CN206477819U
CN206477819U CN201621158745.1U CN201621158745U CN206477819U CN 206477819 U CN206477819 U CN 206477819U CN 201621158745 U CN201621158745 U CN 201621158745U CN 206477819 U CN206477819 U CN 206477819U
Authority
CN
China
Prior art keywords
plugging
grouting
capsule
borehole
plugging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621158745.1U
Other languages
English (en)
Inventor
王东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201621158745.1U priority Critical patent/CN206477819U/zh
Application granted granted Critical
Publication of CN206477819U publication Critical patent/CN206477819U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本实用新型公开了一种钻孔承压水快速封堵装置,包括注浆装置和封堵装置,所述注浆装置是用于向封堵装置提供速凝水泥浆,所述封堵装置是由注浆管和封堵胶囊组成的,注浆管的顶端通过螺纹连接器连接爪块,注浆管与封堵胶囊连接的部分分布注浆孔,封堵胶囊分为上下两个封堵胶囊,每个封堵胶囊的两端都放置一个托盘。本实用新型尤其特别适用于承压水水压较大的钻孔,通过上下两个封堵胶囊对钻孔进行封堵,封堵效果好;结构简单、可操作性强、适于推广。

Description

一种钻孔承压水快速封堵装置
技术领域
本实用新型属于矿井水灾防治领域,具体涉及一种钻孔承压水快速封堵装置。
背景技术
随着采矿工程、隧道工程等地下工程的日益增多,巷道突水事故时有发生,造成大量经济损失,为防止突水事故的发生,需要在掘进面超前水平进行钻孔探水,但是一旦钻至承压水层,当拔出钻杆后,承压水就会通过钻孔喷射出来,必须要将此钻孔封堵住。以往出现此现象,通常情况下采用堆砌沙包、注射混凝土或者用锥形木头进行封堵,这些封堵方法费时费工不经济,并且封堵效果比较差,一般还会需要后续封堵工作,如何快速高效的对钻孔进行封堵,仍然是一个问题。
发明内容
本实用新型的目的是根据上述现有技术的不足,提供了一种钻孔承压水快速封堵装置,通过上下两个封堵胶囊对钻孔进行封堵,封堵效果好,并且结构简单、操作方便。
本实用新型目的的实现由以下技术方案完成:一种钻孔承压水快速封堵装置,包括注浆装置和封堵装置,所述注浆装置是用于向封堵装置提供速凝水泥浆,所述封堵装置是由注浆管和封堵胶囊组成的,所述注浆管与封堵胶囊连接的部分分布注浆孔,所述注浆管顶端连接有爪块,所述封堵胶囊分为上下两个封堵胶囊。
上述的一种钻孔承压水快速封堵装置,其特征在于注浆管和爪块是通过螺纹连接管相连,可随意更换各种型号爪块适应不同钻孔直径和钻孔岩性。
上述的一种钻孔承压水快速封堵装置,其特征在于注浆孔在上下两段封堵胶囊的位置偏移90度,以此达到通过旋转注浆管控制向上下两段封堵胶囊注浆顺序的效果。
上述的一种钻孔承压水快速封堵装置,其特征在于封堵胶囊的两端均固定一个托盘,起到固定胶囊的作用,防治胶囊充填膨胀后发生偏移。
本实用新型提出了一种钻孔承压水快速封堵装置,其通过向封堵胶囊注射速凝水泥浆使胶囊膨胀凝固以达到封堵承压水钻孔的效果。与现有技术不同之处在于,一方面此次胶囊内部注射的为速凝水泥,水泥凝固后可永久封堵突水钻孔。另一方面采用上下两段封堵胶囊,且注浆时间有间隔,这样使封堵效果更佳。
附图说明
图1为本实用新型一种钻孔承压水快速封堵装置示意图。
图2为本实用新型使用过程示意图。
图中,1、上段封堵胶囊;2、下段封堵胶囊;3、爪块;4、注浆孔;5、阀门;6、注浆管;7、螺纹连接管;8、螺纹活接头;9、托盘;10、注浆泵;11、阀门;12、压力表; 13、储浆罐;14、阀门;15、管路。
具体实施方式
本实用新型展示了一种钻孔承压水快速封堵装置,为了使本实用新型的优点、技术方案更加清楚明确,结合下面具体实施方式对本实用新型进一步清楚、完整的说明。
如图1所示,一种钻孔承压水快速封堵装置,其由注浆装置和封堵装置组成,注浆装置是用于向封堵装置提供速凝水泥浆,封堵装置是由注浆管6、上段封堵胶囊1和下段封堵胶囊2组成的,注浆管6与上段封堵胶囊1和下段封堵胶囊2连接的部分分布注浆孔4,注浆管6顶端经螺纹连接管7与爪块3相连,上段封堵胶囊1和下段封堵胶囊2的两端均固定有托盘9。
使用时,首先选取合适型号的爪块3经螺纹连接管7与注浆管6相连,然后将封堵装置整体放入突水的钻孔中,利用注浆管6顶端的爪块3插入孔壁围岩作为支点,然后将速凝水泥浆放入储浆罐13中,依次打开阀门14、11、5,通过注浆泵10经管路15向封堵装置注射水泥浆,注浆过程中时刻观察压力表12,防止压力过大使封堵胶囊破裂,首先进行注浆的是下段封堵胶囊2,待到下段封堵胶囊2充满水泥浆且凝固后,将注浆管旋转90度对上段封堵胶囊1进行注浆,直至上段封堵胶囊充满水泥浆后关闭阀门5,待到上段封堵胶囊1内水泥浆全部凝固后旋转螺纹活接头,将注浆管6与管路15分离,最后清洗注浆管路及设备以备下次使用。
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。

Claims (4)

1.一种钻孔承压水快速封堵装置,包括注浆装置和封堵装置,所述注浆装置是用于向封堵装置提供速凝水泥浆,所述封堵装置是由注浆管和封堵胶囊组成的,所述注浆管与封堵胶囊连接的部分分布注浆孔,所述注浆管顶端连接有爪块,所述封堵胶囊分为上下两个封堵胶囊。
2.根据权利要求1所述的一种钻孔承压水快速封堵装置,其特征在于:所述注浆管和爪块是通过螺纹连接管相连。
3.根据权利要求1所述的一种钻孔承压水快速封堵装置,其特征在于:所述注浆孔在上下两段封堵胶囊的位置偏移90度。
4.根据权利要求1所述的一种钻孔承压水快速封堵装置,其特征在于:所述封堵胶囊的两端均固定一个托盘。
CN201621158745.1U 2016-11-01 2016-11-01 一种钻孔承压水快速封堵装置 Expired - Fee Related CN206477819U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621158745.1U CN206477819U (zh) 2016-11-01 2016-11-01 一种钻孔承压水快速封堵装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621158745.1U CN206477819U (zh) 2016-11-01 2016-11-01 一种钻孔承压水快速封堵装置

Publications (1)

Publication Number Publication Date
CN206477819U true CN206477819U (zh) 2017-09-08

Family

ID=59756529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621158745.1U Expired - Fee Related CN206477819U (zh) 2016-11-01 2016-11-01 一种钻孔承压水快速封堵装置

Country Status (1)

Country Link
CN (1) CN206477819U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281638A (zh) * 2018-11-27 2019-01-29 杭州东升建设工程有限公司 钻孔承压水同步排水注浆封堵装置及封堵方法
CN114525760A (zh) * 2022-01-22 2022-05-24 郑州大学 一种便捷式高聚物突涌水封堵装置及方法
CN116498250A (zh) * 2023-06-13 2023-07-28 中铁四局集团有限公司 一种钻孔承压水同步排水注浆封堵装置
CN116950105A (zh) * 2023-07-04 2023-10-27 上海市基础工程集团有限公司 一种结合固化胶囊的降压井封堵装置及方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281638A (zh) * 2018-11-27 2019-01-29 杭州东升建设工程有限公司 钻孔承压水同步排水注浆封堵装置及封堵方法
CN114525760A (zh) * 2022-01-22 2022-05-24 郑州大学 一种便捷式高聚物突涌水封堵装置及方法
CN114525760B (zh) * 2022-01-22 2024-05-28 郑州大学 一种便捷式高聚物突涌水封堵装置及方法
CN116498250A (zh) * 2023-06-13 2023-07-28 中铁四局集团有限公司 一种钻孔承压水同步排水注浆封堵装置
CN116950105A (zh) * 2023-07-04 2023-10-27 上海市基础工程集团有限公司 一种结合固化胶囊的降压井封堵装置及方法

Similar Documents

Publication Publication Date Title
CN104533452B (zh) 一种煤矿井下破碎煤体分段式注浆加固方法
CN106381863B (zh) 对富水沙层注浆加固的钻注复合装置及施工工艺
CN103758533B (zh) 一种高低压一体化巷道注浆加固方法
CN110259383A (zh) 一种前进式钻注一体装置及使用方法
CN102561992A (zh) 一种变形止水器及采用该变形止水器的注浆封堵工艺
CN206477819U (zh) 一种钻孔承压水快速封堵装置
CN110439497A (zh) 钻孔多段封堵、致裂、注浆、注水一体化设备及使用方法
CN103244071A (zh) 地下储气库老井封堵方法
CN104775787A (zh) 一种破碎围岩水力压裂穿层钻孔上仰孔封孔方法
CN110424892A (zh) 一种矿井近水平定向钻孔的突水治理方法
CN201129184Y (zh) 小导管外阀单向式分段后退注浆装置
CN103993902A (zh) 一种瓦斯抽采钻孔两步注浆封孔方法
CN103089276A (zh) 深浅孔与高低压耦合注浆工艺
CN207145003U (zh) 用于采空区注浆充填的一次性永久止浆塞
CN104948133B (zh) 一种适合高压大流量钻孔涌水的注浆封堵装置及其工艺
CN105421475A (zh) 一种气囊式帷幕渗漏堵漏装置和方法
CN204457590U (zh) 一种封孔注浆装置
CN106437612A (zh) 顺层瓦斯抽采钻孔封孔方法及其封孔结构
CN204252934U (zh) 工程地质钻孔堵漏装置
CN109098750B (zh) 一种井下瓦斯抽采孔兼作煤层注水孔的装置及施工方法
CN107489399A (zh) 一种适用于煤矿床的封闭不良钻孔井下反向注浆封堵工艺
CN103382850A (zh) 一种顶板裂隙水导出装置和方法
CN205908279U (zh) 一种注浆封孔装置
CN102797448B (zh) 后退分段式水力致裂方法
CN104564105A (zh) 一种煤层底板注浆加固二级套管的装置和方法

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908