CN201129178Y - 钻孔分段前进式注浆堵水装置 - Google Patents

钻孔分段前进式注浆堵水装置 Download PDF

Info

Publication number
CN201129178Y
CN201129178Y CNU2007201911587U CN200720191158U CN201129178Y CN 201129178 Y CN201129178 Y CN 201129178Y CN U2007201911587 U CNU2007201911587 U CN U2007201911587U CN 200720191158 U CN200720191158 U CN 200720191158U CN 201129178 Y CN201129178 Y CN 201129178Y
Authority
CN
China
Prior art keywords
grouting
water
slip casting
orifice tube
drilling hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201911587U
Other languages
English (en)
Inventor
李治国
卓越
张民庆
邹翀
孙国庆
张纪奎
罗琼
王全胜
付仲润
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Research of China Railway Tunnel Group Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CNU2007201911587U priority Critical patent/CN201129178Y/zh
Application granted granted Critical
Publication of CN201129178Y publication Critical patent/CN201129178Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本实用新型提出的钻孔分段前进式注浆堵水装置主要包括注浆泵、进浆管(1)和孔口管(8)、注浆三通及排渣排气装置(6)、防突水装置(5);孔口管(8)一端位于钻孔孔口内并固定在孔壁上,其另一端位于钻孔(11)外并通过接头(7)与排渣排气装置(6)联接,排渣排气装置(6)通过法兰盘与防突水装置(5)联接,防突水装置(5)另一端通过法兰盘与带有进浆阀(2)和泄压阀(3)的注浆三通连接,注浆三通通过进浆管(1)与注浆泵连通。本实用新型适用于高水压富水流砂或软弱破碎堵水,反复钻注,压力可控,浆液扩散比较均匀,注浆效果较好,可以保证开挖安全,提高施工速度,具有较大的推广使用价值。

Description

钻孔分段前进式注浆堵水装置
技术领域
本实用新型属于隧道和地下工程高水压、富水软弱破碎围岩的超前堵水和加固技术,主要提出一种钻孔分段前进式注浆堵水装置。
背景技术
在高水压、富水流砂层或软弱地层中进行隧道和地下工程施工,最容易出现的问题是围岩大变形和坍塌以及开挖面涌水、突泥,危及人员、设备安全,造成伤亡事故,严重时,可能引起地表坍塌,水位下降,植被枯死,影响居民正常生活,对地面环境造成破坏。为了保证施工安全,目前国内外常用的地层加固和堵水方法为注浆法,注浆法就是通过一定的压力把一定量的胶凝性材料注入岩层或土体,使其在岩层裂缝或土体空隙中流动、扩散、充填、固结,形成有一定强度和低透水性的胶结体,加固地层,封堵地下水,从而提高围岩的自稳定时间,保证开挖安全。根据注浆原理、工艺、设备的不同,目前国内外比较常用的注浆方法为全孔一次性注浆。这种方法浆液往往沿钻孔壁上的某些薄弱部位形成通道,扩散较远,而其他部位浆液扩散很少或没有扩散,造成地层加固的均匀性较差。另外这种方法比较适合浅孔注浆,进行深孔注浆时,如果钻孔壁坍塌或注浆花管上的出浆孔被泥沙堵塞,可能造成孔底及中间某些部位难以进浆,影响注浆效果。
发明内容
本实用新型的目的是提出一种钻孔分段前进式注浆堵水装置,用于钻孔分段式注浆,使浆液扩散比较均匀,获得比较好的注浆效果。
本实用新型的技术结构为:其主要包括注浆泵、进浆管和孔口管、注浆三通及排渣排气装置、防突水装置;孔口管一端位于钻孔孔口内并固定在孔壁上,其另一端位于钻孔外并通过接头与排渣排气装置联接,排渣排气装置通过法兰盘与防突水装置联接,防突水装置另一端通过法兰盘与带有进浆阀和泄压阀的注浆三通连接,注浆三通通过进浆管与注浆泵连通。
本实用新型装置注浆工作过程:先用钻机钻出浅孔(1.8m左右),退出钻杆,将孔口管一端用钻机顶入钻孔中并用锚固剂固定在孔口壁上,孔口管位于钻孔外的一端与排渣排气装置、防突水装置联接,通过排渣排气装置、防突水装置开始继续钻孔至设计孔深后,退出钻杆,防突水装置通过其另一端法兰盘与带有进浆阀、泄压阀的注浆三通连接,进行注浆作业,注浆前打开进浆阀、关闭泄压阀,开启注浆泵,浆液沿钻孔向地层扩散,进行加固堵水,当注浆达到设计要求后,停止注浆,通过防突水装置、排渣排气装置、孔口管继续进行下一段的钻孔,钻孔完成后再注浆,如此钻孔一段,注浆一段,完成整个循环注浆段,再进行下一孔钻孔注浆施工。
本实用新型提出的钻孔分段前进式注浆堵水装置适用于高水压富水流砂或软弱破碎堵水,反复钻注,压力可控,浆液扩散比较均匀,注浆效果较好,可以保证开挖安全,提高施工速度,具有较大的推广使用价值。
附图说明
图1为本实用新型使用状态示意图。
图中,1、进浆管,2、进浆阀,3、泄压阀,4、法兰盘,5、防突水装置,6、排渣排气装置,7、接头,8、孔口管,9、锚固剂,10、止浆墙,11、钻孔,12、加固土体,13、浆液。
具体实施方式
结合附图对本实用新型实施例加以说明:
如图1所示,本实用新型装置主要包括注浆泵、进浆管1和孔口管8、注浆三通及防突水装置5;注浆泵在图中未给予显示。孔口管8的长度一端位于钻孔孔口内并通过锚固剂9固定在孔口壁上,其另一端位于钻孔11外并通过接头7联接排渣排气装置6,排渣排气装置6通过法兰盘联接防突水装置5,排渣排气装置6和防突水装置为普遍应用的已有市售产品,对其结构不作过多说明。防突水装置5另一端通过法兰盘联接注浆三通,注浆三通上具有有进浆阀2、泄压阀3,注浆三通与进浆管1连接,并通过进浆管1与注浆泵相连。

Claims (1)

1、一种钻孔分段前进式注浆堵水装置,其特征是:主要包括注浆泵、进浆管(1)和孔口管(8)、注浆三通及排渣排气装置(6)、防突水装置(5);孔口管(8)一端位于钻孔孔口内并固定在孔壁上,其另一端位于钻孔(11)外并通过接头(7)与排渣排气装置(6)联接,排渣排气装置(6)通过法兰盘与防突水装置(5)联接,防突水装置(5)另一端通过法兰盘与带有进浆阀(2)和泄压阀(3)的注浆三通连接,注浆三通通过进浆管(1)与注浆泵连通。
CNU2007201911587U 2007-12-29 2007-12-29 钻孔分段前进式注浆堵水装置 Expired - Fee Related CN201129178Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201911587U CN201129178Y (zh) 2007-12-29 2007-12-29 钻孔分段前进式注浆堵水装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201911587U CN201129178Y (zh) 2007-12-29 2007-12-29 钻孔分段前进式注浆堵水装置

Publications (1)

Publication Number Publication Date
CN201129178Y true CN201129178Y (zh) 2008-10-08

Family

ID=40017019

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201911587U Expired - Fee Related CN201129178Y (zh) 2007-12-29 2007-12-29 钻孔分段前进式注浆堵水装置

Country Status (1)

Country Link
CN (1) CN201129178Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696416A (zh) * 2014-01-17 2014-04-02 黄滨 一种地基处理新方法
CN104141468A (zh) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 堵水装置
CN115596476A (zh) * 2022-10-19 2023-01-13 中铁二局集团有限公司(Cn) 一种隧道施工用周边注浆加固方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141468A (zh) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 堵水装置
CN104141468B (zh) * 2014-01-09 2016-09-21 成都绿迪科技有限公司 堵水装置
CN103696416A (zh) * 2014-01-17 2014-04-02 黄滨 一种地基处理新方法
CN103696416B (zh) * 2014-01-17 2016-05-25 黄滨 一种地基处理方法
CN115596476A (zh) * 2022-10-19 2023-01-13 中铁二局集团有限公司(Cn) 一种隧道施工用周边注浆加固方法

Similar Documents

Publication Publication Date Title
CN101666234B (zh) 破碎岩体无止浆墙复合式注浆施工方法
CN101251019B (zh) 孔口止浆管内混合双管分段后退式注浆方法
CN101251017B (zh) 孔口止浆钻杆分段后退式注浆方法
CN104747075B (zh) 松软煤层喷浆防塌钻进方法
CN103334770B (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN103899323B (zh) 一种盾构穿越铁路站场的施工方法
CN201133248Y (zh) 孔口密封双管后退式注浆装置
CN105200978B (zh) 一种前进式定域双液注浆装置及施工方法
CN101251018B (zh) 孔口止浆管外混合双管分段后退式注浆方法
CN107605498B (zh) 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法
CN106014201B (zh) 一种隧道注浆帷幕外泄水钻孔安全施工工艺
CN108999195B (zh) 一种封堵深基坑侧壁较大涌水的地层内台阶堆堰式安全注浆施工工艺
CN103912003B (zh) 一种简便快捷封堵地层动水及孔隙的方法
CN105350519A (zh) 一种适用于砂土层浅埋隧道超前预注浆装置及施工工艺
CN102278130A (zh) 隧道高压富水溶腔加筋注浆工艺方法
CN101070701A (zh) 利用双液注浆法封闭水平旋喷桩孔口的施工方法
CN103195467A (zh) 一种水力压裂与注浆固化相结合的石门揭煤方法
CN101793154A (zh) 利用隧道围岩地质参数和设置分流孔的注浆堵水方法
CN201129183Y (zh) 小导管分段反复注浆装置
CN205918368U (zh) 钻注一体后退式注浆钻杆
CN105909265B (zh) 穿越既有盾构隧道防隆起后退式深孔注浆系统及方法
CN107217987A (zh) 煤矿水患治理井钻井方法
CN201129177Y (zh) 钻杆后退分段注浆装置
CN112855073B (zh) 一种石门揭煤过程中利用微生物固化煤层的装置及方法
CN101251020A (zh) 分段钻孔反复注浆方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY TUNNEL GROUP TECHNOLOGY RESEARCH CO.

Free format text: FORMER OWNER: ZHONGTIE TUNNEL GROUP CO., LTD.

Effective date: 20140606

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140606

Address after: 471009 Luoyang City, the old town of Henan champion Red Road, No. 3

Patentee after: China Railway Tunnel Group Technology Research Co., Ltd.

Address before: 471009 Henan province Luoyang Xigong Cemetery Road No. 3

Patentee before: Zhongtie Tunnel Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081008

Termination date: 20151229

EXPY Termination of patent right or utility model