DE102005013991B3 - Mobile working frame for bridge has sub frames mounted on bridge with roller ways for movable staging operated by winches - Google Patents
Mobile working frame for bridge has sub frames mounted on bridge with roller ways for movable staging operated by winches Download PDFInfo
- Publication number
- DE102005013991B3 DE102005013991B3 DE102005013991A DE102005013991A DE102005013991B3 DE 102005013991 B3 DE102005013991 B3 DE 102005013991B3 DE 102005013991 A DE102005013991 A DE 102005013991A DE 102005013991 A DE102005013991 A DE 102005013991A DE 102005013991 B3 DE102005013991 B3 DE 102005013991B3
- Authority
- DE
- Germany
- Prior art keywords
- bridge
- platform
- working platform
- scaffold according
- mobile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 12
- 239000010959 steel Substances 0.000 claims abstract description 12
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 5
- 239000002131 composite material Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 3
- 239000011121 hardwood Substances 0.000 description 2
- 238000009420 retrofitting Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 235000004443 Ricinus communis Nutrition 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Die Erfindung betrifft ein fahrbares Arbeitsgerüst zur Bearbeitung und/oder Besichtigung einer Brücke, insbesondere Stahlbetonbrücke, Stahlbrücke oder Stahlverbundbrücke.The The invention relates to a mobile scaffolding for processing and / or Visit of a bridge, in particular reinforced concrete bridge, steel bridge or steel composite bridge.
Brücken, insbesondere Stahlbetonbrücken, müssen regelmäßig überprüft und ggf. instand gesetzt werden, da insbesondere durch Witterungseinflüsse sowohl Schäden am Beton als auch an den Stahlträgern entstehen können. Dazu ist es erforderlich, unter die Brückenunterseite zu gelangen, und zwar jeweils über die gesamte Länge der Brücke. Da die lichte Höhe einer Brücke beträchtlich sein kann, ist es nicht möglich, Gerüste zu verwenden, die auf dem Erdboden angebracht sind, sondern es ist notwendig, fahrbare Arbeitsgerüste einzusetzen.Bridges, in particular Reinforced concrete bridges, must be checked regularly and if necessary be repaired, especially due to weather conditions both damage on the concrete as well as on the steel girders can arise. For this it is necessary to get under the bridge underside, each over the entire length the bridge. Because the clear height a bridge considerably it is not possible Scaffolding to use that are attached to the ground, but it is necessary, mobile working scaffolding use.
Bisher im Wesentlichen verwendete fahrbare Arbeitsgerüste sind so ausgebildet, dass sie eine unterhalb der Brücke verfahrbare Arbeitsbühne aufweisen, die über einen C-förmigen Träger mit einem Fahrgestell verbunden ist, das auf Schienen auf der Brückenoberseite im Bereich der Fahrbahn läuft. Solche fahrbaren Arbeitsgerüste sind sehr aufwendig und weisen vor allem das Problem auf, dass die Fahrschienen auf einer Brückenfahrbahn verlegt werden müssen, was zwangsläufig zu einer Teil- oder Vollsperrung der Brücke führt. Zudem müssen die Fahrschienen sukzessiv verlegt werden, was ebenfalls mit entsprechendem Aufwand verbunden ist.So far essentially used mobile scaffolds are designed so that they one below the bridge mobile working platform have that over a C-shaped carrier connected to a chassis that is on rails on the bridge top running in the area of the roadway. Such mobile scaffolding are very elaborate and have the particular problem that the rails on a bridge carriageway have to be relocated which inevitably leads to a partial or full closure of the bridge. In addition, the rails must be laid successively, which also with a corresponding effort connected is.
Aus
Aufgabe der Erfindung ist es, ein fahrbares Arbeitsgerüst zu schaffen, mit dem es unter Berücksichtigung sämtlicher Sicherheitsanforderungen möglich ist, Besichtigungs- und Sanierungsarbeiten an einer Brückenunterseite durchzuführen, ohne den Brückenverkehr wesentlich zu beeinträchtigen.task The invention is to provide a mobile work scaffold, with which it considering all Security requirements possible is, inspection and renovation work on a bridge base perform, without the bridge traffic significantly affect.
