CN106869103B CN201710275325.4A CN201710275325A CN106869103B CN 106869103 B CN106869103 B CN 106869103B CN 201710275325 A CN201710275325 A CN 201710275325A CN 106869103 B CN106869103 B CN 106869103B
Authority
CN
China
Prior art keywords
lock chambers
valve
lock
ship
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710275325.4A
Other languages
English (en)
Other versions
CN106869103A (zh
Inventor
彭国洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUZHOU SMART WATER TECHNOLOGY Co.,Ltd.
Original Assignee
Quanzhou Taiwan Investment Zone Yang Fu Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Taiwan Investment Zone Yang Fu Information Technology Co Ltd filed Critical Quanzhou Taiwan Investment Zone Yang Fu Information Technology Co Ltd
Priority to CN201710275325.4A priority Critical patent/CN106869103B/zh
Publication of CN106869103A publication Critical patent/CN106869103A/zh
Application granted granted Critical
Publication of CN106869103B publication Critical patent/CN106869103B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明是三级四线二分之一互补省水船闸。本发明的有益效果是,在没有省水池的条件下,首次把三级四线船闸船舶每次通过的耗水量降低到1/6H,有效地提高省水效率。本发明的技术方案是,三级四线二分之一互补省水船闸闸室之间以独特的连通方式,按照一套独一无二的进排水操作方法而运行。

