CN203159149U - 大跨度预应力双拱架吊装结构 - Google Patents
大跨度预应力双拱架吊装结构 Download PDFInfo
- Publication number
- CN203159149U CN203159149U CN201320192653.5U CN201320192653U CN203159149U CN 203159149 U CN203159149 U CN 203159149U CN 201320192653 U CN201320192653 U CN 201320192653U CN 203159149 U CN203159149 U CN 203159149U
- Authority
- CN
- China
- Prior art keywords
- steel beam
- arch
- arching
- screws
- hoisting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 36
- 239000010959 steel Substances 0.000 claims abstract description 36
- 238000000034 method Methods 0.000 abstract description 7
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
本实用新型公开了一种大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱间的操作平台,所述操作平台上设有下钢横梁,在下钢横梁上方设有上钢横梁,所述下钢横梁与上钢横梁之间设有千斤顶,拱架端部位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。本实用新型利用螺杆作为提升工具,利用千斤顶作为动力源提升螺杆,由螺杆牵引拱架至设计标高,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短了吊装时间。
Description
技术领域
本实用新型涉及大跨度预应力双拱架吊装结构。
背景技术
大跨度双拱架吊装重量重,吊装高度高,施工难度大。
实用新型内容
本实用新型所要解决的技术问题就是提供一种大跨度预应力双拱架吊装结构,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短吊装时间。
为解决上述技术问题,本实用新型采用如下技术方案:大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱间的操作平台,其特征在于:所述操作平台上设有下钢横梁,在下钢横梁上方设有上钢横梁,所述下钢横梁与上钢横梁之间设有千斤顶,拱架端部位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。
优选的,所述螺杆设有四根并呈矩形分布。
优选的,所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。
优选的,所述承重柱上设有休息孔。
优选的,所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。
本实用新型利用螺杆作为提升工具,利用千斤顶作为动力源提升螺杆,由螺杆牵引拱架至设计标高,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短了吊装时间。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步描述:
图1为大跨度预应力双拱架吊装结构示意图。
具体实施方式
下面结合图1具体说明大跨度预应力双拱架吊装结构,两根并排的承重柱1间设有操作平台10,所述操作平台10上设有下钢横梁20,在下钢横梁上方设有上钢横梁21,所述下钢横梁20与上钢横梁21之间设有千斤顶22,拱架端部3位于两根承重柱1之间操作平台10下方,所述拱架端部与上钢横梁之间由螺杆2连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。
所述螺杆设有四根并呈矩形分布。所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。所述承重柱上设有休息孔。所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。
Claims (5)
1.大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱(1)间的操作平台(10),其特征在于:所述操作平台(10)上设有下钢横梁(20),在下钢横梁上方设有上钢横梁(21),所述下钢横梁与上钢横梁之间设有千斤顶(22),拱架端部(3)位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆(2)连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。
2.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述螺杆设有四根并呈矩形分布。
3.根据权利要求2所述的大跨度预应力双拱架吊装结构,其特征在于:所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。
4.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述承重柱上设有休息孔。
5.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320192653.5U CN203159149U (zh) | 2013-04-16 | 2013-04-16 | 大跨度预应力双拱架吊装结构 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320192653.5U CN203159149U (zh) | 2013-04-16 | 2013-04-16 | 大跨度预应力双拱架吊装结构 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203159149U true CN203159149U (zh) | 2013-08-28 |
Family
ID=49020352
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320192653.5U Expired - Fee Related CN203159149U (zh) | 2013-04-16 | 2013-04-16 | 大跨度预应力双拱架吊装结构 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203159149U (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103264977A (zh) * | 2013-04-16 | 2013-08-28 | 中天建设集团有限公司 | 大跨度预应力双拱架吊装结构 |
-
2013
- 2013-04-16 CN CN201320192653.5U patent/CN203159149U/zh not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103264977A (zh) * | 2013-04-16 | 2013-08-28 | 中天建设集团有限公司 | 大跨度预应力双拱架吊装结构 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202509404U (zh) | 一种高墩单柱盖梁模板施工支撑系统 | |
| CN204510005U (zh) | 一种盖梁施工操作平台 | |
| CN201895984U (zh) | 液压放线架 | |
| CN105369745A (zh) | 一种桥梁支座更换顶升反力架 | |
| CN203247031U (zh) | 遮板运输吊装装置 | |
| CN203159149U (zh) | 大跨度预应力双拱架吊装结构 | |
| CN203312666U (zh) | 一种隔离开关更换大修升降车 | |
| CN203830937U (zh) | 型材对焊辅助设备 | |
| CN206467579U (zh) | 一种桥梁盖梁的支撑装置 | |
| CN203160116U (zh) | 一种抗倾覆桥墩机构 | |
| CN103056649B (zh) | 特大型多功能压机机架安装方法 | |
| CN203132908U (zh) | 一种模板支撑体系的加载装置 | |
| CN203479511U (zh) | 铁路t梁静载试验台座 | |
| CN202214680U (zh) | 系杆拱桥吊杆更换装置 | |
| CN104695717A (zh) | 回转平台上翘度预控调节设备 | |
| CN101774516B (zh) | 更换耙式吊车桥架的顶升装置及施工方法 | |
| CN204162235U (zh) | 电梯上梁安全检修装置 | |
| CN103274324B (zh) | 一种隔离开关更换大修升降车 | |
| CN204038986U (zh) | 用于拆除内支撑钢管的叉车 | |
| CN204643728U (zh) | 一种偏航卡钳升降车 | |
| CN103063510A (zh) | 一种模板支撑体系的加载装置 | |
| CN203361596U (zh) | 一种集成式升降操作平台辅助支架 | |
| CN206667255U (zh) | 用于反力架的底座 | |
| CN206245702U (zh) | 一种悬空横梁施工防护载具 | |
| CN205134533U (zh) | 复杂异形钢网架与钢骨架安装施工结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130828 Termination date: 20140416 |