[go: up one dir, main page]

WO2020170713A1 - プラント機器情報管理システム - Google Patents

プラント機器情報管理システム Download PDF

Info

Publication number
WO2020170713A1
WO2020170713A1 PCT/JP2020/002449 JP2020002449W WO2020170713A1 WO 2020170713 A1 WO2020170713 A1 WO 2020170713A1 JP 2020002449 W JP2020002449 W JP 2020002449W WO 2020170713 A1 WO2020170713 A1 WO 2020170713A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
work
plant
code
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2020/002449
Other languages
English (en)
French (fr)
Inventor
和寛 武藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Original Assignee
Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd filed Critical Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Publication of WO2020170713A1 publication Critical patent/WO2020170713A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a plant equipment information management system.
  • the present application claims priority based on Japanese Patent Application No. 2019-029617 filed in Japan on February 21, 2019, and the content thereof is incorporated herein.
  • equipment information information about the equipment, equipment, and parts that make up the plant
  • work information information about the work required to operate or maintain the plant
  • management methods such as BOM (Bill of Materials) and WBS (Work Breakdown Structure) are used.
  • the BOM is list information in which device information is subdivided into a hierarchical structure
  • the WBS is list information in which work information is subdivided into a hierarchical structure.
  • the BOM and the WBS seem to be separate list information that is not related to each other.
  • the device information of a layer with a BOM is compared with the work information of a layer with a WBS. It is possible to link and manage the plant.
  • Patent Document 1 among a plurality of layers of BOM, a device code corresponding to the device information of the lowest layer among layers in which the device information is necessarily input in all of a plurality of plants, and a plurality of layers of WBS , Using the "maintenance code (COM)" corresponding only to the work code corresponding to the work information of the WBS layer directly linked to the device information of the lowest layer, the plant information of multiple plants can be easily searched. -A plant equipment information management system that can be extracted and compared is disclosed.
  • the rules for encoding plant information and the rules for generating maintenance codes are the same. Becomes Therefore, when a user extracts the plant information using the maintenance code, the plant information of the other users is also extracted, and the confidential information of the other users may leak.
  • the plant information includes not only secret information but also useful information that can be shared by a plurality of users (not secret information). Therefore, it has been desired to develop a plant device information management system that can share the plant information while preventing the confidential information from leaking.
  • the present invention provides a plant equipment information management system capable of solving the above-mentioned problems.
  • a plant equipment information management system of the present invention manages equipment information of a plurality of plants by a BOM, sets device codes respectively corresponding to the equipment information input corresponding to a plurality of layers of the BOM, and sets the plant information.
  • a maintenance code generation unit that generates a maintenance code corresponding only to the work code corresponding to the work information of the WBS layer directly linked to the device information of the lowermost layer, the maintenance code, and the maintenance.
  • a first storage area and a second storage area for storing the device information and the work information associated with a code, the device information of a plurality of BOM layers associated with the maintenance code, and at least the lowest layer
  • a business application that executes a process related to the management work of the plant by using the work information of the WBS hierarchy directly linked to the device information, and the first storage area has a user access right.
  • the second storage area has no access right to the user, and when the business application executes the process for the user, the plurality of BOMs linked to the maintenance code from the first storage area
  • the plant information is extracted differently according to the user who uses the system.
  • the plant device information management system in addition to the plant information that he/she has access to, some of the plant information of other users who do not have access to this plant can be shared. Is extracted as an exception. Therefore, it is possible to provide a plant device information management system that enables sharing of plant information while preventing leakage of confidential information.
  • the related information analysis unit that analyzes the character string of the related information corresponding to the device information and the work information associated with the same maintenance code, and the related information analysis unit analyzed
  • a group code generation unit that generates a group code corresponding to a specific character string of the character strings and associates the group code with the device information and the work information associated with the same maintenance code.
  • the business application may extract the device information and the work information associated with the group code. According to this configuration, it is possible to narrow down and extract the plant information associated with the group code from among the plurality of plant information associated with the same maintenance code.
  • the plant device information management system is capable of sharing the plant information while preventing the confidential information from leaking out, the plant information can be extracted more efficiently, so that the execution time of the management work is shortened and the work efficiency is improved. It is possible to provide an improved plant equipment information management system.
  • the specific character string corresponding to the first group code and the specific character string corresponding to the second group code are different from each other and have the same meaning.
  • the business application may further include a common group code generation unit that generates a common group code and associates the common group code with the device information and the work information associated with the first and second group codes. May extract the device information and the work information associated with the common group code. According to this configuration, even plant information associated with different group codes can be treated as the same group code by the common group code. Therefore, while being a plant device information management system that enables sharing of plant information while preventing leakage of confidential information, it is possible not only to extract plant information more efficiently, but also to prevent missing required plant information. Therefore, it is possible to provide a plant device information management system with improved work efficiency.
  • the user is a first trader
  • the first storage area has the equipment corresponding to the plant of a customer whose order has been or will be received by the first trader.
  • the information and the work information are stored, and the second storage area stores the device information and the work information corresponding to the plant of the customer that the second contractor has received or plans to receive the order, and the business.
  • the application executes the management work of the first trader, the device information of a plurality of BOM layers associated with the maintenance code, the group code, or the common group code from the first storage area.
  • the first company can refer to not only its own plant information but also the sharable plant information of the second company's plant information when performing the management work. Therefore, it is possible to provide a plant device information management system capable of improving the quality and efficiency of management work while being a plant device information management system capable of sharing plant information while preventing leakage of confidential information.
  • the user is a first customer, and in the first storage area, the equipment corresponding to the plant of the first customer that a contractor has received an order or is expected to receive an order.
  • Information and the work information are stored
  • the second storage area stores the device information and the work information corresponding to the plant of the second customer that the contractor has received or is planning to receive the order
  • the work includes a browsing work, and when the business application executes the browsing work of the first customer, a plurality of jobs associated with the maintenance code, the group code, or the common group code from the first storage area.
  • the work information of the WBS layer directly linked to the device information of the BOM layer and at least the device information of the lowest layer can be shared from the second storage area
  • the work information of the WBS layer directly linked to the device information of the lowermost layer and the device information of the lowermost layer that are associated with the maintenance code, the group code, or the common group code may be extracted. ..
  • the first customer refers to not only the plant information of the own customer but also the sharable plant information of the plant information of the second customer, and makes a quotation proposal of the vendor. We can compare. Therefore, it is possible to provide a plant device information management system capable of improving the efficiency of the vendor selection work by the customer, while being a plant device information management system capable of sharing the plant information while preventing leakage of confidential information.
  • the business application may be a maintenance plan creation unit that creates a maintenance plan.
  • FIG. 3 is a diagram showing a processing flow of each management work in each processing unit 121 to 128 of the business application unit 12 in FIG. 1.
  • 2 is a list showing device information, work information, and related information used in each of the processing units 121 to 128 of the business application unit 12 shown in FIG. 1.
  • FIG. 8 is a diagram illustrating a maintenance code generation method in a maintenance code generation unit 120.
  • 9 is a diagram showing a display example of a result of analysis of related information by a related information analysis unit 129.
  • FIG. It is a figure which shows the example of the connection of the group code and common group code in this invention. It is a display example of the plant information by the maintenance plan creation unit 128 of FIG. It is a display example of the plant information by the maintenance plan creation unit 128 of FIG. It is a display example of the plant information by the maintenance plan creation unit 128 of FIG. It is a display example of the plant information by the maintenance plan creation unit 128 of FIG.
  • FIG. 1 is a diagram showing a plant device information management system 10 of the embodiment.
  • the plant equipment information management system 10 (hereinafter, referred to as “management system 10”) is plant information (equipment information, work information, or other information related to such a plant such as a refuse incinerator (hereinafter, referred to as “related information”). )) is an electronically managed system.
  • the management system 10 is configured by one or a plurality of personal computers (referred to as personal computers or personal computers (PCs)), mobile terminals such as tablets, or computers such as server devices.
  • PCs personal computers
  • the management system 10 is wired or wirelessly connected to a plurality of server devices (business application unit 12, storage unit 13, common group code generation unit 14) physically and geographically distant from each other. It is composed of an input/output unit 11 such as a personal computer or a tablet that accesses them via the Internet.
  • the management system 10 is maintained and managed by the operator, and only the user who has a contract with the operator can perform the plant management work by being granted the access right by the operator.
  • the user is a “customer” who owns a plant and conducts business, and a “contractor” who receives an order from the customer for work such as new construction of a plant or maintenance of an existing plant. The operator is not the user.
  • the input/output unit 11 may be lent to the user by the operator, or may be owned by the user.
  • the management system 10 is realized by cloud computing, but if a predetermined program and data can be installed in one personal computer or tablet type mobile terminal, the management is performed only by the personal computer or mobile terminal.
  • the system 10 can be configured. In this case, it is desirable that the operator lends the personal computer or the mobile terminal to the user in order to prevent the confidential information of the management system 10 from leaking.
  • the management system 10 manages equipment information of a plurality of plants to be managed by BOM, and manages work information by WBS.
  • the management system 10 also manages the BOM and the WBS in association with each other.
  • the management system 10 uniformly manages plant information of a plurality of plants that are geographically and functionally different. Therefore, the number of layers of BOM and WBS in one plant may be different from the number of layers of BOM and WBS in another plant.
  • the highest BOM layer is a plant in which device information exists up to BOM level 5 (BOM Lv.5)
  • the WBS layer is The management system 10 will be described assuming that the largest is a plant in which work information exists up to WBS level 3 (WBS Lv.3). For this reason, in FIG. 3, BOM is described up to BOM level 5 and WBS is described up to WBS level 3.
  • the management system 10 includes the input/output unit 11 (input/output units 11-1 to 11-4), the business application unit 12, the storage unit 13, and the common group code generation unit 14.
  • the input/output unit 11 includes an input unit (not shown) and an output unit (display unit), and a user (trader or customer) can input plant information using an input unit such as a keyboard or a touch panel. Also, the plant information is output/displayed to an output unit such as a monitor.
  • the input/output unit 11 may be, for example, a personal computer including a keyboard (input unit) and a monitor (output unit), or a tablet-type mobile terminal in which the input unit and the output unit are integrally formed.
  • inputting to the input unit of the input/output unit 11 is referred to as “inputting to the input/output unit 11 ”, and displaying to the output unit (display unit) of the input/output unit 11 is referred to as “inputting”. It is displayed on the input/output unit 11.”
  • a management system 10 is used by a plurality of business operators who perform new installation and maintenance of a plant and a plurality of business operators (customers) who use the plant to perform business. 1, a trader 2) and each customer (customer A, customer B) are provided with dedicated input/output units 11 (11-1 to 11-4).
  • the trader 1 when using the management system 10, the trader 1 performs input/output at the input/output unit 11-1, the trader 2 performs input/output at the input/output unit 11-2, and the customer A uses the input/output unit 11-3. Input/output is performed, and the customer B performs input/output at the input/output unit 11-4.
  • a plurality of dedicated I/O units 11 are prepared here, one I/O unit 11 may be shared by a plurality of users when access management is performed using a password or the like.
  • FIG. 1 shows an example in which the number of plural suppliers is two and the number of customers is two, the present invention is not limited to this, and two or more vendors and customers may exist.
  • the business application unit 12 includes a plurality of processing units for performing processing related to plant management work.
  • the business application unit 12 includes a maintenance code generation unit 120, a group code generation unit 12A, a customer equipment ledger creation unit 121, a process chart creation unit 122, and a quotation creation unit 123 as processing units.
  • a construction specification creation unit 124, a construction report creation unit 125, a construction daily report creation unit 126, a maintenance history creation unit 127, a maintenance plan creation unit 128, and a related information analysis unit 129 are provided. Details of the processing of these processing units will be described later.
  • the maintenance code COM (COM is an abbreviation for Code Of Maintenance) generated by the maintenance code generation unit 120 and the group code PARE generated by the group code generation unit 12A are types of search codes. It is one of the important components of the invention.
  • the group code PARE is associated with a part of the plant information among the plurality of plant information associated with the specific maintenance code COM. Therefore, by appropriately using one or both of these two codes, it is possible to reduce the load of inputting plant information by the user and search/extract desired plant information with high accuracy when multiple plants are managed. ⁇ Comparison is possible.
  • the group code is named "PARE" for the following reasons.
  • PARE has a meaning of “removing extra parts” in English, and is a management system for comparing a plurality of plant information in that unnecessary information is removed as a kind of search code and only necessary information is extracted.
  • the inventor thought that it was appropriate as a name.
  • the group code PARE has a high correlation with the maintenance code COM, and if "COM" and "PARE” are combined, it becomes “COMPARE” (meaning "comparison” in English), and a management system that compares multiple plant information. This is because the inventor thought that it was appropriate as a name in 10.
  • the storage unit 13 stores the plant information processed by the business application unit 12.
  • the storage unit 13 is a customer BOM/WBSDB 131 in which the plant information processed by the customer equipment ledger creation unit 121 and the maintenance code COM generated by the maintenance code generation unit 120 are stored and processed, and the process table creation unit 122 processes.
  • Construction schedule DB 132 that stores and saves the generated plant information
  • estimate DB 133 that stores and saves the plant information processed by the estimate creation unit 123
  • the ordering cost DB 134 that is saved
  • the equipment inspection/measurement record DB 135 that stores and saves the plant information processed by the construction report creating unit 125, and the plant information that is processed by the construction daily report creating unit 126 are stored and saved.
  • the DBs individually corresponding to the respective processing units 120 to 128 except the group code generation unit 12A and the related information analysis unit 129 are provided.
  • the storage unit 13 includes a storage area 1 in which the plant information corresponding to the plant that is the target of the work ordered by the contractor 1 from the customer A or the work to be ordered (planned to present an estimate) is stored.
  • a storage area 2 in which plant information corresponding to a plant that is an object of the work ordered from or scheduled to be ordered (estimated to present a quotation) is stored, and the work ordered by the contractor 1 from the customer B or an expected schedule (estimated to present a quotation)
  • Area 3 in which the plant information corresponding to the plant targeted for the work is stored, and the plant information corresponding to the plant targeted for the work ordered by the contractor 2 from the customer B or scheduled to be ordered (estimate a quote) Is provided with a storage area 4.
  • Each of the storage areas 1 to 4 has a DB 131 to 138, respectively.
  • "DB” means a database.
  • the DBs 131 to 138 of the respective storage areas 1 to 4 may be separate storage devices or different storage areas within one storage device.
  • the storage areas 1 to 4 or the DBs 131 to 138 of the storage areas 1 to 4 are connected to the business application unit 12, the common group code generation unit 14, and the input/output unit 11 via the Internet or the like by wire or wirelessly. If so, they may exist geographically and spatially separated from each other.
  • Each storage area stores account information (account, ID (identification), password, etc.) of a specific user (specific customer and specific vendor) corresponding to each storage area, and only the user corresponding to each is stored.
  • account information account, ID (identification), password, etc.
  • the user can access a predetermined storage area to which he has an access right.
  • the trader 1 and the customer A can access the storage area 1 in principle
  • only the trader 2 and the customer A can access the storage area 2 in principle
  • the storage area 3 can be accessed.
  • only the trader 1 and the customer B can access the storage area 4
  • only the trader 2 and the customer B can access the storage area 4 in principle.
  • the number of storage areas is four here, the number can be changed as appropriate according to the number of users. In other words, the number of storage areas may be less than 4 or 5 or more depending on the number of users.
  • the operator of the management system 10 can access not only all storage areas but also the business application section 12 and the common group code generation section in order to maintain and manage the system.
  • some of the plant information that can be shared in any of the storage areas is contracted with the operator to acquire account information, and the management system 10 stores the account information. All users who have the access right can access.
  • the second exception can be accessed because the maintenance plan creation unit 128 creates the maintenance plan among the processes (S11 to S18) of the processing units 121 to 128 of the business application unit 12.
  • the process proceeds assuming that only the process S18 is performed.
  • the processing unit such as the quotation creating unit 123 is allowed to access the second exception so that the dealer knows the outline of the estimated price or the like of the dealer other than the current one. This is because the rules do not allow it.
  • the second exception may be accessible in any of the other processes (S11 to S17) depending on the policy of the operator and the consensus of all users, unless the rule does not permit it.
