CN203337814U - Energy meter wiring device - Google Patents
Energy meter wiring device Download PDFInfo
- Publication number
- CN203337814U CN203337814U CN2013203564736U CN201320356473U CN203337814U CN 203337814 U CN203337814 U CN 203337814U CN 2013203564736 U CN2013203564736 U CN 2013203564736U CN 201320356473 U CN201320356473 U CN 201320356473U CN 203337814 U CN203337814 U CN 203337814U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- meter
- linked switch
- wiring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)
Abstract
Description
技术领域technical field
本实用新型特别涉及电能表接线装置。The utility model particularly relates to a wiring device for an electric energy meter.
背景技术Background technique
在电力部门,电能表的更换与现场校检是外勤的一项重要工作。在更换电能表时,需要将与电能表连接的电流互感器的二次侧电流出线端与二次侧电流入线端短接(也即进行二次回路短接)。在现场校验电能表时,需要断开电流互感器的二次侧电流入线端与电能表的电流出线端之间的连接,串接入校验仪。In the power sector, the replacement and on-site calibration of electric energy meters is an important task in the field. When replacing the watt-hour meter, it is necessary to short-circuit the secondary-side current outlet terminal of the current transformer connected to the watt-hour meter with the secondary-side current input terminal (that is, short-circuit the secondary circuit). When calibrating the electric energy meter on site, it is necessary to disconnect the connection between the current input terminal of the secondary side of the current transformer and the current output terminal of the electric energy meter, and connect it to the calibrator in series.
上述短接电流互感器的二次侧电流出线端与二次侧电流入线端,以及断开电流互感器的二次侧电流入线端与电能表的电流出线端之间连接,都需要工作人员手工接线,因此,工作人员的劳动强度比较大。The above-mentioned short-circuiting of the secondary side current outlet terminal of the current transformer and the secondary side current input terminal, and disconnection of the connection between the secondary side current input terminal of the current transformer and the current outlet terminal of the electric energy meter all require work. The personnel are manually wired, so the labor intensity of the staff is relatively high.
实用新型内容Utility model content
有鉴于此,本实用新型的目的在于提供电能表接线装置,以解决上述问题。In view of this, the purpose of this utility model is to provide an electric energy meter wiring device to solve the above problems.
本实用新型解决技术问题的具体方案为:The concrete scheme that the utility model solves technical problem is:
一种电能表接线装置,至少包括:A wiring device for an electric energy meter, at least comprising:
换表联动开关和校表联动开关;Meter change linkage switch and meter calibration linkage switch;
所述换表联动开关分别连接电流互感器的二次侧电流出线端与二次侧电流入线端;The meter changing linkage switch is respectively connected to the secondary side current outlet terminal and the secondary side current input terminal of the current transformer;
所述校表联动开关分别连接电流互感器的二次侧电流入线端与电能表的电流出线端。The meter calibration linkage switch is respectively connected to the current input terminal of the secondary side of the current transformer and the current output terminal of the electric energy meter.
优选的,所述换表联动开关具体为三相联动开关。Preferably, the meter changing linkage switch is specifically a three-phase linkage switch.
优选的,所述校表联动开关具体为三相联动开关。Preferably, the meter calibration linkage switch is specifically a three-phase linkage switch.
优选的,所述三相联动开关的接线端为弹簧触点。Preferably, the terminals of the three-phase linkage switch are spring contacts.
优选的,电能表接线装置还包括校验仪插座,所述插座上设置有第一活动顶柱。Preferably, the electric energy meter wiring device further includes a calibrator socket, and the socket is provided with a first movable push column.
优选的,所述电能表接线装置还包括第二活动顶柱,所述第二活动顶柱设置于电能表上方。Preferably, the electric energy meter wiring device further includes a second movable prop, and the second movable prop is arranged above the electric energy meter.
可见,在本实用新型实施例中,换表联动开关为常开开关,当更换电能表时,闭合换表联动开关,由于分别连接电流互感器的二次侧电流出线端与二次侧电流入线端,则换表联动开关一闭合,就将电流互感器的二次侧电流出线端与二次侧电流入线端短接了;而校表联动开关为常闭开关,这样,在不进行校验时,电流互感器的二次侧电流入线端与电能表的电流出线端是连接的。在校验时,接入校验仪,令校表联动开关断开,则电流互感器的二次侧电流入线端与电能表的电流出线端断开,这样,电流就只能从电流互感器的二次侧电流入线端流入校验仪,从而实现了校验仪的串接。使用本实用新型实施例所提供的电能表接线装置后,在短接电流互感器的二次侧电流出线端与二次侧电流入线端,以及断开电流互感器的二次侧电流入线端与电能表的电流出线端之间连接过程中,都不需要工作人员手工接线,从而降低了工作人员的劳动强度。It can be seen that, in the embodiment of the utility model, the meter changing linkage switch is a normally open switch. When the electric energy meter is replaced, the meter changing linkage switch is closed. As soon as the meter change linkage switch is closed, the secondary side current outlet terminal of the current transformer and the secondary side current input terminal are short-circuited; while the meter calibration linkage switch is a normally closed switch, so that the During calibration, the current input terminal of the secondary side of the current transformer is connected to the current output terminal of the electric energy meter. When calibrating, connect the calibrator and turn off the calibration linkage switch, then the current input terminal of the secondary side of the current transformer will be disconnected from the current output terminal of the electric energy meter, so that the current can only flow from the current mutual inductance The secondary side current input terminal of the device flows into the calibrator, thus realizing the serial connection of the calibrator. After using the electric energy meter wiring device provided by the embodiment of the utility model, short-circuit the secondary side current outlet terminal and the secondary side current input terminal of the current transformer, and disconnect the secondary side current input terminal of the current transformer During the connection process between the terminal and the current outlet terminal of the electric energy meter, manual wiring by the staff is not required, thereby reducing the labor intensity of the staff.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are some embodiments of the present utility model. Those skilled in the art can also obtain other drawings based on these drawings without any creative work.
图1是本实用新型实施例提供的电能表接线装置工作原理示意图;Fig. 1 is a schematic diagram of the working principle of the electric energy meter wiring device provided by the embodiment of the present invention;
图2是本实用新型实施例提供的电能表接线装置接线示意图;Fig. 2 is a schematic diagram of the wiring of the electric energy meter wiring device provided by the embodiment of the present invention;
图3是本实用新型实施例提供的另一电能表接线装置接线示意图。Fig. 3 is a schematic diagram of wiring of another electric energy meter wiring device provided by the embodiment of the present invention.
具体实施方式Detailed ways
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
在电力部门,电能表的更换与现场校检是外勤的一项重要工作。在更换电能表时,需要将与电能表连接的电流互感器的二次侧电流出线端与二次侧电流入线端短接(也即进行二次回路短接)。在现场校验电能表时,需要断开电流互感器的二次侧电流入线端与电能表的电流出线端之间的连接,串接入校验仪。In the power sector, the replacement and on-site calibration of electric energy meters is an important task in the field. When replacing the watt-hour meter, it is necessary to short-circuit the secondary-side current outlet terminal of the current transformer connected to the watt-hour meter with the secondary-side current input terminal (that is, short-circuit the secondary circuit). When calibrating the electric energy meter on site, it is necessary to disconnect the connection between the current input terminal of the secondary side of the current transformer and the current output terminal of the electric energy meter, and connect it to the calibrator in series.
上述短接电流互感器的二次侧电流出线端与二次侧电流入线端,以及断开电流互感器的二次侧电流入线端与电能表的电流出线端之间连接,都需要工作人员手工接线,因此,工作人员的劳动强度比较大。The above-mentioned short-circuiting of the secondary side current outlet terminal of the current transformer and the secondary side current input terminal, and disconnection of the connection between the secondary side current input terminal of the current transformer and the current outlet terminal of the electric energy meter all require work. The personnel are manually wired, so the labor intensity of the staff is relatively high.
有鉴于此,本实用新型实施例提供电能表接线装置以解决上述问题。In view of this, an embodiment of the utility model provides an electric energy meter wiring device to solve the above-mentioned problems.
图1示出了本实用新型实施例提供的电能表接线装置工作原理示意图,上述电能表接线装置至少可包括如下部件:Figure 1 shows a schematic diagram of the working principle of the electric energy meter wiring device provided by the embodiment of the present invention. The above electric energy meter wiring device may at least include the following components:
换表联动开关K1和校表联动开关K2;Meter changing linkage switch K1 and meter calibration linkage switch K2;
换表联动开关K1分别连接电流互感器1的二次侧电流出线端a与二次侧电流入线端d;The meter change linkage switch K1 is respectively connected to the secondary side current outlet terminal a and the secondary side current input terminal d of the
校表联动开关K2分别连接电流互感器1的二次侧电流入线端d与电能表2的电流出线端c。The meter calibration linkage switch K2 is respectively connected to the current input terminal d of the secondary side of the
可见,在本实用新型实施例中,换表联动开关K1为常开开关,校表联动开关K2为常闭开关,在不更换电能表时,以及在不进行校验时,电流的流通方向为a->b->c->d。It can be seen that in the embodiment of the utility model, the meter changing linkage switch K1 is a normally open switch, and the meter calibration linkage switch K2 is a normally closed switch. a->b->c->d.
在更换电能表时,闭合换表联动开关K1后,就将电流互感器1的二次侧电流出线端a与二次侧电流入线端d短接了,这样,电流的流通方向为a->d。When replacing the electric energy meter, after closing the meter replacement linkage switch K1, the secondary side current outlet terminal a of the
而在校验时,接入校验仪3,令校表联动开关K2断开,则电流互感器1的二次侧电流入线端d与电能表2的电流出线端c断开,这样,电流就只能从电流互感器1的二次侧电流入线端c流入校验仪3,再从校验仪3流出进入电流互感器1的二次侧电流入线端d,从而实现了校验仪3的串接。When checking, the
由此可见,使用本实用新型实施例所提供的电能表接线装置后,在短接电流互感器1的二次侧电流出线端与二次侧电流入线端,以及断开电流互感器1的二次侧电流入线端与电能表的电流出线端之间连接过程中,都不需要工作人员手工接线,从而降低了工作人员的劳动强度比较大。It can be seen that after using the electric energy meter wiring device provided by the embodiment of the present invention, the secondary side current outlet terminal and the secondary side current input terminal of the
在实际中,电能表是三相4线,因此,上述换表联动开关K1具体为三相联动开关,而校表联动开关K2具体也为三相联动开关。图1只示出了其中一相。In practice, the electric energy meter is three-phase four-wire, therefore, the above-mentioned meter changing linkage switch K1 is specifically a three-phase linkage switch, and the meter calibration linkage switch K2 is also specifically a three-phase linkage switch. Figure 1 shows only one of the phases.
图2示出了三相四线下的接线示意图。在图2中,N、A、B、C代表电压互感器的三相和零线。a,b,c代表电流互感器的二次侧电流出线端(三相),an、bn、cn代表电流互感器的二次侧电流入线端(三相),21-23代表电流互感器的三个线圈,而31-33代表校验仪的三个线圈。Figure 2 shows a schematic diagram of wiring under three-phase four-wire. In Figure 2, N, A, B, and C represent the three-phase and neutral lines of voltage transformers. a, b, c represent the current transformer secondary side current outlet terminal (three-phase), an, bn, cn represent the current transformer secondary side current input terminal (three-phase), 21-23 represent the current transformer The three coils of , and 31-33 represent the three coils of the calibrator.
电流互感器的二次侧电流出线端(三个)、二次侧电流入线端(三个)、电能表的电流出线端(三个)均为接线柱。实现换表联动开关K1分别与电流互感器的二次侧电流出线端和二次侧电流入线端连接,以及校表联动开关K2与电流互感器的二次侧电流入线端和电能表的电流出线端连接的方式可以有多种,例如,从换表联动开关K1、校表联动开关K2的接线端引出电线,将电线接在接线柱上。The secondary side current outlet terminals (three) of the current transformer, the secondary side current input terminals (three), and the current outlet terminals (three) of the electric energy meter are all binding posts. Realize the connection between the meter change linkage switch K1 and the secondary side current outlet terminal and the secondary side current input terminal of the current transformer respectively, and the connection between the meter calibration linkage switch K2 and the secondary side current input terminal of the current transformer and the electric energy meter There are many ways to connect the current outlet terminals. For example, wires are drawn from the terminals of the meter-changing linkage switch K1 and the meter-calibration linkage switch K2, and the wires are connected to the terminal.
为了进一步减少工作人员的工作量,在本实用新型其他实施例中,换表联动开关K1的接线端和/或校表联动开关K2的接线端可为弹簧触点。In order to further reduce the workload of the staff, in other embodiments of the present invention, the terminal of the meter-changing linkage switch K1 and/or the terminal of the meter-calibration linkage switch K2 can be spring contacts.
利用弹簧触点的弹性,弹簧触点与接线柱紧密顶在一起。这样,就不用工作人员再人工将电线接在接线柱上了。Utilizing the elasticity of the spring contact, the spring contact and the terminal are pressed together tightly. Like this, just do not need staff to manually connect electric wire on the binding post again.
上述换表联动开关K1和校表联动开关K2可为人工手动开关,在更换电能表或检验时,由工作人员人工控制开合。The above-mentioned meter changing linkage switch K1 and meter calibration linkage switch K2 can be manual switches, and the opening and closing are manually controlled by the staff when the electric energy meter is replaced or inspected.
为了进一步减少工作人员的工作量并提高安全性,在本实用新型其他实施例中,参见图3,上述电能表接线装置还可包括校验仪插座5,插座5上设置有第一活动顶柱7。In order to further reduce the workload of the staff and improve safety, in other embodiments of the utility model, referring to Fig. 3, the above-mentioned electric energy meter wiring device can also include a
这样,校验仪上设置有与校验仪插座5相适配的插头6。插头6插入校验仪插座5时,第一活动顶柱7会被插头6顶得向上运动,并运行到校表联动开关K2处,令校表联动开关K2断开,这样,不用人工控制开合,只需要插入插头6就能令校表联动开关K2断开,并将校验仪3串接进来。In this way, the calibrator is provided with a
此外,电能表接线装置还可包括第二活动顶柱,第二活动顶柱设置于电能表上方。当电能表一摘下来,就会触碰第二活动顶柱,与第一活动顶柱相类似,第二活动顶柱可令换表联动开关K1闭合,从而实现更换电能表时,自动短接。In addition, the electric energy meter wiring device may also include a second movable prop, and the second movable prop is arranged above the electric energy meter. When the energy meter is taken off, it will touch the second movable top column, which is similar to the first movable top column. The second movable top column can close the meter change linkage switch K1, thereby realizing automatic short circuit when replacing the energy meter .
以上仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above are only preferred embodiments of the present utility model, and it should be pointed out that for those of ordinary skill in the art, some improvements and modifications can also be made without departing from the principles of the present utility model. It should be regarded as the protection scope of the present utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013203564736U CN203337814U (en) | 2013-06-20 | 2013-06-20 | Energy meter wiring device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013203564736U CN203337814U (en) | 2013-06-20 | 2013-06-20 | Energy meter wiring device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203337814U true CN203337814U (en) | 2013-12-11 |
Family
ID=49706481
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2013203564736U Expired - Lifetime CN203337814U (en) | 2013-06-20 | 2013-06-20 | Energy meter wiring device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203337814U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105487039A (en) * | 2015-11-19 | 2016-04-13 | 国家电网公司 | Conjunction box without power loss during replacement |
| CN110716075A (en) * | 2019-10-10 | 2020-01-21 | 西安科技大学 | A current transformer array switching circuit and control method |
| CN111308145A (en) * | 2020-04-22 | 2020-06-19 | 国网上海市电力公司 | Uninterrupted meter changing auxiliary power supply box with error correction protection function |
-
2013
- 2013-06-20 CN CN2013203564736U patent/CN203337814U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105487039A (en) * | 2015-11-19 | 2016-04-13 | 国家电网公司 | Conjunction box without power loss during replacement |
| CN110716075A (en) * | 2019-10-10 | 2020-01-21 | 西安科技大学 | A current transformer array switching circuit and control method |
| CN111308145A (en) * | 2020-04-22 | 2020-06-19 | 国网上海市电力公司 | Uninterrupted meter changing auxiliary power supply box with error correction protection function |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103399184B (en) | Conveniently can adjust the combined connection box of phase sequence | |
| CA2784338A1 (en) | Wiring tester of multifunctional electric energy metering device | |
| CN204314383U (en) | DC Resistance of Transformer measures connecting wire switching device | |
| CN203337814U (en) | Energy meter wiring device | |
| CN103675535A (en) | High-tension transmission line power frequency parameter testing and testing connection switching integrated device | |
| CN105510714A (en) | Intelligent substation pressure transmitter secondary automatic phase tester | |
| CN203849288U (en) | Wiring conversion device for electrical routine tests of transformer | |
| CN206161687U (en) | Automatic take accuse circuit breaker test fixture mechanism | |
| CN102095899A (en) | Wiring device and current mutual inductance testing system | |
| CN203385774U (en) | Combined conjunction box capable of enabling phase sequence to be adjusted conveniently | |
| CN203849330U (en) | DC Resistance Meter for AC Current Loops | |
| CN207318540U (en) | A kind of transformer test p-wire contact switching device | |
| CN203927005U (en) | Electric valve control circuit and the electric operated valve instrument that comprises this circuit | |
| CN103983859A (en) | Transformer dielectric loss and capacitance on-line measurement device | |
| CN104020326B (en) | A kind of switching device tested used by switch machine characteristic | |
| CN204316171U (en) | A kind of debugging operations platform of automatic change-over controller | |
| CN102946152A (en) | Remote wired operating device for high-voltage switch cabinet | |
| CN207248948U (en) | Transformer measurement intelligence switching line apparatus | |
| CN206270399U (en) | A kind of voltage circuit test circuit | |
| CN203909085U (en) | Relay protection convenient and fast test line | |
| CN203251092U (en) | Multifunctional transition source box | |
| CN204789785U (en) | Portable intelligent substation relay protection testing arrangement | |
| CN203981715U (en) | A kind of Test Switchboard mechanical property switching device used | |
| CN205301429U (en) | Intelligent substation presses and becomes automatic nuclear phase ware of secondary | |
| CN201293814Y (en) | Operating device for GIS test |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20131211 |