Description

三级四线二分之一互补省水船闸
技术领域:
本发明涉及水工建筑物,特别涉及一种船舶通过水坝的船闸。
背景技术:
省水船闸可分为两大类,第一类是带有省水容器(如省水池、储水池、中间渠道)的船闸,第二类是利用闸室的本身做为省水容器的船闸。由于省水容器的高度有严格地设计要求,一座船闸需要多个高度不同的省水池,省水池成本在几百万元、几千万元,甚至高达几亿元。在工程成本这一方面来说,第二类省水船闸不存在省水容器,具有低成本的优势,免除了省水池成本的优越技术效果。
第二类省水船闸是一线船闸与另一线(或者为多线)船闸之间,以水量互相补充的运行方式,达到省水为目的的船闸。第二类省水船闸在所有的文件中没有一个统一的标准的名称,因此申请人把第二类船闸命名为互补省水船闸,把第二类船闸的技术领域称之为互补省水船闸技术领域。
目前世界上普通使用的省水船闸是带有省水容器的船闸,其省水率极低,举一个例子,以典型的省水率1/2单级带省水池船闸进行说明,有省水池A池、B池,船闸泄水运行时先向省水池泄水,其顺序是先泄向高处的省水池(B池),再依次泄向低处的省水池(A池)。水泄向B池导致B池水位上升,B池水位上升没有用于需要上升的船舶,白白地浪费了水位的上升,没有起到省水的效果,需要花费创造性劳动解决省水的效果。同样,水泄向A池导致A池水位上升,A池水位上升没有用于需要上升的船舶,白白地浪费了水位的上升,没有起到省水的效果,需要花费创造性劳动解决省水的效果。灌水顺序与泄水时相反,首先将低处的省水池(A池)的水灌入闸室,然后依次将高处的省水池(B池)向闸室灌水。A池的水灌入闸室导致A池水位下降,A池水位下降没有用于需要下降的船舶,白白地浪费了水位的下降,没有起到省水的效果,需要花费创造性劳动解决省水的效果。同样,B池的水灌入闸室导致B池水位下降,B池水位下降没有用于需要下降的船舶,白白地浪费了水位的下降,没有起到省水的效果,需要花费创造性劳动解决省水的效果。本发明技术方案把省水池改成船闸闸室,充分地利用了水位的上升和下降用于船舶的上升和下降,大幅提高了省水效率技术效果。
发明内容:
三级四线二分之一互补省水船闸是指:船闸为4线,每线为3级,4线之间是连通的,4线船闸闸室之间的水是互相排放的,每一个闸室在每一次排水或进水的水位下降或上升都是槛上水深水位至闸室高水位的二分之一高度。
本发明的有益效果是,在没有省水池的条件下,首次把三级四线船闸船舶每次通过的耗水量降低到1/6H(H:总水头高度),有效地提高省水效率。
本发明的技术方案是:
船闸为4线,每线为3级,A、B、C、D四线船闸并排布置;
4线船闸的第一级闸室之间有1路主廊道,主廊道有4个分支,每1个分支经过1个阀门后分别与A1、B1、C1、D1闸室连通;
4线船闸的第二级闸室之间有1路主廊道,主廊道有4个分支,每1个分支经过1个阀门后分别与A2、B2、C2、D2闸室连通;
4线船闸的第三级闸室之间有1路主廊道,主廊道有4个分支,每1个分支经过1个阀门后分别与A3、B3、C3、D3闸室连通;
每一线船闸的上一级闸室与下一级闸室之间的连通方式和廊道阀门与常规船闸相同;
进水阀门的位置关系及作用与常规三级船闸相同,每一线上游闸室有1个进水阀门;
排水阀门的位置关系及作用与常规三级船闸相同,每一线下游闸室有1个排水阀门;
闸门的位置关系及作用与常规三级船闸相同,每一个闸室有上游闸门、下游闸门;
每一个闸室在每一次排水或进水的水位下降或上升是槛上水深水位至闸室高水位的二分之一高度。
附图说明:
