[go: up one dir, main page]

CN201002909Y - Building construction lifter - Google Patents

Building construction lifter Download PDF

Info

Publication number
CN201002909Y
CN201002909Y CNU2007200102458U CN200720010245U CN201002909Y CN 201002909 Y CN201002909 Y CN 201002909Y CN U2007200102458 U CNU2007200102458 U CN U2007200102458U CN 200720010245 U CN200720010245 U CN 200720010245U CN 201002909 Y CN201002909 Y CN 201002909Y
Authority
CN
China
Prior art keywords
platform
cylinder
retarder
hoist
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200102458U
Other languages
Chinese (zh)
Inventor
金素杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200102458U priority Critical patent/CN201002909Y/en
Application granted granted Critical
Publication of CN201002909Y publication Critical patent/CN201002909Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a building machinery elevator that belongs to construction machinery field, in particular to a construction elevator. The utility model provides a building operations elevator that has two rope speeds and is safe and preferable in saving time and labor. The utility model comprises standard knots, a platform that is arranged at the middle of the standard knots at both sides, the rope of the electronic controlled windlass crosses a trolley on the platform and is connected with a hanging scaffold; one side of the reducer that is arranged on the platform is provided with a roller with twisted rope that can hoist the platform which is provided with a bracket that is provided with pulleys. The key structural point of the utility model is that: the other side of the reducer that is arranged on the platform is provided with a hoisting device; the roller shaft of the electronic controlled windlass is provided with a hub, a damper brake is arranged outside the hub; the input castellated shaft of the reducer that is arranged on the electronic windlass is provided with duplicate gears that have different amount of teeth. The poking rod inside the groove that is arranged between the duplicate gears is connected with the crank that is arranged outside the reducer.

Description

Building construction hoist
Technical field:
The utility model belongs to the vehicle for construction field, particularly a kind of building hoist.
Background technology:
What at present, generally used the building ground is gantry elevator.But there is following shortcoming in this structure: 1, electric controlled hoist only has a kind of rope speed, and therefore, Applicable scope is limited; 2, do not have safety brake on the electric controlled hoist, have potential safety hazard; 3, being transported to standard knot on the platform from ground, is manually to promote by the pulley on the flat-bed support, therefore wastes time and energy.
The utility model content:
The utility model is exactly at the problems referred to above, and a kind of two kinds of rope speeds that have are provided, and not only safety, but also time saving and energy saving building construction hoist.
The utility model adopts following technical scheme: the utility model comprises standard knot, and the centre of both sides standard knot is a platform, and the serving of electric controlled hoist links to each other with hanging scaffold by the pulley on the platform; But a side of the retarder on the platform is provided with the cylinder with serving of lifting platform, and platform is provided with rollered support, and the opposite side of the retarder on its structural feature platform is provided with bont; The cylinder axle head of electric controlled hoist is provided with wheel hub, and wheel hub is outside equipped with damper brake; Doubly-linked gear with different numbers of teeth is set on the input castellated shaft of the retarder of electric controlled hoist, and the driving lever in the groove between the doubly-linked gear links to each other with the outer crank of retarder.
The beneficial effects of the utility model:
1, can on an electric controlled hoist, realize two kinds of rope speeds:
Because the doubly-linked gear with different numbers of teeth is set on the input castellated shaft of the retarder of the utility model electric controlled hoist, the driving lever in the groove between the doubly-linked gear links to each other with the outer crank of the retarder of electric controlled hoist; The utility model makes the winch that becomes two kinds of rope speeds on the winch, can carry out high-low speed change according to the needs of user's use; Quick shelves can be used when high-rise, shelves at a slow speed can be used during low layer; Not only provide convenience, also saved resource simultaneously to the user;
2, safety:
Because the axle head of the cylinder of the utility model electric controlled hoist is provided with wheel hub, wheel hub is outside equipped with damper brake; When having an accident, damper brake can in time be realized automatic train stop, avoids the generation of accident;
3, time saving and energy saving:
Because the opposite side of the retarder on the platform is provided with bont, just can remove manually promoting ground standard knot by the support top sheave from, and is therefore not only time saving and energy saving, and improved work efficiency.
Description of drawings:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is retarder and the dependency structure scheme drawing on the utility model platform;
Fig. 3 is the A-A cutaway view of Fig. 2;
Fig. 4 is the structural representation of the utility model electric controlled hoist;
Fig. 5 is the B-B cutaway view of Fig. 4;
Fig. 6 is that the C of Fig. 4 is to view;
Fig. 7 is that the B of Fig. 4 is to view;
Fig. 8 is that the D of Fig. 4 is to view.
The specific embodiment:
The utility model comprises standard knot 4, and the centre of both sides standard knot 4 is a platform 12, and the serving 2 of electric controlled hoist 1 links to each other with hanging scaffold 3 by the pulley 5 on the platform 12; But a side of the retarder 7 on the platform 12 is provided with the cylinder with serving 9 10 of lifting platform 12, and platform 12 is provided with the support 8 with pulley 11, and the opposite side of the retarder 7 on the platform 12 is provided with bont 6; Cylinder 31 axle heads of electric controlled hoist 1 are provided with wheel hub 34, and wheel hub 34 is outside equipped with damper brake 35; Doubly-linked gear 38 with different numbers of teeth is set on the input castellated shaft 37 of the retarder 30 of electric controlled hoist 1, and the driving lever 40 in the groove 39 between the doubly-linked gear 38 links to each other with retarder 30 outer cranks 41.
Bont 6 comprises that the bearing 28 of axis 18 is outside equipped with the cylinder 16 with serving 17, axis 18 ends are bracing strut 13, be conjoint disk 14 between bracing strut 13 and the cylinder 16, have in the conjoint disk 14 and axle key 19, positioning groove 20 corresponding through holes, knock hole 23, have spring 22, ball 21 in the knock hole 23, the fulcrum 24 on driving lever 15 coaxial stents 13 in the outer rim groove 25 of conjoint disk 14 links to each other; One side of conjoint disk 14 is provided with cylinder 16 side grooves 27 corresponding latches 26.
Retarder 30 on the base 29 of electric controlled hoist 1 links to each other with the cylinder 31 with serving 2, motor 33 with band-type brake 32 respectively; The fulcrum 44 of damper brake 35 is fixed on the support 45 of base 29, and the front end of the joystick 46 on the fulcrum 44 has the fulcrum 43 of wheel hub 34 brake rubber blocks 42.
If when extracting standard knot 4 from ground, the opposite side that starts the retarder 7 on the platform 12 is provided with bont 6, just can extract standard knot 4 by the pulley on platform 12 supports 8 11.
If change rope speed, crank 41 is turned in the detent 47; Driving lever 40 is action thereupon just, makes 38 actions of doubly-linked gear by detent 47, is meshed with different gears on the next stage axle 36 with the different teeth of doubly-linked gear 38, has just realized two kinds of rope speeds.
If when something unexpected happened maybe need stop, can press down joystick 46; Then joystick 46 rotates around the fulcrum 44 of support 45, and just joystick 46 rotations thereupon of two fulcrums 43 of the brake rubber block 42 outside the wheel hub 34 just pack tightly wheel hub 34 with brake rubber block 42, just play good brake action.

Claims (3)

1, building construction hoist comprises standard knot (4), and the centre of both sides standard knot (4) is platform (12), and the serving (2) of electric controlled hoist (1) links to each other by the same hanging scaffold of pulley (5) (3) on the platform (12); Retarder (7) on the platform (12) but a side be provided with the cylinder with serving (9) (10) of lifting platform (12), platform (12) is provided with the have pulley support (8) of (11), it is characterized in that the opposite side of the retarder (7) on the platform (12) is provided with bont (6); Cylinder (31) axle head of electric controlled hoist (1) is provided with wheel hub (34), and wheel hub (34) is outside equipped with damper brake (35); The input castellated shaft (37) of the retarder (30) of electric controlled hoist (1) is gone up the doubly-linked gear (38) with different numbers of teeth is set, and the outer crank (41) of the same retarder of driving lever (40) (30) in the groove (39) between the doubly-linked gear (38) links to each other.
2, building construction hoist according to claim 1, it is characterized in that bont (6) comprises that the bearing (28) of axis (18) is outside equipped with the have serving cylinder (16) of (17), axis (18) end is bracing strut (13), be conjoint disk (14) between bracing strut (13) and the cylinder (16), have in the conjoint disk (14) and axle key (19), the corresponding through hole of positioning groove (20), knock hole (23), has spring (22) in the knock hole (23), fulcrum (24) on driving lever (15) coaxial stents (13) in the ball (21), the outer rim groove (25) of conjoint disk (14) links to each other; One side of conjoint disk (14) is provided with the corresponding latch of same cylinder (16) side groove (27) (26).
3, building construction hoist according to claim 1 is characterized in that the retarder (30) on the base (29) of electric controlled hoist (1) links to each other with the cylinder (31) with serving (2), motor (33) with band-type brake (32) respectively; The fulcrum (44) of damper brake (35) is fixed on the support (45) of base (29), and the front end of the joystick (46) on the fulcrum (44) has the fulcrum (43) of wheel hub (34) brake rubber block (42).
CNU2007200102458U 2007-01-22 2007-01-22 Building construction lifter Expired - Fee Related CN201002909Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200102458U CN201002909Y (en) 2007-01-22 2007-01-22 Building construction lifter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200102458U CN201002909Y (en) 2007-01-22 2007-01-22 Building construction lifter

Publications (1)

Publication Number Publication Date
CN201002909Y true CN201002909Y (en) 2008-01-09

Family

ID=39038450

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200102458U Expired - Fee Related CN201002909Y (en) 2007-01-22 2007-01-22 Building construction lifter

Country Status (1)

Country Link
CN (1) CN201002909Y (en)

Similar Documents

Publication Publication Date Title
CN107522118B (en) A kind of multi-buffer device of electric block
CN202492320U (en) Chain hoist
CN201799603U (en) Transmission device of steel ladle tilting machine
CN201062189Y (en) Rotary material hoister
CN207129879U (en) A kind of electric block over speed protection
CN202337654U (en) Sleeper crane used for railway line overhaul
CN202529752U (en) Telescopic boom crane with counterweight system
CN103332618B (en) Automatic multiplying device for rising power of crane
CN201002909Y (en) Building construction lifter
CN201614223U (en) Double-drum hoisting machine
CN201896050U (en) Gear-driving hinge lifting device
CN2849025Y (en) Hand driven lifting cradle
CN205155091U (en) Free fall is reduction gear for hoist engine
CN204739164U (en) Electric block reduction gear
CN101618821A (en) Double-drum hoisting machine
CN202481929U (en) Planetary driving mechanism of rubber-tired crane
CN201092524Y (en) Bidirectional chain block
CN201343400Y (en) Braking electric block
CN213623040U (en) Self-balancing hoist lifting device
CN202558459U (en) Power driving device for lifting hook
CN203855340U (en) Novel device for lifting cargoes
CN203488097U (en) Novel trailer type water well drilling rig
CN201406296Y (en) Chain hoist
CN209554602U (en) A kind of foot-operated barring gear for elevator lifting
CN206783209U (en) A kind of manual rope cucurbit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080109

Termination date: 20120122