[go: up one dir, main page]

CN200979312Y - Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system - Google Patents

Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system Download PDF

Info

Publication number
CN200979312Y
CN200979312Y CN 200620150125 CN200620150125U CN200979312Y CN 200979312 Y CN200979312 Y CN 200979312Y CN 200620150125 CN200620150125 CN 200620150125 CN 200620150125 U CN200620150125 U CN 200620150125U CN 200979312 Y CN200979312 Y CN 200979312Y
Authority
CN
China
Prior art keywords
well
pipe
water
pump
recharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620150125
Other languages
Chinese (zh)
Inventor
赵树林
王安民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jindadi New Energy Tianjin Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620150125 priority Critical patent/CN200979312Y/en
Application granted granted Critical
Publication of CN200979312Y publication Critical patent/CN200979312Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/40Geothermal heat-pumps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to a recharge well applicable to water source heat pump air conditioning system belonging to water to water type heat pump air conditioning system. The utility model comprises a recharge opposite well and is characterized in that a pipe circuit system arranged on the ground and connecting with the recharge opposite well, the pipe circuit system comprises a conduit pipes, a tificial recharging pipe section of the pump pipe, a splashing recharging pipe section for discharging water, a pooling pipe section, a well port and a sealing device for pump pipe, a cyclonic-liquid desanding filter and a water level pipe. The conduit pipes is connected with the pipe section of the cyclonic-liquid desanding filter by flow pipes, the tificial recharging pipe section of the pump pipe is connected with the splashing recharging pipe section for discharging water by tificial recharging valves of pump pipe and the pump pipe, the splashing recharging pipe section for discharging water is connected with the recharge opposite well, a sealing device is arranged on the upper portion of the well port, a diving pump pipe is arranged on the lower portion of the well port, the lower port of the water level pipe is connected with the well pipe, the upper port is arranged above the ground. The utility model has the advantages of developing and regulating the well port and the pump pipe sealing system, controlling effectively the rising of the water level of the recharge well due to employing the technique of recharging negative pressure and increasing the recharging quantity.

