BRPI0820122A2 - Método de otimização de produção de poços, sistema, e método. - Google Patents
Método de otimização de produção de poços, sistema, e método.Info
- Publication number
- BRPI0820122A2 BRPI0820122A2 BRPI0820122A BRPI0820122A2 BR PI0820122 A2 BRPI0820122 A2 BR PI0820122A2 BR PI0820122 A BRPI0820122 A BR PI0820122A BR PI0820122 A2 BRPI0820122 A2 BR PI0820122A2
- Authority
- BR
- Brazil
- Prior art keywords
- well production
- production optimization
- optimization method
- well
- production
- Prior art date
Links
- 238000000034 method Methods 0.000 title 2
- 238000004519 manufacturing process Methods 0.000 title 1
- 238000005457 optimization Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
- E21B33/1243—Units with longitudinally-spaced plugs for isolating the intermediate space with inflatable sleeves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Geophysics And Detection Of Objects (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Tests Of Electronic Circuits (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/960,852 US7849920B2 (en) | 2007-12-20 | 2007-12-20 | System and method for optimizing production in a well |
| PCT/US2008/087645 WO2009082689A1 (en) | 2007-12-20 | 2008-12-19 | System and method for optimizing production in a well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BRPI0820122A2 true BRPI0820122A2 (pt) | 2015-05-12 |
Family
ID=40787223
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI0820122 BRPI0820122A2 (pt) | 2007-12-20 | 2008-12-19 | Método de otimização de produção de poços, sistema, e método. |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US7849920B2 (pt) |
| BR (1) | BRPI0820122A2 (pt) |
| RU (1) | RU2520187C2 (pt) |
| WO (1) | WO2009082689A1 (pt) |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DK2189622T3 (en) | 2007-01-25 | 2019-02-04 | Welldynamics Inc | Casing valve system for selective borehole stimulation and control |
| MX2010007520A (es) * | 2008-01-11 | 2010-08-18 | Schlumberger Technology Bv | Prueba zonal con el uso de tuberia continua. |
| WO2011044078A2 (en) * | 2009-10-05 | 2011-04-14 | Schlumberger Canada Limited | Chemical injection of lower completions |
| US20110139446A1 (en) * | 2009-12-15 | 2011-06-16 | Baker Hughes Incorporated | Method of Determining Queried Fluid Cuts Along a Tubular |
| US8910716B2 (en) | 2010-12-16 | 2014-12-16 | Baker Hughes Incorporated | Apparatus and method for controlling fluid flow from a formation |
| RU2459941C1 (ru) * | 2011-03-22 | 2012-08-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ освоения многозабойных разветвленно-горизонтальных скважин |
| RU2459945C1 (ru) * | 2011-03-25 | 2012-08-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ освоения многозабойных разветвленно-горизонтальных скважин |
| CN104500057A (zh) * | 2014-12-03 | 2015-04-08 | 中国石油化工股份有限公司 | 一种水平井产液剖面的测试方法 |
| US10352139B2 (en) * | 2014-12-11 | 2019-07-16 | Baker Hughes, A Ge Company, Llc | Coiled tubing through production tubing zone isolation and production method |
| RU2581589C1 (ru) * | 2014-12-31 | 2016-04-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ освоения многозабойной разветвленно-горизонтальной скважины |
| US11136858B2 (en) | 2020-01-31 | 2021-10-05 | Baker Hughes Oilfield Operations Llc | Methods and systems for packing extended reach wells using inflow control devices |
| RU2759621C2 (ru) * | 2020-04-30 | 2021-11-16 | Шлюмберже Текнолоджи Б.В. | Способ оптимизации добычи пластового флюида из скважины после кислотного гидроразрыва пласта |
| CN112196466B (zh) * | 2020-09-09 | 2021-06-25 | 中国地质大学(武汉) | 利用水压锁止的水平定向钻进工程地质勘察压水试验装置 |
| CN112282738A (zh) * | 2020-11-04 | 2021-01-29 | 中国石油天然气股份有限公司 | 一种水平井找堵水一体化管柱及测试方法 |
| WO2022271785A1 (en) | 2021-06-22 | 2022-12-29 | Schlumberger Technology Corporation | Processes for injection of fluids into a wellbore via drill pipe |
| NO347602B1 (en) | 2021-12-23 | 2024-01-29 | Testall As | Intelligent well testing system |
| US11655710B1 (en) | 2022-01-10 | 2023-05-23 | Saudi Arabian Oil Company | Sidewall experimentation of subterranean formations |
| US11970936B2 (en) * | 2022-04-11 | 2024-04-30 | Saudi Arabian Oil Company | Method and system for monitoring an annulus pressure of a well |
| US12134949B2 (en) | 2022-12-21 | 2024-11-05 | Schlumberger Technology Corporation | Processes for injection of fluids into a wellbore |
Family Cites Families (28)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4406461A (en) * | 1982-03-12 | 1983-09-27 | Schlumberger Technology Corporation | Inflatable well packer apparatus reinforced with tire cording |
| US5287741A (en) * | 1992-08-31 | 1994-02-22 | Halliburton Company | Methods of perforating and testing wells using coiled tubing |
| US5505261A (en) * | 1994-06-07 | 1996-04-09 | Schlumberger Technology Corporation | Firing head connected between a coiled tubing and a perforating gun adapted to move freely within a tubing string and actuated by fluid pressure in the coiled tubing |
| US5503014A (en) * | 1994-07-28 | 1996-04-02 | Schlumberger Technology Corporation | Method and apparatus for testing wells using dual coiled tubing |
| WO1997005361A1 (en) * | 1995-07-25 | 1997-02-13 | Nowsco Well Service, Inc. | Safeguarded method and apparatus for fluid communication using coiled tubing, with application to drill stem testing |
| US5826662A (en) * | 1997-02-03 | 1998-10-27 | Halliburton Energy Services, Inc. | Apparatus for testing and sampling open-hole oil and gas wells |
| US6073696A (en) * | 1997-11-02 | 2000-06-13 | Vastar Resources, Inc. | Method and assembly for treating and producing a welbore using dual tubing strings |
| US6216785B1 (en) * | 1998-03-26 | 2001-04-17 | Schlumberger Technology Corporation | System for installation of well stimulating apparatus downhole utilizing a service tool string |
| US6446727B1 (en) * | 1998-11-12 | 2002-09-10 | Sclumberger Technology Corporation | Process for hydraulically fracturing oil and gas wells |
| US7389787B2 (en) * | 1998-12-21 | 2008-06-24 | Baker Hughes Incorporated | Closed loop additive injection and monitoring system for oilfield operations |
| AU778363B2 (en) * | 1998-12-21 | 2004-12-02 | Baker Hughes Incorporated | Closed loop chemical injection and monitoring system for oilfield operations |
| US6712150B1 (en) * | 1999-09-10 | 2004-03-30 | Bj Services Company | Partial coil-in-coil tubing |
| WO2001065053A1 (en) * | 2000-03-02 | 2001-09-07 | Shell Internationale Research Maatschappij B.V. | Tracer injection in a production well |
| RU2171359C1 (ru) * | 2000-03-17 | 2001-07-27 | Открытое Акционерное Общество Акционерная нефтяная компания "Башнефть" | Способ заканчивания горизонтальной скважины |
| US6527050B1 (en) * | 2000-07-31 | 2003-03-04 | David Sask | Method and apparatus for formation damage removal |
| US7222676B2 (en) | 2000-12-07 | 2007-05-29 | Schlumberger Technology Corporation | Well communication system |
| US7395703B2 (en) * | 2001-07-20 | 2008-07-08 | Baker Hughes Incorporated | Formation testing apparatus and method for smooth draw down |
| US6959763B2 (en) * | 2002-04-01 | 2005-11-01 | Schlumberger Technology Corporation | Method and apparatus for integrated horizontal selective testing of wells |
| US6675892B2 (en) * | 2002-05-20 | 2004-01-13 | Schlumberger Technology Corporation | Well testing using multiple pressure measurements |
| US7216703B2 (en) * | 2003-05-09 | 2007-05-15 | Schlumberger Technology Corp. | Method and apparatus for testing and treatment of a completed well with production tubing in place |
| RU2247832C1 (ru) * | 2003-07-28 | 2005-03-10 | Общество с ограниченной ответственностью "ИНТЕНСИФИКАЦИЯ" | Способ поинтервальной обработки продуктивного пласта через открытый горизонтальный ствол скважины и устройство для его осуществления |
| US6978211B2 (en) * | 2003-12-08 | 2005-12-20 | Halliburton Energy Services, Inc. | Methods and systems for using wavelet analysis in subterranean applications |
| RU2246049C1 (ru) * | 2003-12-19 | 2005-02-10 | Зиновий Дмитриевич Хоминец | Скважинная установка для работы в горизонтальных скважинах и способ ее работы |
| US7448448B2 (en) * | 2005-12-15 | 2008-11-11 | Schlumberger Technology Corporation | System and method for treatment of a well |
| US8132621B2 (en) * | 2006-11-20 | 2012-03-13 | Halliburton Energy Services, Inc. | Multi-zone formation evaluation systems and methods |
| US20080302529A1 (en) * | 2007-06-11 | 2008-12-11 | Fowler Jr Stewart Hampton | Multi-zone formation fluid evaluation system and method for use of same |
| US20080308272A1 (en) * | 2007-06-12 | 2008-12-18 | Thomeer Hubertus V | Real Time Closed Loop Interpretation of Tubing Treatment Systems and Methods |
| US8511380B2 (en) * | 2007-10-10 | 2013-08-20 | Schlumberger Technology Corporation | Multi-zone gravel pack system with pipe coupling and integrated valve |
-
2007
- 2007-12-20 US US11/960,852 patent/US7849920B2/en active Active
-
2008
- 2008-12-19 BR BRPI0820122 patent/BRPI0820122A2/pt not_active IP Right Cessation
- 2008-12-19 RU RU2010130182/03A patent/RU2520187C2/ru not_active IP Right Cessation
- 2008-12-19 WO PCT/US2008/087645 patent/WO2009082689A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| US7849920B2 (en) | 2010-12-14 |
| RU2010130182A (ru) | 2012-01-27 |
| WO2009082689A1 (en) | 2009-07-02 |
| US20090159275A1 (en) | 2009-06-25 |
| RU2520187C2 (ru) | 2014-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI0820122A2 (pt) | Método de otimização de produção de poços, sistema, e método. | |
| BRPI0822078A2 (pt) | Método, e, sistema. | |
| BRPI0813914A2 (pt) | Sistema, e, método. | |
| BRPI0814085A2 (pt) | Sistema, e, método | |
| BRPI0815101A2 (pt) | Método, e, sistema | |
| BRPI0815494A2 (pt) | Método implementado por computador, e, sistema. | |
| BRPI0810190A2 (pt) | Sistema, e, método. | |
| BRPI0811722A2 (pt) | Método, e sistema | |
| BRPI0916450A2 (pt) | método, e sistema | |
| BRPI0811754A2 (pt) | Método de comunicação, sistema e produtos | |
| BRPI0821050A2 (pt) | Método, e, sistema | |
| NL2003118A1 (nl) | Alignment system, lithographic system and method. | |
| BRPI0813757A2 (pt) | Sistema de implante, e, método | |
| BRPI0810963A2 (pt) | sistema, e, método | |
| BRPI1016218A2 (pt) | sistema, e, método | |
| BRPI1013630A2 (pt) | sistema, e método | |
| BRPI1014894A2 (pt) | método, e sistema | |
| BRPI0823030A2 (pt) | Sistema de elevador, e, método para fazer um sistema de elevador. | |
| BRPI0814466A2 (pt) | Método. | |
| BRPI0918084A2 (pt) | método, e, sistema | |
| BRPI1011011A2 (pt) | método, sistema de monitoramento, e, produto de programa. | |
| BRPI1016144A2 (pt) | aparelho, método e sistema de comunicação. | |
| BRPI0810356A2 (pt) | Sistema de aquecimento para uma formação de subsuperfície, e, método para aquecer uma formação de subsuperfície. | |
| BRPI1006885A2 (pt) | sistema de completação utilizável com um poço, e método utilizável com um poço | |
| BR112013015581A2 (pt) | método, e. sistema |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B06T | Formal requirements before examination [chapter 6.20 patent gazette] | ||
| B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 10A ANUIDADE. |
|
| B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2494 DE 23-10-2018 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |