Procedure for commissioning a once-through steam generator

Info

Publication number
DE1067038B
DE1067038B DENDAT1067038D DE1067038DA DE1067038B DE 1067038 B DE1067038 B DE 1067038B DE NDAT1067038 D DENDAT1067038 D DE NDAT1067038D DE 1067038D A DE1067038D A DE 1067038DA DE 1067038 B DE1067038 B DE 1067038B
Authority
DE
Germany
Prior art keywords
steam generator
superheater
once
commissioning
procedure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DENDAT1067038D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sulzer AG
Original Assignee
Gebrueder Sulzer AG
Publication date
Publication of DE1067038B publication Critical patent/DE1067038B/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B29/00Steam boilers of forced-flow type
    • F22B29/06Steam boilers of forced-flow type of once-through type, i.e. built-up from tubes receiving water at one end and delivering superheated steam at the other end of the tubes
    • F22B29/08Steam boilers of forced-flow type of once-through type, i.e. built-up from tubes receiving water at one end and delivering superheated steam at the other end of the tubes operating with fixed point of final state of complete evaporation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

DEUTSCHESGERMAN

Die Erfindung betrifft eine weitere A^erbesserung des Verfahrens zum Inbetriebsetzen eines mit Zwangdurchlauf des Arbeitsmittels betriebenen Dampferzeugers nach dem Patentanspruch 1 des Patents 968 350. Das Verfahren nach der Erfindung ist dadurch gekennzeichnet, daß das Wasser an einer Stelle zwischen einem auf den Verdampfer folgenden Vorüberhitzer und dem Überhitzer dem Rohrsystem zur Zurückführung in den Behälter entnommen wird.The invention relates to a further improvement the method for starting up a steam generator operated with forced flow of the working medium according to claim 1 of patent 968 350. The method according to the invention is characterized in that the water at a point between one following the evaporator Pre-superheater and the superheater is taken from the pipe system for return to the container.

Die Merkmale des Erfindungsgegenstandes sind nachstehend an Hand eines Schaltbildes näher erläutert.The features of the subject matter of the invention are detailed below using a circuit diagram explained.

Die in der Zeichnung dargestellte Zwangdurchlaufdampferzeugeranlage weist im wesentlichen einen Speisewasserbehälter 1, einen Vorwärmer 3, einen Verdampfer 31, einen Abscheider 4, einen Vorüberhitzer 61 und einen Endüberhitzer 6 auf. Das Arbeitsmittel wird mittels der Speisepumpe 2 mit einem dem einzuhaltenden Betriebsdampfdruck entsprechenden Förderdruck durch das Rohrsystem 3, 31, 61, 6 gepreßt und hierbei durch die Feuerung 20 im Brennraum 21 und durch die Rauchgase im Rauchgaszug 22 beheizt. Der hierbei entstehende überhitzte Dampf strömt durch die Leitung 7 an nicht gezeichnete Verbrauchsstellen, aus denen das Arbeitsmittel in Form von Kondensat wieder zum Speisewasserbehälter 1 zurückgeführt werden muß.The once-through steam generator system shown in the drawing essentially has a feed water tank 1, a preheater 3, an evaporator 31, a separator 4, a preheater 61 and a final superheater 6. The working fluid is by means of the feed pump 2 with a delivery pressure through the pipe system 3, 31 corresponding to the operating steam pressure to be maintained, 61, 6 pressed and this through the furnace 20 in the combustion chamber 21 and through the flue gases in the flue gas 22 heated. The resulting superheated steam flows through line 7 to not shown Consumption points from which the working fluid is returned to the feed water tank in the form of condensate 1 must be returned.

Während des Anheizens des beschriebenen Kessels ist das Ventil 5 mittels des Handrades 14 geschlossen, so daß das durch die Speisepumpe 2 zugeführte Arbeitsmittel über das geöffnete Ventil 8 durch die Leitung 9 zunächst noch in Form von Wasser in den Speisewasserbehälter 1 zurückgeführt wird. Die Leitung 9 ist zwischen dem auf den Verdampfer 31 folgenden Vorüberhitzer 61 und dem eigentlichen Überhitzer 6 an das Rohrsystem des Dampferzeugers angeschlossen. Es wird hierdurch erreicht, daß beim Anfahrumwälzvorgang auch noch ein Teil des Rohrsystems durch umgewälztes Wasser gekühlt werden kann, welcher auch im normalen Betrieb noch neben schon leicht überhitztem Dampf noch Wasser in Tropfen führt und deshalb an einer Stelle intensiverer Heizung angeordnet werden darf.During the heating of the boiler described, the valve 5 is closed by means of the handwheel 14, so that the working medium supplied by the feed pump 2 via the open valve 8 through the Line 9 is initially returned to the feed water tank 1 in the form of water. the Line 9 is between the pre-superheater 61 following the evaporator 31 and the actual one Superheater 6 connected to the pipe system of the steam generator. It is thereby achieved that when Starting circulating process, part of the pipe system can also be cooled by circulated water which even in normal operation still contains water in addition to slightly overheated steam Drops leads and therefore may be arranged at a point of more intense heating.

Während des Zeitabschnittes dieser Arbeitsmittelumwälzung erwärmt sich der Wasserkreislauf mehr und mehr. Nach einiger Zeit bildet sich an der Austrittsstelle zwischen dem Vorüberhitzer 61 und dem Endüberhitzer 6 ein Dampfwassergemisch, dessen Wassergehalt mehr und mehr abnimmt, bis dessen Abführung durch die Leitung 10 aus dem Abscheider 4 allein gelingt. Es strömt schließlich durch die Leitung 9 trocken gesättigter oder leicht überhitzter Dampf nach dem Speisewasserbehälter 1.During the period of this working medium circulation, the water cycle heats up more and more. After some time, it forms at the exit point between the pre-superheater 61 and the end superheater 6, a steam water mixture, the water content of which decreases more and more until its Discharge through the line 10 from the separator 4 succeeds alone. It eventually flows through that Line 9 dry saturated or slightly superheated steam after the feed water tank 1.

Reim Übergang zum normalen Dauerbetrieb wird Verfahren zum Inbetriebsetzen
eines Zwangdurchlaufdampferzeugers
During the transition to normal continuous operation there is a commissioning procedure
of a once-through steam generator

Zusatz zum Patent 968 350Addition to patent 968 350

Anmelder:Applicant:

Gebrüder Sulzer Aktiengesellschaft,
Winterthur (Schweiz)
Sulzer Brothers Aktiengesellschaft,
Winterthur (Switzerland)

Vertreter: Dipl.-Ing. H. Marsch, Patentanwalt,
Schwelm (Westf.), Drosselstr. 31
Representative: Dipl.-Ing. H. Marsch, patent attorney,
Schwelm (Westphalia), Drosselstr. 31

Beanspruchte Priorität:
Schweiz vom 12. März 1958
Claimed priority:
Switzerland from March 12, 1958

das vorerst geschlossene Ventil 5 geöffnet und umgekehrt das Ventil 8 geschlossen, so daß der Dampf aus dem Vorüberhitzer 61 in den Endüberhitzer 6 weitergelangt. Wird nun auch das Ventil 11 in der Abströmleitung 12 geschlossen, so kann der nun erzeugte überhitzte Hochdruckdampf durch die Leitung 7 zu den Verbrauchsstellen gelangen.the initially closed valve 5 is opened and, conversely, the valve 8 is closed, so that the steam is out from the pre-superheater 61 to the final superheater 6. If now the valve 11 in the discharge line 12 closed, the superheated high-pressure steam that is now generated can be closed through line 7 reach the consumption points.

Die beiden Ventile 5 und 8 wirken im normalen Betrieb als Überströmventile, welche durch den Druckimpulsgeber 13 so gesteuert werden, daß das Ventil 5 den Druck im Verdampfungsrohrsystem des Dampferzeugers dem Betriebsdampfdruck entsprechend hält, während das Ventil 8 dann öffnet, wenn der Druck im Verdampfungsrohrsystem den in diesem normalen Strömungsdruck um ein bestimmtes Maß übersteigt.The two valves 5 and 8 act in normal operation as overflow valves, which through the Pressure pulse generator 13 are controlled so that the valve 5 controls the pressure in the evaporation pipe system of the steam generator maintains the operating steam pressure while valve 8 then opens, if the pressure in the evaporation pipe system exceeds this normal flow pressure by a certain Measure exceeds.

Claims (1)

Patentanspruch·.Claim ·. Verfahren zum Inbetriebsetzen eines mit Zwangdurchlauf des Arbeitsmittels betriebenenMethod for starting up a device operated with forced passage of the work equipment 909 638/67909 638/67 Dampferzeugers nach dem Patentanspruch 1 des Patents 968 350, bei welchem während des Anheizens Wasser aus dem Speisewasserbehälter durch einen Teil des Rohrsystems und zurück in den Behälter umgewälzt wird, dadurch gekennzeichnet, daß das Wasser an einer Stelle zwischen einem auf den Verdampfer folgenden A^orüberhitzer und dem Überhitzer dem Rohrsystem zur Zurückführung in den Behälter entnommen wird.Steam generator according to claim 1 of patent 968 350, in which during heating Water from the feed water tank through part of the pipe system and back into the container is circulated, characterized in that the water is in one place between a superheater following the evaporator and the superheater the pipe system is removed for return to the container. Hierzu 1 Blatt Zeichnungen1 sheet of drawings
DENDAT1067038D Procedure for commissioning a once-through steam generator Pending DE1067038B (en)

Publications (1)

Publication Number Publication Date
DE1067038B true DE1067038B (en) 1959-10-15

Family

ID=593014

Family Applications (1)

Application Number Title Priority Date Filing Date
DENDAT1067038D Pending DE1067038B (en) Procedure for commissioning a once-through steam generator

Country Status (1)

Country Link
DE (1) DE1067038B (en)

Similar Documents

Publication Publication Date Title
DE2816636B2 (en) Steam generator system
DE1069641B (en) Procedure for commissioning a once-through steam generator
DE19544225A1 (en) Cleaning the water-steam cycle in a positive flow generator
DE1444322A1 (en) Method and device for removing scale in systems with several evaporators
DE1576862A1 (en) Procedure for starting up a once-through steam generator
DE1067038B (en) Procedure for commissioning a once-through steam generator
DE1200326B (en) Procedure for starting up a steam power plant
DE1067039B (en) Procedure for commissioning a once-through steam generator
DE596823C (en) Device for controlling a high-pressure pipe steam boiler system with forced flow of water
CH356141A (en) Procedure for commissioning a once-through steam generator
DE649756C (en) Device for the continuous action of gases on liquids
CH356143A (en) Procedure for commissioning a once-through steam generator
CH356142A (en) Procedure for commissioning a once-through steam generator
DE889158C (en) Continuous boiler system with flue gas heated intermediate superheater
DE808011C (en) Method for improving the work process in thermal power machines
DE912335C (en) Procedure for commissioning steam generators
AT103664B (en) Process for superheating steam in steam systems for high steam pressure and high superheating.
DE140632C (en)
DE969268C (en) Process and device for generating cold by absorption
DE223045C (en)
DE2131347A1 (en) Steam power plant
DE435590C (en) Method for heating up high-pressure two-pressure locomotives
DE122263C (en)
DE476023C (en) High-pressure steam boiler with indirect heating by circulating superheated steam with a lower voltage than the voltage generated in the evaporator
DE657281C (en) Steam power plant with fluctuating power and heat requirements