  • the common group code generation unit 14 generates a common group code VIS (Visualized InStinct) and associates plant information associated with each of a plurality of different group codes PARE with each other. Since the plant information between different group codes is linked based on a predetermined rule, the inventor thinks that "visualization of human intuition" is made and named "VIS".
  • the common group code VIS is a kind of search code, like the maintenance code COM and the group code PARE.
  • the common group code generator 14 and the common group code VIS will be described later.
  • FIG. 2 is a diagram showing a processing flow (processing flow) of each management work in each processing unit 121 to 128 of the business application unit 12.
  • FIG. 3 is a table showing device information and work information used in the respective processing units 121 to 128 for each corresponding BOM level or WBS level. It should be noted that the item marked with "-" in FIG. 3 is an item that is not used in the corresponding processing unit, and therefore the item and the input field for inputting the item are not displayed in the input/output unit 11.
  • the plant information of the item with "-" written in it is also related to the DB.
  • the item can be displayed by appropriately selecting the plant information of the user or the sharable plant information.
  • the group code generation unit 12A and the related information analysis unit 129 generate the group code PARE in the processes S12 to S18 other than the process S11 for creating the customer device ledger among the processes described below, Processes used by the work schedule preparation unit 122, the estimate preparation unit 123, the construction specification preparation unit 124, the construction report preparation unit 125, the construction daily report preparation unit 126, the maintenance history preparation unit 127, or the maintenance plan preparation unit 128 as appropriate. It is a department. Further, the processing units 121 to 128 of the business application unit 12 code the plant information input by the user according to a predetermined rule, and store and store it in the corresponding storage unit 13.
  • the business application unit 12 sets device codes corresponding to the device information input corresponding to the plurality of layers of the BOM, and sets the device information corresponding to the plurality of layers of the WBS to the work information input.
  • the corresponding work code is set.
  • the customer equipment ledger creation unit 121 displays a “customer equipment ledger screen” on the input/output unit 11 used by the user.
  • the customer equipment ledger creation unit 121 is a plant that still corresponds to a predetermined storage area of each of the storage areas 1 to 4 of the storage unit 13 that the user has an access right based on the user's account information and is in principle accessible.
  • the customer equipment ledger creation process S11 is executed for a new plant in which information is not stored/saved.
  • input fields for a plurality of items that the user inputs from the input/output unit 11 in the customer equipment ledger creation processing S11 are displayed.
  • the customer equipment name (BOM level 1) which is the device information
  • Level 2) equipment specification classification, customer equipment detailed name, equipment detailed specification, or series (BOM level 3), customer equipment part name or specification (BOM level 4), customer equipment part name or part specification (BOM) Level 5
  • the device ledger creation unit 121 displays it on the input/output unit 11.
  • the customer equipment ledger creation unit 121 uses the information input by the user to the input/output unit 11 to electronically create a ledger (master data) of plant information of the new plant.
  • a ledger master data
  • maintenance code COM device information of BOM
  • work information of WBS work information of WBS
  • the customer equipment ledger creation unit 121 stores and saves the plant information input by the user on the “customer equipment ledger screen” in the customer BOM/WBSDB 131 in an appropriate storage area to which the user has access. For example, in FIG. 1, when the user is “Company 1” and the new plant is “Customer A”, the customer equipment ledger creation unit 121 displays “Customer” in the customer BOM/WBSDB 131 in the storage area 1. The plant information entered by the user on the device ledger screen is stored and saved.
  • the above “series” (BOM level 3) is information that distinguishes a plurality of devices and devices of the same type when they are arranged.
  • the device code corresponding to this is also called the No. furnace code.
  • different No. furnace codes are set to distinguish each refuse incinerator.
  • the maintenance code generation unit 120 associates a maintenance code COM, which is a kind of search code, with a specific combination of a device code and a work code corresponding to the device information and work information input on the “customer device ledger screen”.
  • a maintenance code COM which is a kind of search code
  • the device code corresponding to the device information of the lowest layer in the layer where the device information is necessarily input in all of the multiple plants in this embodiment, BOM level 3 A device code corresponding to device information
  • a work code in this embodiment, WBS level 1
  • the maintenance code generation unit 120 generates the maintenance code COM only in correspondence with the work code corresponding to the work information). Then, the customer equipment ledger creation unit 121 stores the generated maintenance code COM in the customer BOM/WBSDB 131 in association with the plant information input on the “customer equipment ledger screen”.
  • the maintenance code COM may be associated with the plant information by the maintenance code generation unit 120 instead of the customer device ledger creation unit 121. The details will be described below.
  • FIG. 4 is a simplified diagram for explaining a method of generating the maintenance code COM.
  • FIG. 4A shows an example of device information of each layer of the BOM having the plant name “plant ⁇ ”.
  • the plant ⁇ is composed of “equipment 1” and “equipment 2” which are the device information of BOM level 1.
  • the equipment 1 is associated with the "equipment A” and the "equipment B”, which are the equipment information of the BOM level 2, respectively.
  • the facility 2 is linked to the “device C” which is the device information of the BOM level 2.
  • the device A is associated with “device details 1” and “device details 2”, which are device information of the BOM level 3, respectively.
  • the device B is associated with “device details 3” which is the device information of the BOM level 3.
  • the device C is associated with “device details 4” which is the device information of the BOM level 3.
  • the device details 1 are linked to the device information of the BOM level 4 "site 1", and the device 1 is linked to the device information of the BOM level 5 "part 1".
  • the device information of BOM levels 1 to 3 is information that is always input in any plant managed by the management system 10.
  • the device information of BOM levels 4 to 5 is information that needs to be input depending on the type of device information input to BOM levels 1 to 3 and the characteristics of the plant.
  • BOM layers that require user input are BOM levels 1 to 3 here, this is an example, and the number of layers that must be input is set as appropriate according to the specifications of the management system 10. You may for example, the two layers of BOM levels 1 and 2 may be set as the layers in which input is essential. Further, the BOM may have a hierarchy deeper than the BOM level 5 (for example, BOM level 6, BOM level 7,... ).
  • FIG. 4B shows an example of work information of each layer of the WBS of the plant ⁇ .
  • the “work 1”, which is the work information of the WBS level 1, is associated with the “work description A” and the “work description B”, which are the work information of the WBS level 2, respectively.
  • the “work 2”, which is the work information of the WBS level 1, is linked to the “work description C”, which is the work information of the WBS level 2.
  • the work description A is associated with “work details 1” which is work information of WBS level 3.
  • work information of WBS level 3 is information that is always input in any plant managed by the management system 10.
  • the work information of WBS levels 2 to 3 is information that needs to be input depending on the type of work information input to WBS level 1 and the characteristics of the plant.
  • WBS hierarchy that must be entered by the user is WBS level 1 here, but this is an example, and the number of hierarchies that must be entered may be set appropriately according to the specifications of the management system 10. ..
  • the two layers of WBS levels 1 and 2 may be set as the layers that must be input.
  • the WBS may have a hierarchy deeper than the WBS level 3 (eg, WBS level 4, WBS level 5,... ).
  • the BOM and WBS of the plant ⁇ shown in FIGS. 4A and 4B are linked to each other as shown in FIG. 4C. That is, in the BOM hierarchy (BOM levels 1 to 3 in this example) that must be input in all plants managed by the management system 10, the same input is also required in the device information of the BOM level 3 that is the lowest layer. Among the WBS layers (WBS level 1 in this example), the work information of WBS level 1 which is a layer directly linked to the device information of BOM level 3 is linked. In FIG. 4C, “work detail 1” that is the device information of the BOM level 3 is associated with “work 1” that is the work information of the WBS level 1.
  • the work information of the hierarchy "directly linked" to the device information of the BOM level 3 is work information that can be performed on the device information of the BOM level 3 which is the lowest layer. This means the work information of the highest layer in the hierarchy of a plurality of WBSs. Therefore, if there is no work information of WBS level 1 for a plurality of device information of BOM3 level and there is only one work information, WBS level 1 does not become the above-mentioned "directly linked" hierarchy. .. For example, if the work information of the WBS level 1 is only “work 1” and there is no “work 2” in FIG. 4B, the device information of the BOM level 3 is directly included in the WBS hierarchy.
  • the associated hierarchy can be WBS level 2 instead of WBS level 1.
  • the device information of each layer of the BOM and the work information of each layer of the WBS of FIGS. 4A and 4B are the plant of the plant name “plant ⁇ ”. Since it relates to information, the plant ⁇ is associated with these. Further, as shown in FIG. 4C, the maintenance code COM corresponding to only the “device detail 1” that is the device information of the plant ⁇ and the “work 1” that is the work information of the plant ⁇ is the maintenance code generation unit. 120, and is similarly associated with the device information of each layer of the BOM and the work information of each layer of the WBS.
  • the device code automatically set in the business application unit 12 according to a predetermined rule is "123XA”
  • the worker inputs "1” and the work code automatically set according to a predetermined rule in the business application unit 12 is "089X”
  • "123XA089X” is generated.
  • the maintenance code COM is the device code set in the device information of the BOM level 3 and the work information of the WBS level 1 regardless of who the user is, such as the company 1, the company 2, the customer A, and the customer B.
  • the same code is generated based on the set work code.
  • the maintenance code generation unit 120 may generate the maintenance code COM by directly using the device code and the work code that are automatically generated, or may generate a conversion table or conversion of two inputs and one output in the storage unit 13. A table may be separately provided, and the maintenance code generation unit 120 may use this to generate the maintenance code COM.
  • the maintenance code generation unit 120 may arrange the device codes as they are and generate a maintenance code COM such as “123XA089X” or “089X123XA”.
  • the maintenance code COM may be generated in a mixed manner such as “102839XXA” (alternating arrangement).
  • the maintenance code generation unit 120 inputs the device code “123XA” and the work code “089X” into the conversion table, and outputs the code (a value that is completely unrelated to the device code or the work code) from the conversion table.
  • the number of digits and the number of digits, but the code corresponding only to these two codes may be the maintenance code COM.
  • the process table creation unit 122 stores all the maintenance code COM and the plant information associated with the maintenance code COM stored/stored in the customer BOM/WBSDB 131 in the predetermined storage area by the customer device ledger creation unit 121 in the predetermined storage area. It is copied to the construction schedule DB 132 of. For example, when the user is “contractor 1” and the plant for which the management work is to be performed is the “customer A” plant, it is copied to the construction schedule DB 132 in the storage area 1.
  • the work schedule creation unit 122 displays the “work schedule creation screen” on the input/output unit 11 used by the user, and performs the work schedule creation process S12 using the construction schedule DB 132 in which the plant information is copied as described above. Execute. On the "process table creation screen", input fields for a plurality of items input in the process table creation process S12 are displayed. Specifically, as shown in the column of “Process table creation processing (S12)” in FIG.
  • the process chart creation unit 122 displays the input field for inputting the planned shutdown of the furnace or the scheduled inspection, which is the related information, on the input/output unit 11.
  • a textual explanation or comment can be entered. For example, it is possible to input various information such as detailed contents regarding planned decommissioning and inspection, and contact information to the customer. Therefore, the related information may include know-how based on the experience of the user, the model number of the specific product, and work confidential information such as construction work.
  • the process sheet creating unit 122 displays these items when displaying the input field. Display information together.
  • the plant information and the like that need to be input are BOM level 1, BOM level 3, WBS level 1, and Identical at WBS level 2. Therefore, it is not necessary for the user to input these plant information again on the “process chart creation screen”.
  • the process table creation process S12 the user needs to newly input at most two items, the planned process or man-hours (WBS level 3) and the related information. The time and labor can be reduced.
  • the process chart creating unit 122 stores and saves the plant information input by the user on the “process chart creating screen” in the customer BOM/WBSDB 131 in the predetermined storage area. For example, when the storage area is allocated as shown in FIG.
  • the process chart creating unit 122 stores the storage area 1
  • the customer's BOM/WBSDB 131 stores and saves the plant information input in the “process table creation screen”.
  • the process sheet creating unit 122 searches for plant information of a plurality of plants linked to the same maintenance code COM, which serves as a reference for creating the process sheet. It can be extracted and displayed on the input/output unit 11 in a format that can be compared with other plants.
  • the process sheet creation process S12 since the above-mentioned “second exception” access is prohibited, only the plant information stored in the predetermined storage area to which the user has an access right is extracted. .. Specifically, when the user is “company 1”, the plant information stored in the construction schedule DB 132 in the storage areas 1 and 3 is extracted. Therefore, when the user executes the creation process S12, the work can be performed efficiently while comparing with other plants, and thus the time and labor of the input work of the user can be reduced.
  • the related information analysis unit 129 identifies from among the plural pieces of plant information extracted by the maintenance code COM, from a huge amount of text stored and saved as “related information” in the construction schedule DB 132 in a storage area accessible by the user. Character strings such as words and numbers are analyzed (for example, text mining analysis), and as shown in the upper diagram of FIG. 5, a specific number of specific character strings are displayed on the output unit in a descending order.
  • the related information analysis unit 129 performs text mining analysis or the like on the texts stored as “related information” in the construction schedule DB 132 in the storage areas 1 and 3.
  • the related information analysis unit 129 may analyze the related information by a method such as principal component analysis or cluster analysis.
  • a large number of group codes PARE are generated, and a large number of grouping of the plant information associated with the specific maintenance code COM is performed, thereby performing the processing in each of the processing S12 to S18.
  • the speed and processing accuracy can be improved.
  • the group code PARE is generated in a one-to-one correspondence with a specific character string, a different group code PARE is generated when a character string different from the specific character string is selected.
  • the first group code PARE corresponding to the specific character string and the second group code PARE corresponding to the different character string are set to different codes.
  • the character strings are different, the contents and meanings may be the same.
  • one user may use the term "extubation” as an in-house term, while another user may use the term “extubation” as an in-house term.
  • the plant information associated with the first group code PARE is extracted, the above-mentioned narrowing down can be performed, but the plant information associated with the second group code will be lost. Therefore, even if the specific character strings corresponding to the group code PARE one-to-one are different from each other, if the meanings and contents are the same, the operator activates the common group code generation unit 14, A common group code VIS is generated and linked to plant information linked to different group codes.
  • FIG. 6 is a simplified diagram for explaining the association of the group code PARE and the common group code VIS. It can be understood that the group code PARE and the common group code VIS are associated with the device information and work information associated with the specific maintenance code COM. Note that FIG. 6 is an example in which the group code PARE and the common group code VIS are associated with the plant information and maintenance code COM of FIG. 4C.
  • the group code PARE “X425A00A1” is shown as an example, but the number of digits of the code is not limited to this, and may be set to be more or less depending on the specifications and the like.
  • the common group code VIS "GH7T2" is shown as an example, but the number of digits of the code is not limited to this, and may be set to a value higher or lower than this depending on the specifications and the like.
  • the group code PARE and the common group code VIS are generated based on the analysis by the related information analysis unit 129. It is also possible to specify a specific character string based on, and generate the group code PARE based on the specific character string.
  • each processing unit 122 to 128 activates the related information analysis unit 129 and the group code generation unit 12A by using, for example, artificial intelligence (AI), and detects the group code PARE.
  • AI artificial intelligence
  • the generation and the association with the corresponding plant information may be automatically performed.
  • the common group code generation unit 14 is activated by the operator to generate the common group code VIS, but the invention is not limited to this.
  • the common group code generation unit 14 is equipped with artificial intelligence (AI), and automatically determines whether or not the meanings of different specific character strings are the same, even if the operator is not involved, and common if they are the same.
  • the group code VIS may be automatically generated and the linking may be performed. Further, in the above description, as shown in FIG.
  • the group code PARE and the common group code VIS coexist, but when the common group code VIS is generated, this is replaced with the group code PARE to be the plant information. May be tied.
  • the first and second group codes PARE that have already been generated and associated with each other are deleted and replaced.
  • the common group code VIS is recognized as the group code PARE or is regarded as the group code PARE, so that the group code PARE and the common group code VIS are stored in comparison with each other.
  • the storage capacity of the unit 13 can be reduced.
  • the number of digits of the code of the common group code VIS needs to be the same as the number of digits of the code of the group code PARE.
  • the process sheet creation unit 122 stores and saves the plant information corresponding to the group code PARE or the common group code VIS in the construction schedule DB 132 in the above-mentioned predetermined storage area to which the user has an access right.
  • the process chart creating unit 122 stores and saves in the construction schedule DB 132 in the storage areas 1 and 3.
  • the user can execute the narrowing-down using the group code PARE or the common group code VIS and extract the plant information associated with these. Therefore, it is possible to reduce the number of pieces of plant information displayed on the input/output unit 11 and display only the information that is highly relevant to the work, so that the work can be performed more efficiently while comparing with other plants. be able to.
  • the time and labor of the user's input work can be reduced. Further, with only the group code PARE set by the user, there is a possibility that the originally necessary plant information may be missing when the above narrowing down is performed, but by using the common group code VIS, the missing can be prevented and Highly accurate work is possible.
  • the access of the above-mentioned “second exception” is prohibited, and therefore, when the user executes the narrowing down using the group code PARE or the common group code VIS. , Only the plant information stored in the predetermined storage area to which the user has the access right is extracted. Specifically, when the user is “company 1”, the plant information stored in the construction schedule DB 132 in the storage areas 1 and 3 is extracted.
