CN1519190A - How to install the elevator - Google Patents

How to install the elevator Download PDF

Info

Publication number
CN1519190A
CN1519190A CNA2003101164867A CN200310116486A CN1519190A CN 1519190 A CN1519190 A CN 1519190A CN A2003101164867 A CNA2003101164867 A CN A2003101164867A CN 200310116486 A CN200310116486 A CN 200310116486A CN 1519190 A CN1519190 A CN 1519190A
Authority
CN
China
Prior art keywords
installation
rope
mobile operating
elevator
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2003101164867A
Other languages
Chinese (zh)
Other versions
CN1251952C (en
Inventor
泷川行洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of CN1519190A publication Critical patent/CN1519190A/en
Application granted granted Critical
Publication of CN1251952C publication Critical patent/CN1251952C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/14Applications of loading and unloading equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/16Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well
    • B66B5/18Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well and applying frictional retarding forces
    • B66B5/185Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well and applying frictional retarding forces by acting on main ropes or main cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

一种电梯的安装方法,在将电梯厢导轨(5)和平衡块导轨(6)设置在升降路(1)内之后,将主绳索(11)卷挂在卷扬机(9)的驱动滑车轮(9a)上,同时由主绳索(11)将移动作业平台(12)和平衡块(13)吊下在升降路(1)内,一边释放卷扬机(9)的制动装置一边通过手动起重装置(31)将移动作业平台12沿着安装用绳索(30)升降,由移动作业平台(12)上的作业者进行升降路内机器的安装作业。故本发明能提供一种即使在不能确保卷扬机驱动电源的状态下也能容易安装作业、可提高作业效率的电梯的安装方法。

An elevator installation method, after the elevator car guide rail (5) and the balance weight guide rail (6) are arranged in the hoisting road (1), the main rope (11) is wound and hung on the driving sheave ( 9a), at the same time, the mobile work platform (12) and the balance weight (13) are hoisted in the hoistway (1) by the main rope (11), and the brake device of the winch (9) is released while passing through the manual lifting device. (31) The mobile work platform 12 is lifted and lowered along the installation rope (30), and the operator on the mobile work platform (12) performs the installation work of the equipment in the lifting road. Therefore, the present invention can provide an elevator installation method that can facilitate installation work and improve work efficiency even in a state where the driving power supply for the hoist cannot be ensured.

Description

电梯的安装方法How to install the elevator

技术领域technical field

本发明涉及作业者搭乘在升降路内升降的移动作业平台上进行升降路内机器安装作业的电梯的安装方法。The invention relates to an elevator installation method in which an operator rides on a mobile work platform that ascends and descends in an elevator road to perform machine installation work in the elevator road.

背景技术Background technique

以往有一种提案是在升降路内不安装作业场地、作业者搭乘在升降路内升降的移动作业平台上进行升降路内机器安装作业的电梯的安装方法。在该方法中,利用卷扬机的驱动力来使移动作业平台进行升降(例如参照日本专利特公昭54-16287号公报)。In the past, there has been a proposal of an elevator installation method in which no work site is installed in the hoistway, and the operator rides on a mobile work platform that is raised and lowered in the hoistway to perform installation work on the machine in the hoistway. In this method, the driving force of the hoist is used to raise and lower the mobile work platform (for example, refer to Japanese Patent Publication No. Sho 54-16287).

然而,通常在电梯的安装作业之前,大多并不能确保有卷扬机的驱动电源,采用这种方法时,只有在整顿好电源环境的条件才适合使用。即,若不能确保卷扬机的驱动电源,则只能够在升降路内设置作业场地进行安装作业,作业效率差。However, usually before the installation work of the elevator, the driving power of the hoist cannot be guaranteed in many cases. When using this method, it is suitable to use only when the power supply environment is adjusted. That is, if the drive power supply of the hoist cannot be ensured, only a work place can be set in the hoistway for installation work, and the work efficiency is poor.

本发明将解决上述问题作为课题,其目的在于提供一种即使在不能确保卷扬机驱动电源的状态下也能容易安装作业、可提高作业效率的电梯的安装方法。The present invention aims to solve the above problems, and an object of the present invention is to provide an elevator installation method that facilitates installation work and improves work efficiency even in a state where a hoist drive power supply cannot be ensured.

发明内容Contents of the invention

本发明的电梯的安装方法,包括:在升降路内设置上下方向延伸的安装用绳索的工序;将沿着安装用绳索可升降的移动作业平台组装于升降路内、同时将把持安装用绳索以手动方式使移动作业平台相对安装用绳索进行升降的手动起重装置安装在移动作业平台上的工序;一边通过手动起重装置使移动作业平台上升、一边由移动作业平台上的作业者将电梯厢导轨和平衡块导轨设置在升降路内的工序;将主绳索卷挂在卷扬机的驱动滑车轮上、同时通过主绳索将移动作业平台和平衡块在升降路内吊下的工序;以及一边释放卷扬机的制动装置、一边通过手动起重装置使移动作业平台沿着安装用绳索升降、由移动作业平台上的作业者进行升降路内机器安装作业的工序。The elevator installation method of the present invention includes: installing installation ropes extending in the vertical direction in the hoistway; assembling a mobile work platform that can be raised and lowered along the installation ropes in the hoistway; The process of installing the manual lifting device on the mobile work platform by manually lifting the mobile work platform relative to the installation rope; while the mobile work platform is raised by the manual lifting device, the operator on the mobile work platform lifts the elevator car The process of setting the guide rail and the balance weight guide rail in the hoistway; the process of winding the main rope on the driving sheave of the hoist, and at the same time hoisting the mobile working platform and the balance weight in the hoistway through the main rope; and releasing the hoist at the same time The braking device, while the mobile working platform is lifted and lowered along the installation rope by the manual lifting device, and the operator on the mobile working platform performs the machine installation operation in the lifting road.

综上所述,本发明的电梯的安装方法是在将电梯厢导轨和平衡块导轨设置在升降路内之后,将主绳索卷挂在卷扬机的驱动滑车轮上,同时由主绳索将移动作业平台和平衡块吊下在升降路内,一边释放卷扬机的制动装置一边通过手动起重装置将移动作业平台沿着安装用绳索升降,由移动作业平台上的作业者进行升降路内机器的安装作业,由此,即使在不能确保卷扬机的驱动电源的情况下也能容易进行安装作业,可提高作业效率。In summary, the elevator installation method of the present invention is to wind the main rope on the driving sheave of the winch after the elevator car guide rail and the balance weight guide rail are arranged in the hoisting road, and at the same time, the main rope will move the work platform and the balance weight are hoisted in the liftway, while the brake device of the winch is released, the mobile work platform is lifted and lowered along the installation rope by the manual lifting device, and the operator on the mobile work platform performs the installation work of the machine in the liftway Therefore, even if the driving power supply of the hoist cannot be ensured, the installation work can be easily performed, and the work efficiency can be improved.

附图的简单说明A brief description of the drawings

图1为表示本发明实施例1的电梯安装途中状态的构成图。Fig. 1 is a configuration diagram showing a state in the middle of installing an elevator according to Embodiment 1 of the present invention.

图2为表示图1的卷扬机和手动起重装置的构成图。Fig. 2 is a configuration diagram showing the winch and the manual lifting device of Fig. 1 .

图3为表示本发明实施例2的电梯安装途中状态的构成图。Fig. 3 is a configuration diagram showing a state in the middle of installing an elevator according to Embodiment 2 of the present invention.

具体实施方式Detailed ways

下面参照附图说明本发明的实施例。Embodiments of the present invention will be described below with reference to the drawings.

实施例1Example 1

图1为表示本发明实施例1的电梯安装途中状态的构成图。图中,升降路1内的最上部固定着多个起重梁2。升降路1的底部设置有电梯厢侧基台3和平衡块侧基台4。在升降路1内分别垂直状设置有1对电梯厢导轨5和1对平衡块导轨6。电梯厢导轨5支承在电梯厢侧基台3上,平衡块导轨6支承在平衡块侧基台4上。Fig. 1 is a configuration diagram showing a state in the middle of installing an elevator according to Embodiment 1 of the present invention. In the figure, a plurality of lifting beams 2 are fixed on the uppermost part of the liftway 1 . The bottom of the liftway 1 is provided with an elevator car side base 3 and a counterweight side base 4 . A pair of elevator car guide rails 5 and a pair of counterweight guide rails 6 are respectively arranged vertically in the hoistway 1 . The elevator car guide rail 5 is supported on the elevator car side base 3 , and the counterweight guide rail 6 is supported on the counterweight side base 4 .

在电梯厢侧基台3上设置有电梯厢缓冲器7。在平衡块侧基台4上设置有平衡块缓冲器8。升降路1内的上部配置具有驱动滑车轮9a的卷扬机9。卷扬机9支承在固定于平衡块导轨6上部的机械台10上。A car buffer 7 is provided on the car-side base 3 . A weight buffer 8 is provided on the weight-side base 4 . A hoist 9 having a drive sheave 9a is disposed on the upper portion of the hoistway 1 . The winch 9 is supported on a mechanical platform 10 fixed on the top of the balance weight guide rail 6 .

在驱动滑车轮9a上卷挂着多根(图只表示1根)主绳索11。移动作业平台12和平衡块13由主绳索11吊下在升降路1内。在电梯厢导轨5的上部固定着主绳索终端固定梁14。主绳索11的一端部通过电梯厢侧缆绳终端15与主绳索终端固定梁14连接。主绳索11的另一端部通过平衡块侧缆绳终端部16与机械台10连接。A plurality of (only one is shown in the figure) main ropes 11 are wound around the driving sheave 9a. The mobile working platform 12 and the counterweight 13 are suspended in the hoistway 1 by the main rope 11 . The main rope end fixing beam 14 is fixed on the top of the elevator car guide rail 5 . One end of the main rope 11 is connected to the main rope terminal fixing beam 14 via the car-side cable terminal 15 . The other end portion of the main rope 11 is connected to the machine table 10 through a weight-side cable end portion 16 .

移动作业平台12包括:沿着电梯厢导轨5可升降的电梯厢构架17;固定于电梯厢构架17的下部平台18;立设于下部平台18上的下部扶手19;固定于下部平台18上方的电梯厢构架17的上部平台20;立设于上部平台20上的上部扶手21;设置于下部平台18的下部、卷挂有主绳索11的1对电梯厢吊轮22;以及设置于下部平台18下部的紧急止动装置23。The mobile work platform 12 includes: an elevator car frame 17 that can be lifted along the elevator car guide rail 5; a lower platform 18 fixed on the elevator car frame 17; a lower handrail 19 erected on the lower platform 18; The upper platform 20 of the elevator car frame 17; the upper handrail 21 erected on the upper platform 20; a pair of elevator car suspension wheels 22 arranged at the bottom of the lower platform 18 and hung with the main rope 11; and arranged on the lower platform 18 Lower emergency stop device 23.

又,下部扶手19、上部平台20和上部扶手21在安装作业之后可以撤去,但电梯厢构架17、下部平台18、电梯厢吊轮22和紧急止动装置23仍然作为电梯厢的构成部分保留使用。Again, the lower handrail 19, the upper platform 20 and the upper handrail 21 can be removed after the installation work, but the elevator car frame 17, the lower platform 18, the elevator car suspension wheel 22 and the emergency stop device 23 are still used as the constituent parts of the elevator car. .

平衡块13包括:沿着平衡块导轨6可升降的平衡块构架24;支承于平衡块构架24内的多个平衡块层叠体25;以及设置于平衡块构架24的上部、卷挂有主绳索11的平衡块吊轮26。主绳索11从其一端部依次卷挂于电梯厢吊轮22、驱动滑车轮9a和平衡块吊轮26直至另一端部。The balance weight 13 includes: a balance weight frame 24 that can be lifted up and down along the balance weight guide rail 6; a plurality of balance weight stacks 25 supported in the balance weight frame 24; 11 balance weight suspension wheels 26. The main rope 11 is wound around the elevator car hanging sheave 22, the driving sheave 9a, and the counterweight hanging sheave 26 in order from one end to the other end.

电梯厢导轨5的上部安装着调速机27。电梯厢导轨5的下部安装着调速机张紧轮28。在调速机27的滑车轮与调速机张紧轮28之间张设有调速机绳索29。调速机绳索29与紧急止动装置23连接,随着移动作业平台12的升降进行循环。The top of elevator car guide rail 5 is equipped with governor 27. The bottom of elevator car guide rail 5 is equipped with governor tensioner pulley 28. A speed governor rope 29 is stretched between the sheave of the speed governor 27 and the speed governor tension pulley 28 . The governor rope 29 is connected with the emergency stop device 23 and circulates along with the lifting of the mobile work platform 12 .

在升降路1内,垂直状地吊下着安装用绳索30。安装用绳索30的上端部与起重梁2连接。在移动作业平台12上,安装着把持安装用绳索、以手动方式使移动作业平台相对安装用绳索进行升降的手动起重装置31。In the hoistway 1, the installation rope 30 is suspended vertically. The upper end of the installation rope 30 is connected to the lifting beam 2 . Attached to the mobile work platform 12 is a manual lifting device 31 that grasps the installation rope and manually raises and lowers the mobile work platform relative to the installation rope.

在升降路1内的上部设置有控制卷扬机9运转的控制盘32。在上部作业平台20上搭载有制动器释放蓄电池33,用于供给将卷扬机9的制动从移动作业平台12释放用于的电力。在控制盘32与制动器释放蓄电池33之间由可挠性的连接电缆34进行电气连接。A control panel 32 for controlling the operation of the winch 9 is provided on the upper part of the hoistway 1 . A brake release battery 33 is mounted on the upper work platform 20 to supply electric power for releasing the brake of the hoist 9 from the mobile work platform 12 . A flexible connecting cable 34 is electrically connected between the control panel 32 and the brake release battery 33 .

图2为表示图1的卷扬机9和手动起重装置31的构成图。卷扬机9上设置有对驱动滑车轮9a的回转进行制动的制动装置35。制动装置35包括:与驱动滑车轮9a一体回转的制动滚筒36;具有与制动滚筒36离接的制动片的1对制动臂37;向制动片与制动滚筒36接合的方向对制动滚筒36施力的1对制动弹簧38;以及与制动弹簧38相反地、使制动片从制动滚筒36开离的电磁铁39。FIG. 2 is a configuration diagram showing the hoist 9 and the manual lifting device 31 of FIG. 1 . The hoist 9 is provided with a braking device 35 for braking the rotation of the drive sheave 9a. The brake device 35 includes: a brake drum 36 integrally rotating with the drive pulley 9a; a pair of brake arms 37 with brake pads disconnected from the brake drum 36; A pair of brake springs 38 biasing the brake roller 36 in the direction of the brake roller 36;

在手动起重装置31上设置有操作杆41。操作杆41上设置有制动器释放开关42。一旦对制动器释放开关42进行操作,则制动器释放蓄电池33向电磁铁39供给电力,将制动装置35的制动力释放。An operating lever 41 is provided on the manual lifting device 31 . A brake release switch 42 is provided on the operating lever 41 . When the brake release switch 42 is operated, the brake release battery 33 supplies electric power to the electromagnet 39 to release the braking force of the brake device 35 .

又,若对操作杆41进行操作,则制动器释放开关42自动操作,将制动装置35释放,一旦手从操作杆41离开则自动复原而将电磁铁39消磁。即,手动起重装置31操作时,制动装置35自动释放,手动起重装置31非操作时,制动装置35自动成为制动状态。Moreover, if the operating lever 41 is operated, the brake release switch 42 is automatically operated to release the brake device 35, and once the hand is released from the operating lever 41, it will automatically return to demagnetize the electromagnet 39. That is, when the manual lifting device 31 is operated, the braking device 35 is automatically released, and when the manual lifting device 31 is not operated, the braking device 35 is automatically in a braking state.

下面说明实施例1的电梯的安装方法。首先,将起重梁2设置在升降路1内的最上部,同时将电梯厢侧基台3和平衡块侧基台4设置在升降路1的底部。将安装用绳索30从起重梁2吊下,再将最下段的电梯厢导轨5和平衡块导轨6设置在电梯厢侧基台3和平衡块侧基台4上。并且,将调速机张紧轮28设置在电梯厢导轨5上。Next, the method of installing the elevator of the first embodiment will be described. Firstly, the lifting beam 2 is arranged at the uppermost part in the hoistway 1, and the elevator car side base 3 and the counterweight side base 4 are arranged at the bottom of the hoistway 1 at the same time. The installation rope 30 is suspended from the lifting beam 2, and the lowermost elevator car guide rail 5 and the counterweight guide rail 6 are arranged on the elevator car side base 3 and the counterweight side base 4. And, the governor idler pulley 28 is arranged on the elevator car guide rail 5 .

然后,将沿着电梯厢导轨5和安装用绳索30可升降的移动作业平台12组装在升降路1内,同时将手动起重装置31安装在移动作业平台12上。一边由手动起重装置31使移动作业平台12上升,一边由移动作业平台12上的作业者将第2段以下的电梯厢导轨5和平衡块导轨6设置在升降路1内。Then, the mobile work platform 12 that can be moved up and down along the elevator car guide rail 5 and the installation rope 30 is assembled in the hoistway 1, and the manual lifting device 31 is installed on the mobile work platform 12 at the same time. While the mobile work platform 12 is raised by the manual lifting device 31 , the operator on the mobile work platform 12 installs the elevator car guide rail 5 and the counterweight guide rail 6 below the second stage in the hoistway 1 .

这样,在将移动作业平台12移动到升降路1内的最上部时,将机械台10固定在平衡块导轨6上,在机械台10上设置卷扬机9。又,将控制盘32设置在升降路1内的上部,用连接电缆34将移动作业平台12上的制动器释放蓄电池33与控制盘32之间连接,再将控制盘32与卷扬机9之间也电气连接。In this way, when the mobile work platform 12 is moved to the uppermost part in the hoistway 1 , the machine table 10 is fixed on the counterweight guide rail 6 , and the hoist 9 is set on the machine table 10 . Again, the control panel 32 is arranged on the top in the hoistway 1, and the brake release battery 33 on the mobile work platform 12 is connected with the control panel 32 with the connecting cable 34, and then the control panel 32 and the hoist 9 are also electrically connected. connect.

其次,设置调速机27和调速机绳索29,将调速机绳索29与紧急止动装置23连接。这样,在以后的作业中,当移动作业平台12超出预先设定的过速度而落下时,紧急止动装置23启动,将移动作业平台12停止。Next, the speed governor 27 and the speed governor rope 29 are set, and the speed governor rope 29 is connected with the emergency stop device 23 . In this way, in subsequent operations, when the mobile work platform 12 falls beyond the preset overspeed, the emergency stop device 23 is activated to stop the mobile work platform 12 .

然后,将平衡块13配置在平衡块导轨6之间,以安装后相同的方法配置主绳索11。即,将主绳索11卷挂在驱动滑车轮9a、电梯厢吊轮22和平衡块吊轮26上。又,主绳索11的一端部通过电梯厢侧缆绳终端15与主绳索终端固定梁14连接,主绳索11的另一端部通过平衡块侧缆绳终端部16与机械台10连接。Then, the balance weight 13 is arranged between the balance weight guide rails 6, and the main rope 11 is arranged in the same way after installation. That is, the main rope 11 is wound around the driving sheave 9a, the elevator car hanging sheave 22, and the counterweight hanging sheave 26. In addition, one end of the main rope 11 is connected to the main rope terminal fixing beam 14 through the elevator car side cable terminal 15 , and the other end of the main rope 11 is connected to the machine table 10 through the counterweight side cable terminal 16 .

这样,移动作业平台12和平衡块13由主绳索11吊下在升降路1内。并且,将搭载于平衡块13的平衡块层叠体25的重量调整到比安装后的状态轻。即,调整到平衡块13一方的重量小于搭乘必要人数后的移动作业平台12的重量。In this way, the mobile working platform 12 and the counterweight 13 are suspended in the hoistway 1 by the main rope 11 . In addition, the weight of the weight laminated body 25 mounted on the weight 13 is adjusted to be lighter than the mounted state. That is, the weight of the mobile work platform 12 is adjusted so that the weight of the counterweight 13 is smaller than the required number of passengers.

然后,通过手动起重装置31使移动作业平台12沿着安装用绳索30进行升降,由移动作业平台12上的作业者进行升降路1内机器(例如乘口装置以及各层楼配线装置等)的安装作业。这样,在主绳索11被张绕的状态下操作手动起重装置31时,由移动作业平台12上的作业者将卷扬机9的制动装置35释放。即,通过操作杆41的制动器释放开关42的操作,可将电力从制动器释放蓄电池33供给电磁铁39,将制动装置35的制动力释放。Then, the mobile work platform 12 is lifted and lowered along the installation rope 30 by the manual lifting device 31, and the operators on the mobile work platform 12 carry out the machine (such as the entrance device and each floor wiring device, etc.) in the lifting road 1. ) installation work. In this way, when the manual lifting device 31 is operated in a state where the main rope 11 is wound, the operator on the mobile work platform 12 releases the braking device 35 of the hoist 9 . That is, by operating the brake release switch 42 of the operating lever 41 , electric power is supplied from the brake release battery 33 to the electromagnet 39 to release the braking force of the brake device 35 .

作为手动起重装置31可采用公知的各种类型。图2所示的手动起重装置31是通过使操作杆41回动,使相对安装用绳索30的把持位置向上方移动,移动作业平台12沿着安装用绳索30上升。又,通过解除对安装用绳索30的把持,移动作业平台12相对于安装用绳索30下降。Various known types can be adopted as the manual lifting device 31 . In the manual lifting device 31 shown in FIG. 2 , the operating lever 41 is turned back to move the holding position relative to the installation rope 30 upward, and the mobile work platform 12 is raised along the installation rope 30 . Furthermore, by releasing the grip on the installation rope 30 , the mobile work platform 12 descends with respect to the installation rope 30 .

在由这种手动起重装置31操作的移动作业平台12升降时,移动作业平台12和平衡块13处于由主绳索11吊下的状态,并且,由于制动装置35处于被释放的状态,因此,随着移动作业平台12的升降,平衡块13在驱动滑车轮9a回转的同时进行升降。When the mobile work platform 12 operated by such a manual lifting device 31 is lifted and lowered, the mobile work platform 12 and the counterweight 13 are in the state of being suspended by the main rope 11, and, since the brake device 35 is in the state of being released, therefore , along with the lifting of the mobile work platform 12, the balance weight 13 is lifted while driving the pulley 9a to rotate.

由此,在配置了主绳索11之后的安装作业时,用小的力即可操作手动起重装置31。这样,即使在不能确保卷扬机9的驱动电源(本电源)的状态下,也可在升降路1内不安装作业场地的情况下容易进行安装作业,可提高作业效率。又,不需要作业场地的材料、组装、撤去的费用,可降低安装作业的成本。Accordingly, the manual lifting device 31 can be operated with a small force during the installation work after the main rope 11 is arranged. In this way, even in the state where the drive power supply (main power supply) of the hoist 9 cannot be ensured, the installation work can be easily performed without installing a work place in the hoistway 1, and the work efficiency can be improved. In addition, costs for materials, assembly, and removal at the work site are not required, and the cost of installation work can be reduced.

又,制动器释放开关42是在对操作杆41进行操作时能自动操作,将制动装置35释放,一旦手离开操作杆41则自动复原,将电磁铁39消磁,由此,可由作业者1人容易地进行手动起重装置31的操作和制动器释放开关42的操作,并可防止失误操作。Also, the brake release switch 42 can be automatically operated when the operating lever 41 is operated, and the braking device 35 is released. Once the hand leaves the operating lever 41, it will automatically recover and the electromagnet 39 will be demagnetized. The operation of the manual lifting device 31 and the operation of the brake release switch 42 are easily performed, and erroneous operations can be prevented.

又,由于调整成安装时的平衡块13的重量比移动作业平台12的重量轻,因此移动作业平台12下降时不需要作业者的力,可利用移动作业平台12与平衡块13的重量差容易地下降。Moreover, since the weight of the balance weight 13 when adjusted to be installed is lighter than the weight of the mobile work platform 12, no operator's power is required when the mobile work platform 12 descends, and the weight difference between the mobile work platform 12 and the balance weight 13 can be used to easily down.

实施例2Example 2

在上述实施例1中,对卷扬机9设置在升降路1内的上部的无机械室电梯作了说明,例如图3所示,本发明也适用于配置于升降路1上部的机械室43内设置有卷扬机9类型的电梯。在此场合,在设置电梯厢导轨5和平衡块导轨6之前,也可预先在机械室43内设置好卷扬机9。In the above-mentioned first embodiment, the hoist 9 is arranged on the upper part of the hoistway 1 without a machine room elevator. For example, as shown in FIG. There are 9 types of elevators with hoists. In this case, the hoist 9 may be installed in the machine room 43 before the car guide rail 5 and the counterweight guide rail 6 are installed.

又,实施例1、2是对升降路1的上部设置有卷扬机9的电梯作了说明,但本发明例如也适用于在升降路内的底部附近配置卷扬机,在升降路1内的上部配置卷挂主绳索的反向轮的电梯。In addition, Embodiments 1 and 2 have explained the elevator with the hoist 9 arranged on the upper part of the hoistway 1, but the present invention is also applicable to disposing the hoisting machine near the bottom in the hoistway 1 and disposing the hoist 9 on the upper part of the hoistway 1, for example. An elevator with opposite wheels hanging from the main rope.

并且,实施例1、2是对2∶1绳索卷挂方式的电梯作了说明,但不限定于此,例如本发明也适用于1∶1绳索卷挂方式的电梯。In addition, Embodiments 1 and 2 have explained the elevator of the 2:1 rope winding system, but are not limited thereto. For example, the present invention is also applicable to the elevator of the 1:1 rope winding system.

Claims (3)

1. the installation method of an elevator is characterized in that, comprising:
The operation of the installation of above-below direction extension with rope is set in elevating road;
To be assembled in the described elevating road, will control manual lifting gear that described installation makes the described relatively installation of described mobile operating platform carry out lifting with rope with rope with manual mode simultaneously and be installed in operation on the described mobile operating platform with the liftable mobile operating platform of rope along described installation;
On one side described mobile operating platform is risen, by the operator on the described mobile operating platform cage guide rail and balance block guide rail are arranged on operation in the described elevating road on one side by described manual lifting gear;
Main rope volume is hung on the driving block sheave of winch, the operation under by described main rope described mobile operating platform and described balance block being hung in described elevating road simultaneously; And
While the brake equipment that discharges described winch, make described mobile operating platform carry out the operation of elevating road inner machine installation exercise with the rope lifting, by the operator on the described mobile operating platform along described installation by described manual lifting gear.
2. the installation method of elevator as claimed in claim 1, it is characterized in that, described manual lifting gear is provided with and discharges the braking release-push that described brake equipment is used, when described manual lifting gear is operated, described brake equipment automatic release, during described manual lifting gear NOT operation, described brake equipment becomes braking mode automatically.
3. the installation method of elevator as claimed in claim 1 or 2 is characterized in that, the described mobile operating flat-bed of the weight ratio of the described balance block during installation is in light weight.
CNB2003101164867A 2003-02-06 2003-11-19 Mounting method of elevator Expired - Fee Related CN1251952C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003029575A JP2004238151A (en) 2003-02-06 2003-02-06 Elevator installation method
JP2003029575 2003-02-06

Publications (2)

Publication Number Publication Date
CN1519190A true CN1519190A (en) 2004-08-11
CN1251952C CN1251952C (en) 2006-04-19

Family

ID=32956716

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2003101164867A Expired - Fee Related CN1251952C (en) 2003-02-06 2003-11-19 Mounting method of elevator

Country Status (4)

Country Link
JP (1) JP2004238151A (en)
KR (1) KR100555355B1 (en)
CN (1) CN1251952C (en)
TW (1) TWI221460B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1990371B (en) * 2005-12-27 2010-07-21 上海三菱电梯有限公司 The method of elevator installation and the lifting system used in it
CN101348202B (en) * 2007-07-20 2013-05-15 三菱电机大楼技术服务株式会社 Mounting method of elevator and cam apparatus
CN101466630B (en) * 2006-05-08 2013-07-24 通力股份公司 Method for installing hoisting ropes of an elevator
CN104528500A (en) * 2014-12-29 2015-04-22 中国建筑股份有限公司 Double-platform scaffold-free elevator installation method
CN113148806A (en) * 2021-04-26 2021-07-23 海阳中集来福士海洋工程有限公司 Method for installing elevator
CN111232799B (en) * 2020-01-10 2021-11-26 日立电梯(中国)有限公司 Mobile operation platform traction system and machine room-free elevator construction method using same

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7161819B2 (en) * 2019-12-18 2022-10-27 三菱電機株式会社 elevator equipment
CN111891873B (en) * 2020-08-05 2022-01-25 鹤山扬阳智能机械装备有限公司 Elevator brake assembly
CN115009955B (en) * 2022-06-15 2023-03-10 珠海洪银建筑工程有限公司 Elevator well temporary crane with bearing friction torque test

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1990371B (en) * 2005-12-27 2010-07-21 上海三菱电梯有限公司 The method of elevator installation and the lifting system used in it
CN101466630B (en) * 2006-05-08 2013-07-24 通力股份公司 Method for installing hoisting ropes of an elevator
CN101348202B (en) * 2007-07-20 2013-05-15 三菱电机大楼技术服务株式会社 Mounting method of elevator and cam apparatus
CN104528500A (en) * 2014-12-29 2015-04-22 中国建筑股份有限公司 Double-platform scaffold-free elevator installation method
CN104528500B (en) * 2014-12-29 2019-05-14 中国建筑股份有限公司 Double tabletop is without scaffold elevator installing method
CN111232799B (en) * 2020-01-10 2021-11-26 日立电梯(中国)有限公司 Mobile operation platform traction system and machine room-free elevator construction method using same
CN113148806A (en) * 2021-04-26 2021-07-23 海阳中集来福士海洋工程有限公司 Method for installing elevator
CN113148806B (en) * 2021-04-26 2022-05-17 海阳中集来福士海洋工程有限公司 How to install the lift

Also Published As

Publication number Publication date
TWI221460B (en) 2004-10-01
JP2004238151A (en) 2004-08-26
KR100555355B1 (en) 2006-02-24
TW200415109A (en) 2004-08-16
CN1251952C (en) 2006-04-19
KR20040071578A (en) 2004-08-12

Similar Documents

Publication Publication Date Title
CN1236992C (en) Elevator system
US9415974B2 (en) Method and arrangement for moving a heavy load
CN112566864B (en) Application method of lift extension technology of elevator
CN1519190A (en) How to install the elevator
JP2011006218A (en) Elevator passenger rescue apparatus
CN1578751A (en) Emergency stop testing device for elevator
CN1615263A (en) Elevator device
CN1833982A (en) Elevator apparatus
JP3807775B2 (en) How to lift the construction elevator
CN101065313A (en) Elevator apparatus
JP2023177370A (en) Elevator hoisting machine installation auxiliary equipment and installation method
JP2003201074A (en) Elevator containment rescue method and apparatus
JPH09272671A (en) Elevator installation device and elevator installation method
CN113474276B (en) Construction elevator device and speed governor rope extending method for construction elevator device
JP5468029B2 (en) Elevator equipment
CN118742504A (en) Lift construction device and method
CN101239684A (en) Test method for elevator equipment and its emergency braking device
CN1555336A (en) Elevator car fixing device
JPH082850A (en) Elevator hoistway construction method
JP6610914B2 (en) Inspection method for elevator safety device
CN1649790A (en) Elevator device
JP2004262645A (en) Elevator system
CN1479693A (en) Elevator device
CN1833981A (en) Elevator system
CN119637663A (en) Rescue device for elevator without machine room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee