CN105810480A - Tool capable of disassembling and assembling circuit breaker arc extinguish chamber - Google Patents

Tool capable of disassembling and assembling circuit breaker arc extinguish chamber Download PDF

Info

Publication number
CN105810480A
CN105810480A CN201610351309.4A CN201610351309A CN105810480A CN 105810480 A CN105810480 A CN 105810480A CN 201610351309 A CN201610351309 A CN 201610351309A CN 105810480 A CN105810480 A CN 105810480A
Authority
CN
China
Prior art keywords
lifting
circuit breaker
arc
header
extinguishing chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610351309.4A
Other languages
Chinese (zh)
Other versions
CN105810480B (en
Inventor
赵道阳
杨伟民
谢鹏
林可旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Maintenance Branch of State Grid Fujian Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201610351309.4A priority Critical patent/CN105810480B/en
Publication of CN105810480A publication Critical patent/CN105810480A/en
Application granted granted Critical
Publication of CN105810480B publication Critical patent/CN105810480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H11/00Apparatus or processes specially adapted for the manufacture of electric switches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Arc-Extinguishing Devices That Are Switches (AREA)

Abstract

The invention relates to a tool capable of disassembling and assembling a circuit breaker arc extinguish chamber.The tool comprises a three-joint box lifting and fixing device, a power control box, a power switch, a power indicating lamp, a stroke digital display window, a rising button, a rising indicating lamp, a descending button, a descending indicating button, a foot step rising and descending switch, an inlet air pressure control valve instruction, a cylinder with the stroke controllable, a mobile rising and descending trolley, a linear guide rail bottom plate and a connector which is connected with a three-joint box lifting rod and is capable of being disassembled.The tool capable of disassembling and assembling the circuit breaker arc extinguish chamber can complete disassembling and assembling work of a 500 kV T-shaped arc extinguish chamber, slow disassembling and slow assembling operations can be convenient, and various testing and adjusting in the disassembling and assembling processes can be met.

Description

断路器灭弧室可拆解组装工装Circuit breaker interrupter can be disassembled assembly tooling

技术领域technical field

本发明涉及断路器灭弧室工装领域,特别是一种断路器灭弧室可拆解组装工装。The invention relates to the field of tooling for an arc extinguishing chamber of a circuit breaker, in particular to a detachable and assembling tooling for an arc extinguishing chamber of a circuit breaker.

背景技术Background technique

在拆解组装500kVT型断路器灭弧时,没有专门的工具来进行拆解,现阶段只能用行车吊装的方法来进行。例如:在拆解500kVT型断路器灭弧室进行检修过程中,按照现有的条件,只能使用比较原始的方法使用行车进行一边一边的起吊拆解和组装进行,在拆解和组装过程中工作步骤比较繁琐,组装后调试过程使用人工方法操作提升杆来分合两边断路器,操作费时费力。When dismantling and assembling the 500kVT circuit breaker for arc extinguishing, there is no special tool for dismantling. At this stage, it can only be carried out by driving and hoisting. For example: in the process of dismantling the interrupter of a 500kVT circuit breaker for maintenance, according to the existing conditions, only the relatively primitive method can be used to lift and disassemble and assemble side by side. The working steps are cumbersome, and the commissioning process after assembly uses a manual method to operate the lifting lever to open and close the circuit breakers on both sides, which is time-consuming and laborious.

发明内容Contents of the invention

有鉴于此,本发明的目的是提供一种断路器灭弧室可拆解组装工装,使用移动升降小车和气动操作的方法,方便快捷的完成500kVT型断路器灭弧室拆解和组装的工作。In view of this, the object of the present invention is to provide a disassembly and assembly tool for the circuit breaker arc extinguishing chamber, which can conveniently and quickly complete the work of dismantling and assembling the 500kVT type circuit breaker arc extinguishing chamber by using the mobile lifting trolley and the method of pneumatic operation .

本发明采用以下方案实现:一种断路器灭弧室可拆解组装工装,包括三联箱升降固定装置、电源控制箱、进气压力控制阀指示装置、移动升降小车、直线导轨底板;所述移动升降小车均设置于所述直线导轨底板的上部,所述电源控制箱与所述进气压力控制阀指示装置均设置于所述三联箱升降固定装置上。The present invention adopts the following schemes to realize: a circuit breaker arc extinguishing chamber can be disassembled and assembled tooling, including triple box lifting and fixing device, power control box, intake pressure control valve indicating device, mobile lifting trolley, linear guide rail bottom plate; the moving The lifting trolleys are all arranged on the upper part of the linear guide rail bottom plate, and the power control box and the air inlet pressure control valve indicating device are both arranged on the triple box lifting and fixing device.

进一步地,所述三联箱升降固定装置包括固定三联箱螺孔、气缸、行程可控制气缸、磁感应开关限位保护装置、连接三联箱提升杆可拆卸接头;所述固定三联箱螺孔用以固定三联箱;所述气缸通过所述行程可控制气缸的升降实现T型灭弧室内动静触头的慢分慢合动作;所述磁感应开关限位保护装置根据所述T型灭弧室内动触头的行程调整位置,作为气缸行走距离;所述连接三联箱提升杆可拆卸接头通过气缸活塞杆设置于所述所述三联箱升降固定装置的上部,用以连接不同型号断路器的提升杆。Further, the triple box lifting and fixing device includes a screw hole for fixing the triple box, a cylinder, a cylinder with a stroke controllable, a magnetic induction switch limit protection device, and a detachable joint connected to the lifting rod of the triple box; the screw hole for fixing the triple box is used to fix Triple box; the cylinder can control the lifting of the cylinder through the stroke to realize the slow separation and slow closing of the dynamic and static contacts in the T-shaped arc extinguishing chamber; the magnetic induction switch limit protection device The stroke adjustment position is used as the travel distance of the cylinder; the detachable joint connected to the lifting rod of the triple box is set on the upper part of the lifting and fixing device of the triple box through the piston rod of the cylinder, and is used to connect the lifting rods of different types of circuit breakers.

进一步地,所述电源控制箱包括电源开关、电源指示灯、行程数字显示窗、上升按钮、上升指示灯、下降按钮、下降指示按钮,均设置于所述电源控制箱表面,还包括移动式脚踩上升和下降开关;所述行程数字显示窗与磁感应开关限位保护装置相连。所述上升按钮、下降按钮、脚踏上升和下降开关为一套控制装置可以满足不同操作方式的使用。Further, the power control box includes a power switch, a power indicator light, a travel digital display window, an up button, an up indicator light, a down button, and a down indicator button, all of which are arranged on the surface of the power control box, and also includes a movable foot Step on the up and down switches; the digital display window of the stroke is connected with the limit protection device of the magnetic induction switch. The up button, down button, pedal up and down switches are a set of control devices that can satisfy the use of different operation modes.

进一步地,所述移动升降小车包括上下调节装置、纵向调节装置、横向移动装置、瓷瓶支撑装置、上银滑块;所述瓷瓶支撑装置设置于所述纵向调节装置的上部;所述纵向调节装置设置于所述上下调节装置的上部;所述上下调节装置设置于所述横向移动装置的上部;所述上银滑块设置于所述横向移动装置的下部。Further, the mobile lifting trolley includes an up and down adjustment device, a longitudinal adjustment device, a lateral movement device, a porcelain bottle support device, and an upper silver slider; the porcelain bottle support device is arranged on the upper part of the longitudinal adjustment device; the longitudinal adjustment device The upper and lower adjustment devices are arranged on the upper part; the upper and lower adjustment devices are arranged on the upper part of the lateral movement device; the upper silver slider is arranged on the lower part of the lateral movement device.

进一步地,所述进气压力控制阀指示装置包括压力表与设置有所述压力表的可调节进气压力装置,所述可调节进气压力装置包括气压调节阀,所述气压调节阀用以根据压力表的数据调节进气量。Further, the intake pressure control valve indicating device includes a pressure gauge and an adjustable intake pressure device provided with the pressure gauge, and the adjustable intake pressure device includes an air pressure regulating valve, and the air pressure regulating valve is used to Adjust the intake air volume according to the data of the pressure gauge.

