CN107606819A - Take out and fill well method for arranging and its pumping-injection mode - Google Patents
Take out and fill well method for arranging and its pumping-injection mode Download PDFInfo
- Publication number
- CN107606819A CN107606819A CN201710679943.5A CN201710679943A CN107606819A CN 107606819 A CN107606819 A CN 107606819A CN 201710679943 A CN201710679943 A CN 201710679943A CN 107606819 A CN107606819 A CN 107606819A
- Authority
- CN
- China
- Prior art keywords
- well
- pumping
- water
- irrigation
- recharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000002347 injection Methods 0.000 title claims 4
- 239000007924 injection Substances 0.000 title claims 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 70
- 238000005086 pumping Methods 0.000 abstract description 67
- 230000002262 irrigation Effects 0.000 abstract description 35
- 238000003973 irrigation Methods 0.000 abstract description 35
- 230000003993 interaction Effects 0.000 abstract description 4
- 239000003621 irrigation water Substances 0.000 abstract description 3
- 230000003111 delayed effect Effects 0.000 abstract 1
- 239000003673 groundwater Substances 0.000 description 10
- 230000035515 penetration Effects 0.000 description 9
- 238000005516 engineering process Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000001816 cooling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 235000014443 Pyrus communis Nutrition 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000003895 groundwater pollution Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000033772 system development Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
本发明提供抽灌井布置方法及其抽灌模式,包括抽水井A、抽水井B、抽水井C、回灌井A、回灌井B、回灌井C、过滤器、流量计、进水管、球阀、集水器、抽水干管、抽水泵、换热器、回灌干管、回灌水泵、分水器、出水管和目标含水层,本发明的抽灌井布置方法及其抽灌模式,通过合理布置抽灌井群间的距离,安排好井群间的相对位置,可以有效延迟或避免热贯通的发生。同时,通过对抽灌井抽灌水量的调节,可有效减缓热交互影响程度,进而提高热泵机组工作效率。
The invention provides a pumping and irrigation well layout method and its pumping and irrigation mode, including a pumping well A, a pumping well B, a pumping well C, a refilling well A, a refilling well B, a refilling well C, a filter, a flow meter, and a water inlet pipe , ball valve, water collector, pumping main pipe, water pump, heat exchanger, recharging main pipe, recharging water pump, water separator, water outlet pipe and target aquifer, the pumping and irrigation well layout method of the present invention and its pumping and irrigation By rationally arranging the distance between pumping and irrigation well groups and arranging the relative positions between well groups, the occurrence of heat breakthrough can be effectively delayed or avoided. At the same time, by adjusting the pumping and irrigation water volume of the pumping and irrigation well, the degree of thermal interaction can be effectively slowed down, thereby improving the working efficiency of the heat pump unit.
Description
技术领域technical field
本发明涉及地源热泵系统技术领域,具体涉及地下水源热泵系统抽灌井的布置方法及其抽灌模式。The invention relates to the technical field of ground source heat pump systems, in particular to a method for arranging pumping and irrigation wells of an underground water source heat pump system and a pumping and irrigation mode thereof.
背景技术Background technique
随着人类资源的日益紧缺和环境问题的日益突出,越来越多的人将目光转向了地下水、土壤等低位可再生能源的开发利用。地下水冷热源系统在冬天代替锅炉或普通空调从土壤和地下水中取热,向建筑物供暖;夏天代替普通空调向土壤和地下水中排热,给建筑物制冷。这种系统因具环保节能等诸多优点而被快速推广运用。地下水源热泵以温度比较稳定的地下水为媒介,通过开采井和回灌井的水路循环实现热交换,其效率系数COP是传统空调的1.5-2.0倍,被公认为节能环保的空调技术。近20年来,地下水源热泵技术在西欧逐渐发展成熟,并与本世纪迅速推广到国内。With the increasing shortage of human resources and the increasingly prominent environmental problems, more and more people are turning their attention to the development and utilization of low-level renewable energy such as groundwater and soil. The groundwater cooling and heat source system replaces boilers or ordinary air conditioners in winter to obtain heat from the soil and groundwater to heat buildings; in summer, it replaces ordinary air conditioners to discharge heat to soil and groundwater to cool buildings. This system has been rapidly popularized and used because of its many advantages such as environmental protection and energy saving. The ground water source heat pump uses groundwater with a relatively stable temperature as the medium, and realizes heat exchange through the water circulation of the extraction well and the recharge well. Its efficiency coefficient COP is 1.5-2.0 times that of the traditional air conditioner, and it is recognized as an energy-saving and environmentally friendly air-conditioning technology. In the past 20 years, groundwater source heat pump technology has gradually developed and matured in Western Europe, and it has been rapidly extended to China in this century.
但是,地下水源热泵系统的实际推广应用还面临着地下水污染、热贯通、地下冷热岛效应、系统的经济性与含水层深度的相互关系等一系列问题。解决上述问题的第一步,便是寻找适合的地质结构和合理布置抽灌井。其中,完成详细的水文地质调查,获取地下含水层温度、深度、水质和出水量数据,抽灌井位置选择和含水层选择的问题可以解决。However, the practical promotion and application of the groundwater source heat pump system still faces a series of problems such as groundwater pollution, heat penetration, underground cold and heat island effect, and the relationship between system economy and aquifer depth. The first step to solve the above problems is to find a suitable geological structure and rationally arrange pumping and irrigation wells. Among them, the completion of detailed hydrogeological surveys, the acquisition of underground aquifer temperature, depth, water quality and water yield data, the location selection of pumping and irrigation wells and the selection of aquifers can be solved.
然而,合理布置抽灌井间位置以避免井之间的热贯通的发生,就比较困难。对于异井回灌式地下水源热泵系统,在抽水井抽水引起的强迫对流作用下,回灌入含水层的回灌水不再以回灌井中心线为圆心均匀分布,而是有了明显的偏移,回灌水团沿抽水后形成的新的渗流场方向被拉长,回灌水团将被消切变扁,呈梨形。再考虑回灌水的热扩散作用,回灌水的“温度锋面”将移动到抽水井附近,进而出现热贯通现象。However, it is more difficult to reasonably arrange the positions between pumping and irrigation wells to avoid the occurrence of thermal penetration between wells. For the different well recharge type ground water source heat pump system, under the action of forced convection caused by the pumping of the pumping well, the recharged water recharged into the aquifer is no longer evenly distributed with the center line of the recharged well as the center of the circle, but has an obvious deviation. The recharge water mass will be elongated along the direction of the new seepage field formed after pumping, and the recharge water mass will be cut and flattened into a pear shape. Considering the heat diffusion effect of recharge water, the "temperature front" of recharge water will move to the vicinity of the pumping well, and then heat penetration will appear.
为延迟或避免热贯通发生,须将抽灌井之间的距离设置的足够远,而实际工程中场地范围是确定的,因此必须安排好抽灌井间的相对位置,实现有限工程场地范围内抽灌井布置的相对“紧凑”,同时选择适合的井群抽灌模式,最大限度的延迟和减缓热贯通及热交互影响程度,从现有地下水冷热源系统开发模式可以发现,回灌困难和热贯通问题成了该技术推广的两大瓶颈,一方面,需要对各模式的高效、长期运行进行进一步的研究改进;另一方面,亟需对地下换热系统抽水和回灌模式进行进一步研究,探讨长期高效稳定运行的新模式。In order to delay or avoid the occurrence of heat penetration, the distance between the pumping and irrigation wells must be set far enough, and the site range in the actual project is determined, so the relative positions between the pumping and irrigation wells must be arranged to achieve a limited project site range. The layout of pumping and irrigation wells is relatively "compact", and at the same time, select the appropriate well group pumping and irrigation mode to delay and slow down the degree of heat penetration and thermal interaction to the greatest extent. It can be found from the existing groundwater cooling and heat source system development model that recharge is difficult The problem of heat penetration and heat penetration has become the two bottlenecks in the promotion of this technology. On the one hand, further research and improvement on the high-efficiency and long-term operation of each mode are needed; Research to explore a new model for long-term efficient and stable operation.
发明内容Contents of the invention
本发明为了弥补现有技术的不足,提供了一种地下水源热泵系统抽灌井的布置方法及其抽灌模式。In order to make up for the deficiencies in the prior art, the present invention provides a method for arranging pumping and irrigation wells of an underground water source heat pump system and a pumping and irrigation mode thereof.
本发明是通过如下技术方案实现的:The present invention is achieved through the following technical solutions:
抽灌井布置方法及其抽灌模式,包括目标含水层,目标含水层一端设置有抽水井A、抽水井B和抽水机C,目标含水层另一端设置回灌井A、回灌井B和回灌井C,抽水井A、抽水井B、抽水机C、回灌井A、回灌井B和回灌井C由下至上均设置有过滤器和流量计。The arrangement method of pumping and irrigation wells and their pumping and irrigation modes, including the target aquifer, where pumping well A, pumping well B and pump C are set at one end of the target aquifer, and reinjection well A, reinjection well B and recharge well are set at the other end of the target aquifer. Filling well C, pumping well A, pumping well B, water pump C, reinjection well A, reinjection well B and reinjection well C are all equipped with filters and flow meters from bottom to top.
本发明的抽灌井布置方法及其抽灌模式,所述抽水井A、抽水井B和抽水机C上端水平安装有进水管,回灌井A、回灌井B和回灌井C上水平安装有出水管,进水管和出水管上均设置有球阀。The pumping and irrigation well arrangement method and the pumping and irrigation mode of the present invention, the water inlet pipes are installed horizontally on the upper ends of the pumping wells A, B and C, and the reinjection wells A, B and C are installed horizontally There is a water outlet pipe, and ball valves are arranged on the water inlet pipe and the water outlet pipe.
本发明的抽灌井布置方法及其抽灌模式,所述进水管另一端设置有集水器,集水器的另一端连接有抽水干管,抽水干管上安装有抽水泵,抽水干管另一端连接有换热器,换热器另一端设置有回灌干管,回灌干管上安装有回灌水泵,回灌干管的另一端连接有分水器,分水器另一端连接与出水管上。In the arrangement method of pumping and irrigation wells and the pumping and irrigation mode of the present invention, the other end of the water inlet pipe is provided with a water collector, and the other end of the water collector is connected with a main pumping pipe, and a pump is installed on the main pumping pipe, and the main pumping pipe The other end is connected to a heat exchanger, and the other end of the heat exchanger is provided with a recharge main pipe, and a recharge water pump is installed on the recharge main pipe. The other end of the recharge main pipe is connected to a water separator, and the other end of the water separator is connected to with the outlet pipe on.
本发明的抽灌井布置方法及其抽灌模式,所述抽水井A、抽水井B和抽水机C呈三角分布。In the pumping and irrigation well arrangement method and the pumping and irrigation mode of the present invention, the pumping well A, the pumping well B and the water pump C are distributed in a triangle.
本发明的抽灌井布置方法及其抽灌模式,所述回灌井A、回灌井B和回灌井C呈三角分布。In the pumping and irrigation well arrangement method and the pumping and irrigation mode of the present invention, the reinjection well A, the reinjection well B and the reinjection well C are distributed in a triangle.
本发明的有益效果是:The beneficial effects of the present invention are:
本发明的抽灌井布置方法及其抽灌模式,通过合理布置抽灌井群间的距离,安排好井群间的相对位置,可以有效延迟或避免热贯通的发生。同时,通过对抽灌井抽灌水量的调节,可有效减缓热交互影响程度,进而提高热泵机组工作效率。The arrangement method of the pumping and irrigation wells and the pumping and irrigation mode of the present invention can effectively delay or avoid the occurrence of heat penetration by reasonably arranging the distance between the pumping and irrigation well groups and arranging the relative positions between the well groups. At the same time, by adjusting the pumping and irrigation water volume of the pumping and irrigation well, the degree of thermal interaction can be effectively slowed down, thereby improving the working efficiency of the heat pump unit.
附图说明Description of drawings
下面结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.