图1至图6是三级四线二分之一互补省水船闸工作原理顺序图。
()里的数字或字母代表图中的数字或字母,数字或字母代表()前面的名称:A线船闸(A)、B线船闸(B)、C线船闸(C)、D线船闸(D)每一幅图中的位置是相同的,因此只有在图1标出;A线下游闸室A1(A1),B线下游闸室B1(B1),C线下游闸室C1(C1),D线下游闸室D1(D1),A线中间闸室A2(A2),B线中间闸室B2(B2),C线中间闸室C2(C2),D线中间闸室D2(D2),A线上游闸室A3(A3),B线上游闸室B3(B3),C线上游闸室C3(C3),D线上游闸室D3(D3),闸门(Z),水流经过阀门时的流动方向(→),去上游的船舶一(S),去下游的船舶二(X);
水位标记0、01、02在每一线船闸水相同的,因此每一幅附图中只有在A线船闸标出;下游至上游的总水头高度平均分成6个水位高度,其中下游闸室有2个水位高度,3个水位标记下游水位(0)、1/2水位(01)、高水位(02);中间闸室有2个水位高度,3个水位标记槛上水深水位(0)、1/2水位(01)、高水位(02);上游闸室有2个水位高度,3个水位标记槛上水深水位(0)、1/2水位(01)、上游水位(02);
A3闸室上游水进水阀门一(1),B3闸室上游水进水阀门二(2),C3闸室上游水进水阀门三(3),D3闸室上游水进水阀门四(4),A1闸室水排放至下游阀门十三(13);B1闸室水排放至下游阀门十四(14),C1闸室水排放至下游阀门十五(15),D1闸室水排放至下游阀门十六(16);
上一级闸室的水排放至下一级闸室的廊道阀门有阀门五(5)、阀门六(6)、阀门七(7)、阀门八(8)、阀门九(9)、阀门十(10)、阀门十一(11)、阀门十二(12);
一线船闸与另一线船闸之间互相排水的廊道阀门有阀门十七(17)、阀门十八(18)、阀门十九(19)、阀门二十(20)、阀门二十一(21)、阀门二十二(22)、阀门二十三(23)、阀门二十四(24)、阀门二十五(25)、阀门二十六(26)、阀门二十七(27)、阀门二十八(28);
主廊道一(29),主廊道二(30),主廊道三(31);
图中的每一个闸室左边视为下游方向,闸室右边视为上游方向,闸室左边的闸门为该闸室的下游闸门(Z),闸室右边的闸门为该闸室的上游闸门(Z)。
具体实施方式:
结合图1对三级四线二分之一互补省水船闸的廊道阀门位置关系进行说明:
三级四线二分之一互补省水船闸,船闸为4线,每线为3级,4线之间是连通的,4线船闸闸室之间的水是互相排放的,每一个闸室在每一次排水或进水的水位下降或上升是槛上水深水位至闸室高水位的二分之一高度;
A、B、C、D四线船闸,四线船闸并排布置,A线下游闸室A1,A线中间闸室A2,A线上游闸室A3,B线下游闸室B1,B线中间闸室B2,B线上游闸室B3,C线下游闸室C1,C线中间闸室C2,C线上游闸室C3,D线下游闸室D1,D线中间闸室D2,D线上游闸室D3;
A3闸室上游水进水阀门一1,B3闸室上游水进水阀门二2,C3闸室上游水进水阀门三3,D3闸室上游水进水阀门四4,A1闸室水排放至下游阀门十三13;B1闸室水排放至下游阀门十四14,C1闸室水排放至下游阀门十五15,D1闸室水排放至下游阀门十六16;
A3闸室经过阀门五5与A2闸室连通,A2闸室经过阀门九9与A1闸室连通,B3闸室经过阀门六6与B2闸室连通,B2闸室经过阀门十10与B1闸室连通,C3闸室经过阀门七11与C2闸室连通,C2闸室经过阀门十一11与C1闸室连通,D3闸室经过阀门八8与D2闸室连通,D2闸室经过阀门十二12与D1闸室连通;