进一步地,所述直线导轨底板包括万向脚杯支撑、轨道以及挡板;所述万向脚杯支撑用以上下调节轨道的高度,可以上下调节满足一定的高度要求;所述轨道的两侧均设置有所述挡板。Further, the bottom plate of the linear guide rail includes a universal foot cup support, a track and a baffle; the universal foot cup support is used to adjust the height of the track up and down, and can be adjusted up and down to meet a certain height requirement; the two sides of the track The baffles are all provided.

进一步地,所述连接三联箱提升杆可拆卸接头包括与特定型号断路器提示杆相连的接头与连接销。Further, the detachable joint connecting the lifting rod of the triple box includes a joint and a connecting pin connected with a prompt rod of a specific type of circuit breaker.

进一步地,所述直线导轨底板的数量为两块,移动升降小车的数量为两辆,三联箱升降固定装置的数量为一个,所述三联箱升降固定装置设置于两块直线导轨底板的中间,两辆移动升降小车分别设置于一块直线导轨底板的上部。所述移动升降小车与三联箱升降固定装置的高度配合可以通过调节移动升降小车和可调节万向脚杯支撑实现。Further, the number of the linear guide rail bottom plates is two, the number of mobile lifting trolleys is two, and the number of the triple box lifting and fixing device is one. The triple box lifting and fixing device is arranged in the middle of the two linear guide rail bottom plates, Two mobile lifting trolleys are respectively arranged on the upper part of a linear guide rail base plate. The height coordination between the mobile lifting trolley and the triple box lifting and fixing device can be realized by adjusting the mobile lifting trolley and the adjustable universal foot cup support.

与现有技术相比,本发明具有以下有益效果:(1)本发明通过在直线导轨底板上的两部移动升降小车可以方便的拆解、组装500kVT型断路器灭弧室,省时省力;(2)本发明在组装和拆解过程中有气缸行程的显示,较好的能够了解高压断路器内部动触头的实时位置;(3)本发明通过使用两部移动升降小车可以方便的将左右两边灭弧室同时进行升降前后上下移动,加快灭弧室与三联箱的对接,大大提高工作效率;(4)本发明通过控制气缸活塞杆上部连接的提升杆可拆卸接头,来精准的控制动触头的行程,方便测量调试,省去大部分人力。Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention can conveniently disassemble and assemble the arc extinguishing chamber of 500kVT type circuit breaker through two mobile lifting trolleys on the bottom plate of the linear guide rail, saving time and effort; (2) The present invention has cylinder stroke display in the process of assembly and disassembly, which can better understand the real-time position of the moving contact inside the high-voltage circuit breaker; (3) The present invention can conveniently move the The left and right sides of the arc extinguishing chamber move up and down at the same time, speeding up the docking of the arc extinguishing chamber and the triple box, and greatly improving the work efficiency; (4) The present invention controls the detachable joint of the lifting rod connected to the upper part of the cylinder piston rod to achieve precise control The stroke of the moving contact is convenient for measurement and debugging, saving most of the manpower.

附图说明Description of drawings

图1为本发明实施例的构造示意图。Fig. 1 is a schematic structural diagram of an embodiment of the present invention.

图中:1-可调节万向脚杯支撑,2-挡板,3-导轨,4-移动升降小车,5-上下调节手柄,6-钢芯包胶滚,7-纵向调节手柄,8-行程数字显示窗,9-三联箱升降固定装置,10-电源指示灯,11-电源开关,12-连接三联箱提升杆可拆卸接头,13-气缸活塞杆,14-压力表,15-气压调节阀,16-上升按钮,17-下降按钮。In the figure: 1- adjustable universal foot cup support, 2- baffle, 3- guide rail, 4- mobile lifting trolley, 5- up and down adjustment handle, 6- steel core rubber roller, 7- longitudinal adjustment handle, 8- Stroke digital display window, 9- triple box lifting and fixing device, 10- power indicator light, 11- power switch, 12- detachable joint connecting triple box lifting rod, 13- cylinder piston rod, 14- pressure gauge, 15- air pressure adjustment Valve, 16-up button, 17-down button.

具体实施方式detailed description

下面结合附图及实施例对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

本实施例提供一种断路器灭弧室可拆解组装工装,如图1所示,包括三联箱升降固定装置、电源控制箱、进气压力控制阀指示装置、移动升降小车以及直线导轨底板;所述移动升降小车均设置于所述直线导轨底板的上部,所述电源控制箱与所述进气压力控制阀指示装置均设置于所述三联箱升降固定装置上。This embodiment provides a disassembled and assembled tooling for the interrupter chamber of a circuit breaker, as shown in Figure 1, including a three-box lifting and fixing device, a power control box, an air inlet pressure control valve indicating device, a mobile lifting trolley, and a linear guide rail bottom plate; The mobile lifting trolleys are all arranged on the upper part of the linear guide rail bottom plate, and the power control box and the inlet pressure control valve indicating device are both arranged on the triple box lifting and fixing device.

在本实施例中,所述三联箱升降固定装置9包括固定三联箱螺孔、气缸、行程可控制气缸、磁感应开关限位保护装置、连接三联箱提升杆可拆卸接头12;所述固定三联箱螺孔用以固定三联箱;所述气缸通过所述行程可控制气缸的升降实现T型灭弧室内动静触头的慢分慢合动作;所述磁感应开关限位保护装置根据所述T型灭弧室内动触头的行程调整位置,作为气缸行走距离;所述连接三联箱提升杆可拆卸接头12通过气缸活塞杆13设置于所述所述三联箱升降固定装置的上部,用以连接断路器的提升杆。In this embodiment, the triple box lifting and fixing device 9 includes a fixed triple box screw hole, a cylinder, a cylinder with a stroke controllable, a magnetic induction switch limit protection device, and a detachable joint 12 connected to the triple box lifting rod; the fixed triple box The screw holes are used to fix the triple box; the cylinder can control the lifting of the cylinder through the stroke to realize the slow opening and closing of the dynamic and static contacts in the T-shaped arc extinguishing chamber; the magnetic induction switch limit protection device according to the T-shaped extinguishing The stroke adjustment position of the moving contact in the arc chamber is used as the travel distance of the cylinder; the detachable joint 12 connected to the lifting rod of the triple box is set on the upper part of the lifting and fixing device of the triple box through the piston rod 13 of the cylinder to connect the circuit breaker the lifting rod.

在本实施例中,所述电源控制箱包括电源开关11、电源指示灯10、行程数字显示窗8、上升按钮16、上升指示灯、下降按钮17、下降指示按钮,均设置于所述电源控制箱表面;还包括脚踩上升和下降开关;所述行程数字显示窗与磁感应开关限位保护装置相连。所述上升按钮、下降按钮、脚踏上升和下降开关为一套控制装置可以满足不同操作方式的使用。In this embodiment, the power control box includes a power switch 11, a power indicator light 10, a stroke digital display window 8, an up button 16, an up indicator light, a down button 17, and a down indicator button, all of which are arranged on the power control box. The surface of the box; it also includes a foot step up and down switch; the digital display window of the stroke is connected with the limit protection device of the magnetic induction switch. The up button, down button, pedal up and down switches are a set of control devices that can satisfy the use of different operation modes.

在本实施例中,所述移动升降小车4包括上下调节装置、纵向调节装置、横向移动装置、瓷瓶支撑装置、上银滑块;所述瓷瓶支撑装置设置于所述纵向调节装置的上部;所述纵向调节装置设置于所述上下调节装置的上部;所述上下调节装置设置于所述横向移动装置的上部;所述上银滑块设置于所述横向移动装置的下部。其中,上下调节装置包括上下调节手柄5,所述纵向调节装置包括纵向调节手柄7,所述纵向调节手柄7上设置有钢芯包胶滚6。In this embodiment, the mobile lifting trolley 4 includes an up and down adjustment device, a longitudinal adjustment device, a lateral movement device, a porcelain bottle support device, and an upper silver slider; the porcelain bottle support device is arranged on the upper part of the longitudinal adjustment device; The longitudinal adjustment device is arranged on the upper part of the vertical adjustment device; the upper and lower adjustment device is arranged on the upper part of the lateral movement device; the upper silver slider is arranged on the lower part of the lateral movement device. Wherein, the up and down adjustment device includes an up and down adjustment handle 5, and the longitudinal adjustment device includes a longitudinal adjustment handle 7, and a steel core rubber-covered roller 6 is arranged on the longitudinal adjustment handle 7.

在本实施例中,所述进气压力控制阀指示装置包括压力表14与设置有所述压力表的可调节进气压力装置,所述可调节进气压力装置包括气压调节阀15,所述气压调节阀用以根据压力表的数据调节进气量。In this embodiment, the intake pressure control valve indicating device includes a pressure gauge 14 and an adjustable intake pressure device provided with the pressure gauge, and the adjustable intake pressure device includes an air pressure regulating valve 15, the The air pressure regulating valve is used to adjust the intake air volume according to the data of the pressure gauge.

在本实施例中,所述直线导轨底板包括万向脚杯支撑1、轨道3以及挡板4;所述万向脚杯支撑用以上下调节轨道的高度,可以上下调节满足一定的高度要求;所述轨道的两侧均设置有所述挡板。In this embodiment, the linear guide rail bottom plate includes a universal foot cup support 1, a track 3 and a baffle plate 4; the universal foot cup support is used to adjust the height of the track up and down, and can be adjusted up and down to meet a certain height requirement; Both sides of the track are provided with the baffles.

在本实施例中,所述连接三联箱提升杆可拆卸接头包括与特定型号断路器提示杆相连的接头与连接销。In this embodiment, the detachable joint connected to the lifting rod of the triple box includes a joint and a connecting pin connected to a prompt rod of a specific type of circuit breaker.

在本实施例中,所述直线导轨底板的数量为两块,移动升降小车的数量为两辆,三联箱升降固定装置的数量为一个,所述三联箱升降固定装置设置于两块直线导轨底板的中间,两辆移动升降小车分别设置于一块直线导轨底板的上部。所述移动升降小车与三联箱升降固定装置的高度配合可以通过调节移动升降小车和可调节万向脚杯支撑实现。In this embodiment, the number of the linear guide rail bottom plates is two, the number of mobile lifting trolleys is two, and the number of the triple box lifting and fixing device is one, and the triple box lifting and fixing device is arranged on the two linear guide rail bottom plates In the middle, two mobile lifting trolleys are respectively set on the upper part of a linear guide rail bottom plate. The height coordination between the mobile lifting trolley and the triple box lifting and fixing device can be realized by adjusting the mobile lifting trolley and the adjustable universal foot cup support.

在本实施例中,在对500kVT型灭弧室进行拆装过程中,将与灭弧室连接的三联箱固定在升降装置上,两侧灭弧室分别放在左右两侧的移动升降小车上,在进行三联箱固定前将三联箱内的提升杆传动部件与提升杆可拆卸接头通过轴销相连。每部移动升降小车根据灭弧室瓷裙高度分别对前后两个与瓷裙接触的钢芯包胶滚进行高度调整,在将灭弧室与三联箱的连接螺杆拆解完成后,可以推动小车将灭弧室与三联箱分离。在进行组装的过程中分别将灭弧室放在两边的移动小车上,推动小车进行对接,当灭弧室孔位和三联箱孔位不对中时可以对灭弧室进行360度的旋转调整方便的实现对接工作。在对接完成后在进行调试测试时需要将动静触头进行合闸,这时可以通过控制气缸的升降运行来调整,通过位置显示来判断动触头的行走距离。In this embodiment, during the disassembly and assembly process of the 500kVT type arc extinguishing chamber, the triple box connected to the arc extinguishing chamber is fixed on the lifting device, and the arc extinguishing chambers on both sides are respectively placed on the mobile lifting trolleys on the left and right sides , before the triple box is fixed, the lifting rod transmission part in the triple box is connected with the lifting rod detachable joint through the pivot pin. Each mobile lifting trolley adjusts the height of the front and rear steel core rubber rollers in contact with the porcelain skirt according to the height of the porcelain skirt of the arc extinguishing chamber. After dismantling the connecting screw between the arc extinguishing chamber and the triple box, the trolley can be pushed Separate the interrupter from the triple box. During the assembly process, place the arc extinguishing chamber on the mobile trolleys on both sides, and push the trolley to dock. When the hole position of the arc extinguishing chamber and the hole position of the triple box are not aligned, the arc extinguishing chamber can be rotated and adjusted 360 degrees for convenience. The realization of docking work. After the docking is completed, the dynamic and static contacts need to be closed during the debugging test. At this time, it can be adjusted by controlling the lifting operation of the cylinder, and the traveling distance of the moving contacts can be judged through the position display.

以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。The above descriptions are only preferred embodiments of the present invention, and all equivalent changes and modifications made according to the scope of the patent application of the present invention shall fall within the scope of the present invention.

Claims (8)

1. the disassembled assembly tool of arc-extinguishing chamber of circuit breaker, it is characterised in that: include three header lifting and fixing devices, power controling box, air inlet pressure force control valve instruction device, moving lifting dolly, line slideway base plate and connect three header lifting arm detachable connectors;Described moving lifting dolly may be contained within the top of described line slideway base plate, and described power controling box may be contained within described three header lifting and fixing devices with described air inlet pressure force control valve instruction device.
2. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterised in that: described three header lifting and fixing devices include fixing three header screws, cylinder, stroke can control cylinder, magnetic induction switch limiting and protecting device, connect three header lifting arm detachable connectors;Described three header screws of fixing are in order to fix three headers;Described cylinder can control the lifting of cylinder by described stroke and realize the Slow-disconnecting and slow-connecting action of dynamic/static contact in T-shaped arc-chutes;Described magnetic induction switch limiting and protecting device is according to the Traffic control system position of moving contact in described T-shaped arc-chutes, as cylinder travel distance;Described connection three header lifting arm detachable connector is arranged at the top of described three header lifting and fixing devices by cylinder piston rod, in order to connect the lifting arm of different model chopper.
3. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterized in that: described power controling box includes on and off switch, power supply indicator, stroke numeral display window, rising button, rising display lamp, decline button, decline instruction button, may be contained within described power controling box surface, also include portable foot and step on raising and lowering switch;Described stroke numeral display window is connected with magnetic induction switch limiting and protecting device.
4. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterised in that: described moving lifting dolly includes up-down adjustment device, longitudinal adjustment apparatus, horizontal mobile device, porcelain vase prop up support arrangement, upper silver slide block;Described porcelain vase props up support arrangement and is arranged at the top of described longitudinal adjustment apparatus;Described longitudinal adjustment apparatus is arranged at the top of described up-down adjustment device;Described up-down adjustment device is arranged at the top of described horizontal mobile device;Described upper silver slide block is arranged at the bottom of described horizontal mobile device.
5. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterized in that: described air inlet pressure force control valve instruction device includes Pressure gauge and is provided with described manometric scalable admission pressure device, described scalable admission pressure device includes air pressure regulator, and described air pressure regulator is in order to regulate air inflow according to manometric data.
6. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterised in that: described line slideway base plate includes the support of multi-axis foot cup, track and baffle plate;Described multi-axis foot cup supports the height in order to up-down adjustment track, and the both sides of described track are provided with described baffle plate.
7. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterised in that: described connection three header lifting arm detachable connector includes joint and the connecting pin of pointing out bar to be connected with specific model chopper.
8. a kind of disassembled assembly tool of arc-extinguishing chamber of circuit breaker according to claim 1, it is characterized in that: the quantity of described line slideway base plate is two pieces, the quantity of moving lifting dolly is two, the quantity of three header lifting and fixing devices is one, described three header lifting and fixing devices are arranged at the centre of two pieces of line slideway base plates, and two moving lifting dollies are respectively arranged at the top of one piece of line slideway base plate.
CN201610351309.4A 2016-05-25 2016-05-25 The disassembled assembly tool of arc-extinguishing chamber of circuit breaker Active CN105810480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610351309.4A CN105810480B (en) 2016-05-25 2016-05-25 The disassembled assembly tool of arc-extinguishing chamber of circuit breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610351309.4A CN105810480B (en) 2016-05-25 2016-05-25 The disassembled assembly tool of arc-extinguishing chamber of circuit breaker

Publications (2)

Publication Number Publication Date
CN105810480A true CN105810480A (en) 2016-07-27
CN105810480B CN105810480B (en) 2018-01-12

Family

ID=56452844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610351309.4A Active CN105810480B (en) 2016-05-25 2016-05-25 The disassembled assembly tool of arc-extinguishing chamber of circuit breaker

Country Status (1)

Country Link
CN (1) CN105810480B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20301637U1 (en) * 2002-02-04 2003-04-17 EAE-Stöckl Elektroanlagen-Elektrifizierungsges. m.b.H., Innsbruck Device for assembling and wiring a switch or distribution cabinet uses controlled electronic or pneumatic screwdriver to give precise torque
CN202846107U (en) * 2012-10-25 2013-04-03 中电装备恩翼帕瓦(山东)高压开关有限公司 Extra-high-voltage circuit breaker arc extinguish chamber double-fracture simultaneous adjusting tool
KR101271370B1 (en) * 2012-02-24 2013-06-07 (주)도스코 A switchboard production system
EP2804272A1 (en) * 2012-01-13 2014-11-19 Corporative International R&H Europe, S.L. Mobile unit for high- and medium-voltage electrical interconnection
CN104269759A (en) * 2014-08-07 2015-01-07 国网河南省电力公司周口供电公司 Handcart operating platform for 10-35 KV breaker in substation
CN104901204A (en) * 2015-05-25 2015-09-09 国家电网公司 Serially connected cylindrical device disposing/dismounting tool car
CN204668203U (en) * 2015-04-23 2015-09-23 江苏森源电气股份有限公司 A kind of fixture of vacuum circuit-breaker cabinet

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20301637U1 (en) * 2002-02-04 2003-04-17 EAE-Stöckl Elektroanlagen-Elektrifizierungsges. m.b.H., Innsbruck Device for assembling and wiring a switch or distribution cabinet uses controlled electronic or pneumatic screwdriver to give precise torque
EP2804272A1 (en) * 2012-01-13 2014-11-19 Corporative International R&H Europe, S.L. Mobile unit for high- and medium-voltage electrical interconnection
KR101271370B1 (en) * 2012-02-24 2013-06-07 (주)도스코 A switchboard production system
CN202846107U (en) * 2012-10-25 2013-04-03 中电装备恩翼帕瓦(山东)高压开关有限公司 Extra-high-voltage circuit breaker arc extinguish chamber double-fracture simultaneous adjusting tool
CN104269759A (en) * 2014-08-07 2015-01-07 国网河南省电力公司周口供电公司 Handcart operating platform for 10-35 KV breaker in substation
CN204668203U (en) * 2015-04-23 2015-09-23 江苏森源电气股份有限公司 A kind of fixture of vacuum circuit-breaker cabinet
CN104901204A (en) * 2015-05-25 2015-09-09 国家电网公司 Serially connected cylindrical device disposing/dismounting tool car

Also Published As

Publication number Publication date
CN105810480B (en) 2018-01-12

Similar Documents

Publication Publication Date Title
CN208094044U (en) The motor mechanism box installation and debugging platform of disconnecting switch
CN105810480A (en) Tool capable of disassembling and assembling circuit breaker arc extinguish chamber
CN204179539U (en) A kind of shipping unit for the assembling of high pressure independence instrument transformer
CN202333531U (en) Hydraulic elevating type tool car
CN207798399U (en) Fixing device for bicycle frame fatigue testing machine
CN213857809U (en) Automobile pedal fixing tool with positioning mechanism
CN105621311A (en) Jacking mechanism
CN102386576A (en) Hydraulic lift-type maintenance car
CN103944090B (en) 380 V switch cabinet maintenance car
CN104237576A (en) Cable terminal test hydraulic support of GIS cable pressure gas chamber
CN203826825U (en) Maintenance vehicle for 380V switch cabinet
CN204277528U (en) Mattress clamping device
CN217964972U (en) Steel claw residual composite block eradication device
CN217787307U (en) Circuit breaker life test bench
CN204195229U (en) A kind of blower motor assembly streamline
CN204727536U (en) A lifting movable support for the transmission shaft of the crane
CN104162789A (en) Novel drilling machine rack structure convenient to move
CN205528968U (en) With axle guide TV university template base electroslag furnace
CN202984943U (en) Upright H-shaped steel clamping device
CN111717252A (en) A circuit breaker loading and unloading trolley
CN204366599U (en) Engine cylinder-body milling bottom surface hoisting fixture
CN204154756U (en) The cable termination testing hydraulic support of GIS cable pressurized air chamber
CN205666564U (en) First production platform of multifunctional cable
CN223763260U (en) Auxiliary fixture for disassembling and assembling filling valve
CN112222809A (en) Guide rail mold opening table and using method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant