WO2017169088A1 - リチウムイオン二次電池の寿命推定装置 - Google Patents
リチウムイオン二次電池の寿命推定装置 Download PDFInfo
- Publication number
- WO2017169088A1 WO2017169088A1 PCT/JP2017/003773 JP2017003773W WO2017169088A1 WO 2017169088 A1 WO2017169088 A1 WO 2017169088A1 JP 2017003773 W JP2017003773 W JP 2017003773W WO 2017169088 A1 WO2017169088 A1 WO 2017169088A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- capacity
- formula
- lithium ion
- ion secondary
- secondary battery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/3644—Constructional arrangements
- G01R31/3648—Constructional arrangements comprising digital calculation means, e.g. for performing an algorithm
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R31/3842—Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/392—Determining battery ageing or deterioration, e.g. state of health
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/05—Accumulators with non-aqueous electrolyte
- H01M10/052—Li-accumulators
- H01M10/0525—Rocking-chair batteries, i.e. batteries with lithium insertion or intercalation in both electrodes; Lithium-ion batteries
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
-
- H02J7/865—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Definitions
- This disclosure relates to an apparatus for estimating the lifetime of a lithium ion secondary battery.
- Non-Patent Document 1 discloses a method for estimating battery capacity deterioration using a so-called linear rule (linear deterioration) in which the battery capacity decreases linearly in proportion to the cumulative usage period of the battery.
- Non-Patent Document 2 discloses a method for estimating battery capacity deterioration using a so-called route rule (route deterioration) in which the battery capacity gradually decreases as the battery usage period elapses.
- route rule route deterioration
- Patent Document 1 discloses a life estimation apparatus that uses one equation that combines both a straight line rule and a root rule.
- a first term using an exponential function having a variable obtained by multiplying a cumulative use period of a battery by a positive first constant, and a second term using a square root function for the cumulative use period are provided. It is described that the remaining life of a battery is estimated by using a relational expression represented by a function including it.
- a lithium ion secondary battery life estimation apparatus includes a first acquisition unit that acquires an accumulated cycle number or accumulated capacity from the start of use of a lithium ion secondary battery, and a lithium ion secondary battery
- a second acquisition unit for acquiring an open circuit voltage, a voltage increase width after a discharge pause, or a voltage increase rate per predetermined time after a discharge pause at a predetermined discharge depth, and a change amount of the open voltage in a predetermined period,
- a first calculation unit that calculates a change amount of the voltage increase width or a change amount of the voltage increase rate, Formula 1 in which the index n1 is 0.9 to 1.1, and the index n2 is 0.4 to 0.6
- a second calculation unit that calculates a remaining capacity, which is a chargeable / dischargeable capacity of the lithium ion secondary battery, based on Equation (2).
- the second calculation unit calculates the remaining capacity using Formula 1 when the change amount of the open circuit voltage, the change amount of the voltage increase width, or the change amount of the voltage increase rate is positive, and the change amount of the open circuit voltage, or When the change amount of the voltage increase width or the change amount of the voltage increase rate is negative, the remaining capacity is calculated using Expression 2. Equations 1 and 2 are as follows.
- Remaining capacity capacity 1 ⁇ ⁇ (accumulated cycle number or accumulated capacity) n1
- Remaining capacity capacity 2- ⁇ ⁇ (accumulated cycle number or accumulated capacity) n2
- ⁇ and ⁇ are constants different from each other
- the capacity 1 is the initial capacity of the lithium ion secondary battery or the remaining capacity calculated by Expression 2
- the capacity 2 is the initial capacity or the remaining capacity calculated by Expression 1. It is.
- the lithium ion secondary battery life estimation apparatus According to the lithium ion secondary battery life estimation apparatus according to the present disclosure, more accurate life estimation is possible as compared with the conventional method.
- FIG. 1 is a block diagram illustrating a configuration of a lithium-ion secondary battery life estimation apparatus, which is an example of an embodiment, and a system in which the estimation apparatus is mounted.
- FIG. 2 is a diagram illustrating the relationship between the open circuit voltage (OCV) and the number of cycles of a lithium ion secondary battery.
- FIG. 3 is a flowchart illustrating a procedure of estimation processing performed by a lifetime estimation device for a lithium ion secondary battery as an example of the embodiment.
- FIG. 4 is a diagram showing a discharge curve of the lithium ion secondary battery.
- FIG. 5 is a diagram showing the relationship between the open circuit voltage (OCV) of the lithium ion secondary battery and the rest time after discharge.
- FIG. 6 is a flowchart illustrating a procedure of an estimation process performed by a life estimation apparatus for a lithium ion secondary battery, which is another example of the embodiment.
