CN203159149U - Large-span prestress double-arching-frame hoisting structure - Google Patents

Large-span prestress double-arching-frame hoisting structure Download PDF

Info

Publication number
CN203159149U
CN203159149U CN201320192653.5U CN201320192653U CN203159149U CN 203159149 U CN203159149 U CN 203159149U CN 201320192653 U CN201320192653 U CN 201320192653U CN 203159149 U CN203159149 U CN 203159149U
Authority
CN
China
Prior art keywords
steel beam
arch
arching
screws
hoisting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320192653.5U
Other languages
Chinese (zh)
Inventor
虞功平
徐建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201320192653.5U priority Critical patent/CN203159149U/en
Application granted granted Critical
Publication of CN203159149U publication Critical patent/CN203159149U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a large-span prestress double-arching-frame hoisting structure which comprises an operation platform arranged between two load bearing columns arranged abreast. A lower steel beam is arranged on the operation platform, an upper steel beam is arranged above the lower steel beam, a jack is arranged between the lower steel beam and the upper steel beam, the end portions of arching frames are located under the operation platform between the two load bearing columns, the end portions of the arching frames and the upper steel beam are connected through screws, the top ends of the screws penetrate the upper steel beam to be fastened through nuts, and the bottom ends of the screws penetrate the end portions of the arching frames to be fastened through nuts. The screws are utilized as a hoisting tool, the jack is utilized as a power source to hoist the screws, the screws drag the arching frames to the designed elevation, safety and health of constructors in the arching frame hoisting process are ensured, damage to structure quality caused by the hoisting process is avoided, and meanwhile hoisting time is shortened.

Description

大跨度预应力双拱架吊装结构Large-span prestressed double arch hoisting structure

技术领域technical field

本实用新型涉及大跨度预应力双拱架吊装结构。The utility model relates to a large-span prestressed double arch hoisting structure.

背景技术Background technique

大跨度双拱架吊装重量重,吊装高度高,施工难度大。The hoisting weight of the large-span double-arch frame is heavy, the hoisting height is high, and the construction is difficult.

实用新型内容Utility model content

本实用新型所要解决的技术问题就是提供一种大跨度预应力双拱架吊装结构,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短吊装时间。The technical problem to be solved by the utility model is to provide a large-span prestressed double arch hoisting structure, which can ensure the safety and health of construction personnel during the arch hoisting process, ensure that the structure does not suffer from structural quality damage caused by the hoisting process, and shorten the hoisting time at the same time. .

为解决上述技术问题,本实用新型采用如下技术方案:大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱间的操作平台,其特征在于:所述操作平台上设有下钢横梁,在下钢横梁上方设有上钢横梁,所述下钢横梁与上钢横梁之间设有千斤顶,拱架端部位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: the large-span prestressed double-arch hoisting structure includes an operating platform arranged between two side-by-side load-bearing columns. A steel crossbeam, an upper steel crossbeam is arranged above the lower steel crossbeam, a jack is provided between the lower steel crossbeam and the upper steel crossbeam, the end of the arch is located under the operating platform between two load-bearing columns, and the end of the arch is connected to the The upper steel beams are connected by screws, the top ends of the screws pass through the upper steel beams and are fastened by nuts, the bottom ends of the screws pass through the ends of the arch frame and are fastened by nuts.

优选的,所述螺杆设有四根并呈矩形分布。Preferably, there are four screws arranged in a rectangular distribution.

优选的,所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。Preferably, the screw is precision rolled rebar, and the diameter of the screw is 40mm.

优选的,所述承重柱上设有休息孔。Preferably, rest holes are provided on the load-bearing column.

优选的,所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。Preferably, the end of the arch is provided with a lifting reserved hole for the screw to pass through, and a steel pipe is pre-embedded in the lifting reserved hole as a casing, and the steel pipe casing is welded and fixed to the steel bar in the arch.

本实用新型利用螺杆作为提升工具,利用千斤顶作为动力源提升螺杆,由螺杆牵引拱架至设计标高,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短了吊装时间。The utility model uses the screw as the lifting tool, and the jack as the power source to lift the screw, and the screw pulls the arch frame to the design elevation, so as to ensure the safety and health of the construction personnel during the hoisting process of the arch frame, and to ensure that the structure will not be damaged due to the hoisting process. At the same time, the hoisting time is shortened.

附图说明Description of drawings

下面结合附图和具体实施方式对本实用新型作进一步描述:Below in conjunction with accompanying drawing and specific embodiment the utility model is further described:

图1为大跨度预应力双拱架吊装结构示意图。Figure 1 is a schematic diagram of the large-span prestressed double arch hoisting structure.

具体实施方式Detailed ways

下面结合图1具体说明大跨度预应力双拱架吊装结构,两根并排的承重柱1间设有操作平台10,所述操作平台10上设有下钢横梁20,在下钢横梁上方设有上钢横梁21,所述下钢横梁20与上钢横梁21之间设有千斤顶22,拱架端部3位于两根承重柱1之间操作平台10下方,所述拱架端部与上钢横梁之间由螺杆2连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。The hoisting structure of the large-span prestressed double arch will be described in detail below in conjunction with Fig. 1. An operating platform 10 is provided between two load-bearing columns side by side, and a lower steel beam 20 is arranged on the operating platform 10. A steel beam 21, a jack 22 is provided between the lower steel beam 20 and the upper steel beam 21, the arch end 3 is located below the operating platform 10 between two load-bearing columns 1, the arch end and the upper steel beam They are connected by a screw 2, the top end of the screw passes through the upper steel beam and is fastened by a nut, and the bottom end of the screw passes through the end of the arch frame and is fastened by a nut.

所述螺杆设有四根并呈矩形分布。所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。所述承重柱上设有休息孔。所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。The screw rods are provided with four and distributed in a rectangular shape. The screw rod is precision-rolled rebar, and the diameter of the screw rod is 40mm. A rest hole is provided on the load-bearing column. The end of the arch is provided with a lifting reserved hole for the screw to pass through, and a steel pipe is pre-embedded in the lifting reserved hole as a casing, and the steel pipe casing is welded and fixed to the steel bar in the arch.

Claims (5)

1.大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱(1)间的操作平台(10),其特征在于:所述操作平台(10)上设有下钢横梁(20),在下钢横梁上方设有上钢横梁(21),所述下钢横梁与上钢横梁之间设有千斤顶(22),拱架端部(3)位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆(2)连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。1. Large-span prestressed double-arch hoisting structure, including an operating platform (10) arranged between two side-by-side load-bearing columns (1), characterized in that: the operating platform (10) is provided with a lower steel beam ( 20), the upper steel beam (21) is arranged above the lower steel beam, the jack (22) is arranged between the lower steel beam and the upper steel beam, and the end of the arch frame (3) is located between two load-bearing columns to operate the platform Below, the end of the arch and the upper steel beam are connected by a screw (2), the top of the screw passes through the upper steel beam and is fastened by a nut, the bottom end of the screw passes through the end of the arch and is The nut is tight. 2.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述螺杆设有四根并呈矩形分布。2. The large-span prestressed double-arch hoisting structure according to claim 1, characterized in that there are four screws arranged in a rectangular distribution. 3.根据权利要求2所述的大跨度预应力双拱架吊装结构,其特征在于:所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。3. The large-span prestressed double-arch hoisting structure according to claim 2, characterized in that: the screw rod is precision-rolled rebar, and the diameter of the screw rod is 40 mm. 4.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述承重柱上设有休息孔。4. The large-span prestressed double arch hoisting structure according to claim 1, characterized in that: the load-bearing column is provided with a rest hole. 5.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。5. The large-span prestressed double arch hoisting structure according to claim 1, characterized in that: the end of the arch is provided with a lifting reserved hole for the screw to pass through, and the lifting reserved hole is embedded A steel pipe is used as the casing, and the steel pipe casing is welded and fixed to the steel bars in the arch frame.
CN201320192653.5U 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure Expired - Fee Related CN203159149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320192653.5U CN203159149U (en) 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320192653.5U CN203159149U (en) 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure

Publications (1)

Publication Number Publication Date
CN203159149U true CN203159149U (en) 2013-08-28

Family

ID=49020352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320192653.5U Expired - Fee Related CN203159149U (en) 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure

Country Status (1)

Country Link
CN (1) CN203159149U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103264977A (en) * 2013-04-16 2013-08-28 中天建设集团有限公司 Large-span prestress double-arch-frame hoisting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103264977A (en) * 2013-04-16 2013-08-28 中天建设集团有限公司 Large-span prestress double-arch-frame hoisting structure

Similar Documents

Publication Publication Date Title
CN202509404U (en) High-pier single-column capping beam framework construction support system
CN204510005U (en) A kind of Coping Construction operating platform
CN201895984U (en) Hydraulic pay-off stand
CN105369745A (en) Bridge support exchanging and lifting reaction frame
CN203247031U (en) Hoisting device for curtain board transporting
CN203159149U (en) Large-span prestress double-arching-frame hoisting structure
CN203312666U (en) Lift truck for replacing or overhauling disconnecting switch
CN203830937U (en) Auxiliary device for butt welding of sectional materials
CN206467579U (en) A kind of support meanss of bridge coping
CN203160116U (en) Overturning prevention bridge pier mechanism
CN103056649B (en) Super-large-scale multi-functional pressing machine frame installing method
CN203132908U (en) Loading device of template support system
CN203479511U (en) Railway T beam static load test pedestal
CN202214680U (en) Device is changed to tied in a bow member bridge jib
CN104695717A (en) Upwarp degree precontrol adjusting equipment of revolving platform
CN101774516B (en) Lifting device and construction method for replacing rake crane bridge
CN204162235U (en) Lift crosshead safety overhauling device
CN103274324B (en) A kind of disconnector changes overhaul lift car
CN204038986U (en) For removing the fork truck of inner support steel pipe
CN204643728U (en) A kind of driftage clamp lift car
CN103063510A (en) Loading device for template supporting systems
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN206667255U (en) Base for reaction frame
CN206245702U (en) A kind of hanging construction of beam protection carrier
CN205134533U (en) Complicated special -shaped steel mesh frame and steel skeleton construction and installation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20140416