the pressure at the moment the respective first or second switching signal is provided can be read directly on the pressure switching device and thus the functionality can be checked on site in a simple and convenient manner. The connection also preferably has an internal thread so that the pressure gauge can be screwed into it.
Eine zweckmäßige Weiterbildung der Erfindung zeichnet sich dadurch aus, dass das Verbindungselement eine fluidführende Anschlussleitung aufweist, von der eine erste Zuführungsleitung in die erste Messkammer mündend angeordnet ist und von der eine zweite Zuführungsleitung in die zweite Messkammer mündend angeordnet ist. Die Anschlussleitung bildet zusammen mit den ersten und zweiten Zuführungsleitungen eine Verzweigung, beispielsweise ein T- oder Y-Stück, mittels dessen die erste Messkammer und die zweite Messerkammer hydraulisch mit der Anschlussleitung verbunden sind. Vorteilhafter Weise sind auch die Zuführungsleitungen sowie die Anschlussleitung integraler Bestandteil der Montagebasis. Die Montagebasis weist damit sämtliche erforderlichen hydraulischen Verbindungen auf, um die ersten und zweiten Druckerfassungseinrichtungen hydraulisch miteinander zu koppeln und über das Verbindungselement lösbar hydraulisch, beispielsweise an die genannte Zuleitung, anzuschließen.An expedient further development of the invention is characterized in that the connecting element has a fluid-conducting connecting line, of which a first supply line is arranged to open into the first measuring chamber and of which a second supply line is arranged to open into the second measuring chamber. The connecting line forms together with the first and second supply lines a branch, for example a T-piece or Y-piece, by means of which the first measuring chamber and the second measuring chamber are hydraulically connected to the connecting line. Advantageously, the supply lines and the connecting line are also an integral part of the mounting base. The mounting base thus has all the hydraulic connections required to hydraulically couple the first and second pressure detection devices to one another and to detachably connect them hydraulically, for example to the said supply line, via the connecting element.
Gemäß einer bevorzugten Ausbildung weist die Montagebasis Ausnehmungen zur Aufnahme der Druckerfassungseinrichtungen auf und die Ausnehmungen sind derart ausgebildet dass in den Ausnehmungen wahlweise einer der Druckschalter oder einer der Drucksensoren anordenbar eingerichtet sind. Dies bietet den Vorteil, dass die Montagebasis eine Doppelfunktion erfüllt. Einerseits weist diese die zuvor genannten Leitungen zur Herstellung der erforderlichen hydraulischen Verbindungen auf und andererseits dient diese als zugleich als Trägerelement zur Aufnahme und Montage der Druckerfassungseinrichtungen. Somit ist die Montagebasis eingerichtet, in Abhängigkeit der Ausführungsvariante, wahlweise mit zwei der Druckschalter, mit zwei der Drucksensoren oder mit der Kombination von Druckschalter und Drucksensor ausgerüstet zu werden.According to a preferred embodiment, the mounting base has recesses for receiving the pressure detection devices and the recesses are designed in such a way that one of the pressure switches or one of the pressure sensors can be arranged in the recesses. This offers the advantage that the mounting base fulfils a dual function. On the one hand, it has the previously mentioned lines for establishing the required hydraulic connections and, on the other hand, it also serves as a support element for receiving and mounting the pressure detection devices. The mounting base is thus designed to be equipped with two of the pressure switches, two of the pressure sensors or a combination of pressure switch and pressure sensor, depending on the design variant.
Die Messkammern bilden vorzugsweise geschlossene Kammern durch die Aufnahme und Befestigung der Druckschalter und/oder der Drucksensoren in den genannten Ausnehmungen der Montagebasis. Zwischen der jeweiligen Messkammer und der jeweiligen Druckerfassungseinrichtung sind vorzugsweise Dichtelemente, beispielsweise O-Ringe, angeordnet. Auf diese Weise sind ist die Messkammern fluiddicht verschlossen.The measuring chambers preferably form closed chambers by accommodating and fastening the pressure switches and/or the pressure sensors in the aforementioned recesses of the mounting base. Sealing elements, such as O-rings, are preferably arranged between the respective measuring chamber and the respective pressure detection device. In this way, the measuring chambers are sealed in a fluid-tight manner.
Aufgrund der Bauart liegt in der ersten Messkammer und in der zweiten Messkammer stets der gleiche Druck an, insbesondere auch bei der Durchführung der Testläufe beim Start der Pumpe mit der ersten Druckerfassungseinrichtung und der zweiten Druckerfassungseinrichtung nach der Erzeugung des Druckabfalls.Due to the design, the same pressure is always present in the first measuring chamber and in the second measuring chamber, in particular when carrying out the test runs when starting the pump with the first pressure detection device and the second pressure detection device after the pressure drop has been generated.
Gemäß einer vorteilhaften Weiterbildung der Erfindung ist die Druckschaltvorrichtung ausgebildet und eingerichtet, mit dem ersten Schaltsignal über eine erste signalleitende Verbindung und/oder mit dem zweiten Schaltsignal über zweite signalleitende Verbindung den Start mindestens einer Pumpe zu initiieren. Die erste und zweite signalleitende Verbindung ist beispielsweise kabelgebunden oder drahtlos ausgebildet und eingerichtet wahlweise die ersten und zweiten Schaltsignale als analoges oder digitales Signal zu übertragen.According to an advantageous development of the invention, the pressure switching device is designed and configured to initiate the start of at least one pump with the first switching signal via a first signal-conducting connection and/or with the second switching signal via a second signal-conducting connection. The first and second signal-conducting connections are designed, for example, to be wired or wireless and are configured to optionally transmit the first and second switching signals as an analog or digital signal.
