[go: up one dir, main page]

DE1092378B - Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point - Google Patents

Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point

Info

Publication number
DE1092378B
DE1092378B DEG21879A DEG0021879A DE1092378B DE 1092378 B DE1092378 B DE 1092378B DE G21879 A DEG21879 A DE G21879A DE G0021879 A DEG0021879 A DE G0021879A DE 1092378 B DE1092378 B DE 1092378B
Authority
DE
Germany
Prior art keywords
loading
scraper box
belt
continuously
scraper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEG21879A
Other languages
German (de)
Inventor
Konrad Grebe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEG21879A priority Critical patent/DE1092378B/en
Publication of DE1092378B publication Critical patent/DE1092378B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • E21F13/063Loading devices for use in mining
    • E21F13/065Scrapers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/52Cableway excavators

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Description

Verfahren und Anlage zum Laden und Abfördern von an einer Ladestelle kontinuierlich oder annähernd kontinuierlich anfallendem Fördergut Die Erfindung bezieht sich auf ein Verfahren und eine Anlage zum Laden und Abfördern von an einer Ladestelle kontinuierlich oder annähernd kontinuierlich anfallendem Fördergut, das besondere Vorteile dann bietet, wenn die Ladestelle häufig verlegt wird.Process and system for loading and conveying away from a loading point continuously or almost continuously accumulating conveyed material. The invention relates to a method and a system for loading and unloading at a Loading point continuously or almost continuously accumulating conveyed goods that offers particular advantages if the loading point is relocated frequently.

Die Erfindung ermöglicht es, unter solchen Voraussetzungen mit besonderem Vorteil die als solche bekannte Förderung mit Bandabschnitten anzuwenden, deren Wirtschaftlichkeit eine möglichst volle Ausnutzung der Ladekapazität der Bandabschnitte bedingt.The invention makes it possible under such conditions with special Advantage to apply the known as such promotion with tape sections whose Economic efficiency the fullest possible utilization of the loading capacity of the belt sections conditional.

Bisher wird für diesen Zweck meist ein an der Ladestelle angeordneter Zwischenbunker verwendet, in dem sich das Gut während der Intervalle, in denen sich kein Bandabschnitt an der Ladestelle befindet, ansammelt, so daß für die Beladung des eintreffenden Bandabschnitts die erforderliche Gutsmenge zur Verfügung steht.Up to now, one has mostly been arranged at the loading point for this purpose Intermediate bunker used, in which the goods are during the intervals in which no section of tape is located at the loading point, accumulates, so that for loading of the incoming belt section, the required amount of material is available.

Die Notwendigkeit, einen solchen Zwischenbunker vorzusehen, bedeutet aber eine Verteuerung sowohl der Anlage wie auch der Betriebskosten, weil der Bunker, der einen vergleichsweise großen Platz in Anspruch nimmt, bei jeder V orverlegung der Ladestelle mit verlegt werden muß.The need to provide such an intermediate bunker means but an increase in the cost of both the system and the operating costs, because the bunker, which takes up a comparatively large amount of space every time it is moved forward the loading point must also be relocated.

Die Erfindung schafft die Möglichkeit einer gleichmäßigen Beladung der Bandabschnitte mit an einer wandernden Ladestelle z. B. im Streb oder beim Streckenvortrieb anfallendem Gut ohne die Notwendigkeit einer Zwischenbunkerung desselben.The invention creates the possibility of uniform loading the tape sections with at a moving loading point z. B. in the face or when driving accruing goods without the need for intermediate storage of the same.