  • the plant information of a plurality of plants linked to the same maintenance code COM, the same group code PARE, or the same common group code VIS is searched.
  • -It can be extracted and displayed on the input/output unit 11 in a format that can be compared with other plants.
  • the user can perform input for a specific plant with reference to other plant information, making the input work efficient (time reduction, labor reduction), and comparing with plant information based on actual results.
  • the process chart with high reliability can be created.
  • the quotation creation unit 123 stores all the maintenance code COM, the group code PARE or the common group code VIS, and the plant information associated with the maintenance code COM stored and saved in the construction schedule DB 132 in the predetermined storage area by the process chart creation unit 122. It is copied to the estimation DB 133 in the predetermined recording area. For example, when the user is “company 1” and the plant for which the management work is to be performed is “customer A”, it is copied to the estimation DB 133 in the storage area 1.
  • the BOM level 2 and the BOM level which are not used in the process sheet creation process S12 in the process sheet creating unit 122 and are not displayed in the input/output unit 11 The plant information of 4 and BOM level 5 is also copied to the estimation DB 133.
  • the plant information of these BOM level 2, BOM level 4, and BOM level 5 is the same as the plant information stored/saved in the customer BOM/WBSDB 131 in the predetermined storage area.
  • the estimate creation unit 123 displays the “estimate creation screen” on the input/output unit 11, and executes the estimate creation process S13 using the estimate DB 133 in the predetermined storage area.
  • the "estimate creation screen” input fields for a plurality of items input in the quotation creation process S13 are displayed. Specifically, as shown in the column of "Estimation creation process (S13)" in FIG. 3, the customer equipment name (BOM level 1), the customer equipment name (BOM level 2), and the equipment specification that are the equipment information.
  • the maintenance code COM, the group code PARE or the common group code VIS, and the plant information stored/saved in the construction schedule DB 132 of the predetermined storage area are copied to the estimate DB 133 of the predetermined storage area. .. Therefore, regarding the plant information and the like that are items that need to be input in the process of creating the estimate S13 and that have already been copied, the estimate creating unit 123 displays the information and the like when displaying the input field. Is also displayed.
  • the BOM level 2 information that needs to be input in the processing S11 of the customer equipment ledger creation unit 121 is the customer equipment name or the equipment specification
  • the BOM level 2 information that needs to be input is the customer's device name, and the device specification need not be input.
  • the quotation creation unit 123 displays the customer equipment name copied from the construction schedule DB 132 to the quotation DB 133 in the input field of the “quotation preparation screen” and allows the user to make corrections if necessary. Similarly, it is not necessary to display the copied device specifications. Further, in FIG.
  • the information of the BOM level 5 that needs to be input in the process S11 of the customer equipment ledger creation unit 121 is the customer equipment part name or the part specification, whereas in the process S13 of the quotation creation unit 123.
  • the BOM level 5 information that needs to be input is the customer equipment part name, part specification, quantity, or estimated unit price, and the amount of information is increasing.
  • the quotation creation unit 123 displays the customer equipment component name or the component specifications copied from the construction schedule DB 132 to the quotation DB 133 in the input field of the “estimation creation screen” and can be corrected by the user as necessary.
  • the quotation display unit 123 newly displays an input field corresponding to the information (here, the quantity or the estimated unit price) increased within the same BOM level on the “estimate creation screen” to prompt the user to input.
  • the quotation creation unit 123 stores and saves the information input by the user in the quotation DB 133 in the predetermined storage area.
  • the group code PARE or the common group code VIS can also be generated and associated with the plant information also in the creation process S13 of the estimate.
  • the quotation creation unit 123 retrieves and extracts plant information of a plurality of plants associated with the same maintenance code COM and plant information of a plurality of plants associated with the same group code PARE or the same common group code VIS.
  • the user can perform input for a specific plant with reference to other plant information, making the input work efficient (time reduction, labor reduction), and comparing with plant information based on actual results. Since it is the result of doing so, a highly reliable estimate can be created.
  • the work efficiency can be further improved and a highly accurate estimate can be created.
  • the construction specification creating unit 124 includes all the maintenance code COM, the group code PARE or the common group code VIS, and the plant information associated with the maintenance code COM stored and saved in the estimate DB 133 in the predetermined storage area by the estimate creating unit 123. , Is copied to the order cost DB 134 in the predetermined recording area. Then, the construction specification creation unit 124 displays the “construction specification creation screen” on the input/output unit 11, and executes the construction specification creation processing S14 using the order cost DB 134 in the predetermined storage area. The construction specification creation unit 124 stores and saves the information input on the “construction specification creation screen” in the order cost DB 134 in the predetermined storage area.
  • the construction report creation unit 125 firstly, the construction code creation unit 124 stores and saves the maintenance code COM, the group code PARE or the common group code VIS stored and stored in the order cost DB 134 in the predetermined storage area, and the plant associated with them. All the information is copied to the device inspection/measurement record DB 135 in the predetermined recording area. Then, the construction report creating unit 125 displays the “construction report creating screen” on the input/output unit 11, and executes the construction report creating process S15 using the device inspection/measurement record DB 135 in the predetermined storage area. To do. The construction report creation unit 125 stores and saves the information input on the “construction report creation screen” in the device inspection/measurement record DB 135 in the predetermined storage area.
  • the construction daily report creation unit 126 firstly, the construction report creation unit 125 stores the maintenance code COM, the group code PARE or the common group code VIS, which are stored/saved in the device inspection/measurement record DB 135 in the predetermined storage area, and the strings associated with them. All the following plant information is copied to the construction record DB 136 in the predetermined recording area. Then, the construction daily report creation unit 126 displays the “construction daily report creation screen” on the input/output unit 11, and executes the construction daily report creation process S16 using the construction result DB 136 in the predetermined storage area. The construction daily report creation unit 126 stores and saves the information input on the “construction daily report creation screen” in the construction result DB 136 in the predetermined storage area.
  • the maintenance history creation unit 127 firstly acquires the maintenance code COM, the group code PARE or the common group code VIS, and the plant information associated with them, which the construction daily report creation unit 126 stores/stores in the construction result DB 136 in the predetermined storage area. All are copied to the construction history DB 137 in the predetermined recording area. Then, the maintenance history creation unit 127 displays the “maintenance history screen” on the input/output unit 11, and executes the maintenance history creation process S17 using the construction history DB 137 in the predetermined storage area. The maintenance history creation unit 127 stores and saves the information input on the “maintenance history screen” in the construction history DB 137 in the predetermined storage area.
  • the maintenance plan creation unit 128 stores the maintenance code COM, the group code PARE or the common group code VIS, and the plant information associated with them, which the maintenance history creation unit 127 stores/stores in the construction history DB 137 in the predetermined storage area. All are copied to the future construction plan DB 138 in the predetermined recording area. Then, the maintenance plan creation unit 128 displays the “maintenance plan creation screen” on the input/output unit 11, and executes the maintenance plan creation process S18 using the future construction plan DB 138 in the predetermined storage area.
  • the process chart creating unit 122 displays an input field for inputting on the input/output unit 11.
  • the future construction plan DB 138 in the predetermined storage area includes the maintenance code COM, the group code PARE, or the common group code VIS in each processing S11 to S17 of each processing unit 121 to 127 of the business application unit 12, All the plant information and the like that have been sequentially copied are stored and saved. Therefore, in the maintenance plan creation process S18, regarding the items that need to be input and the plant information or the like that has already been copied, the maintenance plan creation unit 128 displays these items when displaying the input field. Display information together. In the example of FIG.
  • the plant information and the like that need to be input are the same in the BOM levels 1 to 4. Therefore, the user does not need to input these plant information again on the "maintenance plan creation screen". However, the user can correct this information in the input fields of the "maintenance plan creation screen". Therefore, as in the other processes S12 to S17, in the maintenance plan creation process S18, the user needs to newly input the planned quantity (BOM level 5), the total planned man-hours or the total planned order amount (WBS level 1). ). Therefore, the time and labor of the input work by the user can be reduced.
  • the maintenance plan creation unit 128 stores and saves the information input by the user in the future construction plan DB 138 in the predetermined storage area.
  • the maintenance plan creation unit 128 stores in the future construction plan DB 138 in a storage area to which the user does not have access in the maintenance plan creation process S18.
  • a part of the stored device information and a part of the work information can be displayed on the input/output unit 11.
  • Part of the device information and part of the work information are not secret information but plant information that can be shared by any user.
  • a part of the device information is BOM level device information corresponding to the device code used when generating the maintenance code COM.
  • a part of the work information is work information corresponding to the WBS level corresponding to the work code used when generating the maintenance code COM.
  • the two pieces of device information and work information are naturally associated with the maintenance code COM.
  • the equipment information of BOM level 3 and the work information of WBS level 1 shown by a thick black frame in the column of “Maintenance plan creation processing (S18)” in FIG. 3 are plant information that can be shared.
  • the maintenance code COM is a search code that enables narrowing down from a large number of plant information to highly related plant information in order to facilitate the management work by the user.
  • the device information at the BOM level and the work information at the WBS level corresponding to the device code and work code that have become invalid can naturally be useful plant information for the user. If you do not want to share some device information or work information among the device information or work information in the thick frame, you can set a flag etc. to make it individually unusable. You can Further, here, the BOM level 3 device information and the WBS level 1 work information are shared plant information, but depending on the policy of the operator and the consensus of all users, at least these plant information and other layers can be used. The sharable range may be extended to the plant information of.
  • FIG. 7A is an example in which the trader 1 in FIG. 1 searches for and extracts desired plant information with a specific maintenance code COM, and is an example in which a part of the plant information is displayed in a chronological table format. Since the trader 1 has a track record of receiving the work for the plant of the customer A and the plant of the customer B, the operator gives the access right to the storage area 1 and the storage area 3 to the trader 1.
  • the amount of money in the column described as “ordering” in parentheses is the “total planned ordering amount” of WBS level 1 that can be shared in the process S18 of creating a maintenance plan. In the case of public works, this amount of money is generally announced by the customer, and can be shared.
  • the “total planned order amount” means the total estimated amount when the estimate is presented or the estimated plan is presented, and the total ordered amount when the order is successful.
  • the amount of money in the column described as “ordering” in parentheses is the “total amount of ordering amount” of WBS level 1 in the maintenance history creating process S17, and therefore is confidential information of the trader 1 and cannot be shared. ..
  • the trader 1 can display the information on the “maintenance plan creation screen” because it is his/her own confidential information.
  • the “total order amount” is the total amount when the contractor 1 places an order with a contractor who undertakes his/her own construction, and is information that is not normally disclosed.
  • FIG. 7A when the data is displayed in the chronological table format, it is possible to list from the past to the future, so that it is possible to easily make a future order plan.
  • FIG. 7B shows an example of a case where the dealer 2 having no access right searches and extracts the information of FIG. 7A with the maintenance code COM using the management system 10. The difference between FIG. 7(b) and FIG.
  • FIG. 7(a) is that the amount of money in the column described as “ordering” in parentheses in FIG. 7(a) is not displayed in FIG. 7(b).
  • the amount of money in the column described as “ordering” in parentheses is “total ordering amount”, and the WBS level 1 plant that can be used in the maintenance plan creation process S18 is sharable. Since it is not information, it is not disclosed to the trader 2.
  • FIG. 7A shows an example in which the maintenance code COM is used to extract and display only the plant information in the storage area to which the user 1 himself/herself has the access right. The plant information in the storage area that does not have can be extracted and displayed.
  • the plant information in the storage area to which the trader 1 does not have the access right is extracted and displayed as in FIG. 7B.
  • the “maintenance plan creation screen” includes a screen similar to that shown in FIG. 7A and a screen similar to that shown in FIG. 7B. If they are displayed side by side in this way, for example, the trader 1 can refer to the plan and the amount of money of the trader 2 who is a competitor, so propose an attractive and competitive plan to the customer. You can Here, in FIG. 7A, for example, when the trader 1 clicks on the column of “232.40 million yen (order received)” of “No. 1 stoker” in 2016, the screen of FIG. 8A is displayed. .. FIG.
  • FIG. 8A shows a large number of information that cannot be shared in the maintenance plan creation process S18, that is, device information of a large number of BOM layers and a large number of WBS layers that are used in the plurality of processes S11 to S18 of FIG.
  • the work information is displayed in addition to the sharable plant information and the non-sharable plant information.
  • the “stalker” in FIG. 8A is the “customer device name” (BOM level 2).
  • FIG. 8A When "Measurement” in the column below "Customer work detail name” is further clicked, the measurement value (actual measurement value) of FIG. 8C is displayed in the maintenance plan creation processing S18. This is an "inspection/measurement result” (BOM level 3) that can be shared in the maintenance plan creation process S18. Since FIG. 8(c) can be shared, for example, when the contractor 2 uses the management system 10 to display FIG. 7(b), “2,324,000 yen (order)” for the No. 1 stoker furnace in 2016 When is clicked, the screen corresponding to FIG. 8A is not displayed but FIG. 8C is immediately displayed. In FIG.
  • FIG. 9A in which the amount of information is increased from that of FIG. 8A may be displayed.
  • the first "stalker” in FIG. 9A is a "device specification classification” (BOM level 3)
  • the second "stalker” is a "customer device name” (BOM level 2).
  • the screen of FIG. 9B is displayed as the screen corresponding to FIG. 9A.
  • FIG. 9B only sharable plant information is displayed.
  • the desired plant information may be displayed without being limited to the one shown in FIG. 7A, FIG. 8A, or FIG. 9A. Further, the display layout may be changed in any way.
  • the maintenance plan creation unit 128, which is the processing unit of the business application unit 12 executes the maintenance plan creation process S18, which is the management work of the business operator 1, the business area 1 and the storage area 1 to which the business operator 1 has the access right. From the storage area 3, the device information of the layers of the plurality of BOMs associated with the maintenance code COM, and at least the lowest layer of the layers of the device information that is surely input in all of the plurality of plants of the plurality of layers of the BOM.
  • the management system 10 is a system that can prevent leakage of confidential information and can share plant information among a plurality of users.
  • a trader it is possible for a trader to refer to not only their own plant information but also shareable and useful plant information out of the plant information of other traders that cannot normally be accessed, so that it is more attractive and competitive than other traders, for example. It is possible to improve work quality and efficiency when performing management work using the management system 10, such as creating a certain estimate.
  • the customer can also use the management system 10 as a user.
  • the customer does not need to modify the plant information input by the vendor, and therefore, in principle, the description will be given here that the information can be browsed. That is, in principle, the customer can only browse the plant management work.
  • modification of some plant information input by the operator or additional writing to the plant information may be permitted. In this case, the customer can also perform management work other than browsing work.
  • the trader performs the input work by displaying the processing screen corresponding to the input/output unit 11 in each of the processes S11 to S18, and thus the browsing work can be naturally performed as the management work.
  • the customer performs the browsing work, all the plant information is stored/saved in the future construction plan DB 138, as described in the processing flow of each processing S11 to S18. It is advisable to perform browsing work on the screen.
  • the customer can search and extract the plant information related to the desired plant using the maintenance code COM, the group code PARE, or the common group code VIS.
  • the management system 10 stores the storage area 1 and the storage area to which the customer A has an access right.
  • the management system 10 can be shared from the storage area 3 and the storage area 4 to which the customer A does not have the access right, and the device information of the lowest layer and the device of the lowest layer linked to the maintenance code COM. It is possible to extract and display the work information of the WBS hierarchy directly linked to the information. Therefore, the customer can refer to not only his own plant information but also sharable and useful plant information among the plant information of other customers that cannot normally be accessed. Therefore, for example, when receiving a quote from a trader, it is possible to know and compare the outline of the quote etc. that the trader is presenting to other customers for the same plant, so discount negotiations, etc. , It is possible to improve the efficiency of the work of selecting an ordering company.
  • a part of the plant information of a plurality of plants can be shared among a plurality of users while preventing the outflow of know-how. Further, by searching/extracting the plant information using the maintenance code COM, the group code PARE, or the common group code VIS, the contents of the maintenance work regarding the similar equipment or work, the cost required for the maintenance work, and the execution of the maintenance work. Cycles can be displayed and compared. Since the user can browse the sharable plant information that he does not have access to as an exception, if the user is a customer, it becomes easier to judge the content of services offered by the vendor and the appropriateness of the price, It is possible to properly and easily select a trader.
  • Plant Equipment Information Management System 11 (11-1 to 11-4) Input/Output Section 12
  • Business Application Section 120
  • Maintenance Code Generation Section 121
  • Customer Equipment Ledger Creation Section 122
  • Process Schedule Creation Section 123
  • Estimate Creation Section 124
  • Construction Specification Creation Section 125
  • Construction Report Creation Section 126
  • Construction Daily Report Creation Section 127
  • Maintenance History Creation Section 128
  • Maintenance Plan Creation Section 129
  • Related Information Analysis Section 12A
  • Group Code Generation Section 13 Storage Section 131 Customer BOM/WBSDB 132 Construction schedule DB 133 estimate DB 134 Order cost DB 135
  • Equipment inspection/measurement record DB 136 construction results DB 137
  • Construction history DB 138
  • Future construction plan DB 14 Common group code generator

