CN1233035C - A working method for rework and salvage of integrated circuit components - Google Patents

A working method for rework and salvage of integrated circuit components Download PDF

Info

Publication number
CN1233035C
CN1233035C CN 02127079 CN02127079A CN1233035C CN 1233035 C CN1233035 C CN 1233035C CN 02127079 CN02127079 CN 02127079 CN 02127079 A CN02127079 A CN 02127079A CN 1233035 C CN1233035 C CN 1233035C
Authority
CN
China
Prior art keywords
integrated circuit
target integrated
circuit package
circuit component
solder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 02127079
Other languages
Chinese (zh)
Other versions
CN1472800A (en
Inventor
王振芳
黄耀奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Via Technologies Inc
Original Assignee
Via Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Via Technologies Inc filed Critical Via Technologies Inc
Priority to CN 02127079 priority Critical patent/CN1233035C/en
Publication of CN1472800A publication Critical patent/CN1472800A/en
Application granted granted Critical
Publication of CN1233035C publication Critical patent/CN1233035C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

The invention relates to an operation method for returning (rework) and saving an integrated circuit assembly, wherein the integrated circuit assembly is packaged in a Ball Grid Array (BGA) mode, and the operation method comprises the following steps: (a) the method comprises the steps of firstly, checking by a preliminary inspection step to screen out damaged and failed integrated circuit components, (b) baking target integrated circuit components at a preset temperature within a preset time, (c) removing at least one solder ball of the integrated circuit components, and (d) re-soldering the solder on the solder-removed parts of the integrated circuit components.

