CN201406267Y - Lever scale type balancing spreader for overhauling metal mixing car - Google Patents
Lever scale type balancing spreader for overhauling metal mixing car Download PDFInfo
- Publication number
- CN201406267Y CN201406267Y CN2009200724046U CN200920072404U CN201406267Y CN 201406267 Y CN201406267 Y CN 201406267Y CN 2009200724046 U CN2009200724046 U CN 2009200724046U CN 200920072404 U CN200920072404 U CN 200920072404U CN 201406267 Y CN201406267 Y CN 201406267Y
- Authority
- CN
- China
- Prior art keywords
- counter
- arm
- balanced carriage
- cross
- hot metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a lever scale type balancing spreader for overhauling metal mixing car, which comprises a cross-arm, a hook, a counter-balanced carriage and a plurality of balancing weights, wherein a plurality of through holes are arranged on the middle portion of the cross-arm along the axial direction, the hook and the counter-balanced carriage are respectively arranged on two endsof the cross-arm, and a plurality of the balancing weights are arranged in the counter-balanced carriage. A metal mixing car grease pump can be continently and rapidly suspended through utilizing thespreader to match with a traveling crane, thereby greatly improving the repairing efficiency of the metal mixing car, and stopping the safety hidden dangers of people and devices during the dismounting procedure.
Description
Technical field
The utility model relates to suspender, relates in particular to a kind of steelyard formula balance sling that is used for the torpedo hot metal mixer car maintenance.
Background technology
Metallurgy industry torpedo hot metal mixer car grease pump is a main construction of torpedo hot metal mixer car maintenance repair.Grease pump is installed in the torpedo hot metal mixer car Machine Room, about 85 kilograms of itself weight, as after filling it up with grease its maximum weight about 150 kilograms.Because space, torpedo hot metal mixer car Machine Room is narrower and small, and the grease pump installation position is in torpedo hot metal mixer car Machine Room inside bottom, in unloading process, can't adopt driving to cooperate lifting, so torpedo hot metal mixer car overhauls and all will rely on a dead lift to carry away after grease pump is unloaded at every turn, because the weight of itself and the restriction of small space, often dismounting manpower and the time that once all will cost a lot of money, have a strong impact on the overhaul efficiency of torpedo hot metal mixer car, carried away big personal safety of existence and device security hidden danger in the process in the grease pump carrying simultaneously.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of steelyard formula balance sling that is used for the torpedo hot metal mixer car maintenance, utilize this suspender to cooperate driving can hang out the torpedo hot metal mixer car grease pump quickly and easily, greatly improve the overhaul efficiency of torpedo hot metal mixer car, stopped the person and the device security hidden danger in the unloading process.
For solving the problems of the technologies described above, the steelyard formula balance sling that the utility model is used for the torpedo hot metal mixer car maintenance comprises cross-arm, suspension hook, counter-balanced carriage and some clump weights; Described cross-arm middle part has some through holes vertically, and described suspension hook and counter-balanced carriage are located at described cross-arm two ends respectively, and described some clump weights are located in the described counter-balanced carriage.
Place for ease of clump weight, above-mentioned counter-balanced carriage is the cage counter-balanced carriage, and described counter-balanced carriage one side is provided with shutter door by bearing pin and is used to place described clump weight.
For guaranteeing the intensity of described cross-arm, this suspender also comprises a brace panel, has some through holes on the described brace panel, and described brace panel is located at described cross-arm middle part by welding.
Adopted technique scheme because the utility model is used for the steelyard formula balance sling of torpedo hot metal mixer car maintenance, promptly be respectively equipped with suspension hook and counter-balanced carriage at cross-arm two ends, placed clump weight in the counter-balanced carriage, the cross-arm middle part has some through holes; Utilize this suspender to cooperate driving can hang out the torpedo hot metal mixer car grease pump quickly and easily, greatly improved the overhaul efficiency of torpedo hot metal mixer car, stopped the person and the device security hidden danger in the unloading process.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and embodiments:
Fig. 1 is used for the structural representation of the steelyard formula balance sling of torpedo hot metal mixer car maintenance for the utility model.
The v specific embodiment
As shown in Figure 1, the utility model steelyard formula balance sling of being used for torpedo hot metal mixer car maintenance comprises cross-arm 1, suspension hook 2, counter-balanced carriage 3 and some clump weights 4; Described cross-arm 1 middle part has some through holes 11 vertically, and described suspension hook 2 and counter-balanced carriage 3 are located at described cross-arm 1 two ends respectively, and described some clump weights 4 are located in the described counter-balanced carriage 3.
Place for ease of clump weight 4, above-mentioned counter-balanced carriage 3 is cage counter-balanced carriages, and described counter-balanced carriage 3 one sides are provided with shutter door 31 by bearing pin and are used to place described clump weight 4.
For guaranteeing the intensity of described cross-arm 1, this suspender also comprises a brace panel 5, has some through holes 51 on the described brace panel 5, and described brace panel 5 is located at described cross-arm 1 middle part by welding.
The steelyard formula balance sling that the utility model is used for the torpedo hot metal mixer car maintenance is respectively equipped with suspension hook 2 and counter-balanced carriage 3 at a cross-arm 1 two ends, places clump weight 4 in the counter-balanced carriage 3, and cross-arm 1 middle part has some through holes 11; When this suspender uses, driving shackle 6 is hung in the through hole 11 of cross-arm 1 or in the through hole 51 of brace panel 5, the suspension hook end of cross-arm 1 stretches in the torpedo hot metal mixer car Machine Room, suspension hook 2 hangs in grease pump 7 joint hinges by steel cable, place clump weights 4 in the counter-balanced carriage 3 of cross-arm 1 other end and also make cross-arm 1 two ends balance, start driving and can hang out grease pump 7 in the torpedo hot metal mixer car Machine Room to inspection platform.Be positioned at the different through hole in cross-arm 1 middle part by adjusting driving shackle 6, also can adjust the balance of cross-arm 1; Simultaneously counter-balanced carriage 3 adopts the cages design also to be provided with shutter door 31, and clump weight 4 is positioned in the cage counter-balanced carriage 3, has guaranteed safety that clump weight 4 is placed and convenient; And brace panel 5 the intensity that has guaranteed cross-arm 1 is set, driving shackle 6 penetrates the through hole 51 of brace panel 5, has further guaranteed the reliability of this suspender.Utilize this suspender to cooperate driving can hang out the torpedo hot metal mixer car grease pump quickly and easily, greatly improved the overhaul efficiency of torpedo hot metal mixer car, stopped the person and the device security hidden danger in the unloading process.
Claims (3)
1, a kind of steelyard formula balance sling that is used for the torpedo hot metal mixer car maintenance, it is characterized in that: this suspender comprises cross-arm, suspension hook, counter-balanced carriage and some clump weights; Described cross-arm middle part has some through holes vertically, and described suspension hook and counter-balanced carriage are located at described cross-arm two ends respectively, and described some clump weights are located in the described counter-balanced carriage.
2, the steelyard formula balance sling that is used for the torpedo hot metal mixer car maintenance according to claim 1, it is characterized in that: described counter-balanced carriage is the cage counter-balanced carriage, described counter-balanced carriage one side is provided with shutter door by bearing pin and is used to place described clump weight.
3, the steelyard formula balance sling that is used for the torpedo hot metal mixer car maintenance according to claim 1, it is characterized in that: this suspender also comprises a brace panel, has some through holes on the described brace panel, described brace panel is located at described cross-arm middle part by welding.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009200724046U CN201406267Y (en) | 2009-05-18 | 2009-05-18 | Lever scale type balancing spreader for overhauling metal mixing car |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009200724046U CN201406267Y (en) | 2009-05-18 | 2009-05-18 | Lever scale type balancing spreader for overhauling metal mixing car |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201406267Y true CN201406267Y (en) | 2010-02-17 |
Family
ID=41677198
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009200724046U Expired - Fee Related CN201406267Y (en) | 2009-05-18 | 2009-05-18 | Lever scale type balancing spreader for overhauling metal mixing car |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201406267Y (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106315391A (en) * | 2016-11-01 | 2017-01-11 | 山东电力建设第工程公司 | Special hoisting tool for inspection of bearing bush of steam turbine generator unit and hoisting method |
| WO2017093033A1 (en) | 2015-11-30 | 2017-06-08 | Cockerill Maintenance & Ingenierie S.A. | Maintenance method and system for solar receiver |
-
2009
- 2009-05-18 CN CN2009200724046U patent/CN201406267Y/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2017093033A1 (en) | 2015-11-30 | 2017-06-08 | Cockerill Maintenance & Ingenierie S.A. | Maintenance method and system for solar receiver |
| CN107207223A (en) * | 2015-11-30 | 2017-09-26 | 考克利尔维修工程有限责任公司 | Maintaining method and system for solar receiver |
| CN107207223B (en) * | 2015-11-30 | 2019-03-29 | 考克利尔维修工程有限责任公司 | Maintenance method and system for a solar receiver |
| US10584017B2 (en) | 2015-11-30 | 2020-03-10 | Cockerill Maintenance & Ingenierie S.A. | Maintenance method and system for solar receiver |
| CN106315391A (en) * | 2016-11-01 | 2017-01-11 | 山东电力建设第工程公司 | Special hoisting tool for inspection of bearing bush of steam turbine generator unit and hoisting method |
| CN106315391B (en) * | 2016-11-01 | 2018-05-18 | 中国电建集团山东电力建设第一工程有限公司 | A kind of turbine generator unit shaft watt checks hoisting special purpose tools and hoisting method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202785258U (en) | Hoisting device for air overturn of large-sized steel column | |
| CN205387439U (en) | Mast hoisting accessory | |
| CN103754775B (en) | Arm disassembling method and auxiliary disassembling device of swing arm tower crane | |
| CN201276399Y (en) | Apparatus hoisting mechanism for tall building floor non-steel platform | |
| CN103754800A (en) | Crane type multi-directional horizontal-movement multifunctional hydraulic lifting construction method | |
| CN106315426A (en) | Block form tower crane mounting and jacking method for assembled building | |
| CN103264952B (en) | Construction method for hoisting converter tower steam pocket in position by using guide rod | |
| CN208200044U (en) | Roof truss lifts suspender easy to disassemble | |
| CN104942564B (en) | A kind of offshore vessel carries the installation method of the large-tonnage bearing pin on jib-type crane arm support | |
| CN201406267Y (en) | Lever scale type balancing spreader for overhauling metal mixing car | |
| CN205716004U (en) | A kind of high pressure vertical shaft penstock erecting device | |
| CN202558444U (en) | Steel penstock hoisting balance beam device | |
| CN202390116U (en) | High-intensity small-tonnage hoist | |
| CN205603125U (en) | Special hoist device that horizontal water tube cooler heat exchange tube was changed | |
| CN202575637U (en) | Lifting device for overhauling annealing furnaces | |
| CN205061416U (en) | OG fan tegillum hoist device | |
| CN103979442B (en) | The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors | |
| CN201458516U (en) | Balance type lifting device | |
| CN204038883U (en) | A kind of shoulder pole girder with swivel hook | |
| CN205838349U (en) | Sling of dry coke quenching hoist | |
| CN204702404U (en) | Portable suspender | |
| CN103803395A (en) | Hydraulic motor installation hoisting beam as well as application thereof | |
| CN205555905U (en) | Portal crane hoist device | |
| CN203287189U (en) | Lifting hook and weight frame structure and winch test platform | |
| CN208200206U (en) | A kind of boom hoisting used in culvert pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100217 Termination date: 20100518 |