DE102007004232A1 - Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product - Google Patents
Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product Download PDFInfo
- Publication number
- DE102007004232A1 DE102007004232A1 DE102007004232A DE102007004232A DE102007004232A1 DE 102007004232 A1 DE102007004232 A1 DE 102007004232A1 DE 102007004232 A DE102007004232 A DE 102007004232A DE 102007004232 A DE102007004232 A DE 102007004232A DE 102007004232 A1 DE102007004232 A1 DE 102007004232A1
- Authority
- DE
- Germany
- Prior art keywords
- control device
- production
- product
- delivery
- products
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32027—Order, plan, execute, confirm end order, if unfeasible execute exception operation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32119—Order handling and manufacturing module and offline monitoring
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Tourism & Hospitality (AREA)
- Operations Research (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Automation & Control Theory (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
Description
Die Erfindung betrifft eine Anordnung und ein Verfahren zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen.The The invention relates to an arrangement and a method for time and Volume or throughput optimized production of at least one product from at least one raw material and / or intermediate by means of process engineering Attachments.
Anordnungen und Verfahren zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung von sogenannten Stückgütern sind allgemein bekannt. Bei der Stückgutfertigung werden die Vorgaben für die Fertigung eines Produktes in Form eines Stückgutes mit Stücklisten und Arbeitsplänen beschrieben. Aufgrund der Art und Beschaffenheit eines solchen Stückgutes lässt sich die Stückgutfertigung ohne weiteres unterbrechen und zeitlich verschieben, sofern dies beispielsweise durch unvorhergesehene Änderung der Auftragslage, etwa vorzuziehende Eilaufträge, oder unvorhergesehenes Auftreten von Störungen erforderlich würde.arrangements and methods for time and volume or throughput optimized production of so-called piece goods are well known. In the general cargo production will be the specifications for the Production of a product in the form of a piece goods with parts lists and work plans described. Due to the nature and nature of such cargo let yourself the general cargo production readily interrupt and postpone, if that for example, due to unforeseen changes in the order situation, such as preferable express orders, or unforeseen occurrence of disturbances would be required.
Anders verhält es sich hingegen bei der Herstellung von Produkten mittels verfahrenstechnischer Prozesse und Anlagen. Eine Unterbrechung und zeitliche Verschiebung ist in der Regel bereits aufgrund thermischer und/oder chemischer Reaktionen von zu verwendenden Rohstoffen, Hilfsstoffen und Betriebstoffen oder von Vorprodukten, Zwischenprodukten und letztlich auch Produkten untereinander während der verfahrenstechnischen Prozesse ausgeschlossen. Wann Fertigungsprozesse zu starten sind, hängt unter anderem von Terminvorgaben der Kunden (Liefertermine), der Dauer der Anlagennutzung (Schichtzeiten) und der Geschwindigkeit ab, in der Produkte nachproduziert werden können (Durchlaufzeit).Different behave it is, however, in the production of products by means of process engineering processes and facilities. An interruption and a time shift is in usually already due to thermal and / or chemical reactions of raw materials, auxiliaries and substances to be used or of precursors, intermediates and ultimately also products with each other during the procedural processes excluded. When manufacturing processes to start depends on other of deadlines of the customers (delivery dates), the duration the plant usage (shift times) and the speed, in of the products can be reproduced (lead time).
Die Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen gestaltet sich daher wesentlich aufwendiger als die Fertigung eines Stückgutes und erfordert größte Genauigkeit und Vorausschau in der Planung dessen.The Production of at least one product from at least one raw material and / or intermediate designed by means of process engineering equipment Therefore, much more expensive than the production of a piece goods and requires the greatest accuracy and foresight in the planning of it.
Im Allgemeinen teilt sich die Planung für das gesamte Verfahren zur Herstellung eines Produktes in eine sogenannte "Grobplanung" und eine sogenannte "Feinplanung" auf.in the Generally, the planning is shared by the whole process Production of a product in a so-called "rough planning" and a so-called "detailed planning" on.
Die Grobplanung umfasst dabei 1) die Zuordnung von Kunden- oder Lageraufträgen zu Stücklisten, Rezepturen von Vormischungen, Vorprodukten, Zwischenprodukten usw., Arbeitsplänen, fertigungsspezifischen (Teil-)Prozessen usw., die Überwachung des Wareneingangs, Prüfungen, Qualitätskontrollen, Buchungen, Zuführung der gelieferten Materialien usw. zu den Zwischenlagerstellen und Lagerstellen, die Steuerung und Überwachung einer Entnahme und/oder Nachbestellung von sich bereits in den Zwischenlagerstellen und Lagerstellen befindlichen Materialien, Rohstoffen sowie der Bereitstellung für geplante Fertigungsprozesse, 2) die Bestimmung der eigenen oder von Dritten hergestellten Materialien, Rohstoffe, Vormischungen, Vorprodukte, Zwischenprodukte usw. mit Menge und Liefertermin und 3) die Beschaffung von Materialien, Rohstoffen, Komponenten, Vormischungen, Vorprodukten, Zwischenprodukten usw. in geeigneten Mengen (Bestellmengen, extern oder intern hergestellt). Bekannte Verfahren der Grobplanung prüfen mithin die Verfügbarkeit von Komponenten, Rohstoffen und Materialien und geben gegebenenfalls eine Terminschätzung mit Start des Herstellungsprozesses ab. In der Grobplanung werden im Allgemeinen auch Nachlieferungen von Materialien, Rohstoffen usw. behandelt. Die Grobplanung, wie die gesamte Materialverwaltung, Bestellwesen von Komponenten, Roh-, Hilfs- und Betriebstoffen, Bilanzierung gelagerter und bestellter Mengen, Vorgabe der Wunschliefertermine, Terminüberwachung usw., erfolgt zumeist mittels marktüblichen kaufmännischen Systemen, sogenannten Enterprise Resource Planning (ERP)-Systemen. Darüber hinaus sind in solchen Systemen zeitweise auch die Stücklisten, Rezepturen usw. für die Produkte hinterlegt. Die Grobplanung ist allerdings weder bestimmt noch geeignet, darüber hinausgehende Planungen, wie eine optimale Belegung der Anlagen oder einen op timalen Zeitpunkt für eine bestimmte Anlage festzulegen, vorzunehmen. ERP-Systeme sind auch deshalb ungeeignet, weil sie einen Prozess in der gesamten Prozesszeit abbilden, d. h. ohne anlagenspezifische Differenzierung. Sind für die Aufträge erforderlichen Materialien, Rohstoffe, Komponenten usw. in den gewünschten Mengen vorhanden, werden diese meist auftragsspezifisch