[go: up one dir, main page]

CN201204123Y - Conductive tube removal tooling - Google Patents

Conductive tube removal tooling Download PDF

Info

Publication number
CN201204123Y
CN201204123Y CN200820021861.8U CN200820021861U CN201204123Y CN 201204123 Y CN201204123 Y CN 201204123Y CN 200820021861 U CN200820021861 U CN 200820021861U CN 201204123 Y CN201204123 Y CN 201204123Y
Authority
CN
China
Prior art keywords
conductive tube
long rod
bolt
rod bolt
head cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200820021861.8U
Other languages
Chinese (zh)
Inventor
李建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority to CN200820021861.8U priority Critical patent/CN201204123Y/en
Application granted granted Critical
Publication of CN201204123Y publication Critical patent/CN201204123Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/82Recycling of waste of electrical or electronic equipment [WEEE]

Landscapes

  • Automatic Assembly (AREA)

Abstract

本实用新型公开了一种装配工装,特别是适用于互感器的导电管拆卸工装。本实用新型包括长杆螺栓、圆柱体位于该长杆螺栓螺帽侧的木质锥头圆柱体和位于长杆螺杆另一端的弓型支架,其中长杆螺栓与木质锥头圆柱体同轴,同时长杆螺栓与支架中心孔为间隙配合,该中心孔直径小于长杆螺栓螺母;木质锥头圆柱体圆柱部分外径大于导电管内径。本实用新型提供了一种效率高,且不容易损坏导电管的导电管拆卸工装。

Figure 200820021861

The utility model discloses an assembly tool, in particular to a tool for dismantling a conductive tube of a transformer. The utility model comprises a long rod bolt, a wooden cone head cylinder with a cylindrical body located on the side of the long rod bolt nut, and a bow-shaped bracket located at the other end of the long rod screw rod, wherein the long rod bolt is coaxial with the wooden cone head cylinder, and at the same time The long rod bolt and the central hole of the support are clearance fit, and the diameter of the central hole is smaller than that of the long rod bolt and nut; the outer diameter of the cylindrical part of the wooden cone head cylinder is larger than the inner diameter of the conductive pipe. The utility model provides a conductive tube dismantling tool with high efficiency and not easy to damage the conductive tube.

Figure 200820021861

Description

导电管拆卸工装 Conductive tube removal tooling

(一)技术领域 (1) Technical field

本实用新型涉及一种装配工装,特别是适用于互感器的导电管拆卸工装。The utility model relates to an assembly tool, in particular to a tool for disassembling a conductive tube of a transformer.

(二)背景技术 (2) Background technology

互感器导电管装置在互感器壳体中间的通孔内,导电管与壳体需要比较好的绝缘,而绝缘则是通过位于导电管与壳体互感器通孔间的绝缘套来实现的。绝缘套相应于上述壳体一边设置有两组绝缘套,两组绝缘套之间还垫有V型密封圈。导电管通过法兰紧固于壳体上,内侧通过通孔内凸环对绝缘套轴向限位,在装配过程中,绝缘套和V型密封圈相互挤压,且受到壳体通孔限制。如果导电管需要拆解,因绝缘套与导电管结合紧密,很难拆卸下来。通常情况下,需要靠人力用木板反复来回撞击导电管两端,将绝缘套带出,然后才能把导电管抽出互感器壳体。此操作因需要来回撞击导电管两端,容易损坏导电管,并且耗时长,效率非常低。The conductive tube of the transformer is installed in the through hole in the middle of the transformer shell. The conductive tube and the shell need better insulation, and the insulation is realized by the insulating sleeve between the conductive tube and the through hole of the transformer shell. The insulating sleeve is provided with two groups of insulating sleeves corresponding to one side of the housing, and a V-shaped sealing ring is placed between the two groups of insulating sleeves. The conductive tube is fastened to the housing through the flange, and the inner side is axially limited by the inner convex ring of the through hole. During the assembly process, the insulating sleeve and the V-shaped sealing ring are squeezed against each other, and are limited by the through hole of the housing. . If the conductive tube needs to be disassembled, it is difficult to disassemble it because the insulating sleeve is tightly combined with the conductive tube. Under normal circumstances, it is necessary to rely on manpower to repeatedly hit the two ends of the conductive tube with wooden boards to bring out the insulating sleeve, and then the conductive tube can be pulled out of the transformer shell. Because this operation needs to hit the two ends of the conductive tube back and forth, it is easy to damage the conductive tube, and it takes a long time and the efficiency is very low.

(三)发明内容 (3) Contents of the invention

本实用新型针对目前拆卸导电管效率低,并且容易损坏导电管的缺陷,提供了一种效率高,且不容易损坏导电管的导电管拆卸工装。The utility model provides a conductive tube dismantling tool with high efficiency and not easy to damage the conductive tube, aiming at the defects of low efficiency and easy damage to the conductive tube at present.

本实用新型采用的技术方案为:The technical scheme that the utility model adopts is:

本实用新型导电管拆卸工装,包括长杆螺栓、圆柱体位于该长杆螺栓螺帽侧的木质锥头圆柱体和位于长杆螺杆另一端的弓型支架,其中长杆螺栓与木质锥头圆柱体同轴,同时长杆螺栓与支架中心孔为间隙配合,该中心孔直径小于长杆螺栓螺母;木质锥头圆柱体圆柱部分外径大于导电管内径。The utility model conduction tube dismantling tooling comprises a long rod bolt, a cylinder with a wooden cone head cylinder located on the side of the long rod bolt nut and a bow-shaped bracket located at the other end of the long rod screw rod, wherein the long rod bolt and the wooden cone head cylinder The body is coaxial, and the long rod bolt and the center hole of the bracket are clearance fit, and the diameter of the center hole is smaller than the long rod bolt and nut; the outer diameter of the cylindrical part of the wooden cone head cylinder is larger than the inner diameter of the conductive tube.

本实用新型导电管拆卸工装包括可穿过导电管的长杆螺栓、圆柱体位于该长杆螺栓螺帽侧的木质锥头圆柱体和位于长杆螺杆另一端弓型支架,木质锥头圆柱体的锥头与导电管装置绝缘套侧管口配合,长杆螺栓另一端套上支架,支架与互感器壳体配合,作为对螺母的限位面。使用中,拧动螺母,因受到弓形支架的限位,螺母轴向无位移,从而使螺杆带动木质锥头圆柱体运动,锥头圆柱体则作用于导电管另一端,对导电管施以均匀静压力,将其沿其轴线方向推出,而绝缘套则因通孔内凸环限位而会留在通孔内,直接用手就可以拿出来。由于此过程锥头圆柱体对导电管所施的是静压力,对导电管冲击小,不会损坏导电管。并且此过程仅需要装置该工装于导电管,然后拧动螺栓即可,使用方便,工作可靠。The utility model conduction pipe disassembly tooling includes a long rod bolt that can pass through the conduction pipe, a wooden cone head cylinder that is located on the side of the long rod bolt nut, and a bow-shaped bracket that is located at the other end of the long rod screw rod, and a wooden cone head cylinder. The cone head of the conductive pipe device is matched with the side nozzle of the insulating sleeve, the other end of the long rod bolt is put on the bracket, and the bracket is matched with the transformer shell as a limiting surface for the nut. In use, when the nut is screwed, the nut has no axial displacement due to the limit of the bow bracket, so that the screw drives the wooden cone head cylinder to move, and the cone head cylinder acts on the other end of the conductive tube to apply uniform force to the conductive tube. Static pressure pushes it out along its axial direction, while the insulating sleeve will stay in the through hole due to the limit of the convex ring in the through hole, and can be taken out directly by hand. Because the cone-head cylinder exerts static pressure on the conductive tube in this process, the impact on the conductive tube is small and the conductive tube will not be damaged. And this process only needs to install the tooling on the conductive pipe, and then screw the bolts, which is convenient to use and reliable in operation.

(四)附图说明 (4) Description of drawings

图1本实用新型导电管拆卸工装结构原理图。Fig. 1 is a structural schematic diagram of the utility model conductive tube dismounting tooling.

图中:1、木质锥头圆柱体,2、长杆螺栓,3、螺母,4、弓型支架。Among the figure: 1, wooden cone head cylinder, 2, long rod bolt, 3, nut, 4, bow-shaped support.

(五)具体实施方式 (5) Specific implementation methods

实施例1:Example 1:

参照说明附图1,导电管拆卸工装,包括长杆螺栓2、圆柱体位于该长杆螺栓螺帽侧的木质锥头圆柱体1和位于长杆螺杆另一端弓型支架4,其中长杆螺栓与木质锥头圆柱体同轴,同时长杆螺栓与支架中心孔为间隙配合,该中心孔直径小于长杆螺栓螺母4;木质锥头圆柱体圆柱部分外径大于导电管内径。With reference to accompanying drawing 1 of illustration, conductive tube dismantling tooling, comprises long bar bolt 2, cylinder body 1 that is positioned at this long bar bolt nut side wooden conical head cylinder 1 and is positioned at the bow-shaped bracket 4 at the other end of long bar screw rod, wherein long bar bolt It is coaxial with the wooden cone head cylinder, and the long rod bolt is clearance fit with the center hole of the support. The diameter of the center hole is smaller than the long rod bolt nut 4; the outer diameter of the wooden cone head cylinder is larger than the inner diameter of the conductive pipe.

当然本实用新型所用木质锥头圆柱体不是定要采用木质的,也可以采用其他的材料,只要钢度大,对导电管损伤小即可。采用木质锥头圆柱体,主要考虑是这种材料好加工,成本比较低。Certainly the used wooden cone head cylinder of the utility model is not necessarily to adopt wooden, also can adopt other materials, as long as the rigidity is big, it is little to the damage of conductive pipe. The main consideration of using wooden cone head cylinder is that this material is easy to process and the cost is relatively low.

Claims (1)

1. dissembling fixture of conductive tube, it is characterized in that: comprise that bolt of long stem (2), cylinder are positioned at the wooden cone cylinder body (1) of this bolt of long stem nut side and are positioned at stock screw rod other end bow type support (4), wherein bolt of long stem is coaxial with wooden cone cylinder body, bolt of long stem and carriage center hole are matched in clearance simultaneously, and this center-hole diameter is less than bolt of long stem nut (4); Wooden cone cylinder body column part external diameter is greater than the contact tube internal diameter.
CN200820021861.8U 2008-05-07 2008-05-07 Conductive tube removal tooling Expired - Lifetime CN201204123Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200820021861.8U CN201204123Y (en) 2008-05-07 2008-05-07 Conductive tube removal tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200820021861.8U CN201204123Y (en) 2008-05-07 2008-05-07 Conductive tube removal tooling

Publications (1)

Publication Number Publication Date
CN201204123Y true CN201204123Y (en) 2009-03-04

Family

ID=40426437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200820021861.8U Expired - Lifetime CN201204123Y (en) 2008-05-07 2008-05-07 Conductive tube removal tooling

Country Status (1)

Country Link
CN (1) CN201204123Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101664913B (en) * 2009-09-15 2011-07-20 中冶实久建设有限公司 Dismantling tool and method of corrugated tube of foundation bolt preformed hole of equipment foundation
CN102501215A (en) * 2011-11-18 2012-06-20 哈尔滨飞机工业集团有限责任公司 Assembly tool for communicating pipeline of fuel system and assembly method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101664913B (en) * 2009-09-15 2011-07-20 中冶实久建设有限公司 Dismantling tool and method of corrugated tube of foundation bolt preformed hole of equipment foundation
CN102501215A (en) * 2011-11-18 2012-06-20 哈尔滨飞机工业集团有限责任公司 Assembly tool for communicating pipeline of fuel system and assembly method thereof
CN102501215B (en) * 2011-11-18 2014-12-10 哈尔滨飞机工业集团有限责任公司 Assembly tool for communicating pipeline of fuel system and assembly method thereof

Similar Documents

Publication Publication Date Title
CN203660361U (en) Fuse-replacing tool
CN103291719B (en) Self-plugging rivet
CN201204123Y (en) Conductive tube removal tooling
CN107791204A (en) A disassembly tool for tubular parts
CN207824794U (en) A kind of bearing puller
CN202684829U (en) One-way valve removal device
CN204248808U (en) A bearing replacement device
CN117020944A (en) Internal support type clamp for cylindrical grinding of slender thin-wall hard and brittle material pipe fitting
CN103419171A (en) Special tool for diesel engine air cylinder cover locating pin disassembling
CN208116805U (en) A kind of clamping position tooling of target pipe end thread chasing machine
CN205280475U (en) Bolt tensile test fixes frock
CN108057901B (en) Machining method of transition sleeve and shaft suitable for shaft machining
CN203077196U (en) Hydraulic spring operating mechanism brake-separating buffer ring dismounting tool
CN101339845A (en) Conductive tube removal tooling
CN105082026B (en) Hexagon socket head cap screw fast dismounting device
CN209648611U (en) A special tool for dismounting and installing the linear bearing of the separation wheel of the pick-up machine
CN205310158U (en) Simple and convenient connecting rod axle sleeve assembly and disassembly tools
CN213226012U (en) Pipe hexagonal coupling nut not damaged dismouting appurtenance
CN205521149U (en) A installation mechanism for installing interior sleeve pipe among tubular heat exchanger
CN207448370U (en) Host oil syringe extracting tool
CN201632977U (en) Bearing adaptor sleeve disassembly and assembly tool
CN222155456U (en) A short pipe removal tool in a subway brake pipeline
CN203527390U (en) Disassembling device
CN211889758U (en) Supporting mechanism with self-locking reaction force for press-fitting machine
CN223344930U (en) A stainless steel pipe that is easy to disassemble and assemble

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: SHANDONG RESEARCH INST. OF ELECTRIC POWER

Effective date: 20130506

Owner name: SHANDONG RESEARCH INST. OF ELECTRIC POWER

Effective date: 20130506

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 250002 JINAN, SHANDONG PROVINCE TO: 100000 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130506

Address after: 100000 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Shandong Research Inst. of Electric Power

Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Patentee before: Shandong Research Inst. of Electric Power

CX01 Expiry of patent term

Granted publication date: 20090304

CX01 Expiry of patent term