WO2020090921A1 - 制御システム、制御方法、制御装置、及び、プログラム - Google Patents
制御システム、制御方法、制御装置、及び、プログラム Download PDFInfo
- Publication number
- WO2020090921A1 WO2020090921A1 PCT/JP2019/042646 JP2019042646W WO2020090921A1 WO 2020090921 A1 WO2020090921 A1 WO 2020090921A1 JP 2019042646 W JP2019042646 W JP 2019042646W WO 2020090921 A1 WO2020090921 A1 WO 2020090921A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- control
- rolling
- control unit
- steel sheet
- speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
- B21B37/165—Control of thickness, width, diameter or other transverse dimensions responsive mainly to the measured thickness of the product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/06—Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars
- B22D11/0637—Accessories therefor
- B22D11/068—Accessories therefor for cooling the cast product during its passage through the mould surfaces
- B22D11/0682—Accessories therefor for cooling the cast product during its passage through the mould surfaces by cooling the casting wheel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/48—Tension control; Compression control
- B21B37/50—Tension control; Compression control by looper control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
- B21B38/04—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product for measuring thickness, width, diameter or other transverse dimensions of the product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
- B21B38/06—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product for measuring tension or compression
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/06—Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/06—Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars
- B22D11/0622—Continuous casting of metals, i.e. casting in indefinite lengths into moulds with travelling walls, e.g. with rolls, plates, belts, caterpillars formed by two casting wheels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/46—Roll speed or drive motor control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/48—Tension control; Compression control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/58—Roll-force control; Roll-gap control
- B21B37/62—Roll-force control; Roll-gap control by control of a hydraulic adjusting device
Definitions
- the present invention relates to a control system, a control method, a control device, and a program.
- the present application claims priority based on Japanese Patent Application No. 2018-205622 filed in Japan on October 31, 2018, the contents of which are incorporated herein by reference.
- Patent Document 1 discloses a technique of performing opening and closing of a rolling roll by performing first control and second control.
- the first control is control for opening the rolling roll.
- the material to be rolled in the rolling state is decelerated from the speed at the time of rolling to an extremely low speed, and the tensions of the material to be rolled on the inlet side and the outlet side of the rolling mill are equal to each other. It is controlled so as to be in a non-contact state with the material to be rolled from all the closed states.
- the second control is control for closing the rolling roll.
- the rolling roll is brought into non-contact with the material to be rolled in a state where the speed of the material to be rolled is an extremely low speed lower than the speed at the time of normal rolling and other predetermined conditions are satisfied. After being closed from the open state, it is controlled so as to accelerate to the speed during normal rolling.
- the rolled material conveyed to the rolling mill may have an abnormality such as a hot band or meandering.
- an abnormality such as a hot band or meandering.
- the rolling may not be performed normally. Therefore, it is necessary to open the rolling roll.
- the torque of the electric motor for rotating the pinch roll rapidly changes. Then, the material to be rolled slips on the pinch rolls, the pinch rolls are flawed, and unsteady work such as adjustment or replacement of the pinch rolls is required, which increases the time during which rolling cannot be performed.
- Patent Document 1 does not describe control when there is an abnormality in the material to be rolled that is conveyed to the rolling mill.
- the present invention aims to make it possible to continue rolling stably.
- a first aspect of the present invention is a twin roll type continuous casting machine, a rolling machine for rolling a steel sheet with a pair of rolling rolls, and a conveyance for conveying the steel sheet in the direction of the rolling machine with a pair of conveyance rolls.
- a twin-roll continuous casting machine having a pair of casting rolls that rotate in opposite directions to each other, and the pair of casting rolls is injected into an upper pool of water between the pair of casting rolls. The molten steel was cooled, the molten steel solidified by cooling was pressed, the steel sheet was discharged from between the pair of casting rolls, and the carrier was discharged from the twin roll type continuous casting machine.
- a control system for a casting and rolling facility that conveys a steel sheet in the direction of the rolling mill, a rolling control for rolling the steel sheet at a predetermined roll gap, and at least one of a pair of the rolling rolls does not come into contact with the steel sheet.
- Control A rolling mill control unit that controls the rolling mill by any of the controls including the opening control, a tension control that conveys the steel plate with the steel plate having a predetermined tension, and the conveyance roll has a predetermined rotation speed.
- a rolling mill control unit that controls the rolling mill by any one of controls including a speed control for feeding the steel sheet, and the rolling mill control unit controls to perform the rolling control, and the rolling mill control unit controls the tension.
- Roll is defined as above
- the conveyor control unit controls the tension control to restart
- the rolling mill control unit controls the rolling control to restart. It is a control system that has.
- the rolling mill is controlled by any of the controls including the light reduction control, and it is determined that the pair of transport rolls is stable at the predetermined rotation speed by the speed control started by the control by the second control unit.
- the third control unit controls the rolling mill control unit to perform the light reduction control, and then controls the conveyor control unit to restart the tension control, and then the rolling mill control unit. May control to restart the rolling control.
- the third control unit controls the rolling mill control unit to perform the light reduction control, and then controls the conveyor control unit to restart the tension control, and then determines that the steel sheet has no abnormality.
- the second control unit determines that the rolling mill control unit is Control to perform the opening control And, wherein the conveyor controller may control to perform the speed control.
- the apparatus further includes an abnormality determination unit that determines that the steel sheet has an abnormality, and the rolling control and the tension control started by the control by the first control unit are performed.
- the second control unit controls the rolling mill control unit to perform the opening control
- the conveyor control unit controls the speed control. You may control so that it may perform.
- the abnormality determination unit determines whether or not an abnormal sheet thickness variation has occurred in the steel sheet, based on a current of an electric motor that rotates the rolling roll. May be.
- the rotation speed of the transport roll is continuously within a predetermined range for a predetermined time.
- the transport roll further includes a speed determination unit that determines that the transport roll is stable at the predetermined rotation speed, and after the speed control is started by control by the second control unit, the transport roll is determined by the speed determination unit. Is determined to be stable at the predetermined rotation speed, the third control unit controls the conveyor control unit to restart the tension control, and the rolling mill control unit restarts the rolling control. It may be controlled to do so.
- a second aspect of the present invention is a twin roll type continuous casting machine, a rolling machine for rolling a steel sheet with a pair of rolling rolls, and a conveyance for conveying the steel sheet in the direction of the rolling machine with a pair of conveyance rolls.
- Machine, the rolling control for rolling the steel sheet with a predetermined roll gap, and the rolling mill is controlled by any one of the controls including the opening control for controlling at least one of the pair of rolling rolls so as not to contact the steel sheet.
- Any one of a control including a rolling mill control unit, a tension control for conveying the steel sheet with a predetermined tension for the steel sheet, and a speed control for conveying the steel sheet with a predetermined rotation speed of the conveyance roll.
- a conveyor control unit that controls the conveyor, and the twin-roll continuous casting machine includes a pair of casting rolls that rotate in mutually opposite directions, and a pair of the casting rolls is a pair of the casting rolls.
- the molten steel poured into the upper pool of the is cooled, the molten steel that has been cooled and solidified is pressed, the steel sheet is discharged from between the pair of casting rolls, and the conveyor is the twin roll type continuous.
- a method of controlling a casting and rolling facility that conveys the steel sheet discharged from a casting machine in the direction of the rolling mill, wherein the rolling mill control unit controls to perform the rolling control, and the transporting machine control unit controls the tension.
- the second control step in which the rolling mill control unit controls to perform the opening control and the transporter control unit controls to perform the speed control, and the carrying speed by the speed control started by the control in the second control step.
- the conveyor control unit controls to restart the tension control
- the rolling mill control unit controls to restart the rolling control. And a control step.
- a third aspect of the present invention is a twin roll type continuous casting machine, a rolling machine for rolling a steel sheet with a pair of rolling rolls, and a conveyance for conveying the steel sheet in the direction of the rolling machine with a pair of conveyance rolls.
- the rolling control for rolling the steel sheet with a predetermined roll gap, and the rolling mill is controlled by any of the controls including the opening control for controlling at least one of the pair of rolling rolls so as not to contact the steel sheet.
- Any one of a control including a rolling mill control unit, a tension control for conveying the steel sheet with a predetermined tension for the steel sheet, and a speed control for conveying the steel sheet with a predetermined rotation speed of the conveyance roll.
- a conveyor control unit for controlling the conveyor, and the twin roll type continuous casting machine includes a pair of casting rolls that rotate in mutually opposite directions, and a pair of the casting rolls is a pair of the castings.
- a pair of the casting rolls is a pair of the castings.
- the molten steel injected into the upper pool of the is cooled, the molten steel that has been cooled and solidified is pressure contacted, the steel sheet is discharged from between the pair of casting rolls, and the conveyor is the twin roll type continuous.
- a control device for controlling the casting and rolling equipment for transporting the steel sheet discharged from a casting machine in the direction of the rolling mill wherein the rolling mill control unit controls to perform the rolling control, and the transporting machine control unit is When it is determined that the steel sheet has an abnormality when the first control unit that controls to perform the tension control, the rolling control started by the control by the first control unit, and the tension control are performed.
- the rolling mill control unit controls to perform the opening control, and the conveyor control unit controls to perform the speed control, and the speed control started by the control by the second control unit.
- the transport roll is A third control unit that controls the conveyor control unit to restart the tension control, and controls the rolling mill control unit to restart the rolling control when it is determined that the rotation speed is stable. It is a control device having.
- a fourth aspect of the present invention is a twin roll type continuous casting machine, a rolling machine that rolls a steel sheet with a pair of rolling rolls, and a conveyance that conveys the steel sheet in the direction of the rolling machine with a pair of conveyance rolls.
- the rolling control for rolling the steel sheet with a predetermined roll gap, and the rolling mill is controlled by any of the controls including the opening control for controlling at least one of the pair of rolling rolls so as not to contact the steel sheet.
- Any one of a control including a rolling mill control unit, a tension control for conveying the steel sheet with a predetermined tension for the steel sheet, and a speed control for conveying the steel sheet with a predetermined rotation speed of the conveyance roll.
- a conveyor control unit for controlling the conveyor, and the twin roll type continuous casting machine includes a pair of casting rolls that rotate in mutually opposite directions, and a pair of the casting rolls is a pair of the castings.
- the molten steel injected into the upper pool of the is cooled, the molten steel that has been cooled and solidified is pressure contacted, the steel sheet is discharged from between the pair of casting rolls, and the conveyor is the twin roll type continuous.
- a program for controlling a casting and rolling facility that conveys the steel sheet discharged from a casting machine in the direction of the rolling mill, the computer controlling the rolling mill control unit to perform the rolling control, and the conveying.
- the rolling mill control unit controls to perform the opening control
- the conveyor control unit controls to perform the speed control
- the control by the second control unit is started.
- the speed control When it is determined that the transport roll is stable at the predetermined rotation speed, the transport machine control unit controls to restart the tension control, and the rolling mill control unit controls to restart the rolling control. And a program for functioning as the third control unit.
- rolling can be stably continued.
- FIG. 1 is a diagram showing an example of the configuration of a casting and rolling system 1.
- the casting and rolling system 1 includes a casting and rolling facility 100 and a control system 101, and casts and rolls a steel plate 10 that is a material to be rolled.
- the lower direction is the direction of gravity
- the upper direction is the opposite direction of gravity.
- the casting and rolling equipment 100 includes a twin roll type continuous casting machine 150, a processing chamber 250, a cooling equipment 252, a meandering gauge 254, a conveyor 300, a rolling mill 350, a looper 400, and a coiler 450. ..
- the twin roll type continuous casting machine 150 is a casting machine that manufactures the steel sheet 10 from molten steel, and includes an injection section 160 and a casting section 200.
- the injection unit 160 is a device that injects molten steel into the casting unit 200, and includes a tundish 161 and a stopper 162.
- the tundish 161 is a container that temporarily receives the molten steel injected from the ladle.
- the molten steel poured into the tundish 161 passes through a spout, which is a through hole provided in the lower part of the tundish 161, and is poured into the pool 210 of the casting part 200.
- the stopper 162 is a rod-shaped member that can open and close the spout provided in the lower portion of the tundish 161, is arranged above the spout, and extends in the vertical direction. By moving the stopper 162 in the vertical direction, the amount of molten steel injected from the tundish 161 into the casting unit 200 changes. Further, when the stopper 162 moves to the lowermost position to close the pouring port of the tundish 161, molten steel is no longer injected from the tundish 161 into the casting portion 200.
- the casting unit 200 manufactures the steel plate 10 from the molten steel injected from the injection unit 160.
- the casting unit 200 includes a pair of casting rolls 201, a pair of weirs 202, a casting motor 205, and a casting machine speedometer 206.
- the pair of casting rolls 201 are cylindrical rolls, respectively, and are rotatable around a central axis as a rotation axis.
- the pair of casting rolls 201 have the same shape, and the respective rotation axes are arranged so as to be substantially parallel to each other on the same horizontal plane.
- a gap called a casting roll gap is provided between the pair of casting rolls 201.
- the pair of casting rolls 201 rotate in mutually opposite directions so that the end portion on the casting roll gap side advances downward.
- An area surrounded by the upper side of the casting roll gap and the weir 202 is a molten metal pool 210 in which the molten steel injected from the injection section 160 is accumulated.
- the pair of casting rolls 201 rotates while the molten steel is poured into the pool 210, the casting roll 201 cools and solidifies the molten steel on the surface of the casting roll 201. Then, the pair of casting rolls 201 press-contact the solidified shell which is the solidified molten steel, and discharge the steel sheet 10 downward from the casting roll gap.
- the pair of weirs 202 are provided at both ends of the casting roll 201 in the rotation axis direction and at least above the casting roll gap, and prevent molten steel from spilling from the pool 210 in the rotation axis direction of the casting roll 201.
- the casting electric motor 205 rotates the pair of casting rolls 201.
- the casting machine speed meter 206 measures the rotation speed of the casting electric motor 205.
- the rotation speed of the casting electric motor 205 corresponds to the casting roll speed.
- the casting roll speed is the speed of the surface of the casting roll 201 and is proportional to the rotation speed of the casting electric motor 205.
- the casting roll speed represents the rotation speed of the casting roll 201.
- the processing chamber 250 is filled with gas and prevents the steel sheet 10 discharged from the twin roll type continuous casting machine 150 from being oxidized.
- the cooling facility 252 is arranged between the first carrier 300A and the second carrier 300B, and cools the steel plate 10 by spraying cooling water on the steel plate 10 being transported.
- the meandering gauge 254 measures the meandering amount of the steel plate 10 and outputs it to the main control device 500. When the steel plate 10 is viewed from above, the meandering amount is the expected normal position of the steel plate 10 in the direction perpendicular to the conveying direction of the steel plate 10 and the actual position of the steel plate 10 in the direction perpendicular to the conveying direction of the steel plate 10. It is a quantity that represents the difference between and.
