CN1833079A - Beam attachment system - Google Patents
Beam attachment system Download PDFInfo
- Publication number
- CN1833079A CN1833079A CNA2004800227880A CN200480022788A CN1833079A CN 1833079 A CN1833079 A CN 1833079A CN A2004800227880 A CNA2004800227880 A CN A2004800227880A CN 200480022788 A CN200480022788 A CN 200480022788A CN 1833079 A CN1833079 A CN 1833079A
- Authority
- CN
- China
- Prior art keywords
- rope
- bar
- attachment system
- beams
- accessory system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2466—Details of the elongated load-supporting parts
- E04B2001/2472—Elongated load-supporting part formed from a number of parallel profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2487—Portico type structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B2001/3583—Extraordinary methods of construction, e.g. lift-slab, jack-block using permanent tensioning means, e.g. cables or rods, to assemble or rigidify structures (not pre- or poststressing concrete), e.g. by tying them around the structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Rod-Shaped Construction Members (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
- Led Device Packages (AREA)
- Flanged Joints, Insulating Joints, And Other Joints (AREA)
- Auxiliary Devices For And Details Of Packaging Control (AREA)
- Braking Arrangements (AREA)
- Variable-Direction Aerials And Aerial Arrays (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明涉及一种梁的附件系统(1),包括两个柱子(5a,5b),一个梁(3b)和至少一个梁索(9a,9b)。所述柱子由梁(3b)对其施压为了使其分离,由梁索(9a,9b)对其施压为了使其相对靠近。
The invention relates to a beam attachment system (1), comprising two columns (5a, 5b), a beam (3b) and at least one beam cable (9a, 9b), wherein the columns are pressed by the beam (3b) to be separated and by the beam cables (9a, 9b) to be relatively close.
Description
Technical field
The present invention relates to the accessory system of beam, in particular for the long span beam.
Background technology
Beam, especially long span beam are having various uses aspect the structure of building and the engineering structures, particularly on longspan structure.Said structure for example is garage, megastore, airplane shed, the centre of motion, large-scale or high-lager building, parking lot, bridge and pedestrian bridge.
FR2611781 has disclosed a kind of the guarantee system that supports and the accessory system of long span beam.This annex is supported by metallic support rod, and each bar has at least a supporting leg member, and it is connected on the connecting axle that combines with corresponding bar pivot axle than end portion.The higher end of this supporting leg member has a kind of both wings raceway groove, and it carries a kind of angle stiffener that combines by the end of contact member and a kind of long span beam.By means of this system, the vertical transfer that is added on the beam gravity is the support force on the axle that acts on the respective leg member.Above-mentioned power produce conversely a kind of level longitudinally pressure act on the corresponding long span beam, support a kind of building.
The gravity of beam on the axle of leg member, applies power to the bar that is connected on the beam by the holding power transferance, pushes them open separation.This meaning holding power has applied a kind of moment on bar.When wanting to increase the span of beam, a kind of may be the longitudinal pressure that increases on the beam, causes the increase of moment in the increase of beam upward pressure, and the additonal pressure that just is applied on the bar has increased.When the limit of the bending power that surpasses bar, the increase on the moment can cause the distortion of bar successively, as bending, warpage or break.The distortion of bar injures the stability of accessory system.Based on more reason, breaking of beam obviously is unfavorable.
Summary of the invention
Therefore, need a kind of existence of accessory system of beam, making increases the span of beam and keeps the stability of system to become possibility.
The accessory system that a kind of scheme of the present invention is a kind of beam comprises two kinds of bars, and a kind of beam and at least a beam rope wherein promote bar separately and by the beam rope bar drawing to be exerted pressure to bar by beam.
In a preferred embodiment, the present invention includes the following characteristics of one or more:
Beam is connected with the beam rope;
Beam and beam rope are provided in a kind of relative slip of sliding area of regulation;
The sliding area that sleeve pipe limits regulation is set on the beam rope;
Beam comprises at least two flank parts (lateral parts), forms a kind of beam rope passage between two flanks;
Beam is supported by the beam rope;
Beam comprises several intercepts longitudinally;
Each bar is connected with beam by a kind of connecting rod device, and an end of described connecting rod is connected with the bar pivot axle of tie-beam, and the other end is connected with beam;
A kind of bar wherein is a side rod.
Description of drawings
Further feature and advantage of the present invention will be carried out clearer elaboration in the following detailed description, the feature and advantage of embodiments of the invention only provide by way of example and to the reference of accompanying drawing, referring to:
Fig. 1: the sketch of this accessory system of the present invention;
Fig. 2: the cross sectional top view on the top of a kind of bar that expression is connected with two beams by connecting rod;
Fig. 3: the vertical view of parts among Fig. 2;
Fig. 4: the part elevation of a beam rope that is fixed on the terminal position of the end of a bar and a beam;
Fig. 5: view in transverse section in a kind of center of beam;
Fig. 6: along the longitudinal component of beam, the fragmentary sectional view of heart position therein;
Fig. 7: expression plans to be arranged on the elevation of the beam in the accessory system;
The specific embodiment
The accessory system that the invention provides a kind of beam comprises two kinds of bars, and a kind of beam and at least a beam rope wherein promote bar separately and by the beam rope bar drawing to be exerted pressure to bar by beam.Described beam rope to small part remedies by beam and is applied to pressure on the bar.This system makes to be increased the span of beam and keeps the stability of this system to become possibility.
Fig. 1 is the sketch of the present invention at described accessory system.The figure shows a kind of side rod 14 and a plurality of bar 5a, 5b, beam 3a, 3b, 3c and beam rope 9a, 9b, 9c.Described bar 5a, 5b are buried in (that is, in ground) in the ground 4, form a kind of metal frame that is used as the accessory system of beam.Common Reference numeral 3 expression beams, numeral 9 expression beam ropes, the frame bars of numeral 5 expressions except that side rod.The additional alphabetical a of reference, b, the different sections of c representational framework.A beam connects between two bars by support system, and this support system will describe in detail below.Described beam rope is a kind of device that is used for bearing tractive force in the system, and for example it can be fixed on the end of bar and make with the form of hawser or the bar (shaft) tightened.Described beam accessory system 1 is according to two bar 5a, 5b, a beam 3b and at least one beam rope 9b of comprising of the present invention.Described beam is positioned under the pressure, described beam rope and bar 5a, at least one connection among the 5b, two bar 5a thus, 5b by the beam 3b application of force with they push open separate and by the beam rope 9b application of force with they drawings.The power that the beam rope applies to small part has remedied beam and has imposed on the moment of bar and make the longitudinal force of beam produce increase therefrom.Therefore, this system produces following possibility, on the one hand, increases the span of beam, on the other hand, offsets the partial pressure that is applied on the bar.Therefore, described spare system also may keep the stability of this system.
Fig. 2 is that the master on the top of a kind of bar of being connected with two beams by connecting rod of expression looks cross-sectional view.This figure shows a bar 5a, two beam 3a and 3b, 17, two connecting rod 13a of a vertical fastener, 13b, two distributing plate 19a, 19b and two beam rope 9a, 9b.Above-mentioned every couple of device a, a is positioned at the left side of bar 5a one of among the b, and device in addition is positioned at the right side.In this example, bar 5a imbeds ground 4, especially in ground.As a kind of distortion, it also can be pivotally connected to the ground place.Bar 5a passes through connecting rod 13a, 13b and beam 3a, and 3b connects.Connecting rod 13a, 13b are on the one hand pivotally connected with beam link and bar 5a at bar 5a, the while on the other hand with beam 3a, 3b is pivotally connected.The pivotally connected pivot connector 14a that passes through at bar 5a level place, 14b realizes.Perhaps as a kind of distortion, by a kind of connection.Pivotally connected by strut angle 18a with beam, 18b realizes.A kind of angle stiffening device and strut angle 18a, 18b connects pivotally connected to constitute.For example, the angle stiffening device is with distributing plate 19a, and the form of 19b shows.This distributing plate is fixed in beam 3a, and 3b makes and supports this beam on the one hand, disperses the support force of beam 3 to become possibility on the other hand.Two beam rope 9a, 9b are individually fixed in the right and left of bar 5a end.
According to another alternate embodiment, only beam rope is fixed in the end of bar 5a.Identical beam rope is extensible to the structure that comprises several bars.Such structure helps disperseing and absorbing these pressure.This can make this structure that adhesion is preferably arranged.
As described below, beam rope to small part collapses into beam.Two beams are further strengthened by two attachment fasteners that are positioned at the beam two ends at the fixing of connecting rod 5a end.Description with reference to Fig. 3 will be more clear.
Fig. 3 is the vertical view of device among Fig. 2.Each beam 3a, 3b have two flank parts, are expressed as 3aG, 3aD, 3bG and 3bD in Fig. 3 respectively.Two flanks part is by retaining element 20a, 20b, and as bolt, assembling and being connected.As shown in Figure 2, these retaining elements pass distributing plate 19a, 19b.And these distributing plates are because by beam rope 9a, 9b covers and can not show in Fig. 3.By retaining element 17G, 17D clamps in the port for flank part 3aG, 3aD, 3bG, 3bD, and is crooked with the flank part that prevents beam.Retaining element 16 locks clamped beam 3a, the retaining element 17 of 3b in addition.Passage 15a, 15b are formed between two flank section divide, and make beam rope 9a, and 9b is present in the passage.The section of Half Beam so design so that finish the assembling of two Half Beams after, passage 15a, 15b form groove and make beam rope 9a, 9b is arranged at wherein.Like that, beam rope 9a, 9b can collapse into beam may protect beam, as in fire to small part.Among Fig. 3, two beam rope 9a, 9b is fixed in the port of bar 5a.
Fig. 4 is the partial elevation view of beam rope that is fixed in the afterbody of the end of bar and a beam.Shown beam rope 9b among the figure, the end of bar 5a, the tensioner 23b of beam 3b and beam rope 9b.23b is used for regulating the tension force of beam rope 9b, as at mounting rail 3b to bar and after tie-beam rope and the beam.
Fig. 5 is the cross section of beam, is positioned at the middle part of beam.This figure show beam 3 by about two flanks (or Half Beam) 3G, 3D forms, 3G, 3D is connected by fastening devices 20.This figure has also shown that bar 5 and connecting rod 13 are connected on the bar 5 by pivot connector 14, and on the position of the distributing plate 19 of beam tie-beam 3.Fastening devices 20 is passed distributing plate 19.The 3G in left side and the 3D on right side form passage 15, make beam rope (not shown) be bonded on wherein.
Be noted that material seldom in the beam rope passage 15 meaning beams.In addition, its allows beam hitch to be combined in the beam to support it, and passage 15 reduces materials makes beam 3 alleviate.Thus, beam 3 avoids because of the self gravitation bending.And the beam rope places passage 15 to save taking up room of beam rope, and has protected the beam rope, as in fire.If necessary, can insert fire-retardant film closed channel 15, when fire, further protect the beam rope like this.
In a specific embodiment, form passage 15 in the following manner: the beam rope is at the center of gravity point position of beam brace summer.The centre distributor plate 41 of beam places on the beam rope 9.Retaining element 40 passes central plate 41 and connects two flank part 3G, 3D by central plate 41.
In addition, the beam rope passage 15 that flank part 3G, 3D constitute allows relative slip between beams and the beam rope.Such characteristic makes beam 3 freely to adjust by relative beam rope 9.Back characteristic in this accessory system will be particularly advantageous when beam 3 suffers a kind of asymmetrically placed load.For example, air-conditioning or heater are fixedly supported to apart from the beam Centrodistal a bit.Beam 3 has reduced the potential energy that pressure brings with respect to the extra degree of freedom that relative slip provided of beam rope 9.Such just characteristic is further firm this accessory system.
Need in addition to cause concern whether in current system, beam 3 is supported by beam rope 9, and the latter also can various possible variations be connected in the beam rope.
According to a kind of distortion, the beam rope can come brace summer by means of ring or suitable linkage, and allows beam 3 to slide along the beam rope.
According to another distortion, Liang Suoke simply is fixed on the beam, as the upper surface in the beam center.This distortion makes simplification accessory system 1 and production become possibility.Thus, obtained accessory system 1, wherein, the beam rope has remedied beam 3 for pressure to the small part of bar and is applied to moment on the bar, and has produced and act on beam 3 vertical upwarding pressure.The huge simplification that such accessory system has benefited from assembling makes the span of increase beam and the pressure that counteracting is applied on the bar become possibility.The true of beam rope tie-beam 3 makes that further beam-bar of stablizing accessory system is assembled into possibility.
