Fastening structure of railway concrete sleeper spike nail Download PDFInfo
- Publication number
- CN201148574Y CN201148574Y CNU2008200024203U CN200820002420U CN201148574Y CN 201148574 Y CN201148574 Y CN 201148574Y CN U2008200024203 U CNU2008200024203 U CN U2008200024203U CN 200820002420 U CN200820002420 U CN 200820002420U CN 201148574 Y CN201148574 Y CN 201148574Y
- Authority
- CN
- China
- Prior art keywords
- sleeper
- railway
- oval
- spike
- railway spike
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 241001669679 Eleotris Species 0.000 title claims abstract description 31
- 239000004033 plastic Substances 0.000 claims description 10
- 229920003023 plastic Polymers 0.000 claims description 10
- 239000000203 mixture Substances 0.000 claims 1
- NINIDFKCEFEMDL-UHFFFAOYSA-N Sulfur Chemical compound [S] NINIDFKCEFEMDL-UHFFFAOYSA-N 0.000 abstract description 6
- 229910052717 sulfur Inorganic materials 0.000 abstract description 5
- 239000011593 sulfur Substances 0.000 abstract description 5
- 238000004873 anchoring Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 3
- 238000004064 recycling Methods 0.000 abstract description 2
- 238000003912 environmental pollution Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 9
- 239000011083 cement mortar Substances 0.000 description 4
- 230000006378 damage Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000012634 fragment Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 241001465754 Metazoa Species 0.000 description 1
- 239000005864 Sulphur Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a fastening structure of a railway concrete sleeper spike. The lower end of a spike is changed and casted as an elliptical taper body and is covered by an elliptical taper sleeve, an integrated body which matches the elliptical taper body is put into an elliptical taper hole which is meshed and consistent with the elliptical taper body through the lower end of a sleeper, and a bolt part is exposed, is covered by a flat gasket and is screwed with a thin nut, the spike is fixed at the sleeper, then all fasteners and parts are mounted, and a top nut is screwed down, so the spike can be fastened firm inside a concrete elliptical taper hole. The fastening structure of the railway concrete sleeper spike can replace sulfur anchoring which has the disadvantages of causing environmental pollution, complex construction, being not capable of changing and recycling, wasting resource.
Description
Described technical field
This practicality newly relates to a kind of fastening structure of railway concrete sleeper railway spike.
Background technology
The railway concrete sleeper is in order to still to adopt sulfur cement mortar anchorage agent anchoring with the method for bolton within its circular hole at present, and the sulfur cement mortar anchorage railway spike will boil sulphur, environment is polluted, and the harm workers ' health, construction is complicated loaded down with trivial details.Owing to adopt the disposable utilization of the fixed anchoring of this kind, when in case railway spike makes situations such as railway spike becomes flexible because of thread damage, corrosion and sulfur cement mortar anchorage lost efficacy, whole sleepers is also scrapped, together abandon together with four railway spikes, can't regain again and utilize, cause the multiple loss of its coherent domestic animal, so far seek a kind of economical and practical railway spike fastening means is the difficult problem that the expectation of railway department solves always.
The utility model content
The utility model provides a kind of simple in structure, installing/dismounting and changes concrete sleeper railway spike fastening structure easily.This structure is at existing railway spike, nut, elastic bar fastener, to be improved with the railway spike and the sleeper hole that are anchored in the sleeper circular hole on the basis of shell fragment etc., railway spike within it is cast as has the big concentric ellipticity body of top handle, make conical plastics sleeve pipe that an endoporus is meshed with it again and it is enclosed within on the railway spike of elliptic cone body, four circular holes of concrete sleeper are changed system into and the together big consistent oval bellmouth of shape of the railway spike that puts plastic bushing, so far the railway spike that only needs to put plastic bushing penetrates from the following hole of sleeper, the bolt of its upper end is partly exposed, the Dai Yiyuan plain cushion is fixed with thinner nut thereon, in order to avoid railway spike falls in the sleeper hole, all supporting elastic bar fasteners, spring, shell fragments etc. are enclosed within the nut and it is tightened screwed on the bolt and get final product.Because the sleeper hole all becomes the elliptic cone shape with railway spike within it, can not form the phenomenon of working day and night when firmly tightening, and in the oval bellmouth that is fastened on sleeper that can it is firm, thereby sulfur cement mortar anchorage replaced.And, no longer abandon other all intact sleeper and railway spikes because of a bolts damages to later dismounting and change or the good condition of recycling creation, its benefit is considerable.
