WO2019220906A1 - 電源システム - Google Patents
電源システム Download PDFInfo
- Publication number
- WO2019220906A1 WO2019220906A1 PCT/JP2019/017551 JP2019017551W WO2019220906A1 WO 2019220906 A1 WO2019220906 A1 WO 2019220906A1 JP 2019017551 W JP2019017551 W JP 2019017551W WO 2019220906 A1 WO2019220906 A1 WO 2019220906A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- battery
- batteries
- output
- input
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L58/00—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
- B60L58/10—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
- B60L58/12—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L58/00—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
- B60L58/10—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
- B60L58/18—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
- B60L58/22—Balancing the charge of battery modules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L7/00—Electrodynamic brake systems for vehicles in general
- B60L7/10—Dynamic electric regenerative braking
- B60L7/16—Dynamic electric regenerative braking for vehicles comprising converters between the power source and the motor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
Definitions
- the present invention relates to a power supply system that controls input / output of power to a plurality of batteries by controlling a plurality of input / output adjustment devices electrically connected between the plurality of batteries and a load.
- Japanese Patent Laid-Open No. 2017-99242 discloses a power supply system using two types of batteries, namely, an output type battery and a capacity type battery, and controls the SOC (State Of Charge) of the output type battery so that it can be operated during powering. It is disclosed that the output of the battery is maintained, and that the power of the battery is maintained during regeneration.
- SOC State Of Charge
- Japanese Patent Laying-Open No. 2015-220772 includes a high-power and expensive first battery (main battery) and a plurality of inexpensive second batteries (sub-batteries) having relatively high internal resistance values.
- a detachable power supply system is disclosed.
- Japanese Patent Laid-Open No. 2017-99242 discloses a method for controlling the SOC between two types of batteries having different characteristics of an output type battery and a capacity type battery, but the SOC between a plurality of batteries of the same type is disclosed. No control method is disclosed.
- the present invention has been made in consideration of such a problem, and an object thereof is to provide a power supply system capable of appropriately controlling the SOC between a plurality of batteries.
- a plurality of batteries, a plurality of input / output adjustment devices electrically connected between the plurality of batteries and a load, and a plurality of the input / output adjustment devices are controlled to control the plurality of the input / output adjustment devices.
- the present invention relates to a power supply system including a control device that controls input / output of power to / from a battery.
- the control device When the power is output from the plurality of batteries to the load via the plurality of input / output adjustment devices, the control device prioritizes the power from among the plurality of batteries that have a SOC exceeding a threshold value.
- the SOC of the plurality of batteries is The plurality of input / output adjustment devices are controlled so as to input the power in preference to the battery having the threshold value or less.
- the output from the battery with low SOC is suppressed, and on the other hand, during regeneration, power is preferentially input to the battery with low SOC to recover the SOC.
- variation in SOC between several batteries is suppressed, and the output of the power supply system which has several batteries can be improved.
- the SOC is recovered without performing power transfer, so that a reduction in power efficiency can be suppressed.
- the power supply system 10 includes a plurality of first batteries 12, a plurality of DC / DC converters (input / output adjustment devices) 14, a second battery 16, a power drive unit (PDU) 18, A battery ECU (control device) 20 and a motor generator ECU (MG-ECU) 22 are included.
- the power supply system 10 is applied to an electric vehicle 24 such as a two-wheeled vehicle, a three-wheeled vehicle, or a four-wheeled vehicle.
- the plurality of first batteries 12 are detachable batteries that are detachable from the electric vehicle 24. Specifically, each of the plurality of first batteries 12 is accommodated in a battery pack 28 including a battery management system (BMU) 26 that monitors the first battery 12.
- BMU battery management system
- the plurality of first batteries 12 can be attached to and detached from the electric vehicle 24 by attaching and detaching the battery pack 28 to and from the electric vehicle 24.
- the plurality of first batteries 12 may be the same type of battery, or may be different types of batteries.
- the number of the first batteries 12 illustrated in FIG. 1 is an example, and the power supply system 10 only needs to include two or more first batteries 12.
- the plurality of BMUs 26 sequentially detect the battery voltage, battery current, and temperature of the first battery 12 using a sensor (not shown).
- the state of the first battery 12 is sequentially transmitted from the plurality of BMUs 26 to the battery ECU 20 via the communication line 30.
- the plurality of DC / DC converters 14 have a primary side electrically connected to any one of the first batteries 12 and a secondary side electrically connected to the PDU 18. Therefore, the plurality of DC / DC converters 14 are connected in parallel to the PDU 18.
- the plurality of DC / DC converters 14 adjust the voltage (output voltage) output to the PDU 18 to a desired output voltage value by increasing / decreasing the battery voltage of the first battery 12 connected to the primary side, The current (output current) flowing through the PDU 18 is adjusted to a desired output current value. Further, the plurality of DC / DC converters 14 sequentially transmit their state to the battery ECU 20 via the communication line 30.
- the second battery 16 is a fixed battery provided in the electric vehicle 24. Also for the second battery 16, the battery voltage, the battery current, and the temperature are detected by a sensor (not shown). The state of the second battery 16 is sequentially transmitted to the battery ECU 20 via the communication line 32.
- the second battery 16 is not an essential component as will be described later.
- the PDU 18 includes a three-phase bridge type inverter.
- a plurality of DC / DC converters 14 and a second battery 16 are connected in parallel to the input side of the PDU 18.
- a motor 34 of the electric vehicle 24 that is a load of the power supply system 10 is electrically connected to the output side of the PDU 18.
- DC power is supplied from the plurality of first batteries 12 to the PDU 18 via the plurality of DC / DC converters 14 or from the second battery 16 to the PDU 18.
- the PDU 18 converts DC power into three-phase AC power and supplies it to the motor 34. Thereby, the motor 34 can be driven and the electric vehicle 24 can be run.
- the PDU 18 converts the AC power generated by the motor 34 into DC power.
- DC power can be input (charged) to the plurality of first batteries 12 via the plurality of DC / DC converters 14 or DC power can be input (charged) to the second battery 16.
- the MG-ECU 22 is an ECU (electronic control unit) for controlling the PDU 18 and the motor 34.
- the MG-ECU 22, the PDU 18, and the battery ECU 20 can send and receive signals or information via the communication lines 36 and 38.
- the MG-ECU 22 and the motor 34 are electrically connected via a communication line 40.
- the MG-ECU 22 supplies a control signal (a signal indicating a torque command value) for operating the switching elements constituting the PDU 18 via the communication line 36.
- the PDU 18 transmits a state of the PDU 18 and a protection request to the MG-ECU 22 via the communication line 36.
- the motor 34 transmits a state of the motor 34 and a protection request to the MG-ECU 22 via the communication line 40.
- the MG-ECU 22 receives the operation amount of the accelerator operation unit or the throttle operation unit operated by the driver of the electric vehicle 24, the state of the electric vehicle 24 such as the vehicle speed and the load requirement value of the auxiliary machine.
- the MG-ECU 22 calculates a required output of the motor 34 based on the input state of the electric vehicle 24 and information transmitted from the PDU 18 and the motor 34, and outputs the calculated required output to the battery via the communication line 38. It transmits to ECU20.
- the required output of the motor 34 includes the amount of power required for driving the motor 34 (required output during power running) that the motor 34 requests from the first battery 12 and the second battery 16 during power running, and the regeneration.
- the motor 34 when the motor 34 generates power, the motor 34 requests the first battery 12 and the second battery 16 to generate regenerative electric energy (regeneration request output) from the motor 34. Further, the MG-ECU 22 can transmit the state of the PDU 18 and the like to the battery ECU 20 via the communication line 38.
- the battery ECU 20 is an ECU for controlling the plurality of DC / DC converters 14.
- the battery ECU 20 performs various processes by reading and executing a program stored in a memory (not shown). Specifically, the battery ECU 20 calculates the SOCs of the first battery 12 and the second battery 16 from the received states of the first battery 12 and the second battery 16. In addition, the battery ECU 20 has an amount of power that can be output from each of the first battery 12 and the second battery 16 during power running (powering allowed power amount) and a power that can be input to the first battery 12 and the second battery 16 during regeneration. The amount (permitted electric energy during regeneration) is calculated. Further, the battery ECU 20 calculates a limit current value of each DC / DC converter 14 from the received states of the plurality of DC / DC converters 14.
- the battery ECU 20 performs all of the calculations based on the calculated SOC, each power running permission power amount and each limit current value, the required output of the motor 34 received from the MG-ECU 22 (power running requested output), etc.
- the total amount of power that can be output from the first battery 12 and the second battery 16 (power running total power amount) is calculated.
- the battery ECU 20 distributes the total power amount during powering based on the state of each first battery 12 and second battery 16, so that the amount of power actually output from each first battery 12 and second battery 16 ( (Power distribution amount during powering) is calculated.
- the battery ECU 20 regenerates all the first batteries based on each regenerative permitted power amount and each limit current value, the required output (regenerative request output) of the motor 34 received from the MG-ECU 22, and the like. 12 and the total amount of electric power that can be input to the second battery 16 (total electric energy during regeneration) are calculated. Then, the battery ECU 20 distributes the total electric energy during regeneration based on the state of each of the first battery 12 and the second battery 16, so that the amount of electric power actually input to each of the first battery 12 and the second battery 16 ( Regenerative power distribution amount) is calculated.
- the battery ECU 20 calculates, for each of the plurality of DC / DC converters 14, a power target value during power running based on the calculated power running power distribution amount, or based on the calculated regenerative power distribution amount. Calculate the target current value during regeneration. As a result, the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30, and battery information such as the SOC of each of the first battery 12 and the second battery 16 to the MG-ECU 22. Send.
- the plurality of DC / DC converters 14 increase / decrease the battery voltage of the connected first battery 12 based on the received current target value, thereby generating an output voltage to be output to the secondary side (input side of the PDU 18). In addition, the output current output to the secondary side is adjusted to the current target value.
- the MG-ECU 22 transmits a control signal based on the received information on each of the first battery 12 and the second battery 16 to the PDU 18 via the communication line 36.
- the PDU 18 operates the switching element based on the received control signal.
- direct current power corresponding to the power distribution amount during power running is output from each of the first battery 12 and the second battery 16, and the PDU 18 converts the output direct current power into alternating current power and supplies it to the motor 34. Supply. Thereby, the motor 34 is driven and the electric vehicle 24 can be run.
- the motor 34 generates power and outputs AC power to the PDU 18, and the PDU 18 converts AC power into DC power.
- the converted DC power is distributed according to each regeneration power distribution amount and input (charged) to each of the first battery 12 and the second battery 16.
- FIG. 2 is a conceptual diagram of the SOC of the plurality of first batteries 12.
- the SOCs of the individual first batteries 12 may be different from each other as shown in FIG. .
- the number of the first batteries 12 is N
- the SOC average value (threshold value, SOC average value) of the plurality of first batteries 12 is SOCave
- the number of the first batteries 12 exceeding the SOC average value SOCave is n.
- the difference between the maximum SOC and the minimum SOC among all the first batteries 12 is ⁇ SOC. Accordingly, the number of the first batteries 12 that are equal to or lower than the SOC average value SOCave is (N ⁇ n).
- n first batteries 12 exceeding SOC average value SOCave will be referred to as “n first batteries 12”, and (N ⁇ n) pieces of SOC average value SOCave or less.
- the “first battery 12” may be referred to as “(N ⁇ n) first batteries 12”.
- the battery ECU 20 determines the power distribution amount during power running and the power distribution amount during regeneration for each first battery 12 according to the concept shown in FIGS. 3 and 4 during power running and regeneration.
- 3 and 4 are diagrams showing the relationship between ⁇ SOC and the load factor when the horizontal axis is ⁇ SOC and the vertical axis is the load factor of each first battery 12 during power running and regeneration.
- the burden rate indicates how much each first battery 12 should bear the input and output of the electric energy with respect to the required output (power required output, regenerative required output). is there.
- the battery ECU 20 calculates the total power amount during powering with respect to the powering request output during powering, and the load factor during powering refers to each first power output during powering (total power during powering). It shows how much the battery 12 outputs (burdens) the amount of electric power.
- the battery ECU 20 calculates the total electric energy during regeneration with respect to the required output during regeneration.
- the load factor during regeneration refers to the required output during regeneration (total electric energy during regeneration). It shows how much the first battery 12 inputs (loads) the amount of electric power.
- the concept shown in FIG. 3 and FIG. 4 is a group of n first batteries 12 exceeding the threshold value (SOC average value SOCave) when the SOC average value SOCave is set as the threshold value for all the first batteries 12, and the threshold value.
- SOC average value SOCave the threshold value for all the first batteries 12, and the threshold value.
- ⁇ SOC is less than a predetermined value A ( ⁇ SOC ⁇ A)
- ⁇ SOC is greater than or equal to a predetermined value A ( ⁇ SOC ⁇ In A)
- the burden rate of the first battery 12 belonging to each group is changed.
- the burden ratios of the n first battery 12 groups are the same, while the burden ratios of the (N ⁇ n) first battery 12 groups are the same. Note the value.
- the battery ECU 20 sets the burden rate with respect to the requested output (total power amount during power running) of each first battery 12 to 100 / N [%]. As a result, all the first batteries 12 share the power running request output equally, and output the same amount of power.
- the battery ECU 20 indicates the burden rate for the powering request output (total power consumption during powering) of each first battery 12, and for the n first batteries 12, 100 / n [%
- the (N ⁇ n) first batteries 12 are set to 0 [%] as indicated by the broken line.
- the power amount corresponding to the burden rate of 100 / n [%] is preferentially output from only the n first batteries 12.
- the battery ECU 20 sets the burden ratio to the required output during regeneration (total power consumption during regeneration) of 100 for each first battery 12. Set to / N [%]. As a result, all the first batteries 12 are equally burdened with the regenerative request output, and are input (charged) by the same amount of power.
- ⁇ SOC is equal to or greater than a predetermined value A during regeneration in FIG. 3 ( ⁇ SOC ⁇ A)
- N ⁇ n first batteries 12
- the battery ECU 20 sets the burden rate for the regenerative request output (regeneration total power amount) of each first battery 12 to 0 [%] for the n first batteries 12 as indicated by the solid line.
- (N ⁇ n) first batteries 12 are set to 100 / (N ⁇ n) [%] as indicated by a broken line.
- only (N ⁇ n) first batteries 12 are preferentially input (charged) with the amount of power corresponding to the burden ratio of 100 / (N ⁇ n) [%].
- the battery ECU 20 changes the burden rate at the predetermined value A [%].
- the battery ECU 20 considers the controllability of the plurality of DC / DC converters 14 with respect to the plurality of first batteries 12, and the n first batteries 12 and the (N ⁇ n) first batteries 12.
- the burden rate may be gradually changed within a range of ⁇ A [%] from A0 [%] to A [%].
- FIG. 3 a case where the burden rate is changed with the predetermined value A [%] is illustrated by a one-dot chain line.
- the n first batteries 12 alone cannot output (cover) the amount of power corresponding to the power running demand output, and (N ⁇ n) first batteries. It is necessary to output electric power from the battery 12 as well.
- the required output during regeneration is large at the time of regeneration, even if power is input to only the (Nn) first batteries 12, the surplus (residual) The distribution of the electric energy when the electric energy of (min) is generated is illustrated.
- the battery ECU 20 sets the burden ratio for the power running request output of each first battery 12 to 100 / N [%].
- ⁇ SOC is greater than or equal to a predetermined value A ( ⁇ SOC ⁇ A) at the time of power running in FIG. 4, the power running request output is large. Can not cover the required load.
- the battery ECU 20 sets the burden ratio for the required output during power running to B1 ⁇ n / Poreq [%] for the n first batteries 12 as indicated by the solid line, while (N ⁇ n ) The first batteries 12 are set to ⁇ o [%] as indicated by the broken line.
- B1 shows the electric energy which can be output at the time of power running (power running permission electric energy) about each of the n first batteries 12.
- Poreq is a powering request output.
- the battery ECU 20 sets the burden rate for the required output during regeneration of each first battery 12 to 100 / N [%].
- the battery ECU 20 sets the burden rate for the required output during regeneration of each first battery 12 to ⁇ i [%] for the n first batteries 12 as indicated by the solid line, while (N ⁇ n)
- the number of first batteries 12 is set to B2 ⁇ (N ⁇ n) / Pireq [%] as indicated by a broken line.
- B2 indicates the amount of power that can be input at the time of regeneration of each of the (N ⁇ n) first batteries 12 (regeneration allowed power amount).
- Pireq is a regenerative request output.
- the battery ECU 20 acquires the state (battery voltage, battery current, temperature) of each first battery 12 from the BMU 26 provided in the plurality of first batteries 12.
- the battery ECU 20 calculates the SOC of each first battery 12 based on the acquired state of each first battery 12. Further, the battery ECU 20 calculates the SOC average value SOCave of each first battery 12 and calculates the difference ⁇ SOC between the maximum SOC and the minimum SOC for each first battery 12.
- step S12 the battery ECU 20 determines whether ⁇ SOC is equal to or greater than a predetermined value A [%].
- step S ⁇ b> 13 the battery ECU 20 uses the power running request output Poreq and the number N of the plurality of first batteries 12 to output the amount of power that each of the plurality of first batteries 12 should output during power running, that is, during power running.
- the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation with respect to the battery voltage based on the received current target value, thereby outputting a power amount corresponding to the power running power distribution amount Pbo from the first battery 12. be able to.
- the total amount of electric power output from the plurality of first batteries 12 to the PDU 18 can be adjusted to the powering request output Poeq (powering total electric energy).
- step S12 if ⁇ SOC is greater than or equal to the predetermined value A in step S12 ( ⁇ SOC ⁇ A, step S12: YES), the process proceeds to step S14.
- step S ⁇ b> 14 the battery ECU 20 calculates an electric energy B ⁇ b> 1 (powering allowed electric energy) that can be output during power running for each of the n first batteries 12.
- the battery ECU 20 determines whether or not the powering request output Poreq is equal to or greater than the total value B1 ⁇ n of the electric energy that can be output from the n first batteries 12.
- step S15 when the powering request output Poreq is less than the total value B1 ⁇ n (Poreq ⁇ B1 ⁇ n, step S15: NO), the process proceeds to step S16.
- step S16 the battery ECU 20 determines that the powering request output Poreq can be covered only by the amount of power output from the n first batteries 12, and divides the powering request output Poreq by n.
- the battery ECU 20 calculates a current target value during power running based on the calculated power distribution amount Pbon during power running.
- the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation with respect to the battery voltage based on the received current target value, thereby outputting a power amount corresponding to the power running power distribution amount Pbon from the first battery 12. be able to.
- the total amount of electric power output from the plurality of first batteries 12 to the PDU 18 can be adjusted to the powering request output Poeq (powering total electric energy).
- step S16 it is noted that the power running power distribution amount for (N ⁇ n) first batteries 12 is 0 and the current target value is also 0.
- step S15 when the powering request output Poeq is equal to or greater than the total value B1 ⁇ n (Poreq ⁇ B1 ⁇ n, step S15: YES), the process proceeds to step S17.
- step S18 the battery ECU 20 calculates a target current value for the DC / DC converter 14 to which the n first batteries 12 are connected, when the power running amount Pbon is the power amount B1.
- the battery ECU 20 transmits the current target value to the DC / DC converter 14 to which the n first batteries 12 are connected via the communication line 30.
- the DC / DC converter 14 that has received the current target value can output the electric energy B1 from the n first batteries 12 by performing a step-up / step-down operation on the battery voltage based on the current target value. it can.
- the battery ECU 20 transmits the current target value via the communication line 30 to the DC / DC converter 14 to which (N ⁇ n) first batteries 12 are connected.
- the DC / DC converter 14 that has received the current target value performs a step-up / step-down operation on the battery voltage based on the current target value, so that the shortage of power from the (N ⁇ n) first batteries 12.
- the quantity C1 / (Nn) can be output.
- step S21 of FIG. 6 the battery ECU 20 acquires the state of the first battery 12 from the plurality of BMUs 26 in the same manner as step S11 of FIG. 5, and each first ECU 12 based on the acquired state of each first battery 12.
- the SOC of the battery 12 is calculated. Also in this case, the battery ECU 20 calculates the SOC average value SOCave and the difference ⁇ SOC.
- step S22 the battery ECU 20 determines whether ⁇ SOC is equal to or greater than a predetermined value A [%], similar to step S12.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation on the battery voltage based on the received current target value, and thereby input the electric energy corresponding to the regenerative power distribution amount Pbi to the first battery 12. be able to.
- the sum total of the electric energy input to the plurality of first batteries 12 is adjusted to the regenerative request output Pireq (regenerative total electric energy).
- step S24 the battery ECU 20 calculates the amount of electric power (regenerative allowed electric energy) B2 that can be input during regeneration of each of the (N ⁇ n) first batteries 12.
- the battery ECU 20 determines whether or not the regenerative request output Pireq is equal to or greater than the total value B2 ⁇ (Nn) of the amount of power that can be input to the (N ⁇ n) first batteries 12. Determine.
- step S25 when the regeneration required output Pireq is less than the total value B2 ⁇ (N ⁇ n) (Pireq ⁇ B2 ⁇ (N ⁇ n), step S25: NO), the process proceeds to step S26.
- the battery ECU 20 calculates a target current value for regeneration based on the calculated regenerative power distribution amount Pbiu.
- the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation on the battery voltage based on the received current target value, thereby obtaining (N ⁇ n) pieces of electric power corresponding to the regenerative power distribution amount Pbiu.
- the first battery 12 can be preferentially input. Also in this case, the total amount of electric power input to the plurality of first batteries 12 can be adjusted to the regenerative request output Pireq (regenerative total electric energy).
- step S26 it is noted that the regenerative power distribution amount for the n first batteries 12 is 0 and the current target value is also 0.
- step S28 the battery ECU 20 calculates a current target value for the DC / DC converter 14 to which the (N ⁇ n) first batteries 12 are connected when the regeneration power distribution amount Pbiu is the power amount B2. To do.
- the battery ECU 20 transmits the current target value via the communication line 30 to the DC / DC converter 14 to which (N ⁇ n) first batteries 12 are connected.
- the DC / DC converter 14 that has received the current target value performs a step-up / step-down operation on the battery voltage based on the current target value, so that power is given priority over the (Nn) first batteries 12.
- the quantity B2 can be entered.
- a current target value corresponding to the power distribution amount Pbin is calculated.
- the battery ECU 20 transmits the current target value to the DC / DC converter 14 to which the n first batteries 12 are connected via the communication line 30.
- the DC / DC converter 14 that has received the current target value inputs a power amount C2 / n to the n first batteries 12 by performing a step-up / step-down operation on the battery voltage based on the current target value. be able to.
- FIGS. 7 to 10 are different from FIGS. 5 and 6 in that the load ratios (output load ratios) of the individual first batteries 12 are different from each other. Therefore, in the modified examples of FIGS. 7 to 10, the current target value transmitted from the battery ECU 20 to the plurality of DC / DC converters 14 may be different for each DC / DC converter 14 in accordance with the load factor. Keep in mind.
- step S31 of FIG. 7 the battery ECU 20 acquires the state of the first battery 12 from the plurality of BMUs 26 as in step S11 of FIG. 5, and based on the acquired state of the first battery 12, the first battery 12. The SOC is calculated. Further, the battery ECU 20 calculates the SOC average value SOCave and the difference ⁇ SOC.
- step S32 the battery ECU 20 determines whether ⁇ SOC is equal to or greater than a predetermined value A [%].
- step S32 the process proceeds to step S33.
- step S ⁇ b> 33 the battery ECU 20 calculates a power running total power amount D ⁇ b> 1 that is a total value of power amounts that can be output from the plurality of first batteries 12 during power running.
- the battery ECU 20 determines the load rate (output load rate) of each first battery 12 that is the ratio of the amount of power Pbop that can be output from each of the plurality of first batteries 12 and the total amount of power D1 during powering.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation with respect to the battery voltage based on the received current target value, thereby outputting a power amount corresponding to the power running power distribution amount Pbo from the first battery 12. be able to.
- step S32 if ⁇ SOC is greater than or equal to predetermined value A in step S32 ( ⁇ SOC ⁇ A, step S32: YES), the process proceeds to step S36.
- step S ⁇ b> 36 the battery ECU 20 calculates an electric energy E ⁇ b> 1 that is a total value of electric energy that can be output from the n first batteries 12.