According to another distortion, this beam rope can be made the beam-Suo part of two separation.One of them connects a bar and beam, another part tie-beam and another bar.A kind of beam rope-bar-girder construction of anchor formula obtains thus, and wherein each in two beams-Suo part to small part remedies the moment that beam applies on each bar.
And as previously mentioned, the free additional range that is provided by the relative slip of beam 3 relative beam ropes 9 makes to reduce the potential energy of getting in touch with load pressure and further stablize accessory system and becomes possibility.Yet the slip of the relative beam rope of restraint beam may be avoided the unstability of described accessory system.Finally, sleeve pipe 43 is fixed on the beam rope 9 slip with the relative beam rope of restraint beam.Fig. 6 has provided more detailed explanation.
Fig. 6 is a kind of partial section of a kind of longitudinal center part position along beam.The core that the figure shows beam 3 comprises two flank parts.This cross section is done between these two flank section are divided.Described beam rope 9 is placed in the beam rope passage that forms in the flank beam part, allows beam 3 along with beam rope 9 slides relatively.In one embodiment, illustrated by Fig. 6, beam 3 is set to relative slip in a kind of sliding area of regulation with beam rope 9, and this sliding area is limited by two sleeve pipes 43,45 that are fixed on the beam rope 9.Described two flanks partly connect by centre distributor plate 41, and this plate 41 is fixed to two flank parts by a plurality of borings on it.Like this, described centre distributor plate can be slided along beam rope 9 between sleeve pipe.Difference between the sliding area of regulation and the length of distributing plate defines sliding scale, as shown in Figure 6.
According to a kind of embodiment of variation, distributing plate 19,41 self is further divided into two plates.In these two plates each can both be pre-assembled on flank part 3G, the 3D.Thus, the assembly mode of beam 3 only needs directly to assemble by the fixation side alar part now, for example gets final product with screw.On the other hand, the pre-assembled pattern is exactly a kind of factory mode (factory phase), and it can be controlled easily.Thus, got rid of any mistake in the beam assembling process.The site assembly of beam 3 has been simplified by said method in fact.
Described sliding scale especially be included in beam span 0.2/10,000th and 5/10 is between the 000th.The selection of this scope is lower than the unstable limiting value of described accessory system just,, exceeds the stability of limit entail dangers to system of the sliding scale of beam that is.So characteristic makes beam 3 further pivotally connected with connecting rod, and can adjust according to beam rope 9 in the sliding area that limits.Thus, when beam 3 is subjected to uneven load,, provide additional free scope of activities, may reduce the potential energy relevant like this with load pressure by the slip of beam 3 with respect to the beam rope.As mentioned above, this characteristic makes that stablizing accessory system becomes possibility.Yet, within the sliding area (limiting) that limits, slide by sleeve pipe, be outside the unstable limiting value of accessory system, to slide for fear of beam.
Fig. 7 is a kind of elevation, and its expression attempts to be assemblied in a kind of beam in the accessory system.This beam 3 is further divided into three vertical intercepts 31,32,33.The 3rd section 33 is similar to first section 31, just on direction with respect to the central cross intercept symmetry of beam 3.At least a end of each intercept is stepped, as shown in the figure, is easy to the intercept assembling like this.Better, center intercept 32 has a kind of stepped cross-section, so that can assemble with other two intercepts 31,33.Fixed head 34 is consolidated beam 3 in its stepped cross-section position.These situations of beam of 31,32,33 to integral materials of intercept of making separation are many flexibly, and it makes that accessory system is transported to the logistic work in somewhere is quite easy.And the use of intercept makes needn't take special transportation resources to become possibility, has also reduced the producing cost of assembling beam thus.
If desired, can also adopt much more necessary intercept and be unlikely to take special transportation resources.According to the present invention, length range make is produced in the design of a kind of accessory system like this becomes possibility in the imagination of 5 to 120m beam.In fact, according to the present invention, produce the length that the is arranged in a kind of accessory system beam greater than 120m, and make the overall dimensions of its suitable beam and bar by adjusting, this is feasible in theory.According to the present invention, in the size of the specially designed beam that is applied to described accessory system, can adopt following length: 18,24,30,35,40,55 and 70m.
