[go: up one dir, main page]

BRPI0409836A - processo para a operação de um parque eólico, parque eólico, e, instalação de energia eólica - Google Patents

processo para a operação de um parque eólico, parque eólico, e, instalação de energia eólica

Info

Publication number
BRPI0409836A
BRPI0409836A BRPI0409836-6A BRPI0409836A BRPI0409836A BR PI0409836 A BRPI0409836 A BR PI0409836A BR PI0409836 A BRPI0409836 A BR PI0409836A BR PI0409836 A BRPI0409836 A BR PI0409836A
Authority
BR
Brazil
Prior art keywords
wind
operating
wind farm
wind power
farm
Prior art date
Application number
BRPI0409836-6A
Other languages
English (en)
Inventor
Aloys Wobben
Original Assignee
Aloys Wobben
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aloys Wobben filed Critical Aloys Wobben
Publication of BRPI0409836A publication Critical patent/BRPI0409836A/pt
Publication of BRPI0409836B1 publication Critical patent/BRPI0409836B1/pt

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/0204Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor for orientation in relation to wind direction
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/026Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor for starting-up
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/028Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/04Automatic control; Regulation
    • F03D7/042Automatic control; Regulation by means of an electrical or electronic controller
    • F03D7/048Automatic control; Regulation by means of an electrical or electronic controller controlling wind farms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/20Wind motors characterised by the driven apparatus
    • F03D9/25Wind motors characterised by the driven apparatus the apparatus being an electrical generator
    • F03D9/255Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor
    • F03D9/257Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor the wind motor being part of a wind farm
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J11/00Circuit arrangements for providing service supply to auxiliaries of stations in which electric power is generated, distributed or converted
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Wind Motors (AREA)
  • Control Of Eletrric Generators (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

"PROCESSO PARA A OPERAçãO DE UM PARQUE EóLICO, PARQUE EóLICO, E, INSTALAçãO DE ENERGIA EóLICA". A presente invenção refere-se a um processo para a operação de um parque eólico tendo uma pluralidade de instalações de energia eólica. A invenção também se refere a uma instalação de energia eólica tendo um gerador eletricamente excitado e um parque eólico tendo um dispositivo central para o controle do parque. Por conseguinte, o objetivo da presente invenção é prover um processo para a operação de um parque eólico tendo uma pluralidade de instalações de energia eólica, e uma instalação de energia eólica tendo um gerador eletricamente excitado e um parque eólico tendo um dispositivo central para o controle do parque, em que a execução dos procedimentos operacionais é efetuada com uma extração de energia restrita ou reduzida a partir da rede (potência de referência). Para esta finalidade, o processo de operação inventivo para um parque eólico consistindo de uma pluralidade de instalações de energia cólica é caracterizado pelo fato de que os procedimentos operacionais de cada instalação de energia eólica são controlados de uma tal maneira que energia elétrica líquida é suprida até um valor máximo predeterminado.
BRPI0409836-6A 2003-05-05 2004-04-19 Processo para a operação de um parque eólico BRPI0409836B1 (pt)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
DE10320087A DE10320087B4 (de) 2003-05-05 2003-05-05 Verfahren zum Betreiben eines Windparks
DE10320087.8 2003-05-05
DE10328889.9 2003-06-26
DE10328889 2003-06-26
PCT/EP2004/004118 WO2004099604A2 (de) 2003-05-05 2004-04-19 Verfahren zum betreiben eines windparks

Publications (2)

Publication Number Publication Date
BRPI0409836A true BRPI0409836A (pt) 2006-05-09
BRPI0409836B1 BRPI0409836B1 (pt) 2014-05-20

Family

ID=33435955

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0409836-6A BRPI0409836B1 (pt) 2003-05-05 2004-04-19 Processo para a operação de um parque eólico

Country Status (18)

Country Link
US (3) US8108079B2 (pt)
EP (3) EP2275676B1 (pt)
JP (2) JP4299334B2 (pt)
KR (2) KR100943599B1 (pt)
CN (2) CN101092943B (pt)
AR (1) AR044173A1 (pt)
AT (1) ATE548564T1 (pt)
AU (1) AU2004236324B2 (pt)
BR (1) BRPI0409836B1 (pt)
CA (3) CA2633068C (pt)
CY (1) CY1112866T1 (pt)
DE (1) DE10320087B4 (pt)
DK (2) DK2275676T3 (pt)
ES (2) ES2381878T3 (pt)
NZ (2) NZ543270A (pt)
PL (1) PL1623114T3 (pt)
PT (2) PT2275676T (pt)
WO (1) WO2004099604A2 (pt)

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10320087B4 (de) * 2003-05-05 2005-04-28 Aloys Wobben Verfahren zum Betreiben eines Windparks
DE102005038558A1 (de) 2005-08-12 2007-02-15 Repower Systems Ag Verfahren zum Betrieb eines Windenergieanlagenparks sowie Windenergieanlagenpark
EP1770277A1 (en) * 2005-09-30 2007-04-04 General Electric Company Method for controlling a wind energy turbine of a wind park comprising multiple wind energy turbines
DE102006021982C5 (de) * 2006-05-10 2010-10-07 Repower Systems Ag Gestaffelt abschaltbarer Windpark
US8497494B2 (en) 2006-11-24 2013-07-30 Lg Display Co., Ltd. Thin film transistor and array substrate for liquid crystal display device comprising organic insulating material
DE102007003030A1 (de) 2007-01-20 2008-07-24 Nordex Energy Gmbh Verfahren zum Betreiben eines Windparks
EP1993184B2 (en) * 2007-05-14 2024-04-24 Siemens Gamesa Renewable Energy A/S Method of start up at least a part of a wind power plant, wind power plant and use of the wind power plant
DE102007035724A1 (de) 2007-07-30 2009-02-05 Joachim Falkenhagen Bedarfsgerecht angepaßte Abschaltgeschwindigkeit bei Windenergieanlagen
DE102007036444A1 (de) * 2007-08-02 2009-02-05 Nordex Energy Gmbh Windpark mit einer Vielzahl von Windenergieanlagen sowie Verfahren zum Betreiben des Windparks
ES2633293T3 (es) 2007-11-30 2017-09-20 Vestas Wind Systems A/S Una turbina eólica, un procedimiento para controlar una turbina eólica y su uso
WO2009068035A2 (en) 2007-11-30 2009-06-04 Vestas Wind Systems A/S A wind turbine, a method for controlling a wind turbine and use thereof
US20090160187A1 (en) * 2007-12-19 2009-06-25 Scholte-Wassink Hartmut Control system and method for operating a wind farm in a balanced state
MX2010005674A (es) * 2007-12-20 2010-10-05 Vestas Wind Sys As Metodo para controlar una salida comun de al menos dos turbinas eolicas, un sistema de control central de turbinas eolicas, un parque eolico y un conjunto de parques eolicos.
DK2235367T3 (en) 2007-12-21 2016-06-27 2-B Energy Holding B V Wind farm
JP4698718B2 (ja) * 2008-09-30 2011-06-08 株式会社日立製作所 風力発電装置群の制御装置及び制御方法
US20120038154A1 (en) * 2009-02-17 2012-02-16 Bittor Gurutz Lekerika Ugarte Method and apparatus for powering a wind turbine
WO2012056564A1 (ja) * 2010-10-29 2012-05-03 三菱重工業株式会社 風力発電装置の制御装置、ウインドファーム、及び風力発電装置の制御方法
WO2011058170A1 (en) * 2009-11-16 2011-05-19 Vestas Wind Systems A/S Method and device for operation of a wind power plant
GB2486700B (en) * 2010-12-23 2013-11-27 Tidal Generation Ltd Water current turbine arrangements
US20120175962A1 (en) * 2011-01-11 2012-07-12 Converteam Technology Ltd. Power Collection and Transmission Systems
EP2503146B1 (en) 2011-03-21 2013-12-18 Siemens Aktiengesellschaft Method and arrangement for controlling an operation of an electric energy production facility during a disconnection to a utility grid.
WO2013005259A2 (en) * 2011-07-06 2013-01-10 Mitsubishi Heavy Industries, Ltd. Energy extraction device, group of energy extraction devices and operating methods
CN104756341B (zh) 2011-07-14 2017-04-05 维斯塔斯风力系统集团公司 发电系统和操作发电系统的方法
KR101302022B1 (ko) * 2011-10-13 2013-09-02 삼성중공업 주식회사 풍력 발전 시스템 및 그 운전 제어 방법
US9644610B2 (en) * 2011-12-06 2017-05-09 Vestas Wind Systems A/S Warning a wind turbine generator in a wind park of an extreme wind event
US9030035B2 (en) * 2011-12-19 2015-05-12 Vestas Wind Systems A/S Quick start-up of wind turbine generators
ES2627023T3 (es) * 2011-12-19 2017-07-26 Vestas Wind Systems A/S Puesta en marcha rápida de generadores de turbina eólica
EP2631470A1 (en) * 2012-02-23 2013-08-28 Siemens Aktiengesellschaft Method to align the yaw angle of a nacelle of a wind turbine
DK2926003T3 (en) * 2012-11-27 2016-09-12 Abb Technology Ag Process for operating an energy plant and an energy system with such energy plants
DE102013102603B4 (de) 2013-03-14 2017-02-09 Sma Solar Technology Ag Verfahren für einen Schwarzstart eines Kraftwerks mit mehreren einem Wechselstromnetz zuschaltbaren Wechselrichtern
EP2902623B1 (en) * 2014-02-04 2020-04-15 GE Renewable Technologies Wind B.V. Methods of operating a wind turbine and wind turbines
EP3149325B1 (en) * 2014-05-30 2020-09-30 Vestas Wind Systems A/S A wind power plant with reduced losses
DE102015201431A1 (de) 2015-01-28 2016-07-28 Wobben Properties Gmbh Verfahren zum Betreiben eines Windparks
DE102015203629A1 (de) 2015-03-02 2016-09-08 Wobben Properties Gmbh Verfahren zum Betreiben einer Windenergieanlage
DE102016105662A1 (de) 2016-03-29 2017-10-05 Wobben Properties Gmbh Verfahren zum Einspeisen elektrischer Leistung in ein elektrisches Versorgungsnetz mit einem Windpark sowie Windpark
CN107304746B (zh) * 2016-04-20 2020-07-17 北京天诚同创电气有限公司 风力发电机组及其运行控制方法与设备
DE102017106338A1 (de) * 2017-03-23 2018-09-27 Wobben Properties Gmbh Verfahren zum Starten eines Energieerzeugungsnetzes
EP3385535A1 (en) 2017-04-07 2018-10-10 Adwen GmbH Rotor locking system
ES2929735T3 (es) * 2017-05-30 2022-12-01 Gen Electric Procedimiento para reducir cargas durante un estado en ralentí o parado de una turbina eólica por medio de desplazamiento de orientación
DE102017122695A1 (de) 2017-09-29 2019-04-04 Wobben Properties Gmbh Verfahren zum Versorgen von Windenergieanlagenkomponenten mit Energie sowie Energieversorgungseinrichtung und Windenergieanlage damit
DE102017127081B4 (de) 2017-11-17 2019-05-29 Sma Solar Technology Ag Verfahren zum Schwarzstart einer Energieversorgungseinrichtung, bidirektionaler Wechselrichter und Energieversorgungseinrichtung mit einem bidirektionalen Wechselrichter
DE102018003854A1 (de) 2018-05-14 2019-11-14 Senvion Gmbh Windpark mit Eigenbedarfskompensation
US10697432B2 (en) 2018-08-03 2020-06-30 General Electric Company Wind farm energy storage device for curtailment and auxiliary loads use
EP4102055A1 (en) * 2021-06-09 2022-12-14 Siemens Gamesa Renewable Energy A/S Restoring productive operation of a wind park
FR3142782B1 (fr) * 2022-12-05 2025-10-10 Ifp Energies Now Procédé de contrôle d’une ferme d’éoliennes au moyen d’une méthode d’apprentissage par renforcement

Family Cites Families (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2086279A (en) * 1935-10-17 1937-07-06 Wincharger Corp Starting means for wind-driven generator units
US2159886A (en) * 1937-09-07 1939-05-23 Lou Mervis Wind propelled generator
GB717100A (en) 1951-10-03 1954-10-20 Bendix Aviat Corp Improvements in or relating to turbine starters for gas turbine units
GB740090A (en) 1952-12-12 1955-11-09 Rolls Royce Improvements relating to starting and ignition systems for gas turbine engines
DE2742559C2 (de) 1977-09-22 1979-06-13 Voith Getriebe Kg, 7920 Heidenheim Windenergie-Konverter
DE3724183A1 (de) * 1987-07-22 1989-02-02 Robert Linhart Windkraftwerk
JP3227355B2 (ja) * 1995-08-22 2001-11-12 松尾橋梁株式会社 風力発電設備
RU2132483C1 (ru) 1996-07-04 1999-06-27 Научно-исследовательский институт радиоприборостроения Автоматическая ветроэлектроустановка
JP3844825B2 (ja) * 1996-12-03 2006-11-15 関西電力株式会社 風車起動促進装置
DE19651364A1 (de) * 1996-12-10 1998-06-25 Nordex En Anlagen Gmbh Vorrichtung zur Verbesserung der Netzverträglichkeit von Windkraftanlagen mit Asynchrongeneratoren
US5799484A (en) * 1997-04-15 1998-09-01 Allied Signal Inc Dual turbogenerator auxiliary power system
JP3927285B2 (ja) * 1997-07-08 2007-06-06 日本トムソン株式会社 スライド装置
DE19756777B4 (de) * 1997-12-19 2005-07-21 Wobben, Aloys, Dipl.-Ing. Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage
NL1009543C2 (nl) * 1998-07-02 2000-01-07 Lagerwey Windturbine B V Inrichting voor het omzetten van windenergie in elektrische energie.
JP2000064940A (ja) 1998-08-19 2000-03-03 Hitachi Zosen Corp 塔状構造物用の風力発電装置
JP2001107838A (ja) 1999-08-02 2001-04-17 Hirai Sekkei Jimusho:Kk 風車およびその制御方法
US6379115B1 (en) * 1999-08-02 2002-04-30 Tetsuo Hirai Windmill and windmill control method
EP1224721B1 (de) * 1999-09-13 2005-09-28 Aloys Wobben Verfahren zur blindleistungsregelung sowie vorrichtung zur erzeugung elektrischer energie in einem elektrischen netz
DE19948196A1 (de) * 1999-10-06 2001-05-17 Aloys Wobben Verfahren zum Betrieb eines Windparks
DE10022974C2 (de) * 2000-05-11 2003-10-23 Aloys Wobben Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage
DE10033029B4 (de) * 2000-07-07 2004-03-18 Wobben, Aloys, Dipl.-Ing. Notstromversorgungseinrichtung
DE10059018C2 (de) * 2000-11-28 2002-10-24 Aloys Wobben Windenergieanlage bzw. Windpark bestehend aus einer Vielzahl von Windenergieanlagen
JP2002315395A (ja) 2001-04-06 2002-10-25 Mitsubishi Heavy Ind Ltd 風力発電装置
DE10138399A1 (de) * 2001-08-04 2003-02-27 Aloys Wobben Verfahren zum Betreiben einer Windenergieanlage
US6692230B2 (en) * 2001-06-14 2004-02-17 Douglas Spriggs Selsam Balanced, high output, rapid rotation wind turbine (Weathervane multi-rotor windmill)
PL212009B1 (pl) 2001-09-28 2012-07-31 Aloys Wobben Układ regulacji farmy wiatrowej składającej się z co najmniej dwóch instalacji wiatrowych
JP2003214320A (ja) 2002-01-18 2003-07-30 Matsushita Electric Ind Co Ltd 風力発電装置
WO2003065567A1 (de) * 2002-01-29 2003-08-07 Vestas Wind Systems A/S Schaltungsanordnung zum einsatz bei einer windenergieanlage
US7071579B2 (en) * 2002-06-07 2006-07-04 Global Energyconcepts,Llc Wind farm electrical system
DE10320087B4 (de) * 2003-05-05 2005-04-28 Aloys Wobben Verfahren zum Betreiben eines Windparks
DE10327344A1 (de) * 2003-06-16 2005-01-27 Repower Systems Ag Windenergieanlage
US7355294B2 (en) * 2006-05-22 2008-04-08 General Electric Company Method and system for wind turbine blade movement

Also Published As

Publication number Publication date
NZ574251A (en) 2010-11-26
ATE548564T1 (de) 2012-03-15
CA2633068C (en) 2012-01-10
PT2275676T (pt) 2018-12-10
JP2006525453A (ja) 2006-11-09
CY1112866T1 (el) 2016-04-13
EP1623114B1 (de) 2012-03-07
AU2004236324B2 (en) 2009-03-05
PT1623114E (pt) 2012-05-10
CA2523407A1 (en) 2004-11-18
CN101092943B (zh) 2010-06-02
DK1623114T3 (da) 2012-05-29
WO2004099604A3 (de) 2005-01-27
US8880230B2 (en) 2014-11-04
US20150028593A1 (en) 2015-01-29
DE10320087A1 (de) 2004-12-16
KR20070107186A (ko) 2007-11-06
AU2009201223A1 (en) 2009-04-23
PL1623114T3 (pl) 2012-09-28
US20070108769A1 (en) 2007-05-17
WO2004099604A2 (de) 2004-11-18
AU2004236324A1 (en) 2004-11-18
JP4896943B2 (ja) 2012-03-14
KR100808833B1 (ko) 2008-03-07
CA2523407C (en) 2012-11-20
CA2633068A1 (en) 2004-11-18
KR20060035597A (ko) 2006-04-26
ES2700661T3 (es) 2019-02-18
JP2009036210A (ja) 2009-02-19
US8108079B2 (en) 2012-01-31
EP2275676B1 (de) 2018-09-12
US9303625B2 (en) 2016-04-05
DK2275676T3 (en) 2018-11-26
CA2744948A1 (en) 2004-11-18
CA2744948C (en) 2013-11-05
EP2063113A1 (de) 2009-05-27
NZ543270A (en) 2010-04-30
CN101092943A (zh) 2007-12-26
AR044173A1 (es) 2005-08-24
CN1784544A (zh) 2006-06-07
BRPI0409836B1 (pt) 2014-05-20
EP1623114A2 (de) 2006-02-08
JP4299334B2 (ja) 2009-07-22
US20120139245A1 (en) 2012-06-07
EP2275676A1 (de) 2011-01-19
DE10320087B4 (de) 2005-04-28
ES2381878T3 (es) 2012-06-01
CN100357590C (zh) 2007-12-26
KR100943599B1 (ko) 2010-02-24

Similar Documents

Publication Publication Date Title
BRPI0409836A (pt) processo para a operação de um parque eólico, parque eólico, e, instalação de energia eólica
TR200400490T3 (tr) Kule temeli üzerine monte edilen rüzgar türbinli güç modülü.
DK1831981T3 (da) Vindparkeffektregulering og -fremgangsmåde
CY1118917T1 (el) Μεθοδος για τη λειτουργια αιολικου παρκου
PT1386078E (pt) Instalacao de energia eolica e procedimento para a operacao de uma instalacao eolica
EP1910670B8 (de) Windenergieanlage mit einzelpitcheinrichtungen
MXPA03004686A (es) Turbina de energia eolica y finca eolica que consiste de una pluralidad de turbinas de energia eolica.
PT1371846T (pt) Processo para pôr em funcionamento uma instalação de energia eólica, bem como uma instalação de energia eólica
BR112019025275A2 (pt) Método para fornecer energia elétrica em um ponto de conexão de rede, e, sistema de energia eólica
CA2598069A1 (en) Power generating system
CY1117967T1 (el) Μεθοδος για τη λειτουργια μιας εγκαταστασης αιολικης ενεργειας
BRPI0403798A (pt) Controle da tensão para geradores eólicos
CY1115044T1 (el) Κινητη ανεμογεννητρια
BR0213475A (pt) Instalação de energia eólica
PT1301974E (pt) Instalação de energia eólica com um dispositivo de alimentação de emergência
BR0110792A (pt) Instalação de energia eólica
BR112013002727A2 (pt) método de regulação de potência reativa em um parque eólico e em uma turbina eólica, e parque eólico
DK1200733T4 (da) Vindenergifacilitet med et lukket kølekredsløb
NZ590573A (en) Wind turbine nacelle with three aviation obstruction lights arranged on it
BR0112444A (pt) Gerador anular, instalação de energia eólica, e, construção de suporte de um gerador anular
NO20054192L (no) Vindenergianlegg
BR112017023520A2 (pt) método para operar uma instalação de energia eólica, observador de estado para determinar uma energia disponível de uma instalação de energia eólica, e, instalação de energia eólica
BRPI0416695A (pt) arranjo de gerador eólico, gerador eólico, dispositivo para converter energia elétrica gerada por um ou mais geradores eólicos para ca, sistema para converter energia elétrica produzida por geradores eólicos para energia ca, e, dispositivo para gerar energia elétrica a partir de energia eólica
MY135514A (en) Method for regulating the level of a dam installation and dam installation implementing the method
BR112019001983A2 (pt) nacele, rotor, instalação de energia eólica, uso de um acionamento com atuador elétrico sem caixa de engrenagem planetária, e, métodos para rastreamento de direção de vento de uma nacele e ajuste de pá de rotor.

Legal Events

Date Code Title Description
B07A Application suspended after technical examination (opinion) [chapter 7.1 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 20/05/2014, OBSERVADAS AS CONDICOES LEGAIS.

B15K Others concerning applications: alteration of classification

Ipc: F03D 7/00 (2006.01), F03D 7/02 (2006.01), F03D 7/0

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 19A ANUIDADE.

B24J Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12)

Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2719 DE 14-02-2023 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.