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Automation & Control Theory (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

秘密情報の流出を防止しつつプラント情報を共用可能とするプラント機器情報管理システムを提供する。プラント機器情報管理システムは、メンテナンスコードを生成するメンテナンスコード生成部と、メンテナンスコードに紐づく機器情報及び作業情報を記憶する第一の記憶領域及び第二の記憶領域と、プラントの管理作業に関する処理を実行する業務アプリケーションを有し、第一の記憶領域はユーザにアクセス権があり、第二の記憶領域はユーザにアクセス権がなく、業務アプリケーションは、第一の記憶領域からメンテナンスコードに紐づくユーザの機器情報及び作業情報を抽出するほか、第二の記憶領域からメンテナンスコードに紐づく共用可能な他のユーザの機器情報及び作業情報を抽出する。

Description

プラント機器情報管理システム
 本発明は、プラント機器情報管理システムに関する。
 本願は、2019年2月21日に、日本に出願された特願2019-029617号に基づき優先権を主張し、その内容をここに援用する。
 ごみ焼却炉等のプラントでは、プラントを構成する設備、機器、並びに部品に関する情報(以下、「機器情報」という)が多く存在し、また、プラントを運用または保守するために必要な作業に関する情報(以下、「作業情報」という)が多く存在する。これら機器情報や作業情報を含むプラント情報を管理するため、BOM(Bill Of Materials)やWBS(Work Breakdown Structure)などの管理手法が用いられる。BOMは、機器情報を階層的な構造に細分化した一覧情報であり、WBSは、作業情報を階層的な構造に細分化した一覧情報である。BOMとWBSは、互いに関係のない別箇の一覧情報であるように見えるが、プラントを運用する場面では、例えば、BOMのある階層の機器情報に対して、WBSのある階層のある作業情報を紐づけ、プラントの管理を行うことができる。
 特許文献1には、BOMの複数の階層のうち、複数のプラントの全てにおいて機器情報が必ず入力される階層の中で最下層の機器情報に対応する装置コードと、WBSの複数の階層のうち、最下層の機器情報に直接的に紐づくWBSの階層の作業情報に対応する作業コードとのみに対応した「メンテナンスコード(COM)」を使用して、複数のプラントのプラント情報を容易に検索・抽出・比較できるプラント機器情報管理システムが開示されている。
日本国特許第6413040号公報
 特許文献1に記載のプラント機器情報管理システムを複数のユーザ(業者または顧客)で共用する場合、同一のシステムを使用するので、プラント情報のコード化のルールや、メンテナンスコードの生成のルールが同一となる。従って、あるユーザがメンテナンスコードを用いてプラント情報を抽出すると、他のユーザのプラント情報も併せて抽出され、当該他のユーザの秘密情報が流出する恐れがある。
 一方、プラント情報には、秘密情報のみならず、複数のユーザで共用可能(秘密情報でない)且つ有益な情報も含まれている。
 このため、秘密情報の流出を防止しつつ、プラント情報を共用することができるプラント機器情報管理システムの開発が望まれてきた。
 本発明は、上述の課題を解決することのできるプラント機器情報管理システムを提供する。
 本発明のプラント機器情報管理システムは、複数のプラントの機器情報をBOMにより管理し、前記BOMの複数の階層に対応して入力された前記機器情報にそれぞれ対応する装置コードが設定され、前記プラントに対して行う作業情報をWBSにより管理し、前記WBSの複数の階層に対応して入力された前記作業情報にそれぞれ対応する作業コードが設定されるプラント機器情報管理システムであって、前記BOMの複数の階層のうち、前記複数のプラントの全てにおいて前記機器情報が必ず入力される前記階層の中で最下層の前記機器情報に対応する前記装置コードと、前記WBSの複数の階層のうち、前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報に対応する前記作業コードとのみに対応したメンテナンスコードを生成するメンテナンスコード生成部と、前記メンテナンスコード、並びに、前記メンテナンスコードに紐づく前記機器情報及び前記作業情報を記憶する第一の記憶領域及び第二の記憶領域と、前記メンテナンスコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を用いて、前記プラントの管理作業に関する処理を実行する業務アプリケーションとを有し、前記第一の記憶領域は、ユーザにアクセス権があり、前記第二の記憶領域は、前記ユーザにアクセス権がなく、前記業務アプリケーションは、前記ユーザに対する前記処理を実行する場合、前記第一の記憶領域から前記メンテナンスコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出するとともに、前記第二の記憶領域から共用可能であり且つ前記メンテナンスコードに紐づく前記最下層の前記機器情報及び前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出することを特徴とする。
 この構成によれば、プラント情報を抽出する際、システムを使用するユーザに応じて、プラント情報を異ならせて抽出する。例えば、あるユーザがプラント機器情報管理システムを使用した際、自己がアクセス権を持つプラント情報に加え、自己に原則としてアクセス権のない他のユーザのプラント情報のうち共用可能な一部のプラント情報が例外として抽出される。
 従って、秘密情報の流出を防止しつつプラント情報を共用可能とするプラント機器情報管理システムを提供することができる。
 本発明のプラント機器情報管理システムは、同一の前記メンテナンスコードに紐づく前記機器情報及び前記作業情報に対応する関連情報の文字列を分析する関連情報分析部と、前記関連情報分析部が分析した前記文字列のうち、特定の文字列に対応したグループコードを生成し且つ前記グループコードを前記同一のメンテナンスコードに紐づく前記機器情報及び前記作業情報に紐づけるグループコード生成部とをさらに有し、前記業務アプリケーションは、前記グループコードに紐づく前記機器情報及び前記作業情報を抽出してもよい。
 この構成によれば、同一のメンテナンスコードに紐づく複数のプラント情報のうち、グループコードに紐づくプラント情報に絞り込んで抽出することができる。
 従って、秘密情報の流出を防止しつつプラント情報を共用可能とするプラント機器情報管理システムでありながら、プラント情報をより効率良く抽出することができるので管理作業の実行時間を短縮し、作業効率を改善したプラント機器情報管理システムを提供することができる。
 本発明のプラント機器情報管理システムは、第一の前記グループコードに対応する前記特定の文字列と第二の前記グループコードに対応する前記特定の文字列とが互いに異なり且つ互いの意味が同一である場合、共通グループコードを生成し且つ前記共通グループコードを前記第一及び第二のグループコードに紐づく前記機器情報及び前記作業情報に紐づける共通グループコード生成部をさらに有し、前記業務アプリケーションは、前記共通グループコードに紐づく前記機器情報及び前記作業情報を抽出してもよい。
 この構成によれば、異なるグループコードが紐づけられたプラント情報であっても、共通グループコードによって、互いに同じグループコードとみなして取り扱うことができる。
 従って、秘密情報の流出を防止しつつプラント情報を共用可能とするプラント機器情報管理システムでありながら、プラント情報をより効率良く抽出するのみならず、必要なプラント情報の欠落を防止することができるので、作業効率をより改善したプラント機器情報管理システムを提供することができる。
 本発明のプラント機器情報管理システムにおいて、前記ユーザは第一の業者であり、前記第一の記憶領域には、前記第一の業者が受注した又は受注予定の顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、前記第二の記憶領域には、第二の業者が受注した又は受注予定の前記顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、前記業務アプリケーションは、前記第一の業者の前記管理作業を実行する場合、前記第一の記憶領域から前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出するとともに、前記第二の記憶領域から共用可能であり且つ前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく前記最下層の前記機器情報及び前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出してもよい。
 この構成によれば、第一の業者は、管理作業を行う際、自己のプラント情報だけでなく、第二の業者のプラント情報のうち共用可能なプラント情報を参考にできる。
 従って、秘密情報の流出を防止しつつプラント情報を共用可能とするプラント機器情報管理システムでありながら、管理作業の質及び効率を改善可能なプラント機器情報管理システムを提供することができる。
 本発明のプラント機器情報管理システムにおいて、前記ユーザは第一の顧客であり、前記第一の記憶領域には、業者が受注した又は受注予定の前記第一の顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、前記第二の記憶領域には、前記業者が受注した又は受注予定の第二の顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、前記管理作業は閲覧作業を含み、前記業務アプリケーションは、前記第一の顧客の前記閲覧作業を実行する場合、前記第一の記憶領域から前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出するとともに、前記第二の記憶領域から共用可能であり且つ前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく前記最下層の前記機器情報及び前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出してもよい。
 この構成によれば、第一の顧客は、閲覧作業を行う際、自己のプラント情報だけでなく、第二の顧客のプラント情報のうち共用可能なプラント情報を参考に、業者の見積提案等を比較検討できる。
 従って、秘密情報の流出を防止しつつプラント情報を共用可能とするプラント機器情報管理システムでありながら、顧客による業者選定作業の効率を改善可能なプラント機器情報管理システムを提供することができる。
 本発明のプラント機器情報管理システムにおいて、前記業務アプリケーションは、保全計画を作成する保全計画作成部であってもよい。
 上記したプラント機器情報管理システムによれば、秘密情報の流出を防止しつつ、プラント情報を共用可能とすることができる。
本発明の実施形態であるプラント機器情報管理システム10を示す図である。 図1の業務アプリケーション部12の各処理部121~128における各管理作業の処理フローを示す図である。 図1で示す業務アプリケーション部12の各処理部121~128でそれぞれ使用される機器情報、作業情報、及び関連情報を示した一覧表である。 メンテナンスコード生成部120におけるメンテナンスコードの生成方法を説明する図である。 関連情報分析部129による関連情報の分析結果の表示例を示す図である。 本発明におけるグループコード及び共通グループコードの紐づけの例を示す図である。 図1の保全計画作成部128によるプラント情報の表示例である。 図1の保全計画作成部128によるプラント情報の表示例である。 図1の保全計画作成部128によるプラント情報の表示例である。
<実施形態>
 以下、本発明の実施形態であるプラント機器情報管理システムを図1~図9を参照して説明する。
 図1は、実施形態のプラント機器情報管理システム10を示す図である。プラント機器情報管理システム10(以下、「管理システム10」という)は、ごみ焼却炉などのプラントのプラント情報(機器情報、作業情報、またはそれらに関連するその他の情報(以下、「関連情報」という))を電子的に管理するシステムである。
 管理システム10は、1台または複数台のパソコン(パーソナルコンピュータまたはPC(personal computer)という)、タブレット等の携帯端末、またはサーバ装置等のコンピュータによって構成される。
 図1に示す管理システム10は、例として、クラウド・コンピューティングによって構成される。従って、ここでは、管理システム10は、物理的、地理的に離れた場所に配置された複数のサーバ装置(業務アプリケーション部12、記憶部13、共通グループコード生成部14)と、有線または無線によってそれらにインターネットを介してアクセスするパソコンまたはタブレット等の入出力部11で構成される。
 管理システム10は、運営業者が保守・管理し、運営業者と契約したユーザのみが、運営業者からアクセス権を付与され、プラントの管理作業を行うことができる。ここでは、ユーザは、プラントを保有等して事業を行う「顧客」と、顧客からプラントの新規建設や既存のプラントのメンテナンス等の工事を受注する「業者」であるとして説明する。なお、運営業者は、ユーザではない。
 図1の管理システム10のうち、入出力部11は、運営業者がユーザに貸与してもよいし、ユーザ所有であってもよい。
 図1では、管理システム10をクラウド・コンピューティングで実現しているが、所定のプログラム及びデータを1台のパソコンやタブレット型の携帯端末にインストールすることができれば、当該パソコンや携帯端末のみで管理システム10を構成できる。この場合には、管理システム10の秘密情報の流出を防止するため、運営業者が当該パソコンや携帯端末をユーザに貸与するのが望ましい。
 管理システム10は、管理対象となる複数のプラントの機器情報をBOMにより管理し、作業情報をWBSにより管理する。また、管理システム10は、BOMとWBSを互いに紐づけて管理する。さらに、管理システム10は、地理的、機能的に異なる複数のプラントのプラント情報を一律に管理する。このため、ある1つのプラントのBOM及びWBSの階層数と、他のプラントのBOM及びWBSの階層数が異なる場合がありうる。
 本実施形態では、例として、取扱う全てのプラントの中で、BOMの階層が最大であるのはBOMレベル5(BOM Lv.5)まで機器情報が存在するプラントであり、また、WBSの階層が最大であるのはWBSレベル3(WBS Lv.3)まで作業情報が存在するプラントであるとして、管理システム10の説明を行う。図3で、BOMはBOMレベル5まで、WBSはWBSレベル3までの記載となっているのは、この理由による。
 管理システム10は、上述のように、入出力部11(入出力部11-1~11-4)と、業務アプリケーション部12と、記憶部13と、共通グループコード生成部14を備える。
 入出力部11は、図示しない入力部と出力部(表示部)を備えており、ユーザ(業者または顧客)がキーボードやタッチパネル等の入力部を用いてプラント情報を入力することができる。また、モニタ等の出力部へプラント情報を出力・表示する。入出力部11は、例えば、キーボード(入力部)とモニタ(出力部)を備えたパソコンや、入力部と出力部が一体に形成されたタブレット型等の携帯端末でよい。
 以下、説明の簡便のため、入出力部11の入力部に入力することを「入出力部11に入力する」といい、入出力部11の出力部(表示部)へ表示することを、「入出力部11に表示する」という。
 ここでは、プラントの新設や保守(メンテナンス)を行う複数の業者と、プラントを利用して事業を行う複数の事業者(顧客)が管理システム10を利用する例を説明するので、各業者(業者1、業者2)、各顧客(顧客A、顧客B)の各々に、それぞれ専用の入出力部11(11-1~11-4)が用意されている。すなわち、管理システム10を使用する際、業者1は入出力部11-1で入出力を行い、業者2は入出力部11-2で入出力を行い、顧客Aは入出力部11-3で入出力を行い、顧客Bは入出力部11-4で入出力を行う。
 なお、ここでは複数の専用の入出力部11を用意したが、パスワード等でアクセス管理を行う場合には、1つの入出力部11を複数のユーザで共用してもよい。また、図1では、複数業者の数が2、顧客の数が2の例を示したが、これに限らず、2以上の業者や顧客が存在してもよい。
 業務アプリケーション部12は、プラントの管理作業に関する処理を行うための複数の処理部を備えている。具体的には、業務アプリケーション部12は、処理部として、メンテナンスコード生成部120と、グループコード生成部12Aと、客先機器台帳作成部121と、工程表作成部122と、見積作成部123と、工事仕様書作成部124と、工事報告書作成部125と、工事日報作成部126と、保全履歴作成部127と、保全計画作成部128と、関連情報分析部129を備えている。これら各処理部の処理の詳細については、後述する。
 なお、後述するが、メンテナンスコード生成部120が生成するメンテナンスコードCOM(COMは、Code Of Maintenanceの略)と、グループコード生成部12Aが生成するグループコードPAREは、検索コードの一種であり、本発明の重要な構成要素の一つである。グループコードPAREは、特定のメンテナンスコードCOMに紐づけられた複数のプラント情報のうち、その一部のプラント情報に紐づけられる。従って、これら2つのコードの一方または両方を適宜用いることで、複数のプラントが管理対象である場合に、ユーザによるプラント情報の入力の負荷を低減し、高い確度で所望のプラント情報を検索・抽出・比較することができる。
 グループコードを“PARE”と名付けたのは、次の理由による。まず、“PARE”は英語で「余分なところを削る」意味を持ち、検索コードの一種として不要な情報を削り取り、必要な情報のみ抽出する点で、複数のプラント情報の比較を行う管理システム10において、名前として適切であると発明者は考えたからである。また、グループコードPAREは、メンテナンスコードCOMと高い相関を持ち、“COM”と“PARE”を合わせれば“COMPARE”(英語で「比較」を意味)となり、複数のプラント情報の比較を行う管理システム10において、やはり名前として適切であると発明者は考えたからである。
 記憶部13は、業務アプリケーション部12で処理されたプラント情報を記憶する。記憶部13は、客先機器台帳作成部121で処理されたプラント情報とメンテナンスコード生成部120が生成したメンテナンスコードCOMが記憶・保存される客先BOM・WBSDB131と、工程表作成部122で処理されたプラント情報が記憶・保存される工事予定DB132と、見積作成部123で処理されたプラント情報が記憶・保存される見積DB133と、工事仕様書作成部124で処理されたプラント情報が記憶・保存される発注コストDB134と、工事報告書作成部125で処理されたプラント情報が記憶・保存される機器点検・計測記録DB135と、工事日報作成部126で処理されたプラント情報が記憶・保存される工事実績DB136と、保全履歴作成部127で処理されたプラント情報が記憶・保存される工事履歴DB137と、保全計画作成部128で処理されたプラント情報が記憶・保存される将来工事計画DB138を備えている。すなわち、業務アプリケーション部12の各処理部のうち、グループコード生成部12Aと関連情報分析部129を除く他の各処理部120~128にそれぞれ個別に対応したDBが設けられている。
