- DD200036A1 DD200036A1 DD23132881A DD23132881A DD200036A1 DD 200036 A1 DD200036 A1 DD 200036A1 DD 23132881 A DD23132881 A DD 23132881A DD 23132881 A DD23132881 A DD 23132881A DD 200036 A1 DD200036 A1 DD 200036A1
- Authority
- DD
- German Democratic Republic
- Prior art keywords
- pillar
- decomposition
- pillars
- carnallite
- mining
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 18
- 238000000354 decomposition reaction Methods 0.000 claims abstract description 23
- 238000005065 mining Methods 0.000 claims abstract description 17
- PALNZFJYSCMLBK-UHFFFAOYSA-K magnesium;potassium;trichloride;hexahydrate Chemical compound O.O.O.O.O.O.[Mg+2].[Cl-].[Cl-].[Cl-].[K+] PALNZFJYSCMLBK-UHFFFAOYSA-K 0.000 claims abstract description 16
- 230000015556 catabolic process Effects 0.000 claims abstract description 11
- 238000006731 degradation reaction Methods 0.000 claims abstract description 11
- 239000007788 liquid Substances 0.000 claims description 17
- 238000010276 construction Methods 0.000 claims description 10
- 239000000126 substance Substances 0.000 claims 1
- 238000000605 extraction Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 abstract description 3
- 230000008030 elimination Effects 0.000 abstract 1
- 238000003379 elimination reaction Methods 0.000 abstract 1
- 244000045947 parasite Species 0.000 abstract 1
- 238000004544 sputter deposition Methods 0.000 abstract 1
- WCUXLLCKKVVCTQ-UHFFFAOYSA-M Potassium chloride Chemical compound [Cl-].[K+] WCUXLLCKKVVCTQ-UHFFFAOYSA-M 0.000 description 7
- 238000009412 basement excavation Methods 0.000 description 7
- 235000002639 sodium chloride Nutrition 0.000 description 7
- 238000011010 flushing procedure Methods 0.000 description 5
- 150000003839 salts Chemical class 0.000 description 5
- 239000011148 porous material Substances 0.000 description 4
- 235000011164 potassium chloride Nutrition 0.000 description 4
- 239000001103 potassium chloride Substances 0.000 description 4
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000001704 evaporation Methods 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000011780 sodium chloride Substances 0.000 description 2
- UXVMQQNJUSDDNG-UHFFFAOYSA-L Calcium chloride Chemical compound [Cl-].[Cl-].[Ca+2] UXVMQQNJUSDDNG-UHFFFAOYSA-L 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000018044 dehydration Effects 0.000 description 1
- 238000006297 dehydration reaction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000000361 pesticidal effect Effects 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/20—Methods of underground mining; Layouts therefor for rock salt or potash salt
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Agricultural Chemicals And Associated Chemicals (AREA)
Abstract
Die Erfindung bezieht sich auf die bergmaennische Gewinnung von Carnallitit, indem Lagerstaettenvorraete, die in den Abbaupfeilern gebunden sind, hereingewonnen werden. Die Erfindung hat das Ziel, die oekonomischen Verluste, die durch das Stehenlassen der Abbaupfeiler entstehen, zu vermeiden. Der Erfindung liegt die Aufgabe zugrunde, die Abbaupfeiler in einer zweiten Abbauphase restlos zu gewinnen, ohne dass es dabei durch Ueberbeanspruchung des sproedbruchempfindlichen Carnallits zu einem ploetzlichen Bruch groesserer Gebirgsvolumina unter Energiefreisetzung kommt. Die technische Aufgabe der Erfindung wird dadurch geloest, dass in die Hohlraeume der ersten Abbauphase Spuelversatz eingebracht wird, und dass die Zusammensetzung der Spuelfluessigkeit so eingestellt wird, dass es zu einer allmaehlichen Zersetzung des in den Pfeilern vorhandenen Carnallitits kommt. Die Verfuellung der primaernen Hohlraeume in Verbindung mit der Beseitigung der Sproedbruchempfindlichkeit des Carnallitits der primaeren Pfeiler und durch dessen Zersetzung ermoeglichen in ihrer kombinierten Wirkung eine nachtraegliche Gewinnung der Abbaupfeiler.The invention relates to the minnainic extraction of carnallitite by recovering storage stocks bound in the mining columns. The object of the invention is to avoid the economic losses caused by leaving the dismantling pillars standing. The object of the invention is to completely recover the decomposition pillars in a second phase of degradation, without causing a sudden breakage of larger rock volumes by overburdening the sproed-fracture-sensitive carnallite with the release of energy. The technical object of the invention is achieved by introducing into the cavities of the first degradation phase a sputtering offset, and that the composition of the spülfluessigkeit is adjusted so that there is a gradual decomposition of the carnallite present in the pillars. The filling of the primary cavities in connection with the elimination of the susceptibility of the carnallite of the primary pillars to decomposition and the decomposition of the parasite, makes possible, in their combined action, a subsequent extraction of the decomposition pillars.
Description
Titel der ErfindungTitle of the invention
Verfahren zur bergmännischen Gewinnung von CarnallititProcess for the mining of carnallitite
/~Y Anwendungsgebiet der Erfindung/ ~ Y Field of application of the invention
Die Erfindung bezieht sich auf die bergmännische Gewinnung von Carnallitit, indem Lagerstättenvorrate, die in Abbaupfeilern gebunden sind, hereingewonnen und Abbauverluste vermieden werden·The invention relates to the mining of carnallitite by recovering deposit stocks bound in mining pillars and avoiding mining losses.
Charakteristik der bekannten technischen Lösungen Beim bergmännischen Abbau von Carnallititlagerstätten besteht gegenüber anderen Salzlagerstätten wie Sylvinit, Hartsalz oder Steinsalz die Besonderheit, daß das zu gewinnende Salzgestein in der Lage ist, große Energiebeträge zu akkumulieren, wodurch sich Hochspannungszonen in Abbaupfeilern und Baufeldrändern ausbilden können. v_y Erreichen diese Spannungen einen bestimmten Grenzbereich, so tritt der spröde Bruch unterschiedlich großer Gebirgsvolumina unter plötzlicher Freisetzung von Energie ein.Characteristic of the Known Technical Solutions In mining mining of carnallitite deposits is compared to other salt deposits such as sylvite, hard salt or rock salt, the peculiarity that the winning salt rock is able to accumulate large amounts of energy, which can form high-voltage zones in degradation pillars and Baufeldrändern. v_y If these tensions reach a certain limit, the brittle fracture of mountain volumes of different sizes occurs with the sudden release of energy.
Dieser als Gebirgss'chlag bezeichnete Vorgang kann zurThis process, referred to as a mountain attack, can be used for
vollständigen oder überwiegenden Zerstörung großer Gru-Y benfelder und seismischen Erschütterungen der Tage.sober-. fläche führen. * · " ' ·complete or overwhelming destruction of large quantities and seismic shocks of the day. surface. * · "'·
Der derzeitige Stand zur Lösung dieser Problematik ist dadurch gekennzeichnet, daß es auf der Grundlage ausgereifter theoretischer Grundlagen möglich ist, die AbbaLipfeiler so zu dimensionieren, daß die sich ergebendeThe current state of solution to this problem is characterized in that it is possible on the basis of mature theoretical principles to dimension the AbbaLipfeiler so that the resulting
Spannungskonzentrationen ausreichend weit vom kritischen Grenzbereich entfernt sind. Eine zusätzliche Maßnahme besteht darin, jeweils zwischen zwei Baustreifen einen weitgehend unverritzten Baustreifentrennpfeiler zu belassen, um ein Übergreifen eines etwaigen Sprödbruches auf den Nachbarbaustreifen auszuschließen. Mit diesen Maßnahmen wird der Abbau von Garnallititlagerstätten geomechanisch beherrscht, jedoch treten hohe Lagerstättenverluste in den .Abbaupfeilern und Baustreifentrennpfeilern auf. DieStress concentrations are sufficiently far away from the critical boundary. An additional measure is to leave a largely unerritzten Baustreifentrennpfeiler between two construction tires, in order to prevent the spread of any brittle fracture on the neighboring construction strips. With these measures, the mining of Garnallititlagerstätten is dominated by geomechanics, but high deposit losses occur in the .Abbaupfeilern and Baustreifentrennpfeilern. The
/J0 Höhe der Abbauverluste ist im wesentlichen abhängig von der Teufe, der LagerStättenmächtigkeit und dem Carnallitgehalt der Pfeiler und wird mit fortschreitender Abbauentwicklung weiter anwachsen» Die Möglichkeit, die Sprödbruchempfindlichkeit carnallitischer Pfeiler dadurch zu beseitigen, daß der Pfeiler mit einer MgGIp ungesättigten Flüssigkeit getrankt wird und dadurch der Carnallitit zersetzt wird, ist bekannte Eine praktische Ausnutzung dieses Gedankens ist bisher u»a· daran gescheitert, weil es dabei zu einer erheblichen Reduzierung der !Tragfähigkeit des zersetzten Pfeilers und damit zu einer Erhöhung der Spannungskonzentration in benachbarten, noch nicht zersetzten Abbaupfeilern oder Baufelärändern kommt. Während die Sprödbruchgefahr für den behandelten Pfeiler beseitigt wird, steigt sie für das Baufeld insgesamt zunächst an« Die Anwendung des Spülversatzverfahrens zur Verfüllung der Abbauhohlräume ist bekannt und für Hartsalzlagerstätten in großem Umfang angewendet worden.»' An die Zusammensetzung der Spülflüssigkeit wurde dabei immer die Forderung gestellt, daß eine Auf-/ J 0 level of degradation losses is substantially dependent on the depth, the deposit thickness and the Carnallitgehalt the pillar and will continue to grow with the progress of degradation development "The ability to eliminate the Sprödbruchempfindlichkeit carnallitischer pillar characterized in that the pillar unsaturated with a MgGIp liquid is soaked A practical exploitation of this idea has so far failed because it leads to a considerable reduction in the carrying capacity of the decomposed pillar and thus to an increase in the concentration of stress in neighboring, not yet decomposed demolition pillars or Baufelärändern comes. While eliminating the risk of brittle fracture for the treated pillar, it is initially increasing for the construction field as a whole. "The use of the backfill backfilling method is well known and has been widely used for hard salt deposits." There has always been a demand for rinse liquid composition provided that a
3o· 'lösung der Zersetzung der anstehenden Pfeiler auszu- . schließen sei« Für Hartsalz- oder SyIvinitpfeiler ist eine Sättigung der Spülflüssigkeit an Kaliumchlorid und Natriumchlorid erforderlich, was ohne Schwierigkeiten · realisierbar ist. To solve the problem of decomposition of the piers. conclude "For hard salt or SyIvinitpfeiler saturation of the rinsing liquid to potassium chloride and sodium chloride is required, which can be realized without difficulty.
Für die Anwendung des Spülversatzverfahrens in Carnallititlagerstätten besteht die Grundvorstellung, durchFor the application of the Spülversatzverfahrens in carnallitite deposits is the basic idea, by
231328 4231328 4
Anwendung einer MgCl^-gesättigten Spülflüssigkeit eben-, falls die Zersetzung der Pfeiler zu vermeiden· Eine praktische Anwendung des Verfahrens ist jedoch bisher nicht erfolgt, da die Erzielung und ständige Erhaltung des dafür erforderlichen hohen MgClp-Gehaltes das .Betreiben spezieller Eindampfanlagen und damit einen hohen Energiebedarf erfordern würde·The use of a MgCl ^ -saturated rinsing liquid also, if the decomposition of the pillar to avoid · A practical application of the method has not yet been done, since the achievement and constant maintenance of the required high MgClp content. The operation of special evaporation plants and thus a would require high energy consumption ·
Eine Ausnutzung des Spülversatzes für die sekundäre Senkung der Abbauverluste wird durch den Kammerpfeilerrückbau erreicht. Dieses Verfahren wurde jedoch bisher nurUtilization of the flushing offset for the secondary reduction of the degradation losses is achieved by the chamber pillar rebuilding. However, this procedure has so far only been
für Haxtsalzgrubenfeider angewendet, bei denen ein Langkammerbau mit einer bestimmten Mindestbreite der Pfeiler ') . . durchgeführt worden war. Da diese .Voraussetzungen nur in wenigen Fällen gegeben waren, hat das Verfahren bisher nur lokale Bedeutung erlangt. Vorstellungen zur Ausdehnung dieses Verfahrens auf Carnallititlagerstätten bestehen bisher nicht.for Haxtsalzgrubenfeider applied, in which a Langkammerbau with a certain minimum width of the pillar '). , had been carried out. Since these prerequisites were only given in a few cases, the process has so far only acquired local significance. Ideas for the extension of this method on carnallitite deposits do not exist so far.
Ziel der Erfindung Die Erfindung hat das Ziel, die ökonomischen Verluste, die durch Stehenlassen der Abbaupfeiler entstehen, zu vermeiden·OBJECT OF THE INVENTION The object of the invention is to avoid the economic losses caused by leaving the demolition pillars standing.
Der Erfindung liegt die Aufgabe zugrunde, die AbbaupfeilerThe invention is based on the object, the dismantling
in einer zweiten Abbauphase restlos zu gewinnen, ohne daß N 25 es dabei durch Überbeanspruchung des sprödbruchempfindy liehen Carnallitits zu einem plötzlichen Bruch größerer Gebirgsvolumina unter Energiefreisetzung kommt.in a second phase of degradation to win completely, without that N 25 it is due to overuse of brittle fracture y lent carnallitite to a sudden break larger rock volumes with release of energy.
Darlegung des ivesens der ErfindungPresentation of the ivesens of the invention
30. Es wurde gefunden, daß die Aufgabe der Erfindung dadurch . . . ... gelöst; wird,, wenn.in die primären Abbauhohlräume .einer Carnallititlagerstätte Spülversatz, eingebracht wird.' Im Gegensatz zu den bisherigen Vorstellungen, die Zusammensetzung der Spülflüssigkeit so zu wählen, daß eine Pfeilerzersetzung vermieden wird, ist erfindungsgemäß eine Pfeilerzersetzung als ein wesentlicher Bestandteil des3 0 . It has been found that the object of the invention thereby. , , ... solved; is introduced when the primary excavation cavities of a carnallite deposit are flushed. In contrast to previous ideas, to choose the composition of the rinsing liquid so that a pillar decomposition is avoided, according to the invention is a pillar decomposition as an integral part of
231328 4231328 4
Anwendung einer MgCl^-gesättigten Spülflüssigkeit ebenfalls die Zersetzung der Pfeiler zu vermeiden· Eine praktische Anwendung des Verfahrens ist jedoch "bisher nicht erfolgt, da die Erzielung und ständige Erhaltung des dafür erforderlichen hohen MgCIp-Gehaltes das Betreiben spezieller Eindampfanlagen und damit einen hohen Energiebedarf erfordern würde.However, a practical application of the method is "not yet done, since the achievement and constant maintenance of the required high MgClc content requires the operation of special evaporation plants and thus a high energy demand would.
Eine Ausnutzung des Spülversatzes für die sekundäre Senkung der Abbauverluste wird durch den Kammerpfeilerrückbau erreicht· Dieses Verfahren wurde jedoch bisher nur für Hartsalzgrubenfeider angewendet, bei denen ein Langkammerbau mit einer bestimmten Mindestbreite der Pfeiler durchgeführt worden war. Da diese Voraussetzungen nur in wenigen Fällen gegeben waren, hat das Verfahren bisher nur lokale Bedeutung erlangt· Vorstellungen zur Ausdehnung dieses Verfahrens auf Carnallititlagerstätten bestehen bisher nicht·A utilization of the flushing offset for the secondary reduction of the mining losses is achieved by the Kammerpfeilerrückbau · However, this method has been used only for Hartsalzgrampffeider, where a Langkammerbau was performed with a certain minimum width of the pillars. Since these conditions were only met in a few cases, the method has so far only gained local significance. Ideas for extending this method to carnallitite deposits have not hitherto existed.
- Ziel der Erfindung- Object of the invention
Die Erfindung hat das Ziel, die ökonomischen Verluste, die durch Stehenlassen der Abbaupfeiler entstehen, zu vermeiden.The aim of the invention is to avoid the economic losses caused by leaving the demolition pillars standing.
Der Erfindung liegt die Aufgabe zugrunde, die Abbaupfeiler in einer zweiten Abbauphase restlos zu gewinnen, ohne daß es.dabei durch tjberbeanspruchung des sprödbruchempfindliehen Carnallitits zu einem plötzlichen Bruch größerer Gebirgsvolumina unter Energiefreisetzung kommt.The invention has for its object to win the dismantling in a second stage of degradation completely without es.dabei by tjberbeanspruchung the brittle fracture-sensitive Carnallitits comes to a sudden break larger mountain volumes with release of energy.
•'Darlegung des Wesens der Erfindung -Es wurde gefunden., daß die Aufgabe der Erfindung dadurch gelöst wird, wenn in die primären Abbäuhohlräume einer · "' Carnallititlagerstatte Spülversatz eingebracht wird. Im Gegensatz zu den bisherigen Vorstellungen, die Zusammensetzung der Spülflüssigkeit so zu wählen, daß eine Pf ei- lerzersetzung vermieden wird, ist erfindungsgemäß'eine Pfeilerzersetzung als ein wesentlicher Bestandteil desSUMMARY OF THE INVENTION It has been found that the object of the invention is achieved by introducing a flushing offset into the primary degradation cavities of a carnallite deposit. In contrast to previous ideas, the composition of the drilling fluid should be selected that pesticidal decomposition is avoided according to the invention is a pillar decomposition as an essential component of the invention
3132831328
Verfahrens beabsichtigt· Die Zersetzung des Carnallits im Pfeiler soll dadurch erreicht werden, daßProcess intended · The decomposition of carnallite in the pillar should be achieved by:
a) eine MgCl^-ungesättigte Spülflüssigkeit verwendet wirda) a MgCl ^ -unsaturated flushing liquid is used
b) das Versatzeinbringen so gesteuert wird, daß die Flüssigkeit verhältnismäßig lange im Spülfeld verbleibtb) the offset introduction is controlled so that the liquid remains relatively long in the rinse field
c) der Kontakt zwischen Spülflüssigkeit und Carnallit im Pfeiler erforderlichenfalls durch eine vorhergehende Perforation der Pfeiler mit Bohrlöchern verbessert wird.c) the contact between rinsing fluid and carnallite in the pillar is improved, if necessary, by a previous perforation of the pillars with boreholes.
Durch den intensiven und langzeitigen Kontakt der ungesättigten Flüssigkeit mit dem Carnallit wird ein erheblicher Teil des Carnallits zersetzt. Dabei wird das im Caxnallit enthaltene Chlorkalium als Zersetzungs-KCl eben-Due to the intensive and long-term contact of the unsaturated liquid with the carnallite, a considerable part of the carnallite is decomposed. The chloride calcium contained in the caxnallite is decomposed as KCl.
^c so wie das Steinsalz im Pfeiler verbleiben, während MgCIo und Kristallwasser mit der Spülflüssigkeit ausgetragen werden« Im Ergebnis der Zersetzung wird aus dem kompakten Carnallititpfeiler ein Zerseiaingsrückstand mit erheblichem Porenvolumen, welches zum Teil mit Spülflüssigkeit zum Teil mit Luft erfüllt ist. Zum Beispiel wird bei einem Carnallitit mit 6o % Carnallitanteil und einer Zersetzung dieses Carnallits zu 7o % ein Zersetzungsrückstand erreicht, der ein Porenvolumen von 31 % aufweist, und der nicht mehr sprödbruchempfindlich ist.As the result of the decomposition, the compact carnallitite pier becomes a segregating residue with considerable pore volume, which is partly filled with rinsing liquid and partly with air. For example, in a carnallite with 6o % Carnallitanteil and a decomposition of this Carnallits to 7o % a decomposition residue is achieved, which has a pore volume of 31%, and is no longer susceptible to brittle fracture.
Durch die Zersetzung des Carnallits im Pfeiler wird dabei auch die Standfestigkeit des Pfeilers wesentlich herabgesetzt. Da jedoch vor und während der Pfeilerzersetzung die benachbarten Abbauhohlräume bereits mit Versatz er- -füllt wurden, kann es trotzdem nicht zu einer Pfeilerzer-The decomposition of the carnallite in the pillar also significantly reduces the stability of the pillar. However, since the adjacent excavation cavities have already been filled with offset before and during the pillar decomposition, it still can not lead to a pillar decomposition.
o0 .störung kommen, sondern das Hangende senkt sich allmählich auf den Versatz und den zersetzten Pfeiler ab.-Dabei ::'· werden beide porösen Körper allmählich verdichtet. Die ' .' zeltgleiche Kompensation der verringerten Tragfähigkeit der Pfeiler durch den unmittelbar angrenzenden Versatzo 0 .störung come, but the hanging wall descends gradually to the offset and the decomposed pillars ab.-It :: '· both porous body are gradually compressed. The '.' same compensation for the reduced bearing capacity of the piers due to the immediately adjacent offset
oc bildet einen wesentlichen Bestandteil der Erfindung. Am Ende der. Versatzphase ist ein Grubenfeld vorhanden, dasoc forms an integral part of the invention. At the end of. Offset phase is a pit field available, the
231328 4231328 4
im Bereich der ehemaligen Abbaue mit Versatz,im Bereich der ehemaligen Pfeiler mit Zersetzungsruckstand des Carnallititsverfüllt ist, wobei im letzteren der Wertstoff KCl in angereichertem Zustand enthalten ist. Beide Körper stellen ein zusammenhängendes Gebirgsmassiv mit einem bestimmten Porenvolumen dar. Das Porenvolumen wird zu einem erheblichen Teil mit Spülflüssigkeit erfüllt sein bzw. mit einer durch die erfolgte Zersetzung wesentlich höher an MgCl2 gesättigten Lösung.in the area of the former excavation with offset, in the area of the former pillars is filled with decomposition residue of carnallitite, wherein in the latter the recyclable material KCl is contained in the enriched state. Both bodies represent a contiguous mountain massif with a certain pore volume. The pore volume will be fulfilled to a considerable extent with rinsing liquid or with a solution which is significantly higher in MgCl 2 due to the decomposition which has taken place.
Ein derartig erfülltes Grubenfeld kann in einer sekundären Abbauphase wieder aufgewältigt werden, ohne daß . sich grundsätzliche Probleme der geomechanischen Beherrschung ergeben. Zunächst muß im tiefsten Teil des Baufeldes eine Strecke vorgetrieben und damit ein Abfluß der im Baufeld noch'vorhandenen Flüssigkeit eingeleitet werden. Nachdem ein ausreichender JTüssigkeitsabzug erfolgt ist, kann der eigentliche Pfeilerrückbau erfolgen. Dabei muß zwangsläufig der bereits eingebrachte Yersatz durchörtert werden, der nach erreichter Austrocknung eine ausreichende Standfestigkeit besitzt. Das Versatzmaterial kann dabei in Abbauhohlräumen der sekundären Gewinnung im gleichen Baufeld verkippt werden. Im Grubenbetrieb kann dieses Verfahren für folgende Aufgaben eingesetzt Werden.Such a filled minefield can be recovered in a secondary mining phase, without. fundamental problems of geomechanical control arise. First, a stretch must be driven in the deepest part of the construction field and thus an outflow of still existing liquid in the construction field be initiated. After a sufficient JTüssigkeitsabzug is done, the actual pillar back building can be done. It inevitably must be discussed the already introduced Y replacement, which has sufficient stability after reaching dehydration. The offset material can be tilted in excavation cavities of secondary extraction in the same construction field. In mining, this procedure can be used for the following tasks.
Ό 25 Gewinnung der in den Pfeilern bereits abgebauter Feldesteile enthaltenen LagerStättenvorräte. Der Erzielung ge-. ringer Abbauverluste in neu in Verhieb genommenen Baufeldern. Beim nachträglichen Abbau der derzeitigen Baustreif entrennpf eiler , nachdem beiderseits des Baustreifen-. 3o-'- . trennpfeilers ..ein-Pfeilerrückbau erfolgt ist.. Für, die. ; .. Schaffung künstlicher Baustreifentrennprofile durch den Versatz bestimmter Abbaustreifen und damit für die geomechanische Parzellierung des Grubenfeldes.Gewinn 25 Obtaining the stocks of stocks held in the pillars already excavated. The achievement ge. Ringer's mining losses in newly abandoned construction sites. When retrofitting the current Baustreif entrennpf eiler, after both sides of the Baustreifen-. 3o -'-. a pillar .. a-pillar back is done .. For, the. ; .. Creation of artificial Baustreifentrennprofil by the offset of certain Abbaustreifen and thus for the geomechanical parceling of the pit field.
. Die Erfindung wird im folgenden Ausführungsbeispiel und an Hand der beifolgenden.Zeichnungen näher erläutert., The invention will be explained in more detail in the following embodiment and with reference to the attached drawings.
6 -6 -
Ausführungsbeispielembodiment
In einem im Kuxzpfeilerorterbau mit standsicheren Pfeilern abgebautem Abbaufeld wird Spülversatz eingebracht, wobei eine an MgGIp ungesättigte Spülflüssigkeit 2 verwendet und über dem Versatzmassiv 1 angestaut wird. Durch den intensiven, durch Bohrlöcher 4 im Pfeiler, noch verstärkten Kontakt der Flüssigkeit 2 mit dem Pfeiler 3 wird der Carnallit im Pfeiler zunächst im unteren Pfeilerbereich 5 zersetzt. Mit fortschreitendem Versatzeinbringen verschiebt sich der Bereich der Anstauung von Spülflüssigkeit und.damit der Pfeilerzersetzung allmählich nach oben.In an excavation field excavated in the Kuxzpfeilerortbau with stable piers flushing offset is introduced, wherein an MgGIp unsaturated rinsing liquid 2 used and accumulated on the offset solid 1. Due to the intensive, through holes 4 in the pillar, even more contact between the liquid 2 and the pillar 3, the carnallite in the pillar is first decomposed in the lower pillar area 5. As the dispensing progresses, the area of damming of rinsing liquid and, thus, the pillar decomposition gradually shifts upward.
( Pig» 1 )(Pig) 1
Nach Abschluß der Verspülung besteht das Baufeld aus weitgehend zersetztem Pfeilermaterial 5> das allseitig vom Yersatzmassiv 1 umgeben wird. Lufterfüllte Hohlräume 6 über der Versatzoberfläche sind in zunächst geringem Umfang vorhanden, werden jedoch durch die Absenkung des Hangenden allmählich geschlossene ( Fig. 2 ) Bei der Wiederaufwältigung wird zunächst im tiefsten Teil des Abbaufeldes eine Strecke 7 vorgetrieben, mit der abwechselnd der eingebrachte Versatz 1 und die zersetzten Pfeiler 5 durchörtert werden. Diese Strecke dient zunächst zum Flüssigkeitsablauf aus dem Versatzmassive Nachdem eine ausreichende Entwässerung erreicht ist, werden Abbaustrecken 8 aufgefahren und von diesem Querörter 9 in die Pfeiler aufgefahren. Das bei der Durchörterung des Versatzmassivs anfallende Haufwerk wird als sekundärer Versatz 1o in diese Querörter verkippt. ( Fig« 3 )After completion of the rinsing the construction field consists of largely decomposed pillar material 5> which is surrounded on all sides by Yersatzmassiv 1. Lufterfüllte cavities 6 above the offset surface are initially present in a small extent, but are gradually closed by the lowering of the hanging wall (Fig. 2) In the Wiederwwältigung a stretch 7 is first driven in the lowest part of the excavation field, with the introduced offset 1 and the decomposed pillars 5 are discussed. This route is initially used to drain liquid from the offset masses After sufficient drainage is achieved, excavation sections 8 are raised and driven by this Querörter 9 in the pillars. The accumulated in the discussion of the offset mass heap is tilted as a secondary offset 1o in these cross-words. (Fig. 3)
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DD23132881A DD200036A1 (en) | 1981-07-01 | 1981-07-01 | PROCESS FOR THE BERGMAENNIC GAINING OF CARNALLITITE |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DD23132881A DD200036A1 (en) | 1981-07-01 | 1981-07-01 | PROCESS FOR THE BERGMAENNIC GAINING OF CARNALLITITE |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DD200036A1 true DD200036A1 (en) | 1983-03-09 |
Family
ID=5532008
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DD23132881A DD200036A1 (en) | 1981-07-01 | 1981-07-01 | PROCESS FOR THE BERGMAENNIC GAINING OF CARNALLITITE |
Country Status (1)
| Country | Link |
|---|---|
| DD (1) | DD200036A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102010022004A1 (en) * | 2010-05-29 | 2011-12-01 | Gts Grube Teutschenthal Sicherungs Gmbh & Co. Kg | Utilizing remaining inventories of crude potassium salts, preferably carnallite in the operating phase of a potash mine, comprises covering a cold solution with water after mechanical removal and stretch support underground |
-
1981
- 1981-07-01 DD DD23132881A patent/DD200036A1/en not_active IP Right Cessation
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102010022004A1 (en) * | 2010-05-29 | 2011-12-01 | Gts Grube Teutschenthal Sicherungs Gmbh & Co. Kg | Utilizing remaining inventories of crude potassium salts, preferably carnallite in the operating phase of a potash mine, comprises covering a cold solution with water after mechanical removal and stretch support underground |
| DE102010022004B4 (en) * | 2010-05-29 | 2011-12-29 | Gts Grube Teutschenthal Sicherungs Gmbh & Co. Kg | Procedure for using residual supplies in the post-operational phase of potash mines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0002877B1 (en) | Method for the removal of methane | |
| DE2158764A1 (en) | Method for producing an underground wall | |
| DE2630027A1 (en) | PROCESS FOR CREATING LIGHT PROTECTIVE WALLS IN THE SOIL AND DEVICE FOR CARRYING OUT THE PROCESS | |
| DE3409591C3 (en) | Process for the subsequent production of an underground sealing sole | |
| DE2047239C3 (en) | Process for the mining of a formation containing a quarry mineral using a solvent | |
| DE1409904A1 (en) | Method for creating excavations in water-bearing soil by means of a jacking shield | |
| DE2915483A1 (en) | PROCEDURES FOR DETERMINING MATERIALS IN POWERFUL FLOECES | |
| DE2712869C2 (en) | Method of preventing water from entering underground cavities | |
| DD200036A1 (en) | PROCESS FOR THE BERGMAENNIC GAINING OF CARNALLITITE | |
| DE2544834A1 (en) | METHOD AND DEVICE FOR BOLTING SHELVES | |
| DE1934170A1 (en) | Removal of mineral oil impregnant from - vicinity of bore holes | |
| DE102021114229A1 (en) | Method of clearing a well clogged by an adsorbent | |
| DE3232906C2 (en) | ||
| DE292753C (en) | ||
| DE10258300A1 (en) | Process for stabilizing disused mining shafts filled with filling material comprises introducing a bore from above into the filling material column and inserting a radially expandable packer arrangement into the bore | |
| DE19642093C1 (en) | Replacing support fluid for work face with compressed air | |
| DE2934116A1 (en) | Electric circuit which expels water from clay - by using electro osmosis rods driven into clay at intervals, with cathodes connected to water-extraction pump | |
| DE2808113A1 (en) | Hydraulic mining machine for sloping sections - has bed sections divided into blocks spaced to prevent interacting pressure | |
| AT375150B (en) | MINING METHOD FOR MINING | |
| DE10320401B4 (en) | Process for mine gas production | |
| DE2454913B2 (en) | PROCEDURE AND ARRANGEMENT FOR DRIVING A TUNNEL | |
| DD258439A1 (en) | METHOD FOR THE COMPLETE RECOVERY OF CALIPER STORES | |
| DE4446028C2 (en) | Method and installation for stabilizing a soil using injections | |
| DE717778C (en) | Process for displacing peatland | |
| DE1815960C (en) | Process for the extraction of coal in underground operations |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| ENJ | Ceased due to non-payment of renewal fee |