[go: up one dir, main page]

DE102004042910B4 - Apparatus for walling the veneer on the gables - Google Patents

Apparatus for walling the veneer on the gables Download PDF

Info

Publication number
DE102004042910B4
DE102004042910B4 DE200410042910 DE102004042910A DE102004042910B4 DE 102004042910 B4 DE102004042910 B4 DE 102004042910B4 DE 200410042910 DE200410042910 DE 200410042910 DE 102004042910 A DE102004042910 A DE 102004042910A DE 102004042910 B4 DE102004042910 B4 DE 102004042910B4
Authority
DE
Germany
Prior art keywords
wall
guide rails
gable
carriage
string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE200410042910
Other languages
German (de)
Other versions
DE102004042910A1 (en
Inventor
Christoph Kreft
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE200410042910 priority Critical patent/DE102004042910B4/en
Publication of DE102004042910A1 publication Critical patent/DE102004042910A1/en
Application granted granted Critical
Publication of DE102004042910B4 publication Critical patent/DE102004042910B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1808Holders for bricklayers' lines, bricklayers' bars; Sloping braces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Vorrichtung zum Mauern von Giebelwänden, die zwei mit längsverschieblichen Befestigungselementen für eine Maurerschnur versehene Führungsschienen aufweist, wobei die zwei Führungsschienen auf jeder Seite nahe des zu mauernden Giebels parallel zu einer geneigten Dachfläche und des Giebels vorübergehend befestigt sind und bei der als jeweiliges Befestigungselement für die Mauerschnur (3) ein Schlitten (2) entlang der Führungsschiene (1) verfahrbar und in vorgebbaren Schichthöhen (7) des zu mauernden Giebels an der Führungsschiene (1) feststellbar ist, dadurch gekennzeichnet, dass der Schlitten einen unterhalb der Führungsschienen (1) angeordneten, in Längsrichtung des Schlittens verschiebbaren Schieber (2.5) aufweist, der einen die Mauerschnur (3) aufnehmenden, rechtwinklig zum Schieber (2.5) angeordneten, axial beweglichen Mauerschnur-Führungsstift (2.6) umfasst, durch deren Positionierung mindestens eine Einstellung der Mauerschnur (3) in den vorgebbaren Schichthöhen (7) und zusätzlich in Richtung der zu mauernden Giebelwand vorgenommen werden kann.Apparatus for walling gable walls comprising two guide rails provided with longitudinally displaceable fastener elements for a masonry cord, the two guide rails on each side being temporarily fixed near the gable to be walled parallel to an inclined roof surface and the gable, and as a respective fixing member for the wall string (3) a carriage (2) can be moved along the guide rail (1) and can be fixed in predeterminable layer heights (7) of the gable to be walled on the guide rail (1), characterized in that the carriage is arranged below the guide rails (1), in the longitudinal direction of the carriage sliding slide (2.5) having a the wall cord (3), at right angles to the slide (2.5) arranged, axially movable wall cord guide pin (2.6) by positioning at least one adjustment of the wall cord (3) in the specifiable layer heights (7) and in addition in the direction of the wall to be walled gable can be made.

Figure 00000001
Figure 00000001

Description

Stand der Technik State of the art

Als Stand der Technik wird Verblendung an den Giebeln in den Bereichen, die durch geneigte Dachflächen umgrenzt sind, zuerst an den seitlichen Rändern zur Dachfläche mittels einer Wasserwaage und eines Messstabs gemauert. Die restlichen dazwischen liegenden Verblendungsflächen werden mittels gespannter Mauerschnur – mit in den Mauerfugen eingeschlagenen Nägel befestigt – gemauert.When The state of the art is veneering on the gables in the areas through inclined roof surfaces bounded, first at the lateral edges to the roof surface by means of a spirit level and a measuring stick. The rest in between lying facing surfaces are stretched by a wall string - with in the wall joints Nails attached - bricked.

Zur Erleichterung der Handhabe einer zu spannenden Mauerschnur ist aus der DE 26 44 650 C3 eine Lehre zum Mauern von Giebelwänden im Dachbereich, die zwei mit längsverschieblichen Schnurhaltern versehene Führungsschienen aufweist, die auf jeder Seite des Giebels angeordnet und jeweils mindestens zwei an den Oberseiten der bereits vorhandenen Dachsparren anliegenden Halteleisten vorrübergehend befestigt sind, deren auskragende Enden mit den spaltartigen Führungsschienen verbindbar sind, bekannt. Dabei greifen die Halteleisten in Bügel ein, die an den nach oben weisenden Rücken der Führungsschienen befestigt sind, so dass die Bügel je eine gegen den Rücken der Führungsschienen gerichtete Feststellschraube tragen, der Rücken der Führungsschiene gegen die in den Bügel eingreifende Halteleiste gepresst wird und dass die Spurführung für die Halter an den nach unten weisenden Seiten der Führungsschienen angeordnet sind. Nachteilig bei dieser bekannten Lösung ist, dass die Lehre zum Mauern von Giebelwänden an den Dachlatten der Dachkonstruktion befestigt werden müssen. Bei den meisten modernen Dachkonstruktionen stehen die Dachlatten zur Anbringung der Lehre zum Zeitpunkt der Herstellung der Giebelwände nicht mehr zur Verfügung, weil diese durch die unterseitige Verkleidung der Dachüberstände bzw. durch die heutzutage vorgeschriebene Anbringung der Feuchtigkeitssperren nicht zu erreichen sind. Nachteilig ist ferner, dass die bekannte Vorrichtung lediglich zum Spannen der Mauerschnur entlang der zu mauernden Schicht dient und kein System zur Voreinstellung des Abstandes der zu mauernden variablen Schichten aufweist. Nachteilig ist zudem, dass die Richtschnur in lediglich dafür vorgesehene Schnurhalter eingehängt wird, so dass ein Verspannen der Richtschnur nur bedingt möglich ist. Ferner ist eine aus mehreren Lehren bestehende Vorrichtung zum Mauern von Giebelwänden eines Gebäudes, dessen Dachstuhl bereits hergestellt ist, bekannt. Die Lehren sind entsprechend dem schrägen Verlauf der oberen Begrenzung der jeweiligen Giebelwand angeordnet und von Schienen gehalten, die an den Außenseiten über jeweils mindestens zwei Sparren über quer befestigte Halterungen befestigt sind. Diese Halteschienen der Lehren sind senkrecht zur Giebelwand verschiebbar. Die Lehren weisen zudem in Längsrichtung verschiebbare Schnurhalter auf. Nachteilig ist hier ebenfalls, dass die Vorrichtung keine Möglichkeit zur Voreinstellung des Abstandes der zu mauernden Schichten aufweist und zudem keine erforderliche Einstellung der Mauerschnur in der Tiefe entgegen einer Giebelwand ermöglichen.To facilitate the handle of an exciting wall string is from the DE 26 44 650 C3 a teaching for the walls of gable walls in the roof area, which has two longitudinally displaceable cord holders guide rails, which are arranged on each side of the gable and at least two voltage applied to the tops of the existing rafters retaining strips are temporarily attached, the projecting ends of the gap-like guide rails connectable are known. In this case, the retaining strips engage in a bracket, which are attached to the upwardly facing back of the guide rails, so that the brackets each carry a directed against the back of the guide rails locking screw, the back of the guide rail is pressed against the engaging in the bracket retaining strip and that the tracking for the holders are arranged on the downwardly facing sides of the guide rails. A disadvantage of this known solution is that the doctrine must be fixed to the walls of gable walls to the roof battens of the roof construction. In most modern roof structures, the roof battens are no longer available for attaching the gauge at the time of manufacture of the gable walls, because they can not be reached by the underside cladding of the roof overhangs or by the now prescribed attachment of the moisture barriers. A further disadvantage is that the known device serves only for tensioning the wall string along the layer to be walled and has no system for presetting the distance of the variable layers to be walled. Another disadvantage is that the guideline is hung in only provided for this purpose string holder, so that a distortion of the guideline is only partially possible. Furthermore, a device consisting of several gauges for walling gable walls of a building whose roof truss is already made known. The gauges are arranged according to the oblique course of the upper boundary of the respective gable wall and held by rails, which are fastened on the outer sides via at least two rafters over transversely mounted holders. These retaining rails of the gauges are displaceable perpendicular to the gable wall. The teachings also have longitudinally displaceable cord holders. The disadvantage here is also that the device has no possibility for presetting the distance of the layers to be walled and also allow no required adjustment of the wall string in the depth against a gable wall.

Problemproblem

Somit ist das Mauern der Verblendung an den Giebeln nach dem Stand der Technik sehr zeitaufwendig und ungenau beziehungsweise können leicht Fehler beim Messen und bei der Benutzung der Wasserwaage oder der Lehre zum Mauern von Wänden begangen werden, insbesondere bei unregelmäßigen Steinen, die eine unebene Oberfläche und in der Tiefe versetzte Kanten aufweisen. Beim Mauern summieren sich erfahrungsgemäß Messfehler, dies führt häufig zu einer unregelmäßig gemauerten Fassade.Consequently is the wall of delusion on the gables according to the state of Technique very time consuming and inaccurate or can be easy Error when measuring and using the spirit level or the Teaching to wall walls be committed, especially with irregular stones, which is an uneven surface and have offset edges in the depth. Add to the walls Experience has shown that measurement errors, this leads to often to an irregular masonry Facade.

Lösungsolution

Zur Lösung dieser Aufgabe wird eine Vorrichtung mit den im Anspruch 1 genannten Merkmalen sowie ein Verfahren gemäß Anspruch 11 vorgeschlagen. Diese besteht aus zwei parallel zur geneigten Dachfläche (10) befestigten seitlichen Führungsschienen (1) rechts und links. Auf jeder Führungsschiene befindet sich jeweils ein dazugehöriger, beweglicher und exakt arretierbarer Schlitten (2), der zur Aufnahme der Mauerschnur (3) bestimmt ist.To solve this problem, a device having the features mentioned in claim 1 and a method according to claim 11 is proposed. This consists of two parallel to the inclined roof surface ( 10 ) attached lateral guide rails ( 1 ) right and left. On each guide rail is in each case an associated, movable and exactly lockable carriage ( 2 ), which absorbs the wall string ( 3 ) is determined.

Erreichte VorteileAchieved benefits

Dadurch wird präzises und schnelles Mauern einer Verblendung (8) nach gewünschter Schichtenhöhe zwischen den geneigten Dachflächen ermöglicht.This provides precise and fast walling of a veneer ( 8th ) according to the desired layer height between the inclined roof surfaces.

Weitere Ausgestaltung der ErfindungFurther embodiment of the invention

Die Vorrichtung ermöglicht zusätzlich das Mauern nach der Mauerschnur mit Steinen, deren Oberfläche uneben ist und die Kanten der unregelmäßigen Steine in der Tiefe versetzt liegen.The Device allows additionally the walls after the wall cord with stones whose surface is uneven is and the edges of the irregular stones lie offset in the depth.

Beschreibung der AusführungsbeispieleDescription of the embodiments

Nachfolgend wird anhand der Figuren ein Ausführungsbeispiel beschrieben. Es zeigt die nachfolgend zusammengestellte 1 bis 7: Figurenbezeichnung Darstellung Figur 1 Übersichtszeichnung Figur 2 Detail aus der Figur 1 Figur 3 Schnitt Y-Y aus der Figur 2 Figur 4 Schnitt X-X aus der Figur 2 Figur 5 Detail aus der Figur 1 Figur 6 Schnitt Y1-Y1 aus der Figur 5 Figur 7 Schnitt X1-X1 aus der Figur 5 Hereinafter, an embodiment will be described with reference to FIGS. It shows the following compiled 1 to 7 : Figure designation presentation FIG. 1 Assembly drawing FIG. 2 Detail from FIG. 1 FIG. 3 Section YY from FIG. 2 FIG. 4 Section XX from FIG. 2 FIG. 5 Detail from FIG. 1 FIG. 6 Section Y1-Y1 of Figure 5 FIG. 7 Section X1-X1 of Figure 5

Die Vorrichtung zum Mauern der Verblendung an den Giebeln ist bestimmt zum Mauern der Verblendung in den Bereichen der Giebeln, die durch die schräg verlaufende Dachflächen mit deren Dachkonstruktion begrenzt ist. Die Vorrichtung besteht aus zwei parallel zu geneigten Dachflächen (10) seitlichen befestigten Führungsschienen (1) rechts und links. Auf jeder Führungsschiene befindet sich jeweils ein dazugehöriger, beweglicher und exakt arretierbarer Schlitten (2), der zur Aufnahme der Mauerschnur (3) bestimmt ist.The device for walling the glazing on the gables is intended to wall the veneer in the areas of the gables, which is limited by the sloping roof surfaces with their roof construction. The device consists of two parallel to inclined roof surfaces ( 10 ) lateral fixed guide rails ( 1 ) right and left. On each guide rail is in each case an associated, movable and exactly lockable carriage ( 2 ), which absorbs the wall string ( 3 ) is determined.

Die Vorrichtung wird wie folgt benutzt:
Nach dem Mauern der Verblendung (8) an den Giebelseiten, wird der Zeitpunkt erreicht, wo die schräg verlaufende Dachkonstruktion mit der zu mauernder Verblendung kollidiert. Das Mauern muss an die schräg verlaufende in Überstände der Dachfläche angepasst werden. An dieser Stelle wird die Vorrichtung zum Mauern der Verblendung an den Giebeln eingesetzt.
The device is used as follows:
After the walls of delusion ( 8th ) on the gable sides, the time is reached when the sloping roof construction collides with the veneer to be bricked. The walls must be adapted to the sloping in overhangs of the roof area. At this point, the device is used to wall the veneer on the gables.

Es werden die Führungsschienen (1) rechts und links des Dachüberstandes so parallel zur Dachfläche befestigt, dass die Führungsschienen (1) mit den eventuell vorhandenen Pfetten (9) der Dachkonstruktion nicht kollidieren. Weiterhin beim Befestigen der Führungsschienen (1) in der Senkrechten-Ebene (Wandebene (8)) ist darauf zu achten, dass der bewegliche Schlitten (2) mit einem einstellbaren Mauerschnur-Führungsstift (2.6) für die Mauerschnur – wie in der 4 und 7 – mit der zu mauernden Verblendung nicht kollidiert. Es ist wichtig, dass sowohl im unteren wie auch im oberen Bereich der Führungsschienen (1) die gleichen waagerechten Abstände zu der gemauerten Verblendung (8) eingehalten werden. Vor dem Befestigen der Führungsschienen (1) ist noch darauf zu achten, dass die beweglichen Schlitten (2), wie in der 2 und 5 dargestellt, vor dem Einbauen auf die Führungsschienen (1) aufgeschoben werden.It will be the guide rails ( 1 ) attached to the right and left of the roof overhang parallel to the roof surface so that the guide rails ( 1 ) with any purlins ( 9 ) of the roof construction do not collide. Furthermore, when fastening the guide rails ( 1 ) in the vertical plane (wall plane ( 8th )), make sure that the moving carriage ( 2 ) with an adjustable wall string guide pin ( 2.6 ) for the wall string - as in the 4 and 7 - did not collide with the veneer to be walled. It is important that both in the lower and in the upper part of the guide rails ( 1 ) the same horizontal distances to the masonry veneer ( 8th ) be respected. Before attaching the guide rails ( 1 ) is still to ensure that the movable carriage ( 2 ), like in the 2 and 5 shown before installation on the guide rails ( 1 ) be deferred.

Nach der Befestigung der Führungsschienen (1) müssen die Schichthöhen (7) der zu mauernden Verblendung so ermittelt werden, dass die vorgesehenen Fensteröffnungshöhen exakt passen und die bisher gemauerten Schichtenhöhen der Verblendung weiterhin optisch eingehalten werden.After fixing the guide rails ( 1 ), the layer heights ( 7 ) of the veneer to be walled are determined so that the intended window opening heights fit exactly and the previously bricked layer heights of the veneer are still visually observed.

Wie in der 1 dargestellt, wird die Höhe der letzen Fensteröffnungs-Schicht (H) und die vorhandenen Schichthöhe der letzten gemauerten Mauerwerksschicht waagerecht auf die Führungsschienen (1) rechts und links übertragen. Die übertragenen Markierungen auf die Führungsschienen (1) rechts und links ergeben eine Strecke (L) die auf kleinere Abstände entsprechend den geplanten Mauerwerksschichten aufgeteilt werden müssen. In der 1 sind im Bereich der Höhe (H) 11 Schichten (7) zu mauern. Dies bedeutet, dass die Strecke (L) auf 11 gleiche Abschnitte auf den Führungsschienen aufgeteilt werden muss.Like in the 1 shown, the height of the last window opening layer (H) and the existing layer height of the last bricked masonry layer horizontally on the guide rails ( 1 ) transferred right and left. The transferred markings on the guide rails ( 1 ) on the right and left result in a distance (L) which must be divided into smaller distances in accordance with the planned masonry layers. In the 1 are in the range of height (H) 11 layers ( 7 ) to wall. This means that the track (L) must be divided into 11 equal sections on the guide rails.

So rechnerisch ermittelte Abstände werden mit dem Bleistift auf die Führungsschienen (1) rechts und links übertragen und erscheinen in Form von senkrechten Strichen (5).Calculated distances are measured with the pencil on the guide rails ( 1 ) are transmitted to the right and left and appear in the form of vertical bars ( 5 ).

Als nächster Schritt werden die Schlitten (2) rechts und links auf den jeweiligen ersten unteren Strichen (5) positioniert und mit den Befestigungsschrauben (2.3) befestigt. Anschließend werden auf den Schlitten (2) die beweglichen Schieber (2.5) so mit den Schrauben (2.2) befestigt, dass die Mauerschnur (3) sich mit der zuletzt gemauerten Mauerwerksschicht in der waagerechten Ebene deckt – siehe 2 und 5.As a next step, the carriages ( 2 ) right and left on the respective first lower lines ( 5 ) and with the fixing screws ( 2.3 ) attached. Then on the sled ( 2 ) the movable slides ( 2.5 ) so with the screws ( 2.2 ), that the wall string ( 3 ) coincides with the last bricked masonry layer in the horizontal plane - see 2 and 5 ,

Als letzter Schritt in der Einstellung werden die Mauerschnur-Führungsstifte (2.6) in der Tiefe zur vorhandenen, zuletzt gemauerten Mauerwerksschicht in der Tiefe und Drehung eingestellt und mit den Schrauben (2.4) so befestigt, dass die Mauerschnur (3) sich mit der Kante der zuletzt gemauerten Mauerwerksschicht deckt. Dabei wird die Mauerschnur (3), wie in der 2 und 5 dargestellt geführt und mit den Schrauben (2.1) arretiert.As a last step in the setting, the wall string guide pins ( 2.6 ) in depth to the existing, last masonry masonry layer in the depth and rotation set and with the screws ( 2.4 ) so fastened that the wall string ( 3 ) with the edge of the last masonry masonry layer covers. The wall string ( 3 ), like in the 2 and 5 shown and with the screws ( 2.1 ) arrested.

Im weiteren Verlauf der Arbeiten (um die Verblendung weiter zu mauern) müssen lediglich die beweglichen Schlitten (2) rechts und links jeweils auf den höherliegenden Strich (5) durch Betätigung der Schrauben (2.3) verschoben werden. Die Mauerschnur (3) ist neu zu spannen und mit den Schrauben (2.1) zu arretieren.In the further course of the work (to further wall the veneer), only the movable carriages ( 2 ) to the left and right respectively to the higher-lying line ( 5 ) by pressing the screws ( 2.3 ) are moved. The wall string ( 3 ) is to be re-tensioned and with the screws ( 2.1 ) to lock.

Nach so erreichter Positionierung der Mauerschnur kann die Verblendung (8) ohne weiteres Ausmessen, ohne Benutzung der Wasserwaage problemlos, schnell und präzise gemauert werden.After having achieved the positioning of the wall string, the veneer can be 8th ) without further measuring, without using the spirit level without problems, fast and precise masonry.

Bei Steinen mit einer glatten Oberfläche und äußeren, scharfen Kannten kann die Benutzung der beweglichen Schiebern (2.5) mit den Mauerschnur-Führungsstiften (2.6) entfallen, wobei die vorgeschriebenen Schritte für die Befestigung der Führungsschienen (1) eingehalten werden müssen.For stones with a smooth surface and outer, sharp edges, the use of the movable slides ( 2.5 ) with the wall string guide pins ( 2.6 ), whereby the prescribed steps for fixing the guide rails ( 1 ) must be complied with.

11
Führungsschienenguide rails
22
Schlittencarriage
2.12.1
Schraubenscrew
2.22.2
Schraubenscrew
2.32.3
Schraubenscrew
2.42.4
Schraubenscrew
2.52.5
Beweglicher Schieberportable pusher
2.62.6
Mauerschnur-FührungsstifteWall line guide pins
33
Mauerschnurwall cord
44
Befestigungselementefasteners
55
markierte senkrechte Strichelabeled vertical lines
66
Öffnung (Fenster)Opening (window)
77
Schichthöhen/MauerschichtenLayer height / wall layers
88th
Mauern Verblendung an den Giebelseitenstonewall Veneer on the gable sides
99
Pfettenpurlins
1010
Dachflächenroofs
HH
Höhe HHeight H
LL
Strecke auf der Führungsschieneroute on the guide rail

Claims (12)

Vorrichtung zum Mauern von Giebelwänden, die zwei mit längsverschieblichen Befestigungselementen für eine Maurerschnur versehene Führungsschienen aufweist, wobei die zwei Führungsschienen auf jeder Seite nahe des zu mauernden Giebels parallel zu einer geneigten Dachfläche und des Giebels vorübergehend befestigt sind und bei der als jeweiliges Befestigungselement für die Mauerschnur (3) ein Schlitten (2) entlang der Führungsschiene (1) verfahrbar und in vorgebbaren Schichthöhen (7) des zu mauernden Giebels an der Führungsschiene (1) feststellbar ist, dadurch gekennzeichnet, dass der Schlitten einen unterhalb der Führungsschienen (1) angeordneten, in Längsrichtung des Schlittens verschiebbaren Schieber (2.5) aufweist, der einen die Mauerschnur (3) aufnehmenden, rechtwinklig zum Schieber (2.5) angeordneten, axial beweglichen Mauerschnur-Führungsstift (2.6) umfasst, durch deren Positionierung mindestens eine Einstellung der Mauerschnur (3) in den vorgebbaren Schichthöhen (7) und zusätzlich in Richtung der zu mauernden Giebelwand vorgenommen werden kann.Apparatus for walling gable walls, comprising two guide rails provided with longitudinally displaceable fastener elements for a masonry cord, the two guide rails being temporarily fixed on each side near the gable to be walled parallel to an inclined roof surface and the gable, and as a respective fixing member for the wall string ( 3 ) a sleigh ( 2 ) along the guide rail ( 1 ) movable and in predefinable layer heights ( 7 ) of the gable to be walled on the guide rail ( 1 ) is detectable, characterized in that the carriage one below the guide rails ( 1 ), slidable in the longitudinal direction of the slide slide ( 2.5 ), one of the wall string ( 3 ) receiving, at right angles to the slider ( 2.5 ), axially movable wall cord guide pin ( 2.6 ) by positioning at least one adjustment of the wall string ( 3 ) in the predefinable layer heights ( 7 ) and in addition in the direction of the wall to be walled can be made. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Führungsschienen (1) Profile sind, die vorzugsweise eine rechteckige geschlossene Form aufweisen.Device according to claim 1, characterized in that the guide rails ( 1 ) Are profiles which preferably have a rectangular closed shape. Vorrichtung nach Anspruch 1 und 2, dadurch gekennzeichnet, dass der Schlitten (2) ein Hohlprofil ist, vorzugsweise ein rechteckiges geschlossenes Hohlprofil, dessen Innenmaße unwesentlich größer sind, als die Außenmaße des Profils der Führungsschienen (1), wodurch der die Führungsschienen (1) umschließende Schlitten (2) mit geringem Spiel entlang der Führungsschienen (1) verfahrbar ist.Device according to claim 1 and 2, characterized in that the carriage ( 2 ) is a hollow profile, preferably a rectangular closed hollow profile whose internal dimensions are insignificantly larger than the outer dimensions of the profile of the guide rails ( 1 ), whereby the guide rails ( 1 ) enclosing carriages ( 2 ) with little play along the guide rails ( 1 ) is movable. Vorrichtung nach Anspruch 1 bis 3, dadurch gekennzeichnet, dass der Schlitten (2) durch mindestens ein Befestigungselement (2.3) an der jeweiligen Führungsschiene (1) feststellbar ist.Apparatus according to claim 1 to 3, characterized in that the carriage ( 2 ) by at least one fastener ( 2.3 ) on the respective guide rail ( 1 ) is detectable. Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, dass das mindestens eine Befestigungselement (2.3) diagonal am Schlitten (2) angeordnet ist und den Schlitten (2) in der Feststellposition auf einer diagonalen Achse der jeweiligen Führungsschiene (1) verspannt.Apparatus according to claim 4, characterized in that the at least one fastening element ( 2.3 ) diagonally on the slide ( 2 ) is arranged and the carriage ( 2 ) in the locking position on a diagonal axis of the respective guide rail ( 1 ) braced. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Schieber (2.5) durch mindestens ein Befestigungselement (2.2) an dem Schlitten (2) in einer vorgebbaren Position befestigbar ist.Device according to claim 1, characterized in that the slide ( 2.5 ) by at least one fastener ( 2.2 ) on the carriage ( 2 ) Can be fastened in a predetermined position. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der jeweilige Schlitten (2) ein Befestigungselement (2.1) zu endseitigen Befestigung der Mauerschnur (3) aufweist.Device according to claim 1, characterized in that the respective carriage ( 2 ) a fastener ( 2.1 ) to end attachment of the wall string ( 3 ) having. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Schlitten (2) auf seiner Oberseite eine spaltartige Aussparung aufweist, durch die die Mauerschnur (3) von dem Befestigungselement (2.1) zum Mauerschnur-Führungsstift (2.6) führbar ist.Device according to claim 1, characterized in that the carriage ( 2 ) has on its upper side a gap-like recess through which the wall string ( 3 ) of the fastener ( 2.1 ) to the wall string guide pin ( 2.6 ) is feasible. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Mauerschnur-Führungsstift (2.6) am Schieber (2.5) durch eine axiale und rotatorische Bewegung justierbar ist und mittels eines Befestigungselements (2.4) arretierbar ist.Apparatus according to claim 1, characterized in that the wall string guide pin ( 2.6 ) on the slide ( 2.5 ) is adjustable by an axial and rotational movement and by means of a fastener ( 2.4 ) is lockable. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Mauerschnur-Führungsstift (2.6) eine Aufnahme für die Mauerschnur (3) aufweist.Apparatus according to claim 1, characterized in that the wall string guide pin ( 2.6 ) a receptacle for the wall string ( 3 ) having. Verfahren zum exakten und schnellen Mauern von Giebelwänden mittels einer Vorrichtung nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass – die Vorrichtung kollisionsfrei zu einer geneigten Dachfläche (10) angebracht wird, wobei die Führungsschienen (1) parallel zur Dachfläche (10) und der zu mauernden Giebelwand (8) angebracht werden, – die Schichthöhen (7) zwischen einer ersten vorhandenen (unteren) und einer letzten geplanten (oberen) Mauerwerksschicht durch eine waagerechte Markierung rechts und links auf die jeweiligen Führungsschienen (1) übertragen werden, – die zwischen diesen Markierungen liegenden Strecken (L) in die Anzahl der zu mauernden Schichten (7) rechnerisch unterteilt werden, so dass sich jeweils ein rechnerischer gleicher Abstand auf den jeweiligen Führungsschienen (1) ergibt, – der Abstand die jeweiligen Führungsschienen (1) in Form von senkrechten Markierungen (5) übertragen wird und diese wiederum den einzelnen zu mauernden Schichthöhen (7) zugeordnet werden, – so dass, zur Einstellung zunächst jeder der Schlitten (2) rechts und links auf der ersten unteren Markierung (5) positioniert wird und die Mauerschnur (3) mittels des beweglichen Schiebers (2.5) und eines rechtwinklig zum Schieber (2.5) angeordneten Mauerschnur-Führungsstiftes (2.6) entlang der zuletzt gemauerten Mauerwerksschicht zumindest in der Höhe an der gewünschten Stelle und zusätzlich in Richtung der zu mauernden Giebelwand positioniert und über die Befestigungselemente (2.2, 2.3, 2.4) arretiert wird, – wodurch zur Erstellung mindestens einer Schicht (7) der Schlitten (2) von einer ersten an den jeweiligen Führungsschienen (1) angebrachten senkrechten Markierung (5) durch Betätigung des Befestigungselementes (2.3) unter neuer Verspannung der Mauerschnur (3) mittels des Befestigungselementes (2.1) zur nächsten Markierung (5) verschoben wird.Method for exact and fast walling of gable walls by means of a device according to one of claims 1 to 10, characterized in that - the device collision-free to a sloping roof surface ( 10 ), the guide rails ( 1 ) parallel to the roof surface ( 10 ) and the gable wall ( 8th ), - the layer heights ( 7 ) between a first existing (lower) and a last planned (upper) masonry layer by a horizontal marking right and left on the respective guide rails ( 1 ), - the distances (L) between these markings to the number of layers to be walled ( 7 ) are divided mathematically, so that in each case a mathematical equal distance on the respective guide rails ( 1 ), - the distance the respective guide rails ( 1 ) in the form of vertical markings ( 5 ) and this in turn the individual layer heights to be strengthened ( 7 ), so that, for adjustment, each of the carriages ( 2 ) right and left on the first lower mark ( 5 ) and the wall string ( 3 ) by means of the movable slide ( 2.5 ) and one at right angles to the slider ( 2.5 ) arranged wall string guide pin ( 2.6 ) along the last bricked masonry layer at least in height at the desired location and additionally positioned in the direction of the gable wall to be walled and on the fasteners ( 2.2 . 2.3 . 2.4 ), whereby to create at least one layer ( 7 ) the sled ( 2 ) from a first to the respective guide rails ( 1 ) vertical marking ( 5 ) by actuation of the fastening element ( 2.3 ) under new tension of the wall string ( 3 ) by means of the fastening element ( 2.1 ) to the next mark ( 5 ) is moved. Verfahren nach Anspruch 11, dadurch gekennzeichnet, dass eine Positionierung und Justierung des Mauerschnur-Führungsstiftes (2.6) an dem jeweiligen Schieber (2.5) durch Drehen entlang seiner Achse sowie Verschieben in einer Tiefe in beziehungsweise entgegen der zu mauernden Giebelwand (8) durchgeführt wird.A method according to claim 11, characterized in that a positioning and adjustment of the wall string guide pin ( 2.6 ) on the respective slide ( 2.5 ) by turning along its axis and shifting at a depth in or against the wall of the gable to be walled ( 8th ) is carried out.
DE200410042910 2004-09-01 2004-09-01 Apparatus for walling the veneer on the gables Expired - Fee Related DE102004042910B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200410042910 DE102004042910B4 (en) 2004-09-01 2004-09-01 Apparatus for walling the veneer on the gables