图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图中,1抽水井A;2抽水井B;3抽水井C;4回灌井A;5回灌井B;6回灌井C;7过滤器;8流量计;9进水管;10球阀;11集水器;12抽水干管;13抽水泵;14换热器;15回灌干管;16回灌水泵;17分水器;18出水管;19目标含水层。In the figure, 1 pumping well A; 2 pumping well B; 3 pumping well C; 4 refilling well A; 5 refilling well B; 6 refilling well C; 7 filter; 8 flowmeter; 9 water inlet pipe; ; 11 water collector; 12 water main pipe; 13 water pump; 14 heat exchanger; 15 recharge main pipe; 16 recharge pump; 17 water separator;
具体实施方式detailed description
附图为本发明的一种具体实施例。该实施例包括目标含水层19,目标含水层19一端设置有抽水井A1、抽水井B2和抽水机C3,目标含水层19另一端设置回灌井A4、回灌井B5和回灌井C6,抽水井A1、抽水井B2、抽水机C3、回灌井A4、回灌井B5和回灌井C6由下至上均设置有过滤器7和流量计8,抽水井A1、抽水井B2和抽水机C3上端水平安装有进水管9,回灌井A4、回灌井B5和回灌井C6上水平安装有出水管18,进水管9和出水管18上均设置有球阀10,进水管9另一端设置有集水器11,集水器11的另一端连接有抽水干管12,抽水干管12上安装有抽水泵13,抽水干管12另一端连接有换热器14,换热器14另一端设置有回灌干管15,回灌干管15上安装有回灌水泵16,回灌干管15的另一端连接有分水器17,分水器17另一端连接与出水管18上,抽水井A1、抽水井B2和抽水机C3呈三角分布,回灌井A4、回灌井B5和回灌井C6呈三角分布。Accompanying drawing is a kind of specific embodiment of the present invention. This embodiment comprises target aquifer 19, and one end of target aquifer 19 is provided with pumping well A1, pumping well B2 and water pump C3, and the other end of target aquifer 19 is provided with recharge well A4, recharge well B5 and recharge well C6, pumping Water well A1, pumping well B2, water pump C3, reinjection well A4, reinjection well B5 and reinjection well C6 are equipped with filters 7 and flowmeters 8 from bottom to top, and the upper ends of pumping well A1, pumping well B2 and pump C3 are horizontal Water inlet pipe 9 is installed, and water outlet pipe 18 is horizontally installed on recharge well A4, recharge well B5 and recharge well C6, and ball valve 10 is all arranged on water inlet pipe 9 and water outlet pipe 18, and the other end of water inlet pipe 9 is provided with collector The water tank 11, the other end of the water collector 11 is connected with a water main pipe 12, the water pump 13 is installed on the water main pipe 12, the other end of the water main pipe 12 is connected with a heat exchanger 14, and the other end of the heat exchanger 14 is provided with The recharge main pipe 15 is installed with a recharge water pump 16, the other end of the recharge main pipe 15 is connected to a water separator 17, and the other end of the water separator 17 is connected to the outlet pipe 18, and the pumping well A1 , the pumping well B2 and the water pump C3 are in a triangular distribution, and the reinjection well A4, the reinjection well B5 and the reinjection well C6 are in a triangular distribution.
本发明的抽灌井布置方法及其抽灌模式,通过合理布置抽灌井群间的距离,安排好井群间的相对位置,可以有效延迟或避免热贯通的发生。同时,通过对抽灌井抽灌水量的调节,可有效减缓热交互影响程度,进而提高热泵机组工作效率。The arrangement method of the pumping and irrigation wells and the pumping and irrigation mode of the present invention can effectively delay or avoid the occurrence of heat penetration by reasonably arranging the distance between the pumping and irrigation well groups and arranging the relative positions between the well groups. At the same time, by adjusting the pumping and irrigation water volume of the pumping and irrigation well, the degree of thermal interaction can be effectively slowed down, thereby improving the working efficiency of the heat pump unit.
以上对本发明的具体实施进行了详细描述,但是只是作为一个范例,本发明并不限制于以上描述的具体实施案例,对本发明进行的等同修改也在本发明的保护范围之内。The specific implementation of the present invention has been described in detail above, but only as an example, the present invention is not limited to the specific implementation cases described above, and equivalent modifications to the present invention are also within the protection scope of the present invention.
Claims (3)
- Well method for arranging and its pumping-injection mode are filled 1. taking out, including target water-bearing layer(19), it is characterised in that:Target water-bearing layer(19) One end is provided with pumped well A (1), pumped well B(2)With water pumper C(3), target water-bearing layer(19)The other end sets inverted well A (4), inverted well B(5)With inverted well C(6), pumped well A (1), pumped well B(2), water pumper C(3), inverted well A(4), inverted well B(5)With inverted well C(6)Filter is provided with from the bottom to top(7)And flowmeter(8);The pumped well A (1), pumped well B(2)With water pumper C(3)Upper end is horizontally installed with water inlet pipe(9), inverted well A(4)、 Inverted well B(5)With inverted well C(6)On be horizontally installed with outlet pipe(18), water inlet pipe(9)And outlet pipe(18)On be provided with Ball valve(10);The water inlet pipe(9)The other end is provided with water collector(11), water collector(11)The other end be connected with the main that draws water(12), Draw water main(12)On suction pump is installed(13), draw water main(12)The other end is connected with heat exchanger(14), heat exchanger(14) The other end is provided with recharge main(15), recharge main(15)On recharge water pump is installed(16), recharge main(15)It is another End is connected with water knockout drum(17), water knockout drum(17)The other end connects and outlet pipe(18)On.
- 2. as claimed in claim 1 take out fills well method for arranging and its pumping-injection mode, it is characterised in that:Pumped well A (1), draw water Well B(2)With water pumper C(3)In angular distribution.
- 3. as claimed in claim 1 take out fills well method for arranging and its pumping-injection mode, it is characterised in that:Inverted well A(4), recharge Well B(5)With inverted well C(6)In angular distribution.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710679943.5A CN107606819A (en) | 2017-08-10 | 2017-08-10 | Take out and fill well method for arranging and its pumping-injection mode |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710679943.5A CN107606819A (en) | 2017-08-10 | 2017-08-10 | Take out and fill well method for arranging and its pumping-injection mode |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107606819A true CN107606819A (en) | 2018-01-19 |
Family
ID=61065212
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710679943.5A Pending CN107606819A (en) | 2017-08-10 | 2017-08-10 | Take out and fill well method for arranging and its pumping-injection mode |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107606819A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110360851A (en) * | 2019-07-18 | 2019-10-22 | 重庆大学 | Cooling tower systems based on air through tunnel cooling |
| CN111609576A (en) * | 2020-06-12 | 2020-09-01 | 东北石油大学 | A device for realizing synchronous exploitation and recharging of geothermal water by using abandoned oil wells |
-
2017
- 2017-08-10 CN CN201710679943.5A patent/CN107606819A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110360851A (en) * | 2019-07-18 | 2019-10-22 | 重庆大学 | Cooling tower systems based on air through tunnel cooling |
| CN111609576A (en) * | 2020-06-12 | 2020-09-01 | 东北石油大学 | A device for realizing synchronous exploitation and recharging of geothermal water by using abandoned oil wells |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105865085A (en) | Coupled saline water layer forced convection well type ground-source heat pump system and operation method | |
| CN110017241A (en) | A kind of coalfield mine hydroelectric generation and heat-exchange system | |
| CN202630513U (en) | Buried pipe heat exchanger for energy-saving ground source heat pump | |
| CN209926635U (en) | Enhanced underground heat exchanger comprehensive utilization system | |
| CN105841222A (en) | Solar heat supply system based on cross-seasonal water body heat storage | |
| CN203964413U (en) | A kind of solar heat-preservation heating system | |
| CN201724469U (en) | Ground water source heat pump system coupled with water storage and peak regulation pool | |
| CN110410131A (en) | A Mine Heat Hazard Control and Comprehensive Utilization System | |
| CN107606819A (en) | Take out and fill well method for arranging and its pumping-injection mode | |
| CN201066219Y (en) | Down-hole heat exchanger heat pump system | |
| CN109654581A (en) | A kind of Combined heating system of the cross-season heat-storage based on artesian aquifer | |
| CN208238300U (en) | It is a kind of novel mostly into single vertical ground heat exchanger of centralized water return out | |
| CN202304105U (en) | Vertical double S-shaped underground heat exchanger for ground source heat pump | |
| CN205593045U (en) | Solar heating supply system based on stride water heat -retaining in season | |
| CN206113383U (en) | Well deep geotherm gets thermal system in pit | |
| CN205448406U (en) | Geothermal energy collection system connecting device | |
| CN210801483U (en) | Underground hot water recycling system | |
| CN204388428U (en) | Lithic drainage is unified soil source system mixed heat transfer system | |
| CN202869060U (en) | Geothermal energy synergistic type heat-exchanging device | |
| CN2632588Y (en) | Vertical soil heat exchanger with double circuit | |
| CN208846521U (en) | Solar cross-season accumulation of energy and earth source heat pump combined heating system | |
| CN202770056U (en) | Heating, cooling and hot spring bathing device utilizing terrestrial heat and ground source heat pump | |
| CN102661636A (en) | Intermittent well control method for pumping-injecting well groups by pumping and recharging in different wells | |
| CN209279417U (en) | A kind of high efficiency levels screw type ground heat exchanger | |
| CN204494908U (en) | A kind of soil source heat pump system from environment heat-obtaining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180119 |
|
| WD01 | Invention patent application deemed withdrawn after publication |