Description

Be applied to adopting in the water resource heat pump waring and cooling air conditioning system and irritate the well ground installation
Technical field
The utility model belongs to water-water type heat pump type air conditioning system, relates in particular to a kind ofly to adopt with pipe well that to irritate underground water be that the adopting in the water resource heat pump waring and cooling air conditioning system that be applied to of medium irritated the well ground installation.
Background technology
Earth source heat pump is a kind of efficient energy-saving water-saving air-conditioning system that heat supply can be freezed again that gets final product of utilizing underground geothermal using resource.Earth source heat pump realizes that by a spot of electric energy of input low-grade energy to the high temperature bit transition, is the thermal source of heat pump heating and the low-temperature receiver of summer air-conditioning in the winter time.Adopting filling underground water with pipe well is medium, is applied to the core technology in water-water type heat pump type air conditioning system.Whole system is mainly divided three parts, outdoor pipe well system, water source heat pump units and indoor end system (fan coil), carry out the transmission of heat by the water heat exchange between three systems, heat transferring medium is a underground water between water resource heat pump and the ground energy, and heat transferring medium is a running water after softening between the constructure heating air-conditioning.By machine set compressor work, force the cold-producing medium compression with low grade heat energy in the underground water winter, and the heat in evaporation, the absorption underground water makes its temperature drop to certain value and recharges underground reservoir again.The heat that unit absorbs is released by the condensation of medium again, and in order to the running water of heating heating system, maximum temperature can reach 45-60 ℃.Summer, unit was done contrary circulation when freezing.Utilize the cooling water of the underground water of inverted well, can improve the operating efficiency of unit greatly, thereby reach energy-conservation effect as unit.Because it is unreasonable to adopt the casing programme of irritating well, great majority are adopted and are irritated the structure that well is still continued to use single filter pipe of recovery well, and the well bore tubing that has adopts the pipe of cement insufficient strength, recharge for a long time or pressure when recharging, break up easily and enclose back-up sand, stratum fine grained blowout is gone in the well, use is recharged in influence; Adopting and irritating well is unsealed uncovered operation, causes the recharge water major part to enter surface layer, and a large amount of recharge waters enter the sewer discharging, cause mining of groundwater unbalance, have a strong impact on the reasonable utilization and the exploitation of groundwater resources.Therefore adopting filling well casing programme and ground installation is the core technology of artificial recharge technology.
The utility model content
The purpose of this utility model is to overcome the defective that above-mentioned technology exists, be applied to adopting in the water resource heat pump waring and cooling air conditioning system and irritate the well ground installation and provide a kind of, irritate the sealing device of extraction system by improving the ground well head, technology such as application of negative pressure recirculation process, under the situation that guarantees two season of summer in winter indoor temperature standard, solved key issue to the well irrigation extraction system in same water-bearing layer comprehensively.
The utility model for achieving the above object, by the following technical solutions: a kind ofly be applied to adopting in the water resource heat pump waring and cooling air conditioning system and irritate the well ground installation, comprise and adopt filling well, it is characterized in that: be installed on the face of land and adopt the pipe-line system that filling is connected to well, described pipe-line system is by waterline, pump line recharges pipeline section, draining is returned and is raised pipeline section, shared pipeline section, well head and pump line sealing device, spinning liquid removes sand filter and surveys water level pipe and form, described waterline is connected with the pipeline section that spinning liquid removes sand filter by flow pipe, pump line recharges pipeline section and recharges valve and pump line and draining by pump line and return and raise pipeline section and be connected, draining is returned and is raised pipeline section and adopt filling well is connected, adopt filling well well head top is connected with sealing device, its underpart connects the diving pump line, survey the water level pipe end opening and be connected suitable for reading placing more than the ground with well casing.Described sealing device mainly contains wellhead flange, rubber cushion, seal disc, water exit elbow, automatic exhaust steam valve, Pressure gauge, thermometer, the described universal flange that is connected with the universal elbow of well head is connected with the well head seal disc, the wellhead flange that the well head seal disc is connected with well casing is tightly connected by seal gasket, the universal elbow of well head is connected with pump line, be equipped with automatic exhaust steam valve, Pressure gauge on the well head seal disc, on the universal elbow of well head pump line pressure vacuum gauge, thermometer be housed.
The beneficial effects of the utility model: development and standard well head and pump line sealing system, adopt the negative pressure recirculation process to control the inverted well water level effectively and rise, improved the amount of recharging, make the average filling amount of adopting reach 45.3m respectively 3/ h (winter) 55.28m 3/ h (summer), maximum is irritated the amount of adopting and is reached 84m 3/ h still has the amount of adopting of filling to increase leeway.Irritate when adopting balance when reaching, the unit amount of recharging reaches 0.504: 1 with the ratio of specific capacity, and individual well self is irritated to adopt and reached 0.74: 1, adopts than improving more than the twice than the filling of the inverted well of static use.