Description

A kind of doing over again rescued back the operational method of integrated circuit package
Technical field
The present invention relates to a kind of doing over again and rescue back the operational method of integrated circuit package, especially finger is a kind of to selecting whether to burn-on again scolding tin with ball pin trellis array way packaged integrated circuits assembly, can rescue back the operational method of this integrated circuit package to carry out next step test.
Background technology
In general, when client terminal to discover has defective integrated circuit package, those integrated circuit packages can be returned goods to manufacturer, hope can give attributional analysis or replacing.At this moment, manufacturer can attempt to determine that it is to belong to defective integrated circuit package just like the client is said that these visitors move back integrated circuit package actually, and as truly belonging to defective integrated circuit package, the pin position that can understand its fault is the defective analysis of which and occurrence cause thereof, so will help the reference of integrated circuit package manufacturer when the next group integrated circuit package is made, to avoid the generation of failure condition of the same race.Certainly, the integrated circuit package that part client returns may be through after the defective analysis, but finds still to belong to the integrated circuit package of operate as normal, thus, this part client returns integrated circuit package and just can be kept, and verifies again or re-uses to return to the client.
(Ball Grid Array, BGA) formula method for packing are widely used in the encapsulation of integrated circuit package to ball pin trellis array already.When returning goods when the integrated circuit package that uses ball pin trellis array package mode because being judged to be defective item by client, integrated circuit package manufacturer can move back defective item at these visitors and carry out accident analysis.The defective analytical method of common technique, earlier these so-called fault integrated circuit packages are given removal on circuit support plate (motherboard) exactly, and remove scolding tin all on it, afterwards again to its scolding tin of burn-oning again, so that carry out next step defective analysis.
Before waiting for the scolding tin of burn-oning again, because these defective integrated circuit packages may be exposed to a period of time in the air, the airborne moisture that made its absorbed inside.Thus, the moment high temperature of following when rewelding scolding tin and coming (for example similarly be 180 degree Celsius to about 260 degree), can make the moisture of integrated circuit package inside destroy (popcorn failure) owing to thermal shock causes volume to expand rice krispies fancy such as causing explosion or delamination rapidly, the defective analysis that will cause being about to after a while carry out is difficult to obtain correct result, has also wasted these for the scolding tin of burn-oning again required material and time simultaneously.
In addition, from the scolding tin of rewelding, whether the scolding tin of rewelding to inspecting is finished, until whole integrated circuit package is cleaned whole process, will consume five to six minutes time.When the needs scolding tin of rewelding carries out integrated circuit package quantity that integrated circuit package pin bit function detects when very huge, still can spend the considerable time on the whole.And must know as early as possible under the situation of analysis result as some client how to quicken the carrying out verifying, analyze, for urgently holding the problem of separating rhymed formula.
Summary of the invention
Main purpose of the present invention is to provide a kind of doing over again to rescue back the operational method of integrated circuit package.This operational method is before scolding tin again, earlier with a predetermined temperature target integrated circuit package being toasted a scheduled time can absorbent ambient moisture to remove the inner institute of this target integrated circuit package, make when carrying out again the scolding tin action, not can because of moment the high thermal conductance volume that causes these water (wetting) gas expand rapidly, cause the integrated circuit package bottom that the protuberance of resembling popcorn or the destruction of internal structure are arranged, and then make the defective analysis of carrying out after a while can't obtain correct result.
In addition, operational method of the present invention can be applicable on the integrated circuit package of the ball pin trellis array package of using POGO Pin test trough seat, it is after removing all scolding tin of so-called defective integrated circuit package, not earlier to this target integrated circuit package action of scolding tin again, make the target integrated circuit package do electrical the contact with conductive pad with POGO Pin test trough seat fully, judge whether to be qualified product earlier, if lost efficacy the then action of scolding tin no longer again of product, and only for the just action of scolding tin again of the partly integrated circuit unit that is judged as qualified product and has an opportunity to rescue back, reweld the required time of scolding tin with saving.It should be noted that the action that this does not reweld scolding tin fully, only be applied to the test trough seat of POGO Pin, for the integrated circuit package of the ball pin trellis array package of using other general test trough seat, this action of scolding tin of rewelding is still necessary.
In order to reach above-mentioned purpose, the operational method that the integrated circuit package of ball pin trellis array package of the present invention is done over again includes inspects bottom that step is used for inspecting this target integrated circuit package with one and whether protuberance is arranged or opens after short circuit lost efficacy, in a scheduled time, toast this target integrated circuit package with a predetermined temperature, remove at least one scolding tin of this target integrated circuit package, and this target integrated circuit package removed the scolding tin position scolding tin of rewelding.Wherein, at general test groove seat and POGO Pin test trough seat, whether operational method of the present invention can be selected after removing scolding tin the target integrated circuit package scolding tin of burn-oning, after the correct bad analysis result that can obtain target integrated circuit package pin position, save the time consumption of the scolding tin of rewelding.
In order further to understand feature of the present invention and technology contents, see also following about detailed description of the present invention and accompanying drawing, yet accompanying drawing only provide with reference to and the explanation usefulness, be not to be used for the present invention is limited.
Description of drawings
Fig. 1 is the flow chart of first preferred embodiment of operational method of the present invention;
Fig. 2 is the flow chart of another preferred embodiment of operational method of the present invention.
Embodiment
See also Fig. 1, Fig. 1 is the flow chart of the operational method 100 of first preferred embodiment of the present invention.Operational method 100 of the present invention includes the following step:
Step 101: beginning;
Step 102: unload defective integrated circuit package on motherboard, this is will inspected target integrated circuit package;
Step 103: carry out initial survey step test-target integrated circuit package, as defective then past step 104, if qualified then toward step 105;
Step 104, this integrated circuit package is judged as defective item and abandons;
Step 105: this one scheduled time of target integrated circuit package of baking under a predetermined temperature;
Step 106: remove scolding tin;
Step 107: clean this integrated circuit package;
Step 108: again to this integrated circuit package scolding tin of burn-oning;
Step 109: whether the scolding tin that execution reinspection step is inspected this target integrated circuit package is qualified, if qualified then toward step 110, the defective step 108 of then getting back to;
Step 110: clean this integrated circuit package once again;
Step 111: this integrated circuit package to test trough seat is installed is carried out functional verification test, as defective then past step 112, if qualified then toward step 113;
Step 112: this integrated circuit package is judged as defective item and abandons;
Step 113: be judged as qualified product and rescue back; And
Step 114: finish.
When receiving the visitor, integrated circuit package manufacturer produces visitor that end sends here when moving back defective integrated circuit package, must earlier these defective integrated circuit packages be gone up removal (shown in step 102) from circuit support plate (or motherboard), and this removal action nature can partial destruction be positioned at these scolding tin with ball pin trellis array encapsulation method packaged integrated circuits assembly bottom.This is just why after a while before carrying out defective analysis, must be to these integrated circuit packages scolding tin of burn-oning again, could learn really that these so-called defective integrated circuit packages are that the very out of order facts takes place actually, or in a single day really defining fault takes place, and is to break down in which leg position actually.
Initial survey step shown in the step 103, be behind these integrated circuit packages of removal on circuit support plate or the motherboard, whether the bottom of (1) these integrated circuit packages of visual examination has protuberance emersion or the uneven phenomenon (so-called Popcorn Failure) of depression earlier, and further (2) check the situation that whether has had abnormal open circuit and/or short circuit to lose efficacy between the power supply of these integrated circuit packages and grounding leg again, this open circuit/short circuit failure conditions available digital voltmeter (Digital Voltage Meier) detection and learning.In case meet above-mentioned two kinds of situations one of them, proceed to just that step 104 directly judges that these integrated circuit packages lost efficacy and be defective item, the value rescued back of further not doing over again is also abandoned it.
Qualified integrated circuit package after process initial survey step then carry out step 105.Owing to having exposed a period of time in air, these integrated circuit packages absorbed airborne part moisture, may be in the removal scolding tin that carries out after a while or the process of rewelding because of moment high heat the and therefore destruction that causes the integrated circuit package internal structure need a milder mode to remove and be present in its inner moisture.Step 105 of the present invention promptly is to toast a scheduled time (as 8 to 12 hours) down to reach this purpose at a predetermined temperature (as 125 degree Celsius).Though in the present embodiment, be with as 125 degree Celsius carry out 8 to 12 hours baking, this temperature height and time length are when visual actual state is adjusted it.
After the baking action of completing steps 105, just can carry out step 106, begin to remove the integrated circuit package bottom because of the scolding tin that when circuit support plate removal, sustains damage, till all scolding tin all is removed.Because scolding tin is the relative position that is arranged at the conductive pad below of integrated circuit package bottom in man-to-man mode, be with after removing scolding tin, if when finding that the conductive pad of integrated circuit package has the phenomenon of oxidation, then need to use in addition the tin silk to these conductive pads tin sticky again.
After finishing removal scolding tin, a cleaning step 107 being arranged in addition, is integrated circuit package to be soaked also to handle in 2 minutes with cleaning solution dry.The action (step 108) of scolding tin afterwards just begins to burn-on again.In the process that present embodiment is rewelded, the temperature that sets is 240 degree Celsius, and be 3 minutes heating time, and be 1 minute cooling time.This temperature is dried the temperature that gas sets (125 degree Celsius) by comparison with baking before, belong to high temperature relatively, if do not include moisture with removal so earlier integrated circuit package is not walked unhurriedly to toast, just directly reweld, probably can cause the infringement of integrated circuit package internal structure, and the situation that has so-called quick-fried corn to destroy takes place.
After rewelding, whether operational method 100 of the present invention includes in addition rechecks step 109, comes the visual integrated circuit package that these have finished again the scolding tin action of inspecting, have scolding tin leakage weldering or the molten tin of scolding tin bad.If the generation of above-mentioned situation is arranged, then come back to step 108 pair defective integrated circuit package part and reweld once again.
After rechecking step 109 end, if the scolding tin of rewelding of integrated circuit package is qualified, then clean (shown in step 110) once more, then integrated circuit package is installed to test trough seat (socket) afterwards in step 111, carry out functional verification test, then abandon this integrated circuit package as defective toward step 112, or used for carrying out further defective analysis in addition; Quilt is rescued back if qualified then past step 113 is judged as qualified product.The whole operational method 100 of doing over again arrives this, just can finish (shown in step 114) at last.If think that more detail knowledge is to break down in that integrated circuit package pin position actually, the integrated circuit package that step 112 can be abandoned sees through more accurate tester table in addition to reach this purpose, and emphasis of the present invention then is the steps flow chart of doing over again and rescuing back.
See also Fig. 2, Fig. 2 is the flow chart of another preferred embodiment of the present invention.The doing over again of the disclosed pin of this embodiment position trellis array package integrated circuit package rescued back operational method 200 and included the following step.
Step 201: beginning;
Step 202: unload defective integrated circuit package on motherboard, this is will inspected target integrated circuit package;
Step 203: carry out initial survey step test-target integrated circuit package, as defective then past step 204, if qualified then toward step 205;