- step S38 the battery ECU 20 determines whether or not the powering request output Poreq is equal to or greater than the electric energy E1.
- step S38 of FIG. 8 when the powering request output Poreq is less than the electric energy E1 (Poreq ⁇ E1, step S38: NO), the process proceeds to step S39.
- the battery ECU 20 calculates a current target value during power running based on the calculated power distribution amount Pbon during power running.
- the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation with respect to the battery voltage based on the received current target value, thereby outputting a power amount corresponding to the power running power distribution amount Pbon from the first battery 12. be able to.
- step S38 when the powering request output Poeq is equal to or greater than the electric energy E1 (Poreq ⁇ E1, step S38: YES), the process proceeds to step S40.
- the battery ECU 20 calculates a target current value corresponding to the power distribution amount Pbon during powering for the DC / DC converter 14 to which the n first batteries 12 are connected.
- the battery ECU 20 transmits the current target value to the DC / DC converter 14 to which the n first batteries 12 are connected via the communication line 30.
- the DC / DC converter 14 that has received the current target value outputs the power-running power distribution amount Pbon from the n first batteries 12 by performing a step-up / step-down operation on the battery voltage based on the current target value. can do.
- step S41 the battery ECU 20 calculates F1, which is the total amount of electric power that can be output from the (N ⁇ n) first batteries 12.
- the battery ECU 20 multiplies the difference between the power-run request output Poreq and the power amount E1 by the output share rate Zoi, thereby power-running power distribution of the (N ⁇ n) first batteries 12.
- the battery ECU 20 calculates a current target value corresponding to the power running power distribution amount Pbou for the DC / DC converter 14 to which the (N ⁇ n) first batteries 12 are connected.
- the battery ECU 20 transmits the current target value via the communication line 30 to the DC / DC converter 14 to which (N ⁇ n) first batteries 12 are connected.
- the DC / DC converter 14 that has received the current target value performs a step-up / step-down operation on the battery voltage based on the current target value, thereby reducing the power running power distribution amount Pbou to the (N ⁇ n) first power distribution amounts. It can be output from the battery 12.
- step S51 of FIG. 9 the battery ECU 20 acquires the state of the first battery 12 from the plurality of BMUs 26 as in step S21 of FIG. 6, and based on the acquired state of the first battery 12, the first battery 12.
- the SOC is calculated. Further, the battery ECU 20 calculates the SOC average value SOCave and the difference ⁇ SOC.
- step S52 the battery ECU 20 determines whether ⁇ SOC is equal to or greater than a predetermined value A [%].
- step S53 the battery ECU 20 calculates a total electric energy D2 during regeneration, which is a total value of electric energy that can be input to the plurality of first batteries 12 during regeneration.
- the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30. Accordingly, the plurality of DC / DC converters 14 perform a step-up / step-down operation on the battery voltage based on the received current target value, and thereby input the electric energy corresponding to the regenerative power distribution amount Pbi to the first battery 12. be able to.
- step S52 the battery ECU 20 calculates an electric energy E2 that is a total value of electric energy that can be input to the (N ⁇ n) first batteries 12.
- the battery ECU 20 divides the electric energy Pbip that can be input to the (N ⁇ n) first batteries 12 by the electric energy E2, so that the (N ⁇ n) first batteries 12
- step S58 of FIG. 10 the battery ECU 20 determines whether or not the regeneration required output Pireq is equal to or greater than the electric energy E2.
- step S58 when the regeneration required output Pireq is less than the electric energy E2 (Pireq ⁇ E2, step S58: NO), the process proceeds to step S59.
- the battery ECU 20 calculates a target current value for regeneration based on the calculated regenerative power distribution amount Pbiu.
- the battery ECU 20 transmits the current target value to the plurality of DC / DC converters 14 via the communication line 30.
- the plurality of DC / DC converters 14 perform a step-up / step-down operation on the battery voltage based on the received current target value, thereby obtaining (N ⁇ n) pieces of electric power corresponding to the regenerative power distribution amount Pbiu.
- the first battery 12 can be preferentially input.
- the battery ECU 20 calculates a current target value corresponding to the regenerative power distribution amount Pbiu for the DC / DC converter 14 to which the (N ⁇ n) first batteries 12 are connected.
- the battery ECU 20 transmits the current target value via the communication line 30 to the DC / DC converter 14 to which (N ⁇ n) first batteries 12 are connected.
- the DC / DC converter 14 that has received the current target value performs a step-up / step-down operation on the battery voltage based on the current target value, thereby reducing the regeneration power distribution amount Pbiu to the (Nn) first power distribution amounts. Input can be given priority over the battery 12.
- step S61 the battery ECU 20 calculates F2, which is the total amount of electric power that can be input to the n first batteries 12.
- the DC / DC converter 14 that has received the current target value performs a step-up / step-down operation on the battery voltage based on the current target value, thereby inputting the regenerative power distribution amount Pbin to the n first batteries 12. can do.
- the plurality of first batteries 12 and the plurality of first batteries 12 and the plurality of electrically connected between the motors 34 loads.
- a power supply system having a DC / DC converter 14 (input / output adjustment device) and a battery ECU 20 (control device) that controls input / output of electric power to / from the plurality of first batteries 12 by controlling the plurality of DC / DC converters 14. 10.
- the battery ECU 20 When power is output from the plurality of first batteries 12 to the motor 34 via the plurality of DC / DC converters 14, the battery ECU 20 sets the SOC of the plurality of first batteries 12 to a threshold value (SOC average value SOCave).
- the plurality of DC / DC converters 14 are controlled so as to output power preferentially from the first battery 12 that exceeds. Further, during regeneration in which electric power is input from the motor 34 to the plurality of first batteries 12 via the plurality of DC / DC converters 14, the battery ECU 20 of the plurality of first batteries 12 has an SOC that is equal to or less than a threshold value.
- the plurality of DC / DC converters 14 are controlled so that power is input in preference to 12.
- the SOC is recovered without transferring power, so that it is possible to suppress a decrease in power efficiency.
- the threshold value is the SOC average value SOCave of the plurality of first batteries 12, and the battery ECU 20 starts from the first battery 12 (n first batteries 12) having SOC exceeding the SOC average value SOCave during power running. What is necessary is just to control the several DC / DC converter 14 so that electric power may be output preferentially. As a result, the SOC of each first battery 12 can be used evenly. That is, since power is output preferentially from the n first batteries 12 having a large SOC, power can be output while suppressing variations in SOC between the first batteries 12 with relatively simple control.
- the battery ECU 20 When the amount of electric power that can be output from the first battery 12 that exceeds the SOC average value SOCave is greater than the required output of the motor 34 (the required output during power running Poreq) during power running, the battery ECU 20 The plurality of DC / DC converters 14 are controlled so that power is output from 12 to the motor 34 via the DC / DC converter 14. Thereby, the SOC of each first battery 12 can be used more efficiently.
- the battery ECU 20 outputs the DC / DC converter 14 from the first battery 12.
- the first battery 12 ((N ⁇ n) first batteries 12) having an SOC average value SOCave or less is connected to the first battery 12.
- the plurality of DC / DC converters 14 are controlled so that a deficient amount of power with respect to the required output is output to the motor 34 via the DC / DC converters 14. Thereby, even when the required output is large, the SOC of each first battery 12 can be used efficiently.
- the battery ECU 20 outputs the same amount of power from the plurality of first batteries 12 or the output burden of the plurality of first batteries 12 with respect to the requested output.
- the plurality of DC / DC converters 14 are controlled so as to output only the amount of power corresponding to the rate. Thereby, the SOC of each first battery 12 can be used more efficiently while suppressing variations in SOC between the first batteries 12.
- the battery ECU 20 receives a plurality of DC / DC so as to input power in preference to the first batteries 12 ((N ⁇ n) first batteries 12) having an SOC equal to or lower than the SOC average value SOCave.
- the DC converter 14 is controlled. Thereby, SOC can be rapidly recovered about the 1st battery 12 with low SOC.
- power is input in preference to the (Nn) first batteries 12 having a small SOC, variations in SOC between the first batteries 12 can be suppressed with relatively simple control.
- the battery ECU 20 When the amount of electric power that can be input to the first battery 12 that is equal to or lower than the SOC average value SOCave is greater than the regenerative power from the motor 34 (regeneration request output Pireq), the battery ECU 20 The plurality of DC / DC converters 14 are controlled so that regenerative power is input to the first battery 12 via the DC / DC converters 14. Thereby, electric power can be reliably input into the 1st battery 12 with low SOC.
- the battery ECU 20 receives the first power from the motor 34 via the DC / DC converter 14.
- the DC / DC converter 14 is controlled. Thereby, even when the required output is large, it becomes possible to input the regenerative power to each first battery 12 efficiently.
- the battery ECU 20 inputs the same amount of power to the plurality of first batteries 12, or the output burden of the plurality of first batteries 12 with respect to the regenerative power.
- the plurality of DC / DC converters 14 are controlled so as to input only the amount of power corresponding to the rate. Thereby, electric power can be efficiently input with respect to the 1st battery 12 with low SOC.
- the plurality of first batteries 12 may be the same type of battery or different types of batteries. Thereby, it is possible to efficiently use the SOC regardless of the type of the first battery 12.
- the plurality of first batteries 12 are respectively accommodated in a plurality of battery packs 28 including a BMU 26 (battery management system) that monitors the first battery 12. Thereby, it can apply easily to a detachable battery.
- BMU 26 battery management system
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
Abstract
電源システム(10)のバッテリECU(20)は、力行時には、複数の第1バッテリ(12)のうち、SOC平均値(SOCave)を超えるn個の第1バッテリ(12)から優先して電力を出力するように複数のDC/DCコンバータ(14)を制御する。また、バッテリECU(20)は、回生時には、複数の第1バッテリ(12)のうち、SOC平均値(SOCave)以下の(N-n)個の第1バッテリ(12)に優先して電力を入力するように複数のDC/DCコンバータ(14)を制御する。
Description
本発明は、複数のバッテリと負荷との間に電気的に接続される複数の入出力調整装置を制御することで、複数のバッテリに対する電力の入出力を制御する電源システムに関する。
特開2017-99242号公報には、出力型バッテリ及び容量型バッテリの異なる2種類のバッテリを用いた電源システムであって、出力型バッテリのSOC(State Of Charge)を制御することで、力行時にはバッテリの出力を維持し、回生時にはバッテリの電力の受入れを維持することが開示されている。
特開2015-220772号公報には、高出力且つ高価な第1蓄電器(メインバッテリ)と、相対的に内部抵抗値の高い廉価な複数の第2蓄電器(サブバッテリ)とを備え、サブバッテリが着脱可能な電源システムが開示されている。
特開2015-220772号公報のサブバッテリのように、負荷に対して同じ種類の複数のバッテリを並列に接続する場合、バッテリ毎にSOCがばらついていると、SOC又はバッテリ電圧の低いバッテリの出力に引きずられて、電源システム全体の出力が低くなってしまう。
そこで、バッテリ間で電力の授受を行うことで、各バッテリのSOCを合わせようとすると、バッテリに対する電力の入出力を制御するDC/DCコンバータ(入出力装置)、配線、及び、バッテリを収容するバッテリパックで電力損失が発生し、電力効率が却って低下する。
一方、特開2017-99242号公報には、出力型バッテリ及び容量型バッテリの異なる特性の2種類のバッテリ間のSOCを制御する手法は開示されているが、同じ種類の複数のバッテリ間のSOCの制御手法については何ら開示されていない。
従って、異なる種類のバッテリ間でのSOCの制御のみならず、同じ種類のバッテリ間でのSOCの制御が望まれている。
本発明は、このような課題を考慮してなされたものであり、複数のバッテリ間のSOCを適切に制御することが可能な電源システムを提供することを目的とする。
本発明の態様は、複数のバッテリと、複数の前記バッテリと負荷との間で電気的に接続される複数の入出力調整装置と、複数の前記入出力調整装置を制御することで複数の前記バッテリに対する電力の入出力を制御する制御装置とを有する電源システムに関する。
前記制御装置は、複数の前記バッテリから複数の前記入出力調整装置を介して前記負荷に電力を出力する力行時には、複数の前記バッテリのうち、SOCが閾値を超えるバッテリから優先して前記電力を出力するように複数の前記入出力調整装置を制御し、前記負荷から複数の前記入出力調整装置を介して複数の前記バッテリに電力を入力する回生時には、複数の前記バッテリのうち、前記SOCが前記閾値以下のバッテリに優先して前記電力を入力するように複数の前記入出力調整装置を制御する。
本発明によれば、力行時には、SOCの低いバッテリからの出力を抑制し、一方で、回生時には、SOCの低いバッテリに優先的に電力を入力して、SOCを回復させるようにしている。これにより、複数のバッテリ間でのSOCのばらつきが抑制され、複数のバッテリを有する電源システムの出力を向上させることができる。
また、複数のバッテリ間でSOCのばらつきがあっても、電力の授受を行うことなくSOCを回復させるので、電力効率の低下も抑制することができる。
このように、本発明では、複数のバッテリ間のSOCを適切に制御することが可能となる。
以下、本発明に係る電源システムについて好適な実施形態を例示し、添付の図面を参照しながら説明する。
[1.本実施形態の構成]
本実施形態に係る電源システム10は、図1に示すように、複数の第1バッテリ12、複数のDC/DCコンバータ(入出力調整装置)14、第2バッテリ16、パワードライブユニット(PDU)18、バッテリECU(制御装置)20、及び、モータジェネレータECU(MG-ECU)22を有する。電源システム10は、例えば、二輪車、三輪車、四輪車等の電動車両24に適用される。
本実施形態に係る電源システム10は、図1に示すように、複数の第1バッテリ12、複数のDC/DCコンバータ(入出力調整装置)14、第2バッテリ16、パワードライブユニット(PDU)18、バッテリECU(制御装置)20、及び、モータジェネレータECU(MG-ECU)22を有する。電源システム10は、例えば、二輪車、三輪車、四輪車等の電動車両24に適用される。
複数の第1バッテリ12は、電動車両24に対して着脱可能な着脱式のバッテリである。具体的に、複数の第1バッテリ12の各々は、第1バッテリ12を監視するバッテリマネジメントシステム(BMU)26を含むバッテリパック28に収容されている。複数の第1バッテリ12は、電動車両24に対してバッテリパック28を着脱することで、該電動車両24に対して着脱可能である。なお、複数の第1バッテリ12は、同一種類のバッテリであってもよいし、又は、互いに異なる種類のバッテリであってもよい。また、図1に示す第1バッテリ12の個数は一例であり、電源システム10は、2個以上の第1バッテリ12を備えていればよい。
また、複数のBMU26は、不図示のセンサを用いて、第1バッテリ12のバッテリ電圧、バッテリ電流及び温度を逐次検出する。これらの第1バッテリ12の状態は、複数のBMU26から通信線30を介してバッテリECU20に逐次送信される。
複数のDC/DCコンバータ14は、1次側が複数の第1バッテリ12のうち、いずれか1つの第1バッテリ12と電気的に接続され、2次側がPDU18と電気的に接続されている。従って、複数のDC/DCコンバータ14は、PDU18に対して並列に接続されている。複数のDC/DCコンバータ14は、1次側に接続されている第1バッテリ12のバッテリ電圧を昇降圧することで、PDU18に出力する電圧(出力電圧)を所望の出力電圧値に調整すると共に、PDU18に流す電流(出力電流)を所望の出力電流値に調整する。また、複数のDC/DCコンバータ14は、通信線30を介して、バッテリECU20に自己の状態を逐次送信する。
第2バッテリ16は、電動車両24に備わる固定式のバッテリである。第2バッテリ16についても、不図示のセンサによって、バッテリ電圧、バッテリ電流及び温度が検出される。これらの第2バッテリ16の状態は、通信線32を介してバッテリECU20に逐次送信される。なお、第2バッテリ16は、後述するように、必須の構成要素ではない。
PDU18は、三相ブリッジ型のインバータを含み構成される。PDU18の入力側には、複数のDC/DCコンバータ14及び第2バッテリ16が並列に接続されている。PDU18の出力側には、電源システム10の負荷である電動車両24のモータ34が電気的に接続されている。電動車両24の力行時には、複数の第1バッテリ12から複数のDC/DCコンバータ14を介してPDU18に、又は、第2バッテリ16からPDU18に、直流電力が供給される。PDU18は、直流電力を三相の交流電力に変換してモータ34に供給する。これにより、モータ34を駆動させ、電動車両24を走行させることができる。一方、電動車両24の回生時に、PDU18は、モータ34が発電した交流電力を直流電力に変換する。これにより、複数のDC/DCコンバータ14を介して複数の第1バッテリ12に直流電力を入力(充電)し、又は、第2バッテリ16に直流電力を入力(充電)することができる。
MG-ECU22は、PDU18及びモータ34を制御するためのECU(電子制御装置)である。MG-ECU22とPDU18及びバッテリECU20とは、通信線36、38を介して、信号又は情報の送受信が可能である。また、MG-ECU22とモータ34とは、通信線40を介して電気的に接続されている。
すなわち、MG-ECU22は、通信線36を介して、PDU18を構成するスイッチング素子を動作させるための制御信号(トルクの指令値を示す信号)を供給する。PDU18は、通信線36を介して、PDU18の状態やMG-ECU22に対する保護要求を送信する。モータ34は、通信線40を介して、モータ34の状態やMG-ECU22に対する保護要求を送信する。
MG-ECU22には、電動車両24の運転者が操作するアクセル操作部又はスロットル操作部等の操作量や、車速、補機の負荷要求値等の電動車両24の状態が入力される。MG-ECU22は、入力された電動車両24の状態や、PDU18及びモータ34から送信された情報に基づいて、モータ34の要求出力を算出し、算出した要求出力を、通信線38を介してバッテリECU20に送信する。なお、モータ34の要求出力には、力行時にモータ34が各第1バッテリ12及び第2バッテリ16に要求する、該モータ34の駆動に必要とされる電力量(力行時要求出力)と、回生時にモータ34が発電した際に、該モータ34が各第1バッテリ12及び第2バッテリ16に要求する、モータ34からの回生電力量(回生時要求出力)とがある。また、MG-ECU22は、通信線38を介して、PDU18の状態等をバッテリECU20に送信可能である。
バッテリECU20は、複数のDC/DCコンバータ14を制御するためのECUである。バッテリECU20は、不図示のメモリに記憶されたプログラムを読み出して実行することにより、各種の処理を行う。具体的に、バッテリECU20は、受信した複数の第1バッテリ12及び第2バッテリ16の各々の状態から、各第1バッテリ12及び第2バッテリ16のSOCを算出する。また、バッテリECU20は、力行時に各第1バッテリ12及び第2バッテリ16から出力可能な電力量(力行時許可電力量)と、回生時に各第1バッテリ12及び第2バッテリ16に入力可能な電力量(回生時許可電力量)とを算出する。さらに、バッテリECU20は、受信した複数のDC/DCコンバータ14の状態から、各DC/DCコンバータ14の制限電流値を算出する。
バッテリECU20は、力行時には、算出した各SOC、各力行時許可電力量及び各制限電流値と、MG-ECU22から受信したモータ34の要求出力(力行時要求出力)等とに基づいて、全ての第1バッテリ12及び第2バッテリ16から出力可能な電力量の合計値(力行時合計電力量)を算出する。そして、バッテリECU20は、各第1バッテリ12及び第2バッテリ16の状態に基づき、力行時合計電力量を分配することで、実際に各第1バッテリ12及び第2バッテリ16から出力する電力量(力行時電力分配量)を算出する。
一方、バッテリECU20は、回生時には、各回生時許可電力量及び各制限電流値と、MG-ECU22から受信したモータ34の要求出力(回生時要求出力)等とに基づいて、全ての第1バッテリ12及び第2バッテリ16に入力可能な電力量の合計値(回生時合計電力量)を算出する。そして、バッテリECU20は、各第1バッテリ12及び第2バッテリ16の状態に基づき、回生時合計電力量を分配することで、実際に各第1バッテリ12及び第2バッテリ16に入力する電力量(回生時電力分配量)を算出する。
そして、バッテリECU20は、複数のDC/DCコンバータ14の各々について、算出した各力行時電力分配量に基づく力行時の電流目標値を算出するか、又は、算出した各回生時電力分配量に基づく回生時の電流目標値を算出する。これにより、バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信すると共に、MG-ECU22に各第1バッテリ12及び第2バッテリ16のSOC等のバッテリ情報を送信する。
複数のDC/DCコンバータ14は、受信した電流目標値に基づいて、接続されている第1バッテリ12のバッテリ電圧を昇降圧することにより、2次側(PDU18の入力側)に出力する出力電圧を調整すると共に、2次側に出力する出力電流を電流目標値に調整する。一方、MG-ECU22は、受信した各第1バッテリ12及び第2バッテリ16の情報に基づく制御信号を、通信線36を介してPDU18に送信する。PDU18は、受信した制御信号に基づいてスイッチング素子を動作させる。
これにより、力行時には、各第1バッテリ12及び第2バッテリ16から力行時電力分配量に応じた直流電力が出力され、PDU18は、出力された各直流電力を交流電力に変換してモータ34に供給する。これにより、モータ34が駆動されて、電動車両24を走行させることができる。一方、回生時には、モータ34が発電して交流電力をPDU18に出力し、PDU18は、交流電力を直流電力に変換する。変換後の直流電力は、各回生時電力分配量に応じて分配され、各第1バッテリ12及び第2バッテリ16に入力(充電)される。
[2.電力量の分配の概要]
以上のように構成される本実施形態に係る電源システム10に関し、バッテリECU20内で行われる電力量の分配の概念について、図2~図4を参照しながら説明する。なお、図1では、第2バッテリ16が配設されているが、以下の説明では、複数の第1バッテリ12に対する電力量の分配について説明する。従って、電源システム10において、第2バッテリ16は、必須の構成要素ではないことに留意する。
以上のように構成される本実施形態に係る電源システム10に関し、バッテリECU20内で行われる電力量の分配の概念について、図2~図4を参照しながら説明する。なお、図1では、第2バッテリ16が配設されているが、以下の説明では、複数の第1バッテリ12に対する電力量の分配について説明する。従って、電源システム10において、第2バッテリ16は、必須の構成要素ではないことに留意する。
図2は、複数の第1バッテリ12のSOCの概念図である。電源システム10に複数の第1バッテリ12が備わる場合(図1及び図2では4個の第1バッテリ12)、図2に示すように、個々の第1バッテリ12のSOCが互いに異なる場合がある。ここで、第1バッテリ12の個数をNとし、複数の第1バッテリ12のSOCの平均値(閾値、SOC平均値)をSOCaveとし、SOC平均値SOCaveを超える第1バッテリ12の個数をnとし、全ての第1バッテリ12のうち、最大のSOCと、最小のSOCとの差をΔSOCとする。従って、SOC平均値SOCave以下の第1バッテリ12の個数は、(N-n)となる。
図2の例では、N=4、n=3、N-n=1である。なお、以下の説明において、「SOC平均値SOCaveを超えるn個の第1バッテリ12」を「n個の第1バッテリ12」と呼称し、「SOC平均値SOCave以下の(N-n)個の第1バッテリ12」を「(N-n)個の第1バッテリ12」と呼称する場合がある。
バッテリECU20では、図3及び図4に示す概念に従って、力行時及び回生時において、各第1バッテリ12に対する力行時電力分配量及び回生時電力分配量を決定する。図3及び図4は、横軸をΔSOCとし、縦軸を力行時及び回生時における各第1バッテリ12の負担率としたときのΔSOCと負担率との関係を示した図である。
ここで、負担率とは、要求出力(力行時要求出力、回生時要求出力)に対して、どの程度の割合で各第1バッテリ12が電力量の入出力を負担すべきかを示したものである。バッテリECU20では、力行時には、力行時要求出力に対して力行時合計電力量を算出するが、力行時の負担率とは、力行時要求出力(力行時合計電力量)に対して、各第1バッテリ12がどの程度の割合で電力量を出力(負担)するかを示したものである。一方、バッテリECU20では、回生時には、回生時要求出力に対して回生時合計電力量を算出するが、回生時の負担率とは、回生時要求出力(回生時合計電力量)に対して、各第1バッテリ12がどの程度の割合で電力量を入力(負担)するかを示したものである。
また、力行時には、複数の第1バッテリ12からモータ34への方向に電力が出力され、一方で、回生時には、モータ34から複数の第1バッテリ12への方向、すなわち、力行時の方向とは逆方向に電力が入力(回生)される。そこで、図3及び図4では、力行時の負担率を縦軸の正方向に図示し、回生時の負担率を縦軸の負方向に図示している。以下の説明において、力行時及び回生時の負担率は、絶対値で説明する。従って、縦軸の0[%]から正方向又は負方向に離れるほど、力行時及び回生時における各第1バッテリ12の負担率が大きくなることに留意する。
図3及び図4に示す概念は、全ての第1バッテリ12について、SOC平均値SOCaveを閾値としたときに、閾値(SOC平均値SOCave)を超えるn個の第1バッテリ12のグループと、閾値以下の(N-n)個の第1バッテリ12のグループとに分けた上で、ΔSOCが所定値A未満である場合(ΔSOC<A)と、ΔSOCが所定値A以上である場合(ΔSOC≧A)とで、それぞれのグループに属する第1バッテリ12の負担率を変更するというものである。また、図3及び図4では、n個の第1バッテリ12のグループの負担率が互いに同一値であり、一方で、(N-n)個の第1バッテリ12のグループの負担率が互いに同一値であることに留意する。
図3の例は、力行時には、SOCaveを超えるn個の第1バッテリ12のみから力行時要求出力に応じた電力量を出力することが可能であり、一方で、回生時には、SOC平均値SOCave以下の(N-n)個の第1バッテリ12のみに対して、回生時要求出力に応じた電力量を入力することが可能である場合の電力量の分配を図示したものである。なお、図3中、実線は、n個の第1バッテリ12に対する負担率の変化を示したものであり、破線は、(N-n)個の第1バッテリ12に対する負担率の変化を示したものである。
図3の力行時において、ΔSOCが所定値A未満である場合(ΔSOC<A)は、各第1バッテリ12間でSOCのばらつきは比較的小さい。この場合、バッテリECU20は、各第1バッテリ12の力行時要求出力(力行時合計電力量)に対する負担率を100/N[%]に設定する。これにより、全ての第1バッテリ12は、力行時要求出力に対して、平等に負担することになり、同じ電力量だけ出力することになる。
また、図3の力行時において、ΔSOCが所定値A以上である場合(ΔSOC≧A)は、n個の第1バッテリ12と(N-n)個の第1バッテリ12との間で、SOCのばらつきが比較的大きく、SOCの小さい(N-n)個の第1バッテリ12から電力を出力することが困難である。この場合、バッテリECU20は、各第1バッテリ12の力行時要求出力(力行時合計電力量)に対する負担率を、n個の第1バッテリ12については、実線で示すように、100/n[%]に設定し、一方で、(N-n)個の第1バッテリ12については、破線で示すように、0[%]に設定する。これにより、n個の第1バッテリ12のみから、負担率100/n[%]に応じた電力量が優先して出力されることになる。
一方、図3の回生時において、ΔSOCが所定値A未満である場合(ΔSOC<A)、バッテリECU20は、各第1バッテリ12の回生時要求出力(回生時合計電力量)に対する負担率を100/N[%]に設定する。これにより、全ての第1バッテリ12は、回生時要求出力に対して、平等に負担することになり、同じ電力量だけ入力(充電)されることになる。
また、図3の回生時において、ΔSOCが所定値A以上である場合(ΔSOC≧A)は、(N-n)個の第1バッテリ12を優先して充電し、SOCを回復させることが望ましい。この場合、バッテリECU20は、各第1バッテリ12の回生時要求出力(回生時合計電力量)に対する負担率を、n個の第1バッテリ12については、実線で示すように、0[%]に設定し、一方で、(N-n)個の第1バッテリ12については、破線で示すように、100/(N-n)[%]に設定する。これにより、(N-n)個の第1バッテリ12のみに対して、負担率100/(N-n)[%]に応じた電力量が優先して入力(充電)される。
このように、図3では、バッテリECU20は、所定値A[%]を境に負担率を変更する。但し、実際上、バッテリECU20では、複数の第1バッテリ12に対する複数のDC/DCコンバータ14の制御性を考慮し、n個の第1バッテリ12及び(N-n)個の第1バッテリ12について、A0[%]からA[%]までのΔA[%]の範囲で、負担率を徐々に変化させてもよい。なお、図3では、所定値A[%]で負担率を変更する場合を一点鎖線で図示している。
一方、図4の例は、力行時には、n個の第1バッテリ12だけでは、力行時要求出力に応じた電力量を出力する(賄う)ことができず、(N-n)個の第1バッテリ12からも電力を出力する必要があり、一方で、回生時には、回生時要求出力が大きいため、(N-n)個の第1バッテリ12のみに電力を入力しても、余剰分(残余分)の電力量が発生する場合の電力量の分配を図示したものである。
図4の力行時でも、ΔSOCが所定値A未満である場合(ΔSOC<A)、バッテリECU20は、各第1バッテリ12の力行時要求出力に対する負担率を100/N[%]に設定する。
一方、図4の力行時において、ΔSOCが所定値A以上である場合(ΔSOC≧A)は、力行時要求出力が大きいため、n個の第1バッテリ12から出力される電力量だけでは、力行時要求負荷を賄い切れない。
そこで、バッテリECU20は、力行時要求出力に対する負担率を、n個の第1バッテリ12については、実線で示すように、B1×n/Poreq[%]に設定し、一方で、(N-n)個の第1バッテリ12については、破線で示すように、Δo[%]に設定する。なお、B1は、n個の第1バッテリ12の各々について、力行時に出力可能な電力量(力行時許可電力量)を示す。また、Poreqは、力行時要求出力である。また、Δoは、(N-n)個の第1バッテリ12の負担率であって、Δo=(100/n-B1×n/Poreq)[%]である。
これにより、n個の第1バッテリ12から出力される電力量に加え、(N-n)個の第1バッテリ12から不足分の電力量が出力されるので、力行時要求出力が大きい場合でも、効率よく電力を出力することができる。
図4の回生時でも、ΔSOCが所定値A未満である場合(ΔSOC<A)、バッテリECU20は、各第1バッテリ12の回生時要求出力に対する負担率を100/N[%]に設定する。
一方、図4の回生時において、ΔSOCが所定値A以上である場合(ΔSOC≧A)は、回生時要求出力が大きいため、(N-n)個の第1バッテリ12への入力のみでは、余剰分の電力量が発生してしまう。
そこで、バッテリECU20は、各第1バッテリ12の回生時要求出力に対する負担率を、n個の第1バッテリ12については、実線で示すように、Δi[%]に設定し、一方で、(N-n)個の第1バッテリ12については、破線で示すように、B2×(N-n)/Pireq[%]に設定する。なお、B2は、(N-n)個の第1バッテリ12の各々の回生時に入力可能な電力量(回生時許可電力量)を示す。また、Pireqは、回生時要求出力である。また、Δiは、n個の第1バッテリ12の負担率であって、Δi=(100/(N-n)-B2×(N-n)/Pireq)[%]である。
これにより、(N-n)個の第1バッテリ12に電力が入力されると共に、残余分の電力がn個の第1バッテリ12に入力されるので、回生時要求出力が大きい場合でも、効率よく電力を入力することができる。
[3.本実施形態の動作]
次に、本実施形態に係る電源システム10の動作について、図5及び図6のフローチャートを参照しながら説明する。この動作説明では、必要に応じて、図1~図4も参照しながら説明する。ここでは、図3及び図4の概念を実現するための電源システム10の動作を図5及び図6のフローチャートを参照しながら説明する。
次に、本実施形態に係る電源システム10の動作について、図5及び図6のフローチャートを参照しながら説明する。この動作説明では、必要に応じて、図1~図4も参照しながら説明する。ここでは、図3及び図4の概念を実現するための電源システム10の動作を図5及び図6のフローチャートを参照しながら説明する。
<3.1 力行時の動作>
先ず、図3及び図4の力行時の動作について、図5のフローチャートを参照しながら説明する。
先ず、図3及び図4の力行時の動作について、図5のフローチャートを参照しながら説明する。
図5のステップS11において、バッテリECU20は、複数の第1バッテリ12に併設されたBMU26から各第1バッテリ12の状態(バッテリ電圧、バッテリ電流、温度)を取得する。バッテリECU20は、取得した各第1バッテリ12の状態に基づいて、各第1バッテリ12のSOCを算出する。また、バッテリECU20は、各第1バッテリ12のSOC平均値SOCaveを算出すると共に、各第1バッテリ12について、最大のSOCと最小のSOCとの差ΔSOCを算出する。
ステップS12において、バッテリECU20は、ΔSOCが所定値A[%]以上であるか否かを判定する。
ΔSOCが所定値A未満である場合(ΔSOC<A、ステップS12:NO)、ステップS13に進む。ステップS13において、バッテリECU20は、力行時要求出力Poreqと、複数の第1バッテリ12の個数Nとを用いて、力行時に複数の第1バッテリ12の各々が出力すべき電力量、すなわち、力行時電力分配量Pboを算出する(Pbo=Poreq/N)。そして、バッテリECU20は、算出した各力行時電力分配量Pboに基づいて、力行時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。
これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、力行時電力分配量Pboに応じた電力量を第1バッテリ12から出力することができる。この結果、複数の第1バッテリ12からPDU18に出力される電力量の総和を、力行時要求出力Poreq(力行時合計電力量)に調整することができる。
一方、ステップS12において、ΔSOCが所定値A以上である場合(ΔSOC≧A、ステップS12:YES)、ステップS14に進む。ステップS14において、バッテリECU20は、n個の第1バッテリ12の各々について、力行時に出力可能な電力量B1(力行時許可電力量)を算出する。
次のステップS15において、バッテリECU20は、力行時要求出力Poreqが、n個の第1バッテリ12から出力可能な電力量の合計値B1×n以上であるか否かを判定する。
ステップS15において、力行時要求出力Poreqが合計値B1×n未満である場合(Poreq<B1×n、ステップS15:NO)、ステップS16に進む。ステップS16において、バッテリECU20は、n個の第1バッテリ12から出力される電力量のみで、力行時要求出力Poreqを賄うことができると判断し、力行時要求出力Poreqをnで除算して、力行時電力分配量Pbonを算出する(Pbon=Poreq/n)。
そして、バッテリECU20は、算出した各力行時電力分配量Pbonに基づいて、力行時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、力行時電力分配量Pbonに応じた電力量を第1バッテリ12から出力することができる。この場合も、複数の第1バッテリ12からPDU18に出力される電力量の総和を、力行時要求出力Poreq(力行時合計電力量)に調整することができる。
なお、図3に示すように、力行時でΔSOC≧Aの場合、(N-n)個の第1バッテリ12の負担率は、0[%]である。そのため、ステップS16において、(N-n)個の第1バッテリ12に対する力行時電力分配量は0であると共に、電流目標値も0であることに留意する。
一方、ステップS15において、力行時要求出力Poreqが合計値B1×n以上である場合(Poreq≧B1×n、ステップS15:YES)、ステップS17に進む。ステップS17において、バッテリECU20は、n個の第1バッテリ12からの電力量のみでは、力行時要求出力Poreqを賄うことができないと判断する。そこで、バッテリECU20は、力行時要求出力Poreqと、n個の第1バッテリ12から出力可能な電力量B1×nとの差C1を算出する(C1=Poreq-B1×n)。すなわち、バッテリECU20は、(N-n)個の第1バッテリ12から出力すべき不足分の電力量であるC1を算出する。
ステップS18において、バッテリECU20は、n個の第1バッテリ12が接続されているDC/DCコンバータ14について、力行時電力分配量Pbonを電力量B1としたときの電流目標値を算出する。バッテリECU20は、通信線30を介して、n個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、電力量B1をn個の第1バッテリ12から出力することができる。
また、ステップS19において、バッテリECU20は、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14に対する力行時電力分配量Pbouを、C1/(N-n)とし(Pbou=C1/(N-n))、該力行時電力分配量Pbouに応じた電流目標値を算出する。バッテリECU20は、通信線30を介して、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、(N-n)個の第1バッテリ12から不足分の電力量C1/(N-n)を出力することができる。
従って、ステップS18、S19の処理により、力行時要求出力Poreqが大きい場合でも、複数の第1バッテリ12からPDU18に出力される電力量の総和を、該力行時要求出力Poreqに調整することができる。
<3.2 回生時の動作>
次に、図3及び図4の回生時の動作について、図6のフローチャートを参照しながら説明する。
次に、図3及び図4の回生時の動作について、図6のフローチャートを参照しながら説明する。
図6のステップS21において、バッテリECU20は、図5のステップS11と同様に、複数のBMU26から第1バッテリ12の状態を取得し、取得した各第1バッテリ12の状態に基づいて、各第1バッテリ12のSOCを算出する。この場合も、バッテリECU20は、SOC平均値SOCaveや差ΔSOCを算出する。
ステップS22において、バッテリECU20は、ステップS12と同様に、ΔSOCが所定値A[%]以上であるか否かを判定する。
ΔSOCが所定値A未満である場合(ΔSOC<A、ステップS22:NO)、ステップS23に進む。ステップS23において、バッテリECU20は、回生時要求出力Pireqを個数Nで除算して、回生時に各第1バッテリ12が入力可能な電力量(回生時許可電力量)、すなわち、回生時電力分配量Pbiを算出する(Pbi=Pireq/N)。そして、バッテリECU20は、算出した各回生時電力分配量Pbiに基づいて、回生時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。
これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、回生時電力分配量Pbiに応じた電力量を第1バッテリ12に入力することができる。この場合、複数の第1バッテリ12に入力される電力量の総和は、回生時要求出力Pireq(回生時合計電力量)に調整される。
一方、ステップS22において、ΔSOCが所定値A以上である場合(ΔSOC≧A、ステップS22:YES)、ステップS24に進む。ステップS24において、バッテリECU20は、(N-n)個の第1バッテリ12の各々の回生時に入力可能な電力量(回生時許可電力量)B2を算出する。
次のステップS25において、バッテリECU20は、回生時要求出力Pireqが、(N-n)個の第1バッテリ12に入力可能な電力量の合計値B2×(N-n)以上であるか否かを判定する。
ステップS25において、回生時要求出力Pireqが合計値B2×(N-n)未満である場合(Pireq<B2×(N-n)、ステップS25:NO)、ステップS26に進む。ステップS26において、バッテリECU20は、(N-n)個の第1バッテリ12に、回生時要求出力Pireqを全て入力することができると判断し、回生時要求出力Pireqを(N-n)で除算して、回生時電力分配量Pbiuを算出する(Pbiu=Pireq/(N-n))。
そして、バッテリECU20は、算出した各回生時電力分配量Pbiuに基づいて、回生時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、回生時電力分配量Pbiuに応じた電力量を(N-n)個の第1バッテリ12に優先して入力することができる。この場合も、複数の第1バッテリ12に入力する電力量の総和を、回生時要求出力Pireq(回生時合計電力量)に調整することができる。
なお、図3に示すように、回生時でΔSOC≧Aの場合、n個の第1バッテリ12の負担率は、0[%]である。そのため、ステップS26において、n個の第1バッテリ12に対する回生時電力分配量は0であると共に、電流目標値も0であることに留意する。
一方、ステップS25において、回生時要求出力Pireqが合計値B2×(N-n)以上である場合(Pireq≧B2×(N-n)、ステップS25:YES)、ステップS27に進む。ステップS27において、バッテリECU20は、(N-n)個の第1バッテリ12に電力を入力するのみでは、余剰分の電力量が発生すると判断する。そこで、バッテリECU20は、回生時要求出力Pireqと、(N-n)個の第1バッテリ12に入力可能な電力量B2×(N-n)との差C2を算出する(C2=Pireq-B2×(N-n))。すなわち、バッテリECU20は、n個の第1バッテリ12に入力すべき電力量であるC2を算出する。
ステップS28において、バッテリECU20は、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14について、回生時電力分配量Pbiuを電力量B2としたときの電流目標値を算出する。バッテリECU20は、通信線30を介して、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、(N-n)個の第1バッテリ12に優先して電力量B2を入力することができる。
また、ステップS29において、バッテリECU20は、n個の第1バッテリ12が接続されているDC/DCコンバータ14に対する回生時電力分配量PbinをC2/nとし(Pbin=C2/n)、該回生時電力分配量Pbinに応じた電流目標値を算出する。バッテリECU20は、通信線30を介して、n個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、n個の第1バッテリ12に電力量C2/nを入力することができる。
従って、ステップS28、S29の処理により、回生時要求出力Pireqが大きい場合でも、複数の第1バッテリ12に入力する電力量の総和を、該回生時要求出力Pireqに調整することができる。
[4.本実施形態の動作の変形例]
次に、図5及び図6の動作の変形例について、図7~図10を参照しながら説明する。図5及び図6では、図3及び図4の概念を反映すべく、SOC平均値SOCaveを超えるn個の第1バッテリ12について、同じ電力量だけ入出力を行い、一方で、SOC平均値SOCave以下の(N-n)個の第1バッテリ12について、同じ電力量だけ入出力を行う場合について説明した。つまり、n個の第1バッテリ12は互いに同一の負担率であると共に、(N-n)個の第1バッテリ12は互いに同一の負担率である場合について説明した。
次に、図5及び図6の動作の変形例について、図7~図10を参照しながら説明する。図5及び図6では、図3及び図4の概念を反映すべく、SOC平均値SOCaveを超えるn個の第1バッテリ12について、同じ電力量だけ入出力を行い、一方で、SOC平均値SOCave以下の(N-n)個の第1バッテリ12について、同じ電力量だけ入出力を行う場合について説明した。つまり、n個の第1バッテリ12は互いに同一の負担率であると共に、(N-n)個の第1バッテリ12は互いに同一の負担率である場合について説明した。
図7~図10では、個々の第1バッテリ12の負担率(出力負担率)が互いに異なる点で、図5及び図6とは異なる。従って、図7~図10の変形例では、負担率に応じて、バッテリECU20から複数のDC/DCコンバータ14に送信される電流目標値が、DC/DCコンバータ14毎に異なる場合があり得ることに留意する。
<4.1 力行時の動作>
力行時の動作について、図7及び図8のフローチャートを参照しながら説明する。
力行時の動作について、図7及び図8のフローチャートを参照しながら説明する。
図7のステップS31において、バッテリECU20は、図5のステップS11と同様に、複数のBMU26から第1バッテリ12の状態を取得し、取得した第1バッテリ12の状態に基づいて、第1バッテリ12のSOCを算出する。また、バッテリECU20は、SOC平均値SOCaveや差ΔSOCを算出する。
ステップS32において、バッテリECU20は、ΔSOCが所定値A[%]以上であるか否かを判定する。
ΔSOCが所定値A未満である場合(ΔSOC<A、ステップS32:NO)、ステップS33に進む。ステップS33において、バッテリECU20は、力行時に複数の第1バッテリ12から出力可能な電力量の合計値である力行時合計電力量D1を算出する。
次のステップS34において、バッテリECU20は、複数の第1バッテリ12の各々から出力可能な電力量Pbopと力行時合計電力量D1との比である各第1バッテリ12の負担率(出力負担率)Xoiを算出する(Xoi=Pbop/D1)。なお、出力負担率Xoiの添字iは、複数の第1バッテリ12に振られた番号である(i=1、2、…、N)。
次のステップS35において、バッテリECU20は、力行時要求出力Poreqに各第1バッテリ12の出力負担率Xoiを乗算することにより、各第1バッテリ12の力行時電力分配量Pboを算出する(Pbo=Poreq×Xoi)。そして、バッテリECU20は、算出した各力行時電力分配量Pboに基づいて、力行時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、力行時電力分配量Pboに応じた電力量を第1バッテリ12から出力することができる。
一方、ステップS32において、ΔSOCが所定値A以上である場合(ΔSOC≧A、ステップS32:YES)、ステップS36に進む。ステップS36において、バッテリECU20は、n個の第1バッテリ12から出力可能な電力量の合計値である電力量E1を算出する。
次のステップS37において、バッテリECU20は、n個の第1バッテリ12から出力可能な電力量Pbopと電力量E1との比であるn個の第1バッテリ12の負担率(出力負担率)Yoiを算出する(Yoi=Pbop/E1)。なお、出力負担率Yoiの添字iは、n個の第1バッテリ12に振られた番号である(i=1、2、…、n)。
ステップS38において、バッテリECU20は、力行時要求出力Poreqが、電力量E1以上であるか否かを判定する。
図8のステップS38において、力行時要求出力Poreqが電力量E1未満である場合(Poreq<E1、ステップS38:NO)、ステップS39に進む。ステップS39において、バッテリECU20は、n個の第1バッテリ12から出力される電力量のみで、力行時要求出力Poreqを賄うことができると判断し、力行時要求出力Poreqと出力負担率Yoiとを乗算して、力行時電力分配量Pbonを算出する(Pbon=Poreq×Yoi)。
そして、バッテリECU20は、算出した各力行時電力分配量Pbonに基づいて、力行時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、力行時電力分配量Pbonに応じた電力量を第1バッテリ12から出力することができる。
一方、ステップS38において、力行時要求出力Poreqが電力量E1以上である場合(Poreq≧E1、ステップS38:YES)、ステップS40に進む。ステップS40において、バッテリECU20は、n個の第1バッテリ12からの電力量のみでは、力行時要求出力Poreqを賄うことができないと判断する。そこで、バッテリECU20は、電力量E1と出力負担率Yoiとを乗算して、n個の第1バッテリ12の力行時電力分配量Pbonを求める(Pbon=E1×Yoi)。
そして、バッテリECU20は、n個の第1バッテリ12が接続されているDC/DCコンバータ14について、力行時電力分配量Pbonに応じた電流目標値を算出する。バッテリECU20は、通信線30を介して、n個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、力行時電力分配量Pbonをn個の第1バッテリ12から出力することができる。
また、ステップS41において、バッテリECU20は、(N-n)個の第1バッテリ12から出力可能な電力量の合計値であるF1を算出する。
次のステップS42において、バッテリECU20は、(N-n)個の第1バッテリ12の各々から出力可能な電力量Pbopを電力量F1で除算することにより、(N-n)個の第1バッテリ12の出力負担率Zoiを算出する(Zoi=Pbop/F1)。なお、添字のiは、(N-n)個の第1バッテリ12に振られた番号である(i=1、2、…(N-n))。
次のステップS43において、バッテリECU20は、力行時要求出力Poreqと電力量E1との差に、出力負担率Zoiを乗算することにより、(N-n)個の第1バッテリ12の力行時電力分配量Pbouを求める(Pbou=(Poreq-E1)×Zoi)。そして、バッテリECU20は、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14について、力行時電力分配量Pbouに応じた電流目標値を算出する。バッテリECU20は、通信線30を介して、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、力行時電力分配量Pbouを(N-n)個の第1バッテリ12から出力することができる。
<4.2 回生時の動作>
次に、回生時の動作について、図9及び図10のフローチャートを参照しながら説明する。
次に、回生時の動作について、図9及び図10のフローチャートを参照しながら説明する。
図9のステップS51において、バッテリECU20は、図6のステップS21と同様に、複数のBMU26から第1バッテリ12の状態を取得し、取得した第1バッテリ12の状態に基づいて、第1バッテリ12のSOCを算出する。また、バッテリECU20は、SOC平均値SOCaveや差ΔSOCを算出する。
ステップS52において、バッテリECU20は、ΔSOCが所定値A[%]以上であるか否かを判定する。
ΔSOCが所定値A未満である場合(ΔSOC<A、ステップS52:NO)、ステップS53に進む。ステップS53において、バッテリECU20は、回生時に複数の第1バッテリ12に入力可能な電力量の合計値である回生時合計電力量D2を算出する。
次のステップS54において、バッテリECU20は、個々の第1バッテリ12に入力可能な電力量Pbipを回生時合計電力量D2で除算して、各第1バッテリ12の出力負担率Xiiを算出する(Xii=Pbip/D2)。なお、出力負担率Xiiの最後の添字iは、複数の第1バッテリ12に振られた番号である(i=1、2、…、N)。
次のステップS55において、バッテリECU20は、回生時要求出力Pireqに出力負担率Xiiを乗算することにより、各第1バッテリ12の回生時電力分配量Pbiを算出する(Pbi=Pireq×Xii)。そして、バッテリECU20は、算出した各回生時電力分配量Pbiに基づいて、回生時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、回生時電力分配量Pbiに応じた電力量を第1バッテリ12に入力することができる。
一方、ステップS52において、ΔSOCが所定値A以上である場合(ΔSOC≧A、ステップS52:YES)、ステップS56に進む。ステップS56において、バッテリECU20は、(N-n)個の第1バッテリ12に入力可能な電力量の合計値である電力量E2を算出する。
次のステップS57において、バッテリECU20は、(N-n)個の第1バッテリ12に入力可能な電力量Pbipを電力量E2で除算することにより、(N-n)個の第1バッテリ12の出力負担率Yiiを算出する(Yii=Pbip/E2)。なお、出力負担率Yiiの最後の添字iは、(N-n)個の第1バッテリ12に振られた番号である(i=1、2、…、(N-n))。
図10のステップS58において、バッテリECU20は、回生時要求出力Pireqが、電力量E2以上であるか否かを判定する。
ステップS58において、回生時要求出力Pireqが電力量E2未満である場合(Pireq<E2、ステップS58:NO)、ステップS59に進む。ステップS59において、バッテリECU20は、(N-n)個の第1バッテリ12のみで、回生時要求出力Pireqの電力量を入力可能と判断し、回生時要求出力Pireqに出力負担率Yiiを乗算して、回生時電力分配量Pbiuを算出する(Pbiu=Pireq×Yii)。
そして、バッテリECU20は、算出した各回生時電力分配量Pbiuに基づいて、回生時の電流目標値を算出する。バッテリECU20は、通信線30を介して、複数のDC/DCコンバータ14に電流目標値を送信する。これにより、複数のDC/DCコンバータ14は、受信した電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、回生時電力分配量Pbiuに応じた電力量を(N-n)個の第1バッテリ12に優先して入力することができる。
一方、ステップS58において、回生時要求出力Pireqが電力量E2以上である場合(Pireq≧E2、ステップS58:YES)、ステップS60に進む。ステップS60において、バッテリECU20は、(N-n)個の第1バッテリ12に回生時要求出力Pireqを入力するのみでは、余剰分の電力量が発生すると判断する。そこで、バッテリECU20は、電力量E2に出力負担率Yiiを乗算して、(N-n)個の第1バッテリ12の回生時電力分配量Pbiuを求める(Pbiu=E2×Yii)。
そして、バッテリECU20は、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14について、回生時電力分配量Pbiuに応じた電流目標値を算出する。バッテリECU20は、通信線30を介して、(N-n)個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、回生時電力分配量Pbiuを(N-n)個の第1バッテリ12に優先して入力することができる。
また、ステップS61において、バッテリECU20は、n個の第1バッテリ12に入力可能な電力量の合計値であるF2を算出する。
次のステップS62において、バッテリECU20は、n個の第1バッテリ12の各々に入力可能な電力量Pbipを電力量F2で除算することにより、n個の第1バッテリ12の出力負担率Ziiを算出する(Zii=Pbip/F2)。なお、最後の添字のiは、n個の第1バッテリ12に振られた番号である(i=1、2、…n)。
次のステップS63において、バッテリECU20は、回生時要求出力Pireqと電力量E2との差に、出力負担率Ziiを乗算することにより、n個の第1バッテリ12の回生時電力分配量Pbinを求める(Pbin=(Pireq-E2)×Zii)。そして、バッテリECU20は、n個の第1バッテリ12が接続されているDC/DCコンバータ14について、回生時電力分配量Pbinに応じた電流目標値を算出する。バッテリECU20は、通信線30を介して、n個の第1バッテリ12が接続されているDC/DCコンバータ14に、該電流目標値を送信する。これにより、電流目標値を受信したDC/DCコンバータ14は、該電流目標値に基づいてバッテリ電圧に対する昇降圧動作を行うことで、回生時電力分配量Pbinをn個の第1バッテリ12に入力することができる。
[5.本実施形態の効果]
以上説明したように、本実施形態に係る電源システム10によれば、複数の第1バッテリ12と、複数の第1バッテリ12とモータ34(負荷)との間で電気的に接続される複数のDC/DCコンバータ14(入出力調整装置)と、複数のDC/DCコンバータ14を制御することで複数の第1バッテリ12に対する電力の入出力を制御するバッテリECU20(制御装置)とを有する電源システム10である。
以上説明したように、本実施形態に係る電源システム10によれば、複数の第1バッテリ12と、複数の第1バッテリ12とモータ34(負荷)との間で電気的に接続される複数のDC/DCコンバータ14(入出力調整装置)と、複数のDC/DCコンバータ14を制御することで複数の第1バッテリ12に対する電力の入出力を制御するバッテリECU20(制御装置)とを有する電源システム10である。
バッテリECU20は、複数の第1バッテリ12から複数のDC/DCコンバータ14を介してモータ34に電力を出力する力行時には、複数の第1バッテリ12のうち、SOCが閾値(SOC平均値SOCave)を超える第1バッテリ12から優先して電力を出力するように複数のDC/DCコンバータ14を制御する。また、バッテリECU20は、モータ34から複数のDC/DCコンバータ14を介して複数の第1バッテリ12に電力を入力する回生時には、複数の第1バッテリ12のうち、SOCが閾値以下の第1バッテリ12に優先して電力を入力するように複数のDC/DCコンバータ14を制御する。
これにより、力行時には、SOCの低い第1バッテリ12からの出力を抑制し、一方で、回生時には、SOCの低い第1バッテリ12に優先的に電力を入力して、SOCを回復させるようにしている。これにより、複数の第1バッテリ12間でのSOCのばらつきが抑制され、複数の第1バッテリ12を有する電源システム10の出力を向上させることができる。
また、複数の第1バッテリ12間でSOCのばらつきがあっても、電力の授受を行うことなくSOCを回復させるので、電力効率の低下も抑制することができる。
このように、本実施形態では、複数の第1バッテリ12間のSOCを適切に制御することが可能となる。
この場合、閾値は、複数の第1バッテリ12のSOC平均値SOCaveであり、バッテリECU20は、力行時には、SOC平均値SOCaveを超えるSOCを有する第1バッテリ12(n個の第1バッテリ12)から優先して電力を出力するように、複数のDC/DCコンバータ14を制御すればよい。これにより、各第1バッテリ12のSOCを均等に利用することが可能となる。すなわち、SOCの大きなn個の第1バッテリ12から優先して電力を出力するので、比較的簡単な制御で第1バッテリ12間のSOCのばらつきを抑えつつ、電力を出力することができる。
また、バッテリECU20は、力行時に、SOC平均値SOCaveを超える第1バッテリ12から出力可能な電力量が、モータ34の要求出力(力行時要求出力Poreq)よりも大きい場合には、該第1バッテリ12からDC/DCコンバータ14を介してモータ34に電力を出力するように、複数のDC/DCコンバータ14を制御する。これにより、各第1バッテリ12のSOCを一層効率よく利用することが可能となる。
また、バッテリECU20は、力行時に、モータ34の要求出力が、SOC平均値SOCaveを超える第1バッテリ12から出力可能な電力量以上である場合には、該第1バッテリ12からDC/DCコンバータ14を介してモータ34に該電力量だけ出力し、一方で、SOC平均値SOCave以下の第1バッテリ12((N-n)個の第1バッテリ12)から、該第1バッテリ12に接続されているDC/DCコンバータ14を介してモータ34に、要求出力に対する不足分の電力量を出力するように、複数のDC/DCコンバータ14を制御する。これにより、要求出力が大きい場合でも、各第1バッテリ12のSOCを効率よく利用することが可能となる。
さらに、バッテリECU20は、SOC平均値SOCaveを超える第1バッテリ12が複数ある場合、複数の第1バッテリ12から同じ電力量だけ出力するか、又は、要求出力に対する複数の第1バッテリ12の出力負担率に応じた電力量だけ出力するように、複数のDC/DCコンバータ14を制御する。これにより、第1バッテリ12間のSOCのばらつきを抑えつつ、各第1バッテリ12のSOCを一層効率よく利用することができる。
一方、バッテリECU20は、回生時には、SOC平均値SOCave以下のSOCを有する第1バッテリ12((N-n)個の第1バッテリ12)に優先して電力を入力するように、複数のDC/DCコンバータ14を制御する。これにより、SOCの低い第1バッテリ12について、SOCを速やかに回復させることができる。また、SOCの小さい(N-n)個の第1バッテリ12に優先して電力を入力するので、比較的簡単な制御で第1バッテリ12間のSOCのばらつきを抑えることができる。
また、バッテリECU20は、回生時に、SOC平均値SOCave以下の第1バッテリ12に入力可能な電力量が、モータ34からの回生電力(回生時要求出力Pireq)よりも大きい場合には、モータ34からDC/DCコンバータ14を介して第1バッテリ12に回生電力を入力するように、複数のDC/DCコンバータ14を制御する。これにより、SOCの低い第1バッテリ12に電力を確実に入力することができる。
バッテリECU20は、回生時に、モータ34からの回生電力が、SOC平均値SOCave以下の第1バッテリ12に入力可能な電力量以上である場合には、モータ34からDC/DCコンバータ14を介して第1バッテリ12に該電力量だけ入力し、一方で、SOC平均値SOCaveを超える第1バッテリ12(n個の第1バッテリ12)に、回生電力の残余分の電力量を入力するように、複数のDC/DCコンバータ14を制御する。これにより、要求出力が大きい場合でも、各第1バッテリ12に効率よく回生電力を入力することが可能となる。
さらに、バッテリECU20は、SOC平均値SOCave以下の第1バッテリ12が複数ある場合、複数の第1バッテリ12に同じ電力量を入力するか、又は、回生電力に対する複数の第1バッテリ12の出力負担率に応じた電力量だけ入力するように、複数のDC/DCコンバータ14を制御する。これにより、SOCの低い第1バッテリ12に対して効率よく電力を入力することができる。
複数の第1バッテリ12は、同一種類のバッテリ、又は、異なる種類のバッテリであってもよい。これにより、第1バッテリ12の種類に関わりなく、SOCを効率よく利用することができる。
また、複数の第1バッテリ12は、該第1バッテリ12を監視するBMU26(バッテリマネジメントシステム)を含む複数のバッテリパック28にそれぞれ収容されている。これにより、着脱式のバッテリに容易に適用することができる。
なお、本発明は、上述の実施形態に限らず、この明細書の記載内容に基づき、種々の構成を採り得ることは勿論である。
Claims (11)
- 複数のバッテリ(12)と、複数の前記バッテリと負荷(34)との間で電気的に接続される複数の入出力調整装置(14)と、複数の前記入出力調整装置を制御することで複数の前記バッテリに対する電力の入出力を制御する制御装置(20)とを有する電源システム(10)であって、
前記制御装置は、
複数の前記バッテリから複数の前記入出力調整装置を介して前記負荷に電力を出力する力行時には、複数の前記バッテリのうち、SOCが閾値(SOCave)を超えるバッテリから優先して前記電力を出力するように複数の前記入出力調整装置を制御し、
前記負荷から複数の前記入出力調整装置を介して複数の前記バッテリに電力を入力する回生時には、複数の前記バッテリのうち、前記SOCが前記閾値以下のバッテリに優先して前記電力を入力するように複数の前記入出力調整装置を制御する、電源システム。 - 請求項1記載の電源システムにおいて、
前記閾値は、複数の前記バッテリのSOC平均値であり、
前記制御装置は、前記力行時には、前記SOC平均値を超えるSOCを有するバッテリから優先して前記電力を出力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項2記載の電源システムにおいて、
前記制御装置は、前記力行時に、前記SOC平均値を超えるバッテリから出力可能な電力量が、前記負荷の要求出力(Poreq)よりも大きい場合には、該バッテリから前記入出力調整装置を介して前記負荷に前記電力を出力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項2記載の電源システムにおいて、
前記制御装置は、前記力行時に、前記負荷の要求出力が、前記SOC平均値を超えるバッテリから出力可能な電力量以上である場合には、該バッテリから前記入出力調整装置を介して前記負荷に前記電力量だけ出力し、一方で、前記SOC平均値以下のバッテリから、該バッテリに接続されている入出力調整装置を介して前記負荷に、前記要求出力に対する不足分の電力量を出力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項3又は4記載の電源システムにおいて、
前記制御装置は、前記SOC平均値を超えるバッテリが複数ある場合、複数の該バッテリから同じ電力量だけ出力するか、又は、前記要求出力に対する複数の該バッテリの負担率に応じた電力量だけ出力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項1記載の電源システムにおいて、
前記閾値は、複数の前記バッテリのSOC平均値であり、
前記制御装置は、前記回生時には、前記SOC平均値以下のSOCを有するバッテリに優先して前記電力を入力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項6記載の電源システムにおいて、
前記制御装置は、前記回生時に、前記SOC平均値以下のバッテリに入力可能な電力量が、前記負荷からの回生電力(Pireq)よりも大きい場合には、前記負荷から前記入出力調整装置を介して前記バッテリに前記回生電力を入力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項6記載の電源システムにおいて、
前記制御装置は、前記回生時に、前記負荷からの回生電力が、前記SOC平均値以下のバッテリに入力可能な電力量以上である場合には、前記負荷から前記入出力調整装置を介して前記バッテリに前記電力量だけ入力し、一方で、前記SOC平均値を超えるバッテリに、前記回生電力の残余分の電力量を入力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項7又は8記載の電源システムにおいて、
前記制御装置は、前記SOC平均値以下のバッテリが複数ある場合、複数の該バッテリに同じ電力量を入力するか、又は、前記回生電力に対する複数の該バッテリの負担率に応じた電力量だけ入力するように、複数の前記入出力調整装置を制御する、電源システム。 - 請求項1~9のいずれか1項に記載の電源システムにおいて、
複数の前記バッテリは、同一種類のバッテリ、又は、異なる種類のバッテリである、電源システム。 - 請求項1~10のいずれか1項に記載の電源システムにおいて、
複数の前記バッテリは、該バッテリを監視するバッテリマネジメントシステム(26)を含む複数のバッテリパック(28)にそれぞれ収容されている、電源システム。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020519550A JP6880318B2 (ja) | 2018-05-14 | 2019-04-25 | 電源システム |
| EP19802955.5A EP3795412B1 (en) | 2018-05-14 | 2019-04-25 | Power supply system |
| CN201980032018.0A CN112118983B (zh) | 2018-05-14 | 2019-04-25 | 电源系统 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018-092865 | 2018-05-14 | ||
| JP2018092865 | 2018-05-14 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019220906A1 true WO2019220906A1 (ja) | 2019-11-21 |
Family
ID=68539897
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2019/017551 Ceased WO2019220906A1 (ja) | 2018-05-14 | 2019-04-25 | 電源システム |
Country Status (4)
| Country | Link |
|---|---|
| EP (1) | EP3795412B1 (ja) |
| JP (1) | JP6880318B2 (ja) |
| CN (1) | CN112118983B (ja) |
| WO (1) | WO2019220906A1 (ja) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021166446A (ja) * | 2020-04-07 | 2021-10-14 | 公益財団法人鉄道総合技術研究所 | 蓄電池制御装置、指令値算出装置および制御方法 |
| CN115122936A (zh) * | 2021-03-25 | 2022-09-30 | 本田技研工业株式会社 | 车辆以及控制装置 |
| WO2023038399A1 (ko) * | 2021-09-08 | 2023-03-16 | 주식회사 엘지에너지솔루션 | 신규 설치 배터리 랙을 포함하는 에너지 저장 시스템 및 이를 제어하는방법 |
| JP2023054996A (ja) * | 2021-10-05 | 2023-04-17 | トヨタ自動車株式会社 | 電源装置 |
| JP2023082724A (ja) * | 2021-12-03 | 2023-06-15 | 株式会社デンソー | 電池システム |
| JP2023543677A (ja) * | 2020-09-30 | 2023-10-18 | ルノー エス.ア.エス. | エンジンの蓄電池と電源ユニットとのネットワークを管理するための方法 |
| WO2024095111A1 (ja) * | 2022-11-03 | 2024-05-10 | 株式会社半導体エネルギー研究所 | バッテリ制御システム及び車両 |
| US12500432B2 (en) | 2021-09-08 | 2025-12-16 | Lg Energy Solution, Ltd. | Energy storage system including newly installed battery racks and method for controlling the same |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011229333A (ja) * | 2010-04-22 | 2011-11-10 | Mitsubishi Electric Corp | 車両用駆動電源装置 |
| JP2013038960A (ja) * | 2011-08-09 | 2013-02-21 | Toshiba Corp | 分散電源の出力変動抑制装置および分散電源の出力変動抑制方法 |
| JP2014079095A (ja) * | 2012-10-11 | 2014-05-01 | Hitachi Automotive Systems Ltd | 車両の回生制御装置 |
| JP2015027158A (ja) * | 2013-07-25 | 2015-02-05 | 電源開発株式会社 | 電力貯蔵装置および電力貯蔵装置の充放電方法 |
| JP2015220772A (ja) | 2014-05-14 | 2015-12-07 | 本田技研工業株式会社 | 2電源システム及び電動車両 |
| JP2016171658A (ja) * | 2015-03-12 | 2016-09-23 | 株式会社日立製作所 | 蓄電システム及び蓄電池電車 |
| JP2017099242A (ja) | 2015-11-28 | 2017-06-01 | 本田技研工業株式会社 | 電力供給システム及び輸送機器、並びに、電力伝送方法 |
| JP2017192272A (ja) * | 2016-04-15 | 2017-10-19 | 日野自動車株式会社 | 電源制御装置 |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5194834B2 (ja) * | 2008-01-24 | 2013-05-08 | 日産自動車株式会社 | 車両電気系システム制御装置および制御方法 |
| JP5987892B2 (ja) * | 2014-12-10 | 2016-09-07 | トヨタ自動車株式会社 | 車両の電源システム |
| JP6254139B2 (ja) * | 2015-11-28 | 2017-12-27 | 本田技研工業株式会社 | 電力供給システム及び輸送機器、並びに、電力伝送方法 |
| JP6652427B2 (ja) * | 2016-03-29 | 2020-02-26 | 本田技研工業株式会社 | 電力供給システム及び輸送機器 |
-
2019
- 2019-04-25 JP JP2020519550A patent/JP6880318B2/ja active Active
- 2019-04-25 CN CN201980032018.0A patent/CN112118983B/zh active Active
- 2019-04-25 EP EP19802955.5A patent/EP3795412B1/en active Active
- 2019-04-25 WO PCT/JP2019/017551 patent/WO2019220906A1/ja not_active Ceased
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011229333A (ja) * | 2010-04-22 | 2011-11-10 | Mitsubishi Electric Corp | 車両用駆動電源装置 |
| JP2013038960A (ja) * | 2011-08-09 | 2013-02-21 | Toshiba Corp | 分散電源の出力変動抑制装置および分散電源の出力変動抑制方法 |
| JP2014079095A (ja) * | 2012-10-11 | 2014-05-01 | Hitachi Automotive Systems Ltd | 車両の回生制御装置 |
| JP2015027158A (ja) * | 2013-07-25 | 2015-02-05 | 電源開発株式会社 | 電力貯蔵装置および電力貯蔵装置の充放電方法 |
| JP2015220772A (ja) | 2014-05-14 | 2015-12-07 | 本田技研工業株式会社 | 2電源システム及び電動車両 |
| JP2016171658A (ja) * | 2015-03-12 | 2016-09-23 | 株式会社日立製作所 | 蓄電システム及び蓄電池電車 |
| JP2017099242A (ja) | 2015-11-28 | 2017-06-01 | 本田技研工業株式会社 | 電力供給システム及び輸送機器、並びに、電力伝送方法 |
| JP2017192272A (ja) * | 2016-04-15 | 2017-10-19 | 日野自動車株式会社 | 電源制御装置 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP3795412A4 |
Cited By (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7453836B2 (ja) | 2020-04-07 | 2024-03-21 | 公益財団法人鉄道総合技術研究所 | 蓄電池制御装置、指令値算出装置および制御方法 |
| JP2021166446A (ja) * | 2020-04-07 | 2021-10-14 | 公益財団法人鉄道総合技術研究所 | 蓄電池制御装置、指令値算出装置および制御方法 |
| JP2023543677A (ja) * | 2020-09-30 | 2023-10-18 | ルノー エス.ア.エス. | エンジンの蓄電池と電源ユニットとのネットワークを管理するための方法 |
| CN115122936A (zh) * | 2021-03-25 | 2022-09-30 | 本田技研工业株式会社 | 车辆以及控制装置 |
| TWI841935B (zh) * | 2021-03-25 | 2024-05-11 | 日商本田技研工業股份有限公司 | 車輛及控制裝置 |
| JP2024501684A (ja) * | 2021-09-08 | 2024-01-15 | エルジー エナジー ソリューション リミテッド | 新規設置電池ラックを含むエネルギー貯蔵システム及びこれを制御する方法 |
| US12500432B2 (en) | 2021-09-08 | 2025-12-16 | Lg Energy Solution, Ltd. | Energy storage system including newly installed battery racks and method for controlling the same |
| JP7791296B2 (ja) | 2021-09-08 | 2025-12-23 | エルジー エナジー ソリューション リミテッド | 新規設置電池ラックを含むエネルギー貯蔵システム及びこれを制御する方法 |
| WO2023038399A1 (ko) * | 2021-09-08 | 2023-03-16 | 주식회사 엘지에너지솔루션 | 신규 설치 배터리 랙을 포함하는 에너지 저장 시스템 및 이를 제어하는방법 |
| JP7602045B2 (ja) | 2021-09-08 | 2024-12-17 | エルジー エナジー ソリューション リミテッド | 新規設置電池ラックを含むエネルギー貯蔵システム及びこれを制御する方法 |
| JP2025026520A (ja) * | 2021-09-08 | 2025-02-21 | エルジー エナジー ソリューション リミテッド | 新規設置電池ラックを含むエネルギー貯蔵システム及びこれを制御する方法 |
| JP2023054996A (ja) * | 2021-10-05 | 2023-04-17 | トヨタ自動車株式会社 | 電源装置 |
| JP7643284B2 (ja) | 2021-10-05 | 2025-03-11 | トヨタ自動車株式会社 | 電源装置 |
| JP2023082724A (ja) * | 2021-12-03 | 2023-06-15 | 株式会社デンソー | 電池システム |
| JP7771687B2 (ja) | 2021-12-03 | 2025-11-18 | 株式会社デンソー | 電池システム |
| WO2024095111A1 (ja) * | 2022-11-03 | 2024-05-10 | 株式会社半導体エネルギー研究所 | バッテリ制御システム及び車両 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3795412B1 (en) | 2024-02-07 |
| CN112118983B (zh) | 2024-01-16 |
| EP3795412A1 (en) | 2021-03-24 |
| JPWO2019220906A1 (ja) | 2021-02-25 |
| JP6880318B2 (ja) | 2021-06-02 |
| EP3795412A4 (en) | 2022-02-23 |
| CN112118983A (zh) | 2020-12-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6880318B2 (ja) | 電源システム | |
| CN107757374B (zh) | 低电压总线的电动车辆电源转换 | |
| US7869913B2 (en) | Vehicle-use electric generator apparatus | |
| US10668817B2 (en) | Driving device | |
| CN105270194B (zh) | 电动车辆 | |
| JP6236391B2 (ja) | 電力用電池に対する充電量を平衡させるための装置 | |
| US7917276B2 (en) | Vehicle-use power supply apparatus | |
| JP5454789B2 (ja) | 電動車両の制御装置 | |
| EP2684732A1 (en) | Electrical system having a DC link | |
| US20160001660A1 (en) | Power supply system | |
| JP6247764B2 (ja) | 電力システム | |
| JP6187530B2 (ja) | 車両の駆動制御システム | |
| JP6410757B2 (ja) | 動力システム及び輸送機器、並びに、電力伝送方法 | |
| CN111731152B (zh) | 一种功率控制方法、装置、车辆和存储介质 | |
| JP2017184405A (ja) | 電力供給システム及び輸送機器、並びに、電力伝送方法 | |
| CN116601046B (zh) | 供电系统 | |
| JP6805395B2 (ja) | 電源システム | |
| CN114026766A (zh) | 充电控制方法、储能模块及用电设备 | |
| US11708060B2 (en) | Electrified powertrain with centralized power distribution strategy and decentralized inverters | |
| JP7410020B2 (ja) | 電源システム | |
| JP2019187148A (ja) | 電源制御装置 | |
| JP2026006177A (ja) | モータ制御装置 | |
| JP2026006174A (ja) | モータ制御装置 | |
| JP2001286071A (ja) | 電動車両のバッテリ充電装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19802955 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2020519550 Country of ref document: JP Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2019802955 Country of ref document: EP Effective date: 20201214 |