Diese Aufgabe wird gelöst mit einem fahrbaren Arbeitsgerüst zur Bearbeitung und/oder Besichtigung einer Brücke, insbesondere Stahlbetonbrücke, mit an der Brückenunterseite zu befestigenden Halteelementen, die beidendseitig jeweils mit wenigstens einer Laufrolle versehen sind, und mit einer Arbeitsbühne, welche an zwei gegenüberliegenden Oberseiten Laufschienen aufweist, mittels derer die Arbeitsbühne entlang der Laufrollen verfahrbar ist.These Task is solved with a mobile scaffolding for processing and / or viewing a bridge, in particular reinforced concrete bridge, with at the bridge bottom to be fastened holding elements, the both ends each with at least one Castor are provided, and with a working platform, which on two opposite Upside rails has, by means of which the work platform along the rollers is movable.
Erfindungsgemäß wird somit ein fahrbares Arbeitsgerüst zur Verfügung gestellt, das nach Art einer Schwebebahn unterseitig an der Brücke aufgehängt ist, wozu beispielsweise in einem Abstand von einem Meter miteinander fluchtend an der Brückenunterseite Halteelemente verankert werden, die beidendseitig jeweils wenigstens eine Laufrolle aufweisen, während die Arbeitsbühne an der Oberseite entsprechende Laufschienen aufweist. Anders als bei bisher bekannten Arbeits gerüsten ist es somit nicht erforderlich, an der Brückenoberseite, insbesondere im Bereich der Fahrbahn, irgendwelche Befestigungs- oder andere Elemente anzubringen, d.h. bei Funktion des Arbeitsgerüstes ist die Brückenfahrbahn unverändert frei zugänglich, so dass keine Verkehrsbeeinträchtigungen entstehen. Das sukzessive Verlegen von Schienen ist nicht erforderlich, da die Arbeitsbühne selbst die Schienen aufweist, es müssen nur sukzessive an der Brückenunterseite die entsprechenden Halteelemente befestigt werden.Thus, according to the invention a mobile scaffolding to disposal placed on the bridge in the manner of a monorail, for example, at a distance of one meter from each other aligned at the bridge base Retaining elements are anchored, both sides at least each have a roller while the work platform has corresponding rails at the top. Different to scaffolding in previously known working It is therefore not necessary on the bridge top, in particular in Area of the roadway, any attachment or other elements to install, i. when working scaffold is the bridge carriageway unchanged freely accessible, so no traffic disturbances arise. The gradual laying of rails is not necessary because the work platform Even the rails has, it must only successively s.der Bridge underside the corresponding holding elements are attached.
Dabei ist vorteilhaft vorgesehen, dass die konsolenartigen Halteelemente mittels in den Brückenüberbau integrierten Befestigungsankern befestigbar sind. Diese Befestigungsanker werden vorzugsweise bei Brückenneubauten direkt in den Brückenüberbau einbetoniert, grundsätzlich wäre auch eine Nachrüstung möglich. Diese Befestigungsanker dienen dann als Aufnahme für die konsolenartigen Halteelemente.there is advantageously provided that the console-like holding elements by means integrated in the bridge superstructure Fixing anchors are fastened. These fastening anchors will be preferably for new bridges concreted directly into the bridge superstructure, in principle would be one too retrofitting possible. These fastening anchors then serve as a receptacle for the console-like holding elements.
Zur Montage des Arbeitsgerüstes werden am leicht zugänglichen Brückenende mit Hilfe eines Hubsteigers oder eines kleinen Gerüstes zunächst einige konsolenartige Halteelemente an den entsprechenden Befestigungsankern der Brücke montiert, beispielsweise mittels Konsolbolzen angeschraubt. Falls Fluchttoleranzen beim Einbau der Befestigungsanker entstanden sind, werden diese durch in den konsolenartigen Halteelementen vorhandene Langlöcher und Höhentoleranzen in der Fahrbahnplatte mittels Hartholzkeilen, Justierspindel oder dergl. ausgeglichen. Nachdem die Arbeitsbühne mit ihren Laufschienen auf die ersten konsolenartigen Halteelemente aufgeschoben ist, werden alle anderen konsolenartigen Halteelemente in der Arbeitsbühne stehend montiert. Dazu kann successiv das jeweilige konsolenartige Halteelement in das vordere Ende der Laufschienen gelegt werden und dann eine Verschraubung an den Befestigungsankern durchgeführt werden. Die Laufschienen garantieren dabei zwangsläufig einen flucht- und höhengerechten Einbau der konsolenartigen Halteelemente.to Assembly of the work scaffold become easily accessible bridge end with the help of a Hubsteigers or a small scaffold first a few console-like holding elements on the corresponding mounting anchors the bridge mounted, for example screwed by means of console bolts. If Escape tolerances have arisen during installation of the fastening anchors, These are provided by existing in the console-like support elements slots and height tolerances in the deck slab by means of hardwood wedges, adjusting spindle or dergl. balanced. After the work platform with its rails is pushed onto the first console-like holding elements are all other console-like holding elements standing in the platform assembled. This can successively the respective console-like holding element be placed in the front end of the rails and then one Screwing be performed on the mounting anchors. The rails inevitably guarantee this a flight and height-appropriate Installation of the console-like holding elements.
Die Verfahrbarkeit der Arbeitsbühne wird vorzugsweise mittels einer Winde oder dergl. realisiert.The Movability of the work platform is preferably realized by means of a winch or the like.
Dabei ist den Sicherheitsanforderungen folgend vorgesehen, dass die Arbeitsbühne feststellbar ausgebildet ist. Dies kann bevorzugt dadurch geschehen, dass die Arbeitsbühne durch sich an den Halteelementen abstützenden Klinken feststellbar ist. Die Klinken sind dann so ausgebildet, dass sie sich nicht selbstständig öffnen können, sondern z.B. nur durch das Ziehen des Windenseiles beim Fortbewegen der Bühne geöffnet werden.there is provided following the safety requirements that the working platform designed detectable is. This can preferably be done by the work platform through supported on the support members Pawl is lockable. The latches are then designed that they can not open independently, but e.g. only by pulling the winch rope when moving the Be opened stage.
Da mit der ersten Arbeitsbühne nur der unterseitige Brücken randbereich erreicht werden kann, ist in bevorzugter Weiterbildung vorgesehen, dass die Arbeitsbühne in einen unterseitigen Mast verlängert ist, welcher zur Aufnahme einer weiteren, unteren Arbeitsbühne ausgebildet ist, welche gegenüber dem Mast quer zur oberen Arbeitsbühne verschiebbar ausgebildet ist. Der Mast ist dabei so lang, dass die untere Arbeitsbühne so tief angeordnet ist, dass auch die unteren Brückenteile, insbesondere die Stahlträger, zugänglich sind. Durch die Verschiebbarkeit der unteren Arbeitsbühne quer zur Brückenlängsachse ist es möglich, auch an Brückenpfeilern vorbeizufahren. Die untere Arbeitsbühne wird von der oberen Arbeitsbühne z.B. mittels einer Winde von innen nach außen und umgekehrt nach Art einer Schublade verschoben.There with the first work platform only the lower edge of the bridge can be achieved is provided in a preferred embodiment, that the work platform extended into a lower-sided mast is, which is designed to accommodate a further lower platform which is opposite the Mast across to the upper platform is formed displaceable. The mast is so long that the lower working platform is arranged so deep that the lower bridge parts, in particular the steel beams, are accessible. Due to the displaceability of the lower platform transversely to the bridge longitudinal axis Is it possible, also to drive past bridge piers. The lower work platform is from the upper work platform e.g. by means of a winch from inside to outside and vice versa by type a drawer moved.
Ganz besonders bevorzugt ist vorgesehen, dass die untere Arbeitsbühne so lang ausgebildet ist, dass sie in einer Endlage soweit nach außen verfahrbar ist, dass sie von außerhalb des Brückenrandes zugänglich ist. Dies ermöglicht auf einfache Weise bei Unfällen oder dergl. eine Bergung mittels eines Hubschraubers, der die untere Arbeitsbühne neben der Brücke erreichen kann. Bisher war es notwendig, eine verunfallte Person mit mehreren Hilfspersonen äußerst umständlich zu bergen.All particularly preferably it is provided that the lower platform so long is formed so that they can be moved in an end position so far outward is that they are from outside the bridge edge is accessible. this makes possible in a simple way in case of accidents or the like. A salvage using a helicopter, the lower platform next to the bridge can reach. So far, it was necessary to have a casualty with several helpers extremely cumbersome too mountains.
In weiterer Ausgestaltung ist den Sicherheitsanforderungen genügend vorgesehen, dass die untere Arbeitsbühne feststell bar ausgebildet ist.In further embodiment, the safety requirements are sufficiently provided that the lower work platform lockable bar is formed.
In
weiterer bevorzugter Ausgestaltung ist vorgesehen, dass die Laufrollen
konisch ausgebildet sind. Dadurch wird das Auffahren bzw. "Auffädeln" in bzw. auf die
Laufschienen
Um von der Brückenoberseite auf die obere Arbeitsbühne und von dort auf die untere Arbeitsbühne zu gelangen, sind fest installierte Leitern oder ähnliches vorgesehen.Around from the bridge top on the upper platform and from there to get to the lower platform are fixed installed ladders or similar intended.
Die Erfindung ist nachstehend anhand der Zeichnung beispielhaft näher erläutert. Diese zeigt in:The The invention is explained in more detail below with reference to the drawing by way of example. These shows in:
In
den Figuren ist eine Stahlverbundbrücke nur bereichsweise dargestellt,
erkennbar ist der äußere Bereich
einer Fahrbahnplatte
Um
die Brückenunterseite,
insbesondere im Bereich der Fahrbahnplatte
Dazu
weist das Arbeitsgerüst
zunächst
im Abstand voneinander quasi bahnschwellenartig anzuordnende, an
der Unterseite der Fahrbahnplatte
Die
konsolenartigen Halteelemente
Um
bei der Montage der konsolenartigen Halteelemente
Wesentlich
ist nun, dass die konsolenartigen Halteelemente
Das
fahrbare Arbeitsgerüst
weist darüber
hinaus eine obere Arbeitsbühne
Wenn
die obere Arbeitsbühne
Das
komplette Arbeitsgerüst
ist mittels einer Winde oder dergl. verfahrbar, die nicht dargestellt
ist. Sie ist in beliebigen Positionen feststellbar ausgebildet,
wozu beispielsweise sich an den Halteelementen
Die
obere Arbeitsbühne
Auch
die untere Arbeitsbühne
Um
das Arbeitsgerüst
erreichen zu können, d.h.
sowohl die obere Arbeitsbühne
Ferner
ist zwischen der oberen Arbeitsbühne
Zur
Montage des fahrbaren Arbeitsgerüstes wird
zunächst
am leicht zugänglichen
Brückenende ein
kleines Gerüst
aufgebaut oder ein Hubsteiger eingesetzt und es werden die ersten
konsolenartigen Halteelemente
Zum
Aufhängen
der oberen Arbeitsbühne
Anschließend wird
der untere Mast
Durch das Betätigen der nicht dargestellten Winde kann die obere Arbeitsbühne in beide Richtungen gefahren werden.By the pressing the winch, not shown, the upper platform in both Be driven directions.
Zum
Umfahren von Brückenpfeilern
wird die untere Arbeitsbühne
Claims (9)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102005013991A DE102005013991B3 (en) | 2005-03-26 | 2005-03-26 | Mobile working frame for bridge has sub frames mounted on bridge with roller ways for movable staging operated by winches |
| DE202005020889U DE202005020889U1 (en) | 2005-03-26 | 2005-03-26 | Mobile stage for working and/or inspecting e.g. steel bridge, has retaining units, respectively, provided on both sides with roller, and working platform moveable along rollers by rails, where retaining units are fastenable by anchor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102005013991A DE102005013991B3 (en) | 2005-03-26 | 2005-03-26 | Mobile working frame for bridge has sub frames mounted on bridge with roller ways for movable staging operated by winches |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE102005013991B3 true DE102005013991B3 (en) | 2006-11-23 |
Family
ID=37311328
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE102005013991A Expired - Lifetime DE102005013991B3 (en) | 2005-03-26 | 2005-03-26 | Mobile working frame for bridge has sub frames mounted on bridge with roller ways for movable staging operated by winches |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE102005013991B3 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE202008003536U1 (en) | 2007-04-23 | 2008-05-29 | Döllen, Heinz von | Mobile superstructure for bridges, in particular steel composite bridges |
| DE102007023083B3 (en) * | 2007-04-23 | 2008-06-19 | Döllen, Heinz von | Mobile superstructure formwork for steel-reinforced concrete bridge has holding elements at intervals on underside of steel support that carry rollers one above the other offset by 90 degrees, one with horizontal, one with vertical axis |
| DE102009014858A1 (en) | 2009-03-30 | 2010-10-21 | Döllen, Heinz von | Formwork device for placing concrete in cantilevered parapet at bridge, has intermediate piece hinged above pivot point at end region of arm and detachably fixed at rod of support frame by cantilever arm at pivot point |
| CN108130861A (en) * | 2018-01-29 | 2018-06-08 | 中国有色金属工业第十四冶金建设公司 | A kind of steel box-girder movable type Hanging Basket |
| CN108708277A (en) * | 2018-06-29 | 2018-10-26 | 中国葛洲坝集团第工程有限公司 | Overpass bridge bottom wire laying device |
| CN108755452A (en) * | 2018-05-31 | 2018-11-06 | 谢世泽 | A kind of high stability cable type bridge maintenance device |
| CN109706837A (en) * | 2019-01-29 | 2019-05-03 | 江苏徐工工程机械研究院有限公司 | Basic arm of bridge inspection vehicle and bridge inspection vehicle |
| DE202018101994U1 (en) | 2018-04-12 | 2019-07-17 | Quick Bauprodukte Gesellschaft mit beschränkter Haftung | Mobile scaffolding |
| CN110886244A (en) * | 2020-01-03 | 2020-03-17 | 中建七局安装工程有限公司 | Longitudinal stretching operation platform device for segmental beam |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3124183A1 (en) * | 1981-06-19 | 1982-12-30 | Peter 5970 Plettenberg Cramer | Device for inspecting the underside of bridges |
| DE3824921A1 (en) * | 1988-07-22 | 1990-01-25 | Alfons Moog | Arrangement for travelling beneath bridges |
| DE29707488U1 (en) * | 1997-04-25 | 1998-08-27 | Brühl, Markus, Dipl.-Ing., 56076 Koblenz | Scaffolding for the renovation of concrete bridges |
-
2005
- 2005-03-26 DE DE102005013991A patent/DE102005013991B3/en not_active Expired - Lifetime
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3124183A1 (en) * | 1981-06-19 | 1982-12-30 | Peter 5970 Plettenberg Cramer | Device for inspecting the underside of bridges |
| DE3824921A1 (en) * | 1988-07-22 | 1990-01-25 | Alfons Moog | Arrangement for travelling beneath bridges |
| DE29707488U1 (en) * | 1997-04-25 | 1998-08-27 | Brühl, Markus, Dipl.-Ing., 56076 Koblenz | Scaffolding for the renovation of concrete bridges |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE202008003536U1 (en) | 2007-04-23 | 2008-05-29 | Döllen, Heinz von | Mobile superstructure for bridges, in particular steel composite bridges |
| DE102007023083B3 (en) * | 2007-04-23 | 2008-06-19 | Döllen, Heinz von | Mobile superstructure formwork for steel-reinforced concrete bridge has holding elements at intervals on underside of steel support that carry rollers one above the other offset by 90 degrees, one with horizontal, one with vertical axis |
| DE102009014858A1 (en) | 2009-03-30 | 2010-10-21 | Döllen, Heinz von | Formwork device for placing concrete in cantilevered parapet at bridge, has intermediate piece hinged above pivot point at end region of arm and detachably fixed at rod of support frame by cantilever arm at pivot point |
| DE102009014858B4 (en) | 2009-03-30 | 2023-04-06 | Quick Bauprodukte Gmbh | formwork device |
| CN108130861A (en) * | 2018-01-29 | 2018-06-08 | 中国有色金属工业第十四冶金建设公司 | A kind of steel box-girder movable type Hanging Basket |
| DE202018101994U1 (en) | 2018-04-12 | 2019-07-17 | Quick Bauprodukte Gesellschaft mit beschränkter Haftung | Mobile scaffolding |
| CN108755452A (en) * | 2018-05-31 | 2018-11-06 | 谢世泽 | A kind of high stability cable type bridge maintenance device |
| CN108755452B (en) * | 2018-05-31 | 2021-07-23 | 谢世泽 | High stability cable formula bridge overhauls device |
| CN108708277A (en) * | 2018-06-29 | 2018-10-26 | 中国葛洲坝集团第工程有限公司 | Overpass bridge bottom wire laying device |
| CN109706837A (en) * | 2019-01-29 | 2019-05-03 | 江苏徐工工程机械研究院有限公司 | Basic arm of bridge inspection vehicle and bridge inspection vehicle |
| CN110886244A (en) * | 2020-01-03 | 2020-03-17 | 中建七局安装工程有限公司 | Longitudinal stretching operation platform device for segmental beam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0064183B1 (en) | Climbing form | |
| CH714893A2 (en) | Mobile scaffolding. | |
| EP0865539B1 (en) | Bridge inspection system | |
| DE3124183A1 (en) | Device for inspecting the underside of bridges | |
| DE2548555A1 (en) | ELEVATION STATION | |
| DE69413669T2 (en) | SCAFFOLDING DEVICE | |
| DE102005013991B3 (en) | Mobile working frame for bridge has sub frames mounted on bridge with roller ways for movable staging operated by winches | |
| DE202005004969U1 (en) | Drilling or boring device for a slope or incline, e.g. for use in civil engineering, has a suspended guide with two parallel rails along which a drilling unit is moved to permit boring at the required position and angle | |
| DE102013206583A1 (en) | CONTRACTORS FOR A WEATHER PROTECTION ROOF AND WEATHER PROTECTION ROOF WITH SEVERAL SPECIALISTS | |
| DE19526964A1 (en) | Temporary mobile platform for access esp. in bridge repair - has mobile working stage with counterweight adjustable in position supported by cable of assembly attached under bridge deck projections | |
| EP0144466A2 (en) | Apparatus for the inspection of the underside of bridges | |
| EP0350525B1 (en) | Method for producing building-walls and a shuttering system | |
| DD244274A3 (en) | GERUEST FOR REPAIR WORK ON FACADES AND ROOF ROOFS | |
| DE3824921C2 (en) | Bridge underride device | |
| DE3526612A1 (en) | Bridge cable inspection device | |
| DE4007222C2 (en) | ||
| DE102007023083B3 (en) | Mobile superstructure formwork for steel-reinforced concrete bridge has holding elements at intervals on underside of steel support that carry rollers one above the other offset by 90 degrees, one with horizontal, one with vertical axis | |
| DE2933061C2 (en) | Method for moving a scaffold girder for the production of multi-span bridge structures made of prestressed concrete | |
| EP0874084B1 (en) | Scaffolding for the renovation of concrete bridges | |
| DE202005020889U1 (en) | Mobile stage for working and/or inspecting e.g. steel bridge, has retaining units, respectively, provided on both sides with roller, and working platform moveable along rollers by rails, where retaining units are fastenable by anchor | |
| DE20015616U1 (en) | Mobile suspended scaffold construction | |
| DE2660087C2 (en) | Device for the section-by-section, free front construction of multi-span bridge structures made of reinforced or prestressed concrete | |
| DE2848536A1 (en) | Concrete bridge phased advance section form carriage - has sliding side pieces linking height adjustable transverse frame, between flanges | |
| DE3122892C2 (en) | ||
| DE202011103375U1 (en) | Modified cable protection crossbar |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 8100 | Publication of patent without earlier publication of application | ||
| 8364 | No opposition during term of opposition | ||
| 8327 | Change in the person/name/address of the patent owner |
Owner name: QUICK BAUPRODUKTE GMBH, 58239 SCHWERTE, DE |
|
| 8381 | Inventor (new situation) |
Inventor name: DOELLEN, HEINZ VON, 58239 SCHWERTE, DE |
|
| R081 | Change of applicant/patentee |
Owner name: QUICK BAUPRODUKTE GMBH, DE Free format text: FORMER OWNER: DOELLEN, HEINZ VON, 58239 SCHWERTE, DE Effective date: 20110316 |
|
| R071 | Expiry of right |