RU2015109295A - Автоматизированное геонавигационное устройство и способ оптимизации размещения и качества скважин - Google Patents
Автоматизированное геонавигационное устройство и способ оптимизации размещения и качества скважин Download PDFInfo
- Publication number
- RU2015109295A RU2015109295A RU2015109295A RU2015109295A RU2015109295A RU 2015109295 A RU2015109295 A RU 2015109295A RU 2015109295 A RU2015109295 A RU 2015109295A RU 2015109295 A RU2015109295 A RU 2015109295A RU 2015109295 A RU2015109295 A RU 2015109295A
- Authority
- RU
- Russia
- Prior art keywords
- downhole device
- well
- geological structure
- actual
- trajectory
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract 12
- 238000005457 optimization Methods 0.000 title 1
- 238000004458 analytical method Methods 0.000 claims abstract 9
- 230000001413 cellular effect Effects 0.000 claims 2
- 238000005553 drilling Methods 0.000 claims 1
- 238000013507 mapping Methods 0.000 claims 1
- 238000012512 characterization method Methods 0.000 abstract 1
- 238000007405 data analysis Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/005—Below-ground automatic control systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/024—Determining slope or direction of devices in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Geophysics And Detection Of Objects (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Earth Drilling (AREA)
Abstract
1. Внутрискважинное устройство, содержащее совокупность схем обработки для обеспечения геонавигации внутрискважинного устройства, причем совокупность схем обработки осуществляет способ, включающий:определение смоделированной траектории скважины внутрискважинного устройства через геологическую структуру;определение фактической траектории скважины внутрискважинного устройства через геологическую структуру;сравнение смоделированной траектории скважины с фактической траекторией скважины внутрискважинного устройства; икорректировку, по мере необходимости, фактической траектории скважины внутрискважинного устройства для приведения в соответствие со смоделированной траекторией скважины внутрискважинного устройства.2. Устройство по п. 1, отличающееся тем, что определение смоделированной траектории скважины дополнительно включает:анализ данных характеристики геологической структуры, соответствующих геологической структуре, окружающей внутрискважинное устройство;анализ данных местоположения, соответствующих местоположению геологической структуры, окружающей внутрискважинное устройство, и/или местоположению внутрискважинного устройства; икорректировку смоделированной траектории скважины внутрискважинного устройства на основании данных характеристики геологической структуры и данных местоположения.3. Устройство по п. 1, отличающееся тем, что определение фактической траектории скважины дополнительно включает:анализ данных характеристики геологической структуры, соответствующих геологической структуре, окружающей внутрискважинное устройство; ианализ данных
Claims (22)
1. Внутрискважинное устройство, содержащее совокупность схем обработки для обеспечения геонавигации внутрискважинного устройства, причем совокупность схем обработки осуществляет способ, включающий:
определение смоделированной траектории скважины внутрискважинного устройства через геологическую структуру;
определение фактической траектории скважины внутрискважинного устройства через геологическую структуру;
сравнение смоделированной траектории скважины с фактической траекторией скважины внутрискважинного устройства; и
корректировку, по мере необходимости, фактической траектории скважины внутрискважинного устройства для приведения в соответствие со смоделированной траекторией скважины внутрискважинного устройства.
2. Устройство по п. 1, отличающееся тем, что определение смоделированной траектории скважины дополнительно включает:
анализ данных характеристики геологической структуры, соответствующих геологической структуре, окружающей внутрискважинное устройство;
анализ данных местоположения, соответствующих местоположению геологической структуры, окружающей внутрискважинное устройство, и/или местоположению внутрискважинного устройства; и
корректировку смоделированной траектории скважины внутрискважинного устройства на основании данных характеристики геологической структуры и данных местоположения.
3. Устройство по п. 1, отличающееся тем, что определение фактической траектории скважины дополнительно включает:
анализ данных характеристики геологической структуры, соответствующих геологической структуре, окружающей внутрискважинное устройство; и
анализ данных местоположения, соответствующих местоположению геологической структуры, окружающей внутрискважинное устройство, и/или местоположению внутрискважинного устройства,
причем фактическая траектория скважины определяется на основании данных характеристики геологической структуры и данных местоположения.
