CN201099845Y - Anti-collision guardrail additionally-connecting device for additionally paving road surface of road traffic safety facility - Google Patents
Anti-collision guardrail additionally-connecting device for additionally paving road surface of road traffic safety facility Download PDFInfo
- Publication number
- CN201099845Y CN201099845Y CNU2007201319804U CN200720131980U CN201099845Y CN 201099845 Y CN201099845 Y CN 201099845Y CN U2007201319804 U CNU2007201319804 U CN U2007201319804U CN 200720131980 U CN200720131980 U CN 200720131980U CN 201099845 Y CN201099845 Y CN 201099845Y
- Authority
- CN
- China
- Prior art keywords
- collision guardrail
- collision
- blocking block
- guardrail
- additionally
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
一种道路交通安全设施加铺路面用防撞护栏加接装置,属于一种交通设施,它包括套管(1)、螺栓(3)和防阻块(4),其特征是套管(1)下端设有一小直径插入段(2),该小直径插入段(2)与防撞护栏杆(5)上端的孔径相配,防阻块(4)位于防撞护栏板(6)之间并通过螺栓(3)相连。本实用新型设计合理,不但满足了加铺路面后防撞护栏的原有高度,而且保留了原防撞护栏的所有功能,还增加了防撞护栏的强度。
A road traffic safety facility, a device for adding a crash barrier to a road surface, belongs to a type of traffic facility and comprises a sleeve (1), a bolt (3) and an anti-blocking block (4). The device is characterized in that the lower end of the sleeve (1) is provided with a small-diameter insertion section (2), the small-diameter insertion section (2) matches the aperture of the upper end of the crash barrier rod (5), and the anti-blocking block (4) is located between the crash barrier plates (6) and connected by the bolt (3). The utility model has a reasonable design and not only meets the original height of the crash barrier after the road surface is added, but also retains all the functions of the original crash barrier and increases the strength of the crash barrier.
Description
技术领域 technical field
本实用新型涉及一种用于道路交通安全设施,尤其是一种防撞护栏加高装置,具体地说是一种道路交通安全设施加铺路面用防撞护栏加接装置。The utility model relates to an anti-collision guardrail heightening device for road traffic safety facilities, in particular to an anti-collision guardrail adding device for paving road surfaces of road traffic safety facilities.
背景技术 Background technique
在道路交通安全设施中,防撞护栏直接承受车辆在道路行驶中发生意外时的冲击力,保护车辆在发生意外时不会翻出护栏外造成更大的损失,是交通安全设施中最容易受到破坏的装置。因道路加铺而降低了防撞护栏的高度,从而使防撞护栏承受冲击力的强度大大下降,使车辆更容易翻出防撞护栏外,安全性大大的下降,直接影响车辆在道路行驶中的安全。以往解决因道路加铺而降低了防撞护栏的高度的办法是,等加铺路面结束时将防撞护栏板撤除,再将防撞护栏杆拔出,然后再用打桩机将防撞护栏杆重新打入地下,再将防撞护栏板装在防撞护栏杆的防阻块上,使新安装的防撞护栏达到防原撞护栏的标准高度。这样不仅费时费工、增加劳动强度、增加成本,而且因道路加铺后沥青的厚度增加强度加大,从新打入地下的防撞护栏杆损耗也随之加大。In the road traffic safety facilities, the anti-collision guardrail directly bears the impact of the vehicle when an accident occurs while driving on the road, and protects the vehicle from falling out of the guardrail and causing greater losses in the event of an accident. It is the most vulnerable traffic safety facility. broken device. The height of the anti-collision barrier is reduced due to road paving, so that the intensity of the impact force of the anti-collision barrier is greatly reduced, making it easier for the vehicle to turn out of the anti-collision barrier, and the safety is greatly reduced, which directly affects the vehicle on the road. safety. In the past, the solution to the reduction of the height of the anti-collision barriers due to road overlaying was to remove the anti-collision barriers when the pavement was over, then pull out the anti-collision barriers, and then use a pile driver to remove the anti-collision barriers. Drive it into the ground again, and then install the anti-collision guardrail on the anti-blocking block of the anti-collision guardrail, so that the newly installed anti-collision guardrail reaches the standard height of the original crash guardrail. This not only takes a lot of time and labor, increases labor intensity, and increases costs, but also increases the loss of the anti-collision guardrails that are newly driven into the ground due to the increase in the thickness of the asphalt after the road is overlaid.
发明内容 Contents of the invention
本实用新型的目的就是为了解决上述问题,提供一种不用拔出防撞护栏杆就可以提升到原防撞护栏高度的加接装置,而且省时伸力,效率高,成本低的加铺路面用防撞护栏加接装置。The purpose of this utility model is to solve the above problems, to provide an additional device that can be lifted to the height of the original anti-collision guardrail without pulling out the anti-collision guardrail, and saves time and stretching force, high efficiency and low cost. Attach the device with crash barriers.
本实用新型的技术解决方案之一是:One of technical solutions of the present utility model is:
一种道路交通安全设施加铺路面用防撞护栏加接装置,包括防撞护栏杆(5)、防阻块(4)和连接螺栓(3),防撞护栏杆(5)的下端固定在路基(7)中,其上端设有穿装连接螺栓(3)的通孔,防阻块(4)通过连接螺栓(3)安装在防撞护栏杆(5)的上部,防撞护栏板(6)通过连接螺钉固定在防阻块(4)上,其特征是所述的防阻块(4)上设有穿装连接螺栓(3)的长条状穿装孔(8),且该长条状穿装孔(8)的长度方向与防撞护栏杆(5)的轴线方向相一致。An anti-collision guardrail attachment device for paving road surfaces of road traffic safety facilities, comprising an anti-collision guardrail (5), an anti-blocking block (4) and connecting bolts (3), the lower end of the anti-collision guardrail (5) is fixed on In the subgrade (7), its upper end is provided with through holes for wearing and fitting connecting bolts (3), and the anti-blocking block (4) is installed on the top of the anti-collision guardrail (5) through the connecting bolts (3), and the anti-collision guardrail ( 6) It is fixed on the anti-blocking block (4) by connecting screws. The length direction of the elongated piercing hole (8) is consistent with the axis direction of the anti-collision guardrail (5).
本实用新型的技术解决方案之二是:Two of the technical solution of the present utility model is:
一种道路交通安全设施加铺路面用防撞护栏加接装置,包括防撞护栏杆(5)、防阻块(4)和连接螺栓(3),防撞护栏杆(5)的下端固定在路基(7)中,其特征是防撞护栏杆(5)的上端插装有套管(1),套管(1)的下端的小直径插入段(2)插入防撞护栏杆(5)的上端中,套管(1)的上端设有穿装连接螺栓(3)的通孔,防阻块(4)通过连接螺栓(3)固定在套管(1)的上端上,防撞护栏板(6)通过连接螺钉固定在防阻块(4)上。An anti-collision guardrail attachment device for paving road surfaces of road traffic safety facilities, comprising an anti-collision guardrail (5), an anti-blocking block (4) and connecting bolts (3), the lower end of the anti-collision guardrail (5) is fixed on In the subgrade (7), the feature is that the upper end of the anti-collision guardrail (5) is inserted with a sleeve (1), and the small-diameter insertion section (2) at the lower end of the sleeve (1) is inserted into the anti-collision guardrail (5) In the upper end of the casing (1), the upper end of the casing (1) is provided with a through hole for wearing the connecting bolt (3), and the anti-blocking block (4) is fixed on the upper end of the casing (1) through the connecting bolt (3). The plate (6) is fixed on the anti-blocking block (4) by connecting screws.
套管(1)的长度为5-100cm,直径为10-20cm,套管(1)下端的小直径插入段(2)的长度为5-50cm,直径为9-19cm。The sleeve pipe (1) has a length of 5-100cm and a diameter of 10-20cm, and a small-diameter insertion section (2) at the lower end of the sleeve pipe (1) has a length of 5-50cm and a diameter of 9-19cm.
套管(1)下端的小直径插入段(2)上穿装有穿过防撞护栏杆(5)的连接螺栓。The small-diameter insertion section (2) at the lower end of the casing (1) is provided with connecting bolts passing through the anti-collision guardrail (5).
所述的防阻块(4)上设有穿装连接螺栓(3)的长条状穿装孔(8)。The anti-blocking block (4) is provided with strip-shaped piercing holes (8) for piercing the connecting bolts (3).
本实用新型的有益效果是:The beneficial effects of the utility model are:
本实用新型设计合理,既可通过调整防阻块上连接螺栓的安装位置来达到调整护栏的高度,又可通过在原防撞护栏杆上加接一段新的套管达到调整护栏高度的目的,不但满足了加铺路面后防撞护栏的原有高度,而且保留了原防撞护栏的所有功能,还增加了防撞护栏的强度。本实用新型可在路面未加铺前或路面加铺后迅速的与原防撞护栏加接,不但对原防撞护栏有增加强度的作用,而且本实用新型的加接套管可以根据以后加铺路面的高度进行多次更换,不会损坏原有防撞护栏。本实用新型操作简单更换时省时省力、效率高、成本低,可在不拔除原护栏杆的情况下调整护栏板的高度,可省去了大量的拔管时间,提高施工速度。本实用新型套管的底部小于防撞护栏杆的顶部,正好安装于防撞护栏的顶部,套管底部与防撞护栏杆中间有孔,可以用螺栓将加接套管底部与原防撞护栏杆的顶部固定在一起,套管顶部有防阻块与护栏板连接。套管上部标准长度为5-100cm,套管下部标准长度为5-50cm,套管上部直径为10-20cm,套管下部直径为9-19cm。The utility model has a reasonable design. The height of the guardrail can be adjusted by adjusting the installation position of the connecting bolt on the anti-blocking block, and the height of the guardrail can be adjusted by adding a new section of casing to the original anti-collision guardrail. It meets the original height of the anti-collision barrier after paving the road surface, and retains all the functions of the original anti-collision barrier, and also increases the strength of the anti-collision barrier. The utility model can be quickly added to the original anti-collision guardrail before the pavement is not added or after the pavement is added, which not only has the effect of increasing the strength of the original anti-collision guardrail, but also the addition sleeve of the utility model can be added according to the future The height of the paving surface can be changed several times without damaging the original crash barriers. The utility model has the advantages of simple operation, time-saving and labor-saving replacement, high efficiency and low cost. The height of the guardrail can be adjusted without pulling out the original guardrail, which saves a lot of time for pulling out the tube and improves the construction speed. The bottom of the sleeve of the utility model is smaller than the top of the anti-collision guardrail, and is just installed on the top of the anti-collision guardrail. The tops of the railings are fixed together, and an anti-blocking block is arranged on the top of the casing to connect with the guardrail. The standard length of the upper part of the casing is 5-100cm, the standard length of the lower part of the casing is 5-50cm, the diameter of the upper part of the casing is 10-20cm, and the diameter of the lower part of the casing is 9-19cm.
附图说明 Description of drawings
图1为本实用新型的结构示意图之一。Fig. 1 is one of structural representations of the utility model.
图2是本实用新型的结构示意图之二。Fig. 2 is the second structural diagram of the utility model.
具体实施方式 Detailed ways
下面结合附图和实施例对本实用新型作进一步的说明。Below in conjunction with accompanying drawing and embodiment the utility model is described further.
图中:1为套管,2为小直径插入段,3为螺栓,4为防阻块,5为防撞护栏杆,6为防撞护栏板,7为路基。In the figure: 1 is a sleeve, 2 is a small-diameter insertion section, 3 is a bolt, 4 is an anti-blocking block, 5 is an anti-collision guardrail, 6 is an anti-collision guardrail, and 7 is a roadbed.
实施例一。Embodiment one.
如图1所示。As shown in Figure 1.
一种道路交通安全设施加铺路面用防撞护栏加接装置,它包括防撞护栏杆5、防撞护栏板6、防阻块4和连接螺栓3,防撞护栏杆5的下端固定在路基7中,其上端设有穿装连接螺栓3的通孔,防阻块4通过连接螺栓3安装在防撞护栏杆5的上部,防撞护栏板6通过连接螺钉固定在防阻块4上,所述的防阻块4上设有穿装连接螺栓3的穿装孔8,且该长条状穿装孔8的长度方向与防撞护栏杆5的轴线方向相一致。An anti-collision guardrail attachment device for paving road surface of road traffic safety facilities, which includes
本结构适用于调整高度不超过5厘米的护栏调整,调整高度时可通过将防阻块4沿其上所开的长条形穿装孔向上移动,到位后,将连接螺栓拧紧,使防阻块4固定在防撞护栏杆5上,最后再将防撞护栏板6固定在防阻块4上即可。This structure is suitable for the adjustment of guardrails whose height does not exceed 5 cm. When adjusting the height, the
实施例二。Embodiment two.
如图2所示。as shown in
一种道路交通安全设施加铺路面用防撞护栏加接装置,包括防撞护栏杆5、防撞护栏板6、防阻块4和连接螺栓3,防撞护栏杆5的下端固定在路基7中,防撞护栏板6通过连接螺钉固定在防阻块4上,防撞护栏杆5的上端插装有套管1,套管1的下端的小直径插入段2插入防撞护栏杆5的上端中,套管1的上端设有穿装连接螺栓3的通孔,防阻块4通过连接螺栓3固定在套管1的上端上,防撞护栏板6通过连接螺钉固定在防阻块4上。本实施例适用于提升高度大于5厘米时的护栏板调整,因此具体实施时套管1的长度可为5-100cm,直径可为10-20cm,套管1上的小直径插入段2的长度可为5-50cm,直径可为9-19cm。为了使小直径插入段2与防撞护栏杆5实现可靠连接,在套管1下端设的小直径插入段2上还穿装有穿过防撞护栏杆5的连接螺栓。具体实施时也可将防阻块4上加工出与实施例一相同的长条状孔8以便当需要再次小幅调整护栏板高度时使用。An anti-collision guardrail attachment device for paving road surface of road traffic safety facilities, comprising
本实用新型安装时先将防撞护栏板6从原防撞护栏杆5上拆除,然后将套管1的下端的小直径插入端2插入到原防撞护栏杆5的顶部并用螺栓固定,再将防阻块4用连接螺栓3固定在套管1的上端,最后用螺钉将防撞护栏板6固定在防阻块4上即可。When the utility model is installed, the
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007201319804U CN201099845Y (en) | 2007-12-27 | 2007-12-27 | Anti-collision guardrail additionally-connecting device for additionally paving road surface of road traffic safety facility |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007201319804U CN201099845Y (en) | 2007-12-27 | 2007-12-27 | Anti-collision guardrail additionally-connecting device for additionally paving road surface of road traffic safety facility |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008201152622U Division CN201317918Y (en) | 2007-12-27 | 2007-12-27 | Anti-collision guardrail connecting device for pavement paved by road traffic safety facilities |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201099845Y true CN201099845Y (en) | 2008-08-13 |
Family
ID=39936376
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2007201319804U Expired - Fee Related CN201099845Y (en) | 2007-12-27 | 2007-12-27 | Anti-collision guardrail additionally-connecting device for additionally paving road surface of road traffic safety facility |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201099845Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102747699A (en) * | 2012-07-26 | 2012-10-24 | 黑龙江省北龙交通工程有限公司 | Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects |
| CN104389282A (en) * | 2014-11-14 | 2015-03-04 | 江苏省交通科学研究院股份有限公司 | Device capable of heightening expressway waveform anti-collision guardrails |
| CN106223193A (en) * | 2016-07-26 | 2016-12-14 | 山东交通学院 | Cushion bumper structure at a kind of road and crossing |
| CN106337378A (en) * | 2016-08-29 | 2017-01-18 | 安徽饰界广告有限公司 | Method for processing shrinking-type guardrail |
-
2007
- 2007-12-27 CN CNU2007201319804U patent/CN201099845Y/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102747699A (en) * | 2012-07-26 | 2012-10-24 | 黑龙江省北龙交通工程有限公司 | Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects |
| CN102747699B (en) * | 2012-07-26 | 2015-06-03 | 黑龙江省北龙交通工程有限公司 | Pile-splicing construction method and pile-splicing component for guiderails in expressway rebuilding and expansion and major maintenance projects |
| CN104389282A (en) * | 2014-11-14 | 2015-03-04 | 江苏省交通科学研究院股份有限公司 | Device capable of heightening expressway waveform anti-collision guardrails |
| CN106223193A (en) * | 2016-07-26 | 2016-12-14 | 山东交通学院 | Cushion bumper structure at a kind of road and crossing |
| CN106337378A (en) * | 2016-08-29 | 2017-01-18 | 安徽饰界广告有限公司 | Method for processing shrinking-type guardrail |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201099845Y (en) | Anti-collision guardrail additionally-connecting device for additionally paving road surface of road traffic safety facility | |
| CN203947434U (en) | A kind of crashproof highway barrier | |
| CN202117012U (en) | High-speed rolling and high-pressure blowdown combination dual-linkage snow removal device | |
| CN103614959A (en) | Portable pavement milling machine | |
| CN104372757A (en) | Waveform beam guard bar heightening device and method | |
| CN106498881B (en) | Highway corrugated guardrail Promotion Transformation method | |
| CN201187042Y (en) | Traffic sign pole having two separable structures | |
| CN212561300U (en) | A retrofit structure of anti-blocking block and corrugated beam guardrail that can be raised multiple times | |
| CN203475351U (en) | Heightening type obstruction block of three-corrugated beam steel barrier of road | |
| CN204570533U (en) | The dumpable type isolated column of a kind of safety | |
| CN210975661U (en) | Safety guardrail for road | |
| CN214992770U (en) | Concrete road surface board connecting structure | |
| CN211690084U (en) | Pavement additional paving structure using existing waveform guard bar | |
| CN209636600U (en) | A kind of bituminous pavement paving width control device | |
| CN204185812U (en) | Road surface trash ice car | |
| CN201317918Y (en) | Anti-collision guardrail connecting device for pavement paved by road traffic safety facilities | |
| CN210238373U (en) | Guardrail stand rising structure | |
| CN202466468U (en) | Highway crash barrier hydraulic pile-pulling device | |
| CN219260830U (en) | Cement anti-collision pier | |
| CN209652799U (en) | A kind of municipal administration hard shoulder | |
| CN219240379U (en) | A protective guardrail | |
| CN201749056U (en) | An adjustable suspension device for road acceleration loading experimental equipment | |
| CN205576918U (en) | Impacted style vibrations pile extractor | |
| CN207747902U (en) | A kind of electric road barricade preventing track battery truck car slipping | |
| CN206512642U (en) | A kind of easy-to-dismount municipal road isolating device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20090213 Address after: Jianye District of Nanjing City, Jiangsu Province Home auspicious autumn Court 1 Building 1, Room 401, zip code: 210017 Co-patentee after: Wang Jun Patentee after: Zhai min Co-patentee after: Li Xingyue Address before: Jianye District of Nanjing City, Jiangsu Province Home auspicious autumn Court 1 Building 1, Room 401, zip code: 210017 Co-patentee before: Wu Ning Patentee before: Zhai min Co-patentee before: Wang Jun |
|
| C53 | Correction of patent of invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Di Min Inventor after: Wang Jun Inventor before: Di Min Inventor before: Wu Ning Inventor before: Wang Jun |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHAI MIN WU NING WANG JUN TO: ZHAI MIN WANG JUN |
|
| DD01 | Delivery of document by public notice |
Addressee: Wang Jun Document name: Notification to Pay the Fees |
|
| DD01 | Delivery of document by public notice |
Addressee: Di Min Document name: Notification of Termination of Patent Right |
|
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080813 Termination date: 20131227 |