主廊道一29有四个分支,第一个分支经过阀门十七17与A1闸室连通,第二个分支经过阀门二十20与B1闸室连通,第三个分支经过阀门二十三23与C1连通,第四个分支经过阀门二十六26与D1闸室连通;
主廊道二30有四个分支,第一个分支经过阀门十八18与A2闸室连通,第二个分支经过阀门二十一21与B2闸室连通,第三个分支经过阀门二十四24与C2连通,第四个分支经过阀门二十七27与D2闸室连通;
主廊道三31有四个分支,第一个分支经过阀门十九19与A3闸室连通,第二个分支经过阀门二十二22与B3闸室连通,第三个分支经过阀门二十五25与C3连通,第四个分支经过阀门二十八28与D3闸室连通。
结合附图对三级四线二分之一互补省水船闸的工作原理进行说明:
每一个工作循环有6个步聚,6个步聚是:
步聚1),A3闸室内船舶二X为上游水位02,B3闸室内船舶二X为槛上水深水位0,C3闸室内船舶一S为槛上水深水位0,D3闸室内船舶一S为上游水位02,A2闸室为槛上水深水位0,B2闸室为高水位02,C2闸室为高水位02,D2闸室为槛上水深水位0,A1闸室内船舶二X为高水位02,B1闸室内船舶二X为下游水位0,C1闸室内船舶一S为下游水位0,D1闸室内船舶一S为高水位02;阀门十七17阀门十八18阀门十九19阀门二十三23阀门二十四24阀门二十五25打开状态,其它阀门关闭状态;A1闸室的水经过阀门十七17阀门二十三23排放至C1闸室,C2闸室的水经过阀门二十四24阀门十八18排放至A2闸室,A3闸室的水经过阀门十九19阀门二十五25排放至C3闸室;B1闸室下游闸门Z打开,B1闸室内船舶二X离开闸室进入下游;B3闸室下游闸门Z打开,B3闸室内船舶二X离开B3闸室进入B2闸室;D1闸室上游闸门Z打开,D1闸室内船舶一S离开D1闸室进入D2闸室;D3闸室上游闸门Z打开,D3闸室内船舶一S离开闸室进入上游;
步聚2),A3闸室内船舶二X为1/2水位01,B3闸室为槛上水深水位0,C3闸室内船舶一S为1/2水位01,D3闸室为上游水位02,A2闸室为1/2水位01,B2闸室内船舶二X为高水位02,C2闸室为1/2水位01,D2闸室内船舶一S为槛上水深水位0,A1闸室内船舶二X为1/2水位01,B1闸室为下游水位0,C1闸室内船舶一S为1/2水位01,D1闸室为高水位02;阀门三3阀门五5阀门十一11阀门十三13阀门二十20阀门二十一21阀门二十二22阀门二十六26阀门二十七27阀门二十八28打开状态,其它阀门关闭状态;A3闸室的水经过阀门五5排放至A2闸室,A1闸室的水经过阀门十三13排放至下游,上游水经过阀门三3排放至C3闸室,C2闸室的水经过十一11排放至C1闸室,D1闸室的水经过阀门二十六26阀门二十20排放至B1闸室,B2闸室的水经过阀门二十一21阀门二十七27排放至D2闸室,D3闸室的水经过阀门二十八28阀门二十二22排放至B3闸室;
步聚3),A3闸室内船舶二X为槛上水深水位0,B3闸室为1/2水位01,C3闸室内船舶一S为上游水位02,D3闸室为1/2水位01,A2闸室为高水位02,B2闸室内船舶二X为1/2水位01,C2闸室为槛上水深水位0,D2闸室内船舶一S为1/2水位01,A1闸室内船舶二X为下游水位0,B1闸室为1/2水位01,C1闸室内船舶一S为高水位02,D1闸室为1/2水位01;阀门二2阀门八8阀门十10阀门十六16打开状态,其它阀门关闭状态;上游水经过阀门二2排放至B3闸室,D3闸室的水经过阀门八8排放至D2闸室,B2闸室的水经过阀门十10排放至B1闸室,D1闸室的水经过阀门十六16排放至下游;A1闸室下游闸门Z打开,A1闸室内船舶二X离开闸室进入下游;A3闸室下游闸门Z打开,A3闸室内船舶二X离开A3闸室进入A2闸室;C1闸室上游闸门Z打开,C1闸室内船舶一S离开C1闸室进入C2闸室;C3闸室上游闸门Z打开,C3闸室内船舶一S离开闸室进入上游;
步聚4),A3闸室为槛上水深水位0,B3闸室为上游水位02,C3闸室为上游水位02,D3闸室为槛上水深水位0,A2闸室闸室内船舶二X为高水位02,B2闸室内船舶二X为槛上水深水位0,C2闸室内船舶一S为槛上水深水位0,D2闸室内船舶一S为高水位02,A1闸室为下游水位0,B1闸室为高水位02,C1闸室为高水位02,D1闸室为下游水位0;阀门十七17阀门十八18阀门十九19阀门二十二22阀门二十三23阀门二十四24阀门二十五25打开状态,其它阀门关闭状态;;C1闸室的水经过阀门二十三23阀门十七17排放至A1闸室,A2闸室的水经过阀门十八18阀门二十四24排放至C2闸室,C3闸室的水经过阀门二十五25阀门十九19排放至A3闸室;B2闸室下游闸门Z打开,B2闸室内船舶二X离开B2闸室进入进入B1闸室;B3闸室上游闸门Z打开,去下游的船舶二X进入B3闸室;D1闸室下游闸门Z打开,去上游的船舶一S进入D1闸室;D2闸室上游闸门Z打开,去上游的船舶一S离开D2闸室进入D3闸室;
步聚5),A3闸室为1/2水位01,B3闸室内船舶二X为上游水位02,C3闸室为1/2水位01,D3闸室内船舶一S为槛上水深水位0,A2闸室闸室内船舶二X为1/2水位01,B2闸室为槛上水深水位0,C2闸室内船舶一S为1/2水位01,D2闸室为高水位02,A1闸室为1/2水位01,B1闸室内船舶二X为高水位02,C1闸室为1/2水位01,D1闸室内船舶一S为下游水位0;阀门一1阀门七7阀门九9阀门十五15阀门二十20阀门二十一21阀门二十二22阀门二十六26阀门二十七27阀门二十八28打开状态,其它阀门关闭状态;上游水经过阀门一1排放至A3闸室,C3闸室的水经过阀门七7排放至C2闸室,A2闸室的水经过阀门九9排放至A1闸室,C闸室的水经过阀门十五15排放至下游,B1闸室的水经过阀门二十20阀门二十六26排放至D1闸室,D闸室的水经过阀门二十七27阀门二十一21排放至B1闸室,B3闸室的水经过阀门二十二22阀门二十八28排放至D3闸室;
步聚6),A3闸室为上游水位02,B3闸室内船舶二X为1/2水位01,C3闸室为槛上水深水位0,D3闸室内船舶一S为1/2水位01,A2闸室闸室内船舶二X为槛上水深水位0,B2闸室为1/2水位01,C2闸室内船舶一S为高水位02,D2闸室为1/2水位01,A1闸室为高水位02,B1闸室内船舶二X为1/2水位01,C1闸室为下游水位0,D1闸室内船舶一S为1/2水位01;阀门四4阀门六6阀门十二12阀门十四14打开状态,其它阀门关闭状态;上游水经过阀门四4排放至D3闸室,B3闸室的水经过阀门六6排放至B2闸室,D2闸室的水经过阀门十二12排放至D1闸室,B1闸室的水经过阀门十四14排放至下游;A2闸室下游闸门Z打开,A2闸室内船舶二X离开A2闸室进入进入A1闸室;A3闸室上游闸门Z打开,去下游的船舶二X进入A3闸室;C1闸室下游闸门Z打开,去上游的船舶一S进入C1闸室;C2闸室上游闸门Z打开,去上游的船舶一S离开C2闸室进入C3闸室。
步聚6)之后闸室水位及船舶的位置关系与步聚1)相同,这时从步聚1)开始,这样循环工作。