Advantage of the present utility model just is: simple structure, easy construction, installation save time, dismantle flexibly, be beneficial to replacings, can realize utilizing again and the effect of useless railway spike recovery.
Description of drawings
The master that Fig. 1 installs for the utility model structure looks and principal part is looked schematic diagram.1. oval taper railway spikes among the figure, 2. oval conical plastics sleeve pipe, 3. oval bellmouth, 4. lower gasket, 5. thin nut, 6. upper gasket, 7. nut.
Fig. 2 is the schematic top plan view of Fig. 1.
Fig. 3 is that the lower end is up-thin-low-thick concentric ellipticity bullet railway spike schematic diagram.
Fig. 4 is the sectional schematic diagram of Fig. 3 upper bolt.
Fig. 5 is that Fig. 3 is ellipticity bullet top elliptic jet schematic diagram.
Fig. 6 is that Fig. 3 is ellipse garden, ellipticity bullet bottom sectional schematic diagram.
Fig. 7 is that plastics (or rubber) sleeve pipe master looks schematic diagram.
Fig. 8 is the schematic top view of Fig. 7.
Fig. 9 looks schematic diagram in the end of Fig. 7.
Figure 10 is the oval bellmouth of the prefabricated shaping of concrete sleeper.
Figure 11 is Figure 10 top view 1 position ellipticity schematic diagram.
Figure 12 is 2 position ellipticity schematic diagrames among Figure 10.
Figure 13 is the cross-sectional schematic of this structure installation forming state.
Specific embodiments
As Fig. 1, shown in Figure 13, concrete implementation step is as follows:
Oval taper railway spike (1) among Fig. 1 is penetrated from plastic bushing (2) lower end, in the lump again from the lower end of concrete sleeper penetrate with the supporting consistent oval bellmouth (3) of its engagement in, make bolt all be exposed at top, cover upper gasket (4), the thin nut 5 of screwing on causes railway spike down not come off.Installing and loading onto packing ring (6) nut (7) of screwing on behind the various fastener spare and accessory parts is the finishing device overall process.
Owing to penetrate the railway spike that is with plastic bushing in the sleeper hole, all be complete supporting tight engagement be the elliptic cone physique structure, therefore firmly tightening the top nut when fastening, bolt has enough anti-rotation abilities, when fastening, make and move on the bolt also from the sleeper hole, to deviate from, and can be firm with its fastening being squeezed within the concrete sleeper hole, and can help evenly disperseing to make to add the expansive force of splashing that acts in the sleeper hole, prolong its application life.
Need its railway spike of dismounting and change very convenient, as long as nut and accessory take down, slightly firmly hammering bolt top just can be with its whole taking-ups.
Claims (3)
1. the fastening structure of a railway concrete sleeper railway spike, by oval taper railway spike, oval conical plastics sleeve pipe, the oval bellmouth of sleeper, compositions such as nut and plain washer is characterized in that: the top of oval taper railway spike is the body of bolt, the bottom is the elliptic cone body.
2. the fastening structure of railway concrete sleeper railway spike according to claim 1 is characterized in that: plastic bushing is the elliptic cone shape, and its internal diameter is identical with oval taper railway spike bottom, and external diameter is consistent with the oval bellmouth epimere of sleeper.
