|
US7251590B2
(en)
|
2000-03-13 |
2007-07-31 |
Smith International, Inc. |
Dynamic vibrational control
|
|
US9482055B2
(en)
|
2000-10-11 |
2016-11-01 |
Smith International, Inc. |
Methods for modeling, designing, and optimizing the performance of drilling tool assemblies
|
|
CA2523325A1
(en)
*
|
2004-10-12 |
2006-04-12 |
Dwayne P. Terracina |
Flow allocation in drill bits
|
|
US7954559B2
(en)
*
|
2005-04-06 |
2011-06-07 |
Smith International, Inc. |
Method for optimizing the location of a secondary cutting structure component in a drill string
|
|
US7784544B2
(en)
*
|
2006-01-24 |
2010-08-31 |
Schlumberger Technology Corporation |
Method of treating a subterranean formation using a rheology model for fluid optimization
|
|
US8812334B2
(en)
*
|
2006-02-27 |
2014-08-19 |
Schlumberger Technology Corporation |
Well planning system and method
|
|
US7857046B2
(en)
*
|
2006-05-31 |
2010-12-28 |
Schlumberger Technology Corporation |
Methods for obtaining a wellbore schematic and using same for wellbore servicing
|
|
CA2997840A1
(en)
*
|
2006-09-27 |
2008-04-03 |
Halliburton Energy Services, Inc. |
Monitor and control of directional drilling operations
|
|
US9359882B2
(en)
|
2006-09-27 |
2016-06-07 |
Halliburton Energy Services, Inc. |
Monitor and control of directional drilling operations and simulations
|
|
US7857047B2
(en)
*
|
2006-11-02 |
2010-12-28 |
Exxonmobil Upstream Research Company |
Method of drilling and producing hydrocarbons from subsurface formations
|
|
US7606666B2
(en)
*
|
2007-01-29 |
2009-10-20 |
Schlumberger Technology Corporation |
System and method for performing oilfield drilling operations using visualization techniques
|
|
WO2008112929A1
(en)
*
|
2007-03-13 |
2008-09-18 |
Schlumberger Canada Limited |
Method and system for managing information
|
|
US8014987B2
(en)
*
|
2007-04-13 |
2011-09-06 |
Schlumberger Technology Corp. |
Modeling the transient behavior of BHA/drill string while drilling
|
|
US8688487B2
(en)
*
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
|
US7814989B2
(en)
*
|
2007-05-21 |
2010-10-19 |
Schlumberger Technology Corporation |
System and method for performing a drilling operation in an oilfield
|
|
CN101765694B
(zh)
*
|
2007-06-26 |
2014-04-30 |
阿特拉斯·科普柯凿岩设备有限公司 |
用于控制岩石钻凿装置的方法和设备
|
|
US8332194B2
(en)
*
|
2007-07-30 |
2012-12-11 |
Schlumberger Technology Corporation |
Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
|
|
US8073800B2
(en)
*
|
2007-07-31 |
2011-12-06 |
Schlumberger Technology Corporation |
Valuing future information under uncertainty
|
|
US7992634B2
(en)
*
|
2007-08-28 |
2011-08-09 |
Frank's Casing Crew And Rental Tools, Inc. |
Adjustable pipe guide for use with an elevator and/or a spider
|
|
US7997333B2
(en)
*
|
2007-08-28 |
2011-08-16 |
Frank's Casting Crew And Rental Tools, Inc. |
Segmented bottom guide for string elevator assembly
|
|
US8316929B2
(en)
*
|
2007-08-28 |
2012-11-27 |
Frank's Casing Crew And Rental Tools, Inc. |
Tubular guiding and gripping apparatus and method
|
|
US20090076873A1
(en)
*
|
2007-09-19 |
2009-03-19 |
General Electric Company |
Method and system to improve engineered system decisions and transfer risk
|
|
US7878268B2
(en)
*
|
2007-12-17 |
2011-02-01 |
Schlumberger Technology Corporation |
Oilfield well planning and operation
|
|
US7845429B2
(en)
*
|
2007-12-21 |
2010-12-07 |
Schlumberger Technology Corporation |
Determining drillstring neutral point based on hydraulic factor
|
|
US8135862B2
(en)
*
|
2008-01-14 |
2012-03-13 |
Schlumberger Technology Corporation |
Real-time, bi-directional data management
|
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
|
US9488044B2
(en)
|
2008-06-23 |
2016-11-08 |
Schlumberger Technology Corporation |
Valuing future well test under uncertainty
|
|
EP2808482B1
(en)
|
2008-10-22 |
2019-07-31 |
Frank's International, LLC |
External grip tubular running tool
|
|
WO2010053618A1
(en)
*
|
2008-11-06 |
2010-05-14 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
|
US10060245B2
(en)
*
|
2009-01-09 |
2018-08-28 |
Halliburton Energy Services, Inc. |
Systems and methods for planning well locations with dynamic production criteria
|
|
US20100200743A1
(en)
*
|
2009-02-09 |
2010-08-12 |
Larry Dale Forster |
Well collision avoidance using distributed acoustic sensing
|
|
US8498853B2
(en)
*
|
2009-07-20 |
2013-07-30 |
Exxonmobil Upstream Research Company |
Petrophysical method for predicting plastic mechanical properties in rock formations
|
|
US8386221B2
(en)
*
|
2009-12-07 |
2013-02-26 |
Nuovo Pignone S.P.A. |
Method for subsea equipment subject to hydrogen induced stress cracking
|
|
US8567526B2
(en)
*
|
2009-12-08 |
2013-10-29 |
Schlumberger Technology Corporation |
Wellbore steering based on rock stress direction
|
|
AU2010345083B2
(en)
|
2010-02-03 |
2016-03-10 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
|
US8265874B2
(en)
|
2010-04-21 |
2012-09-11 |
Saudi Arabian Oil Company |
Expert system for selecting fit-for-purpose technologies and wells for reservoir saturation monitoring
|
|
US20130311147A1
(en)
*
|
2011-02-01 |
2013-11-21 |
Halliburton Energy Services, Inc. |
Drilling optimization
|
|
US20130191081A1
(en)
*
|
2011-07-14 |
2013-07-25 |
Vivek Jain |
Creating a well path
|
|
MX341248B
(es)
*
|
2011-10-03 |
2016-08-09 |
Landmark Graphics Corp |
Metodo 1-d mejorado para prediccion de ventana de densidad de lodo para secciones de pozo subsal.
|
|
WO2013148362A1
(en)
*
|
2012-03-27 |
2013-10-03 |
Exxonmobil Upstream Research Company |
Designing a drillstring
|
|
WO2013169429A1
(en)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Canvas control for 3d data volume processing
|
|
MX2015001362A
(es)
*
|
2012-08-01 |
2015-09-16 |
Schlumberger Technology Bv |
Evaluacion, monitoreo y control de operaciones de perforacion y/o evaluacion de caracteristicas geologicas.
|
|
SG11201408742QA
(en)
*
|
2012-08-10 |
2015-01-29 |
Landmark Graphics Corp |
Navigating to failures in drilling system displays
|
|
US9411071B2
(en)
|
2012-08-31 |
2016-08-09 |
Exxonmobil Upstream Research Company |
Method of estimating rock mechanical properties
|
|
RU2015109295A
(ru)
*
|
2012-09-28 |
2016-11-20 |
Лэндмарк Графикс Корпорейшн |
Автоматизированное геонавигационное устройство и способ оптимизации размещения и качества скважин
|
|
US10047587B2
(en)
*
|
2012-10-31 |
2018-08-14 |
Halliburton Energy Services, Inc. |
Methods for producing fluid invasion resistant cement slurries
|
|
MX363567B
(es)
*
|
2013-01-30 |
2019-03-27 |
Petroleo Brasileiro Sa Petrobras |
Métodos para producir suspensiones de cemento resistentes a la migración de fluido.
|
|
EP2932031B1
(en)
*
|
2013-02-27 |
2022-06-15 |
Landmark Graphics Corporation |
Method and system for predicting drilling events
|
|
EP3004535A4
(en)
*
|
2013-05-29 |
2017-01-18 |
Landmark Graphics Corporation |
Compiling drilling scenario data from disparate data sources
|
|
US10048403B2
(en)
|
2013-06-20 |
2018-08-14 |
Exxonmobil Upstream Research Company |
Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements
|
|
US8996396B2
(en)
|
2013-06-26 |
2015-03-31 |
Hunt Advanced Drilling Technologies, LLC |
System and method for defining a drilling path based on cost
|
|
AU2013397959B2
(en)
*
|
2013-08-13 |
2016-06-16 |
Landmark Graphics Corporation |
Probabilistic methodology for real time drilling
|
|
MX2016001188A
(es)
|
2013-08-30 |
2016-07-26 |
Landmark Graphics Corp |
Estimacion y prediccion de tortuosidad de pozo.
|
|
RU2016112857A
(ru)
|
2013-10-25 |
2017-11-30 |
Лэндмарк Графикс Корпорейшн |
Средство построения технологической карты анализа технических расчетов по бурению
|
|
WO2015093979A1
(en)
*
|
2013-12-19 |
2015-06-25 |
Energy Dynamics As |
Modelling tool
|
|
US11125017B2
(en)
*
|
2014-08-29 |
2021-09-21 |
Landmark Graphics Corporation |
Directional driller quality reporting system and method
|
|
WO2016154723A1
(en)
*
|
2015-03-27 |
2016-10-06 |
Pason Systems Corp. |
Method and apparatus for drilling a new well using historic drilling data
|
|
WO2016161295A1
(en)
|
2015-04-03 |
2016-10-06 |
Schlumberger Technology Corporation |
Wellsite system services
|
|
CN106050215A
(zh)
*
|
2015-04-03 |
2016-10-26 |
普拉德研究及开发股份有限公司 |
目标属性的直接控制
|
|
WO2016168957A1
(en)
*
|
2015-04-19 |
2016-10-27 |
Prad Research And Development Limited |
Automated trajectory and anti-collision for well planning
|
|
US11365623B2
(en)
*
|
2015-10-18 |
2022-06-21 |
Schlumberger Technology Corporation |
Rig operations information system
|
|
AU2015415910A1
(en)
*
|
2015-12-02 |
2018-05-10 |
Landmark Graphics Corporation |
Creation of digital representations of well schematics
|
|
WO2017206182A1
(en)
*
|
2016-06-03 |
2017-12-07 |
Schlumberger Technology Corporation |
Detecting events in well reports
|
|
EP3523502A4
(en)
*
|
2016-10-05 |
2020-06-17 |
Services Petroliers Schlumberger |
MACHINE-LEARNING DRILL MODELS FOR A NEW HOLE
|
|
US10872183B2
(en)
*
|
2016-10-21 |
2020-12-22 |
Baker Hughes, A Ge Company, Llc |
Geomechanical risk and hazard assessment and mitigation
|
|
EP3619399B1
(en)
|
2017-05-03 |
2023-07-12 |
Services Pétroliers Schlumberger |
Drillstring assembly framework
|
|
US11199083B2
(en)
*
|
2017-06-16 |
2021-12-14 |
Landmark Graphics Corporation |
Method and apparatus to predict casing wear for well systems
|
|
US10968730B2
(en)
*
|
2017-07-25 |
2021-04-06 |
Exxonmobil Upstream Research Company |
Method of optimizing drilling ramp-up
|
|
US12463996B1
(en)
*
|
2017-11-27 |
2025-11-04 |
Fortinet, Inc. |
Risk engine that utilizes key performance indicators
|
|
US11613930B2
(en)
*
|
2017-12-28 |
2023-03-28 |
Halliburton Energy Services, Inc. |
Systems and methods to improve directional drilling
|
|
CN112105796B
(zh)
|
2018-03-09 |
2024-10-25 |
斯伦贝谢技术有限公司 |
集成井施工系统操作
|
|
CA3014816C
(en)
|
2018-08-17 |
2020-11-10 |
Pason Systems Corp. |
Methods and systems for performing automated drilling of a wellbore
|
|
CN111206920B
(zh)
*
|
2018-11-01 |
2023-04-07 |
中国石油化工股份有限公司 |
基于多井统计和地层表征的自然造斜规律评价方法
|
|
EP3928238A4
(en)
*
|
2019-02-12 |
2022-11-16 |
Helmerich & Payne Technologies, LLC |
SYSTEMS AND METHODS FOR ITERATIVE HOLE PLANNING FOR OPTIMIZED RESULTS
|
|
US12136054B2
(en)
|
2019-06-19 |
2024-11-05 |
Helmerich & Payne Technologies, Llc |
Systems and methods of iterative well planning for optimized results
|
|
US10655405B1
(en)
*
|
2019-08-15 |
2020-05-19 |
Sun Energy Services, Llc |
Method and apparatus for optimizing a well drilling operation
|
|
CN114746841A
(zh)
|
2019-10-28 |
2022-07-12 |
吉奥奎斯特系统公司 |
钻井活动建议系统和方法
|
|
US20220170361A1
(en)
*
|
2019-11-13 |
2022-06-02 |
China University Of Petroleum |
Risk assessment-based design method for deep complex formation wellbore structure
|
|
US11268380B2
(en)
*
|
2020-04-22 |
2022-03-08 |
Saudi Arabian Oil Company |
Kick detection using logging while drilling
|
|
CN112377172B
(zh)
*
|
2020-12-07 |
2022-10-04 |
中国石油天然气集团有限公司 |
钻井信号下传系统及方法
|
|
US12406114B2
(en)
|
2021-08-23 |
2025-09-02 |
Halliburton Energy Services, Inc. |
Method to recommend design practices that increase the probability of meeting cementing job objectives
|
|
US11708755B2
(en)
|
2021-10-28 |
2023-07-25 |
Halliburton Energy Services, Inc. |
Force measurements about secondary contacting structures
|