AR103644A1 - Método para adquirir información sobre la geometría de una fractura hidráulica para evaluar y optimizar el espaciamiento entre pozos para una plataforma de operaciones multipozo - Google Patents
Método para adquirir información sobre la geometría de una fractura hidráulica para evaluar y optimizar el espaciamiento entre pozos para una plataforma de operaciones multipozoInfo
- Publication number
- AR103644A1 AR103644A1 ARP160100354A ARP160100354A AR103644A1 AR 103644 A1 AR103644 A1 AR 103644A1 AR P160100354 A ARP160100354 A AR P160100354A AR P160100354 A ARP160100354 A AR P160100354A AR 103644 A1 AR103644 A1 AR 103644A1
- Authority
- AR
- Argentina
- Prior art keywords
- wells
- group
- well
- multipoz
- assess
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000012530 fluid Substances 0.000 abstract 2
- 238000009530 blood pressure measurement Methods 0.000 abstract 1
- 238000002955 isolation Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/126—Adaptations of down-hole pump systems powered by drives outside the borehole, e.g. by a rotary or oscillating drive
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/17—Interconnecting two or more wells by fracturing or otherwise attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Measuring Fluid Pressure (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Se da a conocer un método para optimizar el espaciamiento entre pozos para una plataforma multipozo que incluye un primer grupo de pozos y un segundo grupo de pozos. El método comprende los siguientes pasos: (a) generar una fractura a partir de un intervalo de un primer pozo del primer grupo de pozos; (b) aislar un intervalo siguiente de dicho primer pozo del primer grupo de pozos de dicho intervalo; (c) generar una fractura que parte de dicho intervalo siguiente después del paso de aislamiento; (d) medir la presión de un fluido en dicho intervalo siguiente o en comunicación fluida con el mismo y (e) mientras se realiza el paso de medición de la presión, generar una o más fracturas que parten de uno o más intervalos de un pozo del segundo grupo de pozos de manera tal que dichas una o más fracturas efectuadas en el pozo del segundo grupo de pozos induzca el cambio de la presión medida.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/618,865 US10030497B2 (en) | 2015-02-10 | 2015-02-10 | Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AR103644A1 true AR103644A1 (es) | 2017-05-24 |
Family
ID=55359559
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ARP160100354A AR103644A1 (es) | 2015-02-10 | 2016-02-10 | Método para adquirir información sobre la geometría de una fractura hidráulica para evaluar y optimizar el espaciamiento entre pozos para una plataforma de operaciones multipozo |
Country Status (3)
| Country | Link |
|---|---|
| US (2) | US10030497B2 (es) |
| AR (1) | AR103644A1 (es) |
| WO (1) | WO2016128889A1 (es) |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
| US10012064B2 (en) | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
| US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
| US10215014B2 (en) | 2016-07-03 | 2019-02-26 | Reveal Energy Services, Inc. | Mapping of fracture geometries in a multi-well stimulation process |
| US11365617B1 (en) | 2017-01-24 | 2022-06-21 | Devon Energy Corporation | Systems and methods for controlling fracturing operations using monitor well pressure |
| US11028679B1 (en) * | 2017-01-24 | 2021-06-08 | Devon Energy Corporation | Systems and methods for controlling fracturing operations using monitor well pressure |
| CA2997822C (en) | 2017-03-08 | 2024-01-02 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
| US10513923B2 (en) | 2017-07-24 | 2019-12-24 | Reveal Energy Services, Inc. | Dynamically modeling a hydraulic fracture |
| WO2019023480A1 (en) * | 2017-07-26 | 2019-01-31 | Conocophillips Company | TANK VOLUME DIAGNOSTIC DRAINED FROM A MANDEL-CRYER PRESSURE SIGNAL |
| US10794179B2 (en) | 2017-07-26 | 2020-10-06 | Conocophillips Company | Poromechanical impact on yield behavior in unconventional reservoirs |
| CN107642355B (zh) * | 2017-08-24 | 2020-11-06 | 中国石油天然气集团公司 | 基于超声波发射法的水力压裂裂缝监测系统及方法 |
| US11098568B2 (en) * | 2017-09-22 | 2021-08-24 | Statoil Gulf Services LLC | Reservoir stimulation method and system |
| US11415716B2 (en) | 2017-11-01 | 2022-08-16 | Colorado School Of Mines | System and method of locating downhole objects in a wellbore |
| US10851643B2 (en) * | 2017-11-02 | 2020-12-01 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
| US20190249527A1 (en) * | 2018-02-09 | 2019-08-15 | Crestone Peak Resources | Simultaneous Fracturing Process |
| US10801281B2 (en) * | 2018-04-27 | 2020-10-13 | Pro-Ject Chemicals, Inc. | Method and apparatus for autonomous injectable liquid dispensing |
| WO2021119306A1 (en) | 2019-12-10 | 2021-06-17 | Origin Rose Llc | Spectral analysis and machine learning of acoustic signature of wireline sticking |
| US11624277B2 (en) | 2020-07-20 | 2023-04-11 | Reveal Energy Services, Inc. | Determining fracture driven interactions between wellbores |
| US11859490B2 (en) | 2021-08-19 | 2024-01-02 | Devon Energy Corporation | Systems and methods for monitoring fracturing operations using monitor well flow |
| US12276186B2 (en) * | 2023-06-08 | 2025-04-15 | ExxonMobil Technology and Engineering Company | Controlling hydraulic fracture growth using stress shadows |
| WO2025245030A1 (en) * | 2024-05-18 | 2025-11-27 | Combined Well Systems, LLC | Combined well system and method for enhanced production |
| CN119844061B (zh) * | 2025-01-06 | 2025-09-16 | 中国地质调查局油气资源调查中心 | 一种干热岩地热立体井网开采方法 |
Family Cites Families (37)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3586105A (en) | 1969-09-30 | 1971-06-22 | Exxon Production Research Co | Detecting changes in rock properties in a formation by pulse testing |
| US6065538A (en) | 1995-02-09 | 2000-05-23 | Baker Hughes Corporation | Method of obtaining improved geophysical information about earth formations |
| CA2524666C (en) | 1997-05-02 | 2008-04-22 | Sensor Highway Limited | Wellbores utilizing fiber optic-based sensors and operating devices |
| US6787758B2 (en) | 2001-02-06 | 2004-09-07 | Baker Hughes Incorporated | Wellbores utilizing fiber optic-based sensors and operating devices |
| US6281489B1 (en) | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
| US20040043501A1 (en) | 1997-05-02 | 2004-03-04 | Baker Hughes Incorporated | Monitoring of downhole parameters and chemical injection utilizing fiber optics |
| CA2406801C (en) | 2000-04-26 | 2007-01-02 | Pinnacle Technologies, Inc. | Treatment well tiltmeter system |
| GB2379685A (en) | 2002-10-28 | 2003-03-19 | Shell Internat Res Maatschhapp | Enhanced oil recovery with asynchronous cyclic variation of injection rates |
| US7397388B2 (en) | 2003-03-26 | 2008-07-08 | Schlumberger Technology Corporation | Borehold telemetry system |
| RU2324813C2 (ru) | 2003-07-25 | 2008-05-20 | Институт проблем механики Российской Академии наук | Способ и устройство для определения формы трещин в горных породах |
| US7543635B2 (en) | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
| CA2517494C (en) | 2005-06-02 | 2010-03-09 | Sanjel Corporation | Well product recovery process |
| US7946340B2 (en) * | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
| CA2663824C (en) * | 2006-10-13 | 2014-08-26 | Exxonmobil Upstream Research Company | Optimized well spacing for in situ shale oil development |
| WO2009012374A1 (en) | 2007-07-19 | 2009-01-22 | Shell Oil Company | Methods for producing oil and/or gas |
| EA201170472A1 (ru) | 2008-09-19 | 2011-10-31 | Шеврон Ю.Эс.Эй. Инк. | Реализованные посредством компьютера системы и способы для использования при моделировании геомеханической системы коллектора |
| US20110067857A1 (en) | 2009-09-23 | 2011-03-24 | Schlumberger Technology Corporation | Determining properties of a subterranean structure during hydraulic fracturing |
| FR2957629B1 (fr) | 2010-03-16 | 2012-04-06 | Spcm Sa | Procede de reduction de la pression d'injection d'une solution de polymere dans un puits de petrole sans cisaillement de ladite solution. |
| US9164192B2 (en) | 2010-03-25 | 2015-10-20 | Schlumberger Technology Corporation | Stress and fracture modeling using the principle of superposition |
| CA2701422A1 (en) | 2010-04-26 | 2011-10-26 | Exxonmobil Upstream Research Company | A method for the management of oilfields undergoing solvent injection |
| AU2011349851B2 (en) | 2010-12-21 | 2014-11-13 | Shell Internationale Research Maatschappij B.V. | System and method for moniitoring strain and pressure |
| US20130191044A1 (en) | 2011-03-21 | 2013-07-25 | Schlumberger Technology Corporation | Method and system for presenting stress domain |
| US9810803B2 (en) | 2011-03-23 | 2017-11-07 | Seismic Global Ambient, Llc | Method for subsurface mapping using seismic emissions |
| PL408174A1 (pl) | 2011-07-11 | 2014-12-22 | Schlumberger Technology B.V. | Układ i sposób przeprowadzania operacji stymulacji odwiertu |
| WO2013025420A2 (en) | 2011-08-16 | 2013-02-21 | Schlumberger Canada Limited | Hydrocarbon recovery employing an injection well and a production well having multiple tubing strings with active feedback control |
| WO2014058745A2 (en) | 2012-10-09 | 2014-04-17 | Apache Corporation | System and method for monitoring fracture treatment using optical fiber sensors in monitor wellbores |
| WO2014121270A2 (en) | 2013-02-04 | 2014-08-07 | Board Of Regents, The University Of Texas System | Methods for time-delayed fracturing in hydrocarbon formations |
| US9835746B2 (en) * | 2013-08-24 | 2017-12-05 | Schlumberger Technology Corporation | Formation stability modeling |
| US9702247B2 (en) | 2013-09-17 | 2017-07-11 | Halliburton Energy Services, Inc. | Controlling an injection treatment of a subterranean region based on stride test data |
| US9500076B2 (en) | 2013-09-17 | 2016-11-22 | Halliburton Energy Services, Inc. | Injection testing a subterranean region |
| US9777571B2 (en) | 2013-09-17 | 2017-10-03 | Husky Oil Operations Limited | Method for determining regions for stimulation along two parallel adjacent wellbores in a hydrocarbon formation |
| US9574443B2 (en) | 2013-09-17 | 2017-02-21 | Halliburton Energy Services, Inc. | Designing an injection treatment for a subterranean region based on stride test data |
| CA2864964A1 (en) | 2013-09-25 | 2015-03-25 | Shell Internationale Research Maatschappij B.V. | Method of conducting diagnostics on a subterranean formation |
| CA2937225C (en) * | 2013-12-18 | 2024-02-13 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
| US9840900B2 (en) | 2014-01-25 | 2017-12-12 | Petrovations Llc | Process for inhibiting flow of fracturing fluid in an offset wellbore |
| US20160047215A1 (en) * | 2014-08-17 | 2016-02-18 | Petro Research And Analysis Corp | Real Time and Playback Interpretation of Fracturing Pressure Data |
| US10385670B2 (en) * | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
-
2015
- 2015-02-10 US US14/618,865 patent/US10030497B2/en active Active
-
2016
- 2016-02-09 WO PCT/IB2016/050670 patent/WO2016128889A1/en not_active Ceased
- 2016-02-10 AR ARP160100354A patent/AR103644A1/es unknown
-
2018
- 2018-07-03 US US16/026,301 patent/US10669832B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| WO2016128889A1 (en) | 2016-08-18 |
| US20160237799A1 (en) | 2016-08-18 |
| US10669832B2 (en) | 2020-06-02 |
| US10030497B2 (en) | 2018-07-24 |
| US20180320499A1 (en) | 2018-11-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AR103644A1 (es) | Método para adquirir información sobre la geometría de una fractura hidráulica para evaluar y optimizar el espaciamiento entre pozos para una plataforma de operaciones multipozo | |
| AR105209A1 (es) | Método de evaluación geométrica de fracturas hidráulicas | |
| MX382964B (es) | Método de perforación para perforar un pozo subterráneo. | |
| MX2016002008A (es) | Tapones limpiadores de cemento y collares de tuberia de revestimiento inteligentes. | |
| MX2018009876A (es) | Encapsulamiento y desencapsulamiento de medios. | |
| AR097542A1 (es) | Métodos y sistemas para la evaluación de la permeabilidad y la porosidad de la roca y la composición de los fluidos | |
| MX2018003798A (es) | Sistemas y metodos de sincronizacion de funcion para sistemas electronicos de suministro de vapor. | |
| AR103725A1 (es) | Terminaciones integradas de pozos | |
| MX2017014049A (es) | Sistemas y metodos para caracterizar materiales externos a una tuberia de revestimiento. | |
| GB2567066A (en) | Method for slim hole single trip remedial or plug and abandonment cement barrier | |
| BR112017009502A2 (pt) | dispositivo de isolamento anular, método para desmontar um dispositivo de isolamento anular e conjunto de tubo de subida para perfuração com pressão gerenciada | |
| AR095789A1 (es) | Composiciones para el servicio de pozos y métodos para su preparación y uso | |
| MX358250B (es) | Planificacion de comunicaciones de dispositivo a dispositivo. | |
| MX384235B (es) | Aparato y metodo para encontrar una union doble. | |
| AR100842A1 (es) | Métodos y sistemas para detectar etiquetas rfid en un entorno de un pozo | |
| BR112017006728A2 (pt) | método para fraturar um furo de poço, e, ferramenta de fundo de poço. | |
| MX2018002536A (es) | Medicion de propiedades del cemento. | |
| PE20180914A1 (es) | Acoplamiento de la valvula que tiene proyecciones de soporte de centrado | |
| AR102289A1 (es) | Dispositivos y métodos para procesamiento de señales digitales en telemetría de pulso de lodo | |
| MX390146B (es) | Una herramienta cementada en un pozo que contiene un tapon de puerto disuelto mediante corrosion galvanica. | |
| MX2016011287A (es) | Metodo y dispositivo para estudio y control de yacimientos. | |
| WO2014147418A3 (en) | Water deluge system testing apparatus and method | |
| MX2016006388A (es) | Algoritmo para deteccion de falla zonal en un entorno de pozo. | |
| AR090635A1 (es) | Aparato, metodos y sistemas de correccion de la velocidad de compresion | |
| MX2015010070A (es) | Sistemas y metodos para optimizacion de analisis de pozos y fluidos subterraneos con gases nobles. |