im ERP-System reserviert und entsprechend buchhalterisch erfasst. Aufträge, welche aufgrund fehlender Ressourcen einen Fertigungslauf unmöglich machen, werden aussortiert. Die Grobplanung ist somit ein rein steuerungstechnischer Prozess, der zudem nur einen Teil der Produktionsplanung darstellt und nicht zuletzt aufgrund dessen für den immer wichtiger werdenden, weiteren Teil der Produktionsplanung in Form einer Feinplanung nicht bestimmt, geschweige denn eine solche vornehmen kann.The Rough planning includes 1) the assignment of customer or warehouse orders to parts lists, Formulations of premixes, precursors, intermediates, etc., Work plans, production-specific (sub-) processes, etc., monitoring of the goods receipt, examinations, Quality control, Bookings, Feeder of the delivered materials, etc. to the intermediate storage depots and Storage locations, control and monitoring a removal and / or reordering of itself already in the interim storage and storage locations located materials, raw materials and the Provision for planned production processes, 2) the determination of own or materials manufactured by third parties, raw materials, premixes, Precursors, intermediates, etc. with quantity and delivery date and 3) the procurement of materials, raw materials, components, premixes, Intermediate products, intermediates, etc. in suitable quantities (order quantities, externally or internally produced). Known method of rough planning check hence the availability of components, raw materials and materials and give as appropriate an appointment estimate with start of the manufacturing process. In the rough planning will be in general also subsequent deliveries of materials, raw materials etc. treated. The rough planning, like the entire material management, Ordering of components, raw materials and supplies, accounting stored and ordered quantities, specification of requested delivery dates, deadline monitoring etc., usually takes place by means of commercially available commercial Systems, so-called Enterprise Resource Planning (ERP) systems. About that In addition, in such systems, the parts lists, Recipes, etc. for the products deposited. However, the rough planning is neither determined still suitable, about it Further planning, such as optimal occupancy of the facilities or an optimal time for to make a specific investment. ERP systems are also unsuitable because they have a process throughout Map process time, d. H. without plant-specific differentiation. are for the assignments required materials, raw materials, components, etc. in the desired Quantities are available, these are usually order-specific in the ERP system Reserved and recorded accordingly. Orders, which due to lack of resources make a production run impossible, are sorted out. The rough planning is thus a purely control technology Process that only represents part of the production planning and not least because of this for the increasingly important, further part of the production planning in the form of a detailed planning certainly, let alone such a make.
Die Feinplanung, die sich an die Grobplanung anschließt, setzt sich demgegenüber zusammen aus 1) der Planung der Reihenfolge der (Teil-)Produktionsprozesse und Abläufe, 2) der zeitlichen Planung des Einsatzes der erforderlichen Anlagen, Maschinen, des Personals und anderer für die Herstellungsprozesse notwendiger Ressourcen, wie zum Beispiel Energie, Hilfs- und Betriebsstoffe (Anlagenbelegungsplanung), wobei der Beginn des Einsatzes maßgeblich von den Terminvorgaben der Kunden (Liefertermine), der Dauer der Anlagennutzung (Schichtzeiten) und der Geschwindigkeit zur Herstellung der Produkte (Durchlaufzeit) abhängig ist, 3) der Durchführung einzelner Herstellungsschritte ("Eigentliche Produktion") nach Arbeitsplan oder Arbeitsanweisung und 4) der Aufteilung und Zusammenfassung von Auftragsmengen zu anlagenspezifischen Fertigungsmengen.On the other hand, the detailed planning, which follows the rough planning, consists of 1) the planning of the sequence of (partial) production processes and processes, 2) the scheduling of the use of the required equipment, machines, personnel and others for the manufacturing processes necessary resources, such as energy, supplies and equipment (asset allocation planning), whereby the beginning of the use depends significantly on the deadlines of the customers (delivery dates), the duration of the plant use (shift times) and the speed of manufacturing the products (lead time) , 3) the execution of individual production steps te ("actual production") according to the work plan or work instruction; and 4) the allocation and summary of order quantities for plant-specific production quantities.
Mit Hilfe der Erfahrungen, die Mitarbeiter des Unternehmens mit den Fertigungsprozessen haben, Prognosedaten, Auftragsvorlage, erwartete Aufträge usw. werden die Zeitdauer für die Arbeitsprozesse, in der Grobplanung nicht fixierbare Ressourcen, der Einsatz der für die Fertigungsschritte geeigneten Maschinen, Anlagen und Werkzeuge usw. festgelegt. Zeitweise wird auch die in der Feinplanung festgelegte zeitliche Belegung der Anlagen, Maschinen, manuelle Prozesse in einem Produktionsplan mit Hilfe von Visualisierungssystemen, wie zum Beispiel Stecktafeln oder Magnettafeln, festgehalten. Die Feinplanung ist Grundlage für die Herstellung, für den Einsatz und die Bedienung der Anlagen durch das Personal, für interne Lagerbewegungen, Transportabläufe, Bereitstellung von Vorprodukten und/oder Zwischenprodukten etc., Vorgaben für Zwischenlagermöglichkeiten, Abfüll- und Abpackprozesse usw. Für Herstellungsabläufe, die wiederholt auf gleichen Anlagen oder Maschinen durchgeführt werden, ist die Feinplanung einfach festzulegen. Da sich die Herstellungsabläufe und Prozesse wiederholen, liegen ausreichend Erfahrungen vor, um eine Feinplanung mit hoher Treffsicherheit zu erstellen. Stehen dagegen unterschiedliche Fertigungseinrichtungen für gleiche Produktionsverfahren zur Verfügung, wird die Planung der Produktionsabläufe komplex. Es müssen die erwarteten Laufzeiten der Anlagen, die für unterschiedliche Aufträge produzieren, zeitlich geschätzt und neue Aufträge im Schichtverlauf termingerecht eingepasst werden. Ein weiteres Problem besteht darin, dass die Fertigungszeiten durch Probennahmen und damit einhergehenden Fertigungsunterbrechungen, Nachdosierungen usw. nicht, jedenfalls nicht hinreichend genau planbar sind. Entsprechend ist auch die Bereitstellung der Materialien, Rohstoffe usw. festzulegen. Falls Fertigungsprozesse in mehren Stufen ablaufen oder unterschiedliche Maschinen und Anlagen zur Fertigung eingesetzt werden können, Vorprodukte nur bestimmte Haltbarkeit haben (Chemie, Nahrungsmittel) Verkettungen zwischen einzelnen (Teil-)Prozessen notwendig sind, wird Produktionsplanung sehr umfangreich und ist nicht mehr einfach durchzuführen. Entsprechend aufwendig ist die Feinplanung. Da Fertigungspläne in die Zukunft weisen (Prognosen) und sich komplexe Prozesse mit allen Details nur in wenigen Phasen eines Fertigungsprozesses genau abbilden lassen, ist die heutige Feinplanung entsprechend mangelhaft.With Help the experience, the company employees with the Manufacturing processes have forecast data, order template, expected Orders etc. are the time duration for the work processes, resources that can not be fixed in rough planning, the use of for the manufacturing steps suitable machinery, equipment and tools etc. set. At times, the one specified in the detailed planning is also used temporal allocation of the plants, machines, manual processes in a production plan with the help of visualization systems, such as For example, pegboards or magnetic boards, detained. The detailed planning is the basis for the production for which Use and operation of the equipment by the staff, for internal Stock movements, transport processes, Provision of precursors and / or intermediates, etc., Specifications for Interim storage facilities, filling and packaging processes, etc. For Manufacturing processes, which are repeated on the same equipment or machines, The detailed planning is easy to set. As the manufacturing processes and Repeat processes, there is sufficient experience to one Create fine planning with high accuracy. Stand against it different production facilities for the same production process available the planning of production processes complex. To have to the expected terms of the equipment producing for different orders estimated in time and new orders be fit in the course of the shift on schedule. Another one Problem is that the production times by sampling and associated production interruptions, replenishment etc. are not, at least not sufficiently accurately planable. Corresponding The provision of materials, raw materials, etc. should also be specified. If manufacturing processes run in multiple stages or different Machinery and equipment for manufacturing can be used, precursors have only certain shelf life (chemistry, food) chaining between individual (sub-) processes are necessary, production planning very extensive and is no longer easy to perform. Corresponding elaborate is the detailed planning. Because production plans point into the future (forecasts) and complex processes with all the details in only a few phases A detailed representation of a manufacturing process is today's Detailed planning accordingly inadequate.
Die Feinplanung wird noch komplizierter, wenn Störungen oder kurzfristige Änderungen in der Auftragslage auftreten und bestehende Pläne modifiziert werden müssen. Störungen können zum Beispiel Ausfälle von Anlagen aufgrund technischer Mängel sein. Aber auch unzureichende Qualität von Rohstoffen, Materialien, Baugruppen, Vorprodukten, Ausfall von Personal wegen Krankheit oder Urlaub, zwischengeschobene oder im Termin geänderte Aufträge auf Wunsch von Kunden, längere Fertigungszeiten wegen zusätzlicher qualitätssichernder Maßnahmen, Nacharbeiten, im Zeitablauf unterschiedlich verlaufende chemischen Reaktionen usw. bringen den Produktionsplan, der meist für einige Tage festgelegt wird, durcheinander. Häufig sind Grob- und Feinpläne dann neu zu erstellen. Da solche Störungen unter Zeitdruck zu beheben sind, ist die Korrektur entsprechend oberflächlich. Weiterhin ist die Bilanzierung der Materialien, deren Nachbestellung usw. bereits in der Grobplanung abgeschlossen. Die Änderungen führen zur Reduzierung der effektiven Herstellungszeit und erhöhen dadurch Produktionskosten.The Detailed planning becomes even more complicated when disruptions or short-term changes appear in the order book and existing plans need to be modified. Disruptions can cause Example failures of equipment due to technical defects. But also inadequate quality of raw materials, materials, assemblies, precursors, failure of Personnel due to illness or vacation, intervening or im Appointment changed assignments at the request of customers, longer Production times due to additional quality assurance Activities, Reworking, over time varying chemical Reactions etc. bring the production plan, mostly for some Days is set, confused. Often, coarse and fine schedules are then to recreate. Because such disturbances correct under time pressure, the correction is accordingly superficial. Furthermore, the accounting of the materials, their reordering etc. already completed in rough planning. The changes to lead to reduce the effective manufacturing time and thereby increase Production costs.
Gelöst werden solche stochastisch und zeitlich nicht voraussehbaren Probleme heute mit kurzfristig angesetzten Gesprächen des am Produktionsprozess beteiligten Personals. Dabei wird oftmals nach schnellen, jedoch wenig durchdachten Lösungsansätzen gesucht. Die Auswirkungen von vorgenommenen Änderungen sind zumeist nicht ausreichend transparent und vorhersehbar. Die Qualität der Feinplanung ist daher mangelhaft.Be solved such stochastic and temporally unpredictable problems today with short-term discussions of the production process involved personnel. It is often after fast, however poorly thought-out solutions sought. The effects of changes made are mostly not sufficiently transparent and predictable. The quality of the detailed planning is therefore deficient.
Eine derart geänderte Feinplanung nimmt zugleich erheblich Einfluss auf vorausgehende oder folgende, bereits geplante Fertigungsprozesse. Wird zum Beispiel ein Produkt, eine Baugruppe, ein Vorprodukt zeitlich verschoben produziert, hat das Auswirkungen auf den zeitlichen Einsatz der dafür benötigten Ressourcen, etwa Materialien, Rohstoffe oder Personal, für sämtliche nachfolgenden Prozesse. Auch der Einsatz der Ressourcen, die zunächst nicht direkt dem Produktionsprozess zuzuordnen sind, wie zum Beispiel Transporte, Qualitätssicherungsmaßnahmen, Rüsten und Reinigen von Anlagen usw. werden von den Änderungen oder Störungen erfasst. Änderung der ursprünglichen Pläne verlängern daher meist Produktionszeiten, Mitarbeiter müssen erhöhte Leistungen erbringen. Geänderte Abläufe erfordern somit einen zusätzlichen Planungsaufwand und damit einhergehend wiederum einen erhöhten Kostenaufwand.A changed so At the same time, detailed planning has a considerable influence on previous ones or the following, already planned manufacturing processes. Will for example a product, an assembly, a preliminary product is postponed produced, has an effect on the temporal use of the resources required for this, such as materials, raw materials or personnel, for all subsequent processes. Also the use of resources, initially not directly the production process such as transport, quality assurance measures, prepare and cleaning of equipment etc. are covered by the changes or faults. modification the original one Therefore, plans usually extend Production times, employees need increased benefits provide. Modified procedures thus require an additional Planning effort and, in turn, an increased cost.
Ein weiteres Problem der Produktionsplanung in Form der Feinplanung liegt in der Genauigkeit der Zeitvorgaben. So können Fertigungszeiten erheblich schwanken, wenn sich beispielsweise die geplante Fertigungsdauer durch Umrüstungen von Anlagen und Maschinen, unterschiedliche Prozessdauern bei chemischen Reaktionen oder erhöhten Aufwand für Qualitätssicherung verlängert.One Another problem of production planning in the form of detailed planning lies in the accuracy of the time specifications. This can significantly increase production times fluctuate if, for example, the planned production time by conversions of plants and machines, different process times in chemical Reactions or increased effort for quality assurance extended.
Die genannten Probleme verschärfen sich in den letzten Jahren, weil die durchschnittlichen Auftragsmengen der Kunden im Verlauf sinken. Kunden achten aus Gründen der Lagerkosten auf verringerte Lagerhaltung. Die Folgen sind kürzere Bestellzyklen und kleinere Bestellmengen und kürzere Reaktions- und Durchlaufzeiten, um Terminwünsche von Kunden einhalten zu können. Durch häufige Produktwechsel werden wiederum die Durchlaufzeiten länger und erhöhen zugleich den Planungsaufwand. Zudem führt eine stärkt zu beobachtende Diversifizierung des Sortimentes zu einer komplexen Feinplanung. Extreme Anforderungen an Liefertermine, kurze Durchlaufzeiten und zugehörige Produktionspläne bestehen dann, wenn Kunden "Just-In-Time"-Lieferung verlangen und dadurch Fertigungsprozesse der Lieferanten mit den eigenen Fertigungsabläufen verzahnt werden müssen. Die Feinplanung ist dann auf sehr kurze Zeiten begrenzt und bedarf vermehrt der Improvisation.The problems mentioned get worse In recent years, customers' average order volumes are falling. Customers pay attention to reduced storage costs due to storage costs. The consequences are shorter order cycles and smaller order quantities and shorter reaction and lead times to meet customers' deadline requests. Frequent product changes in turn make the throughput times longer and at the same time increase the planning effort. In addition, a stronger diversification of the assortment leads to a complex detailed planning. Extreme demands on delivery dates, short lead times and associated production schedules exist when customers demand "just-in-time" delivery, which means that suppliers' manufacturing processes must be interlinked with their own production processes. The detailed planning is then limited to very short times and increasingly requires improvisation.
Es wird versucht, diese Probleme der Feinplanung mit Hilfe von sogenannten "Reservezeiten", als sogenannte "Sicherheitsbestände" getarnte erhöhten Materialbestände und als "Blindleistung" bezeichnete, von vorneherein erhöhte Bereitstellung von Personal und Anlagenkapazitäten zu reduzieren. Das Problem der mangelhaften Qualität in der Feinplanung wird dadurch jedoch nicht beseitigt.It An attempt is made to solve these problems of detailed planning with the help of so-called "reserve times", as well as so-called "safety stocks" of disguised material inventories and as "reactive power", from increased in the first place Provision of personnel and reduce plant capacity. The problem the poor quality but this is not eliminated in the detailed planning.
Auf die Feinplanung folgt schließlich die der Feinplanung häufig noch zuzurechnende Planung für die Kommissionierung der hergestellten Produkte, den internen und externen Transport, die Ein- und Auslagerung, den Versand usw.On the detailed planning finally follows the fine planning often yet to be allocated planning for the Picking of manufactured products, internal and external Transport, storage and retrieval, shipping, etc.
Bekannte Anordnungen und Verfahren für die Feinplanung der Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen existieren zwar, basieren allerdings allesamt auf einer steuerungstechnischen und damit statischen, linearen Funktionsweise. Diese Anordnungen und Verfahren für die Feinplanung besitzen mithin sämtlich den gravierenden Nachteil, nicht in der Lage zu sein, einen geeigneten alternativen Produktionsplan vorzuschlagen und damit flexibel und individuell auf ungeplante Ereignisse bei der Herstellung des wenigstens einen Produktes, wie beispielhaft auf eine unvorhergesehene Änderung der Auftragslage, etwa vorzuziehende Eilaufträge, oder unvorhergesehenes Auftreten von Störungen reagieren zu können. Ein noch anderes, wesentliches Problem ergibt sich auch dadurch, dass sich mögliche Nachteile und/oder Konsequenzen, die bei zumeist kurzfristigen Planungsänderungen auftreten, wie Kosten, Verschiebung zugeordneter Aufträge etc., nicht im Vorhinein abschätzen oder erkennen lassen. Andere Anordnungen und Verfahren versuchen diesem Missstand mit Wahrscheinlichkeitsrechnungen zu begegnen. Der Aufwand für Dateneingabe und Datenpflege ist jedoch ausgesprochen aufwendig, unwirtschaftlich und nicht praxisorientiert.Known Arrangements and methods for the Detailed planning of the production of at least one product from at least a raw material and / or intermediate by means of process engineering Facilities exist, but are all based on one control technology and thus static, linear operation. These arrangements and methods for fine planning possess therefore all the serious disadvantage of not being able to find a suitable one propose alternative production plan and thus flexible and individually on unplanned events in the production of at least a product, such as an unforeseen change order situation, such as urgent urgent orders, or unforeseen occurrences of disorders to be able to react. Yet another, essential problem arises from that's possible Disadvantages and / or consequences of mostly short-term planning changes occur, such as costs, relocation of assigned orders, etc., not to estimate in advance or recognize. Try other arrangements and procedures to counter this malady with probability calculations. Of the Effort for Data entry and data maintenance is extremely expensive, uneconomical and not practical.
Der Erfindung liegt daher die Aufgabe zugrunde, eine Anordnung und ein Verfahren zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen zur Verfügung zu stellen, mit welcher sich die obigen Nachteile verhindern lassen, welche mithin konstruktiv besonders einfach, schnell, mit hoher Genauigkeit und zugleich zuverlässig eine Feinplanung von komplexen, mehrstufigen verfahrenstechnischen Prozessen mit einer Vielzahl von Rohstoffen, Vorprodukten, Zwischenprodukten usw. ermöglichen, dadurch die verfahrenstechnischen Prozessen verkürzen und beschleunigen sowie zusätzlich sehr kostengünstig sind.Of the Invention is therefore based on the object, an arrangement and a Process for time and volume or throughput optimized production at least a product of at least one raw material and / or intermediate to provide by means of process engineering facilities, with which can prevent the above disadvantages, which therefore constructive particularly simple, fast, with high accuracy and at the same time reliable one Detailed planning of complex, multi-stage process engineering processes with a variety of raw materials, precursors, intermediates etc., thereby shorten and accelerate the process engineering processes as well as additionally very inexpensive are.
Diese Aufgabe wird in vorrichtungstechnischer Hinsicht auf überraschend einfache Weise durch die Merkmale des Anspruchs 1 gelöst.These Task is in device-technical terms to surprising simple manner solved by the features of claim 1.
Durch die erfindungsgemäße Ausgestaltung der erfindungsgemäßen Anordnung zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Vorprodukt und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen, umfassend eine Regelungsvorrichtung zur Feinplanung und Optimierung der Herstellung des wenigstens einen Produktes, wobei die Regelungsvorrichtung zwischen einer Einrichtung zur Erfassung und Lieferung bzw. Bereitstellung von Kundenauftragsdaten und den verfahrenstechnischen Anlagen zur interaktiven Kommunikation angeordnet ist, mit einer Einrichtung zur Erfassung und Lieferung bzw. Bereitstellung von Kapazitätsparametern und einer Einrichtung zur Erfassung und Lieferung bzw. Bereitstellung von Störparametern, sofern Störparameter (bereits) vorhanden sind und/oder unvorhergesehenermaßen (zwischenzeitlich bzw. nachträglich) auftreten, verbunden ist, von der Einrichtung zur Erfassung und Lieferung von Kundenauftragsdaten, der Einrichtung zur Erfassung und Lieferung von Kapazitätsparametern, der Einrichtung zur Erfassung und Lieferung von Störparametern und den verfahrenstechnischen Anlagen Ist-Daten über den aktuellen Herstellungsablauf des wenigstens einen Produktes erhält, zu Soll-Daten bzw. Plandaten eines Herstellungsablaufs des wenigstens einen Produktes in Abhängigkeit der minimal erforderlichen Zeit und/oder des/der maximal herstellbaren Menge/Durchsatzes des wenigstens einen Produktes verarbeitet und den aktuellen Herstellungsablauf an den optimierten Herstellungsablauf des wenigstens einen Produktes anpasst, ist eine konstruktiv besonders einfache, zudem unmittelbar ansprechende und damit schnell arbeitende Anordnung insgesamt erreicht. Zugleich ist mit der erfindungsgemäßen Anordnung eine hohe Genauigkeit in der Feinplanung und Optimierung gewährleistet. Zusätzlich lassen sich unterschiedlichste Planungsvarianten in Echtzeit miteinander vergleichen, speichern und kostenmäßig bewerten. Von ganz besonderer Bedeutung ist bei alledem, dass die Anordnung eine Regelungsvorrichtung zur Feinplanung und Optimierung der Herstellung des wenigstens einen Produktes, die zwischen der Einrichtung zur Erfassung und Lieferung von Kundenauftragsdaten und den verfahrenstechnischen Anlagen angeordnet ist, umfasst, welche Herstellungsprozesse erheblich abkürzt und dadurch die Herstellung von Produkten effizienter macht. Damit einhergehend lassen sich eine termingerechte Planung einzelner Fertigungsstufen und Vorprodukte und/oder Zwischenprodukte sowie eine Belegung der Anlagen einschließlich der Belegungszeiten, die notwendig sind, Produktionsaufträge termingerecht auszuführen, auf einfache und äußerst exakte Weise erreichen. Nicht zuletzt hieraus resultierend können Produkte, die mit beliebigen verfahrenstechnischen Produktionstechniken einschließlich einer rezeptspezifischen Fertigung ("Schritt-für-Schritt"-Fertigung) hergestellt werden, mit kürzeren Durchlaufzeiten bei besserer Auslastung der Fertigungskapazitäten hergestellt werden. Die Regelungsvorrichtung senkt dadurch Produktionskosten. Investitionen in Anlagen, die wie bisher getätigt wurden, um "auf der sicheren Seite zu sein" und lediglich in wenigen und ganz begrenzten Zeitfenstern Produktionsspitzen abzubauen, können unterbleiben. Auch Lagerkosten für Rohstoffe, Vorprodukte, Zwischenprodukte und (Fertigbzw. End-)produkte reduzieren sich aufgrund schnellerer Nachproduktion und verbesserter Disposition von Beständen.By the inventive design of the inventive arrangement for time and volume or throughput optimized production of at least one product from at least one raw material and / or intermediate and / or intermediate product by means of process engineering equipment comprising a control device for fine planning and optimization of the production of at least one product, the control device being arranged between a customer order data acquisition and delivery device and the interactive communication processing systems, comprising means for acquiring and providing capacity parameters and means for acquiring and providing disturbance parameters, if disruptive parameters are (already) present and / or unpredictably occur (in the meantime or subsequently), by the facility for recording and delivering customer traffic to obtain data on the actual production process of the at least one product, to desired data or planning data of a production sequence of the at least one product in Depending on the minimum required time and / or the maximum producible amount / throughput of the at least one product processed and adapts the current production process to the optimized production process of at least one product is a structurally particularly simple, also directly responsive and thus fast-working arrangement as a whole reached. At the same time with the inventive arrangement a high accuracy in the detailed planning and optimization guaranteed. In addition, a wide variety of planning variants can be compared, saved and evaluated in real time. Of particular importance in all that the arrangement comprises a control device for fine planning and optimization of the production of at least one product, which is arranged between the device for recording and delivery of customer order data and the process engineering facilities, which significantly reduces manufacturing processes and thereby the Making products more efficient. Along with this, on-schedule planning of individual production stages and intermediate products and / or intermediate products as well as occupancy of the installations, including the occupancy times that are necessary to execute production orders on time, can be achieved in a simple and extremely exact manner. Not least as a result, products manufactured using any process engineering production technique, including recipe-specific manufacturing ("step-by-step" manufacturing), can be produced with shorter lead times and better utilization of manufacturing capacity. The control device thereby lowers production costs. Investments in facilities that were made as before to "be on the safe side" and only in a few and very limited time windows to reduce production peaks, can be omitted. Stock costs for raw materials, primary products, intermediate products and (finished products) are also reduced due to faster post-production and improved inventory management.
Ganz besonders vorteilhafte konstruktive Einzelheiten der erfindungsgemäßen Anordnung zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen sind in den Ansprüchen 2 bis 10 beschrieben.All particularly advantageous structural details of the arrangement according to the invention for time and volume or throughput optimized production at least a product of at least one raw material and / or intermediate by means of process engineering systems are in the claims 2 to 10 described.
Des Weiteren wird diese Aufgabe in verfahrenstechnischer Hinsicht auf überraschend einfache Weise durch die Merkmale des Anspruchs 11 gelöst.Of Furthermore, this task is surprising in terms of process engineering simple manner solved by the features of claim 11.
Demnach ist durch die Ausgestaltung des erfindungsgemäßen Verfahrens zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Vorprodukt und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen, umfassend folgende Schritte:
- a) Erfassen von Kundenauftragsdaten durch eine Einrichtung zur Erfassung und Lieferung bzw. Bereitstellung von Kundenauftragsdaten,
- b) Liefern der Kundenauftragsdaten durch die Einrichtung zur Erfassung und Lieferung von Kundenauftragsdaten an eine Regelungsvorrichtung,
- c) (Interaktives) Kommunizieren zwischen der Regelungsvorrichtung und der Einrichtung zur Erfassung und Lieferung von Kundenauftragsdaten sowie den verfahrenstechnischen Anlagen,
- d) Erfassen von Kapazitätsparametern durch eine Einrichtung zur Erfassung und Lieferung bzw. Bereitstellung von Kapazitätsparametern und Liefern bzw. Bereitstellen von Ist-Daten über den aktuellen Herstellungsablauf des wenigstens einen Produktes an die Regelungsvorrichtung,
- e) Erfassen von Störparametern durch eine Einrichtung zur Erfassung und Lieferung bzw. Bereitstellung von Störparametern und Liefern bzw. Bereitstellen von Ist-Daten über den aktuellen Herstellungsablauf des wenigstens einen Produktes an die Regelungsvorrichtung, sofern Störparameter (schon) vorhanden sind und/oder unvorhergesehenermaßen (zwischenzeitlich bzw. nachträglich) auftreten,
- f) Verarbeiten der von der Einrichtung zur Erfassung und Lieferung von Kundenauftragsdaten, der Einrichtung zur Erfassung und Lieferung der Kapazitätsparameter, der Einrichtung zur Erfassung und Lieferung von Störparametern sowie den verfahrenstechnischen Anlagen erhaltenen Ist-Daten über den aktu ellen Herstellungsablauf des wenigstens einen Produktes zu Soll-Daten bzw. Plandaten eines Herstellungsablaufs des wenigstens einen Produktes in Abhängigkeit der minimal erforderlichen Zeit und/oder des/der maximal herstellbaren Menge/Durchsatzes des wenigstens einen Produktes, und
- g) Anpassen des aktuellen Herstellungsablaufes an den optimierten Herstellungsablauf des wenigstens einen Produktes durch die Regelungsvorrichtung,
- a) collecting customer order data by a device for the acquisition and delivery of customer order data,
- b) supplying the customer order data by the means for acquiring and delivering customer order data to a control device,
- c) (Interactive) communication between the control device and the device for collecting and delivering customer order data and the process engineering systems,
- d) detecting capacity parameters by a device for detecting and supplying or providing capacity parameters and providing actual data about the current production sequence of the at least one product to the control device,
- e) detecting interference parameters by a device for detecting and delivering or providing interference parameters and delivering or providing actual data on the current production sequence of the at least one product to the control device, if disturbing parameters are (already) present and / or unforeseen ( in the meantime or subsequently),
- (f) processing the actual data on the current production sequence of the at least one product at target obtained by the customer order data collection and delivery device, the capacity parameter acquisition and delivery device, and the process engineering equipment Data or planning data of a production sequence of the at least one product as a function of the minimum required time and / or the maximum producible amount / throughput of the at least one product, and
- g) adapting the current production sequence to the optimized production sequence of the at least one product by the control device,
Von ganz besonderer Bedeutung sind die Merkmale der Ansprüche 12 und/oder 13, wonach eine oder mehrere geeignete Anlage/n aus der/den zur Verfügung stehenden Anlage/n in Abhängigkeit der minimal erforderlichen Zeit und/oder der/des maximal herstellbaren Menge/Durchsatzes des wenigstens Produktes zur geregelten Feinplanung retrograd ausgewählt wird/werden.From Of particular importance are the features of claims 12 and / or 13, according to which one or more suitable plant / s from the disposal standing plant / s depending on the minimum required time and / or the maximum manufacturable Quantity / throughput of the at least product for controlled detailed planning selected retrograde will be.
Weitere ganz besonders vorteilhafte Einzelheiten des erfindungsgemäßen Verfahrens zur zeit- und mengen- bzw. durchsatzoptimierten Herstellung wenigstens eines Produktes aus mindestens einem Rohstoff und/oder Zwischenprodukt mittels verfahrenstechnischer Anlagen sind in den Ansprüchen 14 bis 47 beschrieben.Other particularly advantageous individual units of the process according to the invention for the time and volume or throughput-optimized production of at least one product from at least one raw material and / or intermediate product by means of process engineering plants are described in claims 14 to 47.
Weitere Vorteile, Merkmale und Einzelheiten der Erfindung ergeben sich aus der nachfolgenden Beschreibung einer bevorzugten Ausführungsform der Erfindung sowie anhand der Zeichnungen. Hierbei zeigen:Further Advantages, features and details of the invention will become apparent the following description of a preferred embodiment of Invention and with reference to the drawings. Hereby show:
Bei
der nachfolgenden Beschreibung eines Ausführungsbeispieles der erfindungsgemäßen Anordnung
Die
Anordnung
Bei
der in den
Die
Regelungsvorrichtung
Wie
insbesondere aus den
Darüber hinaus
ist die Regelungsvorrichtung
Betriebsdaten,
aus Maschinen, Anlagen
Die
Regelungsvorrichtung
Die
Soll-Daten werden dabei in Abhängigkeit der
minimal erfor derlichen Zeit und/oder des/der maximal herstellbaren
Menge/Durchsatzes des wenigstens einen Produktes erstellt. Soll-Daten können auf Vorgaben,
wie zum Beispiel minimalen Durchlaufzeiten, minimalem Energieverbrauch,
bestimmtem Mengendurchsatz, minimalen Produktionskosten, minimalem
Materialverbrauch oder minimalen (Einzel- und/oder Gesamt-)Kosten,
basieren. Schließlich passt
die Regelungsvorrichtung
Vorzugsweise
ist die Regelungsvorrichtung
Die
Kopplungseinrichtung
Die
Kopplungseinrichtung
Entsprechend
den
Die
Einrichtung
Die
Einrichtung
Die
Einrichtung
Des
Weiteren kommunizieren die verfahrenstechnischen Anlagen
Die
Regelungsvorrichtung
Zu
diesem Zweck umfasst die Regelungsvorrichtung
Die
Besonderheit der erfindungsgemäßen Anordnung
Der
Regelungsvorrichtung
Alternativ
dazu kann die Regelungsvorrichtung
Da
die Regelungsvorrichtung
Im
Folgenden ist schließlich
noch ein Beispiel zur Abarbeitung eines Auftrages zur Herstellung wenigstens
eines Produktes mittels einer Anordnung
Sodann sind Schichtzahl und Zeitdauer einer Schicht festzulegen, wobei ebenfalls eventuelle Überstunden zu berücksichtigen sind.thereupon the number of shifts and the duration of a shift should be defined, also possible overtime to take into account are.
Die
Anordnung
Die
Anordnung
Die
Anordnung
Die
Anordnung
Die
Anordnung
Die
Verrohrungen zwischen den Anlagen
Die
Anordnung
Für den letzten
Fertigungsschritt eines Endproduktes des ersten Fertigungsauftrages
ist aus der Gruppe der zulässigen
Anlagen
Die
Standardbelegungszeit für
eine Anlage
Die
Anlage
Für alle geeigneten
Anlagen
Der Prozess ist zu wiederholen, wobei die Rüst- und Reinigungszeit addiert werden. Falls eine Anlagenkonfiguration kürzere Durchlaufzeiten hat, wird diese favorisiert.Of the The process is to be repeated, with the set-up and cleaning time added together become. If a plant configuration has shorter lead times, then this favors.
Die vorangegangenen 8 Schritte sind für die vorangehende Anlage in der Prozessfolge zu wiederholen.The Previous 8 steps are for the previous attachment in to repeat the process sequence.
Das Verfahren wird so lange fortgesetzt, bis alle Fertigungsstufen eines Zwischenproduktes oder Endproduktes abgearbeitet sind. Es entstehen für jeden Fertigungsauftrag Prozessketten mit minimalen Durchlaufzeiten und spätesten Startzeiten für die Fertigung von Zwischenprodukten und Endprodukten.The The process continues until all production stages of a Intermediate or finished product are processed. It arises for each Production order process chains with minimal lead times and spätesten Start times for the production of intermediates and end products.
Sind
Anlagen
Unter
Berücksichtigung
laufender Anlagen
Für Teilmengen
der Gesamtmenge sind alternative Lösungen so zu bestimmen, dass
die Teilmengen in andere Anlagen
Falls
zwischen einzelnen Fertigungsstufen Zwischenlagerzeiten entstehen,
weil die aufeinanderfolgenden Fertigungsprozesse zum Beispiel unterschiedliche
Standardbelegungszeiten haben und nicht direkt hintereinandergefertigt
werden können, ist
von der Anordnung
Es
ist zu prüfen,
ob ein Produkt mit Zwischenlagerung in der Anlage mit kürzerer Durchlaufzeit
gefertigt werden kann, wobei die Anlage
Es
ist anzuzeigen, wo und wann die Zwischenlagerung geplant wird. Zu
berücksichtigen
sind bei der Zwischenlagerung die Rüst- und Reinigungszeiten. Eine
Zwischenlagerung kann ungeachtet dessen auch hilfsweise in der/den
Anlage/n
Eine Abfüllung bzw. Abpackung kann aus der Fertigungsanlage oder aus einem Zwischenlager erfolgen. Entscheidungskriterium sind Anlagennutzung, vorhandene personelle Ressourcen (Bedienpersonal) und Durchlaufzeit.A filling or packaging may be from the manufacturing plant or from an intermediate storage respectively. Decision criterion are plant utilization, existing ones Human resources (operating personnel) and lead time.
Die
optimale Behälterfüllung wird
durch anhand der Kapazität
einer Anlage
Ebenso kann bei einem Fertigungsauftrag eine durchgängige Fertigung ohne Zwischenlagerung und ohne Zusammenfassen von gleichartigen Chargen (aus-)gewählt werden.As well can in a production order a continuous production without intermediate storage and without summarizing like batches.
Fertigungsaufträge können so in der Planung fixiert werden, dass in jedem Falle der Wunschliefertermin eingehalten wird.Production orders can do so be fixed in the planning that in each case the requested delivery date is complied with.
Falls
durch Aufteilen einer Produktionsmenge eine Differenzmenge übrig bleibt,
die kleiner als die Sumpfmenge ist, zeigt dies die Anordnung
Falls
eine Schicht nicht ausgelastet ist, prüft die Anordnung
Es können auch Fertigungsaufträge außerhalb der Planungsperiode vorgezogen werden.It can also production orders outside be preferred to the planning period.
Die
Anordnung
Die
Anordnung
Jeder Plan kann gespeichert, mit anderen Plänen verglichen und später (wieder) abgerufen werden. Es können unterschiedliche Planungsperioden geplant werden. Änderungen in der Planung können nach jedem Planungslauf angezeigt werden. Ein Vergleich zwischen altem und neuem Plan ist jederzeit möglich.Each plan can be saved, compared to other plans, and retrieved later. There may be different planning periods to be planned. Changes in the planning can be displayed after each planning run. A comparison between old and new plan is possible at any time.
Die
Belegung der Anlagen
Zusätzlich wird
im Fertigungsplan die zeitliche Belegung der Anlagen
Falls
Wunschliefertermine nicht eingehalten werden können, zeigt das die Anordnung
Manuelle Eingriffe in das GATT-Diagramm sind durch Drag und Drop im Rahmen der Schichtzeiten und Restriktionen zulässig. Grenzen dieser Eingriffe werden aufgezeigt. Der zugehörige Fertigungsplan wird mitgeändert.manual Interventions in the GATT diagram are by drag and drop in the frame shift times and restrictions allowed. Limits of these interventions are shown. The associated Production plan is changed.
Ein Rohstoffmangel kann an die Beschaffung gemeldet werden oder löst automatische Bestellaufträge aus.One Raw material shortage can be reported to the procurement or triggers automatic Purchase orders out.
Änderungen von Terminen, Produktmengen, Anlagenlaufzeiten einschließlich Überstunden des Personals sind durch Eingabe von neuen Werten zulässig. Durch Änderung der Rohstoffmengen etc. und Anlagenlaufzeiten können Liefertermine korrigiert werden.amendments deadlines, product quantities, system run times including overtime of the staff are allowed by entering new values. By change of raw material quantities etc. and system running times, delivery dates can be corrected.
Die Abfrage der Lagersituation, d. h. Fertig- und Rohstofflager, ist möglich. Bestandsverläufe lassen sich im Zeitverlauf darstellen.The Query the storage situation, d. H. Finished and raw material warehouse, is possible. asset history can be displayed over time.
Die
Auslastung der Anlagen
Anhand
der Laufzeiten der Anlagen
Durch Vergleich von zwei Planungsvarianten können unterschiedliche Produktions-Szenarien verarbeitet werden.By Comparison of two planning variants can be different production scenarios are processed.
Werden Daten aus der Fertigung in das Planungssystem zurückgekoppelt, sogenanntes Monitoring, lassen sich Ist-Daten und Soll-Daten bzw. Plandaten vergleichen, gegebenenfalls vorhandene Abweichungen einfach und schnell erkennen und somit schließlich eine zum aktuellen Zeitpunkt optimale Feinplanung erhalten und auswählen.Become Data from production fed back into the planning system, So-called monitoring, can actual data and target data or Compare plan data, possibly existing deviations simply and quickly recognize and thus finally one at the current time receive and select optimal detailed planning.
Claims (47)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102007004232A DE102007004232A1 (en) | 2007-01-27 | 2007-01-27 | Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102007004232A DE102007004232A1 (en) | 2007-01-27 | 2007-01-27 | Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE102007004232A1 true DE102007004232A1 (en) | 2008-08-07 |
Family
ID=39587102
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE102007004232A Withdrawn DE102007004232A1 (en) | 2007-01-27 | 2007-01-27 | Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE102007004232A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013020603A1 (en) * | 2011-08-11 | 2013-02-14 | Siemens Aktiengesellschaft | Method for fabricating a component |
| DE102012206083A1 (en) * | 2012-04-13 | 2013-10-17 | Krones Ag | Method and device for optimizing a production process |
| WO2019081314A1 (en) * | 2017-10-24 | 2019-05-02 | Siemens Aktiengesellschaft | METHOD FOR OPERATING A PRODUCTION SYSTEM FOR MANUFACTURING PRODUCTS OF DIFFERENT PRODUCT TYPES |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10219322A1 (en) * | 2002-04-30 | 2003-11-20 | Siemens Ag | Process for electronic data processing of industrial process has determining product mix for partial process and adjusting operating program for planned period based on product mix and operating priority of product mix |
-
2007
- 2007-01-27 DE DE102007004232A patent/DE102007004232A1/en not_active Withdrawn
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10219322A1 (en) * | 2002-04-30 | 2003-11-20 | Siemens Ag | Process for electronic data processing of industrial process has determining product mix for partial process and adjusting operating program for planned period based on product mix and operating priority of product mix |
Non-Patent Citations (2)
| Title |
|---|
| Volker Schnittler: "Pünktliche Lieferung Zufrie- dene Kunden - Wirksame Fertigungssteuerung durch Manufacturing Execution Systeme (MES)", TeDo-Ver- lag GmbH, Marburg, IT & Production - Zeitschrift für industrielle Informationstechnologie. MES-Füh- rer 2006, S. 18, (auch Online abrufbar unter: http://www.it-production.com/media_container/MES_ Fuehrer_2006.pdf) |
| Volker Schnittler: "Pünktliche Lieferung Zufriedene Kunden - Wirksame Fertigungssteuerung durch Manufacturing Execution Systeme (MES)", TeDo-Verlag GmbH, Marburg, IT & Production - Zeitschrift für industrielle Informationstechnologie. MES-Führer 2006, S. 18, (auch Online abrufbar unter: http://www.it-production.com/media_container/MES_ Fuehrer_2006.pdf) * |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013020603A1 (en) * | 2011-08-11 | 2013-02-14 | Siemens Aktiengesellschaft | Method for fabricating a component |
| DE102012206083A1 (en) * | 2012-04-13 | 2013-10-17 | Krones Ag | Method and device for optimizing a production process |
| WO2019081314A1 (en) * | 2017-10-24 | 2019-05-02 | Siemens Aktiengesellschaft | METHOD FOR OPERATING A PRODUCTION SYSTEM FOR MANUFACTURING PRODUCTS OF DIFFERENT PRODUCT TYPES |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE10112681B4 (en) | Computer system with methods for planning operations in a steel mill and program storage device for performing the method | |
| DE4116277C2 (en) | Computer-controlled method and data processing device for controlling the production of a large number of different products | |
| DE69508931T2 (en) | FACTORY NETWORK WITH SEVERAL FACTORIES AND COORDINATION PROCEDURES | |
| Sugimori et al. | Toyota production system and kanban system materialization of just-in-time and respect-for-human system | |
| DE69428948T2 (en) | Procedure and system for calculating order quantities | |
| DE102020203716B4 (en) | Computer-implemented method for production planning and/or control of a production system and production planning and/or control system | |
| CN102346888A (en) | Production management system and method adopting order lists as core | |
| DE60122346T2 (en) | PRODUCTION PLANNING METHOD AND SYSTEM FOR PRODUCTION PLANNING | |
| DE102016103771A1 (en) | Method of producing a product with integrated planning and direct integrated control | |
| EP2650739A1 (en) | Method and device for optimising a production process | |
| DE102008053274A1 (en) | Method for controlling a plurality of production processes | |
| WO2013026673A1 (en) | Adjustment of an industrial installation | |
| DE102007036325A1 (en) | Method and system for creating a production plan for a production plant | |
| DE102007004232A1 (en) | Product e.g. primary product, manufacturing arrangement, has control device receiving actual data from detection devices and process plant by current process of products and adjusting current process to optimized process of product | |
| EP3463834B1 (en) | Method and system for processing optical lenses | |
| EP1266270B1 (en) | System and method for determining the optimal operating speed of a production machine | |
| DE102012202217A1 (en) | Bottling plant and computer-implemented process for the automatic creation of a current and individual work list | |
| Golinska et al. | Production flow control in the automotive industry–quick scan approach | |
| Mapokgole et al. | The art of managing production disruptions in pump industry through visual management | |
| EP4296917A1 (en) | Optimization of a production planning | |
| DE202016006396U1 (en) | Program for controlling and self-optimizing the production of a smart factory (Industry 4.0) | |
| WO2003056480A2 (en) | Method and system for conducting dynamic, model-based planning and optimization of production processes and for creating schedules | |
| EP4352672A1 (en) | Insertion control for the order inflow in the fabrication of prescription lenses | |
| WO2014048876A1 (en) | Method for stock-keeping and/or the estimation of obsolescence risk | |
| Salgado et al. | Kanban sharing and optimization in Bosch production system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| OP8 | Request for examination as to paragraph 44 patent law | ||
| R016 | Response to examination communication | ||
| R016 | Response to examination communication | ||
| R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |