[go: up one dir, main page]

DE109535C - - Google Patents

Info

Publication number
DE109535C
DE109535C DENDAT109535D DE109535DA DE109535C DE 109535 C DE109535 C DE 109535C DE NDAT109535 D DENDAT109535 D DE NDAT109535D DE 109535D A DE109535D A DE 109535DA DE 109535 C DE109535 C DE 109535C
Authority
DE
Germany
Prior art keywords
tubes
boiler
water
combustion chamber
preheater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DENDAT109535D
Other languages
German (de)
Publication of DE109535C publication Critical patent/DE109535C/de
Active legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B25/00Water-tube boilers built-up from sets of water tubes with internally-arranged flue tubes, or fire tubes, extending through the water tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Supply (AREA)

Description

KAISERLICHESIMPERIAL

PATENTAMTPATENT OFFICE

KLASSE 13: Dampfkessel.CLASS 13: Steam boiler.

Der neue Dampfkessel wird mit flüssigem Brennstoffe geheizt und soll bei demselben das Feuerungsmaterial in der denkbar günstigsten Weise ausgenutzt werden.The new steam boiler is made with liquid Fuels heated and should the same the firing material in the cheapest possible Way to be exploited.

Fig. ι ist ein Querschnitt durch den Kessel mit Dampfsammler, Fig. 2 ein Längsschnitt. Fig. 3 zeigt einen Längsschnitt im gröfseren Mafsstabe.Fig. Ι is a cross section through the boiler with steam collector, Fig. 2 is a longitudinal section. Fig. 3 shows a longitudinal section on a larger scale.

In die Stirnwände 1 und 2 des Kessels sind Feuerrohren 3 dicht eingeschraubt. In diese Feuerröhren ragen Siederöhren 4 hinein, die, an dem einen Ende zugeschweifst, mit dem anderen in eine Stirnwand 5, welche mit der Wand ι zu einem geschlossenen Feuerraum verbunden ist, dicht eingesetzt sind. Die Siederöhren können durch nach Art der Mannlöcher verschlossene Oeffnungen 6, welche sich in der Rückwand 7 des Kessels befinden, eingesetzt und herausgezogen werden. In die Siederöhren sind glatte, vorn und hinten offene Röhren 8 von nahezu derselben Länge wie jene gleichachsig eingesetzt. Durch geeignete Mittel werden dieselben in gleichem Abstande von der Wand der Siederöhren gehalten. Diese Röhren 8 sollen den Umlauf des Wassers in den Siederöhren 4 bewirken, indem durch eintretende Spritzröhren 38 Druckwasser eingeführt wird.In the end walls 1 and 2 of the boiler are Fire pipes 3 screwed in tightly. Boiler tubes 4 protrude into these fire tubes, at one end closed, with the other in an end wall 5, which with the Wall ι is connected to a closed furnace, are used tightly. the Boiler tubes can be closed by openings 6, which are closed in the manner of manholes located in the rear wall 7 of the boiler, inserted and pulled out. In the Boiler tubes are smooth tubes 8, open at the front and back, of almost the same length as those used coaxially. By suitable means they will be equally spaced held by the wall of the boiler tubes. These tubes 8 are intended to circulate the water in the boiler tubes 4 by introducing pressurized water through entering spray tubes 38 will.

Oberhalb der Feuerröhren sind in die vorerwähnten Rohrwände 1 und 2 Heizröhren 9 geschraubt, die zur Vergröfserung der Heizfläche dienen und das Abziehen der Heizgase nach der Rauchkammer bewirken.Above the fire tubes are in the aforementioned tube walls 1 and 2 heating tubes 9 screwed, which serve to enlarge the heating surface and the removal of the heating gases after the smoke chamber.

Gestützt ist die von den Wänden 1 und 5 und dem Mantel 10 gebildete Verbrennungskammer 13 unten durch Stehbolzen 11 und 12,' von denen die mit 12 bezeichneten ganz durchbohrt sind und zur Zuführung atmosphärischer Luft in die Verbrennungskammer 13 dienen. Die hintere Wand 7 des Kessels ist ebenfalls durch Stehbolzen mit der Rückwand , die Seitenwände sind durch Stehbolzen mit der Aufsenwand des Kessels verbunden.The combustion chamber formed by the walls 1 and 5 and the jacket 10 is supported 13 below through stud bolts 11 and 12, ' of which those designated 12 are completely pierced and for the supply of atmospheric Air in the combustion chamber 13 are used. The rear wall 7 of the boiler is also by stud bolts to the rear wall, the side walls are connected to the by stud bolts Connected to the outer wall of the boiler.

Um Zugang zur Verbrennungskammer 13 zu schaffen, sind Mann- und Schlammlöcher sowohl in den Seitenwänden, als auch zusammentreffend mit diesen in der Aufsenwand des Kessels angeordnet, welche durch Rohrstutzen verbunden sind.To access the combustion chamber 13 man and mud holes are in the side walls as well as converging arranged with these in the outer wall of the boiler, which are connected by pipe sockets.

In den vorderen Theil der Feuerröhren 3 sind Brenner 14 für flüssigen Brennstoff eingesetzt (Fig. 2 und 3).In the front part of the fire tubes 3 burners 14 are used for liquid fuel (Figs. 2 and 3).

Das dem Kessel zuzuführende Speisewasser hat zuyor einen Vorwärmer zu durchlaufen. Dieser befindet sich theils in der Rauchkammer 27 (Fig. 2), theils in der Verbrennungskammer 13. Es befindet sich zunächst in der Rauchkammer eine Rohrgruppe, wie in Fig. 4 im Längsschnitte dargestellt, welche aus horizontalen Röhren 28 und diese verbindenden Endbehältern 29 und 30 besteht. Der eine (30) der letzteren besitzt eine Scheidewand 31, durch welche er in zwei Hälften getheilt wird. In die obere Hälfte tritt das Speisewasser zunächst durch Rohr 32 ein, fliefst durch die obere Hälfte der Rohrgruppe, gelangt durch diese in den zweiten Endbehälter 29, welcher die Verbindung mit der unteren Hälfte herstellt. Nachdem das Wasser in den unteren Theil des ersten Endbehälters 30 getreten ist, gelangtThe feed water to be supplied to the boiler must also pass through a preheater. This is located partly in the smoke chamber 27 (Fig. 2) and partly in the combustion chamber 13. There is initially a group of pipes in the smoke chamber, as in FIG. 4 shown in longitudinal section, which consists of horizontal tubes 28 and these connecting End containers 29 and 30 consists. One (30) of the latter has a partition 31 through which it is divided into two halves. The feed water first enters the upper half through pipe 32, flows through the upper half of the pipe group, enters through this the second end container 29, which connects to the lower half. After the water has entered the lower part of the first end container 30, it arrives

es in ein gröfseres Rohr 33, welches unterhalb der Rohrgruppe und parallel zu dieser gelegen ist. Von diesem Rohre zweigen eine Anzahl Rohre 34 ab, welche durch einen Theil der Heizrohren hindurch nach einer zweiten Rohrgruppe gehen, welche genau wie die oben beschriebene ausgeführt ist und in der Verbrennungskammer liegt (Fig. 3). Das parallel zu der Rohrgruppe gelegene Rohr 33 befindet sich hier jedoch oberhalb. Von diesem zweigt sich ein weiteres Rohr 35 ab, welches durch die hintere Wand 5 der Verbrennungskammer hindurchgeführt ist und mit einem horizontalen Rohre 36, parallel zur Wand und im Wasserraum gelegen, verbunden ist. Von diesem Rohre 36 führen eine Anzahl engerer Röhren 37 abwärts. Das Wasser tritt alsdann in Spritzröhren 38, welche sich von den abwärts gerichteten Röhren 37 abzweigen und in die Röhren 8 münden. Durch Einspritzen des Speisewassers in dieselben wird hauptsächlich der Umlauf in den Siederöhren veranlafst.it into a larger tube 33, which is located below and parallel to the tube group is. From this pipe branch off a number of pipes 34 which run through part of the Heat pipes go through to a second group of pipes, which are exactly like the one above is carried out and is located in the combustion chamber (Fig. 3). That in parallel However, the tube 33 located to the tube group is here above. From this branches another pipe 35 extends through the rear wall 5 of the combustion chamber is passed through and with a horizontal tube 36, parallel to the wall and in the water space located, connected. A number of narrower tubes 37 lead from this tube 36 down. The water then enters spray pipes 38, which are directed downwards from the Branch off tubes 37 and open into tubes 8. By injecting the feed water into them, mainly caused the circulation in the boiler tubes.

Von den beiden Endbehä'ltern 29 und 30 in Fig. 4 der in der Verbrennungskammer befindlichen Vorwärmerrohrgruppe 28 führt je ein Rohr 39 (Fig. 3) aus dem obersten Theil derselben durch die Decke der Verbrennungskammer hindurch nach dem Dampfraum, damit im Vorwä'rmer sich ansammelnde Dampfmengen entweichen können. Im Kesselinneren ist über diesen Röhren eine Kappe 40 angebracht, damit miteinströmendes Wasser nicht gegen die Kesseldecke spritzen kann.Of the two end containers 29 and 30 in FIG. 4, the one located in the combustion chamber Preheater pipe group 28 leads a pipe 39 (Fig. 3) from the uppermost part of the same through the ceiling of the combustion chamber through to the steam room, so that the amount of steam that has accumulated in the preheater can escape. Inside the boiler is over A cap 40 is attached to these tubes so that no water flows in against them the boiler roof can splash.

Zur Vergröfserung des Dampfraumes sind parallel zur Längsrichtung des Kessels zwei eylindrische Behälter 41 (Fig. 1 und 2) angebracht, welche mit dem Kessel durch Stutzen verbunden sind. Ein dritter zwischen diesen beiden gelegener Cylinderkessel 42 steht nur mit diesen in Verbindung, ist nach vorn verlängert und führt zwecks Dampftrocknung durch den Schornsteinhals.To enlarge the steam space, there are two parallel to the longitudinal direction of the boiler cylindrical container 41 (Fig. 1 and 2) attached, which are connected to the boiler by nozzles. A third cylinder vessel 42, located between these two, is only standing in connection with these, is extended forward and leads to the purpose of steam drying through the chimney neck.

Die Wirkungsweise des Kessels ist folgende: Die von dem Brenner ausgehende Flamme zieht durch die Feuerröhren und erwärmt sowohl die Innenseite derselben als auch die Aufsenseite des zugehörigen Siederohres. Durch die Verbrennungskammer wird die Verbindung der Feuerröhren mit den Heizrohren erzielt, so dafs die Heizgase durch die letzteren nach der Rauchkammer und von hier weiter nach dem Schornstein geführt werden. Die Heizgase berühren ferner den in der Rauchkammer und in der Verbrennungskammer liegenden Vorwärmer und vollziehen so die Erwärmung des Speisewassers.The boiler works as follows: The flame emanating from the burner pulls through the fire tubes and heats both the inside and the inside of them On the outside of the associated boiler pipe. The connection is made through the combustion chamber the fire tubes achieved with the heating tubes, so that the heating gases through the latter the smoke chamber and from here on to the chimney. The heating gases also touch the preheater located in the smoke chamber and in the combustion chamber and thus carry out the heating of the feed water.

Claims (2)

Patent-Ansprüche:Patent Claims: 1. Dampfkessel mit Verbrennungskammer und rückkehrenden Heizrohren, dadurch gekennzeichnet, dafs in die unteren Feuerröhren (3) mit dem Wasserraum des Kessels in Verbindung stehende, am freien Ende geschlossene Siederöhren (4) hinten hineinragen, und in den vorderen Theil dieser Feuerröhren Brenner (14) für flüssigen Brennstoff eingesetzt sind, der durch eine selbsttätig wirkende Vorrichtung in regelbarer Weise zugeführt wird, während im oberen Theile des Kessels ein Vorwärmer aus zwei Rohrgruppen angeordnet ist, die unter sich durch die oberen Heizrohren (9) durchsetzende Röhren (34) verbunden sind.1. Steam boiler with combustion chamber and returning heating pipes, characterized in that that into the lower fire tubes (3) with the water space of the boiler connecting boiler tubes (4) closed at the free end protrude at the rear, and in the front part of these fire tubes burners (14) for liquid Fuel are used, which can be regulated by an automatically acting device Way is fed, while in the upper part of the boiler a preheater is arranged from two groups of tubes, the are connected below by the upper heating tubes (9) penetrating tubes (34). 2. Röhrendampfkessel nach Anspruch 1, in dessen Siederöhren (4) beiderseits offene Röhren (8) nach Field'scher Art eingesetzt sind, in welche das Speisewasser vom Vorwärmer aus eingespritzt wird, um den Umlauf des Wassers in den Siederöhren zu erhöhen.2. tubular steam boiler according to claim 1, in the boiler tubes (4) open on both sides Tubes (8) according to Field's type are used, in which the feed water from the preheater is injected out to increase the circulation of water in the boiler tubes. Hierzu 1 Blatt Zeichnungen.1 sheet of drawings.
DENDAT109535D Active DE109535C (en)

Publications (1)

Publication Number Publication Date
DE109535C true DE109535C (en)

Family

ID=379419

Family Applications (1)

Application Number Title Priority Date Filing Date
DENDAT109535D Active DE109535C (en)

Country Status (1)

Country Link
DE (1) DE109535C (en)

Similar Documents

Publication Publication Date Title
EP0111874A1 (en) A device for burning coal dust
DE2706043C2 (en) Radiant burner
DE2625615A1 (en) GAS HEATING
DE19647492A1 (en) Method and device for feeding a gas turbine with both liquid and gaseous fuels
DE69207674T2 (en) Burner unit
DE109535C (en)
EP0515365A1 (en) Burner with fuel gas recycling for free-flowing fuels
DE1753198C3 (en) Horizontal water boiler for gas or oil firing
DE602004006804T2 (en) Combustion device and method
DE271066C (en)
EP0002732A2 (en) Method and apparatus for feeding explosive gases to a combustion space
DE2952547C2 (en) Gas turbine plant with water injection into the combustion gases
AT405090B (en) METHOD FOR BURNING A GASEOUS FUEL-AIR MIXTURE AND HEATING DEVICE FOR CARRYING OUT THE METHOD
DE202514C (en)
DE3152948C2 (en) Pressure evaporator burners
DE47055C (en) Feed water preheater
DE434095C (en) Multi-part steep tube boiler
DE149965C (en)
DE130735C (en)
DE16164C (en) Innovations in circulation steam boilers. (I.
DE75193C (en) Flame tube boiler with built-in water chamber and circulation pipes extending from this
AT393020B (en) Burner, in particular gas burner
DE30038C (en) Ship's boiler with the combustion system patented under No. 25313. (Depending on patent no. 25313)
DE839999C (en) Boilers, especially for central heating
DE2838259A1 (en) Recuperative furnace burner - with flue gases passing burner at right angle to inlet for air preheat after circulation in furnace