WO2018110845A1 - Construction method for uninterruptible power distribution without bypass cable intermediate connection points using individually openable single-phase multi-branch switchgear for construction - Google Patents
Construction method for uninterruptible power distribution without bypass cable intermediate connection points using individually openable single-phase multi-branch switchgear for construction Download PDFInfo
- Publication number
- WO2018110845A1 WO2018110845A1 PCT/KR2017/013188 KR2017013188W WO2018110845A1 WO 2018110845 A1 WO2018110845 A1 WO 2018110845A1 KR 2017013188 W KR2017013188 W KR 2017013188W WO 2018110845 A1 WO2018110845 A1 WO 2018110845A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- branch
- phase
- cable
- switchgear
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/12—Devices for maintaining distance between parallel conductors, e.g. spacer
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
Definitions
- the present invention relates to a bypass cable uninterruptible power distribution method, and more specifically, by using a bypass cable installed on the ground or pole during the replacement and relocation of the distribution lines connected to each pole and the change of the transition site.
- site application is very limited in the place where there are many unstable connection points and excessive equipment input and the work area such as traffic obstacle or the city where there are many transformers.
- uninterruptible power distribution method without bypass cable intermediate connection point using individual switchable single-phase multi-branch construction switchgear that minimizes the equipment and eliminates the intermediate connection point of bypass cable and improves the voltage drop. It is about.
- the conventional high voltage distribution line uses a temporary transmission method using a bypass cable, which is one of the uninterrupted electric methods, but it uses the intermediate connection material every 50m by using the high voltage three phase by using a construction switch and a three phase bypass cable. If there is a transformer in the work section, branch from the branch connection material at each installation point of the transformer and supply it to each uninterruptible transformer device.If there is a branch line, the branch line is supplied using the branch connection material to supply a branch line. Work has been done at about 200 ⁇ 300m, but there are many unstable temporary connection places such as voltage drop, and it takes a lot of work time according to the side work such as laying three-phase bypass cable on the ground temporarily and then dismantling it after completion. In order to compensate, the patent registration 10-1122499 is used as' wire wire mechanism and bypass cable Uninterrupted Power Distribution Act was registered.
- the patent method is a conventional method of installing a special high-pressure three-phase bypass cable as shown in Figure 1, the installation of the temporary cable for the temporary transmission only 20 phase of the special high-pressure three-phase ground or column on the sequential
- the present invention relates to an uninterruptible power distribution method for replacing, relocating, and changing the transition of single-phase or extra-high voltage three-phase distribution lines by separate connection.
- transformers 30, 30 'and 30 are installed at every electric pole in the work zone in the urban downtown area with many customers, so that the uninterruptible transformer unit 50 is expensive due to road traffic obstacles. There is a problem that can not be installed every time the application of the method is very limited.
- Patent Document 1 Korean Patent Application No. 10-1122499.
- the present invention has been made to solve the above problems, in the branching of the multi-circuit A phase of the high-pressure three-phase, using a single-stage single-stage multi-stage construction switchgear having a single-phase input and three output structure
- the individual open-ended single-phase multi-branch construction switchgear consisting of a multi-circuit output unit having each switch branched from one input unit to the start section and end pole of the work section in the high-voltage distribution line Respectively install the bypass process, uninterruptible work process, and demolition process,
- the terminal cable is placed on the input of the individual switchgear single-phase multi-branch construction switchgear and A high voltage distribution line A, and a bypass cable is installed on the ground to the switch of any one of the multi-circuit outputs of the two switchgear-type single-phase multi-branch construction switchgear.
- Each of them is branched from one switch to the other end of the individual switchgear for single-stage multi-stage construction switchgear, and is placed on the branch A.
- the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear according to the present invention is an individual switch-type single-phase multi-branch that can be selectively opened and closed at the time of outputting in the A phase of the special high pressure three phases.
- the construction switch By using the construction switch, it eliminates the intermediate connection in the middle of the bypass section of the work section and installs the construction switch by connecting it to the uninterruptible transformer device and the branch line directly from the individual switching type single-phase multi-branch construction switch without using the bypass cable branch connection material.
- FIG. 1 is a state diagram of an uninterruptible power distribution method using a conventional wire transfer mechanism and a bypass cable.
- Figure 2 is a ground-phase construction state of the A-phase bypass cable with a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open-close single-phase multi-branch construction switchgear of the present invention.
- Figure 3 is a ground-phase construction state of the B-phase bypass cable grounding construction with a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open-close single-phase multi-branch construction switchgear of the present invention.
- Figure 4 is a ground-phase construction state of the C-phase bypass cable grounding construction with a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open-close single-phase multi-branch construction switchgear of the present invention.
- Figure 5 is a simplified circuit diagram of the individual open and close single-phase multi-branch construction switchgear of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open and close single-phase multi-branch construction switch.
- Figure 6 is another embodiment of the bypass cable column laid construction state having a branching line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
- Figure 7 is another embodiment of the bypass cable ground installation construction state having two branch poles in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
- Figure 9 is another embodiment of the bypass cable ground laying construction state having a transformer line and a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
- Figure 10 is a ground cable installation state of the bypass cable having three transformer lines and one branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear of the present invention.
- 11 is another embodiment of the bypass cable pole laying construction state having three transformer lines and one branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear according to the present invention .
- FIG. 12 is another embodiment of the bypass cable ground laying construction state having two transformer lines and two branch lines in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switch .
- switch 50 uninterruptible transformer device
- intermediate connecting member 920 branch connecting member
- phase A (1) of the three phases of extra-high pressure separates the bypass cable (20) on the ground without an intermediate connection point, and opens and closes the single-stage multi-phase construction switchgear (40) separately on the standing poles (starting pole and ending pole) on both sides of the work section.
- the individual open and close type single-phase multi-branch construction switchgear 40 installed in the standing column Branch of A phase (1) with a terminal cable (21 ') and the branch line (60), which is connected to the branch line A phase and then inspected, and the individual open-ended single-phase multi-branch switchgear 40 sequentially Connect by bypass.
- phase A (1) By separating the jumper wires at the start and the end of the work section of the phase A (1) where the extra high pressure was bypassed, the entire phase A (1) in the working period was secured in a diagonal working condition. After completing the alteration or replacement of the main pole, the wire twisted line and the long wire work, and bypassing the jumper wire of the A phase (1), when the uninterrupted work is completed, the individual open / close single phase multi-branch construction switchgear 40 is opened sequentially, and the work is performed. A phase (1) uninterruptible work is completed by separating the standing column and the branch column 60 bypass cable 20 and the terminal cable 21 and 21 'at both ends of the section.
- the jumper wires at the start and end of the work section of the phase B of the B phase (2) where the extra high pressure was bypassed are separated, and the entire B phase (2) in the working section is moved to a safe working space in a diagonal state.
- the individual open / close single phase multi-branch construction switchgear 40 is opened sequentially.
- the standing column and branch column (60) bypass cable 20 and the terminal cable (21) (21 ') at both ends of the work section, the B phase (1) uninterrupted work is completed.
- each of the individual opening and closing type single-phase multi-branch construction switchgear 40 is formed on one side of the input unit 41 of one line, the other side of each switch 43a (43a ') individually
- the multi-circuit output section 43 branched into a plurality of lines to be operated is constituted.
- both sides of the phase A (1) is connected to the input unit 41 of the individually openable single-phase multi-branch construction switch 40, respectively, the bypass cable 20 is any of the secondary side multi-circuit output unit 43 It may be connected to one switch 43a, 43a ', 43a ".
- the other switch 43a, 43a ', 43a "of the multi-circuit output part 43 of the other individual open / close single phase multi-branch construction switch 40 does not use an individual open / close single phase multi-branch construction switch. It is possible to connect to the branch column 60 using the cable 21 'or the uninterruptible transformer device 50 using the uninterruptible transformer device connecting cable 22 described below.
- the selection of the phase for the connection of the multi-circuit output portion 43 of the individual open and close single-phase multi-branch construction switchgear 40 configured as described above is not limited, but can be connected through any one of three phases, each phase switch ( It will be appreciated that the configuration is made outputable by the operations 43a) 43a 'and 43a ".
- bypass cable cannot be installed on the ground due to road crossings or road traffic obstacles in the work zone, only the A-phase (1) of the special high-pressure three phases separates the bypass cable (20) in the vicinity of the neutral wire (70) without intermediate connection points.
- the special high pressure of the A phase 1 is branched to the terminal cable 21 'by the individual opening-and-closing single-phase multi-branch construction switchgear 40 installed in the winning line. )
- Connect to the branch line A phase and then check and connect bypass by inserting the individual switch-type single-phase multi-branch construction switch 40 in sequence.
- phase A (1) By separating the jumper wires at the start and the end of the work section of the phase A (1) where the extra high pressure was bypassed, the entire phase A (1) in the working period was secured in a diagonal working condition. After completing the alteration or replacement of the main pole, the wire twisted line and the long wire work, and bypassing the jumper wire of the A phase (1), when the uninterrupted work is completed, the individual open / close single phase multi-branch construction switchgear 40 is opened sequentially, and the work is performed. A phase (1) uninterruptible work is completed by separating the standing column and the branch column 60 bypass cable 20 and the terminal cable 21 and 21 'at both ends of the section.
- the B phase 2 and the C phase 3 of the three phases may be performed by repeatedly performing the removal process and the uninterruptible work process.
- phase A (1) of the three phases of extra-high pressure separates the bypass cable (20) on the ground without an intermediate connection point, and opens and closes the single-stage multi-phase construction switchgear (40) separately on the standing poles (starting pole and ending pole) on both sides of the work section.
- the secondary low voltage of the uninterruptible transformer device (50) is connected to the low voltage distribution line (A phase) by the low voltage bypass cable (81).
- Branch line (60) work is connected to the branch line (60) distribution line by branching to the terminal cable (21 ') from the individual opening-and-closing single-phase multi-branch construction switchgear (40) closest to the site conditions on site conditions Opening and closing single phase multi-branch construction switchgear 40 When the mouth is connected to the bypass.
- the terminal cable 21 ′ connected to the branch column 60 may branch from the uninterruptible transformer device 50 and be prized as the branch column 60. It is to do the uninterrupted work by connecting the terminal cable 21 'of the branch column 60 by branching at the convenient and safe side of the standing column individual open / close single-phase multi-branch construction switchgear 40 or the uninterruptible transformer device 50.
- phase B (2) and phase C (3) of the three phases are already installed at the time of work bypass cable (20), individual switchgear single-phase multi-branch construction switchgear 40, and terminal cable (21) (21 ') and
- the uninterruptible transformer device 50, the connecting cable 22, and the low voltage bypass cable 81 By using the uninterruptible transformer device 50, the connecting cable 22, and the low voltage bypass cable 81, the bypass process and the uninterruptible work process are repeatedly performed and the uninterruptible work is completed.
- the step of dismantling the individual switchgear single-phase multi-branch construction switchgear 40, the terminal cable (21) (21 '), the uninterruptible transformer device (50), the connecting cable (22), the low voltage bypass cable (81) Just do
- a bypass process is performed.
- Phase A of the special high pressure three phases Bypass cable (20) is installed on the ground without intermediate connection points, and the individual opening and closing type single phase multi-branch construction switchgear (40) is installed on the winning end of the work section.
- the A-phase (1) of the individual open / close single-phase multi-branch construction switchgear 40 installed at the winning end of the work section is installed.
- Branch the extra high pressure to install the individual open / close type single phase multi-branch construction switchgear 40 'in front of the uninterruptible transformer device 50 and branch the branched A phase (1) into 3 extra high voltage lines and connect it to the uninterruptible transformer device 50.
- phase B (2) and phase C (3) of the three phases are already installed at the time of work, the individual switchgear single-phase multi-branch construction switchgear 40 (40 '), and the terminal cable (21) ( 21 '), the uninterruptible transformer device 50, the connecting cable 22, and the low voltage bypass cable 81 are used to repeat the bypass process and the uninterruptible work process and the uninterrupted work is completed.
- bypass cable 20 may be located near the neutral line 70 or the low voltage line 80 without an intermediate connection point. It is installed on the columnar, and the individual opening and closing single-phase multi-branch construction switchgear 40 is also installed on the column, both ends of the work section, and the uninterruptible work in the same manner as described in FIG.
- Branch lines 60 and 60 ' can branch off the special high-pressure A phase from the individual open / close single phase multi-branch construction switchgear 40 or the uninterruptible transformer device 50 installed at both ends of the work section, but FIG.
- the bypass process of inputting the individual open-ended single-phase multi-branch construction switch 40 in sequence To perform By bypassing the terminal cable (21 ') to the branch line (60) (60') A phase branch line, and after inspection, the bypass process of inputting the individual open-ended single-phase multi-branch construction switch 40 in sequence To perform.
- the transformer secondary lowering lines 31 and 31 'of the A-phase transformer 30 and 30' are separated, and the work section is opened after opening the COS 35 and 35 'of the transformer 30 and 30'.
- the new or replacement wire A phase transformer (30) (30 ') COS (35) (35') After connecting the transformer secondary lowering line (31) (31 ') to the low voltage line (80) (80'), disconnect the low voltage bypass cable (81) from the low voltage line (80) (80 '), and open / close single-phase multi-branch construction. Opening the switchgear 40 and 40 'sequentially, and separating the standing column and branch column 60 and 60' bypass cables 20 and the terminal cable 21 and 21 'at both ends of the work section. (1) Complete the uninterrupted work process.
- phase B (2) and phase C (3) of the three phases are already installed at the time of work, the individual switchgear single-phase multi-branch construction switchgear 40 (40 '), and the terminal cable (21) ( 21 '), the uninterruptible transformer device 50, the connecting cable 22, and the low voltage bypass cable 81 are used to repeat the bypass process and the uninterruptible work process and the uninterrupted work is completed.
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Electric Cable Installation (AREA)
Abstract
Description
본 발명은 바이패스케이블 무정전 배전공법에 관한 것으로, 더욱 상세하게는 각 전주에 연결 배선된 배전선로의 교체 및 이설과 경과지 변경공사시 지상 또는 주상 포설되는 바이패스케이블을 이용하여 신,구 전선의 순차적 분리 연결에 의해 무정전공사를 시행함에 있어 불안정한 다수의 접속개소 및 과다한 장비투입으로 교통장애등 작업공간이 협소한곳 또는 변압기가 많은 시내지역에서는 현장 적용이 매우 제한적인 문제점을 해결하고 임시송전구간에 장비최소화 및 바이패스케이블의 중간접속개소를 없애고 전압강하를 개선하여 중부하선로 및 도심지 등에 현장적용 범위 확대가 가능한 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법에 관한 것이다.The present invention relates to a bypass cable uninterruptible power distribution method, and more specifically, by using a bypass cable installed on the ground or pole during the replacement and relocation of the distribution lines connected to each pole and the change of the transition site. In case of uninterrupted work by sequential disconnection connection, it is solved the problem that site application is very limited in the place where there are many unstable connection points and excessive equipment input and the work area such as traffic obstacle or the city where there are many transformers. In the uninterruptible power distribution method without bypass cable intermediate connection point using individual switchable single-phase multi-branch construction switchgear that minimizes the equipment and eliminates the intermediate connection point of bypass cable and improves the voltage drop. It is about.
전력수요의 급증에 따라 이에 대응한 전력설비가 계속 확충되고 있으며, 전력 사용자의 전기품질에 대한 요구수준이 높아지면서 순간의 정전도 민원의 대상이 되어 보상청구 등의 전기 사용자의 집단행동과 소송사례가 증가하고 있는 실정으로서 배전공사시에 양질의 전력공급을 위해 전력을 차단하지 않은 상태에서 공사가 이루어지는 무정전 공법이 이루어지고 있다.In response to the surge in electric power demand, electric power facilities have been expanded in response. As the demand for electric quality of electric power users increases, the momentary power failure is also subject to civil complaints. Increasingly, uninterrupted construction methods are being performed in which the construction is performed without disconnecting the power for high quality power supply during power distribution construction.
이러한 종래의 특고압 배전선로 무정전공법 중의 하나인 바이패스케이블을 이용한 임시송전공법을 사용하고 있으나 이는 특고압 3상을 공사용개폐기 및 3상 바이패스케이블을 이용하여 50m 마다 중간접속재를 이용하여 임시로 접속하고, 작업구간에 변압기가 있을 경우에는 변압기 설치 개소마다 분기접속재에서 분기하여 각각의 무정전변압기장치에 공급하고, 분기선로가 있을 경우에는 분기접속재를 사용하여 분기선로를 공급하여 1회 작업구간이 200~300m정도로 작업이 이루어져 왔으나 이는 전압강하 등 불안정한 임시접속개소가 많고, 3상 바이패스케이블을 임시로 지상에 포설하고 작업완료 후 다시 철거하는 등 부대작업에 따른 작업시간이 많이 소요되는 문제점을 보완하기 위하여 특허등록 10-1122499로 '전선이선기구 및 바이패스케이블을 이용한 무정전배전공법'을 등록한바 있다.The conventional high voltage distribution line uses a temporary transmission method using a bypass cable, which is one of the uninterrupted electric methods, but it uses the intermediate connection material every 50m by using the high voltage three phase by using a construction switch and a three phase bypass cable. If there is a transformer in the work section, branch from the branch connection material at each installation point of the transformer and supply it to each uninterruptible transformer device.If there is a branch line, the branch line is supplied using the branch connection material to supply a branch line. Work has been done at about 200 ~ 300m, but there are many unstable temporary connection places such as voltage drop, and it takes a lot of work time according to the side work such as laying three-phase bypass cable on the ground temporarily and then dismantling it after completion. In order to compensate, the patent registration 10-1122499 is used as' wire wire mechanism and bypass cable Uninterrupted Power Distribution Act was registered.
상기 특허공법은 도 1의 도시와 같이 특고압 3상 바이패스케이블을 포설하던 종래의 공법을 특고압 3상중 A상만 지상 또는 주상에 임시송전용 바이패스케이블(20)을 포설하여 전기의 순차적인 분리연결에 의하여 단상 또는 특고압3상 배전선로의 교체 및 이설과 경과지 변경공사를 수행하는 무정전 배전공법에 관한 것이다.The patent method is a conventional method of installing a special high-pressure three-phase bypass cable as shown in Figure 1, the installation of the temporary cable for the temporary transmission only 20 phase of the special high-pressure three-phase ground or column on the sequential The present invention relates to an uninterruptible power distribution method for replacing, relocating, and changing the transition of single-phase or extra-high voltage three-phase distribution lines by separate connection.
이는 작업구간내 50m단위인 바이패스케이블(20)을 접속하기 위한 중간접속재(910) 및 공사용개폐기(400)를 작업구간 양측에 설치하고 분기주(60)가 있을 경우에는 분기접속재(920)에서 분기하고 공사용개폐기(400)를 설치하여 분기주(60) 분기선에 공급 함으로 임시접속개소가 많아 접속 개소당 3%씩 전압 강하가 발생하여 바이패스케이블의 허용용량을 감소 시켜 배전선로의 부하용량에 따라 작업범위가 매우 제한적이고, This is because the intermediate connecting
또한 수용가가 많은 도심지 시내지역에서는 작업구간내 전주마다 변압기(30)(30')(30")가 설치되어 있어 작업장소가 협소하여 도로교통 장애 등으로 고가의 무정전변압기장치(50)를 변압기주 마다 설치가 불가능하여 공법적용이 매우 제한적인 문제점이 있다.In addition,
[선행기술문헌][Preceding technical literature]
[특허문헌][Patent Documents]
(특허문헌 1) 대한민국특허출원등록 제10-1122499호.(Patent Document 1) Korean Patent Application No. 10-1122499.
본 발명은 상기와 같은 제반 문제점을 해결하기 위해 창안된 것으로, 특고압 3상중 A상에 다회로로 분기를 함에 있어, 단상의 입력과 3개의 출력 구조를 갖는 개별 개폐형 단상 다분기 공사용개폐기를 활용하되, 출력시 각각의 분기 선택 개폐가 가능하게 함으로써, 작업구간 간선 중간에 임시접속개소를 없애고도 작업구간내 3개소의 변압기주를 1대의 무정전변압기장치로 3개소의 변압기주 까지 작업이 가능하게 하고, 이와 동시에 3개소의 분기선로 까지도 작업이 가능하게 하는 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법'을 제공함에 본 발명의 목적이 있다. The present invention has been made to solve the above problems, in the branching of the multi-circuit A phase of the high-pressure three-phase, using a single-stage single-stage multi-stage construction switchgear having a single-phase input and three output structure However, it is possible to open and close each branch at the time of output, so that it is possible to work up to three transformer lines with one uninterruptible transformer device in three transformer lines in the work section without removing the temporary connection point in the middle of the work section trunk. In addition, at the same time it is an object of the present invention to provide an uninterruptible power distribution method without a bypass cable intermediate connection point using individual switchgear single-phase multi-branch construction switchgear that can work even up to three branch lines.
상기 목적을 달성하기 위한 구체적인 수단으로는, 특고압 배전선로에서 작업구간 시작전주와 끝전주에 각각 하나의 입력부로부터 3개로 분기되는 각각의 스위치를 갖는 다회로 출력부로 된 개별 개폐형 단상 다분기 공사용개폐기를 각각 설치하여 바이패스 공정과, 무정전 작업공정과, 철거하는 공정을 수행하되,As a specific means for achieving the above object, the individual open-ended single-phase multi-branch construction switchgear consisting of a multi-circuit output unit having each switch branched from one input unit to the start section and end pole of the work section in the high-voltage distribution line Respectively install the bypass process, uninterruptible work process, and demolition process,
배전선로의 작업구간 시작전주와 끝전주 사이에 분기주가 있는 경우, If there is a branch line between the start and end pole of the work section of the distribution line,
바이패스 공정은,Bypass process,
단말케이블을 개별 개폐형 단상 다분기 공사용개폐기의 입력부와 특고압 배전선로 A상에 입상하고, 지상에 바이패스케이블을 포설하여 양측 개별 개폐형 단상 다분기 공사용개폐기의 다회로 출력부 중 어느 하나의 스위치에 각각 연결하며, 개별 개폐형 단상 다분기 공사용개폐기 중 다른 하나의 스위치에서 단말케이블로 분기하여 분기주 A상에 입상하고, 개별 개폐형 단상 다분기 공사용개폐기를 순차적으로 투입하여 바이패스 연결하며, The terminal cable is placed on the input of the individual switchgear single-phase multi-branch construction switchgear and A high voltage distribution line A, and a bypass cable is installed on the ground to the switch of any one of the multi-circuit outputs of the two switchgear-type single-phase multi-branch construction switchgear. Each of them is branched from one switch to the other end of the individual switchgear for single-stage multi-stage construction switchgear, and is placed on the branch A.
무정전 작업공정은,Uninterruptible work process,
배전선로 작업구간 양측 및 분기주의 A상 점퍼선을 분리하여 전체를 사선상태의 작업구간을 확보하여 사선상태로 작업을 완료한 후, 작업이 완료된 배전선로 A상 점퍼선을 각각 바이패스 연결하고, 설치된 개별 개폐형 단상 다분기 공사용개폐기를 순차적으로 개방한 후, 작업구간 시작전주와 끝전주의 배전선로 및 분기주의 배전선로에 연결된 단말케이블을 분리하여 A상 무정전작업을 수행하며,After separating the A-phase jumper wires on both sides of the distribution line work section and the branch line to secure the working section in the diagonal state, complete the work in the oblique state, and then connect the A-phase jumper wires of the completed distribution line bypass, respectively. After opening the individual switchgear single-phase multi-branch construction switchgear installed sequentially, disconnect the terminal cables connected to the distribution line of the start and end poles of the work section and the distribution lines of the branch line, and perform uninterrupted A phase work.
철거하는 공정은,Dismantling process,
포설된 바이패스케이블과, 개별 개폐형 단상 다분기 공사용개폐기와, 단말케이블을 철거하하되,Remove the installed bypass cable, individual switchable single-phase multi-branch construction switchgear, and terminal cable.
하나의 상 이상의 배전선로 작업시에는, When working with distribution lines of more than one phase,
A상 작업시 이미 설치된 개별 개폐형 단상 다분기 공사용개폐기와, 단말케이블과, 포설된 바이패스케이블을 이용하여 다른 상에 순차적인 전기의 분리연결 하여 바이패스 공정과 무정전 작업공정을 반복 수행함으로 달성할 수 있는 것이다.It can be achieved by repeating the bypass process and the uninterruptible work process by separating and connecting the electricity of different phases sequentially using the individual switchgear single-phase multi-branch construction switchgear, terminal cable, and the installed bypass cable. It can be.
이상과 같이 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법은, 특고압 3상중 A상씩 작업함에 있어, 출력시 각각의 선택 개폐가 가능한 개별 개폐형 단상 다분기 공사용개폐기를 이용함으로써, 작업구간 바이패스케이블의 중간에 중간접속을 없애고, 바이패스케이블 분기접속재를 사용하지 않고 개별 개폐형 단상 다분기 공사용개폐기에서 직접 무정전변압기장치 및 분기선로에 연결되게 하여 공사용개폐기 설치 개소를 줄이고 공사용개폐기의 소형화와 작업공정의 단순화가 가능하고, 특히 작업구간 간선 중간에 임시접속개소를 없앰으로써 임시접속개소에서 발생되는 전압강하를 방지하여 바이패스케이블의 허용용량을 증가시켜 중부하선로로 작업범위를 확대하는 효과가 있으며, 작업구간에 다수의 변압기가 있을 경우 1대의 무정전변압기장치로 3개소의 변압기를 공급할 수 있게 되어 복잡한 도심지 시내지역에서의 공법적용이 용이하고 교통장애 및 보행자 통행위험을 방지하여 작업상의 편리함과 안정성이 향상되는 효과를 얻을 수 있는 것이다. As described above, the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear according to the present invention is an individual switch-type single-phase multi-branch that can be selectively opened and closed at the time of outputting in the A phase of the special high pressure three phases. By using the construction switch, it eliminates the intermediate connection in the middle of the bypass section of the work section and installs the construction switch by connecting it to the uninterruptible transformer device and the branch line directly from the individual switching type single-phase multi-branch construction switch without using the bypass cable branch connection material. It is possible to reduce the location, miniaturize the construction switch, and simplify the work process.In particular, by eliminating the temporary connection point in the middle of the work section, it prevents the voltage drop generated at the temporary connection point and increases the allowable capacity of the bypass cable to increase the heavy load. It has the effect of expanding the working range with a furnace, When there are a large number of transformers in the business area, one transformer can supply three transformers, so it is easy to apply the construction method in the downtown downtown area, and it is convenient for operation and stability by preventing traffic obstacles and pedestrian traffic hazards. You can get an improved effect.
도 1은 종래의 전선이선기구 및 바이패스케이블을 이용한 무정전 배전공법 시공상태도.1 is a state diagram of an uninterruptible power distribution method using a conventional wire transfer mechanism and a bypass cable.
도 2는 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 분기선로가 있는 A상 바이패스케이블 지상포설 시공상태도.Figure 2 is a ground-phase construction state of the A-phase bypass cable with a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open-close single-phase multi-branch construction switchgear of the present invention.
도 3은 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 분기선로가 있는 B상 바이패스케이블 지상포설 시공상태도.Figure 3 is a ground-phase construction state of the B-phase bypass cable grounding construction with a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open-close single-phase multi-branch construction switchgear of the present invention.
도 4는 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 분기선로가 있는 C상 바이패스케이블 지상포설 시공상태도.Figure 4 is a ground-phase construction state of the C-phase bypass cable grounding construction with a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open-close single-phase multi-branch construction switchgear of the present invention.
도 5는 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 개별 개폐형 단상 다분기 공사용개폐기 간략회로도.Figure 5 is a simplified circuit diagram of the individual open and close single-phase multi-branch construction switchgear of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual open and close single-phase multi-branch construction switch.
도 6은 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 분기주를 갖는 바이패스케이블 주상포설 시공상태 다른 실시예도.Figure 6 is another embodiment of the bypass cable column laid construction state having a branching line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
도 7은 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 2개의 분기주를 갖는 바이패스케이블 지상포설 시공상태 다른 실시예도.Figure 7 is another embodiment of the bypass cable ground installation construction state having two branch poles in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
도 8은 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 변압기주와 분기주를 갖는 바이패스케이블 지상포설 시공상태도.8 is a ground cable construction state of the bypass cable having a transformer line and a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear of the present invention.
도 9는 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 변압기주와 분기주를 갖는 바이패스케이블 지상포설 시공상태 다른 실시예도.Figure 9 is another embodiment of the bypass cable ground laying construction state having a transformer line and a branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
도 10은 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 3개소 변압기주와 1개소 분기주를 갖는 바이패스케이블 지상포설 시공상태도.Figure 10 is a ground cable installation state of the bypass cable having three transformer lines and one branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear of the present invention.
도 11은 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 3개소 변압기주와 1개소 분기주를 갖는 바이패스케이블 주상포설 시공상태 다른 실시예도.11 is another embodiment of the bypass cable pole laying construction state having three transformer lines and one branch line in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear according to the present invention .
도 12는 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 작업구간에 2개소 변압기주와 2개소 분기주를 갖는 바이패스케이블 지상포설 시공상태 다른 실시예도.12 is another embodiment of the bypass cable ground laying construction state having two transformer lines and two branch lines in the work section of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switch .
[부호의 설명][Description of the code]
20 : 바이패스케이블 21,21' : 단말케이블 20:
22 : 무정전변압기장치 연결케이블22: uninterruptible transformer device connection cable
30, 30', 30" : 변압기 31, 31', 31" : 변압기 2차인하선30, 30 ', 30 ": Transformer 31, 31', 31": Transformer secondary line
35, 35', 35" : COS 35, 35 ', 35 ": COS
40, 40' : 개별 개폐형 단상 다분기 공사용개폐기40, 40 ': Individual switchgear single phase multi-branch construction switchgear
41 : 입력부 43 : 다회로 출력부41
43a,43a',43a" : 스위치 50 : 무정전변압기장치43a, 43a ', 43a ": switch 50: uninterruptible transformer device
60, 60' : 분기주 70 : 중성선60, 60 ': Quarterly 70: Neutral
80 : 저압선 81 : 저압바이패스케이블80: low voltage wire 81: low voltage bypass cable
400 : 공사용개폐기 400: construction switchgear
910 : 중간접속재 920 : 분기접속재 910: intermediate connecting member 920: branch connecting member
본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in this specification and claims are not to be construed as being limited to their ordinary or dictionary meanings, and the inventors may appropriately define the concept of terms in order to best describe their invention. It should be interpreted as meaning and concept corresponding to the technical idea of the present invention based on the principle that the present invention.
따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in the specification and the drawings shown in the drawings are only the most preferred embodiment of the present invention, and do not represent all of the technical idea of the present invention, which can be replaced at the time of the present application It should be understood that there may be various equivalents and variations.
이하, 본 발명 개별 개폐형 단상 다분기 공사용개폐기를 이용한 바이패스케이블 중간접속개소가 없는 무정전 배전공법의 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings a preferred embodiment of the uninterruptible power distribution method without the bypass cable intermediate connection point using the individual switchgear single-phase multi-branch construction switchgear.
*실시예 1Example 1
도 2의 도시와 같이 배전선로의 작업구간 시작전주와 끝전주 사이에 분기주(60)가 있는 경우, As shown in FIG. 2, when there is a
먼저, 바이패스 공정을 수행하되,First, perform the bypass process
특고압 3상중 A상(1)만 별도의 바이패스케이블(20)을 중간접속개소 없이 지상에 포설하고 작업구간 양측 입상주(시작전주와 끝전주)에 개별 개폐형 단상 다분기 공사용개폐기(40)를 각각 설치하여 단말케이블(21)을 이용하여 A상(1)을 바이패스 연결한 후, 작업구간내 분기주(60)가 있을 경우에는 입상주에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40)에서 A상(1)의 특고압을 단말케이블(21')로 분기하여 분기주(60)에 입상하여 분기선로 A상에 연결한 다음 검상을 하고 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 투입하여 바이패스 연결한다.Only the phase A (1) of the three phases of extra-high pressure separates the bypass cable (20) on the ground without an intermediate connection point, and opens and closes the single-stage multi-phase construction switchgear (40) separately on the standing poles (starting pole and ending pole) on both sides of the work section. After installing each of them bypass the A phase (1) by using the terminal cable (21), if there is a branch line (60) in the work zone, the individual open and close type single-phase
이어, 무정전 작업공정을 수행하되,Then, perform an uninterruptible work process,
특고압이 바이패스된 A상(1)의 작업구간 시작과 끝의 입상주 및 분기주(60) 점퍼선을 분리하여 작업구간내 A상(1) 전체를 사선상태의 안전한 작업공간으로 확보하여 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 A상(1)의 점퍼선을 바이패스 연결한 후 무정전작업이 완료되면 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 개방하고, 작업구간 양단 입상주 및 분기주(60) 바이패스케이블(20)과 단말케이블(21)(21')을 분리하여 A상(1) 무정전작업을 완료하게 된다.By separating the jumper wires at the start and the end of the work section of the phase A (1) where the extra high pressure was bypassed, the entire phase A (1) in the working period was secured in a diagonal working condition. After completing the alteration or replacement of the main pole, the wire twisted line and the long wire work, and bypassing the jumper wire of the A phase (1), when the uninterrupted work is completed, the individual open / close single phase
이후 3상 중 B상(2) 작업시 도 3의 도시와 같이 이미 포설된 바이패스케이블(20)의 단말케이블(21)을 작업구간 양측 입상주 에서 B상(2)으로 바이패스 연결한 후, 작업구간 내 분기주(60) 입상 단말케이블(21')을 분기선로 B상(2)에 연결한 다음 검상을 하고 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 투입하여 바이패스 연결한다.Thereafter, when the B phase (2) of the three phases work as shown in Figure 3 after connecting the
이어, 특고압이 바이패스된 B상(2)의 작업구간 시작과 끝의 입상주 및 분기주(60) 점퍼선을 분리하여 작업구간내 B상(2) 전체를 사선상태의 안전한 작업공간으로 확보하여 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 B상(2)의 점퍼선을 바이패스 연결한 후 무정전작업이 완료되면 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 개방하고, 작업구간 양단 입상주 및 분기주(60) 바이패스케이블(20)과 단말케이블(21)(21')을 분리하여 B상(1) 무정전작업을 완료하게 된다.Subsequently, the jumper wires at the start and end of the work section of the phase B of the B phase (2) where the extra high pressure was bypassed are separated, and the entire B phase (2) in the working section is moved to a safe working space in a diagonal state. After completing the alteration or replacement of the pole, wire stranding and long wire work, bypassing the jumper wire of the B phase (2), and after the uninterruptible work is completed, the individual open / close single phase
이후 3상중 C상(3)을 작업시 도 4의 도시와 같이 이미 포설된 바이패스케이블(20)의 단말케이블(21)을 작업구간 양측 입상주 에서 C상(3)으로 바이패스 연결한 후, 작업구간 내 분기주(60) 입상 단말케이블(21')을 분기선로 C상(3)에 연결한 다음 검상을 하고 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 투입하여 바이패스 연결한다.After the C phase (3) of the three phases work as shown in Fig. 4 by connecting the
이어, 특고압이 바이패스된 C상(3)의 작업구간 시작과 끝의 입상주 및 분기주(60) 점퍼선을 분리하여 작업구간내 C상(3) 전체를 사선상태의 안전한 작업공간으로 확보하여 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 C상(3)의 점퍼선을 바이패스 연결한 후 무정전작업이 완료되면 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 개방하고, 작업구간 양단 입상주 및 분기주(60) 바이패스케이블(20)과 단말케이블(21)(21')을 분리하여 B상(1) 무정전작업을 완료하게 된다.Subsequently, the jumper wires at the start and end of the work section of the C phase (3) where the extra high pressure was bypassed were separated and the jumper wires of the C phase (3) in the work section were moved to a safe working space in a diagonal state. After completing the alteration or replacement of the pole, wire stranding and long wire work, bypassing the jumper wire of the C phase (3), and after the uninterruptible work is completed, the individual open / close single-phase
이어, 철거하는 공정을 수행하되,Then, the demolition process is performed,
바이패스케이블(20)의 작업구간 양단 입상주 및 분기주(60)의 단말케이블(21)(21')을 분리하여 C상(3) 무정전작업이 완료되면 포설된 바이패스케이블(20) 및 개별 개폐형 단상 다분기 공사용개폐기(40) 등을 안전하게 철거하고 무정전작업을 마무리 하면 된다.
한편, 상기 각각의 개별 개폐형 단상 다분기 공사용개폐기(40)는, 도 5의 도시와 같이 일측에는 1회선으로 된 입력부(41)가 형성되고, 타측에는 개별로 각각 스위치(43a)(43a')(43a") 작동되는 다수 회선으로 분기된 다회로 출력부(43)가 구성된다.On the other hand, each of the individual opening and closing type single-phase
이에, 일예로 A상(1)의 양측은 개별 개폐형 단상 다분기 공사용개폐기(40)의 입력부(41)와 각각 연결하고, 바이패스케이블(20)은 2차측 다회로 출력부(43)의 어느 하나의 스위치(43a)(43a')(43a")에 연결하면 된다.Thus, for example, both sides of the phase A (1) is connected to the
또한, 다른 개별 개폐형 단상 다분기 공사용개폐기(40)의 다회로 출력부(43)의 다른 하나의 스위치(43a)(43a')(43a")를 개별 개폐형 단상 다분기 공사용개폐기를 사용하지 않고 단말케이블(21')을 이용한 분기주(60)와 또는 하기하는 무정전변압기장치 연결케이블(22)을 이용한 무정전변압기장치(50)로 연결이 가능하다.In addition, the
한편, 상기와 같이 구성된 개별 개폐형 단상 다분기 공사용개폐기(40)의 다회로 출력부(43)의 연결을 위한 상의 선택은 한정되는 것이 아니고 3상 중 어느 한상을 통해 연결 가능하되, 각상의 스위치(43a)(43a')(43a") 작동에 의해 출력 가능하게 구성됨은 당연할 것이다.On the other hand, the selection of the phase for the connection of the
*실시예 2Example 2
도 6의 도시와 같이 같이 바이패스케이블을 지상에 포설이 불가능하여 주상에 포설하고 작업구간내 분기주(60)가 있을 경우,As shown in FIG. 6, when the bypass cable cannot be laid on the ground and laid on the column, and there is a
먼저, 바이패스 공정은,First, the bypass process
작업구간에 도로횡단, 도로 교통장애 등으로 지상으로 바이패스케이블 설치가 불가능한 경우, 특고압 3상중 A상(1)만 별도의 바이패스케이블(20)을 중간접속개소 없이 중성선(70) 부근 주상에 설치하고, 작업구간 양측 입상주(시작전주와 끝전주)에 개별 개폐형 단상 다분기 공사용개폐기(40)를 각각 설치하여 단말케이블(21)을 이용하여 A상(1)을 바이패스 연결한 후, 작업구간내 분기주(60)가 있을 경우에는 입상주에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40)에서 A상(1)의 특고압을 단말케이블(21')로 분기하여 분기주(60)에 입상하여 분기선로 A상에 연결한 다음 검상을 하고 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 투입하여 바이패스 연결한다.If the bypass cable cannot be installed on the ground due to road crossings or road traffic obstacles in the work zone, only the A-phase (1) of the special high-pressure three phases separates the bypass cable (20) in the vicinity of the neutral wire (70) without intermediate connection points. After installing the individual switchgear single-phase
이어, 무정전 작업공정을 수행하되,Then, perform an uninterruptible work process,
특고압이 바이패스된 A상(1)의 작업구간 시작과 끝의 입상주 및 분기주(60) 점퍼선을 분리하여 작업구간내 A상(1) 전체를 사선상태의 안전한 작업공간으로 확보하여 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 A상(1)의 점퍼선을 바이패스 연결한 후 무정전작업이 완료되면 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 개방하고, 작업구간 양단 입상주 및 분기주(60) 바이패스케이블(20)과 단말케이블(21)(21')을 분리하여 A상(1) 무정전작업을 완료하게 된다.By separating the jumper wires at the start and the end of the work section of the phase A (1) where the extra high pressure was bypassed, the entire phase A (1) in the working period was secured in a diagonal working condition. After completing the alteration or replacement of the main pole, the wire twisted line and the long wire work, and bypassing the jumper wire of the A phase (1), when the uninterrupted work is completed, the individual open / close single phase
이후 전술한 바와 같이 3상중 B상(2)과 C상(3)에 대하여 바이패스 공정과, 무정전 작업공정을 반복 수행 및 철거하는 공정을 수행하면 된다.Thereafter, as described above, the
*실시예 3 Example 3
도 7의 도시와 같이 작업구간내 분기주(60)가 다수개소 있는 경우, 실시예 1과 같이 도 2내지 도 7을 참조하여 특고압 A상 내지 C상의 작업을 수행하되, 입상주에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40)에서 A상(1)의 특고압을 단말케이블(21')로 분기하여 분기주(60)마다 단말케이블(21')을 각각 입상하여 분기선로에 연결한 상태에서 파이패스 공정과, 무정전 작업공정과, 철거하는 공정을 수행하면 된다.In the case where there are a plurality of
*실시예 4Example 4
도 5를 참조하여 도 8의 도시와 같이 배전선로의 작업구간 시작전주와 끝전주 사이에 변압기주 및 분기주(60)가 있는 경우에는, Referring to FIG. 5, when there is a transformer column and a
먼저, 바이패스 공정을 수행하되,First, perform the bypass process
특고압 3상중 A상(1)만 별도의 바이패스케이블(20)을 중간접속개소 없이 지상에 포설하고 작업구간 양측 입상주(시작전주와 끝전주)에 개별 개폐형 단상 다분기 공사용개폐기(40)를 각각 설치하여 단말케이블(21)을 이용하여 A상(1)을 바이패스 연결한 후, 작업구간 내 변압기(30)가 있을 경우 개별 개폐형 단상 다분기 공사용개폐기(40)에서 무정전변압기장치 연결케이블(22)로 분기시켜 A상(1)의 특고압을 분기하여 무정전변압기장치(50)에 연결하고, 무정전변압기장치(50) 2차 저압을 저압바이패스케이블(81)로 저압 배전선로 A상에 연결하고, 분기주(60) 작업은 현장여건상 가장 가까운 입상주의 개별 개폐형 단상 다분기 공사용개폐기(40)에서 단말케이블(21')로 분기하여 분기주(60) 배전선로에 연결하고, 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 투입하여 바이패스 연결하면 된다.Only the phase A (1) of the three phases of extra-high pressure separates the bypass cable (20) on the ground without an intermediate connection point, and opens and closes the single-stage multi-phase construction switchgear (40) separately on the standing poles (starting pole and ending pole) on both sides of the work section. By connecting each of the phase A (1) by using the terminal cable (21), if there is a transformer (30) in the work zone, the individual open-type single-phase
이어, 무정전 작업공정을 수행하되,Then, perform an uninterruptible work process,
변압기주에서 변압기(30)의 변압기 2차인하선(31)을 분리하고 변압기 COS(35)를 개방하고 작업구간 시작전주와 끝전주 및 분기주(60)의 점퍼선을 분리하여 작업구간 내 A상(1) 전체를 사선상태의 안전한 작업공간으로 확보하여 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 A상(1)의 점퍼선을 바이패스 연결한 후 신설전선 A상(1) 변압기(30)의 COS(35)를 투입하여 변압기 2차인하선을 저압선(80)에 연결하고, 저압바이패스케이블(81)을 저압선(80) A상에서 분리하고, 개별 개폐형 단상 다분기 공사용개폐기(40)를 순차적으로 개방하고 바이패스케이블(20)의 작업구간 양단 입상주 및 분기주(60) 단말케이블(21')을 분리하여 A상(1) 무정전작업을 완료하게 된다. Remove the transformer secondary lowering
또한 도 9와 같이 분기주(60)로 연결되는 단말케이블(21')은, 무정전변압기장치(50)에서 분기하여 분기주(60)로 입상할 수 있는 것으로, 이는 현장 여건에 따라 작업구간 양단 입상주 개별 개폐형 단상 다분기 공사용개폐기(40) 또는 무정전변압기장치(50)중 편리하고 안전한 쪽에서 분기시켜 분기주(60)의 단말케이블(21')을 연결하여 무정전작업을 하면 되는 것이다.In addition, as shown in FIG. 9, the
이후 3상중 B상(2)과 C상(3)은 작업시에는 이미 설치된 바이패스케이블(20)과, 개별 개폐형 단상 다분기 공사용개폐기(40)와, 단말케이블(21)(21')과, 무정전변압기장치(50)와, 연결케이블(22)과, 저압바이패스케이블(81)을 이용하여 바이패스 공정과, 무정전 작업공정을 반복수행 및 무정전작업이 완료되면 바이패스케이블(20)과, 개별 개폐형 단상 다분기 공사용개폐기(40)와, 단말케이블(21)(21')과, 무정전변압기장치(50)와, 연결케이블(22)과, 저압바이패스케이블(81)을 철거하는 공정을 수행하면 된다.Thereafter, phase B (2) and phase C (3) of the three phases are already installed at the time of work bypass cable (20), individual switchgear single-phase
*실시예 5Example 5
도 10의 도시와 같이 작업구간내 3개소의 변압기주와 1개소의 분기선로가 있는 경우,As shown in Fig. 10, when there are three transformer lines and one branch line in the work section,
도 10의 도시와 같이 먼저, 바이패스 공정을 수행하되,As shown in FIG. 10, first, a bypass process is performed.
특고압 3상중 A상만 바이패스케이블(20)을 중간접속개소 없이 지상에 포설하고 작업구간 양단 입상주에 개별 개폐형 단상 다분기 공사용개폐기(40)을 설치하여 특고압 3상 중 A상(1)을 바이패스 연결한 후 작업구간 내 변압기(30)(30')(30")가 3개소 있을 경우 작업구간 양단 입상주에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40)에서 A상(1)의 특고압을 분기하여 무정전변압기장치(50) 전단에 개별 개폐형 단상 다분기 공사용개폐기(40')를 설치하여 분기된 A상(1)을 특고압 3회선으로 분기시켜 무정전변압기장치(50)에 연결하여 무정전변압기장치(50)내부 단상 변압기 3대를 개별로 운용이 가능하도록 무정전변압기장치(50) 2차 결선하여 저압바이패스케이블(81)을 이용하여 변압기(30)(30')(30")의 저압선(80)(80')(80'') A상에 각각 연결하고, 분기주(60)는 작업구간 양단에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40) 또는 무정전변압기장치(50)에서 특고압 A상을 분기할 수 있으나 도 10은 무정전변압기장치(50)에서 분기하여 분기주(60)에 단말케이블(21')을 A상 분기선에 연결하고, 검상을 한 후 순차적으로 개별 개폐형 단상 다분기 공사용개폐기(40)를 투입하면 된다.Phase A of the special high pressure three phases Bypass cable (20) is installed on the ground without intermediate connection points, and the individual opening and closing type single phase multi-branch construction switchgear (40) is installed on the winning end of the work section. After the bypass connection, if there are three
이후, 무정전 작업공정을 수행하되,Then, perform an uninterruptible work process,
임시송전이 완료되면 A상 변압기(30)(30')(30")의 변압기 2차인하선(31)(31')(31")을 분리하고 A상 변압기(30)(30')(30")의 COS(35)(35')(35")를 개방한 후 작업구간 양단 입상주 및 분기주(60)의 점퍼선을 분리하여 작업구간 A상(1) 전체를 사선상태의 안전한 작업공간으로 확보하여 사선상태로 작업구간내 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 A상(1)의 점퍼선을 바이패스 연결한 후 신설 또는 교체전선 A상 변압기(30)(30')(30")의 COS(35)(35')(35")를 투입하고, 변압기 변압기(30)(30')(30")의 변압기 2차인하선을 저압선(80)(80')(80'') 연결한 후 저압바이패스케이블(81)을 저압선(80)(80')(80'')에서 분리하고, 개별 개폐형 단상 다분기 공사용개폐기(40)(40')를 순차적으로 개방하고, 작업구간 양단 입상주 및 분기주(60)의 바이패스케이블(20)과 단말케이블(21)(21')을 분리하여 A상(1) 무정전작업을 완료하게 된다. When the temporary transmission is completed, disconnect the transformer
이후 3상중 B상(2)과 C상(3)은 작업시에는 이미 설치된 바이패스케이블(20)과, 개별 개폐형 단상 다분기 공사용개폐기(40)(40')와, 단말케이블(21)(21')과, 무정전변압기장치(50)와, 연결케이블(22)과, 저압바이패스케이블(81)을 이용하여 바이패스 공정과, 무정전 작업공정을 반복수행 및 무정전작업이 완료되면 바이패스케이블(20)과, 개별 개폐형 단상 다분기 공사용개폐기(40)(40')와, 단말케이블(21)(21')과, 무정전변압기장치(50)와, 연결케이블(22)과, 저압바이패스케이블(81)을 철거하는 공정을 수행하면 된다.Afterwards, phase B (2) and phase C (3) of the three phases are already installed at the time of work, the individual switchgear single-phase multi-branch construction switchgear 40 (40 '), and the terminal cable (21) ( 21 '), the
*실시예 6Example 6
도 11의 도시와 같이 작업구간내 3개소의 변압기주와 1개소의 분기선로가 있고 바이패스케이블(20)을 지상에 포설이 불가능하여 주상에 포설하는 경우As shown in FIG. 11, when there are three transformer lines and one branch line in the working section, and the
작업구간에 도로횡단, 하천횡단, 또는 도로 교통지장 장애 등으로 바이패스케이블(20)을 지상에 포설이 불가능한 경우 바이패스케이블(20)을 중간접속개소 없이 중성선(70) 또는 저압선(80) 부근 주상에 설치하고, 작업구간 양단 입상주에 설치되는 개별 개폐형 단상 다분기 공사용개폐기(40)도 주상에 함께 설치하고 상기 실시예 5와과 같이 도 9의 설명과 동일한 방법으로 무정전작업을 수행하면 된다. If it is impossible to lay the
*실시예 7 Example 7
도 12의 도시와 같이 작업구간내 2개소의 변압기주와 2개소의 분기선로가 있는 경우As shown in FIG. 12, when there are two transformer lines and two branch lines in a work section
도 12의 도시와 같이 특고압 3상중 A상만 바이패스케이블(20)을 중간접속개소 없이 지상에 포설하고 작업구간 양단 입상주에 개별 개폐형 단상 다분기 공사용개폐기(40)을 설치하여 특고압 3상 중 A상(1)을 바이패스 연결한 후 작업구간 내 변압기(30)(30')가 2개소 있을 경우 작업구간 양단 입상주에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40)에서 A상(1)의 특고압을 분기하여 무정전변압기장치(50) 전단에 개별 개폐형 단상 다분기 공사용개폐기(40')를 설치하여 분기된 A상을 특고압 2회선으로 분기시켜 무정전변압기장치(50)에 연결하여 무정전변압기장치(50)내부 단상 변압기 2대를 개별로 운용이 가능하도록 무정전변압기장치(50) 2차 결선하여 저압바이패스케이블(81)을 이용하여 변압기(30)(30')의 저압선(80)(80') A상에 각각 연결하고, As shown in Fig. 12, only the
분기주(60)(60')는 작업구간 양단에 설치된 개별 개폐형 단상 다분기 공사용개폐기(40) 또는 무정전변압기장치(50)에서 특고압 A상을 분기할 수 있으나 도 12는 무정전변압기장치(50)에서 단말케이블(21')로 분기하여 분기주(60)(60') A상 분기선에 연결하고, 검상을 한 후 순차적으로 개별 개폐형 단상 다분기 공사용개폐기(40)를 투입하는 바이패스 공정을 수행한다.
이후, A상 변압기(30)(30')의 변압기 2차인하선(31)(31')을 분리하고 변압기(30)(30')의 COS(35)(35')를 개방한 후 작업구간 양단 입상주 및 분기주(60)(60')의 점퍼선을 분리하여 작업구간 A상(1) 전체를 사선상태의 안전한 작업공간으로 확보하여 사선상태로 작업구간내 장주변경 또는 교체와 전선연선 및 긴선작업 등을 완료하고 작업이 완료되면 A상(1)의 점퍼선을 바이패스 연결한 후 신설 또는 교체전선 A상 변압기(30)(30') COS(35)(35')를 투입하고 변압기 2차인하선(31)(31')을 저압선(80)(80')에 연결한 후 저압바이패스케이블(81)을 저압선(80)(80')에서 분리하고, 개별 개폐형 단상 다분기 공사용개폐기(40)(40')를 순차적으로 개방하고, 작업구간 양단 입상주 및 분기주(60)(60') 바이패스케이블(20)과 단말케이블(21)(21')을 분리하여 A상(1) 무정전 작업공정을 완료하게 된다. Thereafter, the transformer
이후 3상중 B상(2)과 C상(3)은 작업시에는 이미 설치된 바이패스케이블(20)과, 개별 개폐형 단상 다분기 공사용개폐기(40)(40')와, 단말케이블(21)(21')과, 무정전변압기장치(50)와, 연결케이블(22)과, 저압바이패스케이블(81)을 이용하여 바이패스 공정과, 무정전 작업공정을 반복수행 및 무정전작업이 완료되면 바이패스케이블(20)과, 개별 개폐형 단상 다분기 공사용개폐기(40)(40')와, 단말케이블(21)(21')과, 무정전변압기장치(50)와, 연결케이블(22)과, 저압바이패스케이블(81)을 철거하는 공정을 수행하면 된다.Afterwards, phase B (2) and phase C (3) of the three phases are already installed at the time of work, the individual switchgear single-phase multi-branch construction switchgear 40 (40 '), and the terminal cable (21) ( 21 '), the
Claims (4)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2016-0169158 | 2016-12-13 | ||
| KR1020160169158A KR101754043B1 (en) | 2016-12-13 | 2016-12-13 | Uninterruptible power distribution method without intermediate connection of bypass cable using single-phase multi-branch switchgear with separately switching function |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2018110845A1 true WO2018110845A1 (en) | 2018-06-21 |
Family
ID=59354514
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2017/013188 Ceased WO2018110845A1 (en) | 2016-12-13 | 2017-11-20 | Construction method for uninterruptible power distribution without bypass cable intermediate connection points using individually openable single-phase multi-branch switchgear for construction |
Country Status (2)
| Country | Link |
|---|---|
| KR (1) | KR101754043B1 (en) |
| WO (1) | WO2018110845A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110445082A (en) * | 2019-08-20 | 2019-11-12 | 长沙理工大学 | The single-phase mounting structure and its test method of the parallel connection gaps of 10kV distribution line |
| CN116305693A (en) * | 2023-03-03 | 2023-06-23 | 国核电力规划设计研究院有限公司 | Design Method of Electrical Secondary Wiring Based on Design Decoupling |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20070104759A (en) * | 2006-04-24 | 2007-10-29 | 에스엠 종합개발 주식회사 | Uninterruptible Replacement of Wires |
| KR20090127636A (en) * | 2008-06-09 | 2009-12-14 | 한국전력공사 | Uninterruptible Replacement System for Distribution Transformers and Low Voltage Lines |
| KR20100054948A (en) * | 2008-11-17 | 2010-05-26 | (주) 진흥이엔지 | By-pass construction method for replacement of pole-top transformer (1phase/3phase) using 1phase portable transformer |
| KR20120010370A (en) * | 2010-07-26 | 2012-02-03 | 대원전기 주식회사 | Uninterruptible Power Distribution Method Using Wire Transfer Mechanism and Bypass Cable |
| KR101394095B1 (en) * | 2014-03-19 | 2014-05-14 | 운장전력 주식회사 | Wiring system using overhead earth wire combined with neutral line |
-
2016
- 2016-12-13 KR KR1020160169158A patent/KR101754043B1/en active Active
-
2017
- 2017-11-20 WO PCT/KR2017/013188 patent/WO2018110845A1/en not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20070104759A (en) * | 2006-04-24 | 2007-10-29 | 에스엠 종합개발 주식회사 | Uninterruptible Replacement of Wires |
| KR20090127636A (en) * | 2008-06-09 | 2009-12-14 | 한국전력공사 | Uninterruptible Replacement System for Distribution Transformers and Low Voltage Lines |
| KR20100054948A (en) * | 2008-11-17 | 2010-05-26 | (주) 진흥이엔지 | By-pass construction method for replacement of pole-top transformer (1phase/3phase) using 1phase portable transformer |
| KR20120010370A (en) * | 2010-07-26 | 2012-02-03 | 대원전기 주식회사 | Uninterruptible Power Distribution Method Using Wire Transfer Mechanism and Bypass Cable |
| KR101394095B1 (en) * | 2014-03-19 | 2014-05-14 | 운장전력 주식회사 | Wiring system using overhead earth wire combined with neutral line |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110445082A (en) * | 2019-08-20 | 2019-11-12 | 长沙理工大学 | The single-phase mounting structure and its test method of the parallel connection gaps of 10kV distribution line |
| CN110445082B (en) * | 2019-08-20 | 2020-12-01 | 长沙理工大学 | Single-phase installation structure and test method for parallel clearance of 10kV distribution line |
| CN116305693A (en) * | 2023-03-03 | 2023-06-23 | 国核电力规划设计研究院有限公司 | Design Method of Electrical Secondary Wiring Based on Design Decoupling |
Also Published As
| Publication number | Publication date |
|---|---|
| KR101754043B1 (en) | 2017-07-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110168826B (en) | Uninterruptible Power Distribution Method for Inter-area Operation in Deadline State | |
| WO2012015160A1 (en) | Method for distributing power without interruption using power line shifting device and bypass cable | |
| KR100926445B1 (en) | Uninterrupted bypass construction of underground distribution lines using extension elbows with branch connection | |
| KR20100054948A (en) | By-pass construction method for replacement of pole-top transformer (1phase/3phase) using 1phase portable transformer | |
| WO2012121457A1 (en) | Method for uninterruptible bypass construction of power distribution lines using insulated guiders for maintaining distance | |
| CN106451220A (en) | Bypass equipment and method for live replacement of equipment on same-tower multi-loop pole tower | |
| WO2018097357A1 (en) | Movable auxiliary arm apparatus for use in uninterruptible power distribution works and method using same | |
| WO2018110845A1 (en) | Construction method for uninterruptible power distribution without bypass cable intermediate connection points using individually openable single-phase multi-branch switchgear for construction | |
| KR101766162B1 (en) | Uninterruptible power distribution method without intermediate connection of bypass cable using single-phase multi-branch switchgear | |
| CN110380340B (en) | Substation power distribution device | |
| KR20090024035A (en) | Uninterruptible replacement method for columnar transformer using construction transformer | |
| KR101470868B1 (en) | System applied uninterruptible bypassing method for underground power line | |
| CN211266433U (en) | High-voltage cable tapping device | |
| KR102598787B1 (en) | Uninterruptible power distribution work method for low voltage line | |
| KR100769583B1 (en) | Ground Transformer Replacement Method for Underground Distribution Lines by Uninterruptible Construction Method | |
| KR100407376B1 (en) | wire-changing device inside of electric pole and non-power-failure power distribution method | |
| CN206195248U (en) | Electrified bypass equipment who changes with equipment on pole multiloop shaft tower | |
| KR102569838B1 (en) | Line construction method | |
| KR100415908B1 (en) | Low Voltage a Phase Converter Bypass Connection Device Without Power Failure | |
| WO2010087563A1 (en) | Power distribution system using 3-phase power cable | |
| CN114362041B (en) | Method for changing straight line rod into tension rod and hardware fitting for changing straight line rod into tension rod | |
| AU2016305079B2 (en) | Live conductor stringing, maintenance and repair method | |
| JP7810093B2 (en) | Transformer replacement method | |
| CN117895376A (en) | A method for migrating poles under uninterrupted power supply | |
| CN108281917B (en) | An ultra-high voltage AC substation and its design method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17880391 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 17880391 Country of ref document: EP Kind code of ref document: A1 |