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200410042910 DE102004042910B4 (en) 2004-09-01 2004-09-01 Apparatus for walling the veneer on the gables

Publications (2)

Publication Number Publication Date
DE102004042910A1 DE102004042910A1 (en) 2006-03-16
DE102004042910B4 true DE102004042910B4 (en) 2009-09-17

Family

ID=35853532

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200410042910 Expired - Fee Related DE102004042910B4 (en) 2004-09-01 2004-09-01 Apparatus for walling the veneer on the gables

Country Status (1)

Country Link
DE (1) DE102004042910B4 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1684453B1 (en) * 1966-04-26 1970-04-02 Lothar Schulz Device for walling gable walls consisting of several gauges
DE2644650C3 (en) * 1976-10-02 1979-10-04 Rolf 3061 Buchholz Hilker Teaching about building gable walls in the roof area

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1684453B1 (en) * 1966-04-26 1970-04-02 Lothar Schulz Device for walling gable walls consisting of several gauges
DE2644650C3 (en) * 1976-10-02 1979-10-04 Rolf 3061 Buchholz Hilker Teaching about building gable walls in the roof area

Also Published As

Publication number Publication date
DE102004042910A1 (en) 2006-03-16

Similar Documents

Publication Publication Date Title
EP3926125B1 (en) Fall prevention device
DE102016012946A1 (en) Apparatus for facilitating the attachment of tools for the production of an upper boundary of a wall opening in construction
EP0457171B1 (en) Arrangement at a form for erecting walls
DE6606876U (en) WINDOW SILL
DE2644650C3 (en) Teaching about building gable walls in the roof area
DE4438690C2 (en) Cleaning aid and cleaning process
DE102004042910B4 (en) Apparatus for walling the veneer on the gables
DE829790C (en) Formwork, preferably made of sheet steel, for making walls and ceilings
DE1509100A1 (en) Roof or wall covering
EP0330083B1 (en) Adjusting device for edge-protecting borders
DE9310107U1 (en) Plasterer tripod
EP2372045A2 (en) Device and method for creating a wall with inclined upper edge
EP3922784B1 (en) Screeding apparatus
DE19806145A1 (en) Device that can be walked on and / or driven over
CH713433A2 (en) Form clamp.
DE2007989C3 (en) Composable shop furniture
DE3505049A1 (en) Aiming and measuring staff
DE2947661A1 (en) Wall rendering or floor finish skimmer batten fitting - involves scraper sliding between adjustable support feet on setting bar
EP3121351B1 (en) Method for dividing a section into identical sub-sections and device for carrying out the method
DE4225536C2 (en) Fastening element for the temporary fastening of slats, beams or bars
DE7116781U (en) Auxiliary device for laying slabs, tiles, tiles or the like on a wall surface
DE2408134B2 (en) Buildings composed of spatial units in the form of symmetrical, hexagonal prisms lying on one side
DE8105750U1 (en) "LEVELING DEVICE"
DE2123156A1 (en) Prefabricated facade
DE3436251A1 (en) Special straightedge

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8364 No opposition during term of opposition
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20110401