Die erste und die zweite signalleitende Verbindung sind besonders bevorzugt als Stromkreis ausgebildet oder als Schaltstromkreis. Die Druckerfassungseinrichtungen weisen vorzugsweise Schaltelemente auf, welche bei dem vordefinierten Schwellenwert das erste bzw. zweite Schaltsignal erzeugen, welches beispielsweise an die zentrale Steuereinheit übertragen wird.The first and the second signal-conducting connection are particularly preferably designed as an electric circuit or as a switching circuit. The pressure detection devices preferably have switching elements which, at the predefined threshold value, generate the first or second switching signal, which is transmitted, for example, to the central control unit.
Vorzugsweise ist im betriebsbereiten Zustand, der auch als Normalbetrieb bezeichnet wird, bei dem kein Druckabfall durch eine Sprinklerauslösung vorliegt, der Stromkreis bzw. der Schaltstromkreis geöffnet. Die Schaltelemente schließen bei dem vorbestimmten Schwellenwert bzw. den vorbestimmten Schwellenwerten den Stromkreis bzw. den Schaltstromkreis. Die zentrale Steuereinheit erfasst dieses Schaltsignal und startet die Pumpe.Preferably, in the operational state, which is also referred to as normal operation, in which there is no pressure drop due to a sprinkler activation, the electric circuit or the switching circuit is open. The switching elements close the electric circuit or the switching circuit at the predetermined threshold value or the predetermined threshold values. The central control unit detects this switching signal and starts the pump.
In einer weiteren vorteilhaften Ausgestaltung der Druckschaltvorrichtung ist im betriebsbereiten Zustand, der auch als Normalbetrieb bezeichnet wird, bei dem kein Druckabfall durch eine Sprinklerauslösung vorliegt, der Stromkreis bzw. der Schaltstromkreis geschlossen. Die Schaltelemente öffnen bei dem vorbestimmten Schwellenwert bzw. den vorbestimmten Schwellenwerten den Stromkreis bzw. den Schaltstromkreis. Die zentrale Steuereinheit erfasst dieses Schaltsignal und startet die Pumpe.In a further advantageous embodiment of the pressure switching device, the circuit or the switching circuit is closed in the operational state, which is also referred to as normal operation, in which there is no pressure drop due to a sprinkler activation. The switching elements open the circuit or the switching circuit at the predetermined threshold value or the predetermined threshold values. The central control unit detects this switching signal and starts the pump.
In einer bevorzugten Ausführungsvariante der Druckschaltvorrichtung sind der erste vorbestimmte Schwellenwert und der zweite vorbestimmte Schwellenwert identisch. Das erste und das zweite Schaltsignal werden somit bei gleichem Druck bereitgestellt.In a preferred embodiment of the pressure switching device, the first predetermined threshold value and the second predetermined threshold value are identical. The first and second switching signals are thus provided at the same pressure.
In der Ausführungsvariante der Druckerfassungseinrichtungen mit Druckschaltern ist das Schaltelement beispielhaft als Mikroschalter ausgebildet. Bei dem vordefinierten Schwellenwert wird dieser geschaltet und das erste bzw. das zweite Schaltsignal erzeugt.In the variant of the pressure detection devices with pressure switches, the switching element is designed as a microswitch. At the predefined threshold value, this is switched and the first or second switching signal is generated.
Gemäß einer bevorzugten Ausbildung der Erfindung umfasst diese ferner eine Anschlusseinheit zur Übertragung der Schaltsignale über die signalleitenden Verbindungen. Die Anschlusseinheit ist vorzugsweise in dem Gehäuse integriert und beispielsweise als elektrische Klemme oder als Modul zur drahtlosen Übertragung der ersten und zweiten Schaltsignale ausgebildet und eingerichtet.According to a preferred embodiment of the invention, it further comprises a connection unit for transmitting the switching signals via the signal-conducting connections. The connection unit is preferably integrated in the housing and designed and configured, for example, as an electrical terminal or as a module for wireless transmission of the first and second switching signals.
Die Aufgabe wird auch durch die eingangs genannte Wasserlöschanlage gelöst, wobei diese die zuvor beschriebene erfindungsgemäße Druckschaltvorrichtung aufweist und zudem eine zum steuerbaren Betreiben mindestens einer Pumpe eingerichtete zentrale Steuereinheit umfasst. Die zentrale Steuereinheit ist eingerichtet, die mindestens eine Pumpe beim Vorliegen eines mittels der Druckschaltervorrichtung bereitgestellten ersten Schaltsignals und/oder zweiten Schaltsignals zu starten.The object is also achieved by the water extinguishing system mentioned at the beginning, which has the previously described pressure switching device according to the invention and also a central control unit configured for the controllable operation of at least one pump. The central control unit is configured to start the at least one pump when a first switching signal and/or second switching signal provided by the pressure switch device is present.
Die zentrale Steuereinheit umfasst vorzugsweise Mittel zum Betreiben der mindestens einen Pumpe, um diese beim Vorliegen des ersten Schaltsignals und/der des zweiten Schaltsignales zu starten. Ist die mindestens eine Pumpe elektromotorisch angetrieben, umfasst die zentrale Steuereinheit beispielsweise eine Leistungselektronikeinheit, die eingerichtet ist beim Vorliegen des ersten und/oder zweiten Schaltsignales die Pumpe mit elektrischer Energie zum Start derselben zu versorgen.The central control unit preferably comprises means for operating the at least one pump in order to start it when the first switching signal and/or the second switching signal are present. If the at least one pump is driven by an electric motor, the central control unit comprises, for example, a power electronics unit which is designed to supply the pump with electrical energy to start it when the first and/or second switching signal is present.
In der Ausführungsvariante der Druckerfassungseinrichtungen mit Druckschaltern ist das Schaltelement beispielhaft als Mikroschalter ausgebildet. Bei dem vordefinierten Schwellenwert wird dieser geschaltet und das erste bzw. das zweite Schaltsignal erzeugt.In the variant of the pressure detection devices with pressure switches, the switching element is designed as a microswitch. At the predefined threshold value, this is switched and the first or second switching signal is generated.
Die Aufgabe wird auch durch das eingangs genannte Verfahren gelöst, mit einer Druckschaltvorrichtung, umfassend mindestens zwei hydraulisch miteinander gekoppelte Druckerfassungseinrichtungen, eine Zuleitung und ein Ventil in der Zuleitung, wobei die Druckerfassungseinrichtungen oder die Druckschaltvorrichtung zum Anschluss an eine Zuleitung ausgebildet sind, und wobei die erste Druckerfassungseinrichtung ausgebildet ist, bei einem vorbestimmten ersten Schwellenwert ein erstes Schaltsignal zur Initiierung des Starts einer Pumpe bereitzustellen und die zweite Druckerfassungseinrichtung ausgebildet ist, bei einem vorbestimmten zweiten Schwellenwert ein zweites Schaltsignal zur Initiierung des Starts einer Pumpe bereitzustellen, wobei das Verfahren die folgenden Verfahrensschritte umfasst:
- - Erzeugung eines Druckabfalls in der Zuleitung durch Öffnung des Ventils in der Zuleitung;
- - Bereitstellung der Schaltsignale bei Erreichung der vordefinierten Schwellenwerte
- - steuervariables zumindest temporäres Unterdrücken der Bereitstellung des ersten Schaltsignals bei dem vorbestimmten zweiten Schwellenwert oder durch steuervariables zumindest temporäres Unterdrücken der Bereitstellung des zweiten Schaltsignals bei dem vorbestimmten ersten Schwellenwert, wobei das zumindest temporäre Unterdrücken durch eine Unterbrechungseinheit der Druckschaltvorrichtung erfolgt.
- - Creating a pressure drop in the supply line by opening the valve in the supply line;
- - Provision of switching signals when the predefined threshold values are reached
- - controllably at least temporarily suppressing the provision of the first switching signal at the predetermined second threshold value or by control-variably at least temporarily suppressing the provision of the second switching signal at the predetermined first threshold value, wherein the at least temporary suppression is carried out by an interruption unit of the pressure switching device.
Die sich im Zusammenhang mit dem erfindungsgemäßen Verfahren ergebenden Vorteile entsprechen den bereits im Zusammenhang mit der erfindungsgemäßen Druckschaltvorrichtung genannten Vorzügen. In diesem Zusammenhang sowie zu den folgenden Ausführungsbeispielen wird daher auf die zuvor genannten Vorteile - zur Vermeidung von Wiederholungen - explizit verwiesen. Die dort gemachten Ausführungen gelten analog auch für sämtliche Varianten des erfindungsgemäßen Verfahrens.The advantages resulting from the method according to the invention correspond to the advantages already mentioned in connection with the pressure switch device according to the invention. In this context and in the following embodiments, explicit reference is therefore made to the advantages mentioned above in order to avoid repetition. The statements made there also apply analogously to all variants of the method according to the invention.
Das Ventil zur Erzeugung des Druckabfalls ist vorzugsweises als Zwei- oder Drei-Wege Ventil oder Absperrventil mit Entlastungseinrichtung ausgebildet. In der Ausführungsvariante mit einem Zwei- oder Drei-Wege Ventil wird beim Ablassen des Löschfluids bei der Betätigung des Ventils die fluidleitende Verbindung zur Hauptleitung unterbrochen und ein Fluidauslass geöffnet. Es können aber auch zwei getrennt Ventile verwendet werden, eines zur Unterbrechung der fluidleitenden Verbindung zur Hauptleitung und das zweite zum Ablassen des Löschfluids.The valve for generating the pressure drop is preferably designed as a two- or three-way valve or shut-off valve with a relief device. In the design variant with a two- or three-way valve, when the extinguishing fluid is drained, the fluid connection to the main line is interrupted and a fluid outlet is opened when the valve is operated. However, two separate valves can also be used, one to interrupt the fluid connection to the main line and the second to drain the extinguishing fluid.
Gemäß einer vorteilhaften Ausführung der Erfindung wird zumindest während der Bereitstellung des ersten Schaltsignals die Bereitstellung des zweiten Schaltsignals und zumindest während der Bereitstellung des zweiten Schaltsignals die Bereitstellung des ersten Schaltsignals mit der Unterbrechungseinheit unterdrückt wird.According to an advantageous embodiment of the invention, the provision of the second switching signal is suppressed at least during the provision of the first switching signal and the provision of the first switching signal is suppressed at least during the provision of the second switching signal with the interruption unit.
Eine weitere zweckmäßige Ausführungsform sieht vor, dass die Unterbrechungseinheit eine erste Unterbrechungseinheit und eine zweite Unterbrechungseinheit aufweist und die Bereitstellung des ersten Schaltsignals, zumindest während der Bereitstellung des zweiten Schaltsignals durch die zweite Unterbrechungseinheit unterdrückt wird, und ferner die Bereitstellung des zweiten Schaltsignals, zumindest während der Bereitstellung des ersten Schaltsignals durch die die erste Unterbrechungseinheit unterdrückt wird.A further expedient embodiment provides that the interruption unit has a first interruption unit and a second interruption unit and the provision of the first switching signal is suppressed at least during the provision of the second switching signal by the second interruption unit, and furthermore the provision of the second switching signal is suppressed at least during the provision of the first switching signal by the first interruption unit.
Weiter bevorzugt sind die erste Unterbrechungseinheit und die zweite Unterbrechungseinheit als elektromechanische Betätigungselemente ausgebildet sind und für die Unterdrückung der Schaltsignale die elektromechanische Betätigungselemente betätigt werden.Further preferably, the first interruption unit and the second interruption unit are designed as electromechanical actuating elements and the electromechanical actuating elements are actuated to suppress the switching signals.
Besonders bevorzugte Ausführungsformen der Erfindung werden anhand der beigefügten Figuren näher erläutert. Hierbei zeigen:
-
1 einen schematischen Aufbau einer Wasserlöschanlage mit einer Druckschaltvorrichtung nach dem Stand der Technik; -
2 eine schematische Darstellung der erfindungsgemäßen Druckschaltvorrichtung und der erfindungsgemäßen Wasserlöschanlage; -
3 eine schematische Darstellung der Druckschaltvorrichtung mit zwei Druckschaltern; -
4a eine schematische Schnittdarstellung einer Ausführungsform der Druckschaltvorrichtung; -
4b eine Detaildarstellung der erfindungsgemäßen Montagebasis; -
5 eine schematische Darstellung einer weiteren Ausführungsform der Druckschaltvorrichtung mit einem Druckschalter und einem Drucksensor und -
6 ein Blockdiagramm, das die Schritte des erfindungsgemäßen Verfahrens zeigt.
-
1 a schematic structure of a water extinguishing system with a pressure switching device according to the state of the art; -
2 a schematic representation of the pressure switching device according to the invention and the water extinguishing system according to the invention; -
3 a schematic representation of the pressure switching device with two pressure switches; -
4a a schematic sectional view of an embodiment of the pressure switching device; -
4b a detailed view of the mounting base according to the invention; -
5 a schematic representation of another embodiment of the pressure switching device with a pressure switch and a pressure sensor and -
6 a block diagram showing the steps of the method according to the invention.
Anhand der Zeichnung wird im Folgenden die erfindungsgemäße Druckschaltvorrichtung 3 sowie die erfindungsgemäße Wasserlöschanlage erläutert. Die folgenden Ausführgen zur Funktionsweise der Druckschaltvorrichtung und der Wasserlöschanlage dienen u.a. zur Erläuterung des erfindungsgemäßen Verfahrens.The
Die gezeigte Druckschaltvorrichtung umfasst zwei aus dem Stand der Technikbekannte Druckerfassungseinrichtungen DS1 und DS2, die als Druckschalter ausgebildet sind. Die erste Druckerfassungeinrichtung DS1 und die zweite Druckerfassungseinrichtung DS2 sind hierbei mit jeweils einer ersten Zuleitung 18.1 und einer zweiten Zuleitung18.2 versehen und führen über die gemeinsame Zuleitung 18 zur Hauptleitung 2. Die erste und zweite Zuleitung 18.1 und 18.2 stellen eine fluidleitende Verbindung von der Hauptleitung 2 zu den beiden parallel angeordneten Druckschaltern DS1 und DS2 her. Die Anordnung von zwei Druckschaltern erfolgt aus Redundanzgründen. Beide Zuleitungen weisen je ein Ventil auf, nämlich die erste Zuleitung 18.1 ein erstes Ventil 10.1, und die zweite Zuleitung 18.2 das zweites Ventil 10.2.The pressure switching device shown comprises two pressure detection devices DS1 and DS2, which are known from the prior art and are designed as pressure switches. The first pressure detection device DS1 and the second pressure detection device DS2 are each provided with a first supply line 18.1 and a second supply line 18.2 and lead to the
Weiterhin weisen beide Zuleitungen 18.1, 18.2 je ein Ventil 10 zum Ablassen von Löschfluid, sowie je ein Manometer M auf. In
Die Druckschalter DS1 und DS2 sind ausgebildet, bei Druckabfall, bei einem vordefinierten Schwellenwert, ein Schaltsignal, insbesondere ein erstes und ein zweites-Schaltsignal S1, S2 zum Start der Sprinklerpumpe zu erzeugen. Hierzu wird das Schaltsignal S1 der ersten Druckerfassungseinrichtung DS1 über eine drahtgebundene erste signalleitende Verbindung 19 zu der zentralen Steuereinheit 15 gesendet, welche die Pumpe 12 ansteuert und startet. Das Schaltsignal S2 der Druckschalters DS2 wird über eine drahtgebundene zweite signalleitende Verbindung 20 zur zentralen Steuereinheit 15 gesendet, welche die Pumpe 12 ansteuert und startet. Somit ist gewährleistet, dass bei Ausfall eines der beiden Druckschalter DS1 oder DS2, eines der Schaltsignale S1 oder S2 die zentrale Steuereinheit 15 stets erreicht. Die zentrale Steuereinheit 15 ist also eingerichtet, beim Empfang mindestens eines der beiden Schaltsignale S1, S2 die Pumpe 12 zu starten.The pressure switches DS1 and DS2 are designed to generate a switching signal, in particular a first and a second switching signal S1, S2 to start the sprinkler pump when the pressure drops at a predefined threshold value. For this purpose, the switching signal S1 of the first pressure detection device DS1 is sent via a wired first signal-conducting
Gemäß dem Stand der Technik wird der wöchentliche Testlauf der Pumpe 12 durch eine geschulte Person manuell nach folgendem Verfahren zum Start eines Pumpentestlaufes ausgeführt.According to the state of the art, the weekly test run of the
Es wird manuell das erste Ventil 10.1 in der ersten Zuleitung 18.1 betätigt, damit die fluidleitende Verbindung von der Hauptleitung 2 zu dem ersten Druckschalter DS1 unterbrochen wird. Hierdurch wird bei Erzeugung eines Druckabfalls für den Testlauf, die erste Druckerfassungseinrichtung DS1 diesen Druckabfall nicht erfassen und kein Schaltsignal S1 erzeugen und/oder bereitstellen. Somit ist es möglich, ausschließlich die Funktion der zweiten Druckerfassungseinrichtung DS2 und deren nachfolgenden Komponenten zu testen.The first valve 10.1 in the first supply line 18.1 is manually operated so that the fluid connection from the
Danach wird das zweite Ventil 10.2 in der zweiten Zuleitung 18.2 manuell zur Erzeugung eines Druckabfalls geöffnet. Die zweite Druckerfassungseinrichtung DS2 erzeugt nun bei einem bestimmten Schaltdruck-Messwert, welcher vom Wartungspersonal am Manometer M abgelesen wird, das zweite Schaltsignal S2, welches über die zweite signalleitende Verbindung 20 an die zentrale Steuereinheit 15 zum Starten der Pumpe 12 gesendet wird. Die Pumpe wird gestartet und in der Praxis wird der Testlauf beendet, wenn die normalen Betriebskennwerte der Pumpe erreicht sind.Then the second valve 10.2 in the second supply line 18.2 is opened manually to generate a pressure drop. The second pressure detection device DS2 now generates a pressure drop at a certain switching pressure measurement value, which is determined by the Maintenance personnel read the pressure gauge M, the second switching signal S2, which is sent via the second signal-conducting
Anschließend erfolgt der Testlauf mit dem Start der Pumpe über den ersten Druckschalter DS1. Hierzu wird manuell das zweite Ventil 10.2 in der zweiten Zuleitung 18.2 betätigt, damit die fluidleitende Verbindung von der Hauptleitung 2 zu dem zweiten Druckschalter DS2 unterbrochen wird. Danach wird das erste Ventil 10.1 in der ersten Zuleitung 18.1 zur Erzeugung eines Druckabfalls manuell geöffnet. Die erste Druckerfassungseinrichtung DS1 erzeugt nun bei einem bestimmten Schaltdruck-Messwert, welcher vom Wartungspersonal am Manometer M abgelesen wird, das erste Schaltsignal S1, welches über die erste signalleitende Verbindung 19 an die zentrale Steuereinheit 15 zum Starten der Pumpe gesendet wird.The test run then takes place with the pump being started via the first pressure switch DS1. To do this, the second valve 10.2 in the second supply line 18.2 is operated manually so that the fluid connection from the
Die so erfassten Schaltdruck-Messwerte der ersten und zweiten Druckerfassungseinrichtungen DS1, DS2 werden dann vom Wartungspersonal mit vorgegebenen Schwellenwerten verglichen, um festzustellen, ob die erfassten Schaltdruck-Messwerte den vordefinierten Schwellenwerten innerhalb der erlaubten Toleranz entsprechen.The switching pressure measured values thus recorded by the first and second pressure detection devices DS1, DS2 are then compared by the maintenance personnel with predetermined threshold values in order to determine whether the switching pressure measured values recorded correspond to the predefined threshold values within the permitted tolerance.
Die Druckschaltvorrichtung 3 umfasst zwei hydraulisch miteinander gekoppelte Druckerfassungseinrichtungen DS1, DS2. Die Druckschaltvorrichtung 3 oder die Druckerfassungseinrichtungen DS1, DS2 sind ausgebildet und eingerichtet zum Anschluss an eine Zuleitung 18. Die erste Druckerfassungseinrichtung DS1 ist ausgebildet, bei einem vorbestimmten ersten Schwellenwert p1 ein erstes Schaltsignal S1 bereitzustellen, und die zweite Druckerfassungseinrichtung DS2 ist ausgebildet ist, bei einem vorbestimmten zweiten Schwellenwert p2 ein zweites Schaltsignal S2 bereitzustellen. Die Druckschaltvorrichtung 3 weist eine Unterbrechungseinheit 6 auf, wobei die Unterbrechungseinheit 6 ausgebildet und eingerichtet ist, die Bereitstellung des ersten Schaltsignals S1 und/oder des zweiten Schaltsignals (S2) steuervariabel zumindest temporär zu unterdrücken.The
In der in
Weiterhin weist die Zuleitung 18 ein Ventil 10 auf, das zum Ablassen von Löschfluid und Absperren der Zuleitung 18 von der Hauptleitung 2 eingerichtet ist. Mittels des derart angeordneten Ventils 10 ist es möglich, zum Test der Druckschaltvorrichtung und des Pumpenstarts den notwendigen Druckabfall zu erzeugen. Die Druckerfassungseinrichtungen DS1, DS2 erzeugen dann bei den vorbestimmten Schwellenwerten p1 und p2 das erste und zweite Schaltsignal S1 und S2.Furthermore, the
In dieser bevorzugten Ausführungsvariante der Druckschaltvorrichtung sind der erste vorbestimmte Schwellenwert p1 und der zweite vorbestimmte Schwellenwert p2 identisch. Das erste und das zweite Schaltsignal S1 und S2 werden somit bei gleichem Druck bereitgestellt.In this preferred embodiment of the pressure switching device, the first predetermined threshold value p 1 and the second predetermined threshold value p 2 are identical. The first and second switching signals S1 and S2 are thus provided at the same pressure.
Vorzugsweise ist an die Zuleitung 18 das Manometer M hydraulisch angeschlossen, so dass der in der Zuleitung 18 sowie der ersten und zweiten Zuleitung 18.1, 18.2 herrschende Druck und somit der Druck bei dem die Schaltsignale S1 und S2 erzeugt werden an dem Manometer M ablesbar ist.Preferably, the pressure gauge M is hydraulically connected to the
Wie in
Bevorzugt ist die Unterbrechungseinheit ausgebildet, wahlweise die Bereitstellung des ersten Schaltsignals S1 oder des zweiten Schaltsignals S2 zu unterdrücken. Beispielsweise ist die Unterbrechungseinheit 6 eingerichtet, über ein - in der Zeichnung nicht gezeigtes - extern zugeführtes Steuersignal, die Bereitstellung des ersten Schaltsignals S1 oder des zweiten Schaltsignals S2 in Abhängigkeit des extern zugeführten Steuersignals zu unterdrücken.Preferably, the interruption unit is designed to selectively suppress the provision of the first switching signal S1 or the second switching signal S2. For example, the interruption unit 6 is designed to suppress the provision of the first switching signal S1 or the second switching signal S2 depending on the externally supplied control signal via an externally supplied control signal (not shown in the drawing).
