WO2018130993A3 - Integrated project and equipment management system and method using iot devices and software applications - Google Patents
Integrated project and equipment management system and method using iot devices and software applications Download PDFInfo
- Publication number
- WO2018130993A3 WO2018130993A3 PCT/IB2018/050221 IB2018050221W WO2018130993A3 WO 2018130993 A3 WO2018130993 A3 WO 2018130993A3 IB 2018050221 W IB2018050221 W IB 2018050221W WO 2018130993 A3 WO2018130993 A3 WO 2018130993A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- norms
- equipment
- project
- data
- insights
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
An integrated project and equipment management system and methods related to heavy civil construction and mining industries is disclosed. The method includes building detailed context based on project design data, execution plan; equipment efficiency norms, optimization parameters, alarm thresholds, predictive maintenance conditions; material norms and work norms; real time collection of tracking, operational and transaction data related to plants, machinery and materials usage, and populating the same on to a database; performing data pre- processing/aggregation, analytics on the real-time data applying various parameters of the context, bringing out various actionable insights; corrective actions performed based on the insights until the set optimization levels are achieved. The system facilitates equipment companies to share and update various equipment optimization parameters, norms, alarm thresholds and predictive maintenance conditions. This equipment specific dataset is used by the system to analyse project data and presents valuable insights to the construction companies.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| IN201641024099 | 2017-01-14 | ||
| IN201641024099 | 2017-01-14 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2018130993A2 WO2018130993A2 (en) | 2018-07-19 |
| WO2018130993A3 true WO2018130993A3 (en) | 2018-11-22 |
Family
ID=62839676
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/IB2018/050221 Ceased WO2018130993A2 (en) | 2017-01-14 | 2018-01-13 | Integrated project and equipment management system and method using iot devices and software applications |
Country Status (1)
| Country | Link |
|---|---|
| WO (1) | WO2018130993A2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11556867B2 (en) | 2019-10-16 | 2023-01-17 | Caterpillar Inc. | System and method for worksite project tracking |
| WO2021182556A1 (en) * | 2020-03-11 | 2021-09-16 | 住友建機株式会社 | Construction management system and asphalt finisher |
| CN112149212B (en) * | 2020-09-22 | 2022-08-05 | 广西路桥工程集团有限公司 | Visual construction management platform for engineering project |
| US20220335352A1 (en) * | 2021-04-15 | 2022-10-20 | Invento, Inc | System and method for managing construction and mining projects using computer vision, sensing and gamification |
| US11609688B2 (en) | 2021-05-25 | 2023-03-21 | Caterpillar Inc. | Systems and methods for managing on-site machines by spatial and contextual information |
| US20240370799A1 (en) * | 2023-05-04 | 2024-11-07 | Christopher Townsend Soles | System and Method for Enhancing Building Management Projects |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
| US20030040825A1 (en) * | 2001-08-23 | 2003-02-27 | Ferreri Anthony V. | Materials requirements planning simulation analysis |
| US20040059647A1 (en) * | 2002-02-22 | 2004-03-25 | Hudson Frederick J. | Remote materials management system and method |
| US20070027732A1 (en) * | 2005-07-28 | 2007-02-01 | Accu-Spatial, Llc | Context-sensitive, location-dependent information delivery at a construction site |
| US7398184B1 (en) * | 2007-04-09 | 2008-07-08 | Honeywell International Inc. | Analyzing equipment performance and optimizing operating costs |
| US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
| US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
| US20150242769A1 (en) * | 2014-02-21 | 2015-08-27 | Safety Key Solutions FZ-LLC | Worksite monitoring and management systems and platforms |
-
2018
- 2018-01-13 WO PCT/IB2018/050221 patent/WO2018130993A2/en not_active Ceased
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
| US20030040825A1 (en) * | 2001-08-23 | 2003-02-27 | Ferreri Anthony V. | Materials requirements planning simulation analysis |
| US20040059647A1 (en) * | 2002-02-22 | 2004-03-25 | Hudson Frederick J. | Remote materials management system and method |
| US20070027732A1 (en) * | 2005-07-28 | 2007-02-01 | Accu-Spatial, Llc | Context-sensitive, location-dependent information delivery at a construction site |
| US7398184B1 (en) * | 2007-04-09 | 2008-07-08 | Honeywell International Inc. | Analyzing equipment performance and optimizing operating costs |
| US20120221379A1 (en) * | 2011-02-11 | 2012-08-30 | David Frederick Martinez | Facility control system (fcs) to manage assets and products |
| US20120323382A1 (en) * | 2011-06-15 | 2012-12-20 | Expanergy, Llc | Systems and methods to assess and optimize energy usage for a facility |
| US20150242769A1 (en) * | 2014-02-21 | 2015-08-27 | Safety Key Solutions FZ-LLC | Worksite monitoring and management systems and platforms |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2018130993A2 (en) | 2018-07-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2018130993A3 (en) | Integrated project and equipment management system and method using iot devices and software applications | |
| Quiñones-Grueiro et al. | Data-driven monitoring of multimode continuous processes: A review | |
| AR119380A1 (en) | MODELING AND CONTROL OF HYDRAULIC FRACTURING | |
| EP3550426A3 (en) | Improving an efficiency of computing resource consumption via improved application portfolio deployment | |
| AU2017246545A1 (en) | Selection of machine learning alogorithms | |
| MX2021013170A (en) | System and method for the integrated use of predictive and machine learning analytics for a center pivot irrigation system. | |
| BR112018068044A2 (en) | systems and methods for cloud computing resource management for information systems | |
| IN2015CH03327A (en) | ||
| EP4350592A3 (en) | Work planning system and work planning method | |
| WO2021033207A3 (en) | System and method for just in time characterization of raw materials | |
| SG11201811136WA (en) | Flange fastening managing method, fastening managing system, fastening managing program, and fastening managing device | |
| WO2018217686A3 (en) | Systems and methods for optimizing oil production | |
| Wheeler et al. | MINLP-based Analytic Hierarchy Process to simplify multi-objective problems: Application to the design of biofuels supply chains using on field surveys | |
| SA522440664B1 (en) | System and method for feedback from organic cognitive response to adaptive work instructions (OCR) | |
| RU2014118921A (en) | HARDWARE AND SOFTWARE COMPLEX FOR MANAGEMENT OF INNOVATIVE DEVELOPMENT OF THE ENTERPRISE IN THE FIELD OF OIL PRODUCTION AND REFINING | |
| EA201900512A1 (en) | METHOD FOR CONTROLLING LIFE CYCLE OF A COMPLEX ENGINEERING FACILITY AND SYSTEM FOR ITS IMPLEMENTATION | |
| ATE435540T1 (en) | METHOD, SYSTEM AND COMPUTER PROGRAM PRODUCT FOR AUTOMATICALLY CLONING IT EQUIPMENT STRUCTURES | |
| CN104320301A (en) | Intranet special line flow monitoring method and system | |
| CN107544418A (en) | Station library data acquisition system and method | |
| Quan et al. | Saturated repetitive control for a class of nonlinear systems: A contraction mapping method | |
| Gao et al. | Periodic solutions of discrete time periodic time-varying coupled systems on networks | |
| WO2025049099A3 (en) | System and method for automated task allocation | |
| Spasojević Brkić et al. | Excavator’s and Bulldozer’s Downtime Comparison and Risk Management: Preliminary Study | |
| MX2020007636A (en) | Subsea smart electric control unit. | |
| CN110555218A (en) | Production model update system, apparatus, method, and computer-readable medium |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18738972 Country of ref document: EP Kind code of ref document: A2 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18738972 Country of ref document: EP Kind code of ref document: A2 |