Description of drawings
Fig. 1 is a pipe-line system schematic diagram of the present utility model;
Fig. 2 is the well mouth sealing device structural representation.
The specific embodiment
As shown in the figure, a kind ofly be applied to adopting in the water resource heat pump waring and cooling air conditioning system and irritate the well ground installation, comprise adopt filling to well, be installed on the face of land and adopt the pipe-line system that filling is connected to well, described pipe-line system is recharged pipeline section 2, draining by waterline 1, pump line and is returned and raise pipeline section 3, shared pipeline section 17, well head 4 and pump line sealing device, spinning liquid and remove sand filter and survey water level pipe and form, described waterline is connected with the pipeline section that spinning liquid removes sand filter 5 by flow pipe, and its effect is to carry underground water to source pump.Pump line recharges pipeline section and recharges valve 18 and pump line and draining by pump line and return and raise pipeline section and be connected, and its effect is that the unit discharge water is recharged to underground by pump line.Draining is returned and is raised pipeline section and adopt filling well is connected, and its effect is sewage when initial and the discharging of waste water when pumping up water pulling vacuum with turn on pump.Adopt filling well well head top is connected with sealing device, its underpart connects the diving pump line, sealing device is the special facilities of sealing well head, its effect is except that the passage that water delivery and pump line recharge, it mainly is the sealing well head, prevent to cause when pressure from recharging recharge water excessive, and when the pump line vacuum is recharged, do not leak, keep the vacuum in pump line and the pipeline.Described sealing device mainly contains wellhead flange 6, seal gasket 7, seal disc 8, water exit elbow 9, automatic exhaust steam valve 10, Pressure gauge 11, thermometer 12, the described universal flange 13 that is connected with the universal elbow of well head is connected with well head seal disc 8, the wellhead flange 6 that the well head seal disc is connected with well casing 14 is tightly connected by seal gasket 7, the universal elbow of well head is connected with pump line 15, be equipped with automatic exhaust steam valve, Pressure gauge on the well head seal disc, pump line pressure vacuum gauge 11, thermometer 12 are housed on the universal elbow of well head.Survey water level pipe 16 end openings and be connected suitable for reading placing more than the ground with well casing.Survey the water level pipe end opening and weld 62 millimeters seamless steel pipes of Φ to more than the ground at 140 meters of well casing, so as under the situation of well head sealing the energy measurement water level, check and adopt an important device of irritating under the well duty.Sealing is the key issue that vacuum is recharged in this device.Sealing just can not form vacuum when vacuum is recharged fortunately, just can't utilize siphon principle to produce head difference and recharge, and air is sucked in the water-bearing layer cause the gas phase clogging, and what influence was recharged normally carries out.Vacuum is recharged the position that needs sealing and is mainly contained the Pressure gauge installed on pump pipe union, wellhead flange, gate valve, the pump line, thermometer etc. and connect and form.Vacuum is recharged under the condition that is meant formation-0.1Mpa pressure in pump line, by pump line recharge water is poured into a kind of method in water-bearing layer, down-hole, and its technological process is as follows: recharge in the process in vacuum, abstain from that air enters in the well most.But positive confinement is unapproachable, more or less can leak gas a little when recharging.Should measure vacuum size in the pipeline with vacuum meter.It is generally acknowledged: vacuum is during for-0.06-0.07Mpa, good sealing effect; When vacuum during less than-0.05Mpa, seal degree is poor, should keep in repair mending-leakage immediately.Termination of pumping behind Hui Yang, close by-pass valve control, then vacuum meter shows negative pressure, as not thinking at this moment that less than-0.06Mpa sealing effectiveness is fine, needs to remain unchanged substantially after 8 hours or do not drop to below the 0.05Mpa, just can carry out vacuum and recharge.When recharging, vacuum should note: necessary Hui Yang regularly, and return the time of raising and decide according to the unimpeded situation of inverted well, general one day Hui Yang is once, and is each 20-40 minute, clean to the water sand removal; The amount of recharging should ascendingly increase gradually when the inverted well initial stage used, in order to avoid excessive because of the reverse flow effect, the impact filtration layer causes water flowing not smooth; Adopt filling well is answered annual well-flushing once for irritating to adopt mutually with well, silt up, influence the service life of well to prevent drainage layer accumulative total.Adopt filling well ground installation by improvement, adopt the negative pressure recirculation process to control the inverted well water level effectively and rise, improved the amount of recharging, make the average filling amount of adopting reach 45.3m respectively 3/ h (winter) 55.28m 3/ h (summer), maximum is irritated the amount of adopting and is reached 84m 3/ h still has the amount of adopting of filling to increase leeway.Irritate when adopting balance when reaching, the unit amount of recharging reaches 0.504: 1 with the ratio of specific capacity, and individual well self is irritated to adopt and reached 0.74: 1, adopts than improving more than the twice than the filling of the inverted well of static use.Under the situation that guarantees two season of summer in winter indoor temperature standard, solved key issue to the well irrigation extraction system in same water-bearing layer comprehensively.
The above only is preferred embodiment of the present utility model, is not structure of the present utility model is done any pro forma restriction.Every foundation technical spirit of the present utility model all still belongs in the scope of the technical solution of the utility model any simple modification, equivalent variations and modification that above embodiment did.

Claims (2)

1, a kind ofly be applied to adopting in the water resource heat pump waring and cooling air conditioning system and irritate the well ground installation, comprise and adopt filling well, it is characterized in that: be installed on the face of land and adopt the pipe-line system that filling is connected to well, described pipe-line system is by waterline, pump line recharges pipeline section, draining is returned and is raised pipeline section, shared pipeline section, well head and pump line sealing device, spinning liquid removes sand filter and surveys water level pipe and form, described waterline is connected with the pipeline section that spinning liquid removes sand filter by flow pipe, pump line recharges pipeline section and recharges valve and pump line and draining by pump line and return and raise pipeline section and be connected, draining is returned and is raised pipeline section and adopt filling well is connected, adopt filling well well head top is connected with sealing device, its underpart connects the diving pump line, survey the water level pipe end opening and be connected suitable for reading placing more than the ground with well casing.
2, according to claim 1ly be applied to adopting in the water resource heat pump waring and cooling air conditioning system and irritate the well ground installation, it is characterized in that: described sealing device mainly contains wellhead flange, rubber cushion, seal disc, water exit elbow, automatic exhaust steam valve, Pressure gauge, thermometer, the described universal flange that is connected with the universal elbow of well head is connected with the well head seal disc, the wellhead flange that the well head seal disc is connected with well casing is tightly connected by seal gasket, the universal elbow of well head is connected with pump line, be equipped with automatic exhaust steam valve on the well head seal disc, Pressure gauge is equipped with the pump line pressure vacuum gauge on the universal elbow of well head, thermometer.
CN 200620150125 2006-11-30 2006-11-30 Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system Expired - Lifetime CN200979312Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620150125 CN200979312Y (en) 2006-11-30 2006-11-30 Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620150125 CN200979312Y (en) 2006-11-30 2006-11-30 Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system

Publications (1)

Publication Number Publication Date
CN200979312Y true CN200979312Y (en) 2007-11-21

Family

ID=38979693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620150125 Expired - Lifetime CN200979312Y (en) 2006-11-30 2006-11-30 Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system

Country Status (1)

Country Link
CN (1) CN200979312Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103822403A (en) * 2014-02-19 2014-05-28 潍坊市星河地下水热资源开发科技有限公司 Closed automatic adjustment full recharge system with ground water-source heat pumps and group wells
CN112325511A (en) * 2020-07-26 2021-02-05 万江新能源集团有限公司 Be applied to two condenser systems of screw heat pump host computer
CN119802867A (en) * 2025-03-11 2025-04-11 中国地质调查局水文地质环境地质调查中心 A groundwater stratified energy storage system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103822403A (en) * 2014-02-19 2014-05-28 潍坊市星河地下水热资源开发科技有限公司 Closed automatic adjustment full recharge system with ground water-source heat pumps and group wells
CN112325511A (en) * 2020-07-26 2021-02-05 万江新能源集团有限公司 Be applied to two condenser systems of screw heat pump host computer
CN119802867A (en) * 2025-03-11 2025-04-11 中国地质调查局水文地质环境地质调查中心 A groundwater stratified energy storage system and method