Steuervariables Unterdrücken des ersten Schaltsignals S1 oder des zweiten Schaltsignals S2 im Sine der vorliegenden Erfindung umfasst also sowohl das wechselseitige Unterdrücken der Bereitstellung der genannten Schaltsignale S1, S2, als auch ein Unterdrücken auf Basis eines extern zugeführten Steuersignals, in dessen Abhängigkeit entweder das erste Schaltsignal S1 oder das zweite Schaltsignal S2 unterdrückt wird. Die Unterbrechungseinheit 6 ist hierzu entsprechend ausgebildet und eingerichtet.Control-variable suppression of the first switching signal S1 or the second switching signal S2 in the sense of the present invention therefore includes both the mutual suppression of the provision of the aforementioned switching signals S1, S2, as well as suppression based on an externally supplied control signal, depending on which either the first switching signal S1 or the second switching signal S2 is suppressed. The interruption unit 6 is designed and set up accordingly for this purpose.
Vorzugsweise ist die Unterbrechungseinheit 6 ausgebildet und eingerichtet , zumindest während der Bereitstellung des ersten Schaltsignals S1 die Bereitstellung des zweiten Schaltsignals S2 zu unterdrücken. Weiter ist die Unterbrechungseinheit 6 ausgebildet und eingerichtet, zumindest während der Bereitstellung des zweiten Schaltsignals S2 die Bereitstellung des ersten Schaltsignals S1 zu unterdrücken. Dies bietet den Vorteil, dass die erste und zweite Druckerfassungseinrichtungen DS1, DS2 unabhängig voneinander auf ihre Funktionsfähigkeit hin geprüft werden können.Preferably, the interruption unit 6 is designed and configured to suppress the provision of the second switching signal S2 at least while the first switching signal S1 is being provided. Furthermore, the interruption unit 6 is designed and configured to suppress the provision of the first switching signal S1 at least while the second switching signal S2 is being provided. This offers the advantage that the first and second pressure detection devices DS1, DS2 can be tested independently of one another for their functionality.
Die Unterbrechungseinheit 6 kann auch derart ausgebildet sein, dass schon vor der Erzeugung eines der Schaltsignale S1, S2 der Bereitstellung verhindert wird.The interruption unit 6 can also be designed in such a way that the provision is prevented even before the generation of one of the switching signals S1, S2.
Die Unterbrechungseinheit 6 ist hierzu derart eingerichtet, dass diese in eine Test-Betriebsart versetzbar ist und in dieser Test-Betriebsart die die Bereitstellung der entsprechenden Schaltsignale S1, S2, wie zuvor beschrieben, unterdrückt. Wird die Unterbrechungseinheit 6 anschließend in den Normal-Betrieb versetzt, findet keine Unterdrückung des ersten und zweiten Schaltsignales S1, S2 mehr statt. Auf diese Weise ist die Unterbrechungseinheit 6 eingerichtet, die Bereitstellung des ersten Schaltsignals S1 oder des zweiten Schaltsignals S2 steuervariabel zu unterdrücken. Vorzugweise findet dieses Unterdrücken nur temporär statt, beispielsweise für die Zeitdauer, in der sich die Unterbrechungseinheit 6 in der Test-Betriebsart befindet.The interruption unit 6 is set up in such a way that it can be put into a test operating mode and in this test operating mode the provision of the corresponding switching signals S1, S2 is suppressed, as described above. If the interruption unit 6 is then put into normal operation, the first and second switching signals S1, S2 are no longer suppressed. In this way, the interruption unit 6 is set up to suppress the provision of the first switching signal S1 or the second switching signal S2 in a controllable manner. This suppression preferably only takes place temporarily, for example for the period in which the interruption unit 6 is in the test operating mode.
Wie aus
In
Ferner ist die erste Unterbrechungseinheit 6.1 eingerichtet, die Bereitstellung des zweiten Schaltsignals S2, zumindest während der Bereitstellung des ersten Schaltsignals S1, zu unterdrücken. Auf diese Weise ist es möglich, jede der Druckerfassungseinrichtungen DS1, DS2 separat zu prüfen, ohne dass es einer vorherigen hydraulischen Absperrung der jeweils anderen der Druckerfassungseinrichtungen DS2, DS1 bedarf. Die hydraulische Absperrung erfolgt allein über das Ventil 10, so dass die Zuleitung 18 gegenüber der Hauptleitung 2 abgesperrt wird.Furthermore, the first interruption unit 6.1 is designed to suppress the provision of the second switching signal S2, at least while the first switching signal S1 is being provided. In this way, it is possible to test each of the pressure detection devices DS1, DS2 separately without the need for a prior hydraulic shut-off of the other of the pressure detection devices DS2, DS1. The hydraulic shut-off takes place solely via the
Eine vorteilhafte Weiterbildung der Erfindung ist dadurch gekennzeichnet, dass die erste Unterbrechungseinheit 6.1 und die zweite Unterbrechungseinheit 6.2 als elektromechanische Betätigungselemente ausgebildet sind. Beispielsweise sind die Betätigungselemente als Schalter oder Taster 38, insbesondere als nicht-rastende Taster 38 ausgebildet. Weiter bevorzugt sind die Taster als Öffner ausgebildet, so dass diese bei Betätigung das jeweilige der Schaltsignale unterbrechen und somit die Bereitstellung des ersten bzw. zweiten Schaltsignals S1, S2 steuervariabel für die Dauer der Betätigung unterdrücken.An advantageous development of the invention is characterized in that the first interruption unit 6.1 and the second interruption unit 6.2 are designed as electromechanical actuating elements. For example, the actuating elements are designed as switches or buttons 38, in particular as non-latching buttons 38. The buttons are also preferably designed as break contacts, so that when actuated they interrupt the respective switching signals and thus suppress the provision of the first or second switching signal S1, S2 in a controllable manner for the duration of the actuation.