- the meander gauge 254 is arranged in front of the rolling mill 350. More specifically, the meandering gauge 254 is arranged between the second conveyor 300B and the rolling mill 350. However, the meandering gauge 254 may be arranged behind the rolling mill 350. More specifically, the meander gauge 254 may be arranged between the rolling mill 350 and the looper 400.
- the conveyor 300 conveys the steel sheet 10 by pulling in the steel sheet 10 and discharging it in the conveying direction.
- the carrier 300 includes a pair of pinch rolls 301, a carrier motor 303, and a carrier speedometer 304.
- the pair of pinch rolls 301 are cylindrical rolls, respectively, are rotatable around a central axis as a rotation axis, and are arranged vertically. A gap called a pinch roll gap is provided between the pair of pinch rolls 301.
- the pair of pinch rolls 301 convey the steel plate 10 by sandwiching the steel plate 10 in the pinch roll gap and pressing the surface of the steel plate 10 in opposite directions while rotating in opposite directions.
- the pinch roll 301 is also called a transport roll.
- the transport motor 303 rotates the pair of pinch rolls 301.
- the torque of the transport motor 303 is proportional to the current flowing through the transport motor 303.
- the carrier speed meter 304 measures the rotation speed of the carrier motor 303.
- the rotation speed of the transport motor 303 corresponds to the pinch roll speed.
- the pinch roll speed is the speed of the surface of the pinch roll 301 and is proportional to the rotation speed of the transport motor 303.
- the pinch roll speed represents the rotation speed of the pinch roll 301.
- the casting and rolling facility 100 includes, as the carrier 300, a first carrier 300A and a second carrier 300B.
- the first carrier 300A is arranged at a position deviated from the casting roll gap of the twin roll type continuous casting machine 150 when viewed from above.
- the first conveyor 300A conveys the steel sheet 10 by drawing in the steel sheet 10 discharged from the twin roll type continuous casting machine 150 and discharging it toward the second conveyor 300B.
- the 2nd conveyance machine 300B conveys the steel plate 10 to the rolling mill 350 by pulling in the steel plate 10 conveyed from the 1st conveyance machine 300A, and discharging in the direction of the rolling mill 350.
- the pinch roll 301, the transport motor 303, the transport speed meter 304, and the pinch roll speed of the first transport machine 300A are respectively the first pinch roll 301A, the first transport motor 303A, the first transport speed meter 304A, and , First pinch roll speed.
- the pinch roll 301, the transport motor 303, the transport speedometer 304, and the pinch roll speed of the second transport machine 300B are the second pinch roll 301B, the second transport motor 303B, and the second transport speed meter 304B, respectively.
- the second pinch roll speed is the second pinch roll speed.
- the rolling mill 350 rolls the steel plate 10 conveyed from the second conveyor 300B.
- the rolling mill 350 rolls the steel plate 10 while pulling it in, and discharges the steel plate 10 in the transport direction.
- the rolling mill 350 includes a pair of rolling rolls 351, a pair of backup rolls 352, a rolling mill power cylinder 353, a rolling motor 354, and a rolling mill speed meter 355.
- the pair of rolling rolls 351 are columnar rolls, respectively, are rotatable around a central axis as a rotation axis, and are arranged vertically so that the respective rotation axes are parallel to each other.
- a gap called a rolling roll gap is provided between the pair of rolling rolls 351.
- the pair of rolling rolls 351 rolls the steel sheet 10 by sandwiching the steel sheet 10 in the rolling roll gap and sandwiching the steel sheet 10 and rotating in opposite directions while applying a force to press the steel sheet 10.
- the pair of backup rolls 352 are columnar rolls, respectively, are rotatable around the central axis as a rotation axis, and are arranged in a vertical arrangement with the pair of rolling rolls 351 interposed therebetween.
- the upper backup roll 352 is arranged above the upper rolling roll 351 so as to come into contact with the upper rolling roll 351.
- the lower backup roll 352 is arranged below the lower rolling roll 351 so as to come into contact with the lower rolling roll 351.
- the rolling mill power cylinder 353 is, for example, a hydraulic servo cylinder and applies a force to the upper backup roll 352 to change the rolling mill pressing force or the rolling roll gap.
- Roller pressing force is applied to the steel sheet 10 by the transporter power cylinder 302 via the upper rolling roll 351.
- the rolling mill pressing force is a force with which the rolling roll 351 presses the steel plate 10 to roll the steel plate 10.
- the rolling motor 354 rotates the pair of rolling rolls 351.
- the rolling mill speed meter 355 measures the rotation speed of the rolling motor 354.
- the rotation speed of the rolling motor 354 corresponds to the rolling roll speed.
- the rolling roll speed is the speed of the surface of the rolling roll 351 and is proportional to the rotation speed of the rolling motor 354.
- the rolling roll speed represents the rotation speed of the rolling roll 351.
- the looper 400 gives tension to the steel plate 10.
- the looper 400 of this embodiment is a counter balance weight type looper.
- the looper 400 is arranged between the rolling mill 350 and the coiler 450.
- the coiler 450 pulls in the steel plate 10 and winds the steel plate 10.
- the control system 101 controls the casting and rolling equipment 100.
- the control system 101 includes a main control device 500, a conveyor control device 550, a rolling speed control device 570, and a rolling gap control device 580.
- the main control device 500 is an information processing device that controls the casting and rolling facility 100 by controlling the conveyor control device 550, the rolling speed control device 570, and the rolling gap control device 580.
- the carrier control device 550 is an information processing device that controls the pinch roll 301 by controlling the carrier 300 based on the control of the main controller 500. More specifically, the carrier control device 550 controls the pinch roll 301 by controlling the current of the carrier motor 303 included in the carrier 300.
- the control system 101 includes, as the carrier control device 550, a first carrier control device 550A and a second carrier control device 550B.
- the first carrier control device 550A controls the first carrier 300A. More specifically, the first carrier control device 550A adjusts the current of the first carrier motor 303A to control the first pinch roll 301A.
- the second carrier control device 550B controls the second carrier 300B. More specifically, the second conveyor control device 550B adjusts the current of the second conveyor motor 303B to control the second pinch roll 301B.
- an inverter is used as the carrier control device 550.
- the rolling speed control device 570 is an information processing device that controls the rolling roll speed by controlling the rolling mill 350 based on the control of the main control device 500. More specifically, the rolling speed control device 570 controls the electric current of the rolling motor 354 included in the rolling mill 350 to control the rolling roll speed. For example, an inverter is used as the rolling speed control device 570.
- the rolling gap control device 580 is an information processing device that controls the rolling roll gap by controlling the rolling mill 350 based on the control of the main control device 500. More specifically, the rolling gap controller 580 controls the rolling mill power cylinder 353 included in the rolling mill 350 to control the rolling roll gap.
- the rolling gap control device 580 is also called a rolling mill control device.
- the steel plate 10 is discharged from between the pair of casting rolls 201 of the twin roll type continuous casting machine 150.
- the steel plate 10 passes between a pair of first pinch rolls 301A included in the first conveyor 300A and between a pair of second pinch rolls 301B included in the second conveyor 300B.
- the steel sheet 10 is rolled between the pair of rolling rolls 351 of the rolling mill 350 and discharged to the looper 400.
- the steel plate 10 passes through the looper 400 and is wound by the coiler 450.
- FIG. 2A is a diagram showing an example of the hardware configuration of the main control device 500.
- the main control device 500 is a computer such as a PLC (Programmable Logic Controller), and includes a CPU 501, a storage device 502, a communication interface 503, an input device 504, and a bus 505 connecting these.
- the CPU 501 controls the entire main controller 500.
- the CPU 501 executes the processing based on the program stored in the storage device 502 or the like, whereby the functions of the main control device 500 shown in FIG. 3 and the processing shown in FIG. 9 are realized.
- the storage device 502 is a storage medium such as a RAM, a ROM, and a HDD, and stores a program and stores temporary data used by the CPU 501.
- the communication interface 503 controls communication between the main control device 500 and the conveyor control device 550, the rolling speed control device 570, and the rolling gap control device 580.
- the input device 504 receives input from the operator. Various switches and buttons, a touch panel, a keyboard, a mouse, and the like are used as the input device 504.
- the main control device 500 has a function of virtually dividing the CPU 501 and is capable of parallel processing. Further, the CPU 501 can acquire the information of the measuring instrument of the casting and rolling facility 100 via the communication interface 503.
- the measuring instrument of the casting and rolling facility 100 is a device that acquires various information of the casting and rolling facility 100, and includes a meandering gauge 254, a speedometer such as a casting machine speedometer 206 and a rolling mill speedometer 355.
- FIG. 2B is a diagram showing an example of the hardware configuration of the carrier device control device 550.
- the carrier control device 550 is a computer such as an inverter, and includes a CPU 551, a storage device 552, a communication interface 553, and a bus 554 connecting these.
- the CPU 551 controls the entire conveyor control device 550.
- the functions of the conveyor control device 550 shown in FIGS. 4A and 4B are realized by the CPU 551 executing processing based on the program stored in the storage device 552 or the like.
- the storage device 552 is a storage medium such as a RAM, a ROM, or an HDD, and stores a program or stores temporary data used by the CPU 551.
- the communication interface 553 controls communication between the carrier control device 550 and the main controller 500 or the carrier 300.
- the hardware configurations of the rolling speed control device 570 and the rolling gap control device 580 are the same as those of the carrier control device 550.
- the function of the rolling gap control device is realized by the CPU of the rolling gap control device 580 executing processing based on the program stored in the storage device or the like of the rolling gap control device 580.
- FIG. 3 is a diagram showing an example of a functional configuration of the main control device 500.
- the main controller 500 includes a first controller 510, a second controller 511, a third controller 512, an abnormality determiner 514, a speed determiner 515, a tension determiner 516, and a process manager 517. , Is provided.
- the first control unit 510 controls the rolling gap control device 580 to perform rolling control, and controls the conveyor control device 550 to perform tension control. Rolling control and tension control will be described later.
- the second control unit 511 opens the rolling gap control device 580 when it is determined that the steel sheet 10 has an abnormality during the rolling control started by the control by the first control unit 510 and the tension control. Control is performed so that the carrier control device 550 performs speed control. The opening control and the speed control will be described later.
- the third control unit 512 determines that the first pinch roll speed is stable at the first speed and the second pinch roll speed is stable at the second speed by the speed control started by the control by the second control unit 511.
- the conveyor control device 550 controls to restart the tension control
- the rolling gap control device 580 controls to restart the rolling control.
- the first speed and the second speed are predetermined speeds according to the characteristics of the casting and rolling facility 100 and the like.
- the first speed and the second speed may be the same speed.
- the first speed and the second speed are, for example, casting roll speeds when casting and rolling in the casting and rolling facility 100.
- the abnormality determination unit 514 determines that the steel sheet 10 has an abnormality in at least one of a case where it is determined that the steel sheet 10 is meandering and a case where it is determined that the steel sheet 10 has an abnormal thickness variation. judge.
- An example of an abnormal plate thickness variation in the steel plate 10 is a hot band described later.
- the speed determination unit 515 determines that the first pinch roll speed is stable at the first speed when the first pinch roll speed is continuously included in the first speed range during the first speed determination time. .. Further, the speed determination unit 515 determines that the second pinch roll speed is stable at the second speed when the second pinch roll speed is continuously included in the second speed range during the second speed determination time. judge.
- the first speed range is a range of speeds that includes the first speed.
- the second speed range is a range of speeds including the second speed.
- the first speed range, the second speed range, the first speed determination time, and the second speed determination time are set to appropriate values for the casting and rolling facility 100 by simulation, experiment, or the like.
- the tension determination unit 516 determines that the rear surface tension of the first conveyor 300A is the first tension when the rear surface tension of the first conveyor 300A is continuously included in the first tension range during the first tension determination time. It is judged to be stable. In addition, the tension determination unit 516 determines that the rear surface tension of the second conveyor 300B is equal to the rear surface tension when the rear surface tension of the second conveyor 300B is continuously included in the second tension range during the second tension determination time. 2 Determined to be stable with tension.
- the first tension and the second tension are predetermined according to the type of the steel plate 10, the rolling amount, and the like.
- the first tension range is a range of tensions including the first tension.
- the second tension range is a range of tensions including the second tension.
- the first tension range, the second tension range, the first tension determination time, and the second tension determination time are set to appropriate values for the casting and rolling facility 100 by simulation, experiment, or the like.
- the rear surface tension of the carrier 300 is the tension of the steel plate 10 on the rear side (the traveling direction side of the steel plate 10) of the carrier 300.
- the rear surface tension of the first conveyor 300A is the tension between the first pinch roll 301A and the second pinch roll 301B which is the roll behind the first pinch roll 301A.
- the rear surface tension of the second conveyor 300B is the tension between the second pinch roll 301B and the rolling roll 351 which is the roll behind the second pinch roll 301B.
- the rear surface tension of the carrier 300 is also referred to as the rear surface tension of the pinch roll 301.
- the rear surface tension of the first conveyor 300A and the rear surface tension of the second conveyor 300B are also referred to as the rear surface tension of the first pinch roll 301A and the rear surface tension of the second pinch roll 301B, respectively.
- the process management unit 517 controls various functions of the main control device 500.
- the carrier control device 550 has a carrier controller.
- the carrier control unit controls the carrier 300 by any one of tension control and speed control.
- the carrier control unit includes a tension control unit 560 that performs tension control and a speed control unit 561 that performs speed control.
- the carrier control unit may be configured to control the carrier 300 by control other than tension control and speed control.
- FIG. 4A is a diagram for explaining the tension control.
- the tension control is control for the tension control unit 560 to convey the steel sheet 10 by setting the rear surface tension of the pinch roll 301 to a set tension which is a predetermined tension.
- the tension control unit 560 of the carrier control device 550 performs tension control, so that the carrier 300 conveys the steel sheet 10 with the rear surface tension of the pinch roll 301 set as the set tension.
- the tension control unit 560 of the first carrier control device 550A uses the first tension described above as the set tension.
- the tension controller 560 of the second carrier control device 550B uses the second tension already described as the set tension.
- the tension control performed by the tension controller 560 will be described in more detail.
- the tension control unit 560 determines the torque limit based on the set tension.
- the torque limit is an upper limit value of the torque of the transport motor 303 controlled by the tension control unit 560.
- the tension controller 560 controls the torque of the transport motor 303 so as not to exceed the determined torque limit.
- the tension control unit 560 determines that the pinch roll speed of the pinch roll 301 corresponding to the conveyance motor 303 controlled by the tension control unit 560 is the difference speed command amount from the roll speed of the roll adjacent to the rear side.
- the conveyance motor 303 is controlled so as to be delayed. It is assumed that the tension control unit 560 has previously acquired the differential speed command from the main control device 500.
- the pinch roll speed of the pinch roll 301 corresponding to the conveyance motor 303 controlled by the tension control unit 560 becomes slower than the roll speed of the roll adjacent to the rear side by the differential speed command. Therefore, the torque of the carrier electric motor 303 controlled by the tension control unit 560 gradually increases, and finally the torque of the carrier electric motor 303 becomes constant at the torque limit determined in the first process.
- This torque limit corresponds to the set tension. Therefore, the torque of the transport motor 303 reaches the torque limit, and the tension of the steel sheet 10 is stabilized at the set tension.
- the tension control unit 560 may perform the tension control by a method other than the tension control described here.
- FIG. 4B is a diagram for explaining speed control.
- the speed control is a control for the conveyor 300 to convey the steel sheet 10 by setting the pinch roll speed to a set speed which is a predetermined speed.
- the speed control unit 561 of the carrier control device 550 performs speed control, so that the carrier 300 sets the pinch roll speed to the set speed and conveys the steel sheet 10.
- the speed control unit 561 of the first carrier control device 550A uses the first speed described above as the set speed.
- the speed control unit 561 of the second carrier control device 550B uses the second speed described above as the set speed.
- the speed control performed by the speed control unit 561 will be described in more detail.
- the speed control unit 561 calculates the actual value of the pinch roll speed based on the rotation speed of the transport motor 303 obtained from the transport speedometer 304. Next, the speed control unit 561 determines the current to be passed through the conveyance motor 303 based on the difference between the actual value of the pinch roll speed and the set speed so that the pinch roll speed approaches the set speed. Next, the speed control unit 561 controls so that the determined electric current flows through the carrier electric motor 303. By repeating this process, the speed control unit 561 controls the conveyor 300 to convey the steel sheet 10 with the pinch roll speed set to the set speed.
- the rolling speed control device 570 includes a speed control unit.
- the speed control unit of the rolling speed control device 570 uses the same control method as the speed control unit 561 of the conveyor control device 550 to cause the rolling mill 350 to set the rolling roll speed to the predetermined rolling roll speed and convey the steel sheet 10.
- the rolling motor 354 is controlled so that it does.
- the rolling gap control device 580 has a rolling mill control unit.
- the rolling mill control unit controls the rolling mill 350 by any of control including rolling control, opening control, and light reduction control.
- the rolling mill control unit includes a rolling control unit that performs rolling control, an opening control unit that performs opening control, and a light reduction control unit that performs light reduction control.
- the rolling mill control unit may be configured to be able to control the rolling mill 350 by control other than rolling control, opening control, and light reduction control.
- the rolling control unit performs rolling control that controls the rolling mill power cylinder 353 of the rolling mill 350 to roll the steel sheet 10 with the rolling roll gap set to the first rolling roll gap.
- the tension control unit 560 of the carrier control device 550 controls the tension. This is because, for example, when rolling the steel sheet 10 under rolling control, a preset tension is applied to the steel sheet 10 so that the rolling can be stably performed.
- the first rolling roll gap is predetermined as a rolling parameter.
- the opening control unit performs opening control for controlling the rolling mill power cylinder 353 so that at least one of the pair of rolling rolls 351 does not come into contact with the steel plate 10. A state in which at least one of the pair of rolling rolls 351 does not contact the steel plate 10 is called roll opening.
- the light reduction control unit performs light reduction control for controlling the rolling mill power cylinder 353 of the rolling mill 350 so that the rolling roll gap is set to the second rolling roll gap and the steel sheet 10 is slightly reduced.
- the second rolling roll gap is larger than the first rolling roll gap.
- FIG. 5A is a perspective view showing an example of the casting unit 200 of the twin roll type continuous casting machine 150.
- FIG. 5B is a plan view showing an example of the casting unit 200.
- FIG. 5C is a perspective view showing an example of the steel plate 10 on which the hot band 13 is formed.
- the hot band 13 is a thick portion of the steel plate 10 formed by the metal 12 on the side surface of the weir 202 entering during casting. The base metal 12 on the side surface of the weir 202 as shown in FIG.
- 5A is formed by solidification of the molten steel 11 adhering to the side surface of the weir 202 due to fluctuations in the molten metal level (surface height of the molten steel 11) during casting. To be done.
- the base metal 12 on the side surface of the weir 202 is peeled off from the weir 202 when the lower end of the base metal 12 is caught in the casting roll 201, and as shown in FIG. 5B, between the pair of casting rolls 201. It can get in.
- the metal 12 enters between the pair of casting rolls 201 the hardness of the metal 12 opens the space between the pair of casting rolls 201, and as shown in FIG.
- the steel plate 10 on which the hot band 13 is formed is It is discharged from the twin roll type continuous casting machine 150.
- molten steel discharged from the tundish is cooled through the mold and conveyed to a plurality of rolls to manufacture a steel sheet.
- a powder having a function as a heat insulating material is put in the mold. This powder flows between the mold and the solidifying shell and also acts as a lubricant. Therefore, the amount of metal adhered to the side surface of the mold due to fluctuations in the level of the molten metal is small.
- twin roll type continuous casting machine generally, rapid cooling is required, and therefore, powder having a function as a heat insulating material and a lubricant is not added. Therefore, it is inferior in lubricity as compared with an ordinary continuous casting machine. Therefore, in the twin roll type continuous casting machine, the amount of the bare metal 12 adhered to the side surface of the weir 202 is larger than the amount of the bare metal adhered to the side surface of the mold in the normal continuous casting machine. Therefore, in the case of a twin roll type continuous casting machine, generally, the hot band 13 is easily formed.
- FIG. 6 is a diagram showing a rolling motor current graph 600 and a rolling roll speed graph 601.
- the rolling motor current graph 600 of FIG. 6 shows the time change of the current flowing through the rolling motor 354 when casting and rolling are actually performed in the casting and rolling system 1.
- a rolling roll speed graph 601 in FIG. 6 shows a time change of the rolling roll speed when casting and rolling are actually performed in the casting and rolling system 1.
- the unit of the rolling roll speed is represented by mpm (meter / minute).
- the rolling speed control device 570 controls the speed control unit to perform speed control
- the rolling gap control device 580 controls the rolling control unit to perform rolling control.
- the hot band 13 of the steel plate 10 reached the rolling roll 351 at a time of about 57.4 (sec).
- the current of the rolling motor 354 increases and reaches the upper limit.
- the rolling roll speed graph 601 after the hot band 13 of the steel plate 10 reaches the rolling roll 351, the rolling roll speed becomes 0 (zero), and the conveyance of the steel plate 10 in the rolling mill 350 is stopped.
- the rolling speed control device 570 and the rolling gap control device 580 operate as follows.
- a force in the direction of increasing the rolling roll gap is applied to the rolling roll 351.
- the rolling control unit of the rolling gap control device 580 causes the rolling mill power cylinder 353 to force the upper rolling roll 351 to roll down the steel sheet 10 with a strong force so that the rolling roll gap becomes the first rolling roll gap.
- the speed control unit of the rolling speed control device 570 performs control so as to maintain the rolling roll speed.
- the speed control unit of the rolling speed control device 570 increases the electric current of the rolling motor 354 to maintain the rolling roll speed, and the rolling motor 354. Increase the torque of. In this way, the electric current of the rolling motor 354 reaches the upper limit. Then, finally, the torque of the rolling motor 354 cannot be increased, the rolling roll 351 cannot counter the force of rolling the steel sheet 10, and the rolling roll speed becomes 0 (zero).
- the current of the rolling motor 354 increases and reaches the upper limit. From this, it can be determined that the hot band 13 reaches the rolling motor 354 when the current of the rolling motor 354 exceeds the current threshold value I1 continuously during the hot band determination time T1.
- the current threshold value I1 is a threshold value of the current used for determining the hot band 13.
- the current threshold I1 is a current that does not flow through the rolling motor 354 during normal rolling, and is a current that flows through the rolling motor 354 after the hot band 13 reaches the rolling roll 351.
- the current threshold I1 is predetermined based on the rolling motor current graph 600.
- the hot band determination time T1 is predetermined in order to prevent erroneous determination.
- FIG. 7 is a cross-sectional view showing an example of the steel plate 10.
- the wedge amount of the steel plate 10 is a difference in thickness between both ends of the steel plate 10.
- the wedge amount of the steel plate 10 is defined by the following formula (1).
- Wedge amount
- ta is the thickness of the steel sheet 10 at a position of w (mm) from one end of the steel sheet 10 in the width direction.
- tb is the thickness of the steel plate 10 at the position of w (mm) from the other end of the steel plate 10 in the width direction. For example, 25 (mm) is used as w (mm).
- twin roll type continuous casting machine 150 a pair of casting rolls 201 is used to form a plate-shaped steel plate 10 from molten steel.
- the wedge amount tends to be large because there are many unstable operating factors such as the occurrence of hot bands as compared with the normal continuous casting machine.
- the rolls are opened, and waiting for a portion of the steel plate 10 having a large wedge amount to pass through the rolling rolls 351 may cause the devices and the like to malfunction due to the meandering of the steel plate 10. Can be avoided.
- FIG. 8A is a diagram showing a casting roll speed graph showing the change over time of the casting roll speed.
- FIG. 8B is a diagram showing a first pinch roll speed graph showing the change over time of the first pinch roll speed.
- FIG. 8C is a diagram showing a second pinch roll speed graph showing a time change of the second pinch roll speed.
- FIG. 8D is a diagram showing a rolling roll speed graph showing the time change of the rolling roll speed.
- the casting and rolling system as a comparative example has the same configuration as the casting and rolling system 1 of the present embodiment. However, unlike the operation of the casting and rolling system 1 of the present embodiment which will be described later with reference to FIG. 9, in the casting and rolling system of the comparative example, the conveyor control device 550 performs only tension control.
- the data of FIG. 8A to FIG. 8D are data when casting and rolling were actually performed using the casting and rolling system as the comparative example.
- the tension control unit 560 of the first carrier control device 550A and the tension control unit 560 of the second carrier control device 550B perform tension control.
- the rolling control unit of the rolling gap control device 580 controls rolling. However, at a time of about 91 (sec), the rolling control unit of the rolling gap control device 580 stops the rolling control, the opening control unit of the rolling gap control device 580 starts the opening control, and the roll is opened.
- the tension control unit 560 continues the tension control even after the roll is opened. Further, as will be described later, at a time of about 93 (sec), the operation of the casting and rolling system 1 is stopped in the casting and rolling system of the comparative example.
- the casting roll speed, the first pinch roll speed, the second pinch roll speed, and the rolling roll speed are almost the same speed until the roll is opened. Therefore, it can be said that the steel plate 10 does not slip.
- the plate slippage of the steel plate 10 is a state in which the steel plate 10 is slipping on a roll such as the pinch roll 301. Even if the casting roll speed and the rolling roll speed are released, the casting roll speed and the rolling roll speed are maintained at positive values, as shown from time 91 (sec) to time 93 (sec) in FIGS. 8A and 8D. 8A to 8D, the roll is released at a time of about 91 (sec).
- the first pinch roll speed and the second pinch roll speed change rapidly and become negative as shown in the vicinity of time 91 (sec) in FIGS. 8B and 8C. It becomes a value.
- the fact that the first pinch roll speed and the second pinch roll speed are negative values means that the first pinch roll 301A and the second pinch roll 301B move the steel plate 10 in the direction opposite to the direction of the rolling mill 350. Indicates that it is rotating in the reverse direction so that it is transported.
- the steel sheet 10 is conveyed at a speed close to the casting roll speed in the casting and rolling equipment 100, and is always conveyed in the direction of the rolling mill 350 when viewed from the pinch roll 301 in the time zones before and after the roll opening.
- the tension control unit 560 of the first conveyor control device 550A largely changes the torque of the first conveyor motor 303A in order to maintain the tension of the steel plate 10 at the first tension.
- the rotation speed of the first conveyance motor 303A fluctuates greatly.
- plate slip of the steel plate 10 occurs on the first pinch roll 301A.
- the plate slip of the steel plate 10 similarly occurs. Further, as can be seen from the first pinch roll speed graph of FIG.
- FIG. 9 is a flowchart showing an example of the control process.
- the control process of the present embodiment can eliminate the plate slip of the steel plate 10 in a short time.
- the control process of FIG. 9 is executed by the main control device 500.
- the process management unit 517 acquires various parameters of the casting and rolling facility 100 by referring to the storage device 502 or receiving information from an external device by network communication. Then, the process management unit 517 initializes the casting and rolling equipment 100 so as to perform the operation corresponding to the acquired various parameters.
- the various parameters acquired by the process management unit 517 include the already-described first tension, first tension range, first tension determination time, second tension, second tension range, second tension determination time, first speed, The first speed range, the first speed determination time, the second speed, the second speed range, the second speed determination time, the first rolling roll gap, the second rolling roll gap, and the like are included.
- the first control unit 510 controls the casting and rolling facility 100 to perform casting and rolling. At this time, the first control unit 510 controls the rolling control unit of the rolling gap control device 580 to perform rolling control by transmitting a command to the rolling gap control device 580 via the communication interface 503.
- the first control unit 510 transmits a command to the first carrier control device 550A and the second carrier control device 550B via the communication interface 503, so that the tension control unit of the first carrier control device 550A. 560 controls the tension control, and the tension control unit 560 of the second conveyor control device 550B controls the tension control. Further, the first control unit 510 controls the speed control unit of the rolling speed control device 570 to perform speed control by transmitting a command to the rolling speed control device 570 via the communication interface 503.
- the process management unit 517 performs control for starting the processes of S102, S103, and S104 in parallel.
- the abnormality determination unit 514 determines whether or not the steel plate 10 is meandering based on the meandering amount acquired from the meandering gauge 254.
- the abnormality determining unit 514 determines that the steel plate 10 is meandering when the meandering amount continuously exceeds the meandering amount range during the meandering determination time.
- the meandering amount range is set in advance by an experiment or the like as a range satisfying a condition that the steel plate 10 does not come into contact with a device or the like.
- the meandering determination time is for preventing erroneous detection of meandering of the steel plate 10, and is determined in advance by experiments, simulations, or the like. If it is determined that the steel plate 10 is meandering, the abnormality determination unit 514 advances the process to S105, and if it is determined that the steel plate 10 is not meandering, the abnormality determination unit 514 executes S102 again.
- the abnormality determination unit 514 determines whether or not the hot band 13 is generated based on the current flowing through the rolling motor 354. As described above, the abnormality determination unit 514 determines that the hot band 13 is generated when the current of the rolling motor 354 continuously exceeds the current threshold value I1 during the hot band determination time T1. .. The abnormality determination unit 514 may obtain the current flowing through the rolling motor 354 from the rolling speed control device 570 or may obtain from the ammeter that measures the current of the rolling motor 354. If it is determined that the hot band 13 has occurred, the abnormality determination unit 514 advances the process to S105, and if it determines that the hot band 13 has not occurred, the abnormality determination unit 514 executes S103 again.
- the abnormality determination unit 514 determines whether or not the operator has issued a release instruction based on the operation of the operator received by the input device 504 included in the main control device 500, the information received from the external device, and the like. If the abnormality determination unit 514 determines that the operator has issued the opening instruction, the process proceeds to step S105, and if it is determined that the operator has not issued the opening instruction, the abnormality determination unit 514 executes step S104 again.
- the abnormality determination unit 514 advances the process to S106.
- the processing management unit 517 stops the processing being executed in S102, S103, and S104 when at least one of S102, S103, and S104 is executed. Take control.
- the process management unit 517 performs control for starting the processes of S107, S108, and S109 in parallel.
- the second control unit 511 controls the control method of the first pinch roll 301A to change from tension control to speed control. More specifically, the second control unit 511 transmits a command to the first carrier control device 550A via the communication interface 503, so that the speed control unit 561 of the first carrier control device 550A controls the speed. Control to start. After that, the second control unit 511 advances the processing to S110. In S108, the second control unit 511 controls the control method of the second pinch roll 301B to change from tension control to speed control. More specifically, the second control unit 511 transmits a command to the second carrier control device 550B via the communication interface 503 so that the speed control unit 561 of the second carrier control device 550B controls the speed. Control to start.
- the second control unit 511 advances the processing to S110.
- the second control unit 511 controls to open the roll. More specifically, the second control unit 511 controls the opening control unit of the rolling gap control device 580 to start the opening control by transmitting a command to the rolling gap control device 580 via the communication interface 503. .. Thereby, the roll is released. After that, the second control unit 511 advances the processing to S110.
- the process management unit 517 advances the process to S111 after the processes of S107, S108, and S109 are completed.
- the process management unit 517 performs control for starting the processes of S112, S113, and S114 in parallel.
- the speed determination unit 515 determines whether or not the first standby time has elapsed since the processing of S107 was performed.
- the first standby time is the time from when the roll is opened and the speed control is started until the first pinch roll speed and the second pinch roll speed are stabilized by the speed control, and is determined by performing experiments or simulations in advance. Be done.
- the first waiting time is shown as TFr in FIGS. 10B and 10C described later.
- the speed determination unit 515 determines that the first standby time has elapsed after the processing of S107 is performed, the processing proceeds to S115, and if it is determined that the first standby time has not elapsed, the speed determination unit 515 performs S112 again. Run.
- the speed determination unit 515 determines whether or not the first pinch roll speed is stable at the first speed. As described above, the speed determination unit 515 determines that the first pinch roll speed is the first speed when the first pinch roll speed is continuously included in the first speed range during the first speed determination time. Judge as stable. The speed determination unit 515 acquires the first pinch roll speed from, for example, the first carrier control device 550A. When the speed determination unit 515 determines that the first pinch roll speed is stable at the first speed, the process proceeds to S115, and when it is determined that the first pinch roll speed is not stable at the first speed, S113 is performed again. To execute. The first speed, the first speed range, and the first speed determination time are shown as V1, R1, and TV1 in FIG. 10B described later, respectively.
- the speed determination unit 515 determines whether the second pinch roll speed is stable at the second speed. As described above, when the second pinch roll speed is continuously included in the second speed range during the second speed determination time, the speed determination unit 515 determines that the second pinch roll speed is the second speed. It is judged to be stable. The speed determination unit 515 acquires the second pinch roll speed from, for example, the second carrier control device 550B. When the speed determination unit 515 determines that the second pinch roll speed is stable at the second speed, the process proceeds to S115, and when it is determined that the second pinch roll speed is not stable at the second speed, S114 is performed again. To execute. The second speed, the second speed range, and the second speed determination time are shown as V2, R2, and TV2 in FIG. 10C described later, respectively. In S112, S113, and S114 described above, the speed determination unit 515 performs a process of waiting until the first pinch roll speed and the second pinch roll speed are stabilized by the speed control.
- the process management unit 517 advances the process to S116 after the processes of S112, S113, and S114 are completed.
- the third control unit 512 sends a command to the rolling gap control device 580 via the communication interface 503 to control the light rolling reduction control unit of the rolling gap control device 580 to start the light rolling reduction control.
- the rolling mill 350 starts the process of lightly rolling down the steel plate 10.
- the abnormality of the steel sheet 10 such as the hot band 13 of the steel sheet 10 or the portion of the steel sheet 10 having a large wedge amount causing the meandering of the steel sheet 10 is caused. It is considered that the portion passes through the rolling roll 351.
- the process management unit 517 performs control for starting the processes of S118 and S119 in parallel.
- the third control unit 512 controls the control method of the first pinch roll 301A to change from speed control to tension control. More specifically, the third control unit 512 transmits a command to the first carrier control device 550A via the communication interface 503, so that the tension control unit 560 of the first carrier control device 550A controls the tension. Control to start. After that, the third control unit 512 advances the process to S120. In S119, the third control unit 512 controls the control method of the second pinch roll 301B to change from speed control to tension control. More specifically, the third control unit 512 transmits a command to the second carrier control device 550B via the communication interface 503, so that the tension control unit 560 of the second carrier control device 550B controls the tension. Control to start. After that, the third control unit 512 advances the process to S120. In S120, the process management unit 517 advances the process to S121 after the processes of S118 and S119 are completed.
- the process management unit 517 performs control for starting the processes of S122, S123, and S124 in parallel.
- the tension determination unit 516 determines whether or not the second standby time has elapsed since the processing of S118 was performed.
- the second standby time is the time from the start of tension control until the rear surface tension of the first pinch roll 301A and the rear surface tension of the second pinch roll 301B are stabilized, and is determined by performing experiments or simulations in advance. .. If the tension determination unit 516 determines that the second standby time has elapsed after the processing of S118 is performed, the process proceeds to S125, and if it is determined that the second standby time has not elapsed, the tension determination unit 516 performs S122 again. Run.
- the tension determination unit 516 determines whether the rear surface tension of the first pinch roll 301A is stable at the first tension. As described above, the tension determination unit 516 determines that when the rear surface tension of the first pinch roll 301A continuously reaches the first tension range during the first tension determination time, the tension of the first pinch roll 301A increases. It is determined that the rear surface tension is stable at the first tension. The tension determination unit 516 calculates and uses the rear surface tension of the first pinch roll 301A, for example, based on the output of an ammeter that measures the current of the first transport motor 303A.
- the tension determination unit 516 determines whether the rear surface tension of the second pinch roll 301B is stable at the second tension. As described above, the tension determining unit 516 continuously adjusts the rear surface tension of the second pinch roll 301B in the second pinch roll 301B when the rear surface tension of the second pinch roll 301B continuously reaches the second tension range during the second tension determination time. It is determined that the rear surface tension is stable at the second tension.
- the tension determination unit 516 calculates and uses the rear surface tension of the second pinch roll 301B based on, for example, the output of an ammeter that measures the current of the second transport motor 303B.
- the tension determination unit 516 determines that the rear surface tension of the second pinch roll 301B is stable at the second tension, the process proceeds to S125, and when it is determined that the rear surface tension is not stable at the second tension, S124 is executed again. .. In S122, S123, and S124 described above, the tension determination unit 516 performs a process of waiting until the tension of the steel sheet 10 is stabilized by tension control.
- the process management unit 517 advances the process to S126 after the processes of S122, S123, and S124 are completed.
- the abnormality determination unit 514 determines whether or not the steel plate 10 is meandering based on the meandering amount acquired from the meandering meter 254 in the same manner as in S102. If it is determined that the steel plate 10 is meandering, the abnormality determination unit 514 returns the process to S106, and if it is determined that the steel plate 10 is not meandering, the abnormality determination unit 514 advances the process to S127.
- the abnormality determination unit 514 determines whether or not the hot band 13 is generated based on the current flowing through the rolling motor 354, in the same manner as in S103. If it is determined that the hot band 13 has occurred, the abnormality determination unit 514 returns the process to S106, and if it determines that the hot band 13 has not occurred, the abnormality determination unit 514 advances the process to S128.
- the third control unit 512 controls the rolling control unit of the rolling gap control device 580 to restart rolling control by transmitting a command to the rolling gap control device 580 via the communication interface 503. Thereby, the rolling mill 350 restarts the process of rolling the steel sheet 10. After that, the process management unit 517 ends the process of FIG. 9.
- FIG. 10A is a diagram showing a casting roll speed graph showing the change over time of the casting roll speed.
- FIG. 10B is a diagram showing a first pinch roll speed graph showing a change with time of the first pinch roll speed.
- FIG. 10C is a diagram showing a second pinch roll speed graph showing the time change of the second pinch roll speed.
- FIG. 10D is a diagram showing a rolling roll speed graph showing a time change of the rolling roll speed.
- V1, R1, and TV1 in FIG. 10B are the first speed, the first speed range, and the first speed determination time, which have already been described.
- V2, R2, and TV2 in FIG. 10C are the second speed, the second speed range, and the second speed determination time, which have already been described, respectively.
- TFr in FIGS. 10B and 10C is the first waiting time which has already been described.
- the operator issues a release instruction, and at about time 148.6 (sec), the roll is released in the process of S109 of FIG.
- the control method of the pinch roll 301 changes from tension control to speed control. Is changed to.
- the control method of the pinch roll 301 is changed from the speed control to the tension control in S118 and S119.
- the casting roll speed and the rolling roll speed are maintained at positive values before and after the roll opening, as shown in the vicinity of the time when the roll is opened in FIGS. 10A and 10D, about 148.5 (sec).
- the first pinch roll speed and the second pinch roll speed are rapidly increased before and after the roll is released. It changes and changes from a positive value to a negative value. Therefore, similarly to the operation example described with reference to FIGS. 8A to 8D, immediately after the roll opening, the plate slip of the steel plate 10 occurs in the first pinch roll 301A and the second pinch roll 301B. Can be said to be.
- the first pinch roll speed and the second pinch roll speed are the casting roll speed and the rolling roll within 0.5 (sec) after the roll is opened. It is the same speed as the speed. Therefore, it can be said that the plate slip of the steel plate 10 is resolved within 0.5 (sec) after the roll is opened.
- the control process of FIG. 9 eliminates the plate slip of the steel plate 10 in a short time even when the roll is opened. Then, unlike the operation of the casting and rolling system which is the comparative example described with reference to FIGS. 8A to 8D, in the casting and rolling system 1 of the present embodiment, normal rolling can be resumed even after the roll is opened.
- the plate slip of the steel plate 10 can be eliminated, and the occurrence of unsteady work such as replacement of the pinch roll 301 can be suppressed. Therefore, the rolling of the steel sheet 10 can be stably continued.
- the third control unit 512 controls so that the rolling gap control device 580 restarts the rolling control after the conveyor control device 550 restarts the tension control. Therefore, rolling is automatically restarted. Therefore, the rolling of the steel sheet 10 can be stably continued.
- the twin roll type continuous casting machine 150 discharges the steel plate 10 to the conveyor 300.
- the twin roll type continuous casting machine 150 in the production of the steel sheet, the twin roll type continuous casting machine 150 continuously winds up the steel sheet 10 after hot rolling. There is molten steel in it, and it is being cooled rapidly. Therefore, the molten steel between the pair of casting rolls 201 has a high solid ratio in the solid-liquid coexisting state.
- the molten steel is solidified in the pool 210 or between the pair of casting rolls 201.
- Such unsteady work takes a lot of time.
- the transportation of the steel plate 10 does not stop. Therefore, the unsteady work for removing the solidified molten steel becomes unnecessary. Therefore, the rolling of the steel sheet 10 can be stably continued.
- the third control unit 512 controls the tension control to restart after the rolling gap control device 580 controls to perform the light reduction control. Therefore, when the tension control is restarted, the rolling roll 351 is slightly rolling down the steel plate 10. Therefore, the steel plate 10 between the pinch roll 301 and the rolling roll 351 can be tensioned by tension control.
- the second control unit 511 controls the rolling gap control device 580 to perform the opening control
- the carrier control device 550 controls the speed control. Therefore, the rolling control is not restarted until the abnormality of the steel plate 10 is resolved. Therefore, when the rolling control is restarted, it is possible to reliably perform normal rolling.
- the abnormality determination unit 514 determines that the steel sheet 10 has an abnormality in at least one of the case where it is determined that the steel sheet 10 is meandering and the case where it is determined that the steel sheet 10 has an abnormal plate thickness variation. Judge that there is. Therefore, in the casting and rolling system 1, it is possible to reliably detect a normally assumed abnormality of the steel plate 10.
- the abnormality determination unit 514 determines whether or not the hot band 13 is generated in the steel plate 10 based on the current of the rolling motor 354. Therefore, it is possible to perform a simple process for determining the occurrence of the hot band 13.
- the speed determination unit 515 determines that the first pinch roll speed is stable at the first speed when the first pinch roll speed is continuously within the first speed range during the first speed determination time. judge. Further, the speed determination unit 515 determines that the second pinch roll speed is stable at the second speed when the second pinch roll speed is continuously within the second speed range during the second speed determination time. judge. Therefore, erroneous detection that the pinch roll speed is stable can be prevented.
- the tension determination unit 516 controls the rear surface tension of the transport device 300.
- the tension determination unit 516 may be configured to control the front tension of the transport device 300. It is the tension of the steel plate 10 on the front side of the carrier 300 (the side opposite to the traveling direction of the steel plate 10).
- the casting and rolling facility 100 includes two conveyors 300, but the conveyors 300 may be one or three or more.
- the main control device 500 includes the input device 504.
- the carrier control device 550 may include an input device that receives an input from the operator. When the carrier device control device 550 receives an opening instruction from the operator via the input device, the carrier device control device 550 transmits information indicating that the opening instruction has been received to the main control device 500.
- the abnormality determination unit 514 of the main control device 500 determines that the operator has issued the opening instruction based on the information received from the carrier control device 550.
- At least one of the rolling speed control device 570 and the rolling gap control device 580 may include an input device that receives an input from an operator.
- rolling can be stably continued.