Similar Documents

Publication Publication Date Title
CN105865085B (en) Couple salt water layer forced convertion well formula soil source heat pump system and operation method
CN201866970U (en) Same-floor geothermal energy cyclic utilization system
CN102155823B (en) Cool-heat resource system of three wells for circularly pumping and recharging underground water
CN110307017B (en) Intelligent regulation and control system and method for seepage field of underground water sealed cave depot
CN101458010A (en) Soil source heat pump heating/refrigerating system
CN101153759A (en) Groundwater recharging method for water resource heat pump type central air-conditioner
CN109654581B (en) Season-crossing heat storage composite heating system based on confined aquifer
CN200979312Y (en) Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system
CN202227454U (en) Multifunctional rainwater pump station
CN209131182U (en) A kind of same well geothermal energy resources backflow device
CN100460769C (en) Regional building air-conditioning system for transfer of ocean cooling from coastal subsurface aquifers
CN107419789A (en) The drainage system and water discharge method of the turbine-generator units in the higher river of tailwater level
CN210801483U (en) Underground hot water recycling system
CN115262728A (en) Automatic collection device of domestic sewage negative pressure
CN101825375B (en) A water storage peak regulation decoupling recharge type groundwater source heat pump system
CN216924824U (en) Shallow layer soil source heat pump and sewage source heat pump heating system
CN111795518B (en) Water source side series connection energy-saving water pump system of water source heat pump and control method
CN101418977B (en) Air conditioner energy-conserving method for refrigeration based on underground water, and the system
CN204059461U (en) Surface water water source heat pump central air-conditioning system diafiltration water fetching device
CN201014832Y (en) Anti-corrosion and antiscaling wellhead heat pump unit assembly
CN210292429U (en) Air source and underground frozen earth source heat pump system in severe cold area
CN201322400Y (en) Energy-saving air conditioning system based on underground water refrigeration
CN107606819A (en) Take out and fill well method for arranging and its pumping-injection mode
CN107726422B (en) A pore groundwater circulation heating system with solar energy assisted water source heat pump
CN2695876Y (en) Water-saving anti-freezing solar water heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WANG ANMIN

Free format text: FORMER OWNER: ZHAO SHULIN; PATENTEE

Effective date: 20080808

Owner name: JIN DA DI ENERGY PROJECT TECHNOLOGY CO., LTD., TI

Free format text: FORMER OWNER: WANG ANMIN

Effective date: 20080808

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080808

Address after: Tianjin City, Hexi District Lake Road No. 9 9, zip code: 300060

Patentee after: TIANJIN JINDADI ENERGY ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: Tianjin City, Hexi District Lake Road No. 9 9, zip code: 300060

Patentee before: Wang Anmin

Effective date of registration: 20080808

Address after: Tianjin City, Hexi District Lake Road No. 9 9, zip code: 300060

Patentee after: Wang Anmin

Address before: Tianjin City, Hexi District Lake Road No. 9 9, zip code: 300060

Co-patentee before: Wang Anmin

Patentee before: Zhao Shulin

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Water extraction and filling well ground device for water source heat pump cooling-warming air-conditioning system

Effective date of registration: 20110718

Granted publication date: 20071121

Pledgee: Pudong Shanghai Development Bank Limited by Share Ltd. Tianjin branch

Pledgor: TIANJIN JINDADI ENERGY ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: 2011990000277

C56 Change in the name or address of the patentee

Owner name: GOLDEN EARTH NEW ENERGY (TIANJIN) GROUP CO., LTD.

Free format text: FORMER NAME: TIANJIN JINDADI ENERGY ENGINEERING TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: 300000, A, room 25, building 2, affluent building, west side of Jiefang South Road, Tianjin, Hexi District

Patentee after: GOLDEN EARTH NEW ENERGY (TIANJIN) GROUP CO.,LTD.

Address before: 300060 Tianjin city Hexi District Lake Road No. 9 9

Patentee before: TIANJIN JINDADI ENERGY ENGINEERING TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20150827

Granted publication date: 20071121

Pledgee: Pudong Shanghai Development Bank Limited by Share Ltd. Tianjin branch

Pledgor: GOLDEN EARTH NEW ENERGY (TIANJIN) GROUP CO.,LTD.

Registration number: 2011990000277

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20150827

Registration number: 2011990000277

Pledgor after: GOLDEN EARTH NEW ENERGY (TIANJIN) GROUP CO.,LTD.

Pledgor before: TIANJIN JINDADI ENERGY ENGINEERING TECHNOLOGY Co.,Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 300000, A, room 25, building 2, affluent building, west side of Jiefang South Road, Tianjin, Hexi District

Patentee after: JINDADI NEW ENERGY (TIANJIN) GROUP CO.,LTD.

Address before: 300000, A, room 25, building 2, affluent building, west side of Jiefang South Road, Tianjin, Hexi District

Patentee before: GOLDEN EARTH NEW ENERGY (TIANJIN) GROUP CO.,LTD.

CX01 Expiry of patent term

Granted publication date: 20071121

EXPY Termination of patent right or utility model