Vorzugsweise umfasst die in
In einer bevorzugten Ausführungsvariante der Druckschaltvorrichtung sind der erste vorbestimmte Schwellenwert p1 und der zweite vorbestimmte Schwellenwert p2 identisch. Das erste und das zweite Schaltsignal S1 und S2 werden somit bei gleichem Druck bereitgestellt.In a preferred embodiment of the pressure switching device, the first predetermined threshold value p 1 and the second predetermined threshold value p 2 are identical. The first and second switching signals S1 and S2 are thus provided at the same pressure.
Gemäß einer bevorzugten Weiterbildung der Erfindung sind die Druckerfassungseinrichtungen DS1, DS2 in einem Gehäuse 26 angeordnet sind. Vorteilhafterweise bilden die Druckerfassungseinrichten DS1, DS2 mit dem Gehäuse 26 eine kompakte bauliche Einheit.According to a preferred development of the invention, the pressure detection devices DS1, DS2 are arranged in a
Den
Die Montagebasis 27 ist ferner eingerichtet, mittels des Verbindungselement 8 eine fluidleitende Verbindung der Messkammern 32, 33 mit der Zuleitung 18 herzustellen. Vorteilhafter Weise sind die ersten und zweiten Messkammern 32, 33 integraler Bestandteil der Montagebasis 27. Das Verbindungselement 8 ist zum Herstellen eines lösbaren hydraulischen Anschlusses eingerichtet, mittels dessen die Druckerfassungseinrichtungen DS1 und DS2 vorzugsweise mit der Hauptleitung 2, also einer Löschmittelleitung hydraulisch verbunden werden können, Wie dies beispielsweise in
Wie insbesondere aus der Detailansicht gemäß
Wie in
Die erste und zweite Messkammer 32, 33 bilden vorzugsweise geschlossene Kammern durch die Aufnahme und Befestigung der Druckschalter 22, 23 und/oder der Drucksensoren in den genannten ersten und zweiten Ausnehmungen 35, 36 der Montagebasis. Zwischen der jeweiligen Messkammer 35, 36 und der jeweiligen Druckerfassungseinrichtung DS1, DS2 sind vorzugsweise - in der Zeichnung nicht gezeigte - Dichtelemente, beispielsweise O-Ringe, angeordnet.The first and
Insbesondere ist die erfindungsgemäße Druckschaltvorrichtung 3 ausgebildet und eingerichtet, mit dem ersten Schaltsignal S1 über eine erste signalleitende Verbindung 19 und/oder mit dem zweiten Schaltsignal S2 über zweite signalleitende Verbindung 20 den Start der mindestens einen Pumpe 12 zu initiieren.In particular, the
Die in
Wie in der Zusammenschau der
Weiter bevorzugt umfasst die erfindungsgemäße Druckschaltvorrichtung 3 ferner eine Anschlusseinheit 34 zur Übertragung der Schaltsignale S1, S2 über die signalleitenden Verbindungen. Die Anschlusseinheit 34 ist vorzugsweise - wie die
In
Die in
Die vorliegende Erfindung betrifft auch das zuvor beschriebenen Verfahren zum Start eins Pumpentestlaufes mit einer Druckschaltvorrichtung 3 umfassend mindestens zwei hydraulisch miteinander gekoppelte Druckerfassungseinrichtungen DS1, DS2, wobei die Druckerfassungseinrichtungen DS1, DS2 oder die Druckschaltvorrichtung 3 zum Anschluss an eine Zuleitung 18 ausgebildet sind, und wobei die erste Druckerfassungseinrichtung DS1 ausgebildet ist, bei einem vorbestimmten ersten Schwellenwert p1 ein erstes Schaltsignal S1 zur Initiierung des Starts der mindestens einen Pumpe 12 bereitzustellen und die zweite Druckerfassungseinrichtung DS2 ausgebildet ist, bei einem vorbestimmten zweiten Schwellenwert p2 ein zweites Schaltsignal S2 zur Initiierung des Starts der mindestens einen Pumpe 12 bereitzustellen. Wie in
Erzeugen 100 eines Druckabfalls inder Zuleitung 18 durch Öffnung des Ventils 10 in der Zuleitung; Vorzugsweise wird zuvor mittels des Ventils 10 die Zuleitung 18von der Hauptleitung 2 abgesperrt.
- Generating 100 a pressure drop in the
supply line 18 by opening thevalve 10 in the supply line; Preferably, thesupply line 18 is previously shut off from themain line 2 by means of thevalve 10.
Bereitstellung 201, 202 der Schaltsignale S1,S2 bei Erreichung der vordefinierten Schwellenwerte p1, p2; steuervariables zumindest temporäres Unterdrücken 301 der Bereitstellung 201 des ersten Schaltsignals S1 bei dem vorbestimmten zweiten Schwellenwert p2 und/oder durch steuervariables zumindest temporäres Unterdrücken 302 der Bereitstellung (202) des zweiten Schaltsignals S2 bei dem vorbestimmten ersten Schwellenwert p1, wobei das zumindest temporäre Unterdrücken 301,302 durch die Unterbrechungseinheit 6 der erfindungsgemäßen Druckschaltvorrichtung 3 erfolgt. Wie zuvor beschrieben sind die Schwellenwerte p1, p2 vorzugsweise gleich groß.
Vorzugsweise wird während der Bereitstellung 201 des ersten Schaltsignals S1 die Bereitstellung 202 des zweiten Schaltsignals S2 und zumindest während der Bereitstellung 202 des zweiten Schaltsignals S2 die Bereitstellung 201 des ersten Schaltsignals S1 mit der Unterbrechungseinheit 6 unterdrückt. Vorzugsweise weist die Unterbrechungseinheit 6 eine erste Unterbrechungseinheit 6.1 und eine zweite Unterbrechungseinheit 6.2 auf und die Bereitstellung 201 des ersten Schaltsignals S1 wird, zumindest während der Bereitstellung 202 des zweiten Schaltsignals S2, durch die zweite Unterbrechungseinheit 6.2 unterdrückt. Ferner wird die Bereitstellung 202 des zweiten Schaltsignals S2, zumindest während der Bereitstellung 201 des ersten Schaltsignals S1, durch die die erste Unterbrechungseinheit 6.1 unterdrückt.Preferably, during the
Weiter bevorzugt werden zur Unterdrückung der Schaltsignale S1, S2 die elektromechanische Betätigungselemente betätigt.Further preferably, the electromechanical actuating elements are actuated to suppress the switching signals S1, S2.
Claims (17)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102022115300.2A DE102022115300B4 (en) | 2022-06-20 | 2022-06-20 | Pressure switch device, water extinguishing system and method for starting a pump test run |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102022115300.2A DE102022115300B4 (en) | 2022-06-20 | 2022-06-20 | Pressure switch device, water extinguishing system and method for starting a pump test run |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| DE102022115300A1 DE102022115300A1 (en) | 2023-12-21 |
| DE102022115300B4 true DE102022115300B4 (en) | 2024-08-14 |
Family
ID=88974790
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE102022115300.2A Active DE102022115300B4 (en) | 2022-06-20 | 2022-06-20 | Pressure switch device, water extinguishing system and method for starting a pump test run |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE102022115300B4 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1702655A1 (en) | 2005-03-17 | 2006-09-20 | Gary Richard Noble | Improved sprinkler test system |
| DE102018119776A1 (en) | 2018-08-14 | 2020-02-20 | Minimax Viking Research & Development Gmbh | Water extinguishing system and associated method for checking the water extinguishing system |
| DE102019135815B3 (en) | 2019-12-27 | 2020-12-17 | Minimax Viking Research & Development Gmbh | Water extinguishing system, control device, hazard alarm center, method for controlling a pump test run in a water extinguishing system and use of a fluid diversion in a water extinguishing system for a pump test run of a pump |
-
2022
- 2022-06-20 DE DE102022115300.2A patent/DE102022115300B4/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1702655A1 (en) | 2005-03-17 | 2006-09-20 | Gary Richard Noble | Improved sprinkler test system |
| DE102018119776A1 (en) | 2018-08-14 | 2020-02-20 | Minimax Viking Research & Development Gmbh | Water extinguishing system and associated method for checking the water extinguishing system |
| DE102019135815B3 (en) | 2019-12-27 | 2020-12-17 | Minimax Viking Research & Development Gmbh | Water extinguishing system, control device, hazard alarm center, method for controlling a pump test run in a water extinguishing system and use of a fluid diversion in a water extinguishing system for a pump test run of a pump |
Also Published As
| Publication number | Publication date |
|---|---|
| DE102022115300A1 (en) | 2023-12-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1493064B2 (en) | Device for the error-proof switching off of an electric consumer, particularly in industrial production plants | |
| DE60004494T2 (en) | TEST DEVICE FOR EMERGENCY SHUTDOWN | |
| DE1961928C3 (en) | Device for monitoring a pipeline for burst pipes | |
| EP1869687B1 (en) | Safety switch for the safe disconnection of an electric consumer | |
| EP1894065A1 (en) | Safety switching device and a method for the safe shutdown of a consumer unit in an automated installation | |
| DE2711771C2 (en) | Level monitoring device | |
| DE2539279A1 (en) | Water leakage protection device for electric appliance - consists of moisture sensing electrodes, warning light and solenoid water supply valve | |
| DE102022115300B4 (en) | Pressure switch device, water extinguishing system and method for starting a pump test run | |
| DE2441210C2 (en) | Hemodialysis device with only one catheter | |
| DE102022115301B4 (en) | Pressure switching device, water extinguishing system, method for monitoring a pressure switching device and method for starting at least one pump of a water extinguishing system | |
| EP2520988B1 (en) | Monitoring device for mains monitors | |
| DE1600509B1 (en) | Method and device for testing the tightness of two shut-off valves connected in series in a gas line | |
| DE102024101000A1 (en) | Extinguishing system and method for operating such a system | |
| EP4417270A1 (en) | Extinguishing system and method for operating same | |
| EP0117449B1 (en) | Control device for pouring liquids | |
| DE102024108991B3 (en) | Valve testing procedure and vacuum handling device | |
| DE3725635C2 (en) | ||
| EP0117461B1 (en) | Control device, particularly for controlling a machine, a door or the like | |
| DE10062280A1 (en) | Safety circuit for electrical and/or electronic control circuit for electrical device e.g. dishwasher, detects contact by liquid for protection of electrical device | |
| EP1102403A1 (en) | Operation monitoring for a transformer | |
| DE1441454C3 (en) | Pneumatic holding relay | |
| EP4574244A1 (en) | Reverse osmosis system for medical use areas and method for operating the reverse osmosis system | |
| EP1073077B1 (en) | Method of operating a signal sensor like a switch element | |
| DE102022208872A1 (en) | Method for diagnosing an AC-operated point drive and point operating device | |
| DE10211702B4 (en) | Tripping device for a quick opening valve of a fire extinguishing system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R012 | Request for examination validly filed | ||
| R016 | Response to examination communication | ||
| R083 | Amendment of/additions to inventor(s) | ||
| R018 | Grant decision by examination section/examining division | ||
| R020 | Patent grant now final |