3. the fastening structure of railway concrete sleeper railway spike according to claim 1, it is characterized in that: the sleeper hole be prefabricated into oval bellmouth make the oval taper railway spike that is through wherein and oval conical plastics thimble joint at the assembly of one when fastening, prevent to work day and night and railway spike is deviate from from the sleeper hole, and evenly its expansive force of splashing that acts in the sleeper hole is distributed on the entire contact surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200024203U CN201148574Y (en) | 2008-01-07 | 2008-01-07 | Fastening structure of railway concrete sleeper spike nail |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200024203U CN201148574Y (en) | 2008-01-07 | 2008-01-07 | Fastening structure of railway concrete sleeper spike nail |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201148574Y true CN201148574Y (en) | 2008-11-12 |
Family
ID=40116340
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008200024203U Expired - Fee Related CN201148574Y (en) | 2008-01-07 | 2008-01-07 | Fastening structure of railway concrete sleeper spike nail |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201148574Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103614954A (en) * | 2013-11-08 | 2014-03-05 | 沈阳铁路局小屯轨枕水泥厂 | Method for anchoring railroad sleeper screw spike at normal temperature |
| CN106283961A (en) * | 2016-09-21 | 2017-01-04 | 中国铁道科学研究院铁道建筑研究所 | A kind of 3D prints screw spike |
| CN109235162A (en) * | 2018-10-19 | 2019-01-18 | 上海国爱电气有限公司 | The equal swollen nail of return cable connection rivet formula of stray electrical current |
| CN111801467A (en) * | 2018-01-11 | 2020-10-20 | 施维哈克股份公司 | Rail fixing system |
-
2008
- 2008-01-07 CN CNU2008200024203U patent/CN201148574Y/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103614954A (en) * | 2013-11-08 | 2014-03-05 | 沈阳铁路局小屯轨枕水泥厂 | Method for anchoring railroad sleeper screw spike at normal temperature |
| CN106283961A (en) * | 2016-09-21 | 2017-01-04 | 中国铁道科学研究院铁道建筑研究所 | A kind of 3D prints screw spike |
| CN106283961B (en) * | 2016-09-21 | 2018-07-03 | 中国铁道科学研究院铁道建筑研究所 | A kind of 3D printing screw spike |
| CN111801467A (en) * | 2018-01-11 | 2020-10-20 | 施维哈克股份公司 | Rail fixing system |
| CN111801467B (en) * | 2018-01-11 | 2022-08-30 | 施维哈克股份公司 | Guide rail fixing system |
| US11913177B2 (en) | 2018-01-11 | 2024-02-27 | Shiwihag Ag | Rail fastening system |
| CN109235162A (en) * | 2018-10-19 | 2019-01-18 | 上海国爱电气有限公司 | The equal swollen nail of return cable connection rivet formula of stray electrical current |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201148574Y (en) | Fastening structure of railway concrete sleeper spike nail | |
| CN205688282U (en) | A kind of sleeper check bolt | |
| CN204754958U (en) | Precast prestressed concrete stock | |
| CN202090290U (en) | Prestressed reinforcement tensioning tool | |
| CN201695520U (en) | Expansion anchor bolt sleeve for wallboard installation | |
| CN204608776U (en) | A kind of recoverable anchor rod of falling wedge-type | |
| CN202926788U (en) | Expansion bolt capable of being installed on thin wall | |
| CN203515629U (en) | Anchor rod capable of conducting continuous fastening | |
| CN206972690U (en) | A kind of expansible slip casting crab-bolt | |
| CN209923880U (en) | Formwork tie rod device with water-stop function for sluice side wall and wing wall | |
| CN201020804Y (en) | Fiber rib prestressed anchor unit and its fiber rib prestressed anchor | |
| CN110905903A (en) | Check bolt assembly | |
| CN207080477U (en) | A kind of junction box's lower cover Anti-fall bolt assembly | |
| CN215567113U (en) | Shearing part of a helical spring bolt | |
| CN113323275A (en) | Sealed single-hole anchor for prestressed structure and tensioning system | |
| CN216406131U (en) | Novel turnover type wall connecting piece | |
| CN203051407U (en) | Antiskid anticorrosion bolt | |
| CN104631454A (en) | Inverted wedge type recoverable anchor rod | |
| CN202140104U (en) | Equal-strength, self-locking and anti-loosening anchor rod | |
| CN203051434U (en) | Antiskid bolt | |
| CN218027657U (en) | Wind power generation foundation pre-stressed anchor bolt convenient to replace | |
| CN204357468U (en) | A kind of assembled bolt with elastic connection sleeve | |
| CN209164318U (en) | A kind of stop nut | |
| CN111853367B (en) | A kind of heat preservation pipe fixing bracket and installation method | |
| CN201363353Y (en) | Bearing-type quick-disassembly self-locking fastening device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |