[go: up one dir, main page]

WO2018143661A1 - Beam bridge having beam support plate and construction method therefor - Google Patents

Beam bridge having beam support plate and construction method therefor Download PDF

Info

Publication number
WO2018143661A1
WO2018143661A1 PCT/KR2018/001319 KR2018001319W WO2018143661A1 WO 2018143661 A1 WO2018143661 A1 WO 2018143661A1 KR 2018001319 W KR2018001319 W KR 2018001319W WO 2018143661 A1 WO2018143661 A1 WO 2018143661A1
Authority
WO
WIPO (PCT)
Prior art keywords
support plate
beam support
bridge
beams
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2018/001319
Other languages
French (fr)
Korean (ko)
Inventor
์ „์ข…ํ™˜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of WO2018143661A1 publication Critical patent/WO2018143661A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Definitions

  • the present invention relates to a beam bridge having a beam support plate and a construction method thereof, and more particularly, to install a beam support plate on a lower structure (alternation, piers) to bind a plurality of beams to reduce the beam length.
  • the beam support plate is directly installed in the lower structure to reduce the amount of shoes used, and it is easy to manufacture by installing and removing the sole plate when manufacturing the beam, and through the simultaneous pouring of concrete, the upper structure (cross beam by beam support plate, Beam beam connected to the cross beam, the slab cast on the top) and a beam bridge having a beam support plate to improve the structural stability by integrally integrated, and a construction method thereof.
  • the bridge is a structure that can be constructed to cross rivers, valleys, seas, etc., and consists of a lower structure (alternation, pier), and an upper structure constructed on the lower structure, and the beam bridge according to the present invention has an upper structure on the lower structure. It consists of a plurality of beams mounted through the bridge device, the slab installed on the beam.
  • Patent No. 10-0703134
  • a plurality of beams are arranged along the transverse direction and are respectively installed in the lower structure through a bridge device.
  • the beam bridge according to the prior art has a problem in that the beam is lengthened to be supported by a large area on the lower structure for stable support because the beam is directly mounted on the lower structure, and the beam is simply mounted on the lower structure. Since there is a problem that causes conduction during construction, and the sole plate must be installed to correspond to the chair device on each beam, there is a problem that the manufacturing is cumbersome and the use of a large number of chair devices.
  • the conventional beam bridge has a problem that the structural efficiency of the beam is reduced by reinforcing the parent moment generated in the point of the bridge with the reinforcing bars on the upper surface of the slab by designing the beam as a simple beam and a continuous bridge integrated with the slab only have.
  • the conventional beam bridge has a problem that the construction of the lower structure is difficult to take a long time due to the stepped construction having a height difference between the alternating and the pier surface in consideration of the cross-slope, there is a problem that the workability is greatly reduced.
  • Patent document Japanese Patent Laid-Open No. 2009-256873 is a longitudinal beam bearing flange (end) and a connection concrete (point part) installed on a lower structure, and a precast longitudinal beam is installed on them, and the precast longitudinal beam is a longitudinal beam bearing flange. It is installed through the (end) and the concrete (branch), but it is not a technique of synthesizing the superstructure integrally, but only filling the empty space to finish.
  • Patent Document 1 Republic of Korea Patent No. 10-0703134
  • Patent Document 2 Japanese Unexamined Patent Publication No. 2009-256873
  • the present invention is to solve the above problems, it is possible to reduce the length of the beam (beam) by installing a beam support plate, increase the anti-conduction effect of the beam, improve the manufacturability by simplifying the structure of the beam It is an object of the present invention to provide a beam bridge having a beam support plate for maximizing structural stability by integrally constructing a plurality of beams and slabs arranged in a transverse direction (vertical direction / transverse direction) and a construction method thereof.
  • a beam support plate made of precast concrete and installed on the lower structure for both the formwork and the cross beam;
  • the beam supporting plate includes a synthetic slab which is simultaneously placed between the upper part of the beam support plate and between the beams and synthesized integrally with the beam support plate and the beam, wherein the beam support plate is mounted on a bottom part and the bottom part.
  • the beam bridge having a beam support plate according to the present invention and a construction method thereof, the beam is mounted on the beam support plate and then synthesized with concrete together with the composite slab to shorten the length of the beam directly when installed directly on a conventional substructure. It is possible to improve the productivity, the beam is supported by the beam support wall of the beam support plate to prevent the conduction of the beam during construction, remove the sole plate from the beam and install the beam on the beam support plate.
  • the supporting plate is installed in the lower structure through the bridge device to improve the productivity of the beam and reduce the number of bridge devices.
  • the beam support plate supports and aligns the beam, and also functions as a formwork, allowing simultaneous pouring of the composite slab through the installation of the beam support plate. Since the slab is constructed by simultaneous pouring in a single process and synthesized integrally, there is an effect of improving stability through securing great rigidity.
  • FIG. 1 is a front view of a beam bridge having a beam support plate according to an embodiment of the present invention.
  • FIG. 2 is a plan view of a beam bridge having a beam support plate according to an embodiment of the present invention.
  • FIG 3 is a perspective view of an end beam support plate applied to a beam bridge having a beam support plate according to an embodiment of the present invention.
  • Figure 4 is a perspective view of the beam support plate for the continuous point portion applied to the beam bridge having a beam support plate according to an embodiment of the present invention.
  • FIG. 5 is a front view showing an example of a beam applied to a beam bridge having a beam support plate according to an embodiment of the present invention.
  • 6A and 6B are a plan view and a front view showing a construction state of a beam and an end beam support plate applied to a beam bridge having a beam support plate according to an embodiment of the present invention, respectively.
  • 7A and 7B are respectively a plan view and a front view showing a construction state of a beam applied to a beam bridge having a beam support plate according to an embodiment of the present invention and a beam support plate for continuous point portions;
  • FIG 8 and 9 are respectively a front view showing the reinforcing state of the beam and the beam support plate for the end and the beam support plate for the continuous point portion applied to the beam bridge having a beam support plate according to an embodiment of the present invention.
  • FIG. 10 is a construction process diagram of a beam bridge having a beam support plate according to an embodiment of the present invention.
  • 11 and 12 are different construction state diagrams of beam bridges each provided with a beam support plate according to the present invention.
  • the beam bridge having a beam support plate according to the present invention, as a lower structure alternately 10 and pier 20, a beam support plate installed through the shoe on the lower structure [end Bouillon beam receiving plate 30, continuous point portion beam receiving plate 40], the beam 50 is placed on the beam support plate both sides in the longitudinal direction while being disposed at regular intervals from each other along the longitudinal direction, the beam It is composed of a composite slab 60 which is poured and constructed at the same time to be synthesized integrally with the beam support plate and the beam 50 via a support plate.
  • the substructure is one or more bridges 20 (shown as one example in the drawings) constructed between a pair of shifts 10 and 10, but is not limited thereto. It is also possible to construct only by shift 10.
  • all the beams 50 may be continuous in the longitudinal direction, or may be divided into two or more zones so that the upper structures of the neighboring zones may not be continuous. Do.
  • the beam support plate itself is installed on the lower structure while supporting two or more beams 50, and is divided into the beam support plate 30 for the end and the beam support plate 40 for the continuous point according to the installation position. .
  • the end beam bearing plate 30 is installed at both edges of the beam bridge or in the case of the superstructure repetitive beam bridge with both edges, and thus supports the beam 50 only on one side.
  • the beam bearing plate 50 for the continuous point portion is configured to continuous the neighboring beams 50 and thus supports the ends of the neighboring beams 50 together.
  • the beam receiving plate 30 for the end and the beam receiving plate 40 for the continuous point are characterized by a cross beam connecting two or more beams 50 into one and a function of formwork for placing concrete.
  • Beam support walls 33 and 43 and formwork which are erected on the bottom portions 31 and 41 and the bottom portions 31 and 41, form a space of the beam alignment portions 32 and 42, and support the beam 50. It consists of formwork walls (34, 44) to function.
  • the beam support plate 30 for the end is preferably rectangular in plan view, and the beam support wall 33 is erected on one side and the formwork wall 34 is formed on the other three sides in accordance with the function for the end. According to the structure, the beams 50 are inserted into the beam alignment portion 32 between the beam support wall 33 so that the end portion of the beam support plate 30 is blocked, so that only the upper open space is formed therein, Pouring of concrete is possible.
  • the beam support plate 40 for the continuous point is preferably rectangular in plan view and has beam support walls 43 erected on two opposite sides (relatively long), and formwork walls 44 on the remaining two sides. Is erected.
  • the beam support plate 30 for the end portion and the beam support plate 40 for the continuous point portion are shown in the figure as the bottom portions 31 and 41 are stepped from one side to the other along the transverse direction in consideration of the cross slope. There is also the effect of constructing the step surface of the lower structure (10, 20) without step. Of course, in order to eliminate the need for step construction, the beam support plate 30 for the end and the beam support plate 40 for the continuous point portion may have no step.
  • the beam receiving plate 40 for the continuous point part is similar to the case where the beams 50 are inserted into the beam alignment part 42 so that the circumference is blocked, so that only the upper part of the beam opening is formed therein, so that the casting of concrete is possible.
  • the beam support plate 30 for the end and the beam support plate 40 for the continuous point are respectively composed of the reinforcing bars 35 and 45 protruding to the upper portions of the bottom portions 31 and 41, respectively, and the protruding reinforcement beams of the beam 50. Can be bound. At this time, the reinforcing bars 35 and 45 are formed at positions that do not interfere with the mounting of the beam 50.
  • the composite reinforcing bar is formed as a part of the protruding reinforcing bar on the beam receiving plate 30 for the end portion and the beam receiving plate 40 for the continuous point, it is also included to be directly overlapped by the worker in the field.
  • a sole plate 55 is embedded in the bottom corresponding to the shoe.
  • the expansion joint of the upper structure is installed together.
  • the expansion joint device can be used in a variety of products, such as plate-shaped, box-shaped, elastic material filling material, finger joints.
  • each beam is installed through each shoe so that, for example, four beams are installed, even if one shoe is installed on one side of the beam, eight shoes are used.
  • the present invention provides two beam support plates 30 for two ends. ) And the beam support plate 40 for the continuous point portion is installed through the shoe, there is also a feature that uses only four shoes.
  • an alignment jaw supporting the end of the beam 50 may be added inside the beam support plate 30 for the end and the beam support plate 40 for the continuous point.
  • the beam support plate 30 for the end and the beam support plate 40 for the continuous point are integrally formed with the bottom portions 31 and 41, the beam support walls 33 and 43, and the formwork walls 34 and 44 integrally.
  • the floor parts 31 and 41, the beam support walls 33 and 43, and the formwork walls 34 and 44 are manufactured separately, and then assembled in a factory or on site (anchor, etc.) for free construction according to site conditions. Prefabricated is also available.
  • the beam 50 is arranged in the longitudinal direction between the lower structures and two or more are arranged at regular intervals along the transverse direction, wherein both sides of the longitudinal direction (longitudinal direction) are adjacent beam support plate for each end 30 and the beam support walls 33 and 43 of the beam support plate 40 for the continuous point portion, and specifically, the ends thereof are supported by the beam support plate 30 for the end portion and the beam support plate 40 for the continuous point portion. It is inserted into the beam alignment portions 32 and 42 therebetween and is mounted on the bottom portions 31 and 41, so that the left and right sides are supported by the beam support walls 33 and 43 or the beam support walls 33 and 43 and the form wall. (34,44) is supported.
  • the beam 50 can be used in various beams such as PSC beam, steel beam, and composite beam, and is mounted on the beam support plate 30 for the end and the beam support plate 40 for the continuous point in the longitudinal / lateral direction.
  • the other beam 50 (or the beam support plate 30 for the end and the beam support plate 40 for the continuous point portion), and the protruding reinforcing bar 51 for bonding, and the joining steel are provided.
  • the protruding reinforcing bar is longitudinally protruding reinforcing bar 51 (see Fig. 5) protruding in the longitudinal direction for binding with another beam 50 neighboring in the longitudinal direction, for binding with the other beam 50 neighboring in the transverse direction. Transverse reinforcing bars that protrude in the transverse direction are possible.
  • the longitudinally projecting rebar 51 is a horizontal portion projecting forward in the beam 50 and vertically bent downward or upward in this horizontal portion. It consists of a vertical part and is formed in two places of upper and lower sides, and many pieces are protrudingly arranged along the horizontal direction.
  • FIGS. 6A and 6B are plan views showing the connection state of the beam 50 and the end beam support plate 30 and the protruding reinforcement 51.
  • FIGS. 7A and 7B show the beam support plate for the beam 50 and the continuous point portion ( It is the top view which showed the connection state of 50) and the protrusion reinforcement 51.
  • FIG. 7A and 7B show the beam support plate for the beam 50 and the continuous point portion ( It is the top view which showed the connection state of 50) and the protrusion reinforcement 51.
  • the longitudinally protruding reinforcing bars 51 are disposed in the beam supporting plate 50 for the end and embedded in the concrete of the synthetic slab 60. At this time, as shown in Figure 8, the longitudinally projecting reinforcing bar 51 is preferably bound to the synthetic reinforcing bar 35 protruding upward from the bottom portion 31 of the beam support plate 30 for the end.
  • the neighboring beams 50-1 and 50-2 are inserted into and mounted in the beam support plate 40 for the continuous point portion, and at this time, as shown in FIG. 9, the beam support for the continuous point portion is shown. It is preferable to bind with the synthetic reinforcing bars 45 protruding upward from the bottom portion 41 of the plate 40.
  • Synthetic reinforcing bars (35, 45) can be implemented in a variety of quantities, shapes and directions.
  • the longitudinal protruding bars 51-1 and 51-2 overlap each other along the transverse direction and are bound by wires or the like.
  • the beam 50 includes a fixing flange 52 fixed to the bottom portion 31 and 41 of the beam support plate 30 for the end portion and the beam support plate 40 for the continuous point to prevent the fall. do.
  • the fixing flange 52 is formed at the end of the transverse direction, that is, two places as the bottom of the beam 50, protrudes in the longitudinal direction or protrudes in the transverse direction, and constitutes an anchor hole for installation of the anchor 53.
  • the beam 50 may be used in both the cross-sectional structure and the cross-sectional structure as a whole along the longitudinal direction, for example, as shown in Figs. 6a to 7b, where the beam 50 is spaced inwardly from both ends of the longitudinal direction
  • a wall flange 54 arranged in line with the beam support walls 33 and 43 of the auxiliary beam support plate 30 and the continuous point beam support plate 40 may be provided.
  • the wall flange 54 can be both vertical and inclined (downward inclined toward the end).
  • An elastic bearing is installed on the bottom beams 31 and 41 of the beam bearing plate 30 for the end and the beam bearing plate 40 for the continuous point, and the beam 50 is installed on the elastic bearing.
  • the central portion between two longitudinal ends of the beam 50 may be structurally vulnerable. It is also possible. Various configurations, such as the cross beam, are possible.
  • Synthetic type slab 60 is characterized in that at the same time the end portion of the alternating side 10 and the continuous point portion and the upper portion of the pier 20 side is poured at the same time, a plurality of beams 50 are bound through the beam support plate (30, 40) While being integrally synthesized with each other by concrete pouring, the entire upper structure (beam support plates 30, 40, beam 50, synthetic slab 60) is integrally formed.
  • the bridge 20 is constructed between a pair of shifts 10 and this shift 10. Since the construction of these 10 and 20 can be variously constructed by a method widely used in bridges, a detailed description thereof will be omitted.
  • the beam support plate 30 for the end is installed on the top of the shift 10 together with the hydraulic jack, and the beam support plate 40 for the continuous point portion is installed together with the hydraulic jack on the piers 20.
  • Both longitudinal ends of the beam 50 are mounted over the beam support plate 30 for the neighboring end and the beam support plate 40 for the continuous point.
  • the beam 50 is inserted into and mounted in the beam alignment portions 32 and 42 between the beam support plate 30 for the end and the beam support walls 33 and 43 of the beam support plate 40 for the continuous point. 33, 43) does not cause evangelism.
  • Anchors are respectively installed on the fixing flanges of the beams 50 to fix the beams 50 to the beam receiving plate 30 for the end and the beam supporting plate 40 for the continuous point, respectively. Maximize the fall prevention effect.
  • the beam 50 and the beam support plate 30 for the end 30, the beam 50 and the beam 50, and the beam support plate 40 for the continuous point portion to assemble the reinforcing bars (various implementation, such as the assembly of the protruding reinforcing bars and cast iron)
  • These (50, 30) (50, 50, 40) is bound.
  • formwork is installed between the beams 50 and the reinforcing bar is assembled in the space of the composite slab 60.
  • the beam support plate 30 for one end portion-the plurality of beams 50-the beam support plate 40 for the continuous point portion-the plurality of beams 50-the beam support plate 30 for the other end portion One pouring space is formed over, and concrete is poured in this one space to construct a synthetic type slab (60). Therefore, the end side cross beam by the beam support plate 30 for one end-the plurality of beams 50-the continuous point side cross beam by the beam support plate 40 for the continuous point portion-the multiple beams 50-the other side
  • the upper structure leading to the end side cross beam by the end beam receiving plate 30 is constructed in one piece.
  • the hydraulic jack installed in the previous process is removed, and ancillary facilities, such as pavement and a protective wall, are installed on the intersection of the synthetic slab 60.
  • pier 20 Although the present embodiment is illustrated as one pier 20 in the drawings, two or more pier 20 can be used by the same configuration and method.
  • a pair of shifts 10 and one pier 20 installed therebetween, an end beam bearing plate 30 installed at the shifts 10, and a beam for continuous point portions provided at the pier 20
  • the present invention can be variously implemented as follows.
  • 11 is an alternating beam bridge, the lower structure consisting of only a pair of alternating 10, the end of the beam support plate 30 for the end of each of the alternating 10 is installed symmetrically and both ends of the beam 50 for the end
  • An example of constructing the composite slab 60 after mounting on the beam support plate 30 is shown.
  • the end beam bearing plate 30 is installed on the bridge 20 as well as the alternating 10 and beam beams for the two ends on a single pier 20 (center pier in the drawing). The plate 30 is installed so that the upper structures on the left and right sides of the center piers 20 are not connected to each other and are disconnected.
  • the present invention is a bridge technology using a beam, a beam support plate and concrete, it is possible to shorten the length of the beam and reduce the bridge device by synthesizing the beam with concrete with a synthetic slab, the claims and the details of the invention Based on the description, there is industrial applicability that the present technology can be implemented and operated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a beam bridge having a beam support plate and a construction method therefor, and the objective of the present invention is to enable a beam length to be reduced by providing the beam support plate, increase a beam overturning prevention effect, improve manufacturability through simplification of a beam structure, and maximize structural stability by integrally composing a slab and a plurality of beams aligned in a horizontal direction (vertical direction/horizontal direction). According to the present invention, the beam bridge having the beam support plate comprises: a lower structure including a pair of abutments or the pair of abutments and one or more piers; the beam support plate, which is used as both a mold and a cross beam, manufactured by using precast concrete, and provided on the lower structure by a bridge seat device; two or more beams of which both longitudinal sides are mounted on the adjacent beam support plates; reinforcing bars for coupling the beam support plate and the beams; and a composite slab simultaneously poured into the beam support plate, between the beams and to the upper parts of the beams so as to be integrally combined with the beam support plate and the beams, wherein the beam support plate includes: a bottom part; beam supporting walls erected on the bottom part, forming a beam aligning part in which the beam is inserted and mounted, and functioning as the mold; and a mold wall erected at the position at which the beam supporting walls are not formed, thereby forming a concrete pouring space while the beams are mounted.

Description

๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต ๋ฐ ์ด์˜ ์‹œ๊ณต ๊ณต๋ฒ•Beam bridge with beam support plate and construction method thereof

๋ณธ ๋ฐœ๋ช…์€ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต ๋ฐ ์ด์˜ ์‹œ๊ณต๋ฐฉ๋ฒ•์— ๊ด€ํ•œ ๊ฒƒ์œผ๋กœ์„œ, ๋”์šฑ ์ƒ์„ธํ•˜๊ฒŒ๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ(๊ต๋Œ€, ๊ต๊ฐ) ์œ„์— ์„ค์น˜ํ•˜์—ฌ ๋‹ค์ˆ˜์˜ ๋น”์„ ๊ฒฐ์†ํ•˜์—ฌ ๋น”(beam) ๊ธธ์ด์˜ ์ถ•์†Œ๊ฐ€ ๊ฐ€๋Šฅํ•˜๊ณ , ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ์ง์ ‘ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ์„ค์น˜๋˜์–ด ์Šˆ์˜ ์‚ฌ์šฉ์ˆ˜๋Ÿ‰์„ ์ค„์ด๋Š” ํ•œํŽธ ๋น” ์ œ์ž‘์‹œ ์†” ํ”Œ๋ ˆ์ดํŠธ์˜ ์„ค์น˜๋ฐฐ์ œ๋กœ ์ œ์ž‘์ด ์šฉ์ดํ•˜๋ฉฐ, ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ๋™์‹œ ํƒ€์„ค์„ ํ†ตํ•ด ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ(๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ์˜ํ•œ ๊ฐ€๋กœ๋ณด, ๊ฐ€๋กœ๋ณด์— ์—ฐ๊ฒฐ๋˜๋Š” ๋น”, ์ƒ๋ถ€์— ํƒ€์„ค๋˜๋Š” ์Šฌ๋ž˜๋ธŒ)์„ ์ผ์ฒด๋กœ ํ•ฉ์„ฑํ•˜์—ฌ ๊ตฌ์กฐ์  ์•ˆ์ •์„ฑ์„ ํ–ฅ์ƒํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต ๋ฐ ์ด์˜ ์‹œ๊ณต ๊ณต๋ฒ•์— ๊ด€ํ•œ ๊ฒƒ์ด๋‹ค. The present invention relates to a beam bridge having a beam support plate and a construction method thereof, and more particularly, to install a beam support plate on a lower structure (alternation, piers) to bind a plurality of beams to reduce the beam length. The beam support plate is directly installed in the lower structure to reduce the amount of shoes used, and it is easy to manufacture by installing and removing the sole plate when manufacturing the beam, and through the simultaneous pouring of concrete, the upper structure (cross beam by beam support plate, Beam beam connected to the cross beam, the slab cast on the top) and a beam bridge having a beam support plate to improve the structural stability by integrally integrated, and a construction method thereof.

๊ต๋Ÿ‰์€ ํ•˜์ฒœ, ๊ณ„๊ณก, ๋ฐ”๋‹ค ๋“ฑ์„ ๊ฑด๋„ ์ˆ˜ ์žˆ๋„๋ก ์‹œ๊ณต๋˜๋Š” ๊ตฌ์กฐ๋ฌผ๋กœ์„œ, ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ(๊ต๋Œ€, ๊ต๊ฐ), ์ด ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์‹œ๊ณต๋˜๋Š” ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ๋กœ ๊ตฌ์„ฑ๋˜๋ฉฐ, ๋ณธ ๋ฐœ๋ช…๊ณผ ๊ด€๋ จ๋˜๋Š” ๋น”๊ต๋Š” ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ์ด ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ๊ต์ขŒ์žฅ์น˜๋ฅผ ํ†ตํ•ด ๊ฑฐ์น˜๋˜๋Š” ๋‹ค์ˆ˜์˜ ๋น”, ๋น” ์ƒ๋ถ€์— ์‹œ๊ณต๋˜๋Š” ์Šฌ๋ž˜๋ธŒ๋กœ ๊ตฌ์„ฑ๋œ๋‹ค.The bridge is a structure that can be constructed to cross rivers, valleys, seas, etc., and consists of a lower structure (alternation, pier), and an upper structure constructed on the lower structure, and the beam bridge according to the present invention has an upper structure on the lower structure. It consists of a plurality of beams mounted through the bridge device, the slab installed on the beam.

๋ณธ ๋ฐœ๋ช…์˜ ๋ฐฐ๊ฒฝ๊ธฐ์ˆ ์€ ๋“ฑ๋กํŠนํ—ˆ ์ œ10-0703134ํ˜ธ ๋“ฑ์—์„œ ํ™•์ธ ๊ฐ€๋Šฅํ•˜๋‹ค.Background art of the present invention can be confirmed in Patent No. 10-0703134.

์ข…๋ž˜ ๋น”๊ต๋Š” ๋‹ค์ˆ˜์˜ ๋น”์ด ํšก๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ๋ฐฐ์—ด๋˜๋ฉฐ ๊ฐ๊ฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ๊ต์ขŒ์žฅ์น˜๋ฅผ ํ†ตํ•ด ์„ค์น˜๋œ๋‹ค.In the conventional beam bridge, a plurality of beams are arranged along the transverse direction and are respectively installed in the lower structure through a bridge device.

๊ทธ๋Ÿฌ๋‚˜, ์ข…๋ž˜ ๊ธฐ์ˆ ์— ์˜ํ•œ ๋น”๊ต๋Š” ๋น”์ด ์ง์ ‘ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ์œ„์— ์˜ฌ๋ ค์ ธ ์ง€์ง€๋˜๊ธฐ ๋•Œ๋ฌธ์— ์•ˆ์ •์ ์ธ ์ง€์ง€๋ฅผ ์œ„ํ•˜์—ฌ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ๋„“์€ ๋ฉด์ ์œผ๋กœ ์ง€์ง€๋˜๋„๋ก ๋น”์˜ ๊ธธ์ด๊ฐ€ ๊ธธ์–ด์ง€๋Š” ๋ฌธ์ œ์ ์ด ์žˆ๊ณ , ๋น”์ด ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ๋‹จ์ˆœํžˆ ์˜ฌ๋ ค์ง€๋Š” ๊ฒƒ์ด๊ธฐ ๋•Œ๋ฌธ์— ์‹œ๊ณต ์ค‘์— ์ „๋„๋ฅผ ์ผ์œผํ‚ค๋Š” ๋ฌธ์ œ์ ์ด ์žˆ์œผ๋ฉฐ, ๋น” ๊ฐ๊ฐ์— ๊ต์ขŒ์žฅ์น˜์™€ ๋Œ€์‘ํ•˜๋„๋ก ์†” ํ”Œ๋ ˆ์ดํŠธ๋ฅผ ์„ค์น˜ํ•˜์—ฌ์•ผ ํ•˜๋ฏ€๋กœ ์ œ์ž‘์ด ๋ฒˆ๊ฑฐ๋กœ์šด ๋ฌธ์ œ์ ๊ณผ ๋งŽ์€ ์ˆ˜๋Ÿ‰์˜ ๊ต์ขŒ์žฅ์น˜๋ฅผ ์‚ฌ์šฉํ•˜๋Š” ๋ฌธ์ œ์ ์ด ์žˆ๋‹ค.However, the beam bridge according to the prior art has a problem in that the beam is lengthened to be supported by a large area on the lower structure for stable support because the beam is directly mounted on the lower structure, and the beam is simply mounted on the lower structure. Since there is a problem that causes conduction during construction, and the sole plate must be installed to correspond to the chair device on each beam, there is a problem that the manufacturing is cumbersome and the use of a large number of chair devices.

๋˜ํ•œ, ์ข…๋ž˜ ๋น”์˜ ์—ฐ์†๊ต๋Š” ๋น”์„ ๋‹จ์ˆœ๋ณด๋กœ ์„ค๊ณ„ํ•˜๊ณ  ์Šฌ๋ž˜๋ธŒ๋งŒ ์ผ์ฒดํ™”ํ•œ ์—ฐ์†๊ต๋กœ ์„ค๊ณ„ํ•˜์—ฌ ๊ต๊ฐ์˜ ์ง€์ ๋ถ€์— ๋ฐœ์ƒํ•˜๋Š” ๋ถ€๋ชจ๋ฉ˜ํŠธ๋ฅผ ์Šฌ๋ž˜๋ธŒ ์ƒ๋ฉด์— ์ฒ ๊ทผ์œผ๋กœ ๋ณด๊ฐ•ํ•จ์œผ๋กœ์จ ๋น”์— ๋Œ€ํ•œ ๊ตฌ์กฐ์  ํšจ์œจ์„ฑ์ด ๋–จ์–ด์ง€๋Š” ๋ฌธ์ œ์ ์ด ์žˆ๋‹ค.In addition, the conventional beam bridge has a problem that the structural efficiency of the beam is reduced by reinforcing the parent moment generated in the point of the bridge with the reinforcing bars on the upper surface of the slab by designing the beam as a simple beam and a continuous bridge integrated with the slab only have.

๋˜ํ•œ, ์ข…๋ž˜ ๋น”๊ต๋Š” ํšก๋‹จ๊ฒฝ์‚ฌ๋ฅผ ๊ณ ๋ คํ•˜์—ฌ ๊ต๋Œ€ ๋ฐ ๊ต๊ฐ์˜ ๊ต์ขŒ๋ฉด์„ ๋†’๋‚ฎ์ด์ฐจ๋ฅผ ๊ฐ–๋Š” ๋‹จ์ฐจ์‹œ๊ณตํ•˜์—ฌ์•ผ ํ•˜๋ฏ€๋กœ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์˜ ์‹œ๊ณต์ด ์–ด๋ ค์›Œ ์ž‘์—…์‹œ๊ฐ„์ด ๊ธธ๊ฒŒ ์†Œ์š”๋˜๊ณ  ์ด์— ๋”ฐ๋ผ ์‹œ๊ณต์„ฑ์ด ํฌ๊ฒŒ ๋–จ์–ด์ง€๋Š” ๋ฌธ์ œ์ ์ด ์žˆ์—ˆ๋‹ค.In addition, the conventional beam bridge has a problem that the construction of the lower structure is difficult to take a long time due to the stepped construction having a height difference between the alternating and the pier surface in consideration of the cross-slope, there is a problem that the workability is greatly reduced.

ํŠนํ—ˆ๋ฌธํ—Œ(์ผ๋ณธ ๊ณต๊ฐœํŠนํ—ˆ๊ณต๋ณด ํŠน๊ฐœ2009-256873ํ˜ธ)์€ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์ข…๋น” ๋ฒ ์–ด๋ง ํ”Œ๋žœ์ง€(๋‹จ๋ถ€)์™€ ์—ฐ๊ฒฐ๋ถ€ ์ฝ˜ํฌ๋ฆฌํŠธ(์ง€์ ๋ถ€)๊ฐ€ ์„ค์น˜๋˜๊ณ  ์ด๋“ค ์œ„์— ํ”„๋ฆฌ์บ์ŠคํŠธ ์ข…๋น”์ด ์„ค์น˜๋˜๋Š” ๊ฒƒ์œผ๋กœ, ํ”„๋ฆฌ์บ์ŠคํŠธ ์ข…๋น”์ด ์ข…๋น” ๋ฒ ์–ด๋ง ํ”Œ๋žœ์ง€(๋‹จ๋ถ€)์™€ ์—ฐ๊ฒฐ๋ถ€ ์ฝ˜ํฌ๋ฆฌํŠธ(์ง€์ ๋ถ€)๋ฅผ ๋งค๊ฐœ๋กœ ํ•˜์—ฌ ์„ค์น˜๋˜๋Š” ๊ฒƒ์ด์ง€๋งŒ, ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ์„ ์ผ์ฒด๋กœ ํ•ฉ์„ฑํ•˜๋Š” ๊ธฐ์ˆ ์ด ์•„๋‹ˆ๋ฉฐ ๋‹จ์ง€ ๋นˆ ๊ณต๊ฐ„์„ ์ฑ„์›Œ ๋งˆ๊ฐํ•˜๋Š” ๊ฒƒ์ผ ๋ฟ์ด๋‹ค.Patent document (Japanese Patent Laid-Open No. 2009-256873) is a longitudinal beam bearing flange (end) and a connection concrete (point part) installed on a lower structure, and a precast longitudinal beam is installed on them, and the precast longitudinal beam is a longitudinal beam bearing flange. It is installed through the (end) and the concrete (branch), but it is not a technique of synthesizing the superstructure integrally, but only filling the empty space to finish.

[์„ ํ–‰๊ธฐ์ˆ ๋ฌธํ—Œ][Preceding technical literature]

[ํŠนํ—ˆ๋ฌธํ—Œ][Patent Documents]

(ํŠนํ—ˆ๋ฌธํ—Œ 1) ๋Œ€ํ•œ๋ฏผ๊ตญ ๋“ฑ๋กํŠนํ—ˆ ์ œ10-0703134ํ˜ธ(Patent Document 1) Republic of Korea Patent No. 10-0703134

(ํŠนํ—ˆ๋ฌธํ—Œ 2) ์ผ๋ณธ ๊ณต๊ฐœํŠนํ—ˆ๊ณต๋ณด ํŠน๊ฐœ2009-256873ํ˜ธ(Patent Document 2) Japanese Unexamined Patent Publication No. 2009-256873

๋ณธ ๋ฐœ๋ช…์€ ์ƒ๊ธฐ์™€ ๊ฐ™์€ ๋ฌธ์ œ์ ์„ ํ•ด๊ฒฐํ•˜๊ธฐ ์œ„ํ•œ ๊ฒƒ์œผ๋กœ์„œ, ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ์„ค์น˜ํ•˜์—ฌ ๋น”(beam) ๊ธธ์ด์˜ ์ถ•์†Œ๊ฐ€ ๊ฐ€๋Šฅํ•˜๊ณ , ๋น”์˜ ์ „๋„ ๋ฐฉ์ง€ํšจ๊ณผ๋ฅผ ์ฆ๋Œ€ํ•˜๋ฉฐ, ๋น”์˜ ๊ตฌ์กฐ ๋‹จ์ˆœํ™”๋ฅผ ํ†ตํ•ด ์ œ์ž‘์„ฑ์„ ํ–ฅ์ƒํ•˜๊ณ , ํšก๋ฐฉํ–ฅ(์ข…๋ฐฉํ–ฅ/ํšก๋ฐฉํ–ฅ)์œผ๋กœ ๋ฐฐ์—ด๋˜๋Š” ๋‹ค์ˆ˜์˜ ๋น”๊ณผ ์Šฌ๋ž˜๋ธŒ๋ฅผ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ ์‹œ๊ณตํ•˜์—ฌ ๊ตฌ์กฐ์  ์•ˆ์ •์„ฑ์„ ๊ทน๋Œ€ํ™”ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต ๋ฐ ์ด์˜ ์‹œ๊ณต ๊ณต๋ฒ•์„ ์ œ๊ณตํ•จ์— ๊ทธ ๋ชฉ์ ์ด ์žˆ๋‹ค.The present invention is to solve the above problems, it is possible to reduce the length of the beam (beam) by installing a beam support plate, increase the anti-conduction effect of the beam, improve the manufacturability by simplifying the structure of the beam It is an object of the present invention to provide a beam bridge having a beam support plate for maximizing structural stability by integrally constructing a plurality of beams and slabs arranged in a transverse direction (vertical direction / transverse direction) and a construction method thereof.

์ด์™€ ๊ฐ™์€ ๋ชฉ์ ์„ ๋‹ฌ์„ฑํ•˜๊ธฐ ์œ„ํ•œ ๋ณธ ๋ฐœ๋ช…์˜ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต๋Š”, ํ•œ ์Œ์˜ ๊ต๋Œ€ ๋˜๋Š” ํ•œ ์Œ์˜ ๊ต๋Œ€์™€ ํ•˜๋‚˜ ์ด์ƒ์˜ ๊ต๊ฐ์œผ๋กœ ์ด๋ฃจ์–ด์ง„ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ๊ณผ; ํ”„๋ฆฌ์บ์ŠคํŠธ ์ฝ˜ํฌ๋ฆฌํŠธ๋กœ ์ œ์กฐ๋˜๋ฉฐ ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์„ค์น˜๋˜๋Š” ๊ฑฐํ‘ธ์ง‘๊ณผ ๊ฐ€๋กœ๋ณด๊ฒธ์šฉ์˜ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์™€; ๊ธธ์ด๋ฐฉํ–ฅ์˜ ์–‘์ธก์ด ์ด์›ƒํ•˜๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ๊ฑฐ์น˜๋˜๋Š” 2๊ฐœ ์ด์ƒ์˜ ๋น”๊ณผ; ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์™€ ์ƒ๊ธฐ ๋น”์„ ๊ฒฐ์†ํ•˜๋Š” ์ฒ ๊ทผ๊ณผ; ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ๋‚ด๋ถ€์™€ ์ƒ๊ธฐ ๋น”๋“ค์˜ ์‚ฌ์ด ๋ฐ ์ƒ๋ถ€์— ๋™์‹œ ํƒ€์„ค๋˜์–ด ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ๋ฐ ์ƒ๊ธฐ ๋น”๊ณผ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋˜๋Š” ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ๋ฅผ ํฌํ•จํ•˜๊ณ , ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋Š”, ๋ฐ”๋‹ฅ๋ถ€, ์ƒ๊ธฐ ๋ฐ”๋‹ฅ๋ถ€์— ์„ธ์›Œ์ง€๋ฉฐ ์ƒ๊ธฐ ๋น”์ด ์‚ฝ์ž… ๊ฑฐ์น˜๋˜๋Š” ๋น” ์ •๋ ฌ๋ถ€๋ฅผ ํ˜•์„ฑํ•จ๊ณผ ์•„์šธ๋Ÿฌ ๊ฑฐํ‘ธ์ง‘์˜ ๊ธฐ๋Šฅ์„ ํ•˜๋Š” ๋น” ์ง€์ง€๋ฒฝ, ์ƒ๊ธฐ ๋น” ์ง€์ง€๋ฒฝ์ด ํ˜•์„ฑ๋˜์ง€ ์•Š์€ ๊ณณ์— ์„ธ์›Œ์ง€๋Š” ๊ฑฐํ‘ธ์ง‘๋ฒฝ์„ ํฌํ•จํ•˜์—ฌ ์ƒ๊ธฐ ๋น”์ด ๊ฑฐ์น˜๋˜๋ฉด์„œ ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ํƒ€์„ค ๊ณต๊ฐ„์„ ํ˜•์„ฑํ•˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•œ๋‹ค.A beam bridge having a beam support plate of the present invention for achieving the above object, and a lower structure consisting of a pair of alternations or a pair of alternations and one or more pier; A beam support plate made of precast concrete and installed on the lower structure for both the formwork and the cross beam; Two or more beams mounted on the beam receiving plate adjacent to each other in the longitudinal direction; Reinforcing bars for binding the beam support plate and the beam; The beam supporting plate includes a synthetic slab which is simultaneously placed between the upper part of the beam support plate and between the beams and synthesized integrally with the beam support plate and the beam, wherein the beam support plate is mounted on a bottom part and the bottom part. And forming a beam alignment portion into which the beam is inserted, and including a beam support wall functioning as a formwork and a formwork wall erected where the beam support wall is not formed, thereby forming a casting place of concrete. Characterized in that.

๋ณธ ๋ฐœ๋ช…์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต ๋ฐ ์ด์˜ ์‹œ๊ณต ๊ณต๋ฒ•์— ์˜ํ•˜๋ฉด, ๋น”์ด ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ๊ฑฐ์น˜๋œ ํ›„ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ์™€ ํ•จ๊ป˜ ์ฝ˜ํฌ๋ฆฌํŠธ๋กœ ํ•ฉ์„ฑ๋˜์–ด ๋น”์˜ ๊ธธ์ด๋ฅผ ์ข…๋ž˜ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์ง์ ‘ ์„ค์น˜ํ•  ๋•Œ๋ณด๋‹ค ์งง๊ฒŒ ํ•˜๋Š” ๊ฒƒ์ด ๊ฐ€๋Šฅํ•˜์—ฌ ์ƒ์‚ฐ์„ฑ์„ ํ–ฅ์ƒํ•˜๋Š” ํšจ๊ณผ๊ฐ€ ์žˆ๊ณ , ๋น”์ด ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ๋น” ์ง€์ง€๋ฒฝ์— ์˜ํ•ด ์ง€์ง€๋˜์–ด ์‹œ๊ณต ์ค‘ ๋น”์˜ ์ „๋„๋ฅผ ๋ฐฉ์ง€ํ•˜๋Š” ํšจ๊ณผ๊ฐ€ ์žˆ์œผ๋ฉฐ, ์†” ํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๋น”์—์„œ ๋ฐฐ์ œํ•˜๊ณ  ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ์„ค์น˜ํ•˜์—ฌ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ๊ต์ขŒ์žฅ์น˜๋ฅผ ๋งค๊ฐœ๋กœ ํ•˜์—ฌ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ์„ค์น˜๋˜์–ด ๋น”์˜ ์ƒ์‚ฐ์„ฑ ํ–ฅ์ƒ๊ณผ ํ•จ๊ป˜ ๊ต์ขŒ์žฅ์น˜์˜ ์ˆ˜๋Ÿ‰์„ ์ค„์ด๋Š” ํšจ๊ณผ๊ฐ€ ์žˆ๋‹ค.According to the beam bridge having a beam support plate according to the present invention and a construction method thereof, the beam is mounted on the beam support plate and then synthesized with concrete together with the composite slab to shorten the length of the beam directly when installed directly on a conventional substructure. It is possible to improve the productivity, the beam is supported by the beam support wall of the beam support plate to prevent the conduction of the beam during construction, remove the sole plate from the beam and install the beam on the beam support plate The supporting plate is installed in the lower structure through the bridge device to improve the productivity of the beam and reduce the number of bridge devices.

๊ทธ๋ฆฌ๊ณ , ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ๋น”์„ ์ง€์ง€ ๋ฐ ์ •๋ ฌํ•จ๊ณผ ์•„์šธ๋Ÿฌ ๊ฑฐํ‘ธ์ง‘์˜ ๊ธฐ๋Šฅ์„ ๊ฒธํ•˜์—ฌ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ์„ค์น˜๋ฅผ ํ†ตํ•ด ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ์˜ ๋™์‹œ ํƒ€์„ค์ด ๊ฐ€๋Šฅํ•ด์ง€๋ฏ€๋กœ ์‹œ๊ณต์ด ๋‹จ์ˆœํ•˜๊ณ  ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ์˜ํ•œ ๊ฐ€๋กœ๋ณด์™€ ๋น” ๋ฐ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ๊ฐ€ ๋‹จ์ผ ๊ณต์ •์˜ ๋™์‹œ ํƒ€์„ค์— ์˜ํ•ด ์‹œ๊ณต๋˜์–ด ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋จ์œผ๋กœ์จ ํฐ ๊ฐ•์„ฑ์˜ ํ™•๋ณด๋ฅผ ํ†ตํ•ด ์•ˆ์ •์„ฑ์„ ํ–ฅ์ƒํ•˜๋Š” ํšจ๊ณผ๊ฐ€ ์žˆ๋‹ค.In addition, the beam support plate supports and aligns the beam, and also functions as a formwork, allowing simultaneous pouring of the composite slab through the installation of the beam support plate. Since the slab is constructed by simultaneous pouring in a single process and synthesized integrally, there is an effect of improving stability through securing great rigidity.

๋˜ํ•œ, ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ํšก๋‹จ๊ฒฝ์‚ฌ๋ฅผ ํ†ตํ•ด ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์˜ ๊ต์ขŒ๋ฉด์„ ์ˆ˜ํ‰์œผ๋กœ ์šฉ์ดํ•˜๊ฒŒ ์‹œ๊ณตํ•˜๋Š” ๊ฒƒ์ด ๊ฐ€๋Šฅํ•˜๋ฏ€๋กœ ์‹œ๊ณต์„ฑ์ด ๋งค์šฐ ์šฐ์ˆ˜ํ•˜๋‹ค.In addition, since it is possible to easily install the cross-section of the lower structure through the cross slope of the beam support plate, the workability is very excellent.

๋„ 1์€ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์˜ ์ •๋ฉด๋„.1 is a front view of a beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 2๋Š” ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์˜ ํ‰๋ฉด๋„.2 is a plan view of a beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 3์€ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์— ์ ์šฉ๋œ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ์‚ฌ์‹œ๋„.3 is a perspective view of an end beam support plate applied to a beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 4๋Š” ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์— ์ ์šฉ๋œ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ์‚ฌ์‹œ๋„.Figure 4 is a perspective view of the beam support plate for the continuous point portion applied to the beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 5๋Š” ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์— ์ ์šฉ๋œ ๋น”์˜ ์ผ ์˜ˆ๋ฅผ ๋ณด์ธ ์ •๋ฉด๋„.5 is a front view showing an example of a beam applied to a beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 6a์™€ ๋„ 6b๋Š” ๊ฐ๊ฐ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์— ์ ์šฉ๋œ ๋น”๊ณผ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ์‹œ๊ณต ์ƒํƒœ๋ฅผ ๋ณด์ธ ํ‰๋ฉด๋„์™€ ์ •๋ฉด๋„.6A and 6B are a plan view and a front view showing a construction state of a beam and an end beam support plate applied to a beam bridge having a beam support plate according to an embodiment of the present invention, respectively.

๋„ 7a์™€ ๋„ 7b๋Š” ๊ฐ๊ฐ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์— ์ ์šฉ๋œ ๋น”๊ณผ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ์‹œ๊ณต ์ƒํƒœ๋ฅผ ๋ณด์ธ ํ‰๋ฉด๋„์™€ ์ •๋ฉด๋„.7A and 7B are respectively a plan view and a front view showing a construction state of a beam applied to a beam bridge having a beam support plate according to an embodiment of the present invention and a beam support plate for continuous point portions;

๋„ 8๊ณผ ๋„ 9๋Š” ๊ฐ๊ฐ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์— ์ ์šฉ๋œ ๋น”๊ณผ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ, ๋น”๊ณผ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ์ฒ ๊ทผ ๊ฒฐ์† ์ƒํƒœ๋ฅผ ๋ณด์ธ ์ •๋ฉด๋„.8 and 9 are respectively a front view showing the reinforcing state of the beam and the beam support plate for the end and the beam support plate for the continuous point portion applied to the beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 10์€ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์˜ ์‹œ๊ณต ๊ณต์ •๋„.10 is a construction process diagram of a beam bridge having a beam support plate according to an embodiment of the present invention.

๋„ 11๊ณผ ๋„ 12๋Š” ๊ฐ๊ฐ ๋ณธ ๋ฐœ๋ช…์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์˜ ๋‹ค๋ฅธ ์‹œ๊ณต ์ƒํƒœ๋„.11 and 12 are different construction state diagrams of beam bridges each provided with a beam support plate according to the present invention;

์ดํ•˜, ๋ณธ ๋ฐœ๋ช…์„ ์ฒจ๋ถ€๋œ ๋„๋ฉด์— ์˜ํ•ด ๋ณด๋‹ค ์ƒ์„ธํ•˜๊ฒŒ ์„ค๋ช…ํ•˜๋ฉด ๋‹ค์Œ๊ณผ ๊ฐ™๋‹ค.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

์ฐธ๊ณ ๋กœ ๋ณธ ๋ฐœ๋ช…์„ ์„ค๋ช…ํ•จ์— ์žˆ์–ด ๊ด€๋ จ๋œ ๊ณต์ง€ ๊ธฐ๋Šฅ ๋˜๋Š” ๊ตฌ์„ฑ์— ๋Œ€ํ•œ ๊ตฌ์ฒด์ ์ธ ์„ค๋ช…์ด ๋ณธ ๋ฐœ๋ช…์˜ ์š”์ง€๋ฅผ ๋ถˆํ•„์š”ํ•˜๊ฒŒ ํ๋ฆด ์ˆ˜ ์žˆ๋‹ค๊ณ  ํŒ๋‹จ๋  ๊ฒฝ์šฐ์—๋Š” ๊ทธ ์ƒ์„ธํ•œ ์„ค๋ช…์„ ์ƒ๋žตํ•˜์˜€๋‹ค.For reference, in describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the gist of the present invention, the detailed description thereof is omitted.

๋˜ํ•œ, ํ›„์ˆ ๋˜๋Š” ์šฉ์–ด๋“ค์€ ๋ณธ ๋ฐœ๋ช…์—์„œ์˜ ๊ธฐ๋Šฅ์„ ๊ณ ๋ คํ•˜์—ฌ ์ •์˜๋œ ์šฉ์–ด๋“ค๋กœ์„œ ์ด๋Š” ์‚ฌ์šฉ์ž, ์šด์˜์ž์˜ ์˜๋„ ๋˜๋Š” ๊ด€๋ก€ ๋“ฑ์— ๋”ฐ๋ผ ๋‹ฌ๋ผ์งˆ ์ˆ˜ ์žˆ๋‹ค.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to the intention or convention of a user or an operator.

๊ทธ๋Ÿฌ๋ฏ€๋กœ, ๊ทธ ์ •์˜๋Š” ๋ณธ ๋ช…์„ธ์„œ ์ „๋ฐ˜์— ๊ฑธ์นœ ๋‚ด์šฉ์„ ํ† ๋Œ€๋กœ ๋‚ด๋ ค์ ธ์•ผ ํ•  ๊ฒƒ์ž„์€ ๋ฌผ๋ก ์ด๋‹ค.Therefore, the definition should be made based on the contents throughout the specification.

๋„ 1๊ณผ ๋„ 2์—์„œ ๋ณด์ด๋Š” ๋ฐ”์™€ ๊ฐ™์ด, ๋ณธ ๋ฐœ๋ช…์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต๋Š”, ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ๋กœ์„œ ๊ต๋Œ€(10)์™€ ๊ต๊ฐ(20), ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์Šˆ๋ฅผ ํ†ตํ•ด ์„ค์น˜๋˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ[๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30), ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)], ์ข…๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ์ƒํ˜ธ ๊ฐ„์— ์ผ์ • ๊ฐ„๊ฒฉ์„ ๋‘๊ณ  ๋ฐฐ์น˜๋˜๋ฉด์„œ ๊ธธ์ด๋ฐฉํ–ฅ์˜ ์–‘์ธก์ด ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ์œ„์— ๊ฑฐ์น˜๋˜๋Š” ๋น”(50), ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๋งค๊ฐœ๋กœ ํ•˜์—ฌ ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ๋ฐ ๋น”(50)๊ณผ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋˜๋„๋ก ๋™์‹œ์— ์ฝ˜ํฌ๋ฆฌํŠธ ํƒ€์„ค๋˜์–ด ์‹œ๊ณต๋˜๋Š” ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)๋กœ ๊ตฌ์„ฑ๋œ๋‹ค.As shown in Figure 1 and 2, the beam bridge having a beam support plate according to the present invention, as a lower structure alternately 10 and pier 20, a beam support plate installed through the shoe on the lower structure [end Bouillon beam receiving plate 30, continuous point portion beam receiving plate 40], the beam 50 is placed on the beam support plate both sides in the longitudinal direction while being disposed at regular intervals from each other along the longitudinal direction, the beam It is composed of a composite slab 60 which is poured and constructed at the same time to be synthesized integrally with the beam support plate and the beam 50 via a support plate.

์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์€ ํ•œ ์Œ์˜ ๊ต๋Œ€(10)์™€ ๊ต๋Œ€(10)๋“ค ์‚ฌ์ด์— ์‹œ๊ณต๋˜๋Š” 1๊ฐœ ์ด์ƒ(๋„๋ฉด์—๋Š” 1๊ฐœ๋ฅผ ์˜ˆ๋กœ ๋“ค์–ด ๋„์‹œํ•จ)์˜ ๊ต๊ฐ(20)์ด๋ฉฐ, ๋ฌผ๋ก  ์ด์— ํ•œ์ •๋˜์ง€ ์•„๋‹ˆํ•˜๊ณ  ํ•œ ์Œ์˜ ๊ต๋Œ€(10)๋งŒ์œผ๋กœ ์‹œ๊ณต๋˜๋Š” ๊ฒƒ๋„ ๊ฐ€๋Šฅํ•˜๋‹ค. ๋˜ํ•œ, ๊ต๋Œ€(10)์™€ ๊ต๊ฐ(20)์œผ๋กœ ๊ตฌ์„ฑ๋˜๋Š” ๊ฒฝ์šฐ ๋ชจ๋“  ๋น”(50)์€ ์ข…๋ฐฉํ–ฅ์œผ๋กœ ์—ฐ์†๋˜๋Š” ๊ฒƒ๋„ ๊ฐ€๋Šฅํ•˜๊ณ  2๊ฐœ ์ด์ƒ์˜ ๊ตฌ์—ญ์œผ๋กœ ๊ตฌ๋ถ„ํ•˜์—ฌ ์ด์›ƒํ•˜๋Š” ๊ตฌ์—ญ์˜ ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ๋“ค์ด ์—ฐ์†๋˜์ง€ ์•Š๋„๋ก ์‹œ๊ณต๋˜๋Š” ๊ฒƒ๋„ ๊ฐ€๋Šฅํ•˜๋‹ค.The substructure is one or more bridges 20 (shown as one example in the drawings) constructed between a pair of shifts 10 and 10, but is not limited thereto. It is also possible to construct only by shift 10. In addition, when the alternating 10 and the piers 20 are configured, all the beams 50 may be continuous in the longitudinal direction, or may be divided into two or more zones so that the upper structures of the neighboring zones may not be continuous. Do.

์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋Š” ์ž์‹ ์ด ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์„ค์น˜๋˜๋Š” ํ•œํŽธ 2๊ฐœ ์ด์ƒ์˜ ๋น”(50)์„ ์ง€์ง€ํ•˜๋ฉฐ, ์„ค์น˜ ์œ„์น˜์— ๋”ฐ๋ผ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋กœ ๊ตฌ๋ถ„๋œ๋‹ค.The beam support plate itself is installed on the lower structure while supporting two or more beams 50, and is divided into the beam support plate 30 for the end and the beam support plate 40 for the continuous point according to the installation position. .

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๋Š” ๋น”๊ต์˜ ์–‘์ชฝ ๊ฐ€์žฅ์ž๋ฆฌ ๋˜๋Š” ์ƒ๋ถ€๊ตฌ์กฐ๋ฌผ ๋ฐ˜๋ณตํ˜• ๋น”๊ต์˜ ๊ฒฝ์šฐ ์–‘์ชฝ ๊ฐ€์žฅ์ž๋ฆฌ์™€ ํ•จ๊ป˜ ๋น”์ด ๋‹จ์ ˆ๋˜๋Š” ๋ถ€๋ถ„์— ์„ค์น˜๋˜๊ณ , ๋”ฐ๋ผ์„œ, ํ•œ์ชฝ์—์„œ๋งŒ ๋น”(50)์„ ์ง€์ง€ํ•œ๋‹ค.The end beam bearing plate 30 is installed at both edges of the beam bridge or in the case of the superstructure repetitive beam bridge with both edges, and thus supports the beam 50 only on one side.

์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(50)๋Š” ์ด์›ƒํ•˜๋Š” ๋น”(50)๋“ค์„ ์—ฐ์†ํ•˜๋„๋ก ๊ตฌ์„ฑ๋˜๋ฉฐ ๋”ฐ๋ผ์„œ, ์ด์›ƒํ•˜๋Š” ๋น”(50)๋“ค์˜ ๋‹จ๋ถ€๋ฅผ ํ•จ๊ป˜ ์ง€์ง€ํ•œ๋‹ค.The beam bearing plate 50 for the continuous point portion is configured to continuous the neighboring beams 50 and thus supports the ends of the neighboring beams 50 together.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” 2๊ฐœ ์ด์ƒ์˜ ๋น”(50)์„ ํ•˜๋‚˜๋กœ ์—ฐ๊ฒฐํ•˜๋Š” ๊ฐ€๋กœ๋ณด์˜ ํŠน์ง•๊ณผ ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ํƒ€์„ค์„ ์œ„ํ•œ ๊ฑฐํ‘ธ์ง‘์˜ ๊ธฐ๋Šฅ์„ ํ•˜๋Š” ํŠน์ง•์ด ์žˆ์œผ๋ฉฐ, ์ด๋ฅผ ์œ„ํ•˜์—ฌ ๋ฐ”๋‹ฅ๋ถ€(31,41), ๋ฐ”๋‹ฅ๋ถ€(31,41)์— ์„ธ์›Œ์ง€๋ฉฐ ๋น” ์ •๋ ฌ๋ถ€(32,42)์˜ ๊ณต๊ฐ„์„ ํ˜•์„ฑํ•จ๊ณผ ์•„์šธ๋Ÿฌ ๋น”(50)์„ ์ง€์ง€ํ•˜๋Š” ๋น” ์ง€์ง€๋ฒฝ(33,43), ๊ฑฐํ‘ธ์ง‘์˜ ๊ธฐ๋Šฅ์„ ํ•˜๋Š” ๊ฑฐํ‘ธ์ง‘๋ฒฝ(34,44)์œผ๋กœ ๊ตฌ์„ฑ๋œ๋‹ค.The beam receiving plate 30 for the end and the beam receiving plate 40 for the continuous point are characterized by a cross beam connecting two or more beams 50 into one and a function of formwork for placing concrete. Beam support walls 33 and 43 and formwork, which are erected on the bottom portions 31 and 41 and the bottom portions 31 and 41, form a space of the beam alignment portions 32 and 42, and support the beam 50. It consists of formwork walls (34, 44) to function.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๋Š” ๋ฐ”๋žŒ์งํ•˜๊ฒŒ ํ‰๋ฉด์—์„œ ๋ณผ ๋•Œ ์‚ฌ๊ฐํ˜•์ด๋ฉฐ ๋‹จ๋ถ€์šฉ์˜ ๊ธฐ๋Šฅ์— ๋งž์ถฐ 1๋ฉด์— ๋น” ์ง€์ง€๋ฒฝ(33)์ด ์„ธ์›Œ์ง€๊ณ  ๋‚˜๋จธ์ง€ 3๋ฉด์— ๊ฑฐํ‘ธ์ง‘๋ฒฝ(34)์ด ํ˜•์„ฑ๋˜๊ณ , ์ด์™€ ๊ฐ™์€ ๊ตฌ์กฐ์— ๋”ฐ๋ฅด๋ฉด, ๋น”(50)๋“ค์ด ๋น” ์ง€์ง€๋ฒฝ(33) ์‚ฌ์ด์˜ ๋น” ์ •๋ ฌ๋ถ€(32)์— ์‚ฝ์ž…๋˜์–ด ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๋Š” ๋‘˜๋ ˆ๋ถ€๊ฐ€ ๋ง‰ํžˆ๊ฒŒ ๋˜๋ฏ€๋กœ ๋‚ด๋ถ€์—๋Š” ์ƒ๋ถ€๋งŒ ๊ฐœ๋ฐฉ๋œ ๊ณต๊ฐ„์ด ํ˜•์„ฑ๋˜์–ด, ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ํƒ€์„ค์ด ๊ฐ€๋Šฅํ•˜๋‹ค.The beam support plate 30 for the end is preferably rectangular in plan view, and the beam support wall 33 is erected on one side and the formwork wall 34 is formed on the other three sides in accordance with the function for the end. According to the structure, the beams 50 are inserted into the beam alignment portion 32 between the beam support wall 33 so that the end portion of the beam support plate 30 is blocked, so that only the upper open space is formed therein, Pouring of concrete is possible.

์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” ๋ฐ”๋žŒ์งํ•˜๊ฒŒ ํ‰๋ฉด์—์„œ ๋ณผ ๋•Œ ์ง์‚ฌ๊ฐํ˜•์ด๊ณ  ๋งˆ์ฃผํ•˜๋Š” 2๋ฉด(์ƒ๋Œ€์ ์œผ๋กœ ๊ธธ์ด๊ฐ€ ๊ธด ๋ฉด)์— ๋น” ์ง€์ง€๋ฒฝ(43)์ด ์„ธ์›Œ์ง€๊ณ , ๋‚˜๋จธ์ง€ 2๋ฉด์— ๊ฑฐํ‘ธ์ง‘๋ฒฝ(44)์ด ์„ธ์›Œ์ง„๋‹ค.The beam support plate 40 for the continuous point is preferably rectangular in plan view and has beam support walls 43 erected on two opposite sides (relatively long), and formwork walls 44 on the remaining two sides. Is erected.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” ๋„๋ฉด์—์„œ ๋ฐ”๋‹ฅ๋ถ€(31,41)๊ฐ€ ํšก๋‹จ๊ฒฝ์‚ฌ๋ฅผ ๊ณ ๋ คํ•˜์—ฌ ํšก๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ์ผ์ธก์—์„œ ํƒ€์ธก์œผ๋กœ ๊ฐ€๋ฉด์„œ ๋‹จ์ฐจ์ง€๋Š” ๊ฒƒ์œผ๋กœ ๋„์‹œ๋˜์—ˆ์œผ๋ฉฐ, ๋”ฐ๋ผ์„œ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ(10,20)์˜ ๊ต์ขŒ๋ฉด์„ ๋‹จ์ฐจ์—†์ด ์‹œ๊ณตํ•˜๋Š” ํšจ๊ณผ๋„ ์žˆ๋‹ค. ๋ฌผ๋ก , ๋‹จ์ฐจ ์‹œ๊ณต์ด ๋ถˆํ•„์š”ํ•œ ๊ฒฝ์šฐ๋ฅผ ์œ„ํ•˜์—ฌ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” ๋ฐ”๋‹ฅ๋ฉด์ด ๋‹จ์ฐจ์—†๋Š” ๊ฒƒ๋„ ๊ฐ€๋Šฅํ•˜๋‹ค.The beam support plate 30 for the end portion and the beam support plate 40 for the continuous point portion are shown in the figure as the bottom portions 31 and 41 are stepped from one side to the other along the transverse direction in consideration of the cross slope. There is also the effect of constructing the step surface of the lower structure (10, 20) without step. Of course, in order to eliminate the need for step construction, the beam support plate 30 for the end and the beam support plate 40 for the continuous point portion may have no step.

์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋„ ๋งˆ์ฐฌ๊ฐ€์ง€๋กœ ๋น”(50)๋“ค์ด ๋น” ์ •๋ ฌ๋ถ€(42)์— ์‚ฝ์ž…๋˜๋ฉด ๋‘˜๋ ˆ๋ถ€๊ฐ€ ๋ง‰ํžˆ๊ฒŒ ๋˜์–ด ๋‚ด๋ถ€์—๋Š” ์ƒ๋ถ€๋งŒ ๊ฐœ๋ฐฉ๋œ ๊ณต๊ฐ„์ด ํ˜•์„ฑ๋˜๋ฏ€๋กœ ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ํƒ€์„ค์ด ๊ฐ€๋Šฅํ•˜๋‹ค.Similarly, the beam receiving plate 40 for the continuous point part is similar to the case where the beams 50 are inserted into the beam alignment part 42 so that the circumference is blocked, so that only the upper part of the beam opening is formed therein, so that the casting of concrete is possible.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” ๊ฐ๊ฐ ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ(35,45)์ด ์˜ˆ์ปจ๋Œ€ ๋ฐ”๋‹ฅ๋ถ€(31,41)์˜ ์ƒ๋ถ€๋กœ ๋Œ์ถœ๋˜์–ด ๋น”(50)์˜ ๋Œ์ถœ ์ฒ ๊ทผ๊ณผ ๊ฒฐ์†๋  ์ˆ˜ ์žˆ๋‹ค. ์ด ๋•Œ, ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ(35,45)์€ ๋น”(50)์˜ ๊ฑฐ์น˜๋ฅผ ๊ฐ„์„ญํ•˜์ง€ ์•Š๋Š” ์œ„์น˜์— ํ˜•์„ฑ๋œ๋‹ค. ๋˜ํ•œ, ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ์€ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ์ผ๋ถ€ ๋Œ์ถœ ์ฒ ๊ทผ์œผ๋กœ ํ˜•์„ฑ๋˜๊ณ  ํ˜„์žฅ์—์„œ ์ž‘์—…์ž์— ์˜ํ•ด ์ง์ ‘ ๊ฒน์นจ ๋ฐฐ๊ทผ๋˜๋Š” ๊ฒƒ๋„ ํฌํ•จ๋œ๋‹ค.The beam support plate 30 for the end and the beam support plate 40 for the continuous point are respectively composed of the reinforcing bars 35 and 45 protruding to the upper portions of the bottom portions 31 and 41, respectively, and the protruding reinforcement beams of the beam 50. Can be bound. At this time, the reinforcing bars 35 and 45 are formed at positions that do not interfere with the mounting of the beam 50. In addition, the composite reinforcing bar is formed as a part of the protruding reinforcing bar on the beam receiving plate 30 for the end portion and the beam receiving plate 40 for the continuous point, it is also included to be directly overlapped by the worker in the field.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” ์Šˆ์™€ ๋Œ€์‘ํ•˜๋Š” ์ €๋ถ€์— ์†” ํ”Œ๋ ˆ์ดํŠธ(SOLE PLATE)(55)๊ฐ€ ๋งค๋ฆฝ๋œ๋‹ค.In the beam support plate 30 for the end and the beam support plate 40 for the continuous point portion, a sole plate 55 is embedded in the bottom corresponding to the shoe.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๊ฐ€ ์„ค์น˜๋˜๋Š” ๊ณณ์—๋Š” ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ์˜ ์‹ ์ถ•์ด์Œ์žฅ์น˜๊ฐ€ ํ•จ๊ป˜ ์„ค์น˜๋œ๋‹ค. ์ƒ๊ธฐ ์‹ ์ถ•์ด์Œ์žฅ์น˜๋Š” ํƒ„์„ฑ์žฌ์งˆ์˜ ํŒํ˜•์ด๋‚˜ ๋ฐ•์Šคํ˜•, ํƒ„์„ฑ์žฌ์งˆ์˜ ์ฑ„์›€์žฌ, ํ•‘๊ฑฐ์กฐ์ธํŠธ ๋“ฑ ๋‹ค์–‘ํ•œ ์ œํ’ˆ์˜ ์‚ฌ์šฉ์ด ๊ฐ€๋Šฅํ•˜๋‹ค.Where the beam support plate 30 for the end is installed, the expansion joint of the upper structure is installed together. The expansion joint device can be used in a variety of products, such as plate-shaped, box-shaped, elastic material filling material, finger joints.

์ข…๋ž˜์—๋Š” ๊ฐ๊ฐ์˜ ๋น”๋“ค์ด ๊ฐ๊ฐ ์Šˆ๋ฅผ ํ†ตํ•ด ์„ค์น˜๋˜์–ด ์˜ˆ๋ฅผ ๋“ค์–ด 4๊ฐœ์˜ ๋น”์ด ์„ค์น˜๋˜๋Š” ๊ฒฝ์šฐ ๋น”์˜ ์ผ์ธก์— 1๊ฐœ์”ฉ์˜ ์Šˆ๊ฐ€ ์„ค์น˜๋˜๋”๋ผ๋„ 8๊ฐœ์˜ ์Šˆ๊ฐ€ ์‚ฌ์šฉ๋˜์ง€๋งŒ, ๋ณธ ๋ฐœ๋ช…์€ 2๊ฐœ์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๊ฐ€ ์Šˆ๋ฅผ ํ†ตํ•ด ์„ค์น˜๋˜์–ด 4๊ฐœ์˜ ์Šˆ๋งŒ์„ ์‚ฌ์šฉํ•˜๋Š” ํŠน์ง•๋„ ์žˆ๋‹ค.Conventionally, when each beam is installed through each shoe so that, for example, four beams are installed, even if one shoe is installed on one side of the beam, eight shoes are used. However, the present invention provides two beam support plates 30 for two ends. ) And the beam support plate 40 for the continuous point portion is installed through the shoe, there is also a feature that uses only four shoes.

๋„๋ฉด์— ๋„์‹œํ•˜์ง€๋Š” ์•Š์•˜์ง€๋งŒ, ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋‚ด๋ถ€์—๋Š” ๋น”(50)์˜ ๋‹จ๋ถ€๋ฅผ ์ง€์ง€ํ•˜๋Š” ์ •๋ ฌํ„ฑ์ด ๋ถ€๊ฐ€๋  ์ˆ˜ ์žˆ๋‹ค.Although not shown in the drawings, an alignment jaw supporting the end of the beam 50 may be added inside the beam support plate 30 for the end and the beam support plate 40 for the continuous point.

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋Š” ๋ฐ”๋‹ฅ๋ถ€(31,41)์™€ ๋น” ์ง€์ง€๋ฒฝ(33,43) ๋ฐ ๊ฑฐํ‘ธ์ง‘๋ฒฝ(34,44)์ด ์ผ์ฒด๋กœ ์ œ์ž‘๋˜๋Š” ์ผ์ฒดํ˜•์ด ๋ฐ”๋žŒ์งํ•˜๊ณ , ํ˜„์žฅ ์—ฌ๊ฑด์— ๋งž๋Š” ์ž์œ ๋กœ์šด ์‹œ๊ณต์„ ์œ„ํ•˜์—ฌ ๋ฐ”๋‹ฅ๋ถ€(31,41)์™€ ๋น” ์ง€์ง€๋ฒฝ(33,43) ๋ฐ ๊ฑฐํ‘ธ์ง‘๋ฒฝ(34,44)์€ ๊ฐ๊ฐ ๋‹จํ’ˆ์œผ๋กœ ์ œ์ž‘๋œ ํ›„ ๊ณต์žฅ ๋˜๋Š” ํ˜„์žฅ์—์„œ ์กฐ๋ฆฝ(์•ต์ปค ๋“ฑ)๋˜๋Š” ์กฐ๋ฆฝ์‹๋„ ๊ฐ€๋Šฅํ•˜๋‹ค.The beam support plate 30 for the end and the beam support plate 40 for the continuous point are integrally formed with the bottom portions 31 and 41, the beam support walls 33 and 43, and the formwork walls 34 and 44 integrally. Preferably, the floor parts 31 and 41, the beam support walls 33 and 43, and the formwork walls 34 and 44 are manufactured separately, and then assembled in a factory or on site (anchor, etc.) for free construction according to site conditions. Prefabricated is also available.

๋น”(50)์€ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ๋“ค์˜ ์‚ฌ์ด์— ์ข…๋ฐฉํ–ฅ์œผ๋กœ ๋ฐฐ์—ด๋˜๋ฉฐ 2๊ฐœ ์ด์ƒ์ด ํšก๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ์ผ์ • ๊ฐ„๊ฒฉ์„ ๋‘๊ณ  ๋ฐฐ์—ด๋˜๋Š”๋ฐ, ์ด ๋•Œ, ๊ธธ์ด๋ฐฉํ–ฅ(์ข…๋ฐฉํ–ฅ)์˜ ์–‘์ธก์ด ๊ฐ๊ฐ ์ด์›ƒํ•˜๋Š” ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ๊ฐ๊ฐ ์ง€์ง€๋˜๊ณ , ๊ตฌ์ฒด์ ์œผ๋กœ, ๋‹จ๋ถ€๊ฐ€ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋น” ์ง€์ง€๋ฒฝ(33,43) ์‚ฌ์ด์˜ ๋น” ์ •๋ ฌ๋ถ€(32,42)์— ์‚ฝ์ž…๋˜์–ด ๋ฐ”๋‹ฅ๋ถ€(31,41) ์œ„์— ์˜ฌ๋ ค์ง€๊ณ , ๋”ฐ๋ผ์„œ, ์ขŒ์šฐ ์–‘์ธก์ด ๋น” ์ง€์ง€๋ฒฝ(33,43)๋“ค ๋˜๋Š” ๋น” ์ง€์ง€๋ฒฝ(33,43)๊ณผ ๊ฑฐํ‘ธ์ง‘๋ฒฝ(34,44)์— ์ง€์ง€๋œ๋‹ค.The beam 50 is arranged in the longitudinal direction between the lower structures and two or more are arranged at regular intervals along the transverse direction, wherein both sides of the longitudinal direction (longitudinal direction) are adjacent beam support plate for each end 30 and the beam support walls 33 and 43 of the beam support plate 40 for the continuous point portion, and specifically, the ends thereof are supported by the beam support plate 30 for the end portion and the beam support plate 40 for the continuous point portion. It is inserted into the beam alignment portions 32 and 42 therebetween and is mounted on the bottom portions 31 and 41, so that the left and right sides are supported by the beam support walls 33 and 43 or the beam support walls 33 and 43 and the form wall. (34,44) is supported.

๋น”(50)์€ PSC ๋น”, ๊ฐ•์žฌ ๋น”, ๊ฐ•ํ•ฉ์„ฑ ๋น” ๋“ฑ ๋‹ค์–‘ํ•œ ๋น”์ด ์‚ฌ์šฉ ๊ฐ€๋Šฅํ•˜๊ณ , ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ๊ฑฐ์น˜๋œ ์ƒํƒœ์—์„œ ์ข…๋ฐฉํ–ฅ/ํšก๋ฐฉํ–ฅ์œผ๋กœ ์ด์›ƒํ•˜๋Š” ๋‹ค๋ฅธ ๋น”(50)[๋˜๋Š” ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)]๊ณผ ๊ฒฐ์†์„ ์œ„ํ•œ ๋Œ์ถœ ์ฒ ๊ทผ(51), ์ ‘ํ•ฉ๊ฐ•์žฌ ๋“ฑ์ด ๊ฐ–์ถ”์–ด์ง„๋‹ค. ์ƒ๊ธฐ ๋Œ์ถœ ์ฒ ๊ทผ์€ ์ข…๋ฐฉํ–ฅ์œผ๋กœ ์ด์›ƒํ•˜๋Š” ๋‹ค๋ฅธ ๋น”(50)๊ณผ ๊ฒฐ์†์„ ์œ„ํ•˜์—ฌ ์ข…๋ฐฉํ–ฅ์œผ๋กœ ๋Œ์ถœ๋˜๋Š” ์ข…๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ(51)(๋„ 5 ์ฐธ๊ณ ), ํšก๋ฐฉํ–ฅ์œผ๋กœ ์ด์›ƒํ•˜๋Š” ๋‹ค๋ฅธ ๋น”(50)๊ณผ ๊ฒฐ์†์„ ์œ„ํ•˜์—ฌ ํšก๋ฐฉํ–ฅ์œผ๋กœ ๋Œ์ถœ๋˜๋Š” ํšก๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ ๋“ฑ์ด ๊ฐ€๋Šฅํ•˜๋‹ค.The beam 50 can be used in various beams such as PSC beam, steel beam, and composite beam, and is mounted on the beam support plate 30 for the end and the beam support plate 40 for the continuous point in the longitudinal / lateral direction. The other beam 50 (or the beam support plate 30 for the end and the beam support plate 40 for the continuous point portion), and the protruding reinforcing bar 51 for bonding, and the joining steel are provided. The protruding reinforcing bar is longitudinally protruding reinforcing bar 51 (see Fig. 5) protruding in the longitudinal direction for binding with another beam 50 neighboring in the longitudinal direction, for binding with the other beam 50 neighboring in the transverse direction. Transverse reinforcing bars that protrude in the transverse direction are possible.

๋„ 5๋Š” ์ข…๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ(51)์˜ ์ผ ์˜ˆ๋ฅผ ๋„์‹œํ•œ ๊ฒƒ์ด๋ฉฐ, ์ข…๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ(51)์€ ๋น”(50)์—์„œ ์•ž์œผ๋กœ ๋Œ์ถœ๋˜๋Š” ์ˆ˜ํ‰๋ถ€ ๋ฐ ์ด ์ˆ˜ํ‰๋ถ€์—์„œ ํ•˜๋ถ€ ๋˜๋Š” ์ƒ๋ถ€๋ฅผ ํ–ฅํ•ด ์ˆ˜์ง์œผ๋กœ ์ ˆ๊ณก๋˜๋Š” ์ˆ˜์ง๋ถ€๋กœ ๊ตฌ์„ฑ๋˜์–ด ์ƒํ•˜ 2๊ฐœ์†Œ์— ํ˜•์„ฑ๋˜๊ณ , ํšก๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ๋‹ค์ˆ˜๊ฐœ๊ฐ€ ๋Œ์ถœ ๋ฐฐ๊ทผ๋œ๋‹ค.5 shows an example of the longitudinally projecting rebar 51, wherein the longitudinally projecting rebar 51 is a horizontal portion projecting forward in the beam 50 and vertically bent downward or upward in this horizontal portion. It consists of a vertical part and is formed in two places of upper and lower sides, and many pieces are protrudingly arranged along the horizontal direction.

๋„ 6a, ๋„ 6b๋Š” ๋น”(50)๊ณผ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์˜ ์—ฐ๊ฒฐ ์ƒํƒœ์™€ ๋Œ์ถœ ์ฒ ๊ทผ(51)์„ ๋ณด์ธ ํ‰๋ฉด๋„, ๋„ 7a, ๋„ 7b๋Š” ๋น”(50)๊ณผ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(50)์˜ ์—ฐ๊ฒฐ ์ƒํƒœ ๋ฐ ๋Œ์ถœ ์ฒ ๊ทผ(51)์„ ๋ณด์ธ ํ‰๋ฉด๋„์ด๋‹ค.6A and 6B are plan views showing the connection state of the beam 50 and the end beam support plate 30 and the protruding reinforcement 51. FIGS. 7A and 7B show the beam support plate for the beam 50 and the continuous point portion ( It is the top view which showed the connection state of 50) and the protrusion reinforcement 51. FIG.

๋„ 6a์™€ ๋„ 6b์—์„œ ๋ณด์ด๋Š” ๋ฐ”์™€ ๊ฐ™์ด, ์ข…๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ(51)์€ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(50)์˜ ์•ˆ์— ๋ฐฐ์น˜๋˜๊ณ , ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)์˜ ์ฝ˜ํฌ๋ฆฌํŠธ์— ๋งค์„ค๋œ๋‹ค. ์ด๋•Œ, ๋„ 8์—์„œ ๋ณด์ด๋Š” ๊ฒƒ์ฒ˜๋Ÿผ ์ข…๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ(51)์€ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์˜ ๋ฐ”๋‹ฅ๋ถ€(31)์—์„œ ์ƒ๋ถ€๋กœ ๋Œ์ถœ๋œ ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ(35)๊ณผ ๊ฒฐ์†๋˜๋Š” ๊ฒƒ์ด ๋ฐ”๋žŒ์งํ•˜๋‹ค.As shown in Figs. 6A and 6B, the longitudinally protruding reinforcing bars 51 are disposed in the beam supporting plate 50 for the end and embedded in the concrete of the synthetic slab 60. At this time, as shown in Figure 8, the longitudinally projecting reinforcing bar 51 is preferably bound to the synthetic reinforcing bar 35 protruding upward from the bottom portion 31 of the beam support plate 30 for the end.

๋„ 7a์™€ ๋„ 7b์—์„œ ๋ณด์ด๋Š” ๋ฐ”์™€ ๊ฐ™์ด, ์ด์›ƒํ•˜๋Š” ๋น”(50-1,50-2)์€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ์•ˆ์— ์‚ฝ์ž… ๊ฑฐ์น˜๋˜๊ณ  ์ด๋•Œ, ๋„ 9์—์„œ ๋ณด์ด๋Š” ๊ฒƒ์ฒ˜๋Ÿผ, ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋ฐ”๋‹ฅ๋ถ€(41)์—์„œ ์ƒ๋ถ€๋กœ ๋Œ์ถœ๋œ ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ(45)๊ณผ ๊ฒฐ์†๋˜๋Š” ๊ฒƒ์ด ๋ฐ”๋žŒ์งํ•˜๋‹ค.As shown in FIGS. 7A and 7B, the neighboring beams 50-1 and 50-2 are inserted into and mounted in the beam support plate 40 for the continuous point portion, and at this time, as shown in FIG. 9, the beam support for the continuous point portion is shown. It is preferable to bind with the synthetic reinforcing bars 45 protruding upward from the bottom portion 41 of the plate 40.

ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ(35,45)๋Š” ์ˆ˜๋Ÿ‰๊ณผ ํ˜•ํƒœ ๋ฐ ๋ฐฉํ–ฅ ๋“ฑ์ด ๋‹ค์–‘ํ•˜๊ฒŒ ์‹ค์‹œ ๊ฐ€๋Šฅํ•˜๋‹ค.Synthetic reinforcing bars (35, 45) can be implemented in a variety of quantities, shapes and directions.

์ข…๋ฐฉํ–ฅ ๋Œ์ถœ ์ฒ ๊ทผ(51-1,51-2)์€ ํšก๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ์„œ๋กœ ๊ฒน์ณ์ง€๋ฉฐ ์ฒ ์‚ฌ ๋“ฑ์„ ํ†ตํ•ด ๊ฒฐ์†๋œ๋‹ค.The longitudinal protruding bars 51-1 and 51-2 overlap each other along the transverse direction and are bound by wires or the like.

๋น”(50)์€ ์ „๋„ ๋ฐฉ์ง€๋ฅผ ์œ„ํ•˜์—ฌ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋ฐ”๋‹ฅ๋ถ€(31,41)์— ์•ต์ปค(53)๋กœ ๊ณ ์ •๋˜๋Š” ๊ณ ์ • ํ”Œ๋žœ์ง€(52)๊ฐ€ ํฌํ•จ๋œ๋‹ค.The beam 50 includes a fixing flange 52 fixed to the bottom portion 31 and 41 of the beam support plate 30 for the end portion and the beam support plate 40 for the continuous point to prevent the fall. do.

๊ณ ์ • ํ”Œ๋žœ์ง€(52)๋Š” ๋น”(50)์˜ ์ €๋ถ€๋กœ์„œ ํšก๋ฐฉํ–ฅ์ชฝ์˜ ๋ ์ฆ‰ 2๊ฐœ์†Œ์— ํ˜•์„ฑ๋˜๊ณ , ์ข…๋ฐฉํ–ฅ์„ ๋Œ์ถœ ๋˜๋Š” ํšก๋ฐฉํ–ฅ์œผ๋กœ ๋Œ์ถœ๋˜๋ฉฐ, ์•ต์ปค(53)์˜ ์„ค์น˜๋ฅผ ์œ„ํ•œ ์•ต์ปคํ™€์ด ๊ตฌ์„ฑ๋œ๋‹ค.The fixing flange 52 is formed at the end of the transverse direction, that is, two places as the bottom of the beam 50, protrudes in the longitudinal direction or protrudes in the transverse direction, and constitutes an anchor hole for installation of the anchor 53.

๋˜ํ•œ, ๋น”(50)์€ ๊ธธ์ด๋ฐฉํ–ฅ์„ ๋”ฐ๋ผ ์ „์ฒด์ ์œผ๋กœ ๋‹จ๋ฉด์ด ๋™์ผํ•œ ๊ตฌ์กฐ, ๋ณ€๋‹จ๋ฉด ๊ตฌ์กฐ ๋ชจ๋‘๊ฐ€ ์‚ฌ์šฉ ๊ฐ€๋Šฅํ•˜๋ฉฐ, ์˜ˆ๋ฅผ ๋“ค์–ด ๋„ 6a ๋‚ด์ง€ ๋„ 7b์—์„œ ๋ณด์ด๋Š” ๊ฒƒ์ฒ˜๋Ÿผ, ๊ธธ์ด๋ฐฉํ–ฅ์˜ ์–‘์ธก ๋‹จ๋ถ€๋กœ๋ถ€ํ„ฐ ์•ˆ์ชฝ์œผ๋กœ ์ด๊ฒฉ๋˜๋Š” ๊ณณ์— ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๊ณผ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋น” ์ง€์ง€๋ฒฝ(33,43)๊ณผ ์ผ๋ ฌ๋กœ ๋ฐฐ์—ด๋˜์–ด ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ํƒ€์„ค๋ฉด์„ ์ œ๊ณตํ•˜๋Š” ๋ฒฝ์ฒดํ˜• ํ”Œ๋žœ์ง€(54)๊ฐ€ ํฌํ•จ๋  ์ˆ˜ ์žˆ๋‹ค.In addition, the beam 50 may be used in both the cross-sectional structure and the cross-sectional structure as a whole along the longitudinal direction, for example, as shown in Figs. 6a to 7b, where the beam 50 is spaced inwardly from both ends of the longitudinal direction A wall flange 54 arranged in line with the beam support walls 33 and 43 of the auxiliary beam support plate 30 and the continuous point beam support plate 40 may be provided.

๋ฒฝ์ฒดํ˜• ํ”Œ๋žœ์ง€(54)๋Š” ์ˆ˜์งํ˜•๊ณผ ๊ฒฝ์‚ฌํ˜•(๋‹จ๋ถ€๋กœ ๊ฐ€๋ฉด์„œ ํ•˜ํ–ฅ ๊ฒฝ์‚ฌ) ๋ชจ๋‘๊ฐ€ ๊ฐ€๋Šฅํ•˜๋‹ค.The wall flange 54 can be both vertical and inclined (downward inclined toward the end).

๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋ฐ”๋‹ฅ๋ถ€(31,41) ์œ„์— ํƒ„์„ฑ๋ฐ›์นจ์ด ์„ค์น˜๋˜๊ณ , ๋น”(50)์€ ์ƒ๊ธฐ ํƒ„์„ฑ๋ฐ›์นจ ์œ„์— ์„ค์น˜๋œ๋‹ค.An elastic bearing is installed on the bottom beams 31 and 41 of the beam bearing plate 30 for the end and the beam bearing plate 40 for the continuous point, and the beam 50 is installed on the elastic bearing.

๋น”(50)์˜ ๊ธธ์ด๊ฐ€ ๊ธด ๊ฒฝ์šฐ ๋น”(50)์˜ ์ข…๋ฐฉํ–ฅ ์–‘์ธก ๋‹จ๋ถ€ ์‚ฌ์ด ์˜ˆ๋ฅผ ๋“ค์–ด ์ค‘์•™๋ถ€๊ฐ€ ๊ตฌ์กฐ์ ์œผ๋กœ ์ทจ์•ฝํ•  ์ˆ˜ ์žˆ์œผ๋ฉฐ ์ด๋ฅผ ํ•ด๊ฒฐํ•˜๊ธฐ ์œ„ํ•˜์—ฌ ๋น”(50)์˜ ์ค‘์•™๋ถ€ ํšก๋ฐฉํ–ฅ์˜ ๊ฐ€๋กœ๋ณด๋ฅผ 1๊ฐœ ์ด์ƒ์œผ๋กœ ๊ตฌ์„ฑํ•˜๋Š” ๊ฒƒ๋„ ๊ฐ€๋Šฅํ•˜๋‹ค. ์ƒ๊ธฐ ๊ฐ€๋กœ๋ณด๋Š” ๋น” ๋“ฑ ๋‹ค์–‘ํ•œ ๊ตฌ์„ฑ์ด ๊ฐ€๋Šฅํ•˜๋‹ค.In the case where the length of the beam 50 is long, for example, the central portion between two longitudinal ends of the beam 50 may be structurally vulnerable. It is also possible. Various configurations, such as the cross beam, are possible.

ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)๋Š” ๊ต๋Œ€(10)์ชฝ์ธ ๋‹จ๋ถ€์™€ ๊ต๊ฐ(20)์ชฝ์ธ ์—ฐ์† ์ง€์ ๋ถ€์™€ ์ƒ๋ถ€๋ฅผ ๋™์‹œ์— ํƒ€์„คํ•˜๋Š” ํŠน์ง•์ด ์žˆ๊ณ , ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30,40)๋ฅผ ํ†ตํ•ด ๋‹ค์ˆ˜์˜ ๋น”(50)์ด ๊ฒฐ์†๋˜์–ด ์žˆ์œผ๋ฉด์„œ ์ฝ˜ํฌ๋ฆฌํŠธ ํƒ€์„ค์— ์˜ํ•ด ์„œ๋กœ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋˜์–ด ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ[๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30,40), ๋น”(50), ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)] ์ „์ฒด๊ฐ€ ์ผ์ฒดํ˜•์œผ๋กœ ์ด๋ฃจ์–ด์ง„๋‹ค.Synthetic type slab 60 is characterized in that at the same time the end portion of the alternating side 10 and the continuous point portion and the upper portion of the pier 20 side is poured at the same time, a plurality of beams 50 are bound through the beam support plate (30, 40) While being integrally synthesized with each other by concrete pouring, the entire upper structure (beam support plates 30, 40, beam 50, synthetic slab 60) is integrally formed.

๋„ 10์„ ์ฐธ๊ณ ํ•˜์—ฌ ๋ณธ ๋ฐœ๋ช…์˜ ์ผ ์‹ค์‹œ์˜ˆ์— ์˜ํ•œ ์‹œ๊ณต ๊ณต๋ฒ•์„ ์„ค๋ช…ํ•œ๋‹ค.The construction method according to an embodiment of the present invention will be described with reference to FIG. 10.

1. ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์‹œ๊ณต.1. Construction of substructure.

ํ•œ ์Œ์˜ ๊ต๋Œ€(10)์™€ ์ด ๊ต๋Œ€(10) ์‚ฌ์ด์— ๊ต๊ฐ(20)์„ ์‹œ๊ณตํ•œ๋‹ค. ์ด๋“ค(10,20)์˜ ์‹œ๊ณต์€ ๊ต๋Ÿ‰์—์„œ ๋„๋ฆฌ ์‚ฌ์šฉ๋˜๋Š” ๋ฐฉ๋ฒ•์— ์˜ํ•ด ๋‹ค์–‘ํ•˜๊ฒŒ ์‹œ๊ณต ๊ฐ€๋Šฅํ•œ ๊ฒƒ์ด๋ฏ€๋กœ ๊ตฌ์ฒด์ ์ธ ์„ค๋ช…์„ ์ƒ๋žตํ•œ๋‹ค.The bridge 20 is constructed between a pair of shifts 10 and this shift 10. Since the construction of these 10 and 20 can be variously constructed by a method widely used in bridges, a detailed description thereof will be omitted.

2. ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ์‹œ๊ณต.2. Construction of beam support plate.

๊ต๋Œ€(10)์˜ ์ƒ๋ถ€์— ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๋ฅผ ์œ ์••์žญ๊ณผ ํ•จ๊ป˜ ์„ค์น˜ํ•˜๊ณ , ๊ต๊ฐ(20) ์œ„์— ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)๋ฅผ ์œ ์••์žญ๊ณผ ํ•จ๊ป˜ ์„ค์น˜ํ•œ๋‹ค.The beam support plate 30 for the end is installed on the top of the shift 10 together with the hydraulic jack, and the beam support plate 40 for the continuous point portion is installed together with the hydraulic jack on the piers 20.

3. ๋น” ๊ฑฐ์น˜ ๋ฐ ์•ต์ปค ์„ค์น˜.3. Beam mounting and anchor installation.

๋น”(50)์˜ ์ข…๋ฐฉํ–ฅ ์–‘์ชฝ ๋‹จ๋ถ€๋ฅผ ์ด์›ƒํ•˜๋Š” ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ๊ฑธ์ณ ๊ฑฐ์น˜ํ•œ๋‹ค. ๋น”(50)์€ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋น” ์ง€์ง€๋ฒฝ(33,43) ์‚ฌ์ด์˜ ๋น” ์ •๋ ฌ๋ถ€(32,42) ์•ˆ์— ์‚ฝ์ž… ๊ฑฐ์น˜๋˜๊ณ  ๋น” ์ง€์ง€๋ฒฝ(33,43)์˜ ์ง€์ง€๋ฅผ ํ†ตํ•ด ์ „๋„๋ฅผ ์ผ์œผํ‚ค์ง€ ์•Š๋Š”๋‹ค.Both longitudinal ends of the beam 50 are mounted over the beam support plate 30 for the neighboring end and the beam support plate 40 for the continuous point. The beam 50 is inserted into and mounted in the beam alignment portions 32 and 42 between the beam support plate 30 for the end and the beam support walls 33 and 43 of the beam support plate 40 for the continuous point. 33, 43) does not cause evangelism.

์ด ์ „์— ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์˜ ๋ฐ”๋‹ฅ๋ถ€(31,41)์— ํƒ„์„ฑ๋ฐ›์นจ์„ ์„ค์น˜ํ•œ๋‹ค.Prior to this, elastic supports are installed on the bottom portions 31 and 41 of the beam support plate 30 for the end and the beam support plate 40 for the continuous point.

๋น”(50)์˜ ๊ณ ์ • ํ”Œ๋žœ์ง€์— ์•ต์ปค๋ฅผ ๊ฐ๊ฐ ์„ค์น˜ํ•˜์—ฌ ๋น”(50)์„ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ๊ฐ๊ฐ ๊ณ ์ •ํ•˜๋ฉฐ, ์ด ๊ณผ์ •์„ ํ†ตํ•ด ๋น”(50)์˜ ์ „๋„ ๋ฐฉ์ง€ ํšจ๊ณผ๋ฅผ ๊ทน๋Œ€ํ™”ํ•œ๋‹ค.Anchors are respectively installed on the fixing flanges of the beams 50 to fix the beams 50 to the beam receiving plate 30 for the end and the beam supporting plate 40 for the continuous point, respectively. Maximize the fall prevention effect.

4. ์ฒ ๊ทผ ์กฐ๋ฆฝ ํ›„ ์ฝ˜ํฌ๋ฆฌํŠธ ํƒ€์„ค.4. Concrete pouring after rebar assembly.

๋น”(50)๊ณผ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30), ๋น”(50)๊ณผ ๋น”(50) ๋ฐ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์—์„œ ์ฒ ๊ทผ(๋Œ์ถœ ์ฒ ๊ทผ๊ณผ ์ฃผ์ฒ ๊ทผ์˜ ์กฐ๋ฆฝ ๋“ฑ ๋‹ค์–‘ํ•˜๊ฒŒ ์‹ค์‹œ)์„ ์กฐ๋ฆฝํ•˜์—ฌ ์ด๋“ค(50,30)(50,50,40)์„ ๊ฒฐ์†ํ•œ๋‹ค. In the beam 50 and the beam support plate 30 for the end 30, the beam 50 and the beam 50, and the beam support plate 40 for the continuous point portion to assemble the reinforcing bars (various implementation, such as the assembly of the protruding reinforcing bars and cast iron) These (50, 30) (50, 50, 40) is bound.

๋˜ํ•œ, ๋น”(50)๋“ค ์‚ฌ์ด์— ๊ฑฐํ‘ธ์ง‘์„ ์„ค์น˜ํ•˜๊ณ  ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60) ๊ณต๊ฐ„์— ์ฒ ๊ทผ์„ ์กฐ๋ฆฝํ•œ๋‹ค.In addition, formwork is installed between the beams 50 and the reinforcing bar is assembled in the space of the composite slab 60.

์ด์ƒ์˜ ๊ณต์ •์„ ํ†ตํ•ด ์ผ์ธก์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30) - ๋‹ค์ˆ˜์˜ ๋น”(50) - ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40) - ๋‹ค์ˆ˜์˜ ๋น”(50) - ํƒ€์ธก์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์— ๊ฑธ์ณ ํ•˜๋‚˜์˜ ํƒ€์„ค ๊ณต๊ฐ„์ด ํ˜•์„ฑ๋˜๋ฉฐ, ์ด ํ•˜๋‚˜์˜ ๊ณต๊ฐ„์— ์ฝ˜ํฌ๋ฆฌํŠธ๋ฅผ ๋™์‹œ ํƒ€์„คํ•˜์—ฌ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)๋ฅผ ์‹œ๊ณตํ•œ๋‹ค. ๋”ฐ๋ผ์„œ, ์ผ์ธก์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์— ์˜ํ•œ ๋‹จ๋ถ€์ธก ๊ฐ€๋กœ๋ณด - ๋‹ค์ˆ˜์˜ ๋น”(50) - ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ์˜ํ•œ ์—ฐ์† ์ง€์ ๋ถ€์ธก ๊ฐ€๋กœ๋ณด - ๋‹ค์ˆ˜์˜ ๋น”(50) - ํƒ€์ธก์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์— ์˜ํ•œ ๋‹จ๋ถ€์ธก ๊ฐ€๋กœ๋ณด๋กœ ์ด์–ด์ง€๋Š” ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ์€ ์ผ์ฒดํ˜•์œผ๋กœ ์‹œ๊ณต๋œ๋‹ค.Through the above process, the beam support plate 30 for one end portion-the plurality of beams 50-the beam support plate 40 for the continuous point portion-the plurality of beams 50-the beam support plate 30 for the other end portion One pouring space is formed over, and concrete is poured in this one space to construct a synthetic type slab (60). Therefore, the end side cross beam by the beam support plate 30 for one end-the plurality of beams 50-the continuous point side cross beam by the beam support plate 40 for the continuous point portion-the multiple beams 50-the other side The upper structure leading to the end side cross beam by the end beam receiving plate 30 is constructed in one piece.

5. ์œ ์••์žญ ์ฒ ๊ฑฐ ๋ฐ ๋ถ€๋Œ€๊ณต ์‹œ๊ณต.5. Demolition of hydraulic jack and construction of auxiliary work.

์ „ ๊ณต์ •์—์„œ ์„ค์น˜ํ•œ ์œ ์••์žญ์„ ์ฒ ๊ฑฐํ•˜๊ณ , ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)์˜ ๊ต๋ฉด์„ ํฌ์žฅ ๋ฐ ๋ฐฉํ˜ธ๋ฒฝ ๋“ฑ์˜ ๋ถ€๋Œ€์‹œ์„ค์„ ์„ค์น˜ํ•œ๋‹ค.The hydraulic jack installed in the previous process is removed, and ancillary facilities, such as pavement and a protective wall, are installed on the intersection of the synthetic slab 60.

๋ณธ ์‹ค์‹œ์˜ˆ๋Š” ๋„๋ฉด์— ํ•˜๋‚˜์˜ ๊ต๊ฐ(20)์œผ๋กœ ๋„์‹œํ•˜์˜€์œผ๋‚˜, ๋™์ผํ•œ ๊ตฌ์„ฑ๊ณผ ๋ฐฉ๋ฒ•์— ์˜ํ•ด 2๊ฐœ ์ด์ƒ์˜ ๊ต๊ฐ(20)์ด ์‚ฌ์šฉ ๊ฐ€๋Šฅํ•˜๋‹ค.Although the present embodiment is illustrated as one pier 20 in the drawings, two or more pier 20 can be used by the same configuration and method.

์ง€๊ธˆ๊นŒ์ง€๋Š” ํ•œ ์Œ์˜ ๊ต๋Œ€(10)์™€ ์ด ์‚ฌ์ด์— ์„ค์น˜๋˜๋Š” ํ•˜๋‚˜์˜ ๊ต๊ฐ(20), ๊ต๋Œ€(10)์— ๊ฐ๊ฐ ์„ค์น˜๋˜๋Š” ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30), ๊ต๊ฐ(20)์— ์„ค์น˜๋˜๋Š” ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40), ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์™€ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์— ๊ฐ๊ฐ ๊ฑฐ์น˜๋˜๋ฉฐ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(40)์—์„œ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋˜๋Š” ๋น”(50)์œผ๋กœ ๊ตฌ์„ฑ๋˜๋Š” ์˜ˆ๋ฅผ ์„ค๋ช…ํ•˜์˜€์œผ๋ฉฐ, ๋ณธ ๋ฐœ๋ช…์€ ๋‹ค์Œ๊ณผ ๊ฐ™์ด ๋‹ค์–‘ํ•˜๊ฒŒ ์‹ค์‹œ ๊ฐ€๋Šฅํ•˜๋‹ค.Until now, a pair of shifts 10 and one pier 20 installed therebetween, an end beam bearing plate 30 installed at the shifts 10, and a beam for continuous point portions provided at the pier 20 An example consisting of a beam 50 which is mounted on the support plate 40, the beam support plate 30 for the end and the beam support plate 40 for the continuous point portion, and is integrally synthesized by the beam support plate 40 for the continuous point portion. The present invention can be variously implemented as follows.

๋„ 11์€ ๊ต๋Œ€ํ˜• ๋น”๊ต๋กœ์„œ, ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์„ ํ•œ ์Œ์˜ ๊ต๋Œ€(10)๋งŒ์œผ๋กœ ๊ตฌ์„ฑํ•˜์—ฌ ๊ต๋Œ€(10)์— ๊ฐ๊ฐ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๋ฅผ ๋Œ€์นญ์œผ๋กœ ์„ค์น˜ํ•˜๊ณ  ๋น”(50)์˜ ์–‘์ธก ๋‹จ๋ถ€๋ฅผ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)์— ๊ฑฐ์น˜ํ•œ ํ›„ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ(60)๋ฅผ ์‹œ๊ณตํ•˜๋Š” ์˜ˆ๋ฅผ ๋„์‹œํ•œ ๊ฒƒ์ด๋‹ค.11 is an alternating beam bridge, the lower structure consisting of only a pair of alternating 10, the end of the beam support plate 30 for the end of each of the alternating 10 is installed symmetrically and both ends of the beam 50 for the end An example of constructing the composite slab 60 after mounting on the beam support plate 30 is shown.

๋„ 12๋Š” ์ƒ๋ถ€๊ตฌ์กฐ๋ฌผ ๋ฐ˜๋ณตํ˜• ๋น”๊ต๋กœ์„œ, ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์ด ํ•œ ์Œ์˜ ๊ต๋Œ€(10), 2๊ฐœ ์ด์ƒ(๋„๋ฉด์—๋Š” 3๊ฐœ๋กœ ๋„์‹œํ•จ)์˜ ๊ต๊ฐ(20)์œผ๋กœ ์ด๋ฃจ์–ด์ง€๊ณ , ์ด ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์— ์„ค์น˜๋˜๋Š” ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ์„ ์ „์ฒด์ ์œผ๋กœ ์—ฐ์†๋˜์ง€ ์•Š๋„๋ก ํ•˜๋Š” ๊ฒƒ์œผ๋กœ, ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๋Š” ๊ต๋Œ€(10)๋Š” ๋ฌผ๋ก ์ด๊ณ  ๊ต๊ฐ(20)์—๋„ ์„ค์น˜๋˜๊ณ  ๋‹จ ํ•˜๋‚˜์˜ ๊ต๊ฐ(20)(๋„๋ฉด์—์„œ ์ค‘์•™์˜ ๊ต๊ฐ) ์œ„์— 2๊ฐœ์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ(30)๊ฐ€ ์„ค์น˜๋˜์–ด ์ค‘์•™์˜ ๊ต๊ฐ(20)์„ ์ค‘์‹ฌ์œผ๋กœ ํ•˜์—ฌ ์ขŒ์ธก๊ณผ ์šฐ์ธก์˜ ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ๋“ค์€ ์„œ๋กœ ์—ฐ์†๋˜์ง€ ์•Š๊ณ  ๋‹จ์ ˆ๋œ ์ƒํƒœ์ด๋‹ค.12 is a superstructure repeating beam bridge, the lower structure consisting of a pair of alternating 10, two or more (shown as three in the figure) piers 20, the overall superstructure installed in this substructure In order not to be continuous, the end beam bearing plate 30 is installed on the bridge 20 as well as the alternating 10 and beam beams for the two ends on a single pier 20 (center pier in the drawing). The plate 30 is installed so that the upper structures on the left and right sides of the center piers 20 are not connected to each other and are disconnected.

๋ณธ ๋ฐœ๋ช…์€ ์ƒ์ˆ ํ•œ ํŠน์ •์˜ ๋ฐ”๋žŒ์งํ•œ ์‹ค์‹œ ์˜ˆ์— ํ•œ์ •๋˜์ง€ ์•„๋‹ˆํ•˜๋ฉฐ, ์ฒญ๊ตฌ๋ฒ”์œ„์—์„œ ์ฒญ๊ตฌํ•˜๋Š” ๋ณธ ๋ฐœ๋ช…์˜ ์š”์ง€๋ฅผ ๋ฒ—์–ด๋‚จ์ด ์—†์ด ๋‹นํ•ด ๋ฐœ๋ช…์ด ์†ํ•˜๋Š” ๊ธฐ์ˆ ๋ถ„์•ผ์—์„œ ํ†ต์ƒ์˜ ์ง€์‹์„ ๊ฐ€์ง„ ์ž๋ผ๋ฉด ๋ˆ„๊ตฌ๋“ ์ง€ ๋‹ค์–‘ํ•œ ๋ณ€ํ˜• ์‹ค์‹œ๊ฐ€ ๊ฐ€๋Šฅํ•œ ๊ฒƒ์€ ๋ฌผ๋ก ์ด๊ณ , ๊ทธ์™€ ๊ฐ™์€ ๋ณ€๊ฒฝ์€ ์ฒญ๊ตฌ๋ฒ”์œ„ ๊ธฐ์žฌ์˜ ๋ฒ”์œ„ ๋‚ด์— ์žˆ๊ฒŒ ๋œ๋‹ค.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by those skilled in the art without departing from the gist of the present invention as claimed in the claims. Of course, such changes will fall within the scope of the claims.

[๋ถ€ํ˜ธ์˜ ์„ค๋ช…][Description of the code]

10 : ๊ต๋Œ€, 20 : ๊ต๊ฐ10: shift, 20: pier

30 : ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ,30: beam receiving plate for the end,

31,41 : ๋ฐ”๋‹ฅ๋ถ€, 32,42 : ๋น” ์ •๋ ฌ๋ถ€31,41: bottom part, 32,42: beam alignment part

33,43 : ๋น” ์ง€์ง€๋ฒฝ 34,44 : ๊ฑฐํ‘ธ์ง‘๋ฒฝ33,43: beam support wall 34,44: formwork wall

35,45 : ํ•ฉ์„ฑ์šฉ ์ฒ ๊ทผ, 35,45: composite rebar,

40 : ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ40 beam beam plate for continuous point

50 : ๋น”, 51 : ๋Œ์ถœ ์ฒ ๊ทผ50: beam, 51: extruded rebar

52 : ๊ณ ์ • ํ”Œ๋žœ์ง€, 53 : ์•ต์ปค52: fixed flange, 53: anchor

54 : ๋ฒฝ์ฒดํ˜• ํ”Œ๋žœ์ง€, 55 : ์†” ํ”Œ๋ ˆ์ดํŠธ54 wall flange, 55 sole plate

60 : ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ,60: synthetic slab,

๋ณธ ๋ฐœ๋ช…์€ ๋น”๊ณผ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ๋ฐ ์ฝ˜ํฌ๋ฆฌํŠธ๋ฅผ ์ด์šฉํ•œ ๊ต๋Ÿ‰ ๊ธฐ์ˆ ๋กœ์„œ, ๋น”์„ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ์™€ ํ•จ๊ป˜ ์ฝ˜ํฌ๋ฆฌํŠธ๋กœ ํ•ฉ์„ฑํ•˜์—ฌ ๋น”์˜ ๊ธธ์ด๋ฅผ ์งง๊ฒŒ ํ•˜๋Š” ๊ฒƒ์ด ๊ฐ€๋Šฅํ•˜๊ณ  ๊ต์ขŒ ์žฅ์น˜๋ฅผ ์ค„์ผ ์ˆ˜ ์žˆ์œผ๋ฉฐ, ํŠนํ—ˆ์ฒญ๊ตฌ๋ฒ”์œ„์™€ ๋ฐœ๋ช…์˜ ์ƒ์„ธํ•œ ์„ค๋ช…์„ ๋ฐ”ํƒ•์œผ๋กœ ํ˜„์žฌ ๊ธฐ์ˆ ์— ์˜ํ•œ ์‹ค์‹œ๊ฐ€ ๊ฐ€๋Šฅํ•˜๊ณ  ๋˜ํ•œ ์ž‘๋™์ด ๊ฐ€๋Šฅํ•œ ๊ฒƒ์œผ๋กœ ์‚ฐ์—…์ƒ ์ด์šฉ๊ฐ€๋Šฅ์„ฑ์ด ์žˆ๋‹ค.The present invention is a bridge technology using a beam, a beam support plate and concrete, it is possible to shorten the length of the beam and reduce the bridge device by synthesizing the beam with concrete with a synthetic slab, the claims and the details of the invention Based on the description, there is industrial applicability that the present technology can be implemented and operated.

Claims (8)

ํ•œ ์Œ์˜ ๊ต๋Œ€ ๋˜๋Š” ํ•œ ์Œ์˜ ๊ต๋Œ€์™€ ํ•˜๋‚˜ ์ด์ƒ์˜ ๊ต๊ฐ์œผ๋กœ ์ด๋ฃจ์–ด์ง„ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ๊ณผ;A lower structure consisting of a pair of shifts or a pair of shifts and one or more piers; ํ”„๋ฆฌ์บ์ŠคํŠธ ์ฝ˜ํฌ๋ฆฌํŠธ๋กœ ์ œ์กฐ๋˜๋ฉฐ ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์„ค์น˜๋˜๋Š” ๊ฑฐํ‘ธ์ง‘๊ณผ ๊ฐ€๋กœ๋ณด๊ฒธ์šฉ์˜ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์™€;A beam support plate made of precast concrete and installed on the lower structure for both the formwork and the cross beam; ๊ธธ์ด๋ฐฉํ–ฅ์˜ ์–‘์ธก์ด ์ด์›ƒํ•˜๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ๊ฑฐ์น˜๋˜๋Š” 2๊ฐœ ์ด์ƒ์˜ ๋น”๊ณผ;Two or more beams mounted on the beam receiving plate adjacent to each other in the longitudinal direction; ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์™€ ์ƒ๊ธฐ ๋น”์„ ๊ฒฐ์†ํ•˜๋Š” ์ฒ ๊ทผ๊ณผ;Reinforcing bars for binding the beam support plate and the beam; ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ๋‚ด๋ถ€์™€ ์ƒ๊ธฐ ๋น”๋“ค์˜ ์‚ฌ์ด ๋ฐ ์ƒ๋ถ€์— ๋™์‹œ ํƒ€์„ค๋˜์–ด ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ๋ฐ ์ƒ๊ธฐ ๋น”๊ณผ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋˜๋Š” ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ๋ฅผ ํฌํ•จํ•˜๊ณ ,And a synthetic slab which is simultaneously integrated between the beam support plate and the beam support plate, and is integrated with the beam support plate and the beam, ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋Š”, ๋ฐ”๋‹ฅ๋ถ€, ์ƒ๊ธฐ ๋ฐ”๋‹ฅ๋ถ€์— ์„ธ์›Œ์ง€๋ฉฐ ์ƒ๊ธฐ ๋น”์ด ์‚ฝ์ž… ๊ฑฐ์น˜๋˜๋Š” ๋น” ์ •๋ ฌ๋ถ€๋ฅผ ํ˜•์„ฑํ•จ๊ณผ ์•„์šธ๋Ÿฌ ๊ฑฐํ‘ธ์ง‘์˜ ๊ธฐ๋Šฅ์„ ํ•˜๋Š” ๋น” ์ง€์ง€๋ฒฝ, ์ƒ๊ธฐ ๋น” ์ง€์ง€๋ฒฝ์ด ํ˜•์„ฑ๋˜์ง€ ์•Š์€ ๊ณณ์— ์„ธ์›Œ์ง€๋Š” ๊ฑฐํ‘ธ์ง‘๋ฒฝ์„ ํฌํ•จํ•˜์—ฌ ์ƒ๊ธฐ ๋น”์ด ๊ฑฐ์น˜๋˜๋ฉด์„œ ์ฝ˜ํฌ๋ฆฌํŠธ์˜ ํƒ€์„ค ๊ณต๊ฐ„์„ ํ˜•์„ฑํ•˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต.The beam support plate is formed in the bottom portion, the bottom portion is formed in the beam alignment portion that the beam is inserted and mounted, and the beam support wall functioning as the formwork, the formwork wall is erected where the beam support wall is not formed Beam beam provided with a beam support plate, characterized in that for forming the pouring space of the concrete while the beam is mounted. ์ œ 1 ํ•ญ์— ์žˆ์–ด์„œ, ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋Š”, ์ƒ๊ธฐ ๋ฐ”๋‹ฅ๋ถ€์˜ ์ผ์ธก์— ์ƒ๊ธฐ ๋น” ์ง€์ง€๋ฒฝ์ด ํ˜•์„ฑ๋˜๋Š” ํ•œํŽธ ๋‚˜๋จธ์ง€ ๋ฉด์— ์ƒ๊ธฐ ๊ฑฐํ‘ธ์ง‘๋ฒฝ์ด ํ˜•์„ฑ๋˜๋Š” ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ, ์ƒ๊ธฐ ๋ฐ”๋‹ฅ๋ถ€์˜ ๋งˆ์ฃผํ•˜๋Š” ๋ฉด์— ๊ฐ๊ฐ ์ƒ๊ธฐ ๋น” ์ง€์ง€๋ฒฝ์ด ํ˜•์„ฑ๋˜๋Š” ํ•œํŽธ ๋‚˜๋จธ์ง€ ๋ฉด์— ์ƒ๊ธฐ ๊ฑฐํ‘ธ์ง‘๋ฒฝ์ด ํ˜•์„ฑ๋˜๋Š” ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋กœ ๊ตฌ๋ถ„๋˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต.The beam receiving plate of claim 1, wherein the beam support plate is formed at one side of the bottom portion, and the beam support wall is formed at the other side, and the formwork wall is formed at the other side thereof. A beam bridge having a beam support plate, characterized in that the support wall is formed and divided into a beam support plate for the continuous point portion in which the form wall is formed on the other side. ์ฒญ๊ตฌํ•ญ 1 ๋˜๋Š” ์ฒญ๊ตฌํ•ญ 2์— ์žˆ์–ด์„œ, ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ๋น” ์ง€์ง€๋ฒฝ๊ณผ ์ƒ๊ธฐ ๊ฑฐํ‘ธ์ง‘๋ฒฝ์€ ์ƒ๊ธฐ ๋ฐ”๋‹ฅ๋ถ€์— ์กฐ๋ฆฝ๋˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต.The beam bridge having a beam support plate according to claim 1 or 2, wherein the beam support wall and the formwork wall of the beam support plate are assembled to the bottom portion. ์ฒญ๊ตฌํ•ญ 1์— ์žˆ์–ด์„œ, ์ƒ๊ธฐ ๋น”์€ PSC ๋น”, ๊ฐ•์žฌ ๋น”, ๊ฐ•ํ•ฉ์„ฑ ๋น” ์ค‘ ํ•˜๋‚˜์ด๋ฉฐ, ์ข…๋ฐฉํ–ฅ ์–‘์ธก์— ๊ฐ๊ฐ ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ์•ˆ์—์„œ ๊ฒฐ์†๋˜๋Š” ๋Œ์ถœ ์ฒ ๊ทผ์„ ํฌํ•จํ•˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต. The beam bridge of claim 1, wherein the beam is one of a PSC beam, a steel beam, and a composite beam, and includes protruding reinforcing bars which are respectively bound in the beam support plate on both sides in the longitudinal direction. ์ฒญ๊ตฌํ•ญ 4์— ์žˆ์–ด์„œ, ์ƒ๊ธฐ ๋น”์€ ์ƒ๊ธฐ ์ €๋ถ€์— ์ข…๋ฐฉํ–ฅ ๋˜๋Š” ํšก๋ฐฉํ–ฅ์œผ๋กœ ๋Œ์ถœ๋˜๋ฉฐ ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ์•ต์ปค๋กœ ๊ณ ์ •๋˜๋Š” ๊ณ ์ • ํ”Œ๋žœ์ง€๋ฅผ ํฌํ•จํ•˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต.The beam bridge of claim 4, wherein the beam includes a fixing flange protruding longitudinally or transversely to the bottom and anchored to the beam support plate. ์ฒญ๊ตฌํ•ญ 2์— ์žˆ์–ด์„œ, ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต๋Š” ๊ต๋Œ€ํ˜• ๋น”๊ต ๋˜๋Š” ๋น” ์—ฐ์†ํ˜• ๋น”๊ต ๋˜๋Š” ์ƒ๋ถ€๊ตฌ์กฐ๋ฌผ ๋ฐ˜๋ณตํ˜• ๋น”๊ต์ด๋ฉฐ,The beam bridge having the beam support plate is an alternating beam bridge, a beam continuous beam bridge, or a superstructure repeating beam bridge. ์ƒ๊ธฐ ๊ต๋Œ€ํ˜• ๋น”๊ต๋Š” ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์€ ํ•œ ์Œ์˜ ๊ต๋Œ€๋กœ ์ด๋ฃจ์–ด์ง€๋ฉฐ, ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€์—๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋กœ์„œ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ๊ฐ๊ฐ ์„ค์น˜๋˜๊ณ , ์ƒ๊ธฐ ๋น”์€ ์ƒ๊ธฐ ๊ธธ์ด๋ฐฉํ–ฅ์˜ ์–‘์ธก ๋‹จ๋ถ€๊ฐ€ ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€์— ์„ค์น˜๋œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ๊ฐ๊ฐ ๊ฑฐ์น˜๋˜๋Š” ๊ฒƒ์ด๊ณ ,In the alternating beam bridge, the lower structure is composed of a pair of alternations, and the pair of alternating beam support plates are provided as end portions of the beam support plates, respectively, and the beams have both ends in the longitudinal direction. Are mounted on the beam support plates installed on the alternating pairs, ์ƒ๊ธฐ ๋น” ์—ฐ์†ํ˜• ๋น”๊ต๋Š” ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์€ ํ•œ ์Œ์˜ ๊ต๋Œ€ ๋ฐ ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€ ์‚ฌ์ด์— ์„ค์น˜๋˜๋Š” ํ•˜๋‚˜ ์ด์ƒ์˜ ๊ต๊ฐ์œผ๋กœ ์ด๋ฃจ์–ด์ง€๋ฉฐ, ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€์—๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋กœ์„œ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ๊ฐ๊ฐ ์„ค์น˜๋˜๋Š” ํ•œํŽธ ์ƒ๊ธฐ ๊ต๊ฐ์—๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋กœ์„œ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ์„ค์น˜๋˜์–ด ์ด์›ƒํ•˜๋Š” ๋น”๋“ค์ด ์ƒ๊ธฐ ์—ฐ์† ์ง€์ ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์—์„œ ์—ฐ์†๋˜๋Š” ๊ฒƒ์ด๋ฉฐ,In the beam continuous beam bridge, the lower structure is composed of a pair of shifts and one or more bridges installed between the pair of shifts, and the beam support plates for the end are respectively installed on the pair of shifts as the beam support plates. On the other hand, the beam supporting plate for the continuous point portion is installed in the pier as the beam support plate so that neighboring beams are continuous in the beam support plate for the continuous point portion, ์ƒ๊ธฐ ์ƒ๋ถ€ ๊ตฌ์กฐ๋ฌผ ๋ฐ˜๋ณตํ˜• ๋น”๊ต๋Š” ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์€ ํ•œ ์Œ์˜ ๊ต๋Œ€ ๋ฐ ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€ ์‚ฌ์ด์— ์„ค์น˜๋˜๋Š” ๋‹ค์ˆ˜๊ฐœ์˜ ๊ต๊ฐ์œผ๋กœ ์ด๋ฃจ์–ด์ง€๋ฉฐ, ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€์—๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋กœ์„œ ํ•˜๋‚˜์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ์„ค์น˜๋˜๋Š” ํ•œํŽธ, ์ƒ๊ธฐ ๊ต๊ฐ ์ค‘์—๋Š” ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋กœ์„œ 2๊ฐœ์˜ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๊ฐ€ ์ƒ๊ธฐ ํ•œ ์Œ์˜ ๊ต๋Œ€ ๋˜๋Š” ๊ต๊ฐ์— ์„ค์น˜๋œ ๋‹จ๋ถ€์šฉ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ํ–ฅํ•˜๋„๋ก ์„ค์น˜๋˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต.The upper structure repetitive beam bridge is the lower structure is composed of a plurality of bridges are installed between a pair of alternations and the pair of alternations, the pair of alternating beam support plate for the end as a beam support plate On the other hand, a beam bridge having beam support plates, wherein the beam support plates for the two ends are installed toward the beam support plates for the end installed in the pair of alternating or pier as the beam support plates. . ์ฒญ๊ตฌํ•ญ 1์— ์žˆ์–ด์„œ, ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ๋ฐ”๋‹ฅ๋ถ€๋Š” ํšก๋ฐฉํ–ฅ์œผ๋กœ ๊ฐ€๋ฉด์„œ ๊ฒฝ์‚ฌ์ง€๊ฒŒ ํ˜•์„ฑ๋˜์–ด ์ƒ๊ธฐ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์˜ ๊ต์ขŒ๋ฉด์„ ์ˆ˜ํ‰์œผ๋กœ ์‹œ๊ณตํ•˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต.The beam bridge of claim 1, wherein the bottom portion of the beam support plate is formed to be inclined in a transverse direction to construct the cross section of the lower structure horizontally. ์ฒญ๊ตฌํ•ญ 1์— ์˜ํ•œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์˜ ์‹œ๊ณต ๊ณต๋ฒ•์œผ๋กœ์„œ,As a construction method of a beam bridge provided with a beam support plate according to claim 1, ํ•œ ์Œ์˜ ๊ต๋Œ€ ๋˜๋Š” ํ•œ ์Œ์˜ ๊ต๋Œ€์™€ ํ•˜๋‚˜ ์ด์ƒ์˜ ๊ต๊ฐ์œผ๋กœ ์ด๋ฃจ์–ด์ง„ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ์„ ์‹œ๊ณตํ•˜๋Š” ์ œ1๋‹จ๊ณ„์™€;A first step of constructing a lower structure consisting of a pair of shifts or a pair of shifts and one or more piers; ์ƒ๊ธฐ ์ œ1๋‹จ๊ณ„๋ฅผ ํ†ตํ•ด ์‹œ๊ณต๋œ ํ•˜๋ถ€ ๊ตฌ์กฐ๋ฌผ ์œ„์— ์œ ์••์žญ๊ณผ ํ•จ๊ป˜ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ์„ค์น˜ํ•˜๋Š” ์ œ2๋‹จ๊ณ„์™€;A second step of installing a beam support plate together with a hydraulic jack on the lower structure constructed through the first step; ์ƒ๊ธฐ ์ œ2๋‹จ๊ณ„๋ฅผ ํ†ตํ•ด ์„ค์น˜๋œ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ ์ค‘์—์„œ ์ด์›ƒํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์— ์ง€์ง€๋˜๋„๋ก ๋น”์„ ๊ฑฐ์น˜ํ•˜๋Š” ์ œ3๋‹จ๊ณ„์™€;A third step of mounting a beam to be supported by a neighboring beam support plate among the beam support plates installed through the second step; ์ƒ๊ธฐ ์ œ3๋‹จ๊ณ„๋ฅผ ํ†ตํ•ด ๋น”์„ ๊ฑฐ์น˜ํ•œ ํ›„ ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์™€ ๋น”์„ ์ฒ ๊ทผ์œผ๋กœ ๊ฒฐ์†ํ•˜๋Š” ์ œ4๋‹จ๊ณ„์™€;A fourth step of binding the beam support plate and the beam with reinforcing bars after mounting the beam through the third step; ์ƒ๊ธฐ ๋น”๋“ค ์‚ฌ์ด์— ๊ฑฐํ‘ธ์ง‘์„ ์„ค์น˜ํ•˜๊ณ  ์ƒ๊ธฐ ๋น”๋“ค ์‚ฌ์ด์™€ ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ์˜ ๋‚ด๋ถ€ ๋ฐ ์ƒ๊ธฐ ๋น”๋“ค ์ƒ๋ถ€์— ์ผ์ • ๋†’์ด๋กœ ์ฝ˜ํฌ๋ฆฌํŠธ๋ฅผ ํƒ€์„คํ•˜์—ฌ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ๋ฅผ ์‹œ๊ณตํ•˜๋Š” ์ œ5๋‹จ๊ณ„์™€;A fifth step of constructing a composite slab by installing formwork between the beams and placing concrete at a predetermined height between the beams, inside the beam support plate, and above the beams; ์ƒ๊ธฐ ์ œ5๋‹จ๊ณ„ ์ดํ›„ ์ƒ๊ธฐ ์œ ์••์žญ์„ ์ฒ ๊ฑฐํ•จ๊ณผ ์•„์šธ๋Ÿฌ ์ƒ๊ธฐ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ ์œ„์— ๋ถ€๋Œ€์‹œ์„ค์„ ์„ค์น˜ํ•˜๋Š” ์ œ6๋‹จ๊ณ„๋ฅผ ํฌํ•จํ•˜์—ฌ, ์ƒ๊ธฐ ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ํ†ตํ•ด ์ƒ๊ธฐ ๋น”๊ณผ ํ•ฉ์„ฑํ˜• ์Šฌ๋ž˜๋ธŒ๊ฐ€ ์ผ์ฒด๋กœ ํ•ฉ์„ฑ๋˜๋„๋ก ์‹œ๊ณตํ•˜๋Š” ๊ฒƒ์„ ํŠน์ง•์œผ๋กœ ํ•˜๋Š” ๋น” ๋ฐ›์นจํ”Œ๋ ˆ์ดํŠธ๋ฅผ ๊ตฌ๋น„ํ•œ ๋น”๊ต์˜ ์‹œ๊ณต ๊ณต๋ฒ•.And a sixth step of dismantling the hydraulic jack after the fifth step and installing additional facilities on the compound type slab, and constructing the beam and the compound type slab integrally through the beam support plate. The construction method of the beam bridge provided with the beam support plate.
PCT/KR2018/001319 2016-02-05 2018-01-31 Beam bridge having beam support plate and construction method therefor Ceased WO2018143661A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR20160015307 2016-02-05
KR10-2017-0015745 2017-02-03
KR1020170015745A KR102014418B1 (en) 2016-02-05 2017-02-03 Beam bridge having beam support block and its construction method

Publications (1)

Publication Number Publication Date
WO2018143661A1 true WO2018143661A1 (en) 2018-08-09

Family

ID=59752525

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2018/001319 Ceased WO2018143661A1 (en) 2016-02-05 2018-01-31 Beam bridge having beam support plate and construction method therefor

Country Status (2)

Country Link
KR (1) KR102014418B1 (en)
WO (1) WO2018143661A1 (en)

Cited By (2)

* Cited by examiner, โ€  Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293414A (en) * 2021-12-03 2022-04-08 ไธญ้“็ฌฌๅ››ๅ‹˜ๅฏŸ่ฎพ่ฎก้™ข้›†ๅ›ขๆœ‰้™ๅ…ฌๅธ A kind of viaduct transition section structure and construction method thereof
CN114508049A (en) * 2022-02-11 2022-05-17 ไธญไบคๅ…ฌ่ทฏ่ง„ๅˆ’่ฎพ่ฎก้™ขๆœ‰้™ๅ…ฌๅธ Steel-concrete I-shaped composite beam and bridge structure

Families Citing this family (2)

* Cited by examiner, โ€  Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281252B (en) * 2018-10-19 2023-10-24 ไธญไบค่ทฏๆกฅๅŽๅ—ๅทฅ็จ‹ๆœ‰้™ๅ…ฌๅธ Side span steel beam pushing counterforce device and system
KR102515783B1 (en) * 2021-09-16 2023-03-30 (์ฃผ)์—์ด์น˜์•ค๋””๊ฑด์„ค Unsupported formwork construction method using socket member

Citations (5)

* Cited by examiner, โ€  Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060083810A (en) * 2005-01-18 2006-07-21 ๊น€์ˆœ์ด Gangarobo and its construction method
JP2009256873A (en) * 2008-04-11 2009-11-05 Oriental Shiraishi Corp Bridge equipped with precast cross girder and precast stringer, and its construction method
KR101127427B1 (en) * 2011-10-11 2012-03-22 ๋ฐ•์žฌํ˜„ Rahmen bridge and construction method thereof
KR101256774B1 (en) * 2012-10-09 2013-04-25 (์ฃผ)์ง€์Šน์ปจ์„คํ„ดํŠธ Constrcution method of end cross beam for integrating continuity of supporting portion and preventing falling down of psc girder
KR20160075952A (en) * 2014-12-19 2016-06-30 ํ•œ๊ตญ๋„๋กœ๊ณต์‚ฌ Girder support block of a bridge and method for installing girder using the same

Family Cites Families (1)

* Cited by examiner, โ€  Cited by third party
Publication number Priority date Publication date Assignee Title
KR100703134B1 (en) 2005-07-28 2007-04-06 (์ฃผ)ํ•œ๋งฅ๊ธฐ์ˆ  Prefabricated fish beam bridge and its construction method

Patent Citations (5)

* Cited by examiner, โ€  Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060083810A (en) * 2005-01-18 2006-07-21 ๊น€์ˆœ์ด Gangarobo and its construction method
JP2009256873A (en) * 2008-04-11 2009-11-05 Oriental Shiraishi Corp Bridge equipped with precast cross girder and precast stringer, and its construction method
KR101127427B1 (en) * 2011-10-11 2012-03-22 ๋ฐ•์žฌํ˜„ Rahmen bridge and construction method thereof
KR101256774B1 (en) * 2012-10-09 2013-04-25 (์ฃผ)์ง€์Šน์ปจ์„คํ„ดํŠธ Constrcution method of end cross beam for integrating continuity of supporting portion and preventing falling down of psc girder
KR20160075952A (en) * 2014-12-19 2016-06-30 ํ•œ๊ตญ๋„๋กœ๊ณต์‚ฌ Girder support block of a bridge and method for installing girder using the same

Cited By (2)

* Cited by examiner, โ€  Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293414A (en) * 2021-12-03 2022-04-08 ไธญ้“็ฌฌๅ››ๅ‹˜ๅฏŸ่ฎพ่ฎก้™ข้›†ๅ›ขๆœ‰้™ๅ…ฌๅธ A kind of viaduct transition section structure and construction method thereof
CN114508049A (en) * 2022-02-11 2022-05-17 ไธญไบคๅ…ฌ่ทฏ่ง„ๅˆ’่ฎพ่ฎก้™ขๆœ‰้™ๅ…ฌๅธ Steel-concrete I-shaped composite beam and bridge structure

Also Published As

Publication number Publication date
KR102014418B1 (en) 2019-08-26
KR20170093743A (en) 2017-08-16

Similar Documents

Publication Publication Date Title
WO2018143661A1 (en) Beam bridge having beam support plate and construction method therefor
WO2009104904A2 (en) Fit-together type of precast concrete lining and bridging structural body
WO2012044094A2 (en) Upper structure for bridge
WO2016129826A1 (en) Safety-enhanced pc truss wall structure, and underground-structure construction method using same
WO2012044096A2 (en) Upper structure for bridge
WO2012044097A2 (en) Floor slab structure for bridge
WO2016021811A1 (en) Prefabricated wall unit and frame
JP2013036205A (en) Construction method for joining wall balustrade of bridge
WO2010134731A9 (en) Top-down construction method using a branch-type steel frame with channels for the continuous construction of an underground retaining wall
WO2013133546A1 (en) Method for constructing underground tunnel
WO2020145542A1 (en) Band for fixing removable form for pre-fabricated column
WO2012036335A1 (en) Connection method between steel-plate concrete structure and different structure
WO2013081408A1 (en) Prefabricated hybrid girder capable of applying prestress to girder using gap difference between contact surfaces of connective parts of blocks, method for applying prestress to prefabricated hybrid girder, continuation method for prefabricated hybrid girder, and manufacturing and assembling method thereof
KR100936944B1 (en) Continuous girder and continuous structure of girder and construction method
KR20130047403A (en) Rapid cnstruction method of semi-integral abutment bridge using prestressed concrete girder having end diaphragm
WO2023172027A1 (en) Inverted u-shaped pc modular structure with integral bottom part
WO2020145541A1 (en) Band for fixing removable form for pre-fabricated column
WO2018190444A1 (en) Prefabricated double composite plate girder bridge and construction method therefor
JP4477467B2 (en) Bridge structure and its replacement method
WO2022164128A1 (en) Synthetic frame having end-embedded girder joint structure
WO2015009127A1 (en) Cap beam structure
KR100549046B1 (en) Continuum Method of Middle Point of Prestressed Concrete Beam Using Sol Plate
KR100499976B1 (en) Prestressed reinforced concrete using prestressed concrete wire and T-shaped steel plate and method for constructing bridge using the same
WO2023243961A1 (en) Prefabricated bracket assembly integrated to prefabricated column assembly for connecting pc beams
JP2861219B2 (en) Bridge deck repair steel slab and its mounting method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18748555

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18748555

Country of ref document: EP

Kind code of ref document: A1