Das wird gemäß der Erfindung dadurch ermöglicht, daß unter an sich bekannter Förderung des anfallenden Haufwerks mittels eines seilzugbewegten Schrapperkastens, der das Gut nach einem Ladetisch fördert, die Ladekapazität der Bandzüge der Ladekapazität eines Schrapperkastens entsprechend bemessen wird und die Bandzüge längs der Entleerungsstelle des Schrapperkastens mit einer solchen Geschwindigkeit verfahren werden, daß eine fortlaufende vollständige Beladung des Füllquerschnitts des Bandzuges erfolgt, wobei die Abstände der Bandzüge so auf die Fördergeschwindigkeit des Schrapperkastens abgestimmt sind, daß jeweils bis zur Ankunft des nächsten Bandzuges der Schrapperkasten vom Ladetisch zu dem in der Strecke befindlichen, bei ungleichmäßigem Anfall des Fördergutes als Bunker dienenden und gegebenenfalls durch das Hin- und Herziehen des Schrapperkastens in der Strecke verteilten Haufwerkstapel verfahren wird, sich dort belädt und zum Ladetisch zurückkehrt.This is made possible according to the invention in that under per se known conveyance of the accumulating debris by means of a scraper box moved by a cable, that conveys the goods to a loading table, the loading capacity of the belt pulls of the loading capacity a scraper box is dimensioned accordingly and the tape pulls along the emptying point of the scraper box are moved at such a speed that a continuous full loading of the filling cross-section of the belt tension takes place, with the distances between the belt pulls to the conveying speed of the scraper box are coordinated that in each case until the arrival of the next strip pull the scraper box from the loading table to the one in the line, if the Material to be conveyed serving as a bunker and possibly by moving it back and forth of the scraper box is moved in the path distributed pile of debris, itself loads there and returns to the loading table.

Diese neue Art der Abförderung des Haufwerks ist von besonderer Bedeutung, wenn der Anfall des zum Abfördern verfügbaren Guts zeitlich stark schwankt. Ein Beispiel eines solchen Falles ist die Gewinnung von Kohle von Hand, bei welcher diese Schwankungen sich daraus ergeben, daß die Hauer in bestimmten Perioden - namentlich zu Beginn der Schicht - im wesentlichen mit dem Abbau, in anderen Perioden - namentlich gegen Ende der Schicht - im wesentlichen mit dem Ausbau beschäftigt sind.This new type of removal of the debris is of particular importance, when the amount of material available for removal fluctuates greatly over time. A An example of such a case is the extraction of coal by hand, in which these fluctuations result from the fact that the tusks in certain periods - namely at the beginning of the shift - essentially with the dismantling, in other periods - by name towards the end of the shift - are essentially busy with the expansion.

Das neue Verfahren ermöglicht den Ausgleich dieser Schwankungen bzw. die Verteilung der Fördermengen über die ganze Schicht dadurch, daß nunmehr z. B. der Streckenraum bzw. das Streckenort. selbst den Stapelplatz bildet, von welchem durch den in gleichmäßigen Zeitabständen eintreffenden Schrapperkasten während der ganzen Schicht die Kohle aufgenommen und weggeladen wird.The new procedure enables these fluctuations or the distribution of the delivery rates over the whole layer in that now z. B. the route space or the route location. itself forms the stacking place of which due to the scraper box arriving at regular intervals during the the whole shift the coal is picked up and loaded away.

Das erfindungsgemäße Verfahren ist besonders geeignet für die Verwendung von verhältnismäßig kurzen Bandzügen. Die Zeit, die für das Hin- und Herziehen, Beladen und Entladen des Schrapperkastens zur Verfügung steht, ergibt sich, wenn man die Gesamtdauer der Förderschicht durch die Anzahl der Schrapperladungen teilt, die zum Wegladen der gesamten in der Schicht anfallenden Kohlenmenge benötigt werden. Aus der gleichen Rechnung ergibt sich, in welchen Zeitabständen die Bandabschnitte aufeinanderfolgen müssen.The method according to the invention is particularly suitable for use of relatively short straps. The time it takes to move back and forth Loading and unloading of the scraper box is available, arises when the total duration of the conveyor shift is divided by the number of scraper loads, which are required to unload the entire amount of coal produced in the shift. The same calculation shows at what time intervals the tape sections must follow one another.

Infolge der Zuförderung des Gutes zu der Beladestelle der Bandabschnitte mittels eines Schrapperkastens können die sich als Folge der Verlegung der Ladestelle ergebenden Änderungen der Entfernung zwischen dieser und der Beladestelle der Bandabschnitte im Rahmen der Leistungsfähigkeit der Schrapperanlagen durch bloße Verlängerung des Zugseils des Schrapperkastens überbrückt werden, ohne daß es notwendig ist, die Beladestelle der Bandabschnitte in kleinen Zeitintervallen zu verlegen.As a result of the conveyance of the goods to the loading point of the belt sections by means of a scraper box, which can result from the relocation of the loading point resulting changes in the distance between this and the loading point of the belt sections within the scope of the performance of the scraper systems by simply extending the Pull rope of the scraper box can be bridged without that it is necessary is to relocate the loading point of the belt sections in small time intervals.

Durch Schaltvorrichtungen ist Vorsorge gegen gelegentliche Störungen in der zeitlichen Abstimmung zwischen der Schrapperförderung und der Bandal)schnittsförderung zu treffen: Falls an der Entladestelle des Schrapperkastens kein Bandabschnitt zur Verfügung steht, wird der Schrapperkasten vor Erreichen derselben selbsttätig angehalten. Ebenso wird die Bandanlage selbsttätig stillgesetzt, wenn beim Eintreffen eines Bandabschnitts an der Entladestelle der Schrapperkasten noch nicht zur Entladung zur Verfügung steht.Switching devices are a precaution against occasional malfunctions in the timing between the scraper conveyance and the Bandal) cut conveyance To be met: If there is no section of tape at the unloading point of the scraper box Is available, the scraper box is automatically stopped before it is reached. The conveyor system is also automatically shut down if a Section of the tape at the unloading point of the scraper box is not yet ready for unloading is available.

Eine zur Durchführung des vorstehend gekennzeichneten Verfahrens geeignete Anlage besteht aus einer ansteigenden, den Boden des Schrapperkastens bildenden Führungsbahn, auf der der Schrapperkasten mittels umsteuerbaren Seilzugs verfahren wird und die oberhalb der Tragkonstruktion, auf der die Bandabschnitte verfahren werden, eine Öffnung aufweist, die von dem Profil des Schrapperkastens angepaßten seitlichen Führungswänden umschlossen ist. Gemäii einem besonderen Merkmal der Erfindung schließen die Unterkanten dieser seitlichen Führungswände im Bereich der Öffnung auf eine der Länge des Schrapperkastens entsprechende Länge mit der Führung des Schrapperkastens ab und sind in einem anschließenden Bereich, in dem die Führungswände konvergieren, nach oben gezogen, so daß gewissermaßen eine Schnauze gebildet wird, die bewirkt, daß das durch den sich bewegenden. Bandabschnitt abgezogene Gut auf diesem einen gleichmäßigen, durch entsprechende Ausbildung dieser Schnauze seiner optimalen Beladung entsprechend gestalteten Schüttkegel bildet.A suitable one for carrying out the method identified above The system consists of an ascending line that forms the bottom of the scraper box Guide track on which the scraper box travels by means of reversible rope pull and the one above the supporting structure on which the belt sections move has an opening adapted to the profile of the scraper box lateral guide walls is enclosed. According to a special feature of the invention close the lower edges of these lateral guide walls in the area of the opening to a length corresponding to the length of the scraper box with the guide of the Scraper box and are in an adjoining area in which the guide walls converge, pulled upwards, so that a snout is formed, as it were, which does that by moving. Tape section pulled off the good this one evenly, through appropriate training of this snout his optimal loading forms appropriately designed pouring cone.

Es ist ferner, zum Beispiel wenn das Streckenort nicht allzuweit gegenüber dem Streb voreilt, möglich, mittels ein und derselben Anlage sowohl die im Streb gewonnene, wie die beim Vertrieb einer Grundstrecke anfallende Kohle sowie auch die Berge abzufördern.It is also, for example, if the route location is not too far opposite ahead of the longwall, possible, by means of one and the same system, both those in the longwall recovered, such as the coal that arises when selling a basic route as well as to carry away the mountains.

In den Zeichnungen sind lediglich beispielsweise und unter Weglassung aller für das Verständnis der Erfindung nicht erforderlichen Einzelheiten das neue Verfahren und die wesentlichen -Merkmale einer zu seiner Durchführung dienenden Anlage veranschaulicht.The drawings are only given by way of example and are omitted all details not necessary for understanding the invention are new Procedure and the essential characteristics of a service used to carry it out Plant illustrated.

Fig. 1 zeigt schematisch in Seitenansicht die Gesamtanordnung im Falle ihrer Anwendung zur Abförderung der in einem Streb in flacher bis zu halbsteiler Lagerung anfallenden Kohle; Fig. 2 ist eine Aufsicht auf Fig. 1; Fig.3 ist ein Schnitt im wesentlichen gemäß der Linie III-III der Fig. 1 durch die Übergabestelle oberhalb des zu beladenden Bandabschnitts in vergrößertem Maßstabe und Fig.4 ein entsprechender Schnitt im wesentlichen gemäß der Linie IV-IV der Fig. 1.Fig. 1 shows schematically in side view the overall arrangement in the case its application for the removal of the in a longwall in shallow to half-steep Storage of accumulated coal; Fig. 2 is a plan view of Fig. 1; Fig.3 is a section essentially according to the line III-III of FIG. 1 through the transfer point above of the belt section to be loaded on an enlarged scale and FIG. 4 a corresponding one Section essentially along the line IV-IV of FIG. 1.

In Fig. 1 ist mit 1 schematisch das Traggerüst, auf dem die Bandabschnitte 2, von denen nur ein abfahrender in der Abbildung links angedeutet ist, verfahren werden, bezeichnet.In Fig. 1, 1 is schematically the support frame on which the tape sections 2, of which only one departing is indicated in the figure on the left, proceed are designated.

Der Schrapperkasten 3, der an seiner vorderen und unteren Seite offen ist, wird durch einen Schrapperhaspel 4 mittels des Seilzuges 4', der vorn über eine an der Firste angeschlagene Rolle 5 und an der entgegengesetzten Seite über Haspeltrommeln 6', 6" läuft, nach Beladung mit Kohle von dem Haufwerkstapel 7, dem die Kohle durch das Strebfördermittel 8 zugeförfiert wird, auf der ansteigenden Führungsbahn 9, die unten geschlossen ist und gleichzeitig seinen Boden bildet, nach oben gezogen.The scraper box 3, which is open on its front and lower side is, is through a scraper reel 4 by means of the cable 4 ', the front over a roller 5 attached to the roof and over on the opposite side Reel drums 6 ', 6 "runs, after loading with coal from the pile 7, the the coal is fed by the face conveyor 8, on the rising Guide track 9, which is closed at the bottom and at the same time forms its bottom, pulled up.

Oberhalb der Beladestelle des Bandabschnitts ist die Führungsbahn 9, wie Fig. 2 bei 10 erkennen läßt, unten offen und seitlich durch Wandungen 11', 11" abgeschirmt, die in ihrem vorwärtigen Bereich 12 konvergierend und mit ihren Unterkanten 13 gegenüber der Führungsbahn hochgezogen sind, so daß, wie Fig. 3 erkennen läßt, eine Art Schnauze gebildet wird, die in der oben erläuterten Weise die Bildung eines vorgeschriebenen Schüttkegels auf dem Bandabschnitt durch das aus dem Schrapperkasten im Zuge seiner Fortbewegung über die Öffnung 10 der Führungsbahn ausgetragene, während der Fortbewegung des Bandabschnitts von diesem durch die sich verengende Öffnung fortlaufend abgezogene Gut sichert.The guideway is above the loading point of the belt section 9, as can be seen in FIG. 2 at 10, open at the bottom and laterally through walls 11 ', 11 "shielded, converging in their forward area 12 and with their Lower edges 13 are raised relative to the guideway, so that, as shown in FIG. 3, see lets a kind of snout is formed, which in the manner explained above, the formation a prescribed cone of repose on the tape section through the one from the scraper box carried out in the course of its movement through the opening 10 of the guideway, while the advancement of the band portion thereof through the narrowing opening secures continuously withdrawn goods.

In Fig. 4 ist der Schrapperkasten 3 zwischen den Seitenwandungen 11', 11" während seiner Entleerungsphase dargestellt.In Fig. 4 the scraper box 3 is between the side walls 11 ', 11 "is shown during its emptying phase.

Claims (2)

PATENTANSPRÜCHE: 1. Verfahren zum Laden und Abfördern von an einer Ladestelle kontinuierlich oder annähernd kontinuierlich anfallendem Fördergut durch einen das Gut aufnehmenden und über einen Ladetisch auf einen Bandzugförderer abgebenden Schrapperkasten, dadurch gekennzeichnet, daß die Bandzüge (2) je die Ladekapazität eines Schrapperkastens (3) besitzen und längs der Entleerungsstelle (10) des Schrapperkastens mit einer solchen Geschwindigkeit verfahren werden, daß eine fortlaufende vollständige Beladung des Füllquerschnitts des Bandzuges erfolgt, wobei die Abstände der Bandzüge so auf die Fördergeschwindigkeit des Schrapperkastens abgestimmt sind, daß jeweils bis zur Ankunft des nächsten Bandzuges der Schrapperkasten vom Ladetisch zu dem in der Strecke befindlichen, bei ungleichmäßigem Anfall des Fördergutes als Bunker dienenden und gegebenenfalls durch das Hin- und Herziehen des Schrapperkastens in der Strecke verteilten Haufwerkstapel (7) verfahren wird, sich dort belädt und seinerseits zum Ladetisch zurückkehrt. PATENT CLAIMS: 1. A method for loading and conveying away conveyed goods that are continuously or almost continuously accumulating at a loading point by a scraper box which receives the goods and delivers them to a belt conveyor via a loading table, characterized in that the belt pulls (2) each have the loading capacity of a scraper box (3 ) and are moved along the emptying point (10) of the scraper box at such a speed that a continuous full loading of the filling cross-section of the belt pull takes place, the distances between the belt pulls are matched to the conveying speed of the scraper box that in each case until the arrival of the next Belt pull of the scraper box from the loading table to the pile of debris (7) located in the route, which serves as a bunker in the event of an uneven accumulation of the conveyed material and if necessary by pulling the scraper box back and forth in the route, is loaded and is there on the other hand returns to the loading table. 2. Anlage zum Beladen von Förderbandabschnitten gemäß dem Verfahren nach Anspruch 1 mit einer, den unteren Abschluß eines auf ihr verfahrenen Schrapperkastens bildenden Führungsbahn, die oberhalb der Beladestelle der Bandabschnitte durch eine nach Art eines Bunkeraustrages ausgebildete Öffnung unterbrochen ist und im Bereich der Öffnung dem Profil des Schrapperkastens angepaßte seitliche Führungswände aufweist, dadurch gekennzeichnet, daß die Unterkanten der seitlichen Führungswände (11) vom Beginn der Öffnung an in einem der Länge des Schrapperkastens (3) entsprechenden Bereich gegen die Führungsbahn (9) abschließen und in einem anschließenden Bereich (12), in dem die Führungswände konvergieren, nach oben gezogen sind. In Betracht gezogene Druckschriften: Deutsche Patentschriften Nr. 483 053, 717 146, 835 871; USA.-Patentschrift Nr. 1721002; deutsche Patentanmeldung G 1141 VI / 5 d (bekanntgemacht am 4. 10. 1951).2. System for loading conveyor belt sections according to the method according to claim 1 with a guide track forming the lower end of a scraper box moved on it, which is interrupted above the loading point of the belt sections by an opening designed in the manner of a bunker discharge and in the area of the opening the profile of the scraper box has adapted side guide walls, characterized in that the lower edges of the side guide walls (11) from the beginning of the opening in an area corresponding to the length of the scraper box (3) close against the guide track (9) and in a subsequent area (12) , in which the guide walls converge, are pulled up. Considered publications: German Patent Nos. 483 053, 717 146, 835 871; USA. Patent No. 1721 002nd; German patent application G 1141 VI / 5 d (published October 4, 1951).
DEG21879A 1957-04-11 1957-04-11 Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point Pending DE1092378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG21879A DE1092378B (en) 1957-04-11 1957-04-11 Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG21879A DE1092378B (en) 1957-04-11 1957-04-11 Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point

Publications (1)

Publication Number Publication Date
DE1092378B true DE1092378B (en) 1960-11-03

Family

ID=7121834

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG21879A Pending DE1092378B (en) 1957-04-11 1957-04-11 Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point

Country Status (1)

Country Link
DE (1) DE1092378B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1194804B (en) * 1961-05-13 1965-06-16 Demag Ag Scraper system for driving the excavation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE483053C (en) * 1925-07-06 1929-10-02 Rembrandt Peale Conveyor device, consisting of a boat-like container
US1791002A (en) * 1931-02-03 Automatic teain control
DE717146C (en) * 1938-05-04 1942-02-06 Gewerk Eisenhuette Westfalia Conveyor vessel with scraper flap that closes when a tow rope is pulled in
DE835871C (en) * 1950-12-05 1952-04-07 Weserhuette Ag Eisenwerk Method for operating a conveyor belt provided with its own drive

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1791002A (en) * 1931-02-03 Automatic teain control
DE483053C (en) * 1925-07-06 1929-10-02 Rembrandt Peale Conveyor device, consisting of a boat-like container
DE717146C (en) * 1938-05-04 1942-02-06 Gewerk Eisenhuette Westfalia Conveyor vessel with scraper flap that closes when a tow rope is pulled in
DE835871C (en) * 1950-12-05 1952-04-07 Weserhuette Ag Eisenwerk Method for operating a conveyor belt provided with its own drive

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1194804B (en) * 1961-05-13 1965-06-16 Demag Ag Scraper system for driving the excavation

Similar Documents

Publication Publication Date Title
DD210321A5 (en) SCHUETTGUTVERLADEWAGEN, ESPECIALLY FOR ABRAUMVERLADUNG OF A SCHOTTERBETT CLEANING MACHINE
DE2018849A1 (en) Rake cooling bed
DE2626408A1 (en) LINE BUNKER WITH LIMITED STORAGE CAPABILITY FOR STORING AND REMOVING SHOE GOODS IN LINE CONVEYANCE OF MINING UNDERGROUND
DE1092378B (en) Process and system for loading and evacuating goods that are continuously or almost continuously accumulating at a loading point
DE692888C (en) Sea up conveyor for bulk goods
DE1456721A1 (en) Method and device for pre-homogenizing bulk material, in particular raw cement
DE505767C (en) Device for feeding goods
DE1189507B (en) Material transport system for the transition from the so-called to the seigere production or vice versa in underground mining operations
DE926411C (en) Conveyor belt with trolley
DE1173843B (en) Device for the continuous removal of the material that has been dumped in a pile
DE832118C (en) Method and device for conveying bulk goods
DE1281946B (en) Conveyor belt system with a memory
DE2224583A1 (en) Device for automatically feeding cigarettes into storage containers of packaging machines
DE686675C (en) Extendable conveyor belt for mining operations
DE1099450B (en) System for the onward conveyance of goods supplied by an intermediate conveying means by conveyor belt trains
DE2237976A1 (en) FOERDERER CROSSING STATION
DE886123C (en) Loading chute for conveyor belts
DE1092836B (en) Pick-up and transfer device for the goods that collect under the conveyor belt system, in particular due to the winding of the lower belt run
DE966980C (en) Belt conveyor with an intermediate bunker
DE2119228C3 (en) Device for loosening, loading and conveying away the debris during pipe pre-pressing operation
DE1193913B (en) Process and system for conveying in continuously driven lines
DE685891C (en) Method and device for conveying debris
DE974407C (en) Method for loading conveyor wagons moving quickly relative to the loading point with dredged material
DE920721C (en) Conveying method using a rocker slide
EP0068169A1 (en) Conveyor belt for self unloading ships