The material that is used for beam is the veneer material.As a kind of distortion, can use a kind of regeneration steel part of welding.
Especially, described beam rope is made by the derivative of steel or steel, and it has 190,000 and 230, the coefficient of elasticity between the 000MPa.
Yet, the invention is not restricted on the different embodiment of above-mentioned explanation, but the distortion that can have many other those of ordinary skills to be easy to expect.For example, it is contemplated that the vertical intercept that a kind of beam is divided into some odd number amounts.The odd number number of intercept makes and to comprise one and lean against (rest on) and become possibility at the beam of the central cross intercept of Liang Suoshang with respect to its central cross intercept symmetry.To such an extent as to can optimizing, the quantity of intercept reduces the required complete cost of fitting attachments system.
Claims (10)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR0308093A FR2857038B1 (en) | 2003-07-03 | 2003-07-03 | BEAM ATTACHMENT SYSTEM |
| FR03/08093 | 2003-07-03 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1833079A true CN1833079A (en) | 2006-09-13 |
| CN100557153C CN100557153C (en) | 2009-11-04 |
Family
ID=33522714
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2004800227880A Expired - Fee Related CN100557153C (en) | 2003-07-03 | 2004-07-02 | Attachment system for a beam |
Country Status (9)
| Country | Link |
|---|---|
| US (1) | US20070028551A1 (en) |
| EP (1) | EP1649116B1 (en) |
| CN (1) | CN100557153C (en) |
| AT (1) | ATE394553T1 (en) |
| CA (1) | CA2530559C (en) |
| DE (1) | DE602004013594D1 (en) |
| FR (1) | FR2857038B1 (en) |
| NO (1) | NO20060015L (en) |
| WO (1) | WO2005012665A1 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009144387A1 (en) * | 2008-05-28 | 2009-12-03 | Marc Irigoyen | Beam attachment system with cam-shaped receiving angle |
| EP2427604B1 (en) * | 2009-05-04 | 2017-02-22 | ArcelorMittal | Fire resistant steel structure |
| JP6779038B2 (en) * | 2016-06-01 | 2020-11-04 | キヤノン株式会社 | Image sensor and its control method, image sensor and its control method |
| FR3135473B1 (en) | 2022-05-12 | 2024-04-26 | Sermeca Stephanoise | Corner connection device for industrial buildings with movable perimeter cladding equipped with beams equipped with a runway |
| FR3135472B1 (en) | 2022-05-12 | 2024-04-19 | Sermeca Stephanoise | Device for increasing the spans of beams for industrial buildings with mobile perimeter cladding |
| CN115182450B (en) * | 2022-09-08 | 2023-01-13 | 中铁十九局集团第三工程有限公司 | But reuse and have buffer function's steel material bearing structure |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2693195A (en) * | 1952-07-03 | 1954-11-02 | Frieder | Portable shelter |
| FR1523827A (en) * | 1967-05-22 | 1968-05-03 | Constructions from an assembly of modulated elements | |
| FR2262167A1 (en) * | 1974-02-26 | 1975-09-19 | Savineau Pierre | Architectural supporting structure - has end gantries with ropes and arches between to support roof |
| US4275537A (en) * | 1977-05-26 | 1981-06-30 | Tension Structures, Inc. | Tension members |
| CH623879A5 (en) * | 1977-10-14 | 1981-06-30 | Emil Peter | |
| GB2051919B (en) * | 1979-06-02 | 1983-01-19 | Gleeson M | Stiffened elongate support member |
| US4393637A (en) * | 1980-10-10 | 1983-07-19 | Mosier Leo D | Wood roof truss construction |
| ATE60390T1 (en) * | 1986-03-13 | 1991-02-15 | Strarch Ind Pty Ltd | BUILDING TISSUE. |
| FR2611781B1 (en) * | 1987-02-23 | 1989-06-30 | Irigoyen Marc E | LONG-RANGE BEAM SUPPORT AND LOCKING SYSTEM |
| US5337531A (en) * | 1992-10-15 | 1994-08-16 | Thompson Fabricating Company, Inc. | Adjustable camber truss |