Step 204: this integrated circuit package is judged as defective item and abandons;
Step 205: this one scheduled time of target integrated circuit package of baking under a predetermined temperature;
Step 206: remove scolding tin;
Step 207: clean this integrated circuit package;
Step 208: this integrated circuit package to POGO Pin test trough seat is installed is carried out functional verification test, as defective then past step 209, if qualified then toward step 210;
Step 209: this integrated circuit package is judged as defective item and abandons;
Step 210: again to this integrated circuit package scolding tin of burn-oning;
Step 211: whether the soldered ball that execution reinspection step is inspected this target integrated circuit package is qualified, if qualified then toward step 212, the defective step 210 of then getting back to;
Step 212: clean this integrated circuit package once again;
Step 213: be judged as qualified product and rescue back; And
Step 214: finish.
Shown in step 202,, must earlier these defective integrated circuit packages be gone up removal from circuit support plate (or motherboard) when integrated circuit package manufacturer receives visitor that client sends here when moving back defective integrated circuit package.This removal action nature can part even whole scolding tin that is positioned at pin position trellis array package integrated circuit package bottom that destroys.
Inspect step shown in the step 203, be behind these integrated circuit packages of removal on circuit support plate or the motherboard, whether the bottom of elder generation's visual examination these integrated circuit packages has protuberance emersion or the uneven phenomenon of depression, further checks the situation that open circuit/short circuit inefficacy whether has been arranged between the power supply of these integrated circuit packages and grounding leg again.In case meet above-mentioned two kinds of situations one of them, lost efficacy and do not have and further do over again the value rescued back and it is abandoned (shown in step 204) just directly judge these integrated circuit packages.
When belonging to qualified integrated circuit package after step 203 is inspected,, toast a scheduled time (as 8 to 12 hours) down at a predetermined temperature (as 125 degree Celsius) just carry out step 205 through inspecting.This practice is to remove in a milder mode and is present in its inner moisture, so as not to integrated circuit package in the removal scolding tin that carries out after a while or again in the process of scolding tin because moment high heat and the destruction that causes the integrated circuit package internal structure.
After the baking action of completing steps 205, just can carry out step 206 and begin to remove the integrated circuit package bottom because of the scolding tin that when circuit support plate removal, sustains damage, till all scolding tin all is removed.Because scolding tin is the relative position that is arranged at the conductive pad below of integrated circuit package bottom in man-to-man mode, be with after removing scolding tin, if when finding that the conductive pad of integrated circuit package has the phenomenon of oxidation, then need to use in addition the tin silk to these conductive pads tin sticky again.
After finishing removal scolding tin, a cleaning step 207 is arranged in addition, so that the bottom of integrated circuit package keeps clean and dry.Next in the present embodiment, be to use a POGO Pin test trough seat to come these target integrated circuit packages are carried out functional verification test (step 208).Because due to the architectural feature of POGO Pin test trough seat itself, make the operational method flow process 200 of present embodiment not need this action of scolding tin of to reweld earlier as previous embodiment.Also just because of POGO Pin groove seat with respect to the particularity of general test groove seat, the scolding tin of just not rewelding at last, the contact impedance (contact resistance) between testing integrated circuits assembly and POGO Pin test trough seat can remain on very a stationary value near zero impedance equally.Desire to reach above-mentioned purpose, as long as can keep the conductive pad of integrated circuit package bottom and the cleaning of POGO Pin test trough seat.Carry out the result of functional verification test, then abandon this integrated circuit package toward step 209 as defective, or used for carrying out further defective analysis in addition; If qualifiedly then transfer again this integrated circuit package scolding tin of burn-oning toward step 210.
Behind scolding tin again, operational method 200 of the present invention includes in addition rechecks step 211, comes the visual integrated circuit package that these have finished again the soldered ball action of inspecting, whether have scolding tin to leak weldering or the molten tin of scolding tin defective.If the generation of above-mentioned defective situation is arranged, the integrated circuit package part that then comes back to step 210 and pair the have disappearance scolding tin of rewelding once again, otherwise if the scolding tin of rewelding of integrated circuit package is qualified, promptly enter step 212 and clean integrated circuit package once again, in step 212, be judged as qualified product again and by being rescued back.The whole operational method 200 of doing over again arrives this, just can finish (shown in step 214) at last.
Compared to common technique, back method is rescued in doing over again of ball pin trellis array package integrated circuit package of the present invention, be can be especially at when using elastic probe (POGO Pin) test trough seat, the scolding tin of selecting not reweld is earlier promptly tested, and then only to the integrated circuit package that the is judged as qualified product scolding tin of rewelding, and defective item is directly abandoned and the scolding tin of needn't rewelding, to save scolding tin reweld spent time, manpower and material cost.
The employed probe of elastic probe test trough seat (pin), its characteristics are that probe itself has elasticity, can stretch in response to suffered strength size, so can be when the contact error that partly (as soldering tin) is in height bigger of sphere grid array type integrated circuit package, still has preferable electrical contact effect, thereby improved itself and the electrical effect that contacts of the scolding tin joining zone of scolding tin, to reach the purpose of correct test.Just because of this, some may also have the integrated circuit package that continues to use chance because of the client erroneous judgement, can not scrap because of erroneous judgement, and even cause the loss of client manufacturer itself.
Though be that act one motherboard is an example in the operational method 100,200 of each preferred embodiment of the present invention, but on other circuit board, for example similarly be additional card (add-on card) etc., do over again and rescue return of serve lattice array integrated circuit package and also do not break away from category of the present invention.
The above only is preferred embodiment of the present invention, changes according to any equivalence of the present invention, should belong to the protection range of patent of the present invention.

Claims (5)

1.一种返工救回集成电路组件的作业方法,一目标集成电路组件是以一球脚格状阵列方式封装完成,其特征在于,步骤为:1. A method of reworking and rescuing integrated circuit components, a target integrated circuit component is packaged in a ball-pin lattice array, and it is characterized in that the steps are: (a)以一第一检视步骤检验该目标集成电路组件,以筛除受损失效的目标集成电路组件;(a) inspecting the target integrated circuit device with a first inspection step to screen out damaged and failed target integrated circuit devices; (b)以一预定温度在一预定时间内烘烤该目标集成电路组件;(b) baking the target integrated circuit device at a predetermined temperature for a predetermined time; (c)去除该目标集成电路组件的至少一焊锡;(c) removing at least one solder of the target integrated circuit component; (d)对该目标集成电路组件的已移除焊锡部位重焊焊锡;(d) re-soldering solder removed portions of the target integrated circuit component; (e)进行复检,以确认该重焊焊锡是否合格;(e) Conduct re-inspection to confirm whether the re-soldering solder is qualified; (f)清洗该目标集成电路组件;以及(f) cleaning the target integrated circuit component; and (g)进行功能验证测试,以判断该目标集成电路组件为合格品或不合格品;(g) Conduct functional verification tests to determine whether the target integrated circuit component is a qualified product or a non-conforming product; 其中该焊锡是设置于该目标集成电路组件的一导电垫的下方,用来与一槽座建立电连接。Wherein the solder is disposed under a conductive pad of the target integrated circuit component for establishing electrical connection with a socket. 2.如权利要求1所述的返工救回集成电路组件的作业方法,其特征在于所述的初检步骤包括有检验该目标集成电路组件的底部是否有隆起或凹陷的情况。2. The operation method for reworking and salvaging an integrated circuit assembly as claimed in claim 1, wherein said initial inspection step includes inspecting whether the bottom of the target integrated circuit assembly has bulges or depressions. 3.如权利要求1所述的返工救回集成电路组件的作业方法,其特征在于所述的初检步骤包括有检验该目标集成电路组件的电源与接地接脚间是否有不合格的开路/短路的情况。3. The operation method for reworking and salvaging integrated circuit components as claimed in claim 1, wherein said initial inspection step includes checking whether there is an unqualified open circuit/ short circuit condition. 4.一种返工救回集成电路组件的作业方法,一目标集成电路组件是以一球脚格状阵列方式封装完成,其特征在于,步骤为:4. An operation method for reworking and rescuing integrated circuit components, wherein a target integrated circuit component is packaged in a ball-pin lattice array, and the steps are as follows: (a)以一第一检视步骤检验该目标集成电路组件,以筛除受损失效的目标集成电路组件;(a) inspecting the target integrated circuit device with a first inspection step to screen out damaged and failed target integrated circuit devices; (b)以一预定温度在一预定时间内烘烤该目标集成电路组件;(b) baking the target integrated circuit device at a predetermined temperature for a predetermined time; (c)去除该目标集成电路组件的至少一焊锡;(c) removing at least one solder of the target integrated circuit component; (d)进行功能验证测试,以判断该目标集成电路组件为合格品或不合格品;(d) Conduct functional verification tests to determine whether the target integrated circuit component is a qualified product or a non-conforming product; (e)对该目标集成电路组件的已移除焊锡部位重焊焊锡;(e) re-soldering solder removed portions of the target integrated circuit component; (f)进行复检,以确认该重焊焊锡是否合格;以及(f) conduct re-inspection to confirm that the re-solder solder is acceptable; and (g)清洗该目标集成电路组件;(g) cleaning the target integrated circuit component; 其中该焊锡是一对一设置于该目标集成电路组件的至少一导电垫的下方,用来与一槽座建立电连接。Wherein the soldering tin is arranged one-to-one under at least one conductive pad of the target integrated circuit component, and is used to establish electrical connection with a socket. 5.如权利要求4所述的返工救回集成电路组件的作业方法,其特征在于所述的当执行该步骤(d)进行功能验证测试时,是将该目标集成电路组件插置于一设有弹性探针的测试槽座上进行。5. The operation method for reworking and salvaging integrated circuit components as claimed in claim 4, wherein when performing the step (d) to perform a functional verification test, the target integrated circuit component is inserted into a device Carried out on a test well with elastic probes.
CN 02127079 2002-07-30 2002-07-30 A working method for rework and salvage of integrated circuit components Expired - Lifetime CN1233035C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02127079 CN1233035C (en) 2002-07-30 2002-07-30 A working method for rework and salvage of integrated circuit components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02127079 CN1233035C (en) 2002-07-30 2002-07-30 A working method for rework and salvage of integrated circuit components

Publications (2)

Publication Number Publication Date
CN1472800A CN1472800A (en) 2004-02-04
CN1233035C true CN1233035C (en) 2005-12-21

Family

ID=34143459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02127079 Expired - Lifetime CN1233035C (en) 2002-07-30 2002-07-30 A working method for rework and salvage of integrated circuit components

Country Status (1)

Country Link
CN (1) CN1233035C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070050007A (en) * 2004-06-18 2007-05-14 인테그레이티드 디바이스 테크놀로지, 인코포레이티드 Automated Ball Mounting Method and System with Solder Ball Testing
CN102169809B (en) * 2010-11-22 2013-04-10 苏剑锋 BGA component repairing method and fixture
CN108106745A (en) * 2017-05-24 2018-06-01 郑州云海信息技术有限公司 It is a kind of to bury point methods for BGA repair thermometric plates
CN113155842A (en) * 2021-03-01 2021-07-23 唐芮 System and method for detecting defects of assembly line

Also Published As

Publication number Publication date
CN1472800A (en) 2004-02-04

Similar Documents

Publication Publication Date Title
US6873927B2 (en) Control method of an automatic integrated circuit full testing system
US6914424B2 (en) Automatic integrated circuit testing system and device using an integrative computer and method for the same
CN108666228B (en) Semiconductor device, inspection apparatus and manufacturing method thereof
US20040155241A1 (en) Test assembly for integrated circuit package
CN1233035C (en) A working method for rework and salvage of integrated circuit components
JP2002505010A (en) Multi-function inspection device for microelectronic components
US6342400B1 (en) Dye penetrant test for semiconductor package assembly solder joints
KR20100083341A (en) Precondition reliability testing method for 3-d shape measuring package reflowed by hot air convection
CN1779935A (en) Conductive bump testing device and testing method
US6311301B1 (en) System for efficient utilization of multiple test systems
JP2004363304A5 (en)
Jayaprasad et al. Analysis of low isolation problem in HMC using Ishikawa model: A case study
Albrecht et al. Study on the effect of the warpage of electronic assemblies on their reliability
Ghaffarian Vibration at Low and Extreme Cold Temp for QFN Assembly Reliability
JP2011185746A (en) Method for inspecting printed circuit board, and inspection device used for it
CN118999980B (en) Efficient vibration test device and method for evaluating interconnection reliability
CA2576590A1 (en) Test circuit board and method for testing a technology used to manufacture circuit board assemblies
US20250093303A1 (en) Semiconductor defect inspection method and apparatus
JP2000035459A (en) Electronic parts test device
TWI910887B (en) Inspection devices, inspection systems and inspection methods
Low et al. Mechanical and board level reliability considerations of lidless flip chip BGA packaging
JP3153834B2 (en) Semiconductor device test apparatus and semiconductor device inspection method
US7449907B2 (en) Test unit to test a board having an area array package mounted thereon
KR100227493B1 (en) Testing method and device of pcb for remote controller
JPH10104301A (en) Method for inspecting package substrate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20051221