[go: up one dir, main page]

CN201149287Y - High efficiency briquette boiler - Google Patents

High efficiency briquette boiler Download PDF

Info

Publication number
CN201149287Y
CN201149287Y CNU2007200982994U CN200720098299U CN201149287Y CN 201149287 Y CN201149287 Y CN 201149287Y CN U2007200982994 U CNU2007200982994 U CN U2007200982994U CN 200720098299 U CN200720098299 U CN 200720098299U CN 201149287 Y CN201149287 Y CN 201149287Y
Authority
CN
China
Prior art keywords
heater
boiler
coal
burner hearth
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200982994U
Other languages
Chinese (zh)
Inventor
张德泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200982994U priority Critical patent/CN201149287Y/en
Application granted granted Critical
Publication of CN201149287Y publication Critical patent/CN201149287Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model belongs to a high-efficient coal burning boiler. A sealing turnplate capable of sealing and covering a smoke and dust chamber is mounted at the upper part of a boiler body, a boiler cover is capped on the upper end of a melting chamber, a water jacket interlayer communicating with a water outlet is arranged in the boiler cover, combustion chambers accommodating the molded coal are uniformly and axially distributed on a boiler core at the lower part of the melting chamber, and a fire grate and an air removal hopper are mounted on the base corresponding to the lower position of the combustion chamber. The coal burning boiler has the advantages of reasonable design, small size, easy and convenient ash removal, high safety performance and high efficiency, and is suitable for small and medium enterprises. The coal burning boiler makes full use of the energy, combines various heating manners such as radiation and convection to heat the cold water, obviously improves the heat exchange effect and greatly improves the heat exchange efficiency, thus ensuring a higher temperature of the hot water source.

Description

The high-effect moulding coal boiler
Technical field
The utility model belongs to field of boilers, especially a kind of high-effect moulding coal boiler.
Background technology
The heat that present boiler adopts coal, moulded coal and source of the gas burning to form more heats the cold water in the burner hearth ring wall interlayer, forms heat exchange, thereby the thermal water source is provided.Flue dust is few, blowdown flow rate is little because molded coal boiler has, so it is widely used in the life.But there are following several point defects in existing molded coal boiler: 1. present molded coal boiler is subjected to its structural limitations, can not fully heat the water in the interlayer in conjunction with multiple heat exchange patterns such as radiation, convection current, causes the significant wastage of the energy; 2. boiler is long-term use after, can pile up a large amount of cigarette ashes in its smoke exhaust pipe, cumbersome and be difficult for cleaning out to the smoke exhaust pipe deashing of vertical setting at present, therefore greatly influenced the heat exchange effect of boiler and influenced indoor health; 3. owing to be subjected to the restriction of its volume, can only place several moulded coals in its burner hearth, so burning time be shorter, and need carry out coal continually; 4. if increase the volume that the interior moulded coal quantity of burner hearth will inevitably increase boiler, cause its floor space to strengthen, and increase the manufacturing cost of boiler; In the prior art because the moulded coal in the moulded coal burner hearth is less, heat that its burning the time is produced is also lower, therefore is difficult to guarantee the water in the ring wall interlayer is fully heated.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of volume little, make full use of the high-effect moulding coal boiler that multiple heat exchange pattern reaches good heat exchange effect, can place the polylith moulded coal in the burner hearth of this molded coal boiler in addition, the incendivity time is long.
The utility model solves its technical problem and is achieved through the following technical solutions:
A kind of high-effect moulding coal boiler, by bell, body of heater, base, burner hearth and the water inlet and the delivery port that are installed on the body of heater constitute, body of heater is installed together with base is coaxial, one ring wall interlayer is arranged between burner hearth in body of heater and the body of heater, water inlet and delivery port are communicated with this ring wall interlayer respectively and are arranged on the following of body of heater, top, the dividing plate that is packed in furnace body inside top makes upper of furnace body form a ring-type flue dust chamber, this ring-type flue dust chamber is connected with chimney on being packed in body of heater, the axial uniform smoke exhaust pipe that can be communicated with burner hearth and flue dust chamber that is fixed with between burner hearth and the dividing plate, it is characterized in that: but upper of furnace body is equipped with the sealing rotating disk in capping flue dust chamber, the bell spiral-lock is in the burner hearth upper end, be shaped on the water jacket samdwich that is connected with delivery port in this bell, but the uniform in the axial direction placing type burning of coal chamber that is shaped on of the combustion chamber of lower furnace portion is equipped with fire grate and removes ash bucket on the base with respect to the combustion chamber lower position.
And, be shaped on an ash removing opening on the described sealing rotating disk.
And a coal flap is put in described combustion chamber upper surface, is shaped on a stoke hole on this coal flap.
Advantage of the present utility model and beneficial effect are:
1. bell spiral-lock of the present utility model is in burner hearth upper end, and is shaped on the water jacket samdwich that is connected with delivery port in this bell.Water in the delivery port flows in the bell, is transported in the heating system after heating once more in bell.This high-effect moulding coal boiler makes full use of the energy, in conjunction with multiple mode of heatings such as radiation, convection current cold water is heated, and has improved significantly to add thermal effect, and has greatly improved the efficiency of heating surface.
2. but uniformly on the combustion chamber in the burner hearth be shaped on a plurality of placed type burning of coals chamber, so can place two, 30 moulded coals simultaneously in the burner hearth.This structure can prolong burning time, reduce to change the frequency of moulded coal, make this boiler convenient in use, save trouble.
3. owing to have a large amount of moulded coals to burn simultaneously in the burner hearth, therefore can produce more heat and carry out abundant heat exchange with cold water in the ring wall interlayer, make cold water heat rapid and guaranteed thermal water source's high water temperature.The heat that this molded coal boiler produced can be fully utilized, and helps the raising of heat exchange efficiency.
4. uniformly between burner hearth and dividing plate be fixed with a plurality of smoke exhaust pipes, this smoke exhaust pipe can increase heat exchange area effectively, improves heat exchange efficiency and guarantees the heat exchange effect.
5. the utility model adopts and make a plurality of combustion chambers and the structure that can place the polylith moulded coal in each combustion chamber on combustion chamber.Can guarantee that the moulded coal in the combustion chamber fully burns, can under the situation that does not increase boiler overall volume and manufacturing cost, in burner hearth, place moulded coal as much as possible again.Increased the range of application of this molded coal boiler, made it suit in medium-sized and small enterprises, to use.
6. the hot gas when the coal flap of combustion chamber upper surface storing can be avoided coal in the combustion chamber is scalded the people, has strengthened the security that this high-effect moulding coal boiler uses.
7. but the utility model is equipped with the sealing rotating disk in capping flue dust chamber in upper of furnace body, and is shaped on an ash removing opening on the sealing rotating disk, goes back capping one rotatable end cap on the ash removing opening.During deashing, only need rotatory sealing rotating disk to smoke exhaust pipe top can carry out deashing, this ash removal method is simple and convenient, efficient is high, effective, can guarantee indoor health, and is free from environmental pollution, can improve the heat exchange effect of boiler again effectively.
The utility model be a kind of reasonable in design, volume is little, deashing is simple and convenient, security performance is high, the high-effect moulding coal boiler that suits to use in medium-sized and small enterprises.It makes full use of the energy, in conjunction with multiple mode of heatings such as radiation, convection current cold water is heated, and has improved the heat exchange effect significantly, and has greatly improved heat exchange efficiency, thereby has guaranteed that the thermal water source has higher temperature.
Description of drawings
Fig. 1 is a front view of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is that the A-A of Fig. 1 is to cutaway view;
Fig. 4 is that the B-B of Fig. 3 is to cutaway view.
The specific embodiment
The utility model is described in further detail below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection domain of the present utility model with this.
A kind of high-effect moulding coal boiler is made of bell 4, body of heater 1, base 9, burner hearth 17 and the water inlet 6 and the delivery port 2 that are installed on the body of heater.This body of heater is installed together with base is coaxial.Coaxial being packed between interior burner hearth of body of heater and the body of heater forms a ring wall interlayer 20, and water inlet and delivery port are communicated with this ring wall interlayer respectively and are arranged on the upper and lower portion of body of heater.Cold water enters in the ring wall interlayer from this water inlet and flows out from delivery port through heating.
The dividing plate 14 that is packed in furnace body inside top makes upper of furnace body form a ring-type flue dust chamber 11, and this ring-type flue dust chamber is connected with chimney 3 on being packed in body of heater.In order to increase the area of heat exchange, improve the efficient of heat exchange, the axial uniform smoke exhaust pipe 15 that can be communicated with burner hearth and flue dust chamber that is fixed with between burner hearth and the dividing plate.The quantity of this smoke exhaust pipe can be according to using needs to set.
Innovative point of the present utility model is: the bell spiral-lock is shaped on the water jacket samdwich 13 that is connected with delivery port in the burner hearth upper end in this bell.Water in the delivery port flows in the water jacket samdwich of bell, is transported in the heating system after heating once more in bell.Therefore made full use of the energy, cold water has been heated, improved the heat exchange effect significantly, and greatly improved heat exchange efficiency in conjunction with multiple mode of heatings such as radiation, convection current.
But the axial uniform placed type burning of coal chamber 18 that is shaped on of the combustion chamber 16 of lower furnace portion, the quantity of this combustion chamber can design according to the needs that reality is used.The polylith moulded coal can be placed in each combustion chamber, four moulded coals can be placed simultaneously in each combustion chamber in the present embodiment.Fire grate 7 is installed on the base with respect to the combustion chamber lower position and removes ash bucket 8.The quantity of this fire grate and position can need to adjust.The skin of combustion chamber is enclosed with one deck heat-insulation layer (not shown), and the place, axle center of combustion chamber is shaped on pore 19, and a coal flap 12 is put in the combustion chamber upper surface, is shaped on stoke hole on this coal flap.
But upper of furnace body is equipped with the sealing rotating disk 5 in capping flue dust chamber, and the dust for the ease of in the cleaning smoke exhaust pipe is shaped on an ash removing opening 10, this ash removing opening upper cover one rotatable end cap on the sealing rotating disk.

Claims (3)

1. high-effect moulding coal boiler, by bell, body of heater, base, burner hearth and the water inlet and the delivery port that are installed on the body of heater constitute, body of heater is installed together with base is coaxial, one ring wall interlayer is arranged between burner hearth in body of heater and the body of heater, water inlet and delivery port are communicated with this ring wall interlayer respectively and are arranged on the following of body of heater, top, the dividing plate that is packed in furnace body inside top makes upper of furnace body form a ring-type flue dust chamber, this ring-type flue dust chamber is connected with chimney on being packed in body of heater, the axial uniform smoke exhaust pipe that can be communicated with burner hearth and flue dust chamber that is fixed with between burner hearth and the dividing plate, it is characterized in that: but upper of furnace body is equipped with the sealing rotating disk in capping flue dust chamber, the bell spiral-lock is in the burner hearth upper end, be shaped on the water jacket samdwich that is connected with delivery port in this bell, but the uniform in the axial direction placing type burning of coal chamber that is shaped on of the combustion chamber of lower furnace portion is equipped with fire grate and removes ash bucket on the base with respect to the combustion chamber lower position.
2. high-effect moulding coal boiler according to claim 1 is characterized in that: be shaped on an ash removing opening on the described sealing rotating disk.
3. high-effect moulding coal boiler according to claim 1 is characterized in that: a coal flap is put in described combustion chamber upper surface, is shaped on a stoke hole on this coal flap.
CNU2007200982994U 2007-12-04 2007-12-04 High efficiency briquette boiler Expired - Fee Related CN201149287Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200982994U CN201149287Y (en) 2007-12-04 2007-12-04 High efficiency briquette boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200982994U CN201149287Y (en) 2007-12-04 2007-12-04 High efficiency briquette boiler

Publications (1)

Publication Number Publication Date
CN201149287Y true CN201149287Y (en) 2008-11-12

Family

ID=40117057

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200982994U Expired - Fee Related CN201149287Y (en) 2007-12-04 2007-12-04 High efficiency briquette boiler

Country Status (1)

Country Link
CN (1) CN201149287Y (en)

Similar Documents

Publication Publication Date Title
CN103017328A (en) Combustion and heat exchange system of heating equipment
CN104748367B (en) The dustless hot air boiler of Superstrong energy-saving
CN202675361U (en) Environmental protection and energy-saving furnace
CN201149287Y (en) High efficiency briquette boiler
CN205897522U (en) Ordinary pressure inner loop boiler
CN204787216U (en) Horizontal gasification is returned and is burnt boiler with flue gas postcombustion function
CN203052976U (en) Combustion and heat exchange system of heating equipment
CN203131879U (en) Multi-fuel water heating furnace capable of burning solids and gases
CN202719636U (en) Efficient energy-saving stove
CN202253559U (en) 30L atmospheric steam boiler
CN201488009U (en) Energy saving and environmental protection heating and cooking multi-purpose stove
CN201652430U (en) Straw particle combustion furnace
CN109099462B (en) An environmentally friendly cooking and heating stove with reverse feeding and decoupling combustion of briquette
CN204285525U (en) Heating stove
CN203375682U (en) Vertical type coal-fired hot-water boiler
CN202973187U (en) Efficient cooking and heating furnace with reverse pushing type water sleeves
CN203657191U (en) Efficient energy-saving biomass fuel normal pressure hot water boiler
CN203375424U (en) Vertical type coal-fired steam boiler
CN205447839U (en) Hot hot air heater is adopted to secondary
CN201285154Y (en) Molded coal twice flashback type full water jacket boiler
CN201037659Y (en) Carbon layer smoke filtering heating stove
CN201047608Y (en) Drinking heat water range
CN203940607U (en) High efficiency burnt gas hot-water boiler
CN207865690U (en) Horizontal three return-stroke constant pressure boiler
CN201074899Y (en) Boiler for both bath and warm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081112

Termination date: 20151204

EXPY Termination of patent right or utility model