[go: up one dir, main page]

CN108878126B - Patch inductance assembly machine - Google Patents

Patch inductance assembly machine Download PDF

Info

Publication number
CN108878126B
CN108878126B CN201810676524.0A CN201810676524A CN108878126B CN 108878126 B CN108878126 B CN 108878126B CN 201810676524 A CN201810676524 A CN 201810676524A CN 108878126 B CN108878126 B CN 108878126B
Authority
CN
China
Prior art keywords
station
piece
loading
assembly
stamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810676524.0A
Other languages
Chinese (zh)
Other versions
CN108878126A (en
Inventor
陈科宇
叶同海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Guanmei Automation Technology Co ltd
Original Assignee
Dongguan Guanmei Automation Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Guanmei Automation Technology Co ltd filed Critical Dongguan Guanmei Automation Technology Co ltd
Priority to CN201810676524.0A priority Critical patent/CN108878126B/en
Publication of CN108878126A publication Critical patent/CN108878126A/en
Application granted granted Critical
Publication of CN108878126B publication Critical patent/CN108878126B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • H01F41/02Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets
    • H01F41/04Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets for manufacturing coils
    • H01F41/10Connecting leads to windings

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Automatic Assembly (AREA)
  • Specific Conveyance Elements (AREA)

Abstract

The invention discloses a chip inductor assembling machine, which comprises a secondary assembling table for assembling a C piece and an E piece into a semi-finished product and a main assembling table for assembling the semi-finished product and an I piece into a finished product, wherein the main assembling table comprises a main rotary table and a plurality of trays arranged on the main rotary table, and the trays are provided with a plurality of storage grooves distributed according to a matrix; the main turntable is sequentially provided with a feeding station, an assembling station, a stamping station and a connection station, and a first feeding device is arranged at the outer side of the feeding station; the secondary assembly table is arranged at the outer side of the assembly station, and a transfer manipulator is arranged between the secondary assembly table and the assembly station; the stamping station is provided with a stamping device; the outside of the connection station is provided with a tray conveying device for conveying the tray with the finished product placed on the connection station to the drying box and conveying the empty tray of the tray conveying belt to the connection station. According to the invention, 100 inductors can be assembled by one-step stamping through the tray, so that the consistency of finished products is high, the time of independent swinging of the tray is saved, and the production efficiency is greatly improved.

Description

一种贴片电感组装机A chip inductor assembly machine

技术领域Technical field

本发明涉及电感生产技术领域,特别涉及一种贴片电感组装机。The invention relates to the technical field of inductor production, and in particular to a patch inductor assembly machine.

背景技术Background technique

贴片电感在电路中主要起滤波和振荡作用,分屏蔽电感和非屏蔽电感两类,如图8所示,贴片的屏蔽电感由I片103(屏蔽块)、E片105(由工型磁芯以及绕制到工型磁芯上的线圈组成)和C片104(引脚)组成,在组装过程中C片需要和E片铆合并和I片胶粘固定;传统的贴片电感组装机多是通过一转盘,将E片、C片、I片依次放置在转盘治具上铆合、胶粘冲压固定,然后将组装好的电感进行摆盘烘干,组装生产效率低;同时在进行摆盘的过程中,因为I片和半成品之间的胶还没干燥,使得I片容易发生移动,直接影响成品的良率,使得电感的质量以及一致性较低。The chip inductor mainly plays the role of filtering and oscillation in the circuit. It is divided into two types: shielded inductor and non-shielded inductor. As shown in Figure 8, the shielded inductor of the chip is composed of I piece 103 (shielding block) and E piece 105 (made of industrial type). The magnetic core and the coil wound onto the I-shaped magnetic core) and the C piece 104 (pins). During the assembly process, the C piece needs to be riveted and fixed with the E piece and the I piece glued; the traditional chip inductor group Most of the installation is done through a turntable, and the E piece, C piece, and I piece are placed on the turntable jig in turn, riveted, glued and stamped, and then the assembled inductor is plated and dried. The assembly production efficiency is low; at the same time, in During the placement process, because the glue between the I piece and the semi-finished product has not yet dried, the I piece is easy to move, which directly affects the yield of the finished product and makes the quality and consistency of the inductor low.

发明内容Contents of the invention

本发明解决的技术问题是针对上述现有技术中存在的缺陷,提供一种贴片电感组装机,以解决上述背景技术中提出的问题。The technical problem solved by the present invention is to provide a chip inductor assembly machine to solve the problems raised in the above background technology in view of the defects existing in the above-mentioned prior art.

为解决上述技术问题,本发明采取的技术方案如下:一种贴片电感组装机,所述贴片电感由I片、C片和E片组成,所述组装机包括将C片和E片组装成半成品的次组装台以及将半成品和I片组装成成品的主组装台,所述主组装台包括一主转盘以及放置在主转盘上的多个托盘,所述托盘开制有多个按矩阵分布的置物槽;所述主转盘上依次设置上料工位、组装工位、冲压工位和接驳工位,所述上料工位外侧设置有将一排I片同时摆放在托盘对应的一排置物槽内的第一上料装置;所述次组装台设置在组装工位外侧,所述次组装台和组装工位之间设置有将次组装台的半成品搬运至组装工位与I片进行组装的中转机械手;所述冲压工位设置有将半成品和I片冲压贴合的冲压装置;所述接驳工位外侧设置有将接驳工位放置有成品的托盘搬运到烘干箱并且将托盘输送带的空托盘搬运到接驳工位上的托盘搬运装置。In order to solve the above technical problems, the technical solution adopted by the present invention is as follows: a chip inductor assembly machine. The chip inductor is composed of I piece, C piece and E piece. The assembly machine includes assembling the C piece and the E piece. A sub-assembly station for semi-finished products and a main assembly station for assembling semi-finished products and pieces into finished products. The main assembly station includes a main turntable and multiple pallets placed on the main turntable. The pallets are manufactured with multiple matrix-type Distributed storage slots; the main turntable is provided with a loading station, an assembly station, a stamping station and a connecting station in sequence. A row of I pieces are placed on the outside of the loading station at the same time on the corresponding tray. The first loading device in a row of storage slots; the secondary assembly station is arranged outside the assembly station, and a device is provided between the secondary assembly station and the assembly station to transport the semi-finished products of the secondary assembly station to the assembly station. A transfer manipulator for assembling the I piece; the stamping station is provided with a stamping device for stamping and fitting the semi-finished product and the I piece; the outside of the connection station is provided with a pallet for transporting the finished product at the connection station to the drying station boxes and transport the empty pallets on the pallet conveyor belt to the pallet handling device on the docking station.

作为对上述技术方案的进一步阐述:As a further elaboration of the above technical solution:

在上述技术方案中,所述次组装台上设置有次转盘以及多个等角度设置在次转盘上的治具,所述次组装台沿次转盘转动方向依次设置有搬运E片到治具上的第二上料装置、第一点胶装置、检测点胶好坏的第一检测装置、搬运C片到治具上与E片连接的第三上料装置、将治具上的C片与E片铆合的铆合装置、第二点胶装置、检测点胶好坏的第二检测装置以及供中转机械手夹取半成品的转移工位,所述第二点胶装置和第二检测装置之间还设置有第三点胶装置和第四点胶装置。In the above technical solution, the secondary assembly platform is provided with a secondary turntable and a plurality of jigs arranged on the secondary turntable at equal angles. The secondary assembly stage is sequentially provided with devices to transport E pieces to the jigs along the rotation direction of the secondary turntable. The second loading device, the first dispensing device, the first detection device to detect the quality of the dispensing, the third loading device that transports the C piece to the jig and connects to the E piece, and connects the C piece on the jig to the E piece. The riveting device for riveting the E piece, the second dispensing device, the second detection device for detecting the quality of the dispensing, and the transfer station for the transfer manipulator to clamp the semi-finished product. The second dispensing device and the second detection device The third dispensing device and the fourth dispensing device are also provided in the room.

在上述技术方案中,所述托盘搬运装置包括架设在主转盘接驳工位上方的沿主转盘径向设置的支架,所述烘干箱和托盘输送带均垂直于支架走向,所述托盘输送带设置在接驳工位和烘干箱之间;所述支架吊设有搬运座,所述搬运座下端设置有夹持托盘的搬运机械手,所述支架沿走向设置有驱动搬运座移动的搬运导轨。In the above technical solution, the pallet handling device includes a bracket erected above the main turntable connection station along the radial direction of the main turntable. The drying box and the pallet conveyor belt are both perpendicular to the direction of the bracket. The pallet conveyor The belt is arranged between the connecting station and the drying box; the bracket is hung with a transport seat, and the lower end of the transport seat is provided with a transport robot for clamping the tray. The support is provided with a transport device along the direction to drive the movement of the transport seat. guide.

在上述技术方案中,所述冲压装置包括冲压板、将冲压板吊设在冲压工位上方的固定架,所述冲压板下端设置有多个按矩阵分布与托盘的置物槽相对应的冲头,所述固定架上设置有驱动冲压板的冲压气缸。In the above technical solution, the stamping device includes a stamping plate and a fixed frame that hangs the stamping plate above the stamping station. The lower end of the stamping plate is provided with a plurality of punches distributed in a matrix corresponding to the storage slots of the pallet. , the fixed frame is provided with a stamping cylinder that drives the stamping plate.

在上述技术方案中,所述第一上料装置包括与I片振动盘连接的第一料道、设置在第一料道前端的上料台、设置在上料台一侧的中转块、设置在上料台和上料工位之间的上料轨道以及沿上料轨道移动的上料机械手,所述中转块上等间隔开制有多个中转槽;所述上料台上设置有由推料气缸驱动的将第一料道的I片推送到中转块的中转槽内的推料杆;所述上料机械手下端设置有一排与中转块的中转槽相对应的吸料嘴。In the above technical solution, the first feeding device includes a first material channel connected to a vibrating plate, a loading platform provided at the front end of the first material channel, a transfer block provided on one side of the loading platform, There is a loading track between the loading platform and the loading station and a loading manipulator that moves along the loading track. A plurality of transfer slots are equally spaced on the transfer block; the loading platform is provided with a The push rod driven by the pushing cylinder pushes the I piece of the first feed channel into the transfer trough of the transfer block; the lower end of the loading manipulator is provided with a row of suction nozzles corresponding to the transfer trough of the transfer block.

在上述技术方案中,所述中转块在靠近上料台的一侧平行设置有一挡板,所述中转块的下端设置有滑座,所述滑座下端设置有驱动中转块沿挡板长度方向移动的平移轨道,所述中转槽的上端以及靠近挡板的一侧设置有开口。In the above technical solution, the transfer block is provided with a baffle in parallel on one side close to the loading table. The lower end of the transfer block is provided with a sliding seat. The lower end of the sliding seat is provided with a driving transfer block along the length direction of the baffle. A moving translation track, an opening is provided at the upper end of the transfer slot and on one side close to the baffle.

在上述技术方案中,所述托盘的下端依次设置有中板和底板,所述中板设置有多个往置物槽方向延伸的第一夹块,所述底板设置有多个往置物槽方向延伸的第二夹块,所述中板开制有多个供相应的第二夹块穿过的通孔;所述中板一侧边缘设置有第一推拉块,所述底板一侧边缘设置有第二推拉块;所述每个置物槽内的I片以及成品通过第一夹块和第二夹块固定在置物槽内。In the above technical solution, the lower end of the tray is provided with a middle plate and a bottom plate in sequence, the middle plate is provided with a plurality of first clamping blocks extending in the direction of the storage slot, and the bottom plate is provided with a plurality of first clamping blocks extending in the direction of the storage slot. The second clamping block is provided with a plurality of through holes for the corresponding second clamping blocks to pass through in the middle plate; a first push-pull block is provided on one side edge of the middle plate, and a first push-pull block is provided on one side edge of the bottom plate. The second push-pull block; the I piece and the finished product in each storage slot are fixed in the storage slot through the first clamping block and the second clamping block.

在上述技术方案中,所述主转盘在上料工位和组装工位分别设置有一组推动组件,所述推动组件包括推动第一推拉块带动第一夹块在置物槽内移动的第一推动气缸以及推动第二推拉块带动第二夹块在置物槽内移动的第二推动气缸,所述第二推动气缸设置在主转盘的中央,所述第一推动气缸设置在主转盘的外侧。In the above technical solution, the main turntable is provided with a set of push assemblies at the loading station and the assembly station respectively. The push assembly includes a first pusher that pushes the first push-pull block to drive the first clamping block to move in the storage slot. The cylinder and the second pushing cylinder push the second push-pull block to drive the second clamping block to move in the storage slot. The second pushing cylinder is arranged in the center of the main turntable, and the first pushing cylinder is arranged outside the main turntable.

在上述技术方案中,所述置物槽按10×10的矩阵排列分布在托盘上。In the above technical solution, the storage slots are arranged on the tray in a 10×10 matrix.

与现有技术相比,本发明的有益效果在于:本发明通过次组装台将E片和C片组装成半成品再到主组装台和I片组装成成品,通过托盘10×10个置物槽可以一次冲压组装100个电感,成品的一致性高,同时省去了单独摆盘的时间,大大提高了生产效率;通过第一上料装置可以一次同时往托盘上摆放10个I片,大大的提高了上料的效率;通过托盘中板的第一夹块和底板的第二夹块将成品固定在置物槽中,避免托盘移动的过程中I片和半成品发生偏移,提高电感的质量以及一致性。Compared with the existing technology, the beneficial effect of the present invention is that: the present invention assembles the E piece and the C piece into semi-finished products through the secondary assembly station, and then assembles the I piece into the finished product through the main assembly station. The 10×10 storage slots of the tray can 100 inductors can be assembled by stamping at one time. The consistency of the finished product is high. At the same time, it saves the time of placing individual plates, which greatly improves production efficiency. Through the first loading device, 10 I pieces can be placed on the tray at the same time, which greatly improves the efficiency of production. The efficiency of loading is improved; the finished product is fixed in the storage slot through the first clamping block of the middle plate of the pallet and the second clamping block of the bottom plate to avoid the offset of the I piece and the semi-finished product during the movement of the pallet, improving the quality of the inductor and consistency.

附图说明Description of the drawings

图1是本发明结构示意图;Figure 1 is a schematic structural diagram of the present invention;

图2是托架搬运装置结构示意图;Figure 2 is a schematic structural diagram of the pallet handling device;

图3是主组装台结构示意图;Figure 3 is a schematic structural diagram of the main assembly platform;

图4是第一上料装置结构示意图;Figure 4 is a schematic structural diagram of the first loading device;

图5是次组装台结构示意图;Figure 5 is a schematic structural diagram of the secondary assembly station;

图6是托盘结构示意图;Figure 6 is a schematic diagram of the tray structure;

图7是托盘结构分解示意图;Figure 7 is an exploded schematic diagram of the pallet structure;

图8是贴片电感结构分解示意图。Figure 8 is an exploded schematic diagram of the chip inductor structure.

图中:1、主组装台;11、上料工位;12、组装工位;13、冲压工位;14接驳工位、;15、主转盘;2、次组装台;20、次转盘;21、第一点胶装置;22、第一检测装置;23、铆合装置; 24、第二点胶装置;25、第三点胶装置;26、第四点胶装置;27、第二检测装置;28、转移工位;3、第一上料装置;31、第一料道;32、上料台;33、推料杆;34、中转块;35、滑座; 36、上料轨道;37、上料机械手;4、第二上料装置;5、第三上料装置;6、冲压装置;61、冲压板;62、冲头;7、托盘搬运装置;71、支架;72、搬运座;73、搬运机械手;8、空托盘;9、托盘;91、置物槽;92、成品;93、中板;94、第一夹块;95、通孔;96、第一推拉块;97、底板;98、第二夹块;99、第二推拉块;100、托盘输送带;101、烘干箱;102、中转机械手;103、I片;104、C片;105、E片。In the picture: 1. Main assembly station; 11. Loading station; 12. Assembly station; 13. Stamping station; 14. Connection station; 15. Main turntable; 2. Secondary assembly station; 20. Secondary turntable ; 21. First glue dispensing device; 22. First detection device; 23. Riveting device; 24. Second glue dispensing device; 25. Third glue dispensing device; 26. Fourth glue dispensing device; 27. Second Detection device; 28. Transfer station; 3. First feeding device; 31. First material channel; 32. Feeding table; 33. Push rod; 34. Transfer block; 35. Slide seat; 36. Feeding Track; 37. Feeding robot; 4. Second feeding device; 5. Third feeding device; 6. Stamping device; 61. Stamping plate; 62. Punch; 7. Pallet handling device; 71. Bracket; 72 , transport seat; 73, transport robot; 8, empty pallet; 9, pallet; 91, storage slot; 92, finished product; 93, middle plate; 94, first clamping block; 95, through hole; 96, first push-pull block ; 97. Bottom plate; 98. Second clamping block; 99. Second push-pull block; 100. Pallet conveyor belt; 101. Drying box; 102. Transfer manipulator; 103. I piece; 104. C piece; 105. E piece .

具体实施方式Detailed ways

下面结合附图1至附图8对本发明作进一步详细的说明。The present invention will be described in further detail below with reference to Figures 1 to 8.

通过参考附图描述的实施例是示例性的,旨在用于解释本申请,而不能理解为对本申请的限制。在本申请的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此, 限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本申请的描述中,“若干个”、“多个”的含义是两个或两个以上,除非另有明确具体的限定。在本申请中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。在本申请中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度小于第二特征。The embodiments described with reference to the drawings are exemplary and are intended to be used to explain the present application and are not to be construed as limitations of the present application. In the description of this application, it needs to be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " The directions or positions indicated by "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" etc. The relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, therefore It cannot be construed as a limitation on this application. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Therefore, features defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of this application, "several" and "plurality" mean two or more, unless otherwise clearly and specifically limited. In this application, unless otherwise clearly stated and limited, the terms "installation", "connection", "connection", "fixing" and other terms should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection. , or integrally connected; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances. In this application, unless otherwise expressly provided and limited, the term "above" or "below" a first feature on a second feature may include direct contact between the first and second features, or may include the first and second features. Not in direct contact but through additional characteristic contact between them. Furthermore, the terms "above", "above" and "above" the first feature is above the second feature include the first feature being directly above and diagonally above the second feature, or simply means that the first feature is higher in level than the second feature. "Below", "below" and "below" the first feature is above the second feature includes the first feature being directly above or diagonally above the second feature, or simply means that the horizontal height of the first feature is smaller than that of the second feature.

如图1-8所示,一种贴片电感组装机,贴片电感由I片(103)、C片(104)和E片(105)组成,组装机包括将C片(104)和E片(105)组装成半成品的次组装台2以及将半成品和 I片(103)组装成成品92的主组装台1,主组装台1包括一主转盘15以及放置在主转盘15 上的多个托盘9,托盘9开制有多个按矩阵分布的置物槽91;主转盘15上依次设置上料工位 11、组装工位12、冲压工位13和接驳工位14,上料工位11外侧设置有将一排I片(103) 同时摆放在托盘9对应的一排置物槽91内的第一上料装置3;次组装台2设置在组装工位12 外侧,次组装台2和组装工位12之间设置有将次组装台2的半成品搬运至组装工位12与I 片(103)进行组装的中转机械手102;冲压工位13设置有将半成品和I片(103)冲压贴合的冲压装置6;接驳工位14外侧设置有将接驳工位14放置有成品92的托盘9搬运到烘干箱 101并且将托盘输送带100的空托盘8搬运到接驳工位14上的托盘搬运装置7。As shown in Figure 1-8, a chip inductor assembly machine. The chip inductor is composed of I piece (103), C piece (104) and E piece (105). The assembly machine includes C piece (104) and E piece. The sub-assembly station 2 for assembling pieces (105) into semi-finished products and the main assembly station 1 for assembling semi-finished products and pieces (103) into finished products 92. The main assembly station 1 includes a main turntable 15 and a plurality of main turntables 15 placed on the main turntable 15. The pallet 9 has a plurality of storage slots 91 distributed in a matrix; the main turntable 15 is provided with a loading station 11, an assembly station 12, a stamping station 13 and a connecting station 14. The loading station 11 is provided with a first loading device 3 on the outside that simultaneously places a row of I pieces (103) in a row of storage slots 91 corresponding to the tray 9; a secondary assembly station 2 is arranged outside the assembly station 12, and the secondary assembly station 2 A transfer robot 102 is provided between the assembly station 12 and the assembly station 12 to transport the semi-finished product of the sub-assembly station 2 to the assembly station 12 and assemble the I-piece (103); the stamping station 13 is provided with a stamping station for stamping the semi-finished product and the I-piece (103). The fitting stamping device 6 is provided outside the connecting station 14 to transport the pallets 9 with the finished products 92 placed in the connecting station 14 to the drying box 101 and to transport the empty pallets 8 on the pallet conveyor belt 100 to the connecting station. Pallet handling device 7 on 14.

如图5所示,次组装台2上设置有次转盘20以及多个等角度设置在次转盘20上的治具,次组装台2沿次转盘20转动方向依次设置有搬运E片(105)到治具上的第二上料装置4、第一点胶装置21、检测点胶好坏的第一检测装置22、搬运C片(104)到治具上与E片(105) 连接的第三上料装置5、将治具上的C片(104)与E片(105)铆合的铆合装置23、第二点胶装置24、检测点胶好坏的第二检测装置27以及供中转机械手102夹取半成品的转移工位 28,第二点胶装置24和第二检测装置27之间还设置有第三点胶装置25和第四点胶装置26。As shown in Figure 5, the sub-assembly platform 2 is provided with a secondary turntable 20 and a plurality of jigs arranged at equal angles on the sub-turntable 20. The sub-assembly stage 2 is sequentially provided with conveying E pieces (105) along the rotation direction of the sub-turntable 20. The second loading device 4 on the jig, the first dispensing device 21, the first detection device 22 for detecting the quality of dispensing, and the third device that transports the C piece (104) to the jig and is connected to the E piece (105). Three feeding devices 5, a riveting device 23 for riveting the C piece (104) and the E piece (105) on the jig, a second glue dispensing device 24, a second detection device 27 for detecting the quality of glue dispensing, and a supply The transfer robot 102 clamps the transfer station 28 of the semi-finished product, and a third glue dispensing device 25 and a fourth glue dispensing device 26 are also provided between the second glue dispensing device 24 and the second detection device 27 .

如图2所示,托盘搬运装置7包括架设在主转盘15接驳工位14上方的沿主转盘15径向设置的支架71,烘干箱101和托盘输送带100均垂直于支架71走向,托盘输送带100设置在接驳工位14和烘干箱101之间;支架71吊设有搬运座72,搬运座72下端设置有夹持托盘9的搬运机械手73,支架71沿走向设置有驱动搬运座72移动的搬运导轨。As shown in Figure 2, the pallet handling device 7 includes a bracket 71 erected above the connection station 14 of the main turntable 15 and arranged along the radial direction of the main turntable 15. The drying box 101 and the pallet conveyor belt 100 are both perpendicular to the bracket 71. The pallet conveyor belt 100 is arranged between the connection station 14 and the drying box 101; the bracket 71 is suspended with a transport seat 72. The lower end of the transport seat 72 is provided with a transport robot 73 for clamping the pallet 9. The support 71 is provided with a driver along the direction. The transport guide rail on which the transport base 72 moves.

如图3所示,冲压装置6包括冲压板61、将冲压板61吊设在冲压工位13上方的固定架,冲压板61下端设置有多个按矩阵分布与托盘9的置物槽91相对应的冲头62,固定架上设置有驱动冲压板61的冲压气缸。As shown in Figure 3, the stamping device 6 includes a stamping plate 61 and a fixed frame that hangs the stamping plate 61 above the stamping station 13. The lower end of the stamping plate 61 is provided with a plurality of storage slots 91 distributed in a matrix corresponding to the storage slots 91 of the tray 9. The punch 62 is provided with a stamping cylinder that drives the stamping plate 61 on the fixed frame.

如图4所示,第一上料装置3包括与I片(103)振动盘连接的第一料道31、设置在第一料道31前端的上料台32、设置在上料台32一侧的中转块34、设置在上料台32和上料工位11之间的上料轨道36以及沿上料轨道36移动的上料机械手37,中转块34上等间隔开制有多个中转槽;上料台32上设置有由推料气缸驱动的将第一料道31的I片(103)推送到中转块34的中转槽内的推料杆33;上料机械手37下端设置有一排与中转块34的中转槽相对应的吸料嘴。As shown in Figure 4, the first feeding device 3 includes a first feed channel 31 connected with the I piece (103) vibration plate, a loading platform 32 provided at the front end of the first feeding channel 31, and a feeding platform 32 provided at The transfer block 34 on the side, the loading track 36 provided between the loading platform 32 and the loading station 11, and the loading manipulator 37 moving along the loading track 36, have multiple transfer blocks at equal intervals on the transfer block 34. The loading platform 32 is provided with a push rod 33 driven by a pushing cylinder to push the I piece (103) of the first feed channel 31 into the transfer slot of the transfer block 34; the lower end of the loading manipulator 37 is provided with a row of A suction nozzle corresponding to the transfer slot of the transfer block 34 .

中转块34在靠近上料台32的一侧平行设置有一挡板,中转块34的下端设置有滑座35,滑座35下端设置有驱动中转块34沿挡板长度方向移动的平移轨道,中转槽的上端以及靠近挡板的一侧设置有开口。The transfer block 34 is provided with a baffle in parallel on one side close to the loading table 32. The lower end of the transfer block 34 is provided with a sliding seat 35. The lower end of the sliding seat 35 is provided with a translation track that drives the transfer block 34 to move along the length direction of the baffle. An opening is provided at the upper end of the groove and on the side close to the baffle.

如图6-7所示,托盘9的下端依次设置有中板93和底板87,中板93设置有多个往置物槽91方向延伸的第一夹块94,底板87设置有多个往置物槽91方向延伸的第二夹块98,中板93开制有多个供相应的第二夹块98穿过的通孔95;中板93一侧边缘设置有第一推拉块96,底板87一侧边缘设置有第二推拉块99;第一推拉块96和托盘9之间以及第二推拉块99和托盘9之间设置有金属弹簧或者空气弹簧或者磁铁,本实施方式中采用提供弹力的金属弹簧,金属弹簧设置在第一推拉块96和托盘9之间以及第二推拉块99和托盘9之间带动中板93和底板87往托盘9一侧移动,使得第一夹块94和第二夹块98可以将I片(103)、半成品以及成品92稳定的夹在置物槽91中,每个置物槽91内的I片(103)以及成品92通过第一夹块94和第二夹块98固定在置物槽91内。As shown in Figures 6-7, the lower end of the tray 9 is provided with a middle plate 93 and a bottom plate 87 in sequence. The middle plate 93 is provided with a plurality of first clamping blocks 94 extending toward the direction of the storage slot 91, and the bottom plate 87 is provided with a plurality of first clamping blocks 94 for storage. The second clamping block 98 extends in the direction of the groove 91, and the middle plate 93 has a plurality of through holes 95 for the corresponding second clamping blocks 98 to pass through; a first push-pull block 96 is provided on one edge of the middle plate 93, and the bottom plate 87 A second push-pull block 99 is provided on one edge; a metal spring or an air spring or a magnet is provided between the first push-pull block 96 and the tray 9 and between the second push-pull block 99 and the tray 9. In this embodiment, a spring that provides elastic force is used. The metal spring is arranged between the first push-pull block 96 and the tray 9 and between the second push-pull block 99 and the tray 9 to drive the middle plate 93 and the bottom plate 87 to move to the side of the tray 9, so that the first clamping block 94 and the The two clamping blocks 98 can stably clamp the I piece (103), semi-finished product and finished product 92 in the storage slot 91. The I piece (103) and the finished product 92 in each storage slot 91 pass through the first clamping block 94 and the second clamping block. Block 98 is secured within storage slot 91 .

如图3所示,主转盘15在上料工位11和组装工位12分别设置有一组推动组件,推动组件包括推动第一推拉块96带动第一夹块94在置物槽91内移动的第一推动气缸以及推动第二推拉块99带动第二夹块98在置物槽91内移动的第二推动气缸,第二推动气缸设置在主转盘 15的中央,第一推动气缸设置在主转盘15的外侧。第一推动气缸和第二推动气缸的推动方向相垂直,使得中板93和底板87移动的方向是垂直的,带动第一夹块94和第二夹块98移动使得第一夹块94和第二夹块98之间的空间变大。As shown in FIG. 3 , the main turntable 15 is provided with a set of push assemblies at the loading station 11 and the assembly station 12 respectively. The push assemblies include a third push-pull block 96 that drives the first clamp block 94 to move in the storage slot 91 . A pushing cylinder and a second pushing cylinder that push the second push-pull block 99 to drive the second clamping block 98 to move in the storage slot 91. The second pushing cylinder is arranged in the center of the main turntable 15, and the first pushing cylinder is arranged at the center of the main turntable 15. outside. The pushing directions of the first pushing cylinder and the second pushing cylinder are perpendicular, so that the moving directions of the middle plate 93 and the bottom plate 87 are vertical, and the first clamping block 94 and the second clamping block 98 are driven to move, so that the first clamping block 94 and the second clamping block 94 are moved. The space between the two clamping blocks 98 becomes larger.

置物槽91按10×10的矩阵排列分布在托盘9上。The storage slots 91 are arranged on the tray 9 in a 10×10 matrix.

本发明的工作过程,托盘搬运装置7的搬运机械手73将托盘输送带100上的空托盘8夹取搬运到主转盘15的接驳工位14,主转盘15将托盘9转动到上料工位11,上料工位11的推动组件的第一推动气缸和第二推动气缸分别推动中板93和底板87,使得第一夹块94和第二夹块98之间的空间变大,以方便放入I片(103);第一上料装置3的第一料道31将I片(103)输送到上料台32,上料台32的推料杆33与中转块34协作将10个I片(103)依次推送到中转块34的10个中转槽中,因为有挡板的阻挡防止中转槽中I片(103)掉落,上料机械手37将10个I片(103)吸取并摆放到上料工位11的托盘9的一排置物槽91中,上料工位11的托盘9摆满I片(103)后随主转盘15转动到组装工位12,组装工位12的推动组件推动中板93和底板87,使得第一夹块94和第二夹块98之间的空间变大,以方便放入半成品;中转机械手102将次组装台2转移工位28上组装好的半成品夹取放入置物槽91中和 I片(103)贴合,组装工位12上托盘9摆满半成品后随主转盘15转动到冲压工位13,冲压气缸启动来驱动冲压板61和多个冲头62下压,将半成品和I片(103)冲压贴合,冲压完成后,冲压工位13的托盘9移动到接驳工位14上,托盘搬运装置7的搬运机械手73夹取装满成品92的托盘9移动到烘干箱101的传送带上,使得装满成品92的托盘9进入烘干箱101 将胶烘干形成一个屏蔽电感。In the working process of the present invention, the transport robot 73 of the pallet transport device 7 clamps and transports the empty pallet 8 on the pallet conveyor belt 100 to the connection station 14 of the main turntable 15, and the main turntable 15 rotates the pallet 9 to the loading station. 11. The first pushing cylinder and the second pushing cylinder of the pushing assembly of the loading station 11 push the middle plate 93 and the bottom plate 87 respectively, so that the space between the first clamping block 94 and the second clamping block 98 becomes larger for convenience. Put the I piece (103); the first feed channel 31 of the first feeding device 3 transports the I piece (103) to the loading table 32, and the pushing rod 33 of the loading table 32 cooperates with the transfer block 34 to transfer 10 pieces The I-pieces (103) are pushed to the 10 transfer slots of the transfer block 34 in turn. Because there are baffles to prevent the I-pieces (103) from falling in the transfer slots, the loading manipulator 37 absorbs the 10 I-pieces (103) and Placed in a row of storage slots 91 of the pallet 9 of the loading station 11, the pallet 9 of the loading station 11 is filled with pieces (103) and then rotates to the assembly station 12 with the main turntable 15. The assembly station 12 The pushing component pushes the middle plate 93 and the bottom plate 87 to enlarge the space between the first clamping block 94 and the second clamping block 98 to facilitate the insertion of semi-finished products; the transfer manipulator 102 transfers the secondary assembly platform 2 to the station 28 for assembly. The good semi-finished products are clamped and put into the storage slot 91 to fit the I piece (103). The pallet 9 on the assembly station 12 is filled with semi-finished products and then rotates to the stamping station 13 with the main turntable 15. The stamping cylinder is started to drive the stamping plate 61 Press down with multiple punches 62 to punch and fit the semi-finished product and the piece 1 (103). After the stamping is completed, the pallet 9 of the stamping station 13 moves to the connection station 14, and the transfer robot 73 of the pallet transfer device 7 clamps Take the tray 9 filled with finished products 92 and move it to the conveyor belt of the drying box 101, so that the tray 9 filled with finished products 92 enters the drying box 101 to dry the glue to form a shielded inductor.

其中,次组装台2上第二上料装置4将E片(105)放在次转盘20的治具上,治具上的E片(105)移动到第一点胶装置21下方进行第一次点胶,然后移动到第二上料装置4下方,第二上料装置4将C片(104)摆放到E片(105)上,放置了E片(105)和C片(104)的治具经过第一检测装置22对胶位进行外观检测后移动到铆合装置23下方,铆合装置23将C 片(104)铆合在E片(105)上固定形成半成品,放置半层品的治具移动到第二点胶装置24 下方进行第二次点胶,不同型号的电感需要多个位置点胶,或者不同型号的电感用的胶不同,这都通过第三点胶装置25和第四点胶装置26实现,第二次点胶后治具经过第二检测装置27 对胶位进行外观检测,最后移动到转移工位28上供中转机械手102夹取。Among them, the second loading device 4 on the secondary assembly table 2 places the E piece (105) on the jig of the secondary turntable 20, and the E piece (105) on the jig moves to the bottom of the first dispensing device 21 for the first time. Dispensing glue, and then moves to the bottom of the second loading device 4. The second loading device 4 places the C piece (104) on the E piece (105), placing the E piece (105) and C piece (104) The jig moves to the bottom of the riveting device 23 after the first detection device 22 performs visual inspection on the glue position. The riveting device 23 rivets the C piece (104) to the E piece (105) to form a semi-finished product, and places a half layer The jig of the product is moved to the bottom of the second dispensing device 24 for the second dispensing. Different models of inductors require dispensing at multiple locations, or different models of inductors use different glues. This all passes through the third dispensing device 25 It is implemented with the fourth glue dispensing device 26. After the second glue dispensing, the fixture passes through the second detection device 27 to perform visual inspection of the glue position, and finally moves to the transfer station 28 for the transfer manipulator 102 to clamp.

以上并非对本发明的技术范围作任何限制,凡依据本发明技术实质对以上的实施例所作的任何修改、等同变化与修饰,均仍属于本发明的技术方案的范围内。The above does not limit the technical scope of the present invention in any way. Any modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention still fall within the scope of the technical solution of the present invention.

Claims (6)

1.一种贴片电感组装机,所述贴片电感由I片、C片和E片组成,其特征在于:所述组装机包括将C片和E片组装成半成品的次组装台以及将半成品和I片组装成成品的主组装台,所述主组装台包括一主转盘以及放置在主转盘上的多个托盘,所述托盘开制有多个按矩阵分布的置物槽;所述主转盘上依次设置上料工位、组装工位、冲压工位和接驳工位,所述上料工位外侧设置有将一排I片同时摆放在托盘对应的一排置物槽内的第一上料装置;所述次组装台设置在组装工位外侧,所述次组装台和组装工位之间设置有将次组装台的半成品搬运至组装工位与I片进行组装的中转机械手;所述冲压工位设置有将半成品和I片冲压贴合的冲压装置;所述接驳工位外侧设置有将接驳工位放置有成品的托盘搬运到烘干箱并且将托盘输送带的空托盘搬运到接驳工位上的托盘搬运装置;其中:1. A chip inductor assembly machine. The chip inductor is composed of I piece, C piece and E piece. It is characterized in that: the assembly machine includes a sub-assembly station for assembling C piece and E piece into semi-finished products and a sub-assembly station for assembling the C piece and E piece into semi-finished products. Semi-finished products and I pieces are assembled into the main assembly platform of the finished product. The main assembly platform includes a main turntable and a plurality of trays placed on the main turntable. The trays are provided with a plurality of storage slots distributed in a matrix; the main assembly stage The turntable is provided with a loading station, an assembly station, a stamping station and a splicing station in sequence. The outside of the loading station is provided with a row of I pieces that are simultaneously placed in a row of storage slots corresponding to the pallet. A loading device; the secondary assembly station is arranged outside the assembly station, and a transfer robot is provided between the secondary assembly station and the assembly station to transport the semi-finished products of the secondary assembly station to the assembly station for assembly with the first piece; The stamping station is provided with a stamping device for stamping and fitting semi-finished products and pieces; the outside of the connection station is provided with a device for transporting the pallet with the finished product at the connection station to the drying box and emptying the pallet conveyor belt. The pallet handling device is used to transport pallets to the docking station; among which: 所述第一上料装置包括与I片振动盘连接的第一料道、设置在第一料道前端的上料台、设置在上料台一侧的中转块、设置在上料台和上料工位之间的上料轨道以及沿上料轨道移动的上料机械手,所述中转块上等间隔开制有多个中转槽;所述上料台上设置有由推料气缸驱动的将第一料道的I片推送到中转块的中转槽内的推料杆;所述上料机械手下端设置有一排与中转块的中转槽相对应的吸料嘴;The first feeding device includes a first material channel connected to a vibrating plate, a loading platform provided at the front end of the first material channel, a transfer block provided on one side of the loading platform, a loading platform and an upper feeding device. There is a loading track between the material stations and a loading manipulator that moves along the loading track. A plurality of transfer slots are equally spaced on the transfer block; the loading platform is equipped with a pusher driven by a pushing cylinder. The I piece of the first material channel is pushed to the pushing rod in the transfer trough of the transfer block; the lower end of the loading manipulator is provided with a row of suction nozzles corresponding to the transfer trough of the transfer block; 所述托盘的下端依次设置有中板和底板,所述中板设置有多个往置物槽方向延伸的第一夹块,所述底板设置有多个往置物槽方向延伸的第二夹块,所述中板开制有多个供相应的第二夹块穿过的通孔;所述中板一侧边缘设置有第一推拉块,所述底板一侧边缘设置有第二推拉块;所述每个置物槽内的I片以及成品通过第一夹块和第二夹块固定在置物槽内;The lower end of the tray is provided with a middle plate and a bottom plate in sequence. The middle plate is provided with a plurality of first clamping blocks extending in the direction of the storage slot. The bottom plate is provided with a plurality of second clamping blocks extending in the direction of the storage slot. The middle plate has a plurality of through holes for corresponding second clamping blocks to pass through; a first push-pull block is provided on one side edge of the middle plate, and a second push-pull block is provided on one side edge of the bottom plate; The I piece and the finished product in each storage slot are fixed in the storage slot through the first clamping block and the second clamping block; 所述置物槽按10×10的矩阵排列分布在托盘上。The storage slots are arranged and distributed on the tray in a 10×10 matrix. 2.根据权利要求1所述的一种贴片电感组装机,其特征在于,所述次组装台上设置有次转盘以及多个等角度设置在次转盘上的治具,所述次组装台沿次转盘转动方向依次设置有搬运E片到治具上的第二上料装置、第一点胶装置、检测点胶好坏的第一检测装置、搬运C片到治具上与E片连接的第三上料装置、将治具上的C片与E片铆合的铆合装置、第二点胶装置、检测点胶好坏的第二检测装置以及供中转机械手夹取半成品的转移工位,所述第二点胶装置和第二检测装置之间还设置有第三点胶装置和第四点胶装置。2. A chip inductor assembly machine according to claim 1, characterized in that the secondary assembly stage is provided with a secondary turntable and a plurality of jigs arranged on the secondary turntable at equal angles. The secondary assembly stage Along the rotation direction of the sub-turntable, there are arranged a second loading device for transporting the E piece to the jig, a first dispensing device, a first detection device for detecting the quality of the dispensing, and a second loading device for transporting the C piece to the jig to connect with the E piece. The third loading device, the riveting device that rivets the C piece and the E piece on the jig, the second dispensing device, the second detection device to detect the quality of the dispensing, and the transfer tool for the transfer manipulator to clamp the semi-finished product position, a third glue dispensing device and a fourth glue dispensing device are also provided between the second glue dispensing device and the second detection device. 3.根据权利要求1所述的一种贴片电感组装机,其特征在于,所述托盘搬运装置包括架设在主转盘接驳工位上方的沿主转盘径向设置的支架,所述烘干箱和托盘输送带均垂直于支架走向,所述托盘输送带设置在接驳工位和烘干箱之间;所述支架吊设有搬运座,所述搬运座下端设置有夹持托盘的搬运机械手,所述支架沿走向设置有驱动搬运座移动的搬运导轨。3. A chip inductor assembly machine according to claim 1, characterized in that the pallet handling device includes a bracket erected above the main turntable connection station and arranged along the radial direction of the main turntable, and the drying device The box and pallet conveyor belts are perpendicular to the direction of the bracket, and the pallet conveyor belt is arranged between the connecting station and the drying box; the bracket is hung with a transport seat, and the lower end of the transport seat is equipped with a transport clamp to hold the pallet. Manipulator, the bracket is provided with a transport guide rail along the direction that drives the transport base to move. 4.根据权利要求1所述的一种贴片电感组装机,其特征在于,所述冲压装置包括冲压板、将冲压板吊设在冲压工位上方的固定架,所述冲压板下端设置有多个按矩阵分布与托盘的置物槽相对应的冲头,所述固定架上设置有驱动冲压板的冲压气缸。4. A chip inductor assembly machine according to claim 1, characterized in that the stamping device includes a stamping plate and a fixed frame that hangs the stamping plate above the stamping station, and the lower end of the stamping plate is provided with a A plurality of punches are distributed in a matrix corresponding to the storage slots of the pallet, and a stamping cylinder for driving the stamping plate is provided on the fixed frame. 5.根据权利要求1所述的一种贴片电感组装机,其特征在于, 所述中转块在靠近上料台的一侧平行设置有一挡板,所述中转块的下端设置有滑座,所述滑座下端设置有驱动中转块沿挡板长度方向移动的平移轨道,所述中转槽的上端以及靠近挡板的一侧设置有开口。5. A chip inductor assembly machine according to claim 1, characterized in that the transfer block is provided with a baffle in parallel on one side close to the loading table, and a slide is provided at the lower end of the transfer block. The lower end of the slide seat is provided with a translation track that drives the transfer block to move along the length direction of the baffle. The upper end of the transfer slot and the side close to the baffle are provided with openings. 6.根据权利要求1所述的一种贴片电感组装机,其特征在于,所述主转盘在上料工位和组装工位分别设置有一组推动组件,所述推动组件包括推动第一推拉块带动第一夹块在置物槽内移动的第一推动气缸以及推动第二推拉块带动第二夹块在置物槽内移动的第二推动气缸,所述第二推动气缸设置在主转盘的中央,所述第一推动气缸设置在主转盘的外侧。6. A chip inductor assembly machine according to claim 1, characterized in that the main turntable is provided with a set of push components at the loading station and the assembly station respectively, and the push component includes pushing the first push-pull A first pushing cylinder that drives the first clamping block to move in the storage slot and a second pushing cylinder that drives the second push-pull block to drive the second clamping block to move in the storage slot. The second pushing cylinder is arranged in the center of the main turntable. , the first pushing cylinder is arranged outside the main turntable.
CN201810676524.0A 2018-06-27 2018-06-27 Patch inductance assembly machine Expired - Fee Related CN108878126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810676524.0A CN108878126B (en) 2018-06-27 2018-06-27 Patch inductance assembly machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810676524.0A CN108878126B (en) 2018-06-27 2018-06-27 Patch inductance assembly machine

Publications (2)

Publication Number Publication Date
CN108878126A CN108878126A (en) 2018-11-23
CN108878126B true CN108878126B (en) 2023-12-22

Family

ID=64296069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810676524.0A Expired - Fee Related CN108878126B (en) 2018-06-27 2018-06-27 Patch inductance assembly machine

Country Status (1)

Country Link
CN (1) CN108878126B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109590705B (en) * 2018-12-26 2020-09-04 上海福赛特机器人有限公司 Automatic wafer assembling device and automatic assembling method
CN110416011B (en) * 2019-08-26 2024-03-12 东莞市谊嘉电子科技有限公司 Membrane switch assembly machine and production process of membrane switch
CN113369890B (en) * 2021-06-30 2025-05-30 上海合愉电机有限公司 Motor stator assembly equipment
CN114883096B (en) * 2021-11-30 2024-12-13 金动力智能科技(深圳)有限公司 A fully automatic manufacturing line for high-current 5G and new energy vehicle inductors
CN114464438B (en) * 2022-02-10 2022-07-22 长兴华强电子股份有限公司 Full-automatic loading chip mounter for metal carrier inductor
CN114700227B (en) * 2022-04-22 2023-09-08 广东赛威莱自动化科技有限公司 Chip mounter
CN115283954B (en) * 2022-07-27 2023-03-17 深圳市三一联光智能设备股份有限公司 Full-automatic assembling equipment for inductors
CN115445862B (en) * 2022-09-26 2024-05-31 福立旺精密机电(中国)股份有限公司 Glue dispensing detection device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001267129A (en) * 2000-03-16 2001-09-28 Murata Mfg Co Ltd Chip inductor and manufacturing method thereof
CN202120707U (en) * 2011-05-11 2012-01-18 亚世电子(东莞)有限公司 A New SMD Inductor
CN206877825U (en) * 2017-05-27 2018-01-12 深圳顺络电子股份有限公司 A kind of power inductance automatic assembly equipment
CN108161439A (en) * 2018-02-05 2018-06-15 东莞市钺河自动化科技有限公司 A kind of potentiometer kludge of automatic card-loading circle
CN108202221A (en) * 2018-02-05 2018-06-26 东莞市钺河自动化科技有限公司 A kind of potentiometer pedestal kludge
CN208433306U (en) * 2018-06-27 2019-01-25 东莞市冠美自动化科技有限公司 A kind of chip inductor kludge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001267129A (en) * 2000-03-16 2001-09-28 Murata Mfg Co Ltd Chip inductor and manufacturing method thereof
CN202120707U (en) * 2011-05-11 2012-01-18 亚世电子(东莞)有限公司 A New SMD Inductor
CN206877825U (en) * 2017-05-27 2018-01-12 深圳顺络电子股份有限公司 A kind of power inductance automatic assembly equipment
CN108161439A (en) * 2018-02-05 2018-06-15 东莞市钺河自动化科技有限公司 A kind of potentiometer kludge of automatic card-loading circle
CN108202221A (en) * 2018-02-05 2018-06-26 东莞市钺河自动化科技有限公司 A kind of potentiometer pedestal kludge
CN208433306U (en) * 2018-06-27 2019-01-25 东莞市冠美自动化科技有限公司 A kind of chip inductor kludge

Also Published As

Publication number Publication date
CN108878126A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN108878126B (en) Patch inductance assembly machine
CN202649362U (en) Automatic voltage and internal resistance test machine for battery
CN111300034B (en) Wire connector and automatic production equipment and method thereof
CN105773139A (en) Lens mount and ICR automatic assembly line
CN107175486A (en) Connector intellectuality conveying and assembling outfit
CN210709344U (en) battery supply equipment
CN114023549A (en) Automatic assembly production line for PCB planar transformer
CN208433306U (en) A kind of chip inductor kludge
CN116618875A (en) An intelligent welding system for hood mounting bracket
CN114955526B (en) Manipulator swinging tray and turning tray stacking machine
KR100295786B1 (en) Ic package transfer and relocation mechanism
CN112440106B (en) A belt conveyor type magnetic toy assembly production line and assembly method thereof
CN212648054U (en) Transformer production equipment
CN211804659U (en) Fully automatic assembly welding system
CN211034357U (en) Equipment for loading circuit board into tray disk
CN117775366B (en) Automatic assembling and packaging machine for pens
CN111153169A (en) Automatic blanking machine and its working method
CN218641884U (en) A charging fixture automatic loading and unloading device
CN112208838A (en) Automatic plate classifying and collecting method and device
CN110773997A (en) A heat exchanger plate bundle automatic assembly device
CN113894544B (en) A sensor assembly process
CN110976668B (en) Automatic production equipment for wire connectors and bottom clamping piece feeding device of automatic production equipment
CN116637780A (en) A crystal oscillator dispensing and solid crystal equipment
CN211542837U (en) Hot stamping device suitable for hot stamping of various materials
CN119734069B (en) Automatic assembling equipment for inductance coil base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231222