- Casting and rolling system 100 Casting and rolling equipment 101 Control system 150 Twin roll type continuous casting machine 300 Conveyor 350 Rolling machine 400 Looper 450 Coiler 500 Main controller 550 Conveyor controller 570 Rolling speed controller 580 Rolling gap controller
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
- Metal Rolling (AREA)
Abstract
Description
本願は、2018年10月31日に、日本に出願された特願2018-205622号に基づき優先権を主張し、その内容をここに援用する。
しかしながら、被圧延材に所定の張力を与える張力制御を行っている状態で圧延ロールを急に開放すると、ピンチロールを回転させる電動機のトルクが急激に変動する。そして、被圧延材がピンチロールに対して滑って、ピンチロールに疵がついて、ピンチロールの調整や交換等の非定常作業が必要になり、圧延できなくなる時間が増える。また、被圧延材がピンチロールに対して滑った状態が継続すると、被圧延材に所定の張力を与えることができず、被圧延材を正常に圧延できない状態が継続する。特許文献1には、圧延機に搬送される被圧延材に異常がある場合の制御については記載がない。
(1)本発明の第一の態様は、双ロール式連続鋳造機と、一対の圧延ロールで鋼板を圧延する圧延機と、一対の搬送ロールで前記鋼板を前記圧延機の方向に搬送する搬送機と、を有し、前記双ロール式連続鋳造機は、互いに逆方向に回転する一対の鋳造ロールを備え、一対の前記鋳造ロールは、一対の前記鋳造ロールの間の上側の湯溜まりに注入された溶鋼を冷却し、冷却されて凝固した前記溶鋼を圧接して、一対の前記鋳造ロールの間から前記鋼板を排出し、前記搬送機は、前記双ロール式連続鋳造機から排出された前記鋼板を前記圧延機の方向に搬送する鋳造圧延設備の制御システムであって、定められたロールギャップで前記鋼板を圧延する圧延制御、及び、一対の前記圧延ロールの少なくとも一方が前記鋼板と接触しないよう制御する開放制御を含む制御の何れかで前記圧延機を制御する圧延機制御部と、前記鋼板を定められた張力にして前記鋼板を搬送する張力制御、及び、前記搬送ロールを定められた回転速度にして前記鋼板を搬送する速度制御を含む制御の何れかで前記搬送機を制御する搬送機制御部と、前記圧延機制御部が前記圧延制御を行うよう制御し、前記搬送機制御部が前記張力制御を行うよう制御する第1制御部と、前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する第2制御部と、前記第2制御部による制御で開始した前記速度制御で前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御する第3制御部と、を有する制御システムである。
(2)上記(1)に記載の制御システムでは、前記圧延機制御部は、前記圧延制御、前記開放制御、及び、前記定められたロールギャップよりロールギャップを大きくして前記鋼板を軽圧下する軽圧下制御を含む制御の何れかで前記圧延機を制御し、前記第2制御部による制御で開始した前記速度制御で前記一対の搬送ロールが前記定められた回転速度で安定したと判定された場合、前記第3制御部は、前記圧延機制御部が前記軽圧下制御を行うよう制御し、その後、前記搬送機制御部が前記張力制御を再開するよう制御し、その後、前記圧延機制御部が前記圧延制御を再開するよう制御してもよい。
(3)上記(2)に記載の制御システムでは、前記第2制御部による制御で開始した前記速度制御で前記一対の搬送ロールが前記定められた回転速度で安定したと判定された場合、前記第3制御部は、前記圧延機制御部が前記軽圧下制御を行うよう制御し、その後、前記搬送機制御部が前記張力制御を再開するよう制御し、その後、前記鋼板に異常がないと判定された場合、前記圧延機制御部が前記圧延制御を再開するよう制御し、前記第3制御部による制御で前記張力制御が再開された後に前記鋼板に異常があると判定された場合、又は、前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記第2制御部は、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御してもよい。
(4)上記(1)~(3)の何れか1項に記載の制御システムでは、前記鋼板が蛇行していると判定した場合、及び、前記鋼板に異常な板厚変動が生じていると判定した場合の少なくとも何れかの場合、前記鋼板に異常があると判定する異常判定部を更に有し、前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記異常判定部によって前記鋼板に異常があると判定された場合、前記第2制御部は、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御してもよい。
(5)上記(4)に記載の制御システムでは、前記異常判定部は、前記圧延ロールを回転させる電動機の電流に基づいて、前記鋼板に異常な板厚変動が生じているか否かを判定してもよい。
(6)上記(1)~(5)のいずれか1項に記載の制御システムでは、前記搬送ロールの回転速度が、定められた時間の間、継続して、定められた範囲に含まれる場合に、前記搬送ロールが前記定められた回転速度で安定したと判定する速度判定部を更に有し、前記第2制御部による制御で前記速度制御が開始した後に、前記速度判定部によって前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記第3制御部は、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御してもよい。
まず、図1を参照して、本実施形態の鋳造圧延システム1について説明する。図1は、鋳造圧延システム1の構成の一例を示す図である。鋳造圧延システム1は、鋳造圧延設備100と、制御システム101と、を有し、被圧延材である鋼板10の鋳造、及び、圧延を行う。本実施形態において、下とは重力の方向であり、上とは、重力の反対方向である。
鋳造圧延設備100は、双ロール式連続鋳造機150と、処理室250と、冷却設備252と、蛇行計254と、搬送機300と、圧延機350と、ルーパ400と、コイラ450と、を備える。
注入部160は、溶鋼を鋳造部200に注入する装置であり、タンディッシュ161と、ストッパ162と、を備える。
タンディッシュ161は、レードルから注入される溶鋼を一時的に受け止める容器である。タンディッシュ161に注入された溶鋼は、タンディッシュ161の下部に設けられた貫通孔である注ぎ口を通り、鋳造部200の湯溜まり210に注入される。
ストッパ162は、タンディッシュ161の下部に設けられた注ぎ口を開閉でき、注ぎ口の上方に配置され、上下方向に伸びるような棒状の部材である。ストッパ162が上下方向に動くことで、タンディッシュ161から鋳造部200に注入される溶鋼の量が変わる。また、ストッパ162が最も下に移動してタンディッシュ161の注ぎ口を閉じたとき、タンディッシュ161から鋳造部200に溶鋼が注入されなくなる。
一対の鋳造ロール201は、それぞれ円柱状のロールであり、中心軸を回転軸として回転可能である。一対の鋳造ロール201は同形状であり、それぞれの回転軸は、同じ水平面上にほぼ平行になるように配置される。また、一対の鋳造ロール201の間には鋳造ロールギャップと呼ばれる隙間が設けられる。一対の鋳造ロール201は、鋳造ロールギャップ側の端部が下方に進むように、互いに逆方向に回転する。鋳造ロールギャップの上側と堰202とで囲まれた領域が、注入部160から注入された溶鋼が溜まる湯溜まり210である。
湯溜まり210に溶鋼が注入された状態で一対の鋳造ロール201が回転すると、鋳造ロール201は、鋳造ロール201の表面で溶鋼を冷却して凝固させる。そして、一対の鋳造ロール201は、凝固した溶鋼である凝固シェルを圧接して、鋳造ロールギャップから下方に鋼板10を排出する。
鋳造電動機205は、一対の鋳造ロール201を回転させる。
鋳造機速度計206は、鋳造電動機205の回転速度を計測する。鋳造電動機205の回転速度は、鋳造ロール速度に対応する。鋳造ロール速度は、鋳造ロール201の表面の速度であり、鋳造電動機205の回転速度に比例する。鋳造ロール速度は、鋳造ロール201の回転速度を表す。
冷却設備252は、第1搬送機300Aと第2搬送機300Bとの間に配置されて、搬送される鋼板10に冷却水を吹き付ける等によって鋼板10を冷却する。
蛇行計254は、鋼板10の蛇行量を計測して、メイン制御装置500に出力する。蛇行量は、鋼板10を上から見た場合に、鋼板10の搬送方向に垂直な方向についての鋼板10の予定正常位置と、鋼板10の搬送方向に垂直な方向についての鋼板10の実際の位置との差を表す量である。予定正常位置は、予め定められているものとする。本実施形態では、蛇行計254は、圧延機350の前方に配置される。より具体的には、蛇行計254は、第2搬送機300Bと圧延機350との間に配置される。ただし、蛇行計254は、圧延機350の後方に配置されてもよい。より具体的には、蛇行計254は、圧延機350とルーパ400との間に配置されてもよい。
一対のピンチロール301は、それぞれ円柱状のロールであり、中心軸を回転軸として回転可能であって、上下に並ぶように配置される。一対のピンチロール301の間にはピンチロールギャップと呼ばれる隙間が設けられる。一対のピンチロール301は、ピンチロールギャップに鋼板10を通して鋼板10を挟み、鋼板10の表面を押し付けながら、互いに逆方向に回転することで、鋼板10を搬送する。ピンチロール301を搬送ロールとも呼ぶ。
搬送電動機303は、一対のピンチロール301を回転させる。搬送電動機303のトルクは搬送電動機303に流れる電流に比例する。
搬送機速度計304は、搬送電動機303の回転速度を計測する。搬送電動機303の回転速度は、ピンチロール速度に対応する。ピンチロール速度は、ピンチロール301の表面の速度であり、搬送電動機303の回転速度に比例する。ピンチロール速度は、ピンチロール301の回転速度を表す。
第1搬送機300Aは、上から見たときに双ロール式連続鋳造機150の鋳造ロールギャップとずれた位置に配置される。第1搬送機300Aは、双ロール式連続鋳造機150から排出された鋼板10を引き込んで、第2搬送機300Bの方向に排出することで、鋼板10を搬送する。第2搬送機300Bは、第1搬送機300Aから搬送された鋼板10を引き込んで、圧延機350の方向に排出することで、鋼板10を圧延機350に搬送する。
また、第2搬送機300Bのピンチロール301、搬送電動機303、搬送機速度計304、及び、ピンチロール速度を、それぞれ、第2ピンチロール301B、第2搬送電動機303B、第2搬送機速度計304B、及び、第2ピンチロール速度と呼ぶ。
一対の圧延ロール351は、それぞれ円柱状のロールであり、中心軸を回転軸として回転可能であって、それぞれの回転軸が互いに平行になるように上下に並んで配置される。一対の圧延ロール351の間には圧延ロールギャップと呼ばれる隙間が設けられる。一対の圧延ロール351は、圧延ロールギャップに鋼板10を通して鋼板10を挟み、鋼板10を押し付ける力を加えながら、互いに逆方向に回転することで、鋼板10を圧延する。
一対のバックアップロール352は、それぞれ円柱状のロールであり、中心軸を回転軸として回転可能であって、一対の圧延ロール351を挟んで上下に並ぶように配置される。上側のバックアップロール352は、上側の圧延ロール351と接触するように、上側の圧延ロール351の上側に配置される。下側のバックアップロール352は、下側の圧延ロール351と接触するように、下側の圧延ロール351の下側に配置される。
圧延電動機354は、一対の圧延ロール351を回転させる。
圧延機速度計355は、圧延電動機354の回転速度を計測する。圧延電動機354の回転速度は、圧延ロール速度に対応する。圧延ロール速度は、圧延ロール351の表面の速度であり、圧延電動機354の回転速度に比例する。圧延ロール速度は、圧延ロール351の回転速度を表す。
コイラ450は、鋼板10を引き込んで、鋼板10を巻取る。
メイン制御装置500は、搬送機制御装置550と、圧延速度制御装置570と、圧延ギャップ制御装置580と、を制御することで、鋳造圧延設備100を制御する情報処理装置である。
搬送機制御装置550は、メイン制御装置500の制御に基づいて、搬送機300を制御することで、ピンチロール301を制御する情報処理装置である。搬送機制御装置550は、より具体的には、搬送機300が備える搬送電動機303の電流を制御することで、ピンチロール301を制御する。制御システム101は、搬送機制御装置550として、第1搬送機制御装置550Aと、第2搬送機制御装置550Bと、を備える。第1搬送機制御装置550Aは、第1搬送機300Aを制御する。より具体的には、第1搬送機制御装置550Aは、第1搬送電動機303Aの電流を調整して、第1ピンチロール301Aを制御する。第2搬送機制御装置550Bは、第2搬送機300Bを制御する。より具体的には、第2搬送機制御装置550Bは、第2搬送電動機303Bの電流を調整して、第2ピンチロール301Bを制御する。搬送機制御装置550として例えばインバータが使われる。
圧延ギャップ制御装置580は、メイン制御装置500の制御に基づいて、圧延機350を制御することで、圧延ロールギャップを制御する情報処理装置である。圧延ギャップ制御装置580は、より具体的には、圧延機350が備える圧延機動力シリンダ353を制御することで、圧延ロールギャップを制御する。圧延ギャップ制御装置580を圧延機制御装置とも呼ぶ。
次に、図2Aを参照して、メイン制御装置500のハードウェア構成について説明する。図2Aは、メイン制御装置500のハードウェア構成の一例を示す図である。
メイン制御装置500は、PLC(プログラマブルロジックコントローラ)等のコンピュータであり、CPU501と、記憶装置502と、通信インタフェース503と、入力装置504と、これらを接続するバス505と、を備える。
CPU501は、メイン制御装置500の全体を制御する。CPU501が記憶装置502等に記憶されているプログラムに基づき処理を実行することによって、図3に示すメイン制御装置500の機能や、図9の処理が実現される。
通信インタフェース503は、メイン制御装置500と、搬送機制御装置550や圧延速度制御装置570や圧延ギャップ制御装置580との通信を制御する。
入力装置504は、オペレータからの入力を受け付ける。入力装置504として、各種のスイッチやボタン、タッチパネル、キーボードやマウス等が使われる。
搬送機制御装置550は、インバータ等のコンピュータであり、CPU551と、記憶装置552と、通信インタフェース553と、これらを接続するバス554と、を備える。
CPU551は、搬送機制御装置550の全体を制御する。CPU551が記憶装置552等に記憶されているプログラムに基づき処理を実行することによって、図4Aや図4Bに示す搬送機制御装置550の機能等が実現される。
記憶装置552は、RAM、ROM、HDD等の記憶媒体であって、プログラムを記憶したり、CPU551が使う一時的なデータを保存したりする。
通信インタフェース553は、搬送機制御装置550と、メイン制御装置500や搬送機300との通信を制御する。
次に、図3を参照して、メイン制御装置500の機能構成について説明する。図3は、メイン制御装置500の機能構成の一例を示す図である。メイン制御装置500は、第1制御部510と、第2制御部511と、第3制御部512と、異常判定部514と、速度判定部515と、張力判定部516と、処理管理部517と、を備える。
第2制御部511は、第1制御部510による制御で開始した圧延制御、及び、張力制御が行われているときに鋼板10に異常があると判定された場合、圧延ギャップ制御装置580が開放制御を行うよう制御し、搬送機制御装置550が速度制御を行うよう制御する。開放制御、及び、速度制御については後に説明する。
第3制御部512は、第2制御部511による制御で開始した速度制御によって、第1ピンチロール速度が第1速度で安定し、第2ピンチロール速度が第2速度で安定したと判定された場合、搬送機制御装置550が張力制御を再開するよう制御し、圧延ギャップ制御装置580が圧延制御を再開するよう制御する。
第1速度、及び、第2速度は、鋳造圧延設備100の特性等に応じて予め定められた速度である。第1速度と第2速度とは同じ速度であってもよい。第1速度、及び、第2速度は、例えば、鋳造圧延設備100で鋳造、圧延をする際の鋳造ロール速度にする。
速度判定部515は、第1ピンチロール速度が、第1速度判定時間の間、継続して、第1速度範囲に含まれる場合に、第1ピンチロール速度が第1速度で安定したと判定する。また、速度判定部515は、第2ピンチロール速度が、第2速度判定時間の間、継続して、第2速度範囲に含まれる場合に、第2ピンチロール速度が第2速度で安定したと判定する。
第1速度範囲は、第1速度が含まれる速度の範囲である。第2速度範囲は、第2速度が含まれる速度の範囲である。第1速度範囲、第2速度範囲、第1速度判定時間、及び、第2速度判定時間は、シミュレーションや実験等によって、鋳造圧延設備100に適切な値が定められる。
第1張力、及び、第2張力は、鋼板10の種類や圧延量等に応じて予め定められている。第1張力範囲は、第1張力が含まれる張力の範囲である。第2張力範囲は、第2張力が含まれる張力の範囲である。第1張力範囲、第2張力範囲、第1張力判定時間、及び、第2張力判定時間は、シミュレーションや実験等によって、鋳造圧延設備100に適切な値が定められる。
処理管理部517は、メイン制御装置500が備える各機能の制御等を行う。
まず、図4Aを参照して、張力制御部560が行う張力制御について説明する。図4Aは、張力制御を説明するための図である。
張力制御は、張力制御部560が、ピンチロール301の後面張力を定められた張力である設定張力にして鋼板10を搬送するための制御である。搬送機制御装置550の張力制御部560が張力制御を行うことで、搬送機300が、ピンチロール301の後面張力を設定張力にして鋼板10を搬送する。第1搬送機制御装置550Aの張力制御部560は、設定張力として既に説明した第1張力を使用する。第2搬送機制御装置550Bの張力制御部560は、設定張力として既に説明した第2張力を使用する。
張力制御部560は、第1処理として、設定張力に基づいて、トルクリミットを決定する。トルクリミットは、張力制御部560が制御する搬送電動機303のトルクの上限値である。張力制御部560は、搬送電動機303のトルクが、決定したトルクリミットを超えないように制御する。
次いで、張力制御部560は、第2処理として、張力制御部560が制御する搬送電動機303に対応するピンチロール301のピンチロール速度が、後ろ側に隣接するロールのロール速度より、差速指令分遅くなるように、搬送電動機303を制御する。張力制御部560は、予め差速指令をメイン制御装置500から取得しているものとする。
第2処理によって、張力制御部560が制御する搬送電動機303に対応するピンチロール301のピンチロール速度が、後ろ側に隣接するロールのロール速度より、差速指令分遅くなる。このため、張力制御部560が制御する搬送電動機303のトルクが徐々に増加し、最終的に搬送電動機303のトルクが第1処理で決定されたトルクリミットで一定になる。このトルクリミットは設定張力に対応する。したがって、搬送電動機303のトルクがトルクリミットになることで、鋼板10の張力が設定張力で安定する。ただし、張力制御部560は、ここで説明した張力制御以外の方法による張力制御を行ってもよい。
速度制御は、搬送機300がピンチロール速度を定められた速度である設定速度にして鋼板10を搬送するための制御である。搬送機制御装置550の速度制御部561が速度制御を行うことで、搬送機300が、ピンチロール速度を設定速度にして、鋼板10を搬送する。第1搬送機制御装置550Aの速度制御部561は、設定速度として既に説明した第1速度を使用する。第2搬送機制御装置550Bの速度制御部561は、設定速度として既に説明した第2速度を使用する。
速度制御部561が行う速度制御について、より詳しく説明する。
速度制御部561は、搬送機速度計304から取得した搬送電動機303の回転速度に基づいて、ピンチロール速度の実績値を算出する。
次いで、速度制御部561は、ピンチロール速度の実績値と設定速度との差に基づいて、ピンチロール速度が設定速度に近づくように、搬送電動機303に流す電流を決定する。
次いで、速度制御部561は、決定した電流を搬送電動機303に流すよう制御する。
速度制御部561は、この処理を繰り返すことで、搬送機300がピンチロール速度を設定速度にして鋼板10を搬送するよう制御する。
開放制御部は、一対の圧延ロール351の少なくとも一方が鋼板10と接触しないよう圧延機動力シリンダ353を制御する開放制御を行う。一対の圧延ロール351の少なくとも一方が鋼板10と接触しない状態を、ロール開放と呼ぶ。
軽圧下制御部は、圧延ロールギャップを第2圧延ロールギャップにして鋼板10を軽圧下するよう圧延機350の圧延機動力シリンダ353を制御する軽圧下制御を行う。第2圧延ロールギャップは、第1圧延ロールギャップより大きい値である。
次に、図5A、図5B、図5Cを参照して、鋼板10の異常な板厚変動の例である鋼板10のホットバンド13について説明する。図5Aは、双ロール式連続鋳造機150の鋳造部200の一例を示す斜視図である。図5Bは、鋳造部200の一例を示す平面図である。図5Cは、ホットバンド13が形成された鋼板10の一例を示す斜視図である。
ホットバンド13は、図5Cに示すように、堰202の側面の地金12が鋳造時に入り込んで形成された鋼板10の厚肉部である。図5Aに示すような堰202の側面の地金12は、鋳造時の湯面レベル(溶鋼11の表面高さ)の変動等によって、堰202の側面に付着した溶鋼11が凝固することで形成される。
堰202の側面の地金12は、地金12の下側の端部が鋳造ロール201に巻き込まれること等によって堰202から剥がれ落ちて、図5Bに示すように、一対の鋳造ロール201の間に入り込むことがある。地金12が一対の鋳造ロール201の間に入り込むと、地金12の硬さによって、一対の鋳造ロール201の間隔が開き、図5Cに示すように、ホットバンド13が形成された鋼板10が双ロール式連続鋳造機150から排出される。
例えば、タンディッシュと、鋳型と、複数のロールと、を有し、タンディッシュから排出した溶鋼を、鋳型を介して冷却して複数のロールに搬送させて鋼板を製造する通常の連続鋳造機では、鋳型内に断熱材としての機能を有するパウダーを投入している。このパウダーは、鋳型と凝固シェルの間に流れ込み、潤滑剤としての機能も果たす。そのため、湯面レベルの変動等による鋳型側面への地金の付着は少量となる。一方、双ロール式連続鋳造機では、一般的に急速冷却を必要とするため、断熱材及び潤滑剤としての機能を有するパウダーを投入していない。そのため、通常の連続鋳造機と比較して潤滑性に劣る。従って、双ロール式連続鋳造機においては、堰202の側面への地金12の付着量は、通常の連続鋳造機における鋳型側面の地金の付着量と比較して多量となる。そのため、双ロール式連続鋳造機の場合、一般に、ホットバンド13が形成されやすい。
次に、図6を参照して、ホットバンド発生の検知方法について説明する。図6は、圧延電動機電流グラフ600、及び、圧延ロール速度グラフ601を示す図である。
図6の圧延電動機電流グラフ600は、鋳造圧延システム1で実際に鋳造及び圧延を行ったときの圧延電動機354に流れる電流の時間変化を示す。図6の圧延ロール速度グラフ601は、鋳造圧延システム1で実際に鋳造及び圧延を行ったときの圧延ロール速度の時間変化を示す。圧延ロール速度グラフ601において圧延ロール速度は単位がmpm(メートル/分)で表されている。図6のデータを取得する際、圧延速度制御装置570では速度制御部が速度制御を行うように制御され、圧延ギャップ制御装置580では圧延制御部が圧延制御を行うように制御されている。圧延電動機電流グラフ600において、時刻約57.4(sec)で、鋼板10のホットバンド13が圧延ロール351に達した。
圧延電動機電流グラフ600から分かるように、鋼板10のホットバンド13が圧延ロール351に達すると、圧延電動機354の電流が上がって上限に達する。また、圧延ロール速度グラフ601から分かるように、鋼板10のホットバンド13が圧延ロール351に達した後、圧延ロール速度が0(ゼロ)になり、圧延機350において鋼板10の搬送が停止する。
次に、図6の圧延ロール速度グラフ601を参照して、ホットバンド発生時のロール開放の必要性について説明する。上記の通り、鋼板10のホットバンド13が圧延ロール351に達した後に圧延ギャップ制御装置580の圧延制御部が圧延制御を継続すると、圧延ロール速度が0(ゼロ)になり、圧延機350において鋼板10の搬送が停止する。そこで、ホットバンド13が圧延ロール351に達した場合、ロール開放して、ホットバンド13が圧延ロール351を通過することを待つ。これにより、圧延ロール速度が0(ゼロ)になることを回避できる。
次に、図7を参照して、鋼板10のウェッジ量について説明する。図7は、鋼板10の一例を示す断面図である。
鋼板10のウェッジ量は、鋼板10の両端部の厚さの差である。鋼板10のウェッジ量は、次の式(1)で定義される。
ウェッジ量=|ta-tb| ・・・ (1)
ここで、taは、鋼板10の幅方向の一方の端部から、w(mm)の位置での鋼板10の厚さである。tbは、鋼板10の幅方向の他方の端部から、w(mm)の位置での鋼板10の厚さである。w(mm)として、例えば、25(mm)が使われる。
双ロール式連続鋳造機150では、一対の鋳造ロール201で溶鋼から板状の鋼板10にしている。双ロール式連続鋳造機150では、通常の連続鋳造機と比較して、ホットバンドが発生しやすい等の不安定な操業要素が多いため、ウェッジ量が大きくなりやすい傾向がある。
そこで、鋼板10の蛇行が発生した場合に、ロール開放して、鋼板10のウェッジ量が大きい部分が圧延ロール351を通過することを待つことで、鋼板10の蛇行によって機器等が故障等することを回避できる。
次に、図8Aから図8Dを参照して、張力制御が行われているときにロール開放された場合の比較例となる鋳造圧延システムの動作について説明する。図8Aは、鋳造ロール速度の時間変化を表す鋳造ロール速度グラフを示す図である。図8Bは、第1ピンチロール速度の時間変化を表す第1ピンチロール速度グラフを示す図である。図8Cは、第2ピンチロール速度の時間変化を表す第2ピンチロール速度グラフを示す図である。図8Dは、圧延ロール速度の時間変化を表す圧延ロール速度グラフを示す図である。比較例となる鋳造圧延システムは、本実施形態の鋳造圧延システム1と同様の構成である。ただし、後に図9を参照して説明する本実施形態の鋳造圧延システム1の動作と異なり、比較例となる鋳造圧延システムでは、搬送機制御装置550は、張力制御のみを行う。
また、後に説明するように、時刻約93(sec)で、比較例となる鋳造圧延システムでは鋳造圧延システム1の動作を停止させている。
鋳造ロール速度、及び、圧延ロール速度は、ロール開放されても、図8A、図8Dにおいて時刻約91(sec)から時刻約93(sec)に示されるように、正の値に維持される。なお、図8Aから図8Dでは、時刻約91(sec)でロール開放されている。一方、第1ピンチロール速度、及び、第2ピンチロール速度は、ロール開放されると、図8B、図8Cにおいて時刻約91(sec)の近辺に示されるように、急激に変化して負の値になる。第1ピンチロール速度、及び、第2ピンチロール速度が負の値であることは、第1ピンチロール301A、及び、第2ピンチロール301Bは、圧延機350の方向とは逆方向に鋼板10を搬送するように、逆回転していることを表す。ここで、鋼板10は、鋳造圧延設備100において、鋳造ロール速度に近い速度で搬送されており、ロール開放の前後の時間帯でピンチロール301から見て常に圧延機350の方向に搬送されていると考えられる。そして、鋼板10は、ロール開放される時刻約91(sec)において第1ピンチロール301A、及び、第2ピンチロール301Bが逆回転した瞬間に、この逆回転に伴って急に逆方向に搬送されることはない。したがって、第1ピンチロール301A、及び、第2ピンチロール301Bにおいて、鋼板10の板滑りが発生しているといえる。
また、図8Bの第1ピンチロール速度グラフから分かるように、第1ピンチロール301Aでは、ロール開放によって鋼板10の板滑りが発生すると、鋼板10の板滑りが継続して、鋼板10の板滑りが解消しない。このため、図8Aから図8Dに示されるように、遅くても時刻95(sec)で、鋳造ロール速度、第1ピンチロール速度、第2ピンチロール速度、及び、圧延ロール速度を全て0(ゼロ)にして、鋳造圧延システム1の動作を停止させている。
鋼板10の板滑りが発生すると、張力制御ができなくなり、鋼板10を正常に圧延できなくなる。また、鋼板10の板滑りによって、ロールに疵がつくことがある。このため、ロール開放した場合に鋼板10の板滑りが発生した場合でも、短時間に鋼板10の板滑りを解消する必要がある。
次に、図9を参照して、本実施形態の制御処理について説明する。図9は、制御処理の一例を示すフローチャートである。本実施形態の制御処理によって、短時間に鋼板10の板滑りを解消できる。図9の制御処理は、メイン制御装置500が実行する。
S100において、処理管理部517は、記憶装置502を参照したりネットワーク通信によって外部装置から情報を受信したりして、鋳造圧延設備100の各種パラメータを取得する。そして、処理管理部517は、鋳造圧延設備100が、取得した各種パラメータに対応する動作を行うように初期設定する。処理管理部517が取得する各種パラメータには、既に説明した第1張力、第1張力範囲、第1張力判定時間、第2張力、第2張力範囲、第2張力判定時間、第1速度、第1速度範囲、第1速度判定時間、第2速度、第2速度範囲、第2速度判定時間、第1圧延ロールギャップ、第2圧延ロールギャップ等が含まれる。
また、第1制御部510は、鋳造圧延設備100が鋳造、及び、圧延を行うよう制御する。この際に、第1制御部510は、通信インタフェース503を介して圧延ギャップ制御装置580に命令を送信することで、圧延ギャップ制御装置580の圧延制御部が圧延制御を行うよう制御する。また、第1制御部510は、通信インタフェース503を介して第1搬送機制御装置550Aと第2搬送機制御装置550Bとに命令を送信することで、第1搬送機制御装置550Aの張力制御部560が張力制御を行うよう制御し、第2搬送機制御装置550Bの張力制御部560が張力制御を行うよう制御する。また、第1制御部510は、通信インタフェース503を介して圧延速度制御装置570に命令を送信することで、圧延速度制御装置570の速度制御部が、速度制御を行うよう制御する。
S102において、異常判定部514は、蛇行計254から取得した蛇行量に基づいて、鋼板10が蛇行しているか否かを判定する。異常判定部514は、蛇行量が、蛇行判定時間の間、継続して、蛇行量範囲を超えている場合に、鋼板10が蛇行していると判定する。蛇行量範囲は、鋼板10が機器等に接触しない等の条件を満たす範囲として、予め実験等で定められている。蛇行判定時間は、鋼板10の蛇行の誤検知を防止するためのものであり、予め実験やシミュレーション等で定められている。異常判定部514は、鋼板10が蛇行していると判定した場合、処理をS105に進め、鋼板10が蛇行していないと判定した場合、再度S102を実行する。
S106において、処理管理部517は、S107、S108、及び、S109の処理が並列に開始するための制御を行う。
S108において、第2制御部511は、第2ピンチロール301Bの制御方法を、張力制御から速度制御に変更するよう制御する。より具体的には、第2制御部511は、通信インタフェース503を介して第2搬送機制御装置550Bに命令を送信することで、第2搬送機制御装置550Bの速度制御部561が速度制御を開始するよう制御する。その後、第2制御部511は、処理をS110に進める。
S109において、第2制御部511は、ロール開放するよう制御する。より具体的には、第2制御部511は、通信インタフェース503を介して圧延ギャップ制御装置580に命令を送信することで、圧延ギャップ制御装置580の開放制御部が開放制御を開始するよう制御する。これにより、ロール開放が行われる。その後、第2制御部511は、処理をS110に進める。
S111において、処理管理部517は、S112、S113、及び、S114の処理が並列に開始するための制御を行う。
S112において、速度判定部515は、S107の処理が行われてから、第1待機時間が経過したか否かを判定する。第1待機時間は、ロール開放して速度制御が開始してから速度制御によって第1ピンチロール速度と第2ピンチロール速度とが安定するまでの時間であり、実験やシミュレーションを予め行うことで定められる。第1待機時間は、後に説明する図10B、図10CにおいてTFrとして示されている。速度判定部515は、S107の処理が行われてから、第1待機時間が経過したと判定した場合、処理をS115に進め、第1待機時間が経過していないと判定した場合、再度S112を実行する。
上記のS112、S113、及び、S114において、速度判定部515は、第1ピンチロール速度と第2ピンチロール速度とが速度制御によって安定するまで待つ処理を行う。
S116において、第3制御部512は、通信インタフェース503を介して圧延ギャップ制御装置580に命令を送信することで、圧延ギャップ制御装置580の軽圧下制御部が軽圧下制御を開始するよう制御する。これにより、圧延機350は鋼板10を軽圧下する処理を開始する。S109でロール開放が行われてからS116で軽圧下が開始するまでの間に、鋼板10のホットバンド13や鋼板10の蛇行の原因となる鋼板10のウェッジ量が大きい部分等の鋼板10の異常部分が圧延ロール351を通過すると考えられる。仮に、S109でロール開放が行われてからS116で軽圧下が開始するまでの間に、鋼板10の異常部分が残っている場合、S126又はS127の処理の後に、S109以降が再度実行され、ロール開放されてピンチロール速度が安定した後にS116が実行される。したがって、最終的には、鋼板10の異常部分は全て圧延ロール351を通過することになる。
S117において、処理管理部517は、S118、及び、S119の処理が並列に開始するための制御を行う。
S119において、第3制御部512は、第2ピンチロール301Bの制御方法を、速度制御から張力制御に変更するよう制御する。より具体的には、第3制御部512は、通信インタフェース503を介して第2搬送機制御装置550Bに命令を送信することで、第2搬送機制御装置550Bの張力制御部560が張力制御を開始するよう制御する。その後、第3制御部512は、処理をS120に進める。
S120において、処理管理部517は、S118、及び、S119の処理が終了した後に、処理をS121に進める。
S122において、張力判定部516は、S118の処理が行われてから、第2待機時間が経過したか否かを判定する。第2待機時間は、張力制御が開始してから第1ピンチロール301Aの後面張力と第2ピンチロール301Bの後面張力とが安定するまでの時間であり、実験やシミュレーションを予め行うことで定められる。張力判定部516は、S118の処理が行われてから、第2待機時間が経過したと判定した場合、処理をS125に進め、第2待機時間が経過していないと判定した場合、再度S122を実行する。
S124において、張力判定部516は、第2ピンチロール301Bの後面張力が第2張力で安定したか否かを判定する。張力判定部516は、既に説明したように、第2ピンチロール301Bの後面張力が、第2張力判定時間の間、継続して、第2張力範囲になった場合に、第2ピンチロール301Bの後面張力が第2張力で安定したと判定する。張力判定部516は、例えば、第2搬送電動機303Bの電流を測定する電流計の出力に基づいて、第2ピンチロール301Bの後面張力を算出して使用する。張力判定部516は、第2ピンチロール301Bの後面張力が第2張力で安定したと判定した場合、処理をS125に進め、第2張力で安定していないと判定した場合、再度S124を実行する。
上記のS122、S123、及び、S124において、張力判定部516は、鋼板10の張力が張力制御によって安定するまで待つ処理を行う。
S126において、異常判定部514は、S102と同様の方法で、蛇行計254から取得した蛇行量に基づいて、鋼板10が蛇行しているか否かを判定する。異常判定部514は、鋼板10が蛇行していると判定した場合、処理をS106に戻し、鋼板10が蛇行していないと判定した場合、処理をS127に進める。
S128において、第3制御部512は、通信インタフェース503を介して圧延ギャップ制御装置580に命令を送信することで、圧延ギャップ制御装置580の圧延制御部が圧延制御を再開するよう制御する。これにより、圧延機350は鋼板10を圧延する処理を再開する。その後、処理管理部517は、図9の処理を終了する。
次に、図10Aから図10Dを参照して、図9の制御処理の動作例について説明する。図10Aは、鋳造ロール速度の時間変化を表す鋳造ロール速度グラフを示す図である。図10Bは、第1ピンチロール速度の時間変化を表す第1ピンチロール速度グラフを示す図である。図10Cは、第2ピンチロール速度の時間変化を表す第2ピンチロール速度グラフを示す図である。図10Dは、圧延ロール速度の時間変化を表す圧延ロール速度グラフを示す図である。
図10BのV1、R1、TV1は、それぞれ、既に説明した第1速度、第1速度範囲、第1速度判定時間である。図10CのV2、R2、TV2は、それぞれ、既に説明した第2速度、第2速度範囲、第2速度判定時間である。また、図10B及び図10CのTFrは、既に説明した第1待機時間である。
その後、S112、S113、S114の処理で速度制御によってピンチロール速度が安定したと判定された場合、S118、S119で、ピンチロール301の制御方法が速度制御から張力制御に変更される。
しかし、ロール開放時に速度制御が開始することで、ロール開放後の0.5(sec)以内には、第1ピンチロール速度、及び、第2ピンチロール速度は、鋳造ロール速度、及び、圧延ロール速度と同等の速度になっている。したがって、ロール開放した後の0.5(sec)以内には、鋼板10の板滑りは解消しているといえる。
このように、図9の制御処理により、ロール開放した場合であっても、鋼板10の板滑りが短時間に解消する。そして、図8Aから図8Dを参照して説明した比較例となる鋳造圧延システムの動作と異なり、本実施形態の鋳造圧延システム1では、ロール開放した後も正常な圧延を再開できる。
鋼板10に異常が生じた場合に圧延を継続すると、既に説明したように、圧延ロール速度が0(ゼロ)になって圧延が停止したり、鋼板10の蛇行によって鋼板10が機器等に接触して機器等が故障したりする。また、鋼板10の蛇行によって鋼板10の幅方向の端部が機器等に接触すると、鋼板10が折れ曲がって、圧延の継続ができなくなることがある。したがって、圧延を再開するための作業や機器等を直すための作業等の非定常作業が必要となる。このため、鋼板10の圧延を安定して継続することができなくなる。
一方、本実施形態では、鋼板10に異常が生じた場合に開放制御によってロール開放が行われる。よって、圧延が停止したり機器等が故障したりすることが回避され、鋼板10の圧延を安定して継続することが可能になる。
一方、本実施形態では、ロール開放の後に、ピンチロール301の制御方法を張力制御から速度制御に変更する。よって、既に説明したように、鋼板10の板滑りを解消でき、ピンチロール301の交換等の非定常作業が発生すること抑制できる。したがって、鋼板10の圧延を安定して継続することが可能になる。
また、本実施形態では、第3制御部512は、搬送機制御装置550が張力制御を再開した後に、圧延ギャップ制御装置580が圧延制御を再開するよう制御する。よって、自動的に圧延が再開する。したがって、鋼板10の圧延を安定して継続することが可能になる。
上記の実施形態では、張力判定部516は搬送機300の後面張力を制御する。ただし、張力判定部516は搬送機300の前面張力を制御するように構成されてもよい。搬送機300の前側(鋼板10の進行方向と反対側)での鋼板10の張力である。
鋳造圧延設備100は、搬送機300を2台備えるが、搬送機300は、1台や3台以上であってもよい。
また、上記の実施形態では、メイン制御装置500が入力装置504を備える。しかし、搬送機制御装置550がオペレータからの入力を受け付ける入力装置を備えていてもよい。搬送機制御装置550は、入力装置を介してオペレータによる開放指示を受け付けた場合、開放指示を受け付けた旨の情報をメイン制御装置500に送信する。そして、図9のS104において、メイン制御装置500の異常判定部514は、搬送機制御装置550から受信した情報に基づいて、オペレータが開放指示を行ったと判定する。圧延速度制御装置570、及び、圧延ギャップ制御装置580の少なくとも何れかが、オペレータからの入力を受け付ける入力装置を備えていてもよい。
100 鋳造圧延設備
101 制御システム
150 双ロール式連続鋳造機
300 搬送機
350 圧延機
400 ルーパ
450 コイラ
500 メイン制御装置
550 搬送機制御装置
570 圧延速度制御装置
580 圧延ギャップ制御装置
Claims (9)
- 双ロール式連続鋳造機と、一対の圧延ロールで鋼板を圧延する圧延機と、一対の搬送ロールで前記鋼板を前記圧延機の方向に搬送する搬送機と、を有し、前記双ロール式連続鋳造機は、互いに逆方向に回転する一対の鋳造ロールを備え、一対の前記鋳造ロールは、一対の前記鋳造ロールの間の上側の湯溜まりに注入された溶鋼を冷却し、冷却されて凝固した前記溶鋼を圧接して、一対の前記鋳造ロールの間から前記鋼板を排出し、前記搬送機は、前記双ロール式連続鋳造機から排出された前記鋼板を前記圧延機の方向に搬送する鋳造圧延設備の制御システムであって、
定められたロールギャップで前記鋼板を圧延する圧延制御、及び、一対の前記圧延ロールの少なくとも一方が前記鋼板と接触しないよう制御する開放制御を含む制御の何れかで前記圧延機を制御する圧延機制御部と、
前記鋼板を定められた張力にして前記鋼板を搬送する張力制御、及び、前記搬送ロールを定められた回転速度にして前記鋼板を搬送する速度制御を含む制御の何れかで前記搬送機を制御する搬送機制御部と、
前記圧延機制御部が前記圧延制御を行うよう制御し、前記搬送機制御部が前記張力制御を行うよう制御する第1制御部と、
前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する第2制御部と、
前記第2制御部による制御で開始した前記速度制御で前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御する第3制御部と、を有する制御システム。 - 前記圧延機制御部は、前記圧延制御、前記開放制御、及び、前記定められたロールギャップよりロールギャップを大きくして前記鋼板を軽圧下する軽圧下制御を含む制御の何れかで前記圧延機を制御し、
前記第2制御部による制御で開始した前記速度制御で前記一対の搬送ロールが前記定められた回転速度で安定したと判定された場合、前記第3制御部は、前記圧延機制御部が前記軽圧下制御を行うよう制御し、その後、前記搬送機制御部が前記張力制御を再開するよう制御し、その後、前記圧延機制御部が前記圧延制御を再開するよう制御する請求項1に記載の制御システム。 - 前記第2制御部による制御で開始した前記速度制御で前記一対の搬送ロールが前記定められた回転速度で安定したと判定された場合、前記第3制御部は、前記圧延機制御部が前記軽圧下制御を行うよう制御し、その後、前記搬送機制御部が前記張力制御を再開するよう制御し、その後、前記鋼板に異常がないと判定された場合、前記圧延機制御部が前記圧延制御を再開するよう制御し、
前記第3制御部による制御で前記張力制御が再開された後に前記鋼板に異常があると判定された場合、又は、前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記第2制御部は、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する請求項2に記載の制御システム。 - 前記鋼板が蛇行していると判定した場合、及び、前記鋼板に異常な板厚変動が生じていると判定した場合の少なくとも何れかの場合、前記鋼板に異常があると判定する異常判定部を更に有し、
前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記異常判定部によって前記鋼板に異常があると判定された場合、前記第2制御部は、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する請求項1~3の何れか1項に記載の制御システム。 - 前記異常判定部は、前記圧延ロールを回転させる電動機の電流に基づいて、前記鋼板に異常な板厚変動が生じているか否かを判定する請求項4に記載の制御システム。
- 前記搬送ロールの回転速度が、定められた時間の間、継続して、定められた範囲に含まれる場合に、前記搬送ロールが前記定められた回転速度で安定したと判定する速度判定部を更に有し、
前記第2制御部による制御で前記速度制御が開始した後に、前記速度判定部によって前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記第3制御部は、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御する請求項1~5の何れか1項に記載の制御システム。 - 双ロール式連続鋳造機と、一対の圧延ロールで鋼板を圧延する圧延機と、一対の搬送ロールで前記鋼板を前記圧延機の方向に搬送する搬送機と、定められたロールギャップで前記鋼板を圧延する圧延制御、及び、一対の前記圧延ロールの少なくとも一方が前記鋼板と接触しないよう制御する開放制御を含む制御の何れかで前記圧延機を制御する圧延機制御部と、前記鋼板を定められた張力にして前記鋼板を搬送する張力制御、及び、前記搬送ロールを定められた回転速度にして前記鋼板を搬送する速度制御を含む制御の何れかで前記搬送機を制御する搬送機制御部と、を有し、前記双ロール式連続鋳造機は、互いに逆方向に回転する一対の鋳造ロールを備え、一対の前記鋳造ロールは、一対の前記鋳造ロールの間の上側の湯溜まりに注入された溶鋼を冷却し、冷却されて凝固した前記溶鋼を圧接して、一対の前記鋳造ロールの間から前記鋼板を排出し、前記搬送機は、前記双ロール式連続鋳造機から排出された前記鋼板を前記圧延機の方向に搬送する鋳造圧延設備の制御方法であって、
前記圧延機制御部が前記圧延制御を行うよう制御し、前記搬送機制御部が前記張力制御を行うよう制御する第1制御ステップと、
前記第1制御ステップによる制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する第2制御ステップと、
前記第2制御ステップによる制御で開始した前記速度制御で前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御する第3制御ステップと、を含む制御方法。 - 双ロール式連続鋳造機と、一対の圧延ロールで鋼板を圧延する圧延機と、一対の搬送ロールで前記鋼板を前記圧延機の方向に搬送する搬送機と、定められたロールギャップで前記鋼板を圧延する圧延制御、及び、一対の前記圧延ロールの少なくとも一方が前記鋼板と接触しないよう制御する開放制御を含む制御の何れかで前記圧延機を制御する圧延機制御部と、前記鋼板を定められた張力にして前記鋼板を搬送する張力制御、及び、前記搬送ロールを定められた回転速度にして前記鋼板を搬送する速度制御を含む制御の何れかで前記搬送機を制御する搬送機制御部と、を有し、前記双ロール式連続鋳造機は、互いに逆方向に回転する一対の鋳造ロールを備え、一対の前記鋳造ロールは、一対の前記鋳造ロールの間の上側の湯溜まりに注入された溶鋼を冷却し、冷却されて凝固した前記溶鋼を圧接して、一対の前記鋳造ロールの間から前記鋼板を排出し、前記搬送機は、前記双ロール式連続鋳造機から排出された前記鋼板を前記圧延機の方向に搬送する鋳造圧延設備を制御する制御装置であって、
前記圧延機制御部が前記圧延制御を行うよう制御し、前記搬送機制御部が前記張力制御を行うよう制御する第1制御部と、
前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する第2制御部と、
前記第2制御部による制御で開始した前記速度制御で前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御する第3制御部と、を有する制御装置。 - 双ロール式連続鋳造機と、一対の圧延ロールで鋼板を圧延する圧延機と、一対の搬送ロールで前記鋼板を前記圧延機の方向に搬送する搬送機と、定められたロールギャップで前記鋼板を圧延する圧延制御、及び、一対の前記圧延ロールの少なくとも一方が前記鋼板と接触しないよう制御する開放制御を含む制御の何れかで前記圧延機を制御する圧延機制御部と、前記鋼板を定められた張力にして前記鋼板を搬送する張力制御、及び、前記搬送ロールを定められた回転速度にして前記鋼板を搬送する速度制御を含む制御の何れかで前記搬送機を制御する搬送機制御部と、を有し、前記双ロール式連続鋳造機は、互いに逆方向に回転する一対の鋳造ロールを備え、一対の前記鋳造ロールは、一対の前記鋳造ロールの間の上側の湯溜まりに注入された溶鋼を冷却し、冷却されて凝固した前記溶鋼を圧接して、一対の前記鋳造ロールの間から前記鋼板を排出し、前記搬送機は、前記双ロール式連続鋳造機から排出された前記鋼板を前記圧延機の方向に搬送する鋳造圧延設備を制御するためのプログラムであって、
コンピュータを、
前記圧延機制御部が前記圧延制御を行うよう制御し、前記搬送機制御部が前記張力制御を行うよう制御する第1制御部と、
前記第1制御部による制御で開始した前記圧延制御と前記張力制御とが行われているときに前記鋼板に異常があると判定された場合、前記圧延機制御部が前記開放制御を行うよう制御し、前記搬送機制御部が前記速度制御を行うよう制御する第2制御部と、
前記第2制御部による制御で開始した前記速度制御で前記搬送ロールが前記定められた回転速度で安定したと判定された場合、前記搬送機制御部が前記張力制御を再開するよう制御し、前記圧延機制御部が前記圧延制御を再開するよう制御する第3制御部と、として機能させるためのプログラム。
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020553995A JP6927439B2 (ja) | 2018-10-31 | 2019-10-30 | 制御システム、制御方法、制御装置、及び、プログラム |
| CN201980069801.4A CN112912189B (zh) | 2018-10-31 | 2019-10-30 | 控制系统、控制方法、控制装置以及程序 |
| BR112021006560-1A BR112021006560B1 (pt) | 2018-10-31 | 2019-10-30 | Sistema de controle de equipamento de lingotamento e laminação, método de controle, dispositivo de controle e programa |
| US17/285,844 US11819895B2 (en) | 2018-10-31 | 2019-10-30 | Control system, control method, control device, and program |
| KR1020217013643A KR102467210B1 (ko) | 2018-10-31 | 2019-10-30 | 제어 시스템, 제어 방법, 제어 장치, 및 프로그램 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018-205622 | 2018-10-31 | ||
| JP2018205622 | 2018-10-31 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2020090921A1 true WO2020090921A1 (ja) | 2020-05-07 |
Family
ID=70462270
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2019/042646 Ceased WO2020090921A1 (ja) | 2018-10-31 | 2019-10-30 | 制御システム、制御方法、制御装置、及び、プログラム |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US11819895B2 (ja) |
| JP (1) | JP6927439B2 (ja) |
| KR (1) | KR102467210B1 (ja) |
| CN (1) | CN112912189B (ja) |
| TW (1) | TW202039111A (ja) |
| WO (1) | WO2020090921A1 (ja) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114850228A (zh) * | 2022-04-26 | 2022-08-05 | 广东韶钢松山股份有限公司 | 加热炉输送钢坯至轧机控制方法及系统 |
| CN115156288A (zh) * | 2022-06-30 | 2022-10-11 | 武汉钢铁有限公司 | 一种钢轨轧制过程中的尾部尺寸控制方法、装置及钢轨 |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20240001418A1 (en) * | 2022-07-02 | 2024-01-04 | Shandong Steel Group Rizhao Co., Ltd. | Method and device for producing medium-thickness plates with high thickness precision through cvc steckel mill |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0890181A (ja) * | 1994-09-16 | 1996-04-09 | Nippon Steel Corp | 直結型連続鋳造圧延設備の制御方法 |
| JPH08294715A (ja) * | 1995-04-21 | 1996-11-12 | Nippon Steel Corp | ストリップ連続鋳造熱間圧延熱処理設備およびストリップ連続鋳造熱間圧延熱処理方法 |
| JPH0952108A (ja) * | 1995-08-09 | 1997-02-25 | Nippon Steel Corp | 薄帯状鋳片の搬送方法 |
| JP2002540953A (ja) * | 1999-04-08 | 2002-12-03 | キャストリップ・リミテッド・ライアビリティ・カンパニー | ストリップ鋳造 |
Family Cites Families (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS57127505A (en) * | 1981-01-22 | 1982-08-07 | Nippon Steel Corp | Direct rolling manufacturing device for steel |
| JPH0515921A (ja) | 1991-07-08 | 1993-01-26 | Mitsubishi Electric Corp | 自動減速制御装置 |
| JP4292839B2 (ja) * | 2003-03-19 | 2009-07-08 | Jfeスチール株式会社 | 熱延鋼板の製造設備および製造方法 |
| AT501314B1 (de) * | 2004-10-13 | 2012-03-15 | Voest Alpine Ind Anlagen | Verfahren und vorrichtung zum kontinuierlichen herstellen eines dünnen metallbandes |
| US7849722B2 (en) * | 2006-03-08 | 2010-12-14 | Nucor Corporation | Method and plant for integrated monitoring and control of strip flatness and strip profile |
| DE102007004053A1 (de) * | 2007-01-22 | 2008-07-31 | Siemens Ag | Gießanlage zum Gießen eines Gießguts und Verfahren zur Führung eines Gießguts aus einem Gießbehälter einer Gießanlage |
| JP4423618B2 (ja) | 2007-03-28 | 2010-03-03 | 株式会社日立製作所 | 圧延形状制御方法および圧延形状制御システム |
| DE102007056192A1 (de) * | 2007-11-21 | 2009-05-28 | Sms Demag Ag | Verfahren und Vorrichtung zum Herstellen eines Bandes aus Metall |
| CN201186300Y (zh) * | 2008-02-26 | 2009-01-28 | 宝山钢铁股份有限公司 | 一种Kocks轧机空过导槽 |
| CN101653779B (zh) * | 2008-08-20 | 2011-06-15 | 中冶赛迪工程技术股份有限公司 | 一种热轧带钢生产工艺-ehsp及方法 |
| KR101158209B1 (ko) * | 2008-12-22 | 2012-06-19 | 신닛뽄세이테쯔 카부시키카이샤 | 강판 스트립의 압연 방법 및 강판의 제조 방법 |
| CN101856671B (zh) * | 2009-04-10 | 2013-02-13 | 株式会社日立制作所 | 轧制装置、轧制装置的控制方法及轧制设备 |
| JP5452968B2 (ja) * | 2009-04-10 | 2014-03-26 | 株式会社日立製作所 | 圧延装置およびその制御方法 |
| CN201889316U (zh) * | 2010-02-24 | 2011-07-06 | 武汉钢铁(集团)公司 | 一种轧钢生产线 |
| EP2418031A1 (de) * | 2010-08-13 | 2012-02-15 | Siemens Aktiengesellschaft | Verfahren zum Herstellen von Metallband mittels einer Gießwalzverbundanlage, Steuer- und/oder Regeleinrichtung für eine Gießwalzverbundanlage und Gießwalzverbundanlage |
| CN102380513B (zh) * | 2010-08-25 | 2014-11-05 | 株式会社日立制作所 | 轧制控制装置及轧制控制方法 |
| DE102012013425A1 (de) * | 2012-07-03 | 2014-01-09 | Salzgitter Flachstahl Gmbh | Kontinuierlich arbeitende Bandgieß- und Walzanlage |
| JP5839053B2 (ja) | 2014-01-06 | 2016-01-06 | 株式会社日立製作所 | 圧延装置およびその制御方法 |
| US11052441B2 (en) * | 2015-02-02 | 2021-07-06 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Meandering control device for rolling line |
| US10281502B2 (en) * | 2017-05-31 | 2019-05-07 | Taiwan Semiconductor Manufacturing Co., Ltd. | Maximum voltage selection circuit |
-
2019
- 2019-10-30 WO PCT/JP2019/042646 patent/WO2020090921A1/ja not_active Ceased
- 2019-10-30 TW TW108139320A patent/TW202039111A/zh unknown
- 2019-10-30 CN CN201980069801.4A patent/CN112912189B/zh active Active
- 2019-10-30 KR KR1020217013643A patent/KR102467210B1/ko active Active
- 2019-10-30 JP JP2020553995A patent/JP6927439B2/ja active Active
- 2019-10-30 US US17/285,844 patent/US11819895B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0890181A (ja) * | 1994-09-16 | 1996-04-09 | Nippon Steel Corp | 直結型連続鋳造圧延設備の制御方法 |
| JPH08294715A (ja) * | 1995-04-21 | 1996-11-12 | Nippon Steel Corp | ストリップ連続鋳造熱間圧延熱処理設備およびストリップ連続鋳造熱間圧延熱処理方法 |
| JPH0952108A (ja) * | 1995-08-09 | 1997-02-25 | Nippon Steel Corp | 薄帯状鋳片の搬送方法 |
| JP2002540953A (ja) * | 1999-04-08 | 2002-12-03 | キャストリップ・リミテッド・ライアビリティ・カンパニー | ストリップ鋳造 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114850228A (zh) * | 2022-04-26 | 2022-08-05 | 广东韶钢松山股份有限公司 | 加热炉输送钢坯至轧机控制方法及系统 |
| CN114850228B (zh) * | 2022-04-26 | 2023-12-01 | 广东韶钢松山股份有限公司 | 加热炉输送钢坯至轧机控制方法及系统 |
| CN115156288A (zh) * | 2022-06-30 | 2022-10-11 | 武汉钢铁有限公司 | 一种钢轨轧制过程中的尾部尺寸控制方法、装置及钢轨 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112912189B (zh) | 2022-09-27 |
| US11819895B2 (en) | 2023-11-21 |
| JP6927439B2 (ja) | 2021-09-01 |
| US20210379636A1 (en) | 2021-12-09 |
| KR102467210B1 (ko) | 2022-11-16 |
| JPWO2020090921A1 (ja) | 2021-09-02 |
| TW202039111A (zh) | 2020-11-01 |
| CN112912189A (zh) | 2021-06-04 |
| KR20210070355A (ko) | 2021-06-14 |
| BR112021006560A2 (pt) | 2021-07-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| TW476675B (en) | Casting strip | |
| WO2020090921A1 (ja) | 制御システム、制御方法、制御装置、及び、プログラム | |
| US10434552B2 (en) | Method and device for producing a metallic strip in a continuous casting and rolling process | |
| JPS63252604A (ja) | 連鋳直結圧延方法及び装置 | |
| CN103097056B (zh) | 连续铸造装置及相关方法 | |
| CN104837574B (zh) | 对带状轧件的宽度影响 | |
| JP6617615B2 (ja) | 薄肉鋳片製造設備、及び、薄肉鋳片の製造方法 | |
| JP4585628B2 (ja) | 鋼板ストリップの圧延方法及び鋼板の製造方法 | |
| JP4669777B2 (ja) | 連続処理設備の速度制御方法 | |
| US10875065B2 (en) | Method for rolling a rolling material and rolling mill | |
| Lee et al. | Development of healing control technology for reducing breakout in thin slab casters | |
| US20200406342A1 (en) | Continuous steel casting method | |
| JP7003821B2 (ja) | 制御システム、制御装置、制御方法、及び、プログラム | |
| JP6981347B2 (ja) | 判定システム、判定装置、制御方法、及び、プログラム | |
| JP5741258B2 (ja) | 鋼帯の蛇行防止方法および装置 | |
| BR112021006560B1 (pt) | Sistema de controle de equipamento de lingotamento e laminação, método de controle, dispositivo de controle e programa | |
| JP7256370B2 (ja) | 双ドラム式連続鋳造装置および双ドラム式連続鋳造方法 | |
| JPS61189850A (ja) | 鋼のスラブ用連続鋳造方法 | |
| JP2009178765A (ja) | 連続鋳造鋳片の蛇行防止装置及び双ドラム式連続鋳造設備 | |
| JPH1099946A (ja) | ダミーバー格納装置 | |
| JPH04322847A (ja) | 双ロール式薄板鋳造における鋳造開始方法 | |
| JP2006082121A (ja) | ロールキス判定装置,圧延制御装置,ロールキス判定方法及び圧延制御方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19880088 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2020553995 Country of ref document: JP Kind code of ref document: A |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112021006560 Country of ref document: BR |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 20217013643 Country of ref document: KR Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 112021006560 Country of ref document: BR Kind code of ref document: A2 Effective date: 20210406 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 19880088 Country of ref document: EP Kind code of ref document: A1 |