| FR2698897B1 (en) * | 1992-12-08 | 1995-01-06 | Walter Ets Lucien | Structure for construction such as hall, marquee, tent or the like. |
| US6065257A (en) * | 1999-05-24 | 2000-05-23 | Hubbell, Roth & Clark, Inc. | Tendon alignment assembly and method for externally reinforcing a load bearing beam |
| IT1313918B1 (en) * | 1999-10-12 | 2002-09-26 | Sergio Zambelli | DEVICE FOR THE CONNECTION OF A BEAM TO PILLARS, OR SIMILAR SUPPORTING ELEMENTS, FOR THE CONSTRUCTION OF BUILDINGS, |
-
2003
- 2003-07-03 FR FR0308093A patent/FR2857038B1/en not_active Expired - Fee Related
-
2004
- 2004-07-02 DE DE602004013594T patent/DE602004013594D1/en not_active Expired - Lifetime
- 2004-07-02 CA CA2530559A patent/CA2530559C/en not_active Expired - Fee Related
- 2004-07-02 CN CNB2004800227880A patent/CN100557153C/en not_active Expired - Fee Related
- 2004-07-02 AT AT04767562T patent/ATE394553T1/en not_active IP Right Cessation
- 2004-07-02 WO PCT/FR2004/001722 patent/WO2005012665A1/en not_active Ceased
- 2004-07-02 EP EP04767562A patent/EP1649116B1/en not_active Expired - Lifetime
- 2004-07-02 US US10/562,733 patent/US20070028551A1/en not_active Abandoned
-
2006
- 2006-01-03 NO NO20060015A patent/NO20060015L/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| DE602004013594D1 (en) | 2008-06-19 |
| US20070028551A1 (en) | 2007-02-08 |
| CA2530559C (en) | 2012-09-11 |
| ATE394553T1 (en) | 2008-05-15 |
| EP1649116B1 (en) | 2008-05-07 |
| FR2857038B1 (en) | 2007-03-30 |
| EP1649116A1 (en) | 2006-04-26 |
| CA2530559A1 (en) | 2005-02-10 |
| NO20060015L (en) | 2006-02-02 |
| WO2005012665A1 (en) | 2005-02-10 |
| FR2857038A1 (en) | 2005-01-07 |
| CN100557153C (en) | 2009-11-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11661734B2 (en) | Hold down system using hollow bearing members | |
| CN1276161C (en) | Mullion splice joint design | |
| AU2016200079B2 (en) | Light gauge steel beam-to-column joint with yielding panel zone | |
| MX2007004687A (en) | Deck assembly for transporter vehicle. | |
| DE2838053A1 (en) | CONNECTION FOR COMBINABLE SKELETON CONSTRUCTIONS | |
| CN1078283A (en) | reinforced steel beam | |
| US20100005749A1 (en) | Steel building frame system | |
| DE202009007537U1 (en) | Solar module mounting | |
| CN1833079A (en) | Beam attachment system | |
| CN211499452U (en) | Reinforced H-shaped steel | |
| EP1704337A1 (en) | Adjusting device and fixing device | |
| CN113668698A (en) | Double-layer steel structure with anti-torsion function | |
| KR101933989B1 (en) | Bridge pier steel I beam compound double girder construction method | |
| KR102188023B1 (en) | Carbon curtain wall | |
| DE10254043B4 (en) | Composite construction of high load capacity | |
| US20070062135A1 (en) | Corrugated shear panel and anchor interconnect system | |
| CN112012351B (en) | Prefabricated wall panel dry connection node with double connection at the top and bottom of beam | |
| EP3752688A1 (en) | Method for producing composite floors, and composite floor | |
| DE102008006251A1 (en) | Floor covering, for load-bearing surfaces, has a locking mechanism to hold part-sections together with a lock through openings with a double hook and claw locked into each other without surface projections | |
| WO2015004442A1 (en) | Structural frame | |
| CN1619080A (en) | Floor supporting structure for building | |
| KR102540103B1 (en) | Tension damper installation method for the building structure | |
| CN215055687U (en) | A building block and modular building | |
| US20080202056A1 (en) | Lightweight low profile floor structure | |
| CN1079479C (en) | Stability dividers for building floor isolation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091104 Termination date: 20130702 |