4. Устройство по п. 1, отличающееся тем, что корректировка фактической траектории скважины внутрискважинного устройства осуществляется в реальном времени.
5. Устройство по п. 1, отличающееся тем, что корректировка фактической траектории скважины внутрискважинного устройства осуществляется без вмешательства с поверхности.
6. Устройство по п. 1, отличающееся тем, что определение смоделированной траектории скважины внутрискважинного устройства дополнительно включает создание траектории скважины в геологической ячеистой модели недр.
7. Устройство по п. 1, отличающееся тем, что корректировка фактической траектории скважины внутрискважинного устройства дополнительно включает корректировку для следования фактической траектории скважины внутрискважинного устройства вдоль горизонтальной скважины.
8. Устройство по п. 1, отличающееся тем, что внутрискважинным устройством является буровой снаряд.
9. Способ геонавигации для автоматизированного внутрискважинного устройства, помещенного в пределах геологической структуры, включающий:
определение смоделированной траектории скважины внутрискважинного устройства через геологическую структуру;
определение фактической траектории скважины внутрискважинного устройства через геологическую структуру;
сравнение смоделированной траектории скважины с фактической траекторией скважины внутрискважинного устройства; и
корректировку, по мере необходимости, фактической траектории скважины внутрискважинного устройства для приведения в соответствие со смоделированной траекторией скважины внутрискважинного устройства.
10. Способ по п. 9, отличающийся тем, что определение смоделированной траектории скважины дополнительно включает:
анализ данных характеристики геологической структуры, соответствующих геологической структуре, окружающей внутрискважинное устройство;
анализ данных местоположения, соответствующих местоположению геологической структуры, окружающей внутрискважинное устройство, и/или местоположению внутрискважинного устройства; и
корректировку смоделированной траектории скважины внутрискважинного устройства на основании данных характеристики геологической структуры и данных местоположения.
11. Способ по п. 9, отличающийся тем, что определение фактической траектории скважины дополнительно включает:
анализ данных характеристики геологической структуры, соответствующих геологической структуре, окружающей внутрискважинное устройство; и
анализ данных местоположения, соответствующих местоположению геологической структуры, окружающей внутрискважинное устройство, и/или местоположению внутрискважинного устройства,
причем фактическая траектория скважины определяется на основании данных характеристики геологической структуры и данных местоположения.
12. Способ по п. 9, отличающийся тем, что корректировка фактической траектории скважины внутрискважинного устройства осуществляется в реальном времени.
13. Способ по п. 9, отличающийся тем, что корректировка фактической траектории скважины внутрискважинного устройства осуществляется без вмешательства с поверхности.
14. Способ по п. 9, отличающийся тем, что определение смоделированной траектории скважины внутрискважинного устройства дополнительно включает создание траектории скважины в геологической ячеистой модели недр.
15. Способ по п. 9, отличающийся тем, что корректировка фактической траектории скважины внутрискважинного устройства дополнительно включает корректировку для следования фактической траектории скважины внутрискважинного устройства вдоль горизонтальной скважины.
16. Способ по п. 9, отличающийся тем, что дополнительно включает бурение ствола скважины с использованием автоматизированного внутрискважинного устройства.
17. Автоматизированное геонавигационное устройство, содержащее
компьютерную систему ведения;
стратиграфический зондирующий инструмент, электрически связанный с компьютерной системой ведения, предназначенный для определения характеристики геологической структуры, окружающей геонавигационное устройство;
инструмент местоположения в недрах, электрически связанный с компьютерной системой ведения, предназначенный для определения местоположения геонавигационного устройства; и
контроллер направления, электрически связанный с компьютерной системой ведения, предназначенный для задания направления геонавигационного устройства в ответ на сигналы, принятые из компьютерной системы ведения.
18. Устройство по п. 17, отличающееся тем, что дополнительно содержит головку бура.
19. Устройство по п. 17, отличающееся тем, что компьютерная система ведения содержит модель недр для геологической структуры.
20. Устройство по п. 19, отличающееся тем, что модель недр дополнительно содержит горизонтальную траекторию скважины геонавигационного устройства.
21. Устройство по п. 17, отличающееся тем, что дополнительно содержит инструмент отображения среды, предназначенный для определения одной или более относящихся к разрыву характеристик геологической структуры, окружающей геонавигационное устройство.
22. Устройство по п. 17, отличающееся тем, что компьютерная система ведения содержит процессор; и память, функционально соединенную с процессором, содержащую сохраненные в ней программные команды, которые при выполнении процессором обеспечивают осуществление процессором способа, включающего:
определение смоделированной траектории скважины внутрискважинного устройства через геологическую структуру;
определение фактической траектории скважины внутрискважинного устройства через геологическую структуру;
сравнение смоделированной траектории скважины с фактической траекторией скважины внутрискважинного устройства; и
корректировку, по мере необходимости, фактической траектории скважины внутрискважинного устройства для приведения в соответствие со смоделированной траекторией скважины внутрискважинного устройства.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/US2012/057853 WO2014051612A1 (en) | 2012-09-28 | 2012-09-28 | Self-guided geosteering assembly and method for optimizing well placement and quality |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2015109295A true RU2015109295A (ru) | 2016-11-20 |
Family
ID=50388800
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2015109295A RU2015109295A (ru) | 2012-09-28 | 2012-09-28 | Автоматизированное геонавигационное устройство и способ оптимизации размещения и качества скважин |
Country Status (11)
| Country | Link |
|---|---|
| US (1) | US10267137B2 (ru) |
| EP (1) | EP2900915B1 (ru) |
| CN (1) | CN104736795A (ru) |
| AR (1) | AR092711A1 (ru) |
| AU (2) | AU2012391016B2 (ru) |
| BR (1) | BR112015006822A2 (ru) |
| CA (2) | CA2886327C (ru) |
| MX (1) | MX2015003998A (ru) |
| RU (1) | RU2015109295A (ru) |
| SG (1) | SG11201502406PA (ru) |
| WO (1) | WO2014051612A1 (ru) |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2877696B1 (en) * | 2012-09-07 | 2017-10-11 | Landmark Graphics Corporation | Well placement and fracture design optimization system, method and computer program product |
| GB2547563B (en) * | 2014-12-31 | 2020-11-18 | Halliburton Energy Services Inc | Automated optimal path design for directional drilling |
| CN104806226B (zh) * | 2015-04-30 | 2018-08-17 | 北京四利通控制技术股份有限公司 | 智能钻井专家系统 |
| CN106321062B (zh) * | 2015-07-06 | 2020-01-07 | 中国石油天然气股份有限公司 | Sagd双水平井的生产井靶区钻遇率的获取方法 |
| WO2017120447A1 (en) * | 2016-01-08 | 2017-07-13 | Nature Conservancy, The | Techniques for positioning energy infrastructure |
| US10830033B2 (en) | 2017-08-10 | 2020-11-10 | Motive Drilling Technologies, Inc. | Apparatus and methods for uninterrupted drilling |
| US10584574B2 (en) | 2017-08-10 | 2020-03-10 | Motive Drilling Technologies, Inc. | Apparatus and methods for automated slide drilling |
| US11492890B2 (en) * | 2017-08-21 | 2022-11-08 | Landmark Graphics Corporation | Iterative real-time steering of a drill bit |
| RU2720115C1 (ru) * | 2018-01-24 | 2020-04-24 | Общество с ограниченной ответственностью "Геонавигационные технологии" | Способ автоматизированного процесса геологической проводки скважин и система для его осуществления |
| US10947841B2 (en) * | 2018-01-30 | 2021-03-16 | Baker Hughes, A Ge Company, Llc | Method to compute density of fractures from image logs |
| WO2020163372A1 (en) | 2019-02-05 | 2020-08-13 | Motive Drilling Technologies, Inc. | Downhole display |
| WO2020163242A1 (en) | 2019-02-05 | 2020-08-13 | Magnetic Variation Services, Llc | Geosteering methods and systems for improved drilling performance |
| US11466556B2 (en) | 2019-05-17 | 2022-10-11 | Helmerich & Payne, Inc. | Stall detection and recovery for mud motors |
| WO2021154249A1 (en) | 2020-01-29 | 2021-08-05 | Halliburton Energy Services, Inc. | Trajectory control for directional drilling using formation evaluation measurement feedback |
| CN111459955B (zh) * | 2020-03-13 | 2023-09-29 | 济南轨道交通集团有限公司 | 一种基于gis平台的三维地质结构模型自动更新方法及系统 |
| US12163425B2 (en) * | 2020-03-13 | 2024-12-10 | Baker Hughes Oilfield Operations Llc | Automated geosteering based on a distance to oil-water contact |
| US11885212B2 (en) | 2021-07-16 | 2024-01-30 | Helmerich & Payne Technologies, Llc | Apparatus and methods for controlling drilling |
| US20230313663A1 (en) * | 2022-03-31 | 2023-10-05 | Baker Hughes Oilfield Operations Llc | Automated reservoir navigation |
Family Cites Families (65)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4733733A (en) * | 1986-02-11 | 1988-03-29 | Nl Industries, Inc. | Method of controlling the direction of a drill bit in a borehole |
| US4962490A (en) * | 1990-01-18 | 1990-10-09 | Mobil Oil Corporation | Acoustic logging method for determining the dip angle and dip direction of a subsurface formation fracture |
| US5812068A (en) * | 1994-12-12 | 1998-09-22 | Baker Hughes Incorporated | Drilling system with downhole apparatus for determining parameters of interest and for adjusting drilling direction in response thereto |
| US6206108B1 (en) * | 1995-01-12 | 2001-03-27 | Baker Hughes Incorporated | Drilling system with integrated bottom hole assembly |
| US6176323B1 (en) * | 1997-06-27 | 2001-01-23 | Baker Hughes Incorporated | Drilling systems with sensors for determining properties of drilling fluid downhole |
| US6315062B1 (en) * | 1999-09-24 | 2001-11-13 | Vermeer Manufacturing Company | Horizontal directional drilling machine employing inertial navigation control system and method |
| GB2354852B (en) * | 1999-10-01 | 2001-11-28 | Schlumberger Holdings | Method for updating an earth model using measurements gathered during borehole construction |
| US7463035B2 (en) | 2002-03-04 | 2008-12-09 | Baker Hughes Incorporated | Method and apparatus for the use of multicomponent induction tool for geosteering and formation resistivity data interpretation in horizontal wells |
| EP1483602B1 (en) | 2002-03-04 | 2013-04-24 | Baker Hughes Incorporated | Use of a multicomponent induction tool for geosteering and formation resistivity data interpretation in horizontal wells |
| US6968909B2 (en) * | 2002-03-06 | 2005-11-29 | Schlumberger Technology Corporation | Realtime control of a drilling system using the output from combination of an earth model and a drilling process model |
| US20040050590A1 (en) * | 2002-09-16 | 2004-03-18 | Pirovolou Dimitrios K. | Downhole closed loop control of drilling trajectory |
| US7063174B2 (en) * | 2002-11-12 | 2006-06-20 | Baker Hughes Incorporated | Method for reservoir navigation using formation pressure testing measurement while drilling |
| US7093672B2 (en) * | 2003-02-11 | 2006-08-22 | Schlumberger Technology Corporation | Systems for deep resistivity while drilling for proactive geosteering |
| GB2413871A (en) * | 2003-02-27 | 2005-11-09 | Schlumberger Holdings | Estimation of formation characteristics in wells |
| RU37766U1 (ru) | 2004-01-14 | 2004-05-10 | ООО Научно-исследовательский институт технических систем "Пилот" | Геонавигационная кабельная телеметрическая система для управления бурением скважин |
| WO2005071222A1 (en) * | 2004-01-20 | 2005-08-04 | Saudi Arabian Oil Company | Real time earth model for collaborative geosteering |
| US7546884B2 (en) * | 2004-03-17 | 2009-06-16 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements |
| US7269515B2 (en) * | 2004-06-15 | 2007-09-11 | Baker Hughes Incorporated | Geosteering in anisotropic formations using multicomponent induction measurements |
| US7448262B2 (en) * | 2004-08-26 | 2008-11-11 | Baker Hughes Incorporated | Determination of correct horizontal and vertical permeabilities in a deviated well |
| US7630872B2 (en) * | 2004-09-16 | 2009-12-08 | Schlumberger Technology Corporation | Methods for visualizing distances between wellbore and formation boundaries |
| US7191850B2 (en) * | 2004-10-28 | 2007-03-20 | Williams Danny T | Formation dip geo-steering method |
| US7778811B2 (en) * | 2004-11-12 | 2010-08-17 | Baker Hughes Incorporated | Method and system for predictive stratigraphy images |
| US7650269B2 (en) * | 2004-11-15 | 2010-01-19 | Halliburton Energy Services, Inc. | Method and apparatus for surveying a borehole with a rotating sensor package |
| WO2008008386A2 (en) | 2006-07-11 | 2008-01-17 | Halliburton Energy Services, Inc. | Modular geosteering tool assembly |
| US9135475B2 (en) * | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
| US7606666B2 (en) * | 2007-01-29 | 2009-10-20 | Schlumberger Technology Corporation | System and method for performing oilfield drilling operations using visualization techniques |
| US7814989B2 (en) | 2007-05-21 | 2010-10-19 | Schlumberger Technology Corporation | System and method for performing a drilling operation in an oilfield |
| US20080314641A1 (en) * | 2007-06-20 | 2008-12-25 | Mcclard Kevin | Directional Drilling System and Software Method |
| WO2009064732A1 (en) * | 2007-11-12 | 2009-05-22 | Schlumberger Canada Limited | Wellbore depth computation |
| US9638830B2 (en) * | 2007-12-14 | 2017-05-02 | Westerngeco L.L.C. | Optimizing drilling operations using petrotechnical data |
| US8364404B2 (en) * | 2008-02-06 | 2013-01-29 | Schlumberger Technology Corporation | System and method for displaying data associated with subsurface reservoirs |
| US8705318B2 (en) * | 2008-03-10 | 2014-04-22 | Schlumberger Technology Corporation | Data aggregation for drilling operations |
| US8199166B2 (en) * | 2008-03-14 | 2012-06-12 | Schlumberger Technology Corporation | Visualization techniques for oilfield operations |
| US8714246B2 (en) | 2008-05-22 | 2014-05-06 | Schlumberger Technology Corporation | Downhole measurement of formation characteristics while drilling |
| US8061444B2 (en) * | 2008-05-22 | 2011-11-22 | Schlumberger Technology Corporation | Methods and apparatus to form a well |
| US8095349B2 (en) * | 2008-05-30 | 2012-01-10 | Kelkar And Associates, Inc. | Dynamic updating of simulation models |
| GB2460096B (en) * | 2008-06-27 | 2010-04-07 | Wajid Rasheed | Expansion and calliper tool |
| US8892407B2 (en) * | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
| US8783382B2 (en) * | 2009-01-15 | 2014-07-22 | Schlumberger Technology Corporation | Directional drilling control devices and methods |
| US8645571B2 (en) * | 2009-08-05 | 2014-02-04 | Schlumberger Technology Corporation | System and method for managing and/or using data for tools in a wellbore |
| US8245795B2 (en) * | 2009-12-08 | 2012-08-21 | Schlumberger Technology Corporation | Phase wellbore steering |
| US8567526B2 (en) * | 2009-12-08 | 2013-10-29 | Schlumberger Technology Corporation | Wellbore steering based on rock stress direction |
| US8818779B2 (en) * | 2009-12-21 | 2014-08-26 | Baker Hughes Incorporated | System and methods for real-time wellbore stability service |
| WO2011096964A1 (en) * | 2010-02-03 | 2011-08-11 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
| US9273517B2 (en) * | 2010-08-19 | 2016-03-01 | Schlumberger Technology Corporation | Downhole closed-loop geosteering methodology |
| EP2609540B1 (en) * | 2010-08-24 | 2020-07-22 | Exxonmobil Upstream Research Company | System and method for planning a well path |
| US8463549B1 (en) * | 2010-09-10 | 2013-06-11 | Selman and Associates, Ltd. | Method for geosteering directional drilling apparatus |
| US9097096B1 (en) * | 2010-09-10 | 2015-08-04 | Selman and Associates, Ltd. | Multi dimensional model for directional drilling |
| EA201391035A1 (ru) * | 2011-01-13 | 2013-12-30 | Лэндмарк Графикс Корпорейшн | Способ и система для обновления геоячеечной модели |
| US9715026B2 (en) * | 2011-03-11 | 2017-07-25 | Schlumberger Technology Corporation | System and method for performing microseismic fracture operations |
| RU2571457C1 (ru) * | 2011-08-03 | 2015-12-20 | Хэллибертон Энерджи Сервисиз, Инк. | Устройство и способ посадки скважины в целевой зоне |
| BR112014007287A2 (pt) * | 2011-09-27 | 2017-04-18 | Halliburton Energy Services Inc | método e sistema para realizar uma operação de perfuração, e, dispositivo de armazenamento legível por máquina |
| CN202300374U (zh) * | 2011-11-03 | 2012-07-04 | 中国石油集团川庆钻探工程有限公司 | 利用微振动对井下钻头准确定位的测量系统 |
| US10030499B2 (en) * | 2011-12-06 | 2018-07-24 | Bp Corporation North America Inc. | Geological monitoring console |
| US11085283B2 (en) * | 2011-12-22 | 2021-08-10 | Motive Drilling Technologies, Inc. | System and method for surface steerable drilling using tactical tracking |
| EP2877690B1 (en) * | 2012-08-10 | 2023-03-01 | Halliburton Energy Services Inc. | Methods and systems for borehole image forward modeling of formation properties |
| EP2877696B1 (en) * | 2012-09-07 | 2017-10-11 | Landmark Graphics Corporation | Well placement and fracture design optimization system, method and computer program product |
| US20140172303A1 (en) * | 2012-12-18 | 2014-06-19 | Smith International, Inc. | Methods and systems for analyzing the quality of a wellbore |
| US9951607B2 (en) * | 2013-01-31 | 2018-04-24 | Baker Hughes, LLC | System and method for characterization of downhole measurement data for borehole stability prediction |
| US10920576B2 (en) * | 2013-06-24 | 2021-02-16 | Motive Drilling Technologies, Inc. | System and method for determining BHA position during lateral drilling |
| DE112013007492T5 (de) * | 2013-10-11 | 2016-07-14 | Halliburton Energy Services, Inc. | Steuerung eines Bohrpfades unter Einsatz von Glättung |
| CA2933141A1 (en) * | 2014-01-02 | 2015-07-09 | Shell Internationale Research Maatschappij B.V. | System and method for making downhole measurements |
| CA2910186C (en) * | 2014-10-31 | 2023-01-24 | Ryan Directional Services, Inc. | Method and apparatus for determining wellbore position |
| US10113363B2 (en) * | 2014-11-07 | 2018-10-30 | Aps Technology, Inc. | System and related methods for control of a directional drilling operation |
| US9933535B2 (en) * | 2015-03-11 | 2018-04-03 | Schlumberger Technology Corporation | Determining a fracture type using stress analysis |
-
2012
- 2012-09-28 SG SG11201502406PA patent/SG11201502406PA/en unknown
- 2012-09-28 BR BR112015006822A patent/BR112015006822A2/pt not_active IP Right Cessation
- 2012-09-28 CN CN201280076092.0A patent/CN104736795A/zh active Pending
- 2012-09-28 MX MX2015003998A patent/MX2015003998A/es unknown
- 2012-09-28 RU RU2015109295A patent/RU2015109295A/ru not_active Application Discontinuation
- 2012-09-28 EP EP12885240.7A patent/EP2900915B1/en active Active
- 2012-09-28 CA CA2886327A patent/CA2886327C/en active Active
- 2012-09-28 WO PCT/US2012/057853 patent/WO2014051612A1/en not_active Ceased
- 2012-09-28 CA CA3006150A patent/CA3006150A1/en not_active Abandoned
- 2012-09-28 AU AU2012391016A patent/AU2012391016B2/en active Active
- 2012-09-28 US US14/430,812 patent/US10267137B2/en active Active
-
2013
- 2013-09-27 AR ARP130103484A patent/AR092711A1/es unknown
-
2016
- 2016-10-19 AU AU2016247116A patent/AU2016247116B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| AU2012391016A1 (en) | 2015-03-19 |
| CA3006150A1 (en) | 2014-04-03 |
| AU2016247116B2 (en) | 2018-04-05 |
| AU2016247116A1 (en) | 2016-11-10 |
| AU2012391016B2 (en) | 2016-07-21 |
| WO2014051612A1 (en) | 2014-04-03 |
| SG11201502406PA (en) | 2015-04-29 |
| EP2900915A4 (en) | 2016-09-21 |
| EP2900915B1 (en) | 2019-03-20 |
| EP2900915A1 (en) | 2015-08-05 |
| CN104736795A (zh) | 2015-06-24 |
| CA2886327A1 (en) | 2014-04-03 |
| BR112015006822A2 (pt) | 2017-07-04 |
| MX2015003998A (es) | 2015-09-29 |
| US20150267525A1 (en) | 2015-09-24 |
| US10267137B2 (en) | 2019-04-23 |
| AR092711A1 (es) | 2015-04-29 |
| CA2886327C (en) | 2018-07-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2015109295A (ru) | Автоматизированное геонавигационное устройство и способ оптимизации размещения и качества скважин | |
| Bijl et al. | A magneto-and chemostratigraphically calibrated dinoflagellate cyst zonation of the early Palaeogene South Pacific Ocean | |
| US10024104B2 (en) | Improving geosteering inversion using look-ahead look-around electromagnetic tool | |
| RU2012120743A (ru) | Способы определения особенностей пластов, осуществления навигации траекторий бурения и размещения скважин применительно к подземным буровым скважинам | |
| US10494912B2 (en) | Integrated well survey management and planning tool | |
| WO2011026996A4 (en) | Method of assessing hydrocarbon source rock candidate | |
| AU2018208726A1 (en) | Optimized production via geological mapping | |
| RU2015118349A (ru) | Системы и способы для опережающего измерения удельного сопротивления с использованием информации опорной скважины | |
| GB2466412A (en) | Formation modeling while drilling for enhanced high angle or horizontal well placement | |
| US20090157361A1 (en) | Method of well placement modeling and geosteering | |
| RU2014106048A (ru) | Способ и инструмент для обнаружения обсадных труб | |
| RU2015117646A (ru) | Угловая ориентация на опорном интервале для операций обработки данных с координатной привязкой и/или с перекрытием | |
| CA2945474C (en) | Improving well survey performance | |
| US20170254193A1 (en) | Methods and apparatus for multi-well ranging determination | |
| GB2518310B (en) | Analyzing subterranean formation with current source vectors | |
| CN104265279B (zh) | 断层条件下随钻测井曲线预测方法 | |
| CN107330220B (zh) | 考虑渗透率各向异性的本煤层顺层瓦斯钻孔设计方法 | |
| NO20180609A1 (en) | Methods and systems to analyze bed boundary detection | |
| GB2575418A (en) | System and methods for evaluating a formation using pixelated solutions of formation data | |
| CN103790579B (zh) | 随钻地质导向中确定钻头与地层界面距离的方法及装置 | |
| CN104570092B (zh) | 一种识别碳酸盐岩大型缝洞型储层顶包络面的方法及装置 | |
| RU2015122933A (ru) | Системы и способы оптимизации создания скважины в сланцевой формации | |
| CN111577250B (zh) | 水平井地质导向方法及装置 | |
| AU2013402484B2 (en) | Integrated well survey management and planning tool | |
| EP3685190B1 (en) | Processing a 4d seismic signal based on noise model |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FA94 | Acknowledgement of application withdrawn (non-payment of fees) |
Effective date: 20170912 |