 また、記憶部13は、業者1が顧客Aから受注した作業又は受注予定(見積提示予定)の作業の対象となるプラントに対応するプラント情報が格納される記憶領域1と、業者2が顧客Aから受注した作業又は受注予定(見積提示予定)の作業の対象となるプラントに対応するプラント情報が格納される記憶領域2と、業者1が顧客Bから受注した作業又は受注予定(見積提示予定)の作業の対象となるプラントに対応するプラント情報が格納される記憶領域3と、業者2が顧客Bから受注した作業又は受注予定(見積提示予定)の作業の対象となるプラントに対応するプラント情報が格納される記憶領域4を備える。各記憶領域1~4は、それぞれDB131~138を備える。
 なお、「DB」はデータベースを意味する。各記憶領域1~4のDB131~138は、各々が別箇の記憶装置であってもよいし、1つの記憶装置内の異なる記憶領域であってもよい。また、各記憶領域1~4または各記憶領域1~4のDB131~138は、有線または無線で、インターネット等を介して業務アプリケーション部12、共通グループコード生成部14、及び入出力部11に接続されるのであれば、互いに地理的・空間的に分かれて存在してもよい。
 各記憶領域には、それぞれに対応する特定のユーザ(特定の顧客及び特定の業者)のアカウント情報(アカウント、ID(identification)、パスワード、等)が格納されており、それぞれに対応するユーザのみがアクセス権を持つ。従って、ユーザは、原則としてアクセス権を持つ所定の記憶領域にアクセスすることができる。例えば、図1では、記憶領域1に対して、原則として業者1と顧客Aのみがアクセスでき、記憶領域2に対して、原則として業者2と顧客Aのみがアクセスでき、記憶領域3に対して、原則として業者1と顧客Bのみがアクセスでき、記憶領域4に対して、原則として業者2と顧客Bのみがアクセスすることができる。
 なお、ここでは、記憶領域の数は4としているが、ユーザの数に応じて適宜変更可能である。言い換えれば、ユーザの数に応じて、記憶領域の数を4未満としてもよいし、5以上としてもよい。
 ただし、上述した原則に対して例外がある。第一の例外として、管理システム10の運営業者は、当該システムの保守及び管理を行うため、全ての記憶領域のみならず、業務アプリケーション部12及び共通グループコード生成部へアクセスできる。
 また、後述するように、いずれの記憶領域であっても、共用可能な一部のプラント情報については、第二の例外として、運営業者と契約してアカウント情報を取得し、管理システム10へのアクセス権を持つ全てのユーザがアクセス可能である。ただし、ここでは、第二の例外のアクセスが可能となるのは、業務アプリケーション部12の各処理部121~128の各処理(S11~S18)のうち、保全計画作成部128による保全計画の作成処理S18のみであるとして話を進める。例えば、顧客による競争入札が行われる際に、見積作成部123等の処理部で第二の例外のアクセスを可能としてある業者が自己以外の業者の見積価格等の概要を知ることは、現在のルール上、許されないからである。
 もちろん、ルール上許されない場合を除き、運営業者の方針や全てのユーザの総意によって、他の処理(S11~S17)のいずれかにおいて、第二の例外のアクセスを可能としてもよい。
 共通グループコード生成部14は、共通グループコードVIS(Visualized InStinct)を生成して、複数の異なるグループコードPAREの各々に紐づいたプラント情報を互いに紐づける。異なるグループコード間のプラント情報を所定のルールに基づいて紐づけるため、「人の直感を見える化」していると発明者は考え、“VIS”と名付けた。共通グループコードVISは、メンテナンスコードCOMやグループコードPAREと同様、検索コードの一種である。共通グループコード生成部14及び共通グループコードVISについては、後述する。
 では、業務アプリケーション部12の各処理部121~128の処理を、図1、図2及び図3を用いて、詳細に説明する。図2は、業務アプリケーション部12の各処理部121~128における各管理作業の処理流れ(処理フロー)を示す図である。図3は、各処理部121~128でそれぞれ使用される機器情報及び作業情報を、対応するBOMレベルまたはWBSレベルごとに示した表である。
 なお、図3で「-」が記載された項目は、それに対応する処理部では使用されない項目であるので、その項目及びその項目を入力するための入力欄は、入出力部11に表示されない。しかし、各処理部に個別に対応して設けられたDBには、その上流の処理部における処理でプラント情報の入力がなされていれば、「-」が記載された項目のプラント情報も当該DBに記憶・保存されているので、ユーザが当該項目の表示を希望する場合、自己のプラント情報または共用可能なプラント情報であれば、適宜選択することで、当該項目を表示することができる。
 また、グループコード生成部12Aと関連情報分析部129は、以下に説明する各処理のうち、客先機器台帳の作成処理S11を除く他の処理S12~S18において、グループコードPAREを生成する場合に、適宜、工程表作成部122、見積作成部123、工事仕様書作成部124、工事報告書作成部125、工事日報作成部126、保全履歴作成部127、または保全計画作成部128が使用する処理部である。
 さらに、業務アプリケーション部12の各処理部121~128は、ユーザが入力したプラント情報を所定のルールに従ってコード化し、対応する記憶部13に記憶・保存する。例えば、業務アプリケーション部12は、BOMの複数の階層に対応して入力された機器情報に対して、それぞれ対応する装置コードを設定し、WBSの複数の階層に対応して入力された作業情報に対して、それぞれ対応する作業コードを設定する。
 以下の処理フローの説明では、各処理部121~128の処理の説明の際に、メンテナンスコード生成部120の処理と、グループコード生成部12A及び関連情報分析部129の処理を併せて説明する。
(客先機器台帳の作成処理S11)
 まず、客先機器台帳作成部121は、ユーザが使用する入出力部11に「客先機器台帳画面」を表示する。客先機器台帳作成部121は、記憶部13の各記憶領域1~4のうち、ユーザのアカウント情報に基づいて当該ユーザがアクセス権を持ち原則としてアクセス可能な所定の記憶領域に未だ対応するプラント情報が記憶・保存されていない新規のプラントについて、客先機器台帳の作成処理S11を実行する。「客先機器台帳画面」には、客先機器台帳の作成処理S11で、ユーザが入出力部11から入力する複数の項目の入力欄が表示される。
 具体的には、図3の「客先機器台帳の作成処理(S11)」の欄に示すように、機器情報である客先設備名(BOMレベル1)、客先機器名または機器仕様(BOMレベル2)、機器仕様分類、客先機器詳細名、機器詳細仕様、または系列(BOMレベル3)、客先機器部分名または部分仕様(BOMレベル4)、客先機器部品名または部品仕様(BOMレベル5)、並びに、作業情報である作業属性または客先実施項目名(WBSレベル1)及び客先作業詳細名(WBSレベル2)を入出力部11から入力するための入力欄を、客先機器台帳作成部121が入出力部11に表示する。客先機器台帳作成部121は、ユーザが入出力部11へ入力した情報を使用して、新規プラントのプラント情報の台帳(マスタデータ)を電子的に作成する。当該台帳においては、後述するように、メンテナンスコードCOM、BOMの機器情報、WBSの作業情報、及び関連情報が互いに紐づけられている。
 ここで、「客先機器台帳画面」には、客先機器台帳の作成処理S11で入力される項目として、BOMレベル1からBOMレベル5の機器情報、WBSレベル1、2の作業情報に対応する入力欄が表示されるが、取扱う全てのプラントにおいて必ず機器情報が入力されるのはBOMレベル1からBOMレベル3までであり、取扱う全てのプラントで必ず作業情報が入力されるのはWBSレベル1までであるとして説明を進める。すなわち、取扱う全てのプラントの中には、BOMレベル4、BOMレベル5の機器情報を入力する必要のないプラントや、WBSレベル2の作業情報を入力する必要のないプラントが存在しうる。
 そして、客先機器台帳作成部121は、ユーザが「客先機器台帳画面」で入力したプラント情報を、ユーザがアクセス権を持つ適切な記憶領域の客先BOM・WBSDB131へ記憶・保存する。例えば、図1において、ユーザが「業者1」、新規のプラントが「顧客A」のプラントである場合、客先機器台帳作成部121は、記憶領域1の客先BOM・WBSDB131へ、「客先機器台帳画面」にユーザが入力したプラント情報の記憶・保存を行う。
 なお、上記「系列」(BOMレベル3)は、同型の複数の装置や機器が配置される場合に、これらを区別する情報である。炉の場合には、「号炉」情報ともいわれ、これに対応する装置コードは号炉コードともいわれる。例えば、1つのごみ焼却プラントに、複数のごみ焼却炉が設けられる場合には、各ごみ焼却炉を区別するため、それぞれ異なる号炉コードが設定される。
(メンテナンスコードCOMの生成処理)
 メンテナンスコード生成部120は、「客先機器台帳画面」で入力された機器情報及び作業情報に対応した装置コード及び作業コードの特定の組み合わせに対応させて、検索コードの一種であるメンテナンスコードCOMを生成する。具体的には、BOMの複数の階層のうち、複数のプラントの全てにおいて機器情報が必ず入力される階層の中で最下層の機器情報に対応する装置コード(本実施形態では、BOMレベル3の機器情報に対応する装置コード)と、WBSの複数の階層のうち、上記最下層の機器情報に直接的に紐づくWBSの階層の作業情報に対応する作業コード(本実施形態では、WBSレベル1の作業情報に対応する作業コード)とのみに対応して、メンテナンスコード生成部120が、メンテナンスコードCOMを生成する。
 そして、生成されたメンテナンスコードCOMは、客先機器台帳作成部121が、「客先機器台帳画面」で入力したプラント情報に紐づけて、客先BOM・WBSDB131へ記憶・保存する。なお、メンテナンスコードCOMと当該プラント情報の紐づけは、客先機器台帳作成部121ではなく、メンテナンスコード生成部120が行ってもよい。
 以下に詳細を述べる。
 図4は、メンテナンスコードCOMの生成方法を説明するための簡略図である。図4(a)に、プラント名「プラントα」のBOMの各階層の機器情報の一例を示す。
 例えば、プラントαは、BOMレベル1の機器情報である「設備1」及び「設備2」で構成される。設備1は、BOMレベル2の機器情報である「機器A」と「機器B」にそれぞれ紐づく。設備2は、BOMレベル2の機器情報である「機器C」に紐づく。
 機器Aは、BOMレベル3の機器情報である「機器詳細1」と「機器詳細2」にそれぞれ紐づく。機器Bは、BOMレベル3の機器情報である「機器詳細3」に紐づく。機器Cは、BOMレベル3の機器情報である「機器詳細4」に紐づく。
 機器詳細1は、BOMレベル4の機器情報である「部位1」に紐づき、さらに部位1は、BOMレベル5の機器情報である「部品1」に紐づく。
 なお、機器詳細2、機器詳細3、及び機器詳細4に紐づくBOMレベル4またはそれより深い階層の機器情報は存在しない。
 ここで、BOMレベル1~3の機器情報は、管理システム10で管理するいずれのプラントにおいても必ず入力される情報である。BOMレベル4~5の機器情報は、BOMレベル1~3に入力される機器情報の種類やプラントの特性によって、入力の要否が分かれる情報である。なお、ユーザによる入力が必須であるBOMの階層は、ここではBOMレベル1~3としたが、これは一例であり、管理システム10の仕様によって、入力を必須とする階層の数を適宜設定してよい。例えば、BOMレベル1、2の2階層を、入力が必須の階層に設定してもよい。また、BOMは、BOMレベル5よりも深い階層(例えば、BOMレベル6、BOMレベル7、・・・など)を有していてもよい。
 図4(b)に、プラントαのWBSの各階層の作業情報の一例を示す。WBSレベル1の作業情報である「作業1」は、WBSレベル2の作業情報である「作業明細A」と「作業明細B」にそれぞれ紐づく。WBSレベル1の作業情報である「作業2」は、WBSレベル2の作業情報である「作業明細C」に紐づく。作業明細Aは、WBSレベル3の作業情報である「作業詳細1」に紐づく。作業明細B及び作業明細Cに紐づくWBSレベル3またはそれより深い階層の作業情報は存在しない。
 ここで、WBSレベル1の作業情報は、管理システム10で管理するいずれのプラントにおいても必ず入力する情報である。WBSレベル2~3の作業情報は、WBSレベル1に入力される作業情報の種類やプラントの特性によって、入力の要否が分かれる情報である。なお、ユーザによる入力が必須であるWBSの階層は、ここではWBSレベル1としたが、これは一例であり、管理システム10の仕様によって、入力を必須とする階層の数を適宜設定してよい。例えば、WBSレベル1、2の2階層を、入力が必須の階層に設定してもよい。また、WBSは、WBSレベル3よりも深い階層(例えば、WBSレベル4、WBSレベル5、・・・など)を有していてもよい。
 図4(a)及び図4(b)で示したプラントαのBOMとWBSは、図4(c)に示すように、互いに紐づけられる。すなわち、管理システム10で管理する全てのプラントにおいて入力が必須のBOMの階層(この例では、BOMレベル1~3)のうち、最下層であるBOMレベル3の機器情報に、同様に入力が必須のWBSの階層(この例では、WBSレベル1)のうち、BOMレベル3の機器情報に直接的に紐づく階層であるWBSレベル1の作業情報が紐づけられる。図4(c)では、BOMレベル3の機器情報である「機器詳細1」に、WBSレベル1の作業情報である「作業1」が紐づけられている。
 なお、WBSの階層の中で、BOMレベル3の機器情報に「直接的に紐づく」階層の作業情報とは、上記最下層であるBOMレベル3の機器情報に対して実施されうる作業情報が複数存在するWBSの階層の中で、最上層の作業情報を意味する。従って、BOM3レベルの複数の機器情報に対して、WBSレベル1の作業情報が複数存在せず、ただ一つの作業情報しかない場合、WBSレベル1は上記「直接的に紐づく」階層とはならない。例えば、仮に、図4(b)でWBSレベル1の作業情報が唯一「作業1」だけで「作業2」が存在しない場合、WBSの階層の中で、BOMレベル3の機器情報に直接的に紐づく階層は、WBSレベル1ではなくWBSレベル2になりうる。
 次に、図4(c)に示すように、図4(a)及び図4(b)のBOMの各階層の機器情報及びWBSの各階層の作業情報は、プラント名「プラントα」のプラント情報に関するものであるので、プラントαが、これらに紐づけられる。
 さらに、図4(c)に示すように、プラントαの機器情報である「機器詳細1」及びプラントαの作業情報である「作業1」にのみに対応するメンテナンスコードCOMが、メンテナンスコード生成部120により生成され、同様に、BOMの各階層の機器情報及びWBSの各階層の作業情報に紐づけられる。メンテナンスコードCOMは、例えば、「機器詳細1」をユーザが入力した場合にこれに対応して業務アプリケーション部12で所定のルールに従って自動的に設定される装置コードが「123XA」であり、「作業1」を作業者が入力した場合にこれに対応して業務アプリケーション部12で所定のルールに従って自動的に設定される作業コードが「089X」である場合に、これら2つのコードのみに対応して、「123XA089X」と生成される。
 管理システム10を複数のユーザで使用する場合、同一のシステムであるのでコード化の所定のルールや、上述のメンテナンスコード生成のルールは同一である。従って、メンテナンスコードCOMは、業者1、業者2、顧客A、顧客B等、ユーザが誰であるかを問わず、BOMレベル3の機器情報に設定される装置コード及びWBSレベル1の作業情報に設定される作業コードに基づいて、同一のコードが生成される。
 なお、当該装置コードが「123XA」、当該作業コードが「089X」の場合を例として説明したが、これらコードの桁数はこれに限らず、仕様等に応じてこれ以上またはこれ以下に設定されうる。さらに、メンテナンスコード生成部120は、自動で生成された当該装置コードと当該作業コードをそのまま利用してメンテナンスコードCOMを生成してもよいし、記憶部13に2入力1出力の変換表または変換テーブルを別途備え、メンテナンスコード生成部120がこれを利用してメンテナンスコードCOMを生成してもよい。例えば、メンテナンスコード生成部120は、当該装置コードが「123XA」、当該作業コードが「089X」の場合に、そのまま並べ、「123XA089X」や「089X123XA」のようにメンテナンスコードCOMを生成してもよいし、混在させて「102839XXA」(互い違いに配置)のようにメンテナンスコードCOMを生成してもよい。また、メンテナンスコード生成部120は、上記変換表に、当該装置コード「123XA」及び当該作業コード「089X」を入力し、当該変換表から出力されるコード(装置コードや作業コードと全く無関係の値や桁数であるが、これら2つのコードに唯一対応するコード)を、メンテナンスコードCOMとしてもよい。
(工程表の作成処理S12)
 図1、図2及び図3の説明に戻る。工程表作成部122は、まず、客先機器台帳作成部121が上記所定の記憶領域の客先BOM・WBSDB131に記憶・保存したメンテナンスコードCOM及びそれに紐づくプラント情報を全て、当該所定の記憶領域の工事予定DB132にコピーする。例えば、ユーザが「業者1」、管理作業を行う対象のプラントが「顧客A」のプラントである場合は、記憶領域1の工事予定DB132にコピーする。
 そして、工程表作成部122は、ユーザが使用する入出力部11に「工程表作成画面」を表示し、上述のようにプラント情報をコピーした工事予定DB132を用いて工程表の作成処理S12を実行する。「工程表作成画面」には、工程表の作成処理S12で入力される複数の項目の入力欄が表示される。具体的には、図3の「工程表の作成処理(S12)」の欄に示すように、機器情報である客先設備名(BOMレベル1)、機器仕様分類、客先機器詳細名、機器詳細仕様、または系列(BOMレベル3)、並びに、作業情報である作業属性または客先実施項目名(WBSレベル1)、客先作業詳細名(WBSレベル2)、予定工程または予定工数(WBSレベル3)、さらには関連情報である休炉予定または検査予定等を入力するための入力欄を、工程表作成部122が入出力部11に表示する。
 なお、関連情報の入力欄には、文章で説明やコメントを入力することができる。例えば、予定されている休炉や検査に関する詳細な内容や、お客様への連絡事項等の種々の情報を入力することができる。従って、関連情報には、ユーザの経験によるノウハウや、特定製品の型番、工事等の作業上の秘密情報が含まれうる。
 このとき、上記所定の記憶領域の工事予定DB132には、当該所定の記憶領域の客先BOM・WBSDB131に記憶・保存されたメンテナンスコードCOM及びプラント情報がコピーされている。よって、工程表の作成処理S12の際、入力が必要となる項目であって、且つ、すでにコピーされたプラント情報等については、工程表作成部122は、当該入力欄の表示の際に、これら情報等を併せて表示させる。
 図3の例では、客先機器台帳作成部121の処理S11と工程表作成部122の処理S12で、入力が必要となるプラント情報等は、BOMレベル1、BOMレベル3、WBSレベル1、及びWBSレベル2において同一である。よって、これらのプラント情報は、「工程表作成画面」でユーザが改めて入力する必要はない。ただし、ユーザは、「工程表作成画面」の入力欄でこれら情報を修正することができる。
 従って、工程表の作成処理S12においてユーザが新規に入力する必要があるのは、多くとも、予定工程または予定工数(WBSレベル3)と関連情報の2項目であり、このため、ユーザの入力作業の時間及び労力を削減することができる。
 そして、工程表作成部122は、ユーザが「工程表作成画面」で入力したプラント情報を上記所定の記憶領域の客先BOM・WBSDB131へ記憶・保存する。例えば、記憶領域が図1のように割り当てられており、ユーザが「業者1」、管理作業の対象であるプラントが「顧客A」のプラントである場合、工程表作成部122は、記憶領域1の客先BOM・WBSDB131へ「工程表作成画面」で入力されたプラント情報の記憶・保存を行う。
 また、特定のプラントについて工程表の作成処理S12を実行する際、工程表作成部122は、当該工程表の作成に参考となる同一のメンテナンスコードCOMに紐づく複数のプラントのプラント情報を検索・抽出し、他のプラントと比較できる形式で入出力部11に表示させることができる。
 ここで、工程表の作成処理S12においては、上述の「第二の例外」のアクセスが禁止されるので、ユーザがアクセス権を持つ上記所定の記憶領域に格納されたプラント情報のみが抽出される。具体的には、ユーザが「業者1」である場合、記憶領域1と記憶領域3の工事予定DB132に保存されたプラント情報が抽出される。
 従って、ユーザが作成処理S12を実行する際、他のプラントと比較しながら効率よく作業を行うことができるので、ユーザの入力作業の時間及び労力を削減することができる。
(グループコードPARE並びに共通グループコードVISの生成処理)
 ここで、本発明においては、上述のように、同一のメンテナンスコードCOMに紐づく複数のプラントのプラント情報等を抽出して入出力部11に表示させた際、抽出された複数のプラント情報等が多数である場合、ユーザは、抽出されたプラント情報を、グループコードPAREまたは共通グループコードVISでさらに絞り込んで抽出し、当該出力部に表示させることができる。
 グループコードPARE及び共通グループコードVISの生成、並びに、プラント情報へのこれらの紐づけ方法は、以下のとおりである。
 まず、ユーザは、「工程表作成画面」を介して工程表作成部122に指示することで、工程表作成部122が関連情報分析部129を起動させる。関連情報分析部129は、メンテナンスコードCOMによって抽出された複数のプラント情報のうち、ユーザがアクセス可能な記憶領域の工事予定DB132に「関連情報」として記憶・保存されている膨大なテキストから、特定の単語、数字などの文字列を分析(例えば、テキストマイニング分析)し、図5の上図に示すように、特定の文字列を数の多い順に所定数だけ当該出力部に表示する。例えば、ユーザが業者1である場合、関連情報分析部129は、記憶領域1及び記憶領域3の工事予定DB132に「関連情報」として保存されたテキストを対象として、テキストマイニング分析等を行う。なお、関連情報分析部129は、テキストマイニングの他、関連情報を対象として主成分分析、クラスター分析等の手法によって分析を行ってもよい。
 ユーザが、図5の上図の特定の文字列(例えば、「抜管」)を選択すると、図5の下図に示すように、選択した特定の文字列に関連性の高い文字列のみが表示される。ここで、ユーザが当該選択した特定の文字列で上記絞り込みを希望する場合、ユーザは、「工程表作成画面」を介して工程表作成部122に指示することで、工程表作成部122がグループコード生成部12Aを起動させる。
 グループコード生成部12Aは、当該選択した特定の文字列に一対一に対応する特定のグループコードPAREを作成し、すでに抽出して「工程表作成画面」に表示させている「同一のメンテナンスコードCOMに紐づく複数のプラントのプラント情報」のうち、当該選択した特定の文字列を関連情報に含むプラント情報に紐づける。
 なお、1つのプラント情報に複数のグループコードPAREを紐づけることが可能である。例えば、図5の上図にて、「抜管」、「足場」の各々に基づいて、異なるグループコードPAREを生成することが可能である。その場合、プラント情報の中には、「抜管」に基づいて生成されたグループコードPAREと、「足場」に基づいて生成されたグループコードPAREとの両方に紐づけられるプラント情報が生じうる。当該プラント情報は、対応するメンテナンスコードCOM、これら2つのグループコードPAREのいずれでも検索することが可能となる。また、ある一つのグループコードPAREに紐づけられた複数のプラント情報でなるグループは、当該プラント情報に対応するメンテナンスコードCOMに紐づけられた複数のプラント情報でなるグループに包含される関係が成立する。
従って、関連情報分析部129の分析結果を参照して、多数のグループコードPAREを生成し、特定のメンテナンスコードCOMに紐づくプラント情報のグループ分けを数多く行うことによって、各処理S12~S18における処理速度や処理精度を高めることができる。
 ところで、グループコードPAREは、特定の文字列に一対一に対応して生成されるため、当該特定の文字列と異なる文字列が選択される場合には、異なるグループコードPAREが生成される。言い換えれば、当該特定の文字列に対応する第一のグループコードPAREと、当該異なる文字列に対応する第二のグループコードPAREは、互いに異なるコードに設定される。しかし、文字列は異なるものの、その内容や意味は同じという場合がありうる。
 例えば、あるユーザは社内用語として「抜管」という用語を使用する場合でも、他のユーザは社内用語として「抜き管」という用語を使用する場合がありうる。この場合に、第一のグループコードPAREに紐づいたプラント情報を抽出すると、上記絞り込みはできるものの、第二のグループコードに紐づいたプラント情報が欠落することになる。
 そこで、グループコードPAREと一対一に対応する特定の文字列が互いに異なる場合であっても、その意味・内容が同じである場合には、運営業者が共通グループコード生成部14を起動して、共通グループコードVISを生成し、これを互いに異なるグループコードに紐づくプラント情報に紐づける。上述の例では、「抜管」という特定の文字列に対応する第一のグループコードPAREに紐づいた機器情報及び作業情報と、「抜き管」という特定の文字列に対応する第二のグループコードPAREに紐づいた機器情報及び作業情報とを、共通グループコード生成部14が一つの共通グループコードVISに紐づける。
 図6は、グループコードPARE及び共通グループコードVISの紐づけを説明するための簡略図である。グループコードPARE及び共通グループコードVISは、特定のメンテナンスコードCOMに紐づく機器情報及び作業情報等に紐づけられることが理解できる。なお、図6は、図4(c)のプラント情報及びメンテナンスコードCOMにグループコードPARE及び共通グループコードVISが紐づけられた例である。
 グループコードPAREは、例として「X425A00A1」を示したが、コードの桁数はこれに限らず、仕様等に応じてこれ以上またはこれ以下に設定されうる。同様に、共通グループコードVISは、例として「GH7T2」を示したが、コードの桁数はこれに限らず、仕様等に応じてこれ以上またはこれ以下に設定されうる。
 なお、以上の説明では、関連情報分析部129による分析に基づいてグループコードPARE及び共通グループコードVISが生成されたが、関連情報分析部129による分析によらずとも、ユーザが、自らの知見などに基づいて特定の文字列を指定し、その特定の文字列に基づいてグループコードPAREを生成してもよい。また、ユーザが関与せずとも、例えば、人工知能(AI:Artificial intelligence)を用いて、各処理部122~128が、関連情報分析部129とグループコード生成部12Aを起動し、グループコードPAREの生成及び対応するプラント情報への紐づけを自動的に行ってもよい。
 また、以上の説明では、共通グループコード生成部14は運営業者によって起動され、共通グループコードVISが生成されたが、これに限る必要はない。共通グループコード生成部14が人工知能(AI)を搭載し、運営業者が関与せずとも、互いに異なる特定の文字列の意味が同一か否かを自動的に判断し、同一である場合に共通グループコードVISを自動的に生成して上記紐づけを行うとしてもよい。
 さらに、以上の説明では、図6に示すように、グループコードPAREと共通グループコードVISが併存するが、共通グループコードVISが生成された場合には、これをグループコードPAREと入れ替えてプラント情報へ紐づけてもよい。上述した「抜管」という特定の文字列と「抜き管」という特定の文字列の例で説明すると、すでに生成されて紐づけられている第一及び第二のグループコードPAREを消去して、代わりに共通グループコードVISに紐づける。この場合には、業務アプリケーション部12の各処理部では、共通グループコードVISはグループコードPAREとして認識またはグループコードPAREとみなされるので、グループコードPAREと共通グループコードVISが併存する場合に比べ、記憶部13の記憶容量を低減することができる。ただし、この場合、共通グループコードVISのコードの桁数は、グループコードPAREのコードの桁数と同じである必要がある。
 そして、工程表作成部122は、グループコードPAREまたは共通グループコードVISに対応するプラント情報を、ユーザがアクセス権を持つ上記所定の記憶領域の工事予定DB132に記憶・保存する。例えば、ユーザが業者1である場合、工程表作成部122は、記憶領域1及び記憶領域3の工事予定DB132に記憶・保存する。
 これにより、ユーザは、グループコードPAREまたは共通グループコードVISを用いて上記絞り込みを実行し、これらに紐づいたプラント情報を抽出することができる。このため、入出力部11に表示される複数のプラント情報の数を減数させ、作業に関連性の高い情報のみを表示させることができるので、他のプラントと比較しながらさらに効率よく作業を行うことができる。よって、ユーザの入力作業の時間及び労力を削減することができる。
 また、ユーザによって設定されるグループコードPAREのみでは、上記絞り込みの際、本来必要なプラント情報に欠落が生じる恐れがあるが、共通グループコードVISを使用することで、当該欠落を防止し、ユーザによる精度の高い作業が可能となる。
 なお、上述のとおり、工程表の作成処理S12においては、上述の「第二の例外」のアクセスが禁止されるので、ユーザがグループコードPAREまたは共通グループコードVISを用いて上記絞り込みを実行した場合、ユーザがアクセス権を持つ上記所定の記憶領域に格納されたプラント情報のみが抽出される。具体的には、ユーザが「業者1」である場合、記憶領域1と記憶領域3の工事予定DB132に保存されたプラント情報が抽出される。
 以上の通り、特定のプラントについて工程表の作成処理S12を実行する際、同一のメンテナンスコードCOMや、同一のグループコードPAREまたは同一の共通グループコードVISに紐づく複数のプラントのプラント情報等を検索・抽出し、他のプラントと比較できる形式で入出力部11に表示させることができる。これにより、ユーザは、特定のプラントについて、他のプラント情報を参考に入力を行うことができるので、入力作業が効率的(時間短縮、労力低減)になり、また、実績に基づくプラント情報と比較した結果であるので信頼性の高い工程表を作成することができる。
(見積の作成処理S13)
 図1、図2及び図3の説明に戻る。見積作成部123は、まず、工程表作成部122が上記所定の記憶領域の工事予定DB132に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれに紐づくプラント情報を全て、当該所定の記録領域の見積DB133にコピーする。例えば、ユーザが「業者1」、管理作業を行う対象のプラントが「顧客A」のプラントである場合は、記憶領域1の見積DB133にコピーする。
 工事予定DB132に記憶・保存されたプラント情報等を全てコピーするので、工程表作成部122における工程表の作成処理S12で使用されず、入出力部11に表示されなかったBOMレベル2、BOMレベル4、及びBOMレベル5のプラント情報も見積DB133にコピーされる。これらBOMレベル2、BOMレベル4、及びBOMレベル5のプラント情報は、当該所定の記憶領域の客先BOM・WBSDB131に記憶・保存されたプラント情報と同一である。
 そして、見積作成部123は、入出力部11に「見積作成画面」を表示し、上記所定の記憶領域の見積DB133を用いて見積の作成処理S13を実行する。「見積作成画面」には、見積の作成処理S13で入力される複数の項目の入力欄が表示される。具体的には、図3の「見積の作成処理(S13)」の欄に示すように、機器情報である客先設備名(BOMレベル1)、客先機器名(BOMレベル2)、機器仕様分類、客先機器詳細名、または系列(BOMレベル3)、客先機器部品名、部品仕様、数量、または見積単価(BOMレベル5)、並びに、作業情報である作業属性または客先実施項目名(WBSレベル1)、客先作業詳細名、見積工数、または見積単価(WBSレベル2)、さらには関連情報である経費を入力するための入力欄を、見積作成部123が入出力部11に表示する。
 このとき、当該所定の記憶領域の見積DB133には、当該所定の記憶領域の工事予定DB132に記憶・保存されたメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びプラント情報がコピーされている。よって、見積の作成処理S13の際、入力が必要となる項目であって、且つ、すでにコピーされたプラント情報等については、見積作成部123は、当該入力欄の表示の際に、これら情報等を併せて表示させる。
 ここで、図3において、客先機器台帳作成部121の処理S11で入力が必要なBOMレベル2の情報は、客先機器名または機器仕様であるのに対し、見積作成部123の処理S13で入力が必要なBOMレベル2の情報は、客先機器名であって、機器仕様の入力は不要となっている。この場合、見積作成部123は、「見積作成画面」の入力欄に、工事予定DB132から見積DB133にコピーされた客先機器名を表示し、必要に応じてユーザによる修正を可能とするが、同様にコピーされた機器仕様を表示する必要はない。
 また、図3において、客先機器台帳作成部121の処理S11で入力が必要なBOMレベル5の情報は、客先機器部品名または部品仕様であるのに対し、見積作成部123の処理S13で入力が必要なBOMレベル5の情報は、客先機器部品名、部品仕様、数量、または見積単価であり、情報量が増加している。この場合、見積作成部123は、「見積作成画面」の入力欄に、工事予定DB132から見積DB133にコピーされた客先機器部品名または部品仕様を表示し、必要に応じてユーザによる修正を可能とする。さらに、見積表示部123は、同じBOMレベル内で増加した情報(ここでは、数量または見積単価)に対応する入力欄を新たに「見積作成画面」に表示して、ユーザの入力を促す。見積作成部123は、ユーザが入力した情報を、上記所定の記憶領域の見積DB133に記憶・保存する。
 なお、工程表作成部122と同様、見積の作成処理S13においても、グループコードPAREまたは共通グループコードVISを生成し、プラント情報に紐づけることができる。そして、見積作成部123は、同一のメンテナンスコードCOMに紐づく複数のプラントのプラント情報や、同一のグループコードPAREまたは同一の共通グループコードVISに紐づく複数のプラントのプラント情報を検索・抽出し、他のプラントと比較できる形式で入出力部11に表示させることができる。これにより、ユーザは、特定のプラントについて、他のプラント情報を参考に入力を行うことができるので、入力作業が効率的(時間短縮、労力低減)になり、また、実績に基づくプラント情報と比較した結果であるので信頼性の高い見積を作成することができる。特に関連性の深い、同一のグループコードに紐づくプラントのプラント情報を表示させることにより、さらに作業効率を向上させ、確度の高い見積もりを作成することができる。
 その他の処理部124~127は、メンテナンスコードCOM、グループコードPARE、並びに共通グループコードVISを用いたプラント情報の抽出を含めて、工程表作成部122または見積作成部123と同様の動作を行うので、以下、簡単に説明する。
(工事仕様書の作成処理S14)
 工事仕様書作成部124は、まず、見積作成部123が上記所定の記憶領域の見積DB133に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれらに紐づくプラント情報を全て、当該所定の記録領域の発注コストDB134にコピーする。そして、工事仕様書作成部124は、入出力部11に「工事仕様書作成画面」を表示し、当該所定の記憶領域の発注コストDB134を用いて工事仕様書の作成処理S14を実行する。工事仕様書作成部124は、「工事仕様書作成画面」で入力された情報を当該所定の記憶領域の発注コストDB134に記憶・保存する。
(工事報告書の作成処理S15)
 工事報告書作成部125は、まず、工事仕様書作成部124が上記所定の記憶領域の発注コストDB134に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれらに紐づくプラント情報を全て、当該所定の記録領域の機器点検・計測記録DB135にコピーする。そして、工事報告書作成部125は、入出力部11に「工事報告書作成画面」を表示し、当該所定の記憶領域の機器点検・計測記録DB135を用いて工事報告書の作成処理S15を実行する。工事報告書作成部125は、「工事報告書作成画面」で入力された情報を当該所定の記憶領域の機器点検・計測記録DB135に記憶・保存する。
(工事日報の作成処理S16)
 工事日報作成部126は、まず、工事報告書作成部125が上記所定の記憶領域の機器点検・計測記録DB135に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれらに紐づくプラント情報を全て、当該所定の記録領域の工事実績DB136にコピーする。そして、工事日報作成部126は、入出力部11に「工事日報作成画面」を表示し、当該所定の記憶領域の工事実績DB136を用いて工事日報の作成処理S16を実行する。工事日報作成部126は、「工事日報作成画面」で入力された情報を当該所定の記憶領域の工事実績DB136に記憶・保存する。
(保全履歴の作成処理S17)
 保全履歴作成部127は、まず、工事日報作成部126が上記所定の記憶領域の工事実績DB136に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれらに紐づくプラント情報を全て、当該所定の記録領域の工事履歴DB137にコピーする。そして、保全履歴作成部127は、入出力部11に「保全履歴画面」を表示し、当該所定の記憶領域の工事履歴DB137を用いて保全履歴の作成処理S17を実行する。保全履歴作成部127は、「保全履歴画面」で入力された情報を当該所定の記憶領域の工事履歴DB137に記憶・保存する。
(保全計画の作成処理S18)
 ここでは、上述のとおり、「第二の例外」のアクセスが可能となるので、この点を含めて説明を行う。なお、保全計画の作成処理S18の後、図2に示すように、処理フローは工程表の作成処理S12へ戻り、順次、継続してゆく。処理フローが工程表の作成処理S12へ戻った際は、工程表作成部122は、まず、上記所定の記憶領域の将来工事計画DB138に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれらに紐づくプラント情報を全て、当該所定の記憶領域の工事予定DB132にコピーするとともに、客先機器台帳作成部121が当該所定の記憶領域の客先BOM・WBSDB131に新たに記憶・保存したメンテナンスコードCOM及びそれに紐づくプラント情報を全て、当該所定の記憶領域の工事予定DB132にコピーする。
 では、保全計画の作成処理S18を説明する。
 まず、保全計画作成部128は、保全履歴作成部127が上記所定の記憶領域の工事履歴DB137に記憶・保存したメンテナンスコードCOM、グループコードPAREまたは共通グループコードVIS、及びそれらに紐づくプラント情報を全て、当該所定の記録領域の将来工事計画DB138にコピーする。そして、保全計画作成部128は、入出力部11に「保全計画作成画面」を表示し、当該所定の記憶領域の将来工事計画DB138を用いて保全計画の作成処理S18を実行する。「保全計画作成画面」には、保全計画の作成処理S18で入力される複数の項目の入力欄が表示される。具体的には、図3の「保全計画の作成処理(S18)」の欄に示すように、機器情報である客先設備名(BOMレベル1)、客先機器名または機器仕様(BOMレベル2)、機器仕様分類、客先機器詳細名、機器詳細仕様、系列、または点検・計測結果(BOMレベル3)、客先機器部分名または部分仕様(BOMレベル4)、客先機器部品名、部品仕様、または計画数量(BOMレベル5)、並びに、作業情報である作業属性、客先実施項目名、計画工数合計、または予定受注額合計(WBSレベル1)、さらに関連情報である補足説明等を入力するための入力欄を、工程表作成部122が入出力部11に表示する。
 このとき、上記所定の記憶領域の将来工事計画DB138には、メンテナンスコードCOM、グループコードPAREまたは共通グループコードVISを含め、業務アプリケーション部12の各処理部121~127の各処理S11~S17で、順次コピーされてきたプラント情報等の全てが記憶・保存されている。よって、保全計画の作成処理S18の際、入力が必要となる項目であって、且つ、すでにコピーされたプラント情報等については、保全計画作成部128は、当該入力欄の表示の際に、これら情報等を併せて表示させる。
 図3の例では、保全履歴作成部127の処理S17と保全計画作成部128の処理S18で、入力が必要となるプラント情報等は、BOMレベル1~4において同一である。よって、これらのプラント情報は、「保全計画作成画面」でユーザが改めて入力する必要はない。ただし、ユーザは、「保全計画作成画面」の入力欄でこれら情報を修正することができる。
 従って、他の処理S12~S17と同様、保全計画の作成処理S18においてユーザが新規に入力する必要があるのは、計画数量(BOMレベル5)、計画工数合計または予定受注額合計(WBSレベル1)であり、このため、ユーザの入力作業の時間及び労力を削減することができる。
 保全計画作成部128は、ユーザが入力した情報を、上記所定の記憶領域の将来工事計画DB138に記憶・保存する。
 ここで、保全計画作成部128は、保全計画の作成処理S18において、業務アプリケーション部12における他の処理部121~127と異なり、ユーザがアクセス権を持たない記憶領域の将来工事計画DB138に記憶・保存された機器情報の一部及び作業情報の一部を、入出力部11に表示することができる。当該機器情報の一部及び当該作業情報の一部は、秘密情報でなく、いずれのユーザでも共用可能なプラント情報である。
 具体的には、当該機器情報の一部は、メンテナンスコードCOMを生成する際に使用した装置コードに対応するBOMレベルの機器情報である。また、当該作業情報の一部は、メンテナンスコードCOMを生成する際に使用した作業コードに対応するWBSレベルに相当する作業情報である。言い換えれば、共用可能であり、且つ、BOMの複数の階層のうち複数のプラントの全てにおいて機器情報が必ず入力される階層の中で最下層の機器情報と、WBSの複数の階層のうち当該最下層の機器情報に直接的に紐づくWBSの階層の作業情報である。この2つの機器情報と作業情報は、当然のことながらメンテナンスコードCOMに紐づいている。
 ここでは、図3の「保全計画の作成処理(S18)」の欄に黒色の太枠で示したBOMレベル3の機器情報及びWBSレベル1の作業情報が共用可能なプラント情報である。
 上述のように、メンテナンスコードCOMは、ユーザによる管理作業を容易にするため、多数のプラント情報から関連の高いプラント情報に絞り込むことを可能にする検索コードであり、この検索コードを生成する元になった装置コードや作業コードの対応するBOMレベルの機器情報やWBSレベル作業情報は、自ずとユーザに有益なプラント情報となりうる。
 なお、当該太枠内の機器情報または作業情報のうち、一部の機器情報または作業情報を共用可能とすることを希望しない場合、ユーザはフラグ等を立てることで、個別に共用不能とすることができる。また、ここではBOMレベル3の機器情報及びWBSレベル1の作業情報を共用可能なプラント情報としたが、運営業者の方針や全てのユーザの総意によって、少なくともこれらのプラント情報のほか、他の階層のプラント情報まで共用可能の範囲を広げてもよい。
 図7、図8、及び図9に、保全計画作成部128の保全計画の作成処理S18における「保全計画作成画面」の表示例を示す。
 図7(a)は、図1の業者1が特定のメンテナンスコードCOMで所望のプラント情報を検索・抽出した例であり、年表形式で一部のプラント情報を表示した例である。業者1は、顧客Aのプラントと顧客Bのプラントに関する工事を受注した実績があるので、運営業者によって、業者1に対し、記憶領域1と記憶領域3のアクセス権が与えられている。また、現在は、2019年上半期であり、過去、すなわち、2016年~2018年には受注した実績があり、2019年及び将来、すなわち、2019年~2021年は受注実績がまだないが、見積りを提示したまたは見積りを提示予定であるとして、話を進める。
 図7(a)に表示されたプラント情報のうち、「1号ストーカ」、「2号ストーカ」、「1号燃焼装置」、「2号燃焼装置」、「3号燃焼装置」は、保全計画の作成処理S18において共用可能なBOMレベル3の「客先機器詳細名」であり、「ストーカ整備」及び「燃焼装置整備」は、共用可能なWBSレベル1の「客先実施項目名」である。
 また、括弧書で「受注」と記載された欄の金額は、保全計画の作成処理S18において共用可能なWBSレベル1の「予定受注額合計」である。この金額は、公共事業の場合、一般的に顧客により公示されるので、共用可能である。また、「予定受注額合計」は、見積りを提示したまたは見積りを提示予定である場合には、見積金額の合計を意味し、受注に成功した場合には、受注金額の合計を意味する。
 一方、括弧書で「発注」と記載された欄の金額は、保全履歴の作成処理S17のWBSレベル1の「発注金額合計」であるため、業者1の秘密情報であって、共用可能ではない。しかしながら、業者1にとっては、自己の秘密情報であるので、「保全計画作成画面」に表示させることができる。なお、「発注金額合計」は、業者1が、自己の工事を請け負わせた請負業者へ発注した際の金額合計であり、通常、公開されない情報である。
 図7(a)に示すように、年表形式で表示すると、過去から将来まで一覧できるため、容易に将来の受注計画を立てることができる。
 なお、この図7(a)の情報を、アクセス権のない業者2が、管理システム10を使用してメンテナンスコードCOMで検索・抽出した場合の例を、図7(b)に示す。
 図7(b)と図7(a)との相違点は、図7(a)において括弧書で「発注」と記載された欄の金額が、図7(b)では表示されない点である。上述のとおり、図7(a)において括弧書で「発注」と記載された欄の金額は「発注金額合計」であって、保全計画の作成処理S18で使用する共用可能なWBSレベル1のプラント情報ではないため、業者2に開示されない。
 また、図7(a)では、メンテナンスコードCOMを用いて、ユーザである業者1自身がアクセス権を持つ記憶領域のプラント情報のみを抽出・表示した例を示しているが、業者1がアクセス権を持たない記憶領域のプラント情報も抽出・表示できる。業者1がアクセス権を持たない記憶領域のプラント情報については、図7(b)と同様に抽出・表示される。この場合には、「保全計画作成画面」に、図7(a)と同様の画面と、図7(b)と同様の画面が併存する。このように併存して表示すれば、例えば業者1は、競合他社である業者2の計画や金額を参考にすることができるので、顧客に対して魅力的かつ競争力のある計画を提案することができる。
 ここで、図7(a)において、例えば、業者1が、2016年の「1号ストーカ」の「2324万円(受注)」の欄をクリックすると、図8(a)の画面が表示される。図8(a)には、保全計画の作成処理S18において共用可能でない多数の情報、すなわち図3の複数の処理S11~S18でそれぞれ使用する多数のBOMの階層の機器情報及び多数のWBSの階層の作業情報であって、且つ、共用可能なプラント情報のほかに共用可能でないプラント情報も含めて表示される。具体的には、図8(a)の「ストーカ」は「客先機器名」(BOMレベル2)である。「工事準備」や「養生設置」等は「客先作業詳細名」(WBSレベル2)、「見積工数」の下方の各欄の数字は「見積工数」(WBSレベル2)、「見積単価(円/工数)」の下方の各欄の数字は「見積単価」(WBSレベル2)である。「備考」の下方の各欄(ここでは空欄であるが、記載されている場合がある)は「個別情報(関連情報)」である。これら共用可能でないプラント情報は、アクセス権のある業者1のみが表示することができる。
 同様に、図7(a)において、例えば、業者1が、2016年の「1号ストーカ」の「1768万円(発注)」の欄をクリックすると、図8(b)の画面が表示される。
 図8(a)と図8(b)で相違する表示を簡潔に説明する。図8(b)の「発注工数」の下方の各欄の数字は「発注工数」(WBSレベル2)、「発注単価(円/工数)」の下方の各欄の数字は「発注単価」(WBSレベル2)である。また、「請負業者」の下方の各欄の請負業者名(業者α、業者β)は、図3の表に記載がないが、WBSレベル2に紐づく関連情報である。
 上述のように、業者1がアクセス権を持つ記憶領域1及び記憶領域3の将来工事計画DB138には、それぞれの記憶領域に関する処理フローにおいて、順次各DBにコピーされたプラント情報が全て記憶・保存されている。このため、保全計画の作成処理S18において使用しないプラント情報も、表示することができる。図8(a)、図8(b)のように業者1は自己の秘密情報であって詳細な情報を表示できるので、管理作業を促進することができる。
 なお、図7(a)の過去分、例えば2016年の1号ストーカ炉において、業者1が実績額である「2324万円(受注)」をクリックして図8(a)を表示した場合、「客先作業詳細名」の下方の欄の「計測」をさらにクリックすると、保全計画の作成処理S18において、図8(c)の計測値(実測値)が表示される。これは、保全計画の作成処理S18で共用可能な「点検・計測結果」(BOMレベル3)である。図8(c)は共用可能であるので、例えば、業者2が管理システム10を使用して図7(b)を表示した場合、2016年の1号ストーカ炉の「2324万円(受注)」をクリックすると、図8(a)に相当する画面は表示されず、ただちに図8(c)が表示される。
 図7(a)において、例えば、業者1が、2016年の「1号ストーカ」の「2324万円(受注)」の欄をクリックすると、図8(a)の画面が表示される例を説明したが、図8(a)に代わり、図8(a)より情報量を増加させた図9(a)を表示してもよい。
 図8(a)と図9(a)で相違する表示を簡潔に説明する。図9(a)の1つめの「ストーカ」は「機器仕様分類」(BOMレベル3)、2つめの「ストーカ」は「客先機器名」(BOMレベル2)である。「処理能力:200t/d ラン数:2ラン」は「機器詳細仕様」(BOMレベル3)、「01」は「系列」(BOMレベル3)、「830」は「計画工数合計」(BOMレベル3)である。「点検整備」は「作業属性」(WBSレベル1)、並びに、「23,240,000」は「予定受注額合計」(WBSレベル1)である。
 業者1が、保全計画の作成処理S18において、メンテナンスコードCOMを用いてプラント情報を抽出した場合、業者2及び顧客Bにアクセス権があり且つ業者1にアクセス権がない記憶領域2及び記憶領域4の将来工事計画DB138のプラント情報は、共用可能なプラント情報のみ表示されるので、図9(a)に相当する画面として例えば図9(b)の画面が表示される。図9(b)には、共用可能なプラント情報のみ表示される。
 なお、保全計画の作成処理S18において、メンテナンスコードCOMを用いてプラント情報を抽出した場合を説明したが、グループコードPAREまたは共通グループコードVISを用いてプラント情報を抽出した場合も同様である。
 また、自己がアクセス権を持つプラント情報であれば、図7(a)、図8(a)、または図9(a)に限らず、所望のプラント情報を表示させてよい。さらに、表示のレイアウトをいかように変更してもよい。
 以上のように、業務アプリケーション部12の処理部である保全計画作成部128は、業者1の管理作業である保全計画の作成処理S18を実行する場合、業者1がアクセス権を持つ記憶領域1及び記憶領域3から、メンテナンスコードCOMに紐づく複数のBOMの階層の機器情報と、少なくとも、BOMの複数の階層のうち複数のプラントの全てにおいて機器情報が必ず入力される階層の中で最下層の機器情報に直接的に紐づくWBSの階層の作業情報を抽出して表示することができ、また、業者1がアクセス権を持たない記憶領域2及び記憶領域4から、共用可能であり、且つ、当該メンテナンスコードCOMに紐づく当該最下層の機器情報と当該最下層の機器情報に直接的に紐づくWBSの階層の作業情報を抽出して表示することができる。
 従って、管理システム10は、秘密情報の流出を防止することができ、且つ、プラント情報を複数のユーザで共用可能なシステムである。
 また、業者にとって、自己のプラント情報だけでなく、通常はアクセスできない他の業者のプラント情報のうち共用可能かつ有用なプラント情報を参考にできるので、例えば、他の業者よりも魅力的かつ競争力のある見積を作成するなど、管理システム10を用いて管理作業を行う際の作業の質や効率を向上することができる。
 なお、以上の管理システム10の説明では、ユーザが業者である場合に主眼を置いて説明した。しかし、顧客もユーザとして管理システム10を使用することができる。
 顧客は、一般的に、業者が入力したプラント情報を改変する必要がないため、ここでは原則として閲覧することができるのみとして説明する。すなわち、顧客は、プラントの管理作業のうち、原則として閲覧作業のみ可能である。しかしながら、運営業者の方針や全てのユーザの総意によって、業者が入力した一部のプラント情報の改変や、当該プラント情報への追記を許容してもよい。この場合には、顧客も、閲覧作業以外の管理作業ができることになる。
 なお、上述のように、業者は各処理S11~S18で入出力部11に対応する処理画面を表示させて入力作業を行うので、管理作業として当然に閲覧作業を行うことができる。
 顧客が閲覧作業を行う場合は、各処理S11~S18の処理フローで説明した通り、将来工事計画DB138に全てのプラント情報が記憶・保存されているので、保全計画作成部128の「保全計画作成画面」で閲覧作業を行うとよい。
 この場合、顧客は、メンテナンスコードCOM、グループコードPAREまたは共通グループコードVISを用いて所望のプラントに関連するプラント情報を検索・抽出することができる。ただし、ユーザが業者である場合と同様、自己がアクセス権を持たない将来工事計画DB138に記憶・保存されたプラント情報については、共用可能なプラント情報のみ閲覧可能である。
 例えば、図1において、顧客Aの管理作業である閲覧作業を保全計画作成部128の保全計画の作成処理S18で実行する場合、管理システム10は、顧客Aがアクセス権を持つ記憶領域1及び記憶領域2から、メンテナンスコードCOMに紐づく複数のBOMの階層の機器情報と、少なくとも、BOMの複数の階層のうち複数のプラントの全てにおいて機器情報が必ず入力される階層の中で最下層の機器情報に直接的に紐づくWBSの階層の作業情報を抽出して表示することができる。また、管理システム10は、顧客Aがアクセス権を持たない記憶領域3及び記憶領域4から、共用可能であり、且つ、当該メンテナンスコードCOMに紐づく当該最下層の機器情報と当該最下層の機器情報に直接的に紐づくWBSの階層の作業情報を抽出して表示することができる。
 従って、顧客にとって、自己のプラント情報だけでなく、通常はアクセスできない他の顧客のプラント情報のうち共用可能かつ有用なプラント情報を参考にできる。このため、例えば、業者から見積等の提示を受けた際、同様のプラントに対して当該業者が他の顧客へ提示している見積等の概要を知り、比較することができるので、値引き交渉等、発注する業者の選定作業の効率を向上することができる。
 以上に詳述したように、本発明の管理システム10によれば、複数のプラントのプラント情報の一部を、ノウハウの流出を防ぎつつ、複数のユーザ間で共有することができる。また、メンテナンスコードCOM、グループコードPARE、または共通グループコードVISを用いてプラント情報を検索・抽出することで、類似する機器や作業に関する保守作業の内容、保守作業に必要なコスト、保守作業の実施サイクルなどを表示させ、比較することができる。
 ユーザが自己にアクセス権がない共用可能なプラント情報を例外として閲覧することができるので、ユーザが顧客である場合には、業者が提案するサービスの内容や価格の適正さを判断しやすくなり、業者選定を適正かつ容易に行うことができる。また、ユーザが業者である場合、自社の秘密情報を守りつつ、他社の見積提案等の概要を把握して、顧客へ魅力的且つ競争力ある提案を行うことができる。また、多くの業者や顧客が管理システム10を利用することで、競争原理が働き、透明性が高い健全な市場の実現を図ることができる。
 その他、本発明の趣旨を逸脱しない範囲で、上記した実施形態における構成要素を周知の構成要素に置き換えることは適宜可能である。また、この発明の技術範囲は上記の実施形態に限られるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。
 上記したプラント機器情報管理システムによれば、秘密情報の流出を防止しつつ、プラント情報を共用可能とすることができる。
10   プラント機器情報管理システム
11(11-1~11~4)   入出力部
12   業務アプリケーション部
120   メンテナンスコード生成部
121   客先機器台帳作成部
122   工程表作成部
123   見積作成部
124   工事仕様書作成部
125   工事報告書作成部
126   工事日報作成部
127   保全履歴作成部
128   保全計画作成部
129   関連情報分析部
12A   グループコード生成部
13   記憶部
131   客先BOM・WBSDB
132   工事予定DB
133   見積DB
134   発注コストDB
135   機器点検・計測記録DB
136   工事実績DB
137   工事履歴DB
138   将来工事計画DB
14   共通グループコード生成部

Claims (6)

  1.  複数のプラントの機器情報をBOMにより管理し、前記BOMの複数の階層に対応して入力された前記機器情報にそれぞれ対応する装置コードが設定され、前記プラントに対して行う作業情報をWBSにより管理し、前記WBSの複数の階層に対応して入力された前記作業情報にそれぞれ対応する作業コードが設定されるプラント機器情報管理システムであって、
     前記BOMの複数の階層のうち、前記複数のプラントの全てにおいて前記機器情報が必ず入力される前記階層の中で最下層の前記機器情報に対応する前記装置コードと、前記WBSの複数の階層のうち、前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報に対応する前記作業コードとのみに対応したメンテナンスコードを生成するメンテナンスコード生成部と、
     前記メンテナンスコード、並びに、前記メンテナンスコードに紐づく前記機器情報及び前記作業情報を記憶する第一の記憶領域及び第二の記憶領域と、
     前記メンテナンスコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を用いて、前記プラントの管理作業に関する処理を実行する業務アプリケーションとを有し、
     前記第一の記憶領域は、ユーザにアクセス権があり、
     前記第二の記憶領域は、前記ユーザにアクセス権がなく、
     前記業務アプリケーションは、前記ユーザに対する前記処理を実行する場合、前記第一の記憶領域から前記メンテナンスコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出するとともに、前記第二の記憶領域から共用可能であり且つ前記メンテナンスコードに紐づく前記最下層の前記機器情報及び前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出すること
     を特徴とするプラント機器情報管理システム。
  2.  同一の前記メンテナンスコードに紐づく前記機器情報及び前記作業情報に対応する関連情報の文字列を分析する関連情報分析部と、
     前記関連情報分析部が分析した前記文字列のうち、特定の文字列に対応したグループコードを生成し且つ前記グループコードを前記同一のメンテナンスコードに紐づく前記機器情報及び前記作業情報に紐づけるグループコード生成部と
     をさらに有し、
     前記業務アプリケーションは、前記グループコードに紐づく前記機器情報及び前記作業情報を抽出すること
     を特徴とする請求項1に記載のプラント機器情報管理システム。
  3.  第一の前記グループコードに対応する前記特定の文字列と第二の前記グループコードに対応する前記特定の文字列とが互いに異なり且つ互いの意味が同一である場合、共通グループコードを生成し且つ前記共通グループコードを前記第一及び第二のグループコードに紐づく前記機器情報及び前記作業情報に紐づける共通グループコード生成部
     をさらに有し、
     前記業務アプリケーションは、前記共通グループコードに紐づく前記機器情報及び前記作業情報を抽出すること
     を特徴とする請求項2に記載のプラント機器情報管理システム。
  4.  前記ユーザは第一の業者であり、
     前記第一の記憶領域には、前記第一の業者が受注した又は受注予定の顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、
     前記第二の記憶領域には、第二の業者が受注した又は受注予定の前記顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、
     前記業務アプリケーションは、前記第一の業者の前記管理作業を実行する場合、前記第一の記憶領域から前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出するとともに、前記第二の記憶領域から共用可能であり且つ前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく前記最下層の前記機器情報及び前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出すること
     を特徴とする請求項3に記載のプラント機器情報管理システム。
  5.  前記ユーザは第一の顧客であり、
     前記第一の記憶領域には、業者が受注した又は受注予定の前記第一の顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、
     前記第二の記憶領域には、前記業者が受注した又は受注予定の第二の顧客の前記プラントに対応する前記機器情報及び前記作業情報が記憶され、
     前記管理作業は閲覧作業を含み、
     前記業務アプリケーションは、前記第一の顧客の前記閲覧作業を実行する場合、前記第一の記憶領域から前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく複数の前記BOMの階層の前記機器情報及び少なくとも前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出するとともに、前記第二の記憶領域から共用可能であり且つ前記メンテナンスコード、前記グループコード、または前記共通グループコードに紐づく前記最下層の前記機器情報及び前記最下層の前記機器情報に直接的に紐づく前記WBSの階層の前記作業情報を抽出すること
     を特徴とする請求項3に記載のプラント機器情報管理システム。
  6.  前記業務アプリケーションは、保全計画を作成する保全計画作成部であること
     を特徴とする請求項1から請求項5のいずれか一項に記載のプラント機器情報管理システム。
PCT/JP2020/002449 2019-02-21 2020-01-24 プラント機器情報管理システム Ceased WO2020170713A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-029617 2019-02-21
JP2019029617A JP6634665B1 (ja) 2019-02-21 2019-02-21 プラント機器情報管理システム

Publications (1)

Publication Number Publication Date
WO2020170713A1 true WO2020170713A1 (ja) 2020-08-27

Family

ID=69166726

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/002449 Ceased WO2020170713A1 (ja) 2019-02-21 2020-01-24 プラント機器情報管理システム

Country Status (2)

Country Link
JP (1) JP6634665B1 (ja)
WO (1) WO2020170713A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116976861A (zh) * 2023-08-14 2023-10-31 常州润来科技有限公司 一种铜管生产车间设备的养护数据管理方法及系统
JP2025006473A (ja) * 2023-06-29 2025-01-17 キヤノン株式会社 デバイス管理システムおよびその制御方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023079537A (ja) * 2021-11-29 2023-06-08 株式会社バルカー 工事管理の方法、システム、プログラム、装置および記録媒体
WO2023228284A1 (ja) * 2022-05-24 2023-11-30 スパイダープラス株式会社 指摘内容出力システム、指摘内容出力方法及びプログラム

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0113040B2 (ja) * 1982-06-18 1989-03-03 Boeicho Gijutsu Kenkyu Honbucho
JP2006119842A (ja) * 2004-10-20 2006-05-11 Tokyo Electric Power Co Inc:The 発電設備建設管理装置および発電設備建設管理方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001229137A (ja) * 2000-02-17 2001-08-24 Toyo Eng Corp ホスティングシステム
JP2002123569A (ja) * 2000-10-16 2002-04-26 Babcock Hitachi Kk 廃棄物処理施設の設計手法
JP2012128761A (ja) * 2010-12-17 2012-07-05 Mitsubishi Heavy Ind Ltd プラント情報の管理装置
JP6708083B2 (ja) * 2016-09-30 2020-06-10 横河電機株式会社 アプリケーション開発環境提供システム、アプリケーション開発環境提供方法、アプリケーション開発環境提供プログラム、及び端末装置
JP6413040B1 (ja) * 2018-04-20 2018-10-24 三菱重工環境・化学エンジニアリング株式会社 プラント機器情報管理システム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0113040B2 (ja) * 1982-06-18 1989-03-03 Boeicho Gijutsu Kenkyu Honbucho
JP2006119842A (ja) * 2004-10-20 2006-05-11 Tokyo Electric Power Co Inc:The 発電設備建設管理装置および発電設備建設管理方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2025006473A (ja) * 2023-06-29 2025-01-17 キヤノン株式会社 デバイス管理システムおよびその制御方法
JP7654717B2 (ja) 2023-06-29 2025-04-01 キヤノン株式会社 デバイス管理システムおよびその制御方法
CN116976861A (zh) * 2023-08-14 2023-10-31 常州润来科技有限公司 一种铜管生产车间设备的养护数据管理方法及系统
CN116976861B (zh) * 2023-08-14 2024-04-05 常州润来科技有限公司 一种铜管生产车间设备的养护数据管理方法及系统

Also Published As

Publication number Publication date
JP2020135538A (ja) 2020-08-31
JP6634665B1 (ja) 2020-01-22

Similar Documents

Publication Publication Date Title
US11182719B1 (en) Associating executable actions with work steps in work plans generated when creating work orders
US10109017B2 (en) Web data scraping, tokenization, and classification system and method
Castro et al. Benchmarking of best practices: an overview of the academic literature
US11164118B1 (en) Generating work plans which include work steps when creating new work orders
US5802493A (en) Method and apparatus for generating a proposal response
WO2020170713A1 (ja) プラント機器情報管理システム
JP2013536535A (ja) 並列処理開発環境および関連する方法
CN115115257B (zh) 一种基于关系图谱的企业风险预警方法及系统
Huang et al. A two-stage manufacturing partner selection framework for virtual enterprises
KR102054497B1 (ko) Eip 및 erp 통합 시스템
Anwer et al. Comparative analysis of requirement change management challenges between in-house and global software development: findings of literature and industry survey
Neumann The integrated list of agile practices-a tertiary study
JP2020013413A (ja) 判断支援装置および判断支援方法
Jou et al. A study on the improvements of new product development procedure performance–an application of design for Six Sigma in a semi-conductor equipment manufacturer
Van Kleeck et al. Managing bibliographic data quality in a consortial academic library: a case study
US11145021B2 (en) Methods for operating budget information system with cross-reference feature
CN101989304A (zh) 计算机设定计分和评分矩阵系统的自动筛选搜索结果方法
JP5510031B2 (ja) 情報セキュリティ管理支援方法及び装置
JP7709933B2 (ja) ソリューション提案支援方法及びソリューション提案支援システム
Mahmood et al. Identifying the factors that influence task allocation in global software development: preliminary results
JPWO2016186210A1 (ja) 価格設定支援システム、価格設定支援プログラム、価格設定支援方法、知的財産評価支援システム、知的財産評価支援プログラム及び知的財産評価設定支援方法
CA2551243A1 (en) Opportunity management, tracking, and reporting system
JP6519901B1 (ja) プラント機器情報管理システム
Gould Systems analysis and design
Caglayan et al. Revisiting technical debt types and indicators for software systems

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20760132

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20760132

Country of ref document: EP

Kind code of ref document: A1