Claims (1)

1.三级四线二分之一互补省水船闸,船闸为4线,每线为3级,4线之间是连通的,4线船闸闸室之间的水是互相排放的,每一个闸室在每一次排水或进水的水位下降或上升是槛上水深水位至闸室高水位的二分之一高度;
A、B、C、D四线船闸,四线船闸并排布置,A线下游闸室A1,A线中间闸室A2,A线上游闸室A3,B线下游闸室B1,B线中间闸室B2,B线上游闸室B3,C线下游闸室C1,C线中间闸室C2,C线上游闸室C3,D线下游闸室D1,D线中间闸室D2,D线上游闸室D3;
A3闸室上游水进水阀门一(1),B3闸室上游水进水阀门二(2),C3闸室上游水进水阀门三(3),D3闸室上游水进水阀门四(4),A1闸室水排放至下游阀门十三(13);B1闸室水排放至下游阀门十四(14),C1闸室水排放至下游阀门十五(15),D1闸室水排放至下游阀门十六(16);
A3闸室经过阀门五(5)与A2闸室连通,A2闸室经过阀门九(9)与A1闸室连通,B3闸室经过阀门六(6)与B2闸室连通,B2闸室经过阀门十(10)与B1闸室连通,C3闸室经过阀门七(11)与C2闸室连通,C2闸室经过阀门十一(11)与C1闸室连通,D3闸室经过阀门八(8)与D2闸室连通,D2闸室经过阀门十二(12)与D1闸室连通;
主廊道一(29)有四个分支,第一个分支经过阀门十七(17)与A1闸室连通,第二个分支经过阀门二十(20)与B1闸室连通,第三个分支经过阀门二十三(23)与C1连通,第四个分支经过阀门二十六(26)与D1闸室连通;
主廊道二(30)有四个分支,第一个分支经过阀门十八(18)与A2闸室连通,第二个分支经过阀门二十一(21)与B2闸室连通,第三个分支经过阀门二十四(24)与C2连通,第四个分支经过阀门二十七(27)与D2闸室连通;
主廊道三(31)有四个分支,第一个分支经过阀门十九(19)与A3闸室连通,第二个分支经过阀门二十二(22)与B3闸室连通,第三个分支经过阀门二十五(25)与C3连通,第四个分支经过阀门二十八(28)与D3闸室连通;
每一个工作循环有6个步聚:
步聚1),A3闸室内船舶二(X)为上游水位(02),B3闸室内船舶二(X)为槛上水深水位(0),C3闸室内船舶一(S)为槛上水深水位(0),D3闸室内船舶一(S)为上游水位(02),A2闸室为槛上水深水位(0),B2闸室为高水位(02),C2闸室为高水位(02),D2闸室为槛上水深水位(0),A1闸室内船舶二(X)为高水位(02),B1闸室内船舶二(X)为下游水位(0),C1闸室内船舶一(S)为下游水位(0),D1闸室内船舶一(S)为高水位(02);阀门十七(17)阀门十八(18)阀门十九(19)阀门二十三(23)阀门二十四(24)阀门二十五(25)打开状态,其它阀门关闭状态;A1闸室的水经过阀门十七(17)阀门二十三(23)排放至C1闸室,C2闸室的水经过阀门二十四(24)阀门十八(18)排放至A2闸室,A3闸室的水经过阀门十九(19)阀门二十五(25)排放至C3闸室;B1闸室下游闸门(Z)打开,B1闸室内船舶二(X)离开闸室进入下游;B3闸室下游闸门(Z)打开,B3闸室内船舶二(X)离开B3闸室进入B2闸室;D1闸室上游闸门(Z)打开,D1闸室内船舶一(S)离开D1闸室进入D2闸室;D3闸室上游闸门(Z)打开,D3闸室内船舶一(S)离开闸室进入上游;
步聚2),A3闸室内船舶二(X)为1/2水位(01),B3闸室为槛上水深水位(0),C3闸室内船舶一(S)为1/2水位(01),D3闸室为上游水位(02),A2闸室为1/2水位(01),B2闸室内船舶二(X)为高水位(02),C2闸室为1/2水位(01),D2闸室内船舶一(S)为槛上水深水位(0),A1闸室内船舶二(X)为1/2水位(01),B1闸室为下游水位(0),C1闸室内船舶一(S)为1/2水位(01),D1闸室为高水位(02);阀门三(3)阀门五(5)阀门十一(11)阀门十三(13)阀门二十(20)阀门二十一(21)阀门二十二(22)阀门二十六(26)阀门二十七(27)阀门二十八(28)打开状态,其它阀门关闭状态;A3闸室的水经过阀门五(5)排放至A2闸室,A1闸室的水经过阀门十三(13)排放至下游,上游水经过阀门三(3)排放至C3闸室,C2闸室的水经过十一(11)排放至C1闸室,D1闸室的水经过阀门二十六(26)阀门二十(20)排放至B1闸室,B2闸室的水经过阀门二十一(21)阀门二十七(27)排放至D2闸室,D3闸室的水经过阀门二十八(28)阀门二十二(22)排放至B3闸室;
步聚3),A3闸室内船舶二(X)为槛上水深水位(0),B3闸室为1/2水位(01),C3闸室内船舶一(S)为上游水位(02),D3闸室为1/2水位(01),A2闸室为高水位(02),B2闸室内船舶二(X)为1/2水位(01),C2闸室为槛上水深水位(0),D2闸室内船舶一(S)为1/2水位(01),A1闸室内船舶二(X)为下游水位(0),B1闸室为1/2水位(01),C1闸室内船舶一(S)为高水位(02),D1闸室为1/2水位(01);阀门二(2)阀门八(8)阀门十(10)阀门十六(16)打开状态,其它阀门关闭状态;上游水经过阀门二(2)排放至B3闸室,D3闸室的水经过阀门八(8)排放至D2闸室,B2闸室的水经过阀门十(10)排放至B1闸室,D1闸室的水经过阀门十六(16)排放至下游;A1闸室下游闸门(Z)打开,A1闸室内船舶二(X)离开闸室进入下游;A3闸室下游闸门(Z)打开,A3闸室内船舶二(X)离开A3闸室进入A2闸室;C1闸室上游闸门(Z)打开,C1闸室内船舶一(S)离开C1闸室进入C2闸室;C3闸室上游闸门(Z)打开,C3闸室内船舶一(S)离开闸室进入上游;
步聚4),A3闸室为槛上水深水位(0),B3闸室为上游水位(02),C3闸室为上游水位(02),D3闸室为槛上水深水位(0),A2闸室闸室内船舶二(X)为高水位(02),B2闸室内船舶二(X)为槛上水深水位(0),C2闸室内船舶一(S)为槛上水深水位(0),D2闸室内船舶一(S)为高水位(02),A1闸室为下游水位(0),B1闸室为高水位(02),C1闸室为高水位(02),D1闸室为下游水位(0);阀门十七(17)阀门十八(18)阀门十九(19)阀门二十二(22)阀门二十三(23)阀门二十四(24)阀门二十五(25)打开状态,其它阀门关闭状态;;C1闸室的水经过阀门二十三(23)阀门十七(17)排放至A1闸室,A2闸室的水经过阀门十八(18)阀门二十四(24)排放至C2闸室,C3闸室的水经过阀门二十五(25)阀门十九(19)排放至A3闸室;B2闸室下游闸门(Z)打开,B2闸室内船舶二(X)离开B2闸室进入进入B1闸室;B3闸室上游闸门(Z)打开,去下游的船舶二(X)进入B3闸室;D1闸室下游闸门(Z)打开,去上游的船舶一(S)进入D1闸室;D2闸室上游闸门(Z)打开,去上游的船舶一(S)离开D2闸室进入D3闸室;
步聚5),A3闸室为1/2水位(01),B3闸室内船舶二(X)为上游水位(02),C3闸室为1/2水位(01),D3闸室内船舶一(S)为槛上水深水位(0),A2闸室闸室内船舶二(X)为1/2水位(01),B2闸室为槛上水深水位(0),C2闸室内船舶一(S)为1/2水位(01),D2闸室为高水位(02),A1闸室为1/2水位(01),B1闸室内船舶二(X)为高水位(02),C1闸室为1/2水位(01),D1闸室内船舶一(S)为下游水位(0);阀门一(1)阀门七(7)阀门九(9)阀门十五(15)阀门二十(20)阀门二十一(21)阀门二十二(22)阀门二十六(26)阀门二十七(27)阀门二十八(28)打开状态,其它阀门关闭状态;上游水经过阀门一(1)排放至A3闸室,C3闸室的水经过阀门七(7)排放至C2闸室,A2闸室的水经过阀门九(9)排放至A1闸室,C闸室的水经过阀门十五(15)排放至下游,B1闸室的水经过阀门二十(20)阀门二十六(26)排放至D1闸室,D闸室的水经过阀门二十七(27)阀门二十一(21)排放至B1闸室,B3闸室的水经过阀门二十二(22)阀门二十八(28)排放至D3闸室;
步聚6),A3闸室为上游水位(02),B3闸室内船舶二(X)为1/2水位(01),C3闸室为槛上水深水位(0),D3闸室内船舶一(S)为1/2水位(01),A2闸室闸室内船舶二(X)为槛上水深水位(0),B2闸室为1/2水位(01),C2闸室内船舶一(S)为高水位(02),D2闸室为1/2水位(01),A1闸室为高水位(02),B1闸室内船舶二(X)为1/2水位(01),C1闸室为下游水位(0),D1闸室内船舶一(S)为1/2水位(01);阀门四(4)阀门六(6)阀门十二(12)阀门十四(14)打开状态,其它阀门关闭状态;上游水经过阀门四(4)排放至D3闸室,B3闸室的水经过阀门六(6)排放至B2闸室,D2闸室的水经过阀门十二(12)排放至D1闸室,B1闸室的水经过阀门十四(14)排放至下游;A2闸室下游闸门(Z)打开,A2闸室内船舶二(X)离开A2闸室进入进入A1闸室;A3闸室上游闸门(Z)打开,去下游的船舶二(X)进入A3闸室;C1闸室下游闸门(Z)打开,去上游的船舶一(S)进入C1闸室;C2闸室上游闸门(Z)打开,去上游的船舶一(S)离开C2闸室进入C3闸室。
CN201710275325.4A 2017-04-25 2017-04-25 三级四线二分之一互补省水船闸 Active CN106869103B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710275325.4A CN106869103B (zh) 2017-04-25 2017-04-25 三级四线二分之一互补省水船闸

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710275325.4A CN106869103B (zh) 2017-04-25 2017-04-25 三级四线二分之一互补省水船闸

Publications (2)

Publication Number Publication Date
CN106869103A CN106869103A (zh) 2017-06-20
CN106869103B true CN106869103B (zh) 2018-10-30

Family

ID=59161561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710275325.4A Active CN106869103B (zh) 2017-04-25 2017-04-25 三级四线二分之一互补省水船闸

Country Status (1)

Country Link
CN (1) CN106869103B (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452719A (zh) * 2014-12-25 2015-03-25 河海大学 一种底板运输式过桥船闸
CN106087933A (zh) * 2016-05-18 2016-11-09 彭国洪 三线多级单向通行省水船闸
CN106320312A (zh) * 2016-09-18 2017-01-11 河海大学 一种省水船闸及其船舶过闸方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009099761A2 (en) * 2008-02-04 2009-08-13 Bert Gustav Shelton Water-saving lock configurations and operations

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452719A (zh) * 2014-12-25 2015-03-25 河海大学 一种底板运输式过桥船闸
CN106087933A (zh) * 2016-05-18 2016-11-09 彭国洪 三线多级单向通行省水船闸
CN106320312A (zh) * 2016-09-18 2017-01-11 河海大学 一种省水船闸及其船舶过闸方法

Also Published As

Publication number Publication date
CN106869103A (zh) 2017-06-20

Similar Documents

Publication Publication Date Title
CN104631413B (zh) 一种单级四线连通的船闸
CN106013032B (zh) 双线多级单向通行省水船闸
CN106930262A (zh) 省水池重叠高水头船闸
CN106087933B (zh) 三线多级单向通行省水船闸
JPH03103525A (ja) エアリフト式閘門
CN203904958U (zh) 一种节水型船闸
CN109629525A (zh) 一种深层取水系统及其操作方法
CN207003391U (zh) 一种新型水闸消能设施
CN107090819A (zh) 双级三线双向通行互补省水船闸
CN106759210A (zh) 埋置式自浮动垂直升降船闸及其运行方法
CN106869103B (zh) 三级四线二分之一互补省水船闸
CN106869102B (zh) 双级六线单向通行互补省水船闸
CN107882008A (zh) 一种多功能调度船闸
CN104895022B (zh) 一种连通泄水建筑物的竖井结构及泄洪方法
CN106812128A (zh) 单级七线互补省水船闸
CN106906814A (zh) 单级八线互补省水船闸
CN106759212A (zh) 单级六线互补省水船闸
CN107059831A (zh) 三级四线四分之一互补省水船闸
CN112686438A (zh) 一种考虑多因素的单级省水船闸水级设计方法
CN106869101A (zh) 双级五线单向通行互补省水船闸
CN107119651A (zh) 双级四线单向通行互补省水船闸
CN107268563A (zh) 单级五线互补省水船闸
CN205875113U (zh) 一种可实现水量多次互补的通航船闸
CN107882007A (zh) 四级四线单向通行互补省水船闸
CN107022992A (zh) 双级六线双向通行互补省水船闸

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180914

Address after: 362000 Fujian province Quanzhou Taiwan Investment Zone Dongyuan town group Village D 704

Applicant after: Quanzhou Taiwan Investment Zone Yang Fu Information Technology Co., Ltd.

Address before: 518131 Guangdong Shenzhen Longhua New District Min Zhi street Meilong Road, Guangzhou International Center, the first floor of the front desk.

Applicant before: Peng Guohong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200925

Address after: Room 1603, Building 3, High-tech Venture Service Center, 82 Garden West Road, Chuzhou City, Anhui Province

Patentee after: CHUZHOU SMART WATER TECHNOLOGY Co.,Ltd.

Address before: 362000 Fujian province Quanzhou Taiwan Investment Zone Dongyuan town group Village D 704

Patentee before: Quanzhou Taiwan Investment Zone Yang Fu Information Technology Co.,Ltd.

TR01 Transfer of patent right