- the present inventors have intensively studied to improve the life estimation accuracy of the lithium ion secondary battery. Then, a new technique has been found in which the estimation formulas (formulas 1 and 2 above) are switched based on the transition of the open-circuit voltage of the battery.
- the estimation formulas (formulas 1 and 2 above) are switched based on the transition of the open-circuit voltage of the battery.
- the life estimation apparatus of the present disclosure even for a battery using a layered lithium transition metal oxide, there is almost no deviation from the actual measurement value, and a more accurate life estimation is possible.
- a transition of the voltage rise after the discharge pause or a transition of the voltage rise rate per predetermined time after the discharge pause can be used instead of the transition of the open circuit voltage.
- FIG. 1 is a block diagram illustrating a configuration of a life estimation apparatus 10 (hereinafter referred to as “life estimation apparatus 10”) of a lithium ion secondary battery, which is an example of an embodiment, and a system 30 in which the lifetime estimation apparatus 10 is mounted. It is. As illustrated in FIG. 1, the life estimation apparatus 10 stores the following formula 1 in which the index n1 is 0.9 to 1.1 and the following formula 2 in which the index n2 is 0.4 to 0.6. It is a device that includes a storage unit 11 and estimates the lifetime of the lithium ion secondary battery 20 using Formula 1 and Formula 2.
- Remaining capacity capacity 1 ⁇ ⁇ (accumulated cycle number or accumulated capacity) n1
- Remaining capacity capacity 2- ⁇ ⁇ (accumulated cycle number or accumulated capacity) n2
- ⁇ and ⁇ are constants different from each other
- the capacity 1 is the initial capacity of the lithium ion secondary battery 20 or the remaining capacity calculated by Expression 2
- the capacity 2 is the initial capacity or the remaining capacity calculated by Expression 1.
- the remaining capacity calculated by the lifetime estimation device 10 is a capacity that can charge and discharge the lithium ion secondary battery 20. That is, the life of the lithium ion secondary battery 20 means a period from the start of use of the battery until the remaining capacity becomes zero.
- the remaining capacity can be arbitrarily set according to the use of the lithium ion secondary battery 20, and is set to 50% of the initial capacity, for example.
- the remaining capacity and the initial capacity of the lithium ion secondary battery 20 mean a discharge capacity obtained from an open-circuit voltage curve when discharged from a fully charged state to a fully discharged state (discharge depth 100%).
- the life estimation device 10 is incorporated as a part of the system 30 together with the lithium ion secondary battery 20, for example, and is incorporated in the system 30.
- the system 30 includes a load 31, a lithium ion secondary battery 20 that supplies power to the load 31, and a life estimation device 10 that estimates the life of the lithium ion secondary battery 20.
- a life estimation device 10 that estimates the life of the lithium ion secondary battery 20.
- at least one of the life estimation device 10 and the lithium ion secondary battery 20 may not be built in the system 30.
- Examples of the system 30 include notebook computers, tablets, smartphones, mobile phones, mobile routers, automobiles, and various power supply devices.
- examples of the load 31 include a monitor, a CPU, and a memory.
- the system 30 on which the life estimation apparatus 10 is mounted is not particularly limited. In the system 30, for example, when the remaining capacity of the lithium ion secondary battery 20 becomes 0, power supply from the lithium ion secondary battery 20 to the load 31 is prohibited. Further, the remaining capacity of the lithium ion secondary battery 20 or the fact that the remaining capacity becomes 0 (the battery has reached the end of its life) may be displayed on a monitor or the like.
- the system 30 includes a voltmeter 21 that measures the voltage of the lithium ion secondary battery 20, an ammeter 22 that measures a current output from the battery and a current input to the battery, and a charge / discharge circuit 23.
- the charge / discharge circuit 23 includes a switching element (not shown), and is a circuit that controls power supplied from the lithium ion secondary battery 20 to the load 31.
- the charging / discharging circuit 23 controls charging of the lithium ion secondary battery 20 by an external power source.
- the system 30 includes a connector 24 to which a cable connected to an external power source is attached.
- the lithium ion secondary battery 20 includes an electrode body including a positive electrode, a negative electrode, and a separator, a non-aqueous electrolyte, and a battery case that houses the electrode body and the non-aqueous electrolyte.
- the electrode body has, for example, a winding structure in which a positive electrode and a negative electrode are wound via a separator, or a stacked structure in which a plurality of positive electrodes and a plurality of negative electrodes are alternately stacked via a separator.
- the lithium ion secondary battery 20 may be in any form such as a cylindrical battery, a square battery, a coin battery, or a laminate battery.
- the number of lithium ion secondary batteries 20 is not particularly limited, and may be one or plural.
- the plurality of batteries may be connected in series or in parallel to form a module.
- the lifetime estimation device 10 estimates the remaining lifetime in units of modules or parallel blocks, for example.
- the positive electrode includes a positive electrode current collector and a positive electrode active material layer formed on the current collector.
- a lithium transition metal oxide having a layered structure is used as the positive electrode active material.
- the lithium transition metal oxide is a composite oxide containing a metal element such as Co, Mn, Ni, and Al.
- the lithium-containing transition metal oxide is not particularly limited, but has the general formula Li 1 + x MO 2 (wherein ⁇ 0.2 ⁇ x ⁇ 0.2, M includes at least one of Ni, Co, Mn, and Al) It is preferable that it is complex oxide represented by these.
- the negative electrode has a negative electrode current collector and a negative electrode active material layer formed on the current collector.
- the negative electrode active material is not particularly limited as long as it can reversibly occlude and release lithium ions.
- carbon materials such as natural graphite and artificial graphite, metals such as Si and Sn, alloys with lithium, or the like
- An alloy, a complex oxide, or the like can be used.
- the lifetime estimation apparatus 10 includes a storage unit 11 in which Equations 1 and 2 are stored as described above.
- the storage unit 11 in addition to Equations 1 and 2 (including ⁇ and ⁇ ), data necessary for battery life estimation processing, such as the initial capacity of the lithium ion secondary battery 20, for executing the processing Programs are stored.
- the storage unit 11 sequentially stores data acquired by each acquisition unit described later.
- the life estimation apparatus 10 is configured by a microcomputer including a CPU, a memory, and an input / output port, for example.
- the lifetime estimation apparatus 10 further includes a first acquisition unit 12, a second acquisition unit 13, a first calculation unit 14, and a second calculation unit 15.
- the first acquisition unit 12 and the second acquisition unit 13 acquire data necessary for life estimation processing from the voltmeter 21, the ammeter 22, the charge / discharge circuit 23, and the like.
- the first calculation unit 14 calculates parameters necessary for the calculation of the remaining capacity of the lithium ion secondary battery 20 by the second calculation unit 15 based on the data acquired by each acquisition unit.
- the second calculation unit 15 receives the expression 1 or the expression from the storage unit 11 based on the data acquired by each acquisition unit, the data stored in advance in the storage unit 11, the parameters calculated by the first calculation unit 14, and the like. Equation 2 is read to calculate the remaining capacity.
- the first acquisition unit 12 acquires the accumulated cycle number or accumulated capacity from the start of use of the lithium ion secondary battery 20.
- the total number of cycles from the start of use is obtained, for example, by counting the number of times of switching (switching) between charge and discharge by the charge / discharge circuit 23 or by counting the number of times the direction of the current measured by the ammeter 22 has changed. Is done.
- the 1st acquisition part 12 counts the frequency
- the integrated capacity from the start of use is acquired by, for example, integrating the discharge capacity obtained by multiplying the discharge time and discharge current at each discharge.
- the 1st acquisition part 12 calculates the discharge capacity at the time of each discharge, makes it memorize
- the accumulated capacity / initial capacity is a value corresponding to the accumulated number of cycles at a discharge depth of 100% for discharging from the fully charged state to the fully discharged state. Since the life (remaining capacity) of the lithium ion secondary battery 20 is calculated using an open circuit voltage at a discharge depth of 100% as will be described later, the cycle with a discharge depth of 100% is also used for the number of integrated cycles used for the calculation. It is preferable to obtain the number by integrating the numbers. By using the value of accumulated capacity / initial capacity as the accumulated cycle number, it is possible to accurately estimate the battery life even when charging / discharging with a depth of discharge of less than 100% is performed.
- the second acquisition unit 13 acquires an open circuit voltage (hereinafter referred to as “OCV”) at a predetermined discharge depth of the lithium ion secondary battery 20.
- OCV open circuit voltage
- the OCV of the lithium ion secondary battery 20 is measured by the voltmeter 21 in a state where the connection with the load 31 and the external power source is cut off, for example.
- the second acquisition unit 13 acquires the measurement value of the voltmeter 21 and stores it in the storage unit 11.
- Each acquisition unit stores the accumulated cycle number and the OCV in the storage unit 11 in association with each other.
- OCV is measured, for example, under conditions of a discharge depth of 100%.
- OCV is measured when 10 minutes or more have elapsed after discharge (discharge pause time 10 minutes). More preferably, the OCV is measured when 20 minutes or more have elapsed after the discharge, and particularly preferably 30 minutes or more have elapsed after the discharge.
- the second acquisition unit 13 acquires the OCV at the timing when charge / discharge at a discharge depth of 100% is performed, for example.
- an OCV may be obtained for each cycle to perform battery life estimation processing.
- OCV is acquired at a rate of once per several times of charging / discharging.
- the life estimation apparatus 10 may periodically display a display prompting the use of a discharge depth of 100% on the monitor to acquire the OCV every predetermined period.
- the first calculation unit 14 calculates the amount of change in the OCV during a predetermined period.
- the change amount of the OCV becomes a trigger for switching between two types of estimation expressions.
- the predetermined period can be arbitrarily set. For example, at the timing when the OCV is acquired, the OCV acquired last time is read from the storage unit 11 to calculate the OCV change amount. In this case, the interval at which the OCV is acquired is a predetermined period.
- the first calculation unit 14 subtracts the OCV at the current time T2 (hereinafter referred to as “OCV (T2)”) from the OCV at the time T1 when the previous OCV was acquired (hereinafter referred to as “OCV (T1)”). Then, the amount of change in OCV (OCV (T2) ⁇ OCV (T1)) is calculated. The change amount of the OCV is calculated as a positive value or a negative value and stored in the storage unit 11.
- the second calculation unit 15 charges and discharges the lithium ion secondary battery 20 based on Formula 1 where the index n1 is 0.9 to 1.1 and Formula 2 where the index n2 is 0.4 to 0.6.
- the remaining capacity which is a possible capacity, is calculated.
- the second calculation unit 15 selects one of two types of estimation formulas based on the OCV change amount calculated by the first calculation unit 14, and calculates the remaining capacity using the selected formula.
- Formula 1 is a formula based on a straight line rule.
- Remaining capacity capacity 1 ⁇ ⁇ (accumulated cycle number or accumulated capacity) n1
- ⁇ is a constant
- the capacity 1 is the initial capacity of the lithium ion secondary battery 20 or the remaining capacity calculated by Equation 2.
- the index n1 is 0.9 to 1.1 as described above, for example 1.0.
- ⁇ and n1 are obtained by a charge / discharge test using the actual lithium ion secondary battery 20 (charge / discharge test at a discharge depth of 100%), and are stored in the storage unit 11 in advance.
- ⁇ and n1 vary depending on the type of battery (positive electrode, negative electrode, nonaqueous electrolyte, etc.), assumed use environment, and the like.
- Equation 2 is an equation based on the root rule.
- Remaining capacity capacity 2- ⁇ ⁇ (accumulated cycle number or accumulated capacity) n2
- ⁇ is a constant
- capacity 2 is the initial capacity of the lithium ion secondary battery 20 or the remaining capacity calculated by Equation 1.
- the index n2 is 0.4 to 0.6 as described above, for example 0.5.
- “ ⁇ ⁇ (the number of accumulated cycles or accumulated capacity) n2 ” which is the second term of Equation 2 is to obtain the deteriorated capacity, and the remaining capacity is obtained by subtracting this from the capacity 2.
- ⁇ and n2 are obtained by a charge / discharge test using the actual lithium ion secondary battery 20 and are stored in the storage unit 11 in advance. ⁇ and n2 vary depending on the type of battery, assumed usage environment, and the like.
- the second calculation unit 15 uses the change amount of the OCV as a trigger for selecting Expression 1 and Expression 2. Specifically, when the amount of change in OCV is positive, the remaining capacity is calculated using Equation 1, and when the amount of change in OCV is negative, the remaining capacity is calculated using Equation 2. That is, the second calculation unit 15 reads an appropriate formula from the storage unit 11 based on the amount of change in OCV, and calculates the remaining capacity by using two types of formulas separately.
- FIG. 2 is a diagram showing the relationship between the OCV of the lithium ion secondary battery 20 and the number of cycles.
- the lithium ion secondary battery 20 of the present embodiment has a characteristic that the amount of change in OCV changes from negative to positive and then changes from positive to negative.
- the second calculation unit 15 uses Expression 2-1 and Expression 2-2 as Expression 2, and uses Expression 2-1 and Expression 1 The remaining capacity is calculated by switching in the order of Equation 2-2.
- Formula 2-1 and Formula 2-2 are as follows.
- Remaining capacity Initial capacity ⁇ 1 ⁇ (Number of accumulated cycles or accumulated capacity) n2
- Remaining capacity capacity 2- ⁇ 2 ⁇ (accumulated cycle number or accumulated capacity) n2
- ⁇ 1 and ⁇ 2 are constants different from each other, and the capacity 2 is the remaining capacity calculated by Equation 1.
- the index n2 is 0.4 to 0.6, preferably 0.5.
- ⁇ 1, ⁇ 2, and n2 are obtained by a charge / discharge test using the actual lithium ion secondary battery 20, and are stored in the storage unit 11 in advance.
- ⁇ is, for example, 0.005 to 1
- ⁇ is, for example, -10 to 30
- ⁇ 1 is, for example, -10 to 30
- ⁇ 2 is, for example, 0 to 30.
- the change amount of OCV is negative from the start of use of the lithium ion secondary battery 20 to the cycle number Na (period P1), and positive from the cycle number Na to Nb (period P2). Yes, and becomes negative when the number of cycles Nb is exceeded (period P3). Therefore, Expression 2-1 is used in the period P1, Expression 1 is used in the period P2, and Expression 2-2 is used in the period P3. In this case, the remaining capacity calculated by Expression 2-1 is used for “capacity 1” which is the first term of Expression 1.
- FIG. 3 is a flowchart showing an example of the procedure of the life estimation process of the lithium ion secondary battery 20 by the life estimation apparatus 10.
- FIG. 3 shows the procedure of the life estimation process at the current time T2.
- the lithium ion secondary battery 20 shows the OCV transition shown in FIG.
- the number of integrated cycles (T2) of the lithium ion secondary battery 20 at the current time T2 is acquired (S10).
- This procedure is executed by the function of the first acquisition unit 12.
- the first acquisition unit 12 reads the accumulated capacity (T2) and the initial capacity from the storage unit 11, and calculates the accumulated capacity (T2) / initial capacity.
- the integrated capacity (T2) can be used as it is.
- the OCV (T2) of the lithium ion secondary battery 20 is acquired (S11). This procedure is executed by the function of the second acquisition unit 13.
- OCV (T2) as described above, it is preferable to use a value measured when 10 minutes or more have elapsed after discharge at a discharge depth of 100%.
- the second acquisition unit 13 acquires a measurement value (OCV (T2)) from the voltmeter 21 and stores it in the storage unit 11.
- OCV (T2) is a value acquired at T1 last time.
- the first calculation unit 14 reads OCV (T2) and OCV (T1) from the storage unit 11, calculates the change amount of OCV (OCV (T2) ⁇ OCV (T1)), and stores it in the storage unit 11.
- the OCV change amount used in the estimation process is a change amount in a period from the time T1 when the previous OCV is acquired to the current time T2 (the time when the OCV is next acquired).
- Formula 2-1 and Formula 2-2 are used as Formula 2, for example, when the OCV change amount is negative at the beginning of the cycle, the remaining capacity is calculated using Formula 2-1. On the other hand, if the OCV change amount becomes positive and then becomes negative again, the remaining capacity is calculated using Equation 2-2.
- the lifetime estimation apparatus 10 by adopting a new method of switching the estimation formula based on the transition of the OCV, it is possible to perform lifetime estimation with high accuracy with almost no deviation from the actual measurement value.
- Equation 2-1 and Equation 2-2 are used to calculate the remaining capacity.
- the configuration of the estimation measure is the same as that of the life estimation apparatus 10 illustrated in FIG. Below, the description which overlaps with the above-mentioned embodiment is abbreviate
- the second acquisition unit 13 acquires ⁇ V
- the first calculation unit 14 calculates the amount of change in ⁇ V
- the second calculation unit 15 calculates Formula 1 or Formula based on the amount of change in ⁇ V. 2 is selected.
- the 2nd acquisition part 13 acquires dv / dt
- the 1st calculation part 14 calculates the variation
- the 2nd calculation part 15 is dv / dt.
- Formula 1 or Formula 2 is selected based on the amount of change in dt.
- the first acquisition unit 12 acquires the accumulated cycle number or accumulated capacity from the start of use of the lithium ion secondary battery 20.
- ⁇ , ⁇ , n1, and n2 in Equations 1 and 2 are different depending on when OCV, ⁇ V, and dv / dt are used.
- FIG. 4 is a diagram showing a discharge curve of the lithium ion secondary battery 20.
- FIG. 4 shows a discharge curve when discharged to the final discharge voltage Vd (the discharge conditions are the same during the battery use periods T1 and T2).
- the discharge curve of the lithium ion secondary battery 20 differs particularly in the shape at the discharge end depending on the usage period (number of cycles) of the battery.
- the discharge time until the discharge end voltage Vd is reached is shorter in the use period T2 than in the use period T1.
- FIG. 5 is a diagram showing the relationship between the OCV of the lithium ion secondary battery 20 and the rest time after discharge.
- the OCV increases with the downtime, and for example, the OCV is substantially constant when 10 minutes or more have elapsed. It becomes.
- the difference between the OCV immediately after the completion of the discharge and the OCV at the time when, for example, 10 minutes have elapsed after the discharge is ⁇ V illustrated in FIGS. 4 and 5.
- the rate of increase of the OCV during a predetermined pause time is dv / dt illustrated in FIG.
- ⁇ V and dv / dt it is preferable to use values measured when the depth of discharge of the lithium ion secondary battery 20 is 90% to 100%. ⁇ V and dv / dt are measured, for example, for 10 seconds after the discharge is stopped at a discharge depth of 90% to 100%. By using the value measured when the depth of discharge is 90% or more, the difference in change amounts of ⁇ V and dv / dt calculated by the first calculation unit 14 is increased, and the accuracy of life estimation is improved. Changes in ⁇ V and dv / dt accompanying the increase in the number of cycles are the same as in the OCV case, for example, as shown in FIG. For this reason, even when ⁇ V and dv / dt are used instead of OCV, the battery life can be estimated by the same method as when OCV is used.
- FIG. 6 is a flowchart showing an example of the procedure of life estimation processing using ⁇ V.
- FIG. 6 shows the procedure of the life estimation process at the current time T2.
- the lithium ion secondary battery 20 has the same ⁇ V transition as the OCV transition shown in FIG. 2.
- the point (S10) of acquiring the accumulated cycle number (T2) of the lithium ion secondary battery 20 at the current time T2 is the same as in the estimation process using OCV.
- ⁇ V (T2) of the lithium ion secondary battery 20 is acquired (S21). This procedure is executed by the function of the second acquisition unit 13.
- ⁇ V (T2) is measured, for example, for 10 seconds after the discharge is stopped at a discharge depth of 90%.
- a ⁇ V change amount is calculated from ⁇ V (T2) and ⁇ V (T1) (S22). This procedure is executed by the function of the first calculation unit 14.
- ⁇ V (T1) is a value acquired at T1 last time.
- the present invention can be used for an apparatus for estimating the lifetime of a lithium ion secondary battery.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Materials Engineering (AREA)
- Power Engineering (AREA)
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Tests Of Electric Status Of Batteries (AREA)
Abstract
寿命推定装置は、指数n1が0.9~1.1である式1、及び指数n2が0.4~0.6である式2に基づいて、リチウムイオン二次電池の充放電可能な容量である残存容量を算出する第2算出部を備える。第2算出部は、開放電圧の変化量、又は電圧上昇幅の変化量、又は電圧上昇率の変化量が正のときは式1を用いて残存容量を算出し、開放電圧の変化量、又は電圧上昇幅の変化量、又は電圧上昇率の変化量が負のときは式2を用いて残存容量を算出する。 式1:残存容量=容量1-α×(積算サイクル数又は積算容量)n1 式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
Description
本開示は、リチウムイオン二次電池の寿命推定装置に関する。
従来、リチウムイオン二次電池の使用可能な残存寿命を推定する方法がいくつか提案されている。例えば、非特許文献1では、電池の累積使用期間に比例して電池容量が直線的に低下していく所謂直線則(直線劣化)を用いて、電池の容量劣化を推定する方法が開示されている。また、非特許文献2では、電池の使用期間の経過と共に電池容量が緩やかに低下していく所謂ルート則(ルート劣化)を用いて、電池の容量劣化を推定する方法が開示されている。なお、直線劣化は正極の劣化に起因し、ルート劣化は負極の劣化に起因すると考えられている。
電池の残存寿命をより正確に推定すべく、特許文献1では、直線則とルート則の両方を組み合わせた1つの式を用いる寿命推定装置が開示されている。特許文献1には、電池の累積使用期間に正の第1定数を乗じた値を変数とする指数関数を用いた第1項と、累積使用期間についての平方根関数を用いた第2項とを含む関数で示される関係式を用いて電池の残存寿命を推定することが記載されている。
J.Belt et al.,Journal of Power Sources 196(2011),10213-10221
H.Yoshida et al.,Electrochemistry 71(2003),1018-1024
特許文献1の方法によれば、直線側又はルート側のいずれかを単純に用いる場合と比較して推定精度の向上が期待される。しかし、特許文献1の方法によっても、推定値と実測値の乖離は未だ大きく、さらなる推定精度の向上が求められている。
本開示の一態様であるリチウムイオン二次電池の寿命推定装置は、リチウムイオン二次電池の使用開始時からの積算サイクル数、又は積算容量を取得する第1取得部と、リチウムイオン二次電池の所定の放電深度における、開放電圧、又は放電休止後の電圧上昇幅、又は放電休止後の所定時間当りの電圧上昇率を取得する第2取得部と、所定期間における、開放電圧の変化量、又は電圧上昇幅の変化量、又は電圧上昇率の変化量を算出する第1算出部と、指数n1が0.9~1.1である式1、及び指数n2が0.4~0.6である式2に基づいて、リチウムイオン二次電池の充放電可能な容量である残存容量を算出する第2算出部とを備える。第2算出部は、開放電圧の変化量、又は電圧上昇幅の変化量、又は電圧上昇率の変化量が正のときは式1を用いて残存容量を算出し、開放電圧の変化量、又は電圧上昇幅の変化量、又は電圧上昇率の変化量が負のときは式2を用いて残存容量を算出することを特徴とする。式1及び式2は、下記の通りである。
式1:残存容量=容量1-α×(積算サイクル数又は積算容量)n1
式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
ここで、α、βは互いに異なる定数であり、容量1はリチウムイオン二次電池の初期容量又は式2により算出された残存容量であり、容量2は初期容量又は式1により算出された残存容量である。
式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
ここで、α、βは互いに異なる定数であり、容量1はリチウムイオン二次電池の初期容量又は式2により算出された残存容量であり、容量2は初期容量又は式1により算出された残存容量である。
本開示に係るリチウムイオン二次電池の寿命推定装置によれば、従来の方法と比較して、より正確な寿命推定が可能である。
本発明者らは、リチウムイオン二次電池の寿命推定精度を向上させるべく鋭意検討を行った。そして、電池の開放電圧の推移に基づいて推定式(上記の式1、式2)を切り替えるという新たな手法を見出したのである。特に、層状構造のリチウム遷移金属酸化物を正極活物質とするリチウムイオン二次電池では、単一数式での容量推移計算が難しく、従来の方法では正確に残存寿命を推定することができなかった。本開示の寿命推定装置によれば、層状構造のリチウム遷移金属酸化物を用いた電池についても、実測値との乖離が殆どなく、より高精度な寿命推定が可能である。また、推定式を切り替えるトリガーとして、開放電圧の推移の代わりに、放電休止後の電圧上昇幅の推移、又は放電休止後の所定時間当りの電圧上昇率の推移を使用することもできる。
以下、図面を参照しながら、本開示に係るリチウムイオン二次電池の寿命推定装置の実施形態の一例について詳細に説明する。
図1は、実施形態の一例であるリチウムイオン二次電池の寿命推定装置10(以下、「寿命推定装置10」とする)、及び寿命推定装置10が搭載されるシステム30の構成を示すブロック図である。図1に例示するように、寿命推定装置10は、指数n1が0.9~1.1である下記式1、及び指数n2が0.4~0.6である下記式2が記憶された記憶部11を備え、式1及び式2を用いてリチウムイオン二次電池20の寿命を推定する装置である。
式1:残存容量=容量1-α×(積算サイクル数又は積算容量)n1
式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
ここで、α、βは互いに異なる定数であり、容量1はリチウムイオン二次電池20の初期容量又は式2により算出された残存容量であり、容量2は初期容量又は式1により算出された残存容量である。
式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
ここで、α、βは互いに異なる定数であり、容量1はリチウムイオン二次電池20の初期容量又は式2により算出された残存容量であり、容量2は初期容量又は式1により算出された残存容量である。
寿命推定装置10により算出される残存容量とは、リチウムイオン二次電池20の充放電可能な容量である。即ち、リチウムイオン二次電池20の寿命とは、電池の使用開始から残存容量が0になるまでの期間を意味する。残存容量は、リチウムイオン二次電池20の用途等に応じて任意に設定可能であり、例えば初期容量の50%に設定される。なお、リチウムイオン二次電池20の残存容量及び初期容量とは、満充電状態から完全放電状態(放電深度100%)まで放電したときの開放電圧曲線から求められる放電容量を意味する。
寿命推定装置10は、例えばリチウムイオン二次電池20と共にシステム30の一部として組み込まれ、システム30に内蔵されている。システム30は、負荷31と、負荷31に電力を供給するリチウムイオン二次電池20と、リチウムイオン二次電池20の寿命を推定する寿命推定装置10とで構成される。但し、寿命推定装置10及びリチウムイオン二次電池20の少なくとも一方が、システム30に内蔵されていなくてもよい。
システム30としては、ノートパソコン、タブレット、スマートフォン、携帯電話、モバイルルーター、自動車、各種電源装置などが例示できる。システム30がノートパソコンである場合、負荷31としては、モニター、CPU、メモリなどが挙げられる。なお、寿命推定装置10が搭載されるシステム30は特に限定されない。システム30では、リチウムイオン二次電池20の残存容量が0になった場合に、例えばリチウムイオン二次電池20から負荷31への電力供給を禁止する。また、リチウムイオン二次電池20の残存容量、又は残存容量が0になったこと(電池が寿命に達したこと)をモニター等に表示してもよい。
システム30は、リチウムイオン二次電池20の電圧を測定する電圧計21、電池から出力される電流及び電池に入力される電流を測定する電流計22、及び充放電回路23を内蔵している。充放電回路23は、図示しないスイッチング素子を含み、リチウムイオン二次電池20から負荷31に供給する電力を制御する回路である。また、充放電回路23は、外部電源によるリチウムイオン二次電池20の充電を制御する。システム30は、外部電源に繋がるケーブルが取り付けられるコネクタ24を備える。
リチウムイオン二次電池20は、正極、負極、セパレータを含む電極体と、非水電解質と、電極体及び非水電解質を収容する電池ケースとを備える。電極体は、例えば正極と負極がセパレータを介して巻回された巻回構造、又は複数の正極と複数の負極がセパレータを介して交互に積層された積層構造を有する。リチウムイオン二次電池20は、円筒形電池、角形電池、コイン形電池、ラミネート電池など、いずれの形態であってもよい。
リチウムイオン二次電池20の数は、特に限定されず、1つであってもよく、複数であってもよい。複数の電池は、互いに直列又は並列に接続されてモジュールを構成していてもよい。システム30に複数のリチウムイオン二次電池20が搭載される場合、寿命推定装置10は、例えば各モジュール単位、又は並列ブロック単位で残存寿命を推定する。
正極は、正極集電体と、当該集電体上に形成された正極活物質層とを有する。正極活物質には、例えば層状構造のリチウム遷移金属酸化物が用いられる。リチウム遷移金属酸化物は、Co、Mn、Ni、Al等の金属元素を含有する複合酸化物である。リチウム含有遷移金属酸化物は、特に限定されないが、一般式Li1+xMO2(式中、-0.2<x≦0.2、MはNi、Co、Mn、Alの少なくとも1種を含む)で表される複合酸化物であることが好ましい。
負極は、負極集電体と、当該集電体上に形成された負極活物質層とを有する。負極活物質は、リチウムイオンを可逆的に吸蔵、放出できるものであれば特に限定されず、例えば天然黒鉛、人造黒鉛等の炭素材料、Si、Sn等のリチウムと合金化する金属、又はこれらを含む合金、複合酸化物などを用いることができる。
寿命推定装置10は、上述の通り、式1及び式2が記憶された記憶部11を備える。記憶部11には、式1、式2(α、βを含む)の他に、リチウムイオン二次電池20の初期容量等の電池寿命の推定処理に必要なデータ、当該処理を実行するためのプログラムなどが記憶されている。また、記憶部11には後述の各取得部によって取得されるデータなどが逐次記憶される。寿命推定装置10は、例えばCPU、メモリ、及び入出力ポートを含むマイコンによって構成される。
寿命推定装置10は、さらに、第1取得部12、第2取得部13、第1算出部14、及び第2算出部15を備える。第1取得部12及び第2取得部13は、電圧計21、電流計22、充放電回路23等から寿命推定処理に必要なデータを取得する。第1算出部14は、各取得部によって取得されたデータに基づいて、第2算出部15によるリチウムイオン二次電池20の残存容量の算出に必要なパラメータを算出する。そして、第2算出部15は、各取得部によって取得されたデータ、記憶部11に予め記憶されたデータ、及び第1算出部14によって算出されたパラメータ等に基づき、記憶部11から式1又は式2を読み出して残存容量を算出する。
第1取得部12は、リチウムイオン二次電池20の使用開始時からの積算サイクル数、又は積算容量を取得する。使用開始時からの積算サイクル数は、例えば充放電回路23による充放電の切り替え(スイッチング)の回数をカウントする、或いは電流計22により計測される電流の向きが変化した回数をカウントすることにより取得される。第1取得部12は、充放電回路23のスイッチング回数等をカウントして記憶部11に記憶させ、逐次データを更新して積算サイクル数を取得する。使用開始時からの積算容量は、例えば各放電時における放電時間と放電電流を乗算して求められる放電容量を積算することにより取得される。第1取得部12は、各放電時の放電容量を算出して記憶部11に記憶させ、逐次データを更新して積算容量を取得する。
積算サイクル数には、上記積算容量をリチウムイオン二次電池20の初期容量で除した値(積算容量/初期容量)を使用することが好適である。積算容量/初期容量は、満充電状態から完全放電状態まで放電する放電深度100%の積算サイクル数に相当する値である。リチウムイオン二次電池20の寿命(残存容量)は、後述するように放電深度100%における開放電圧を用いて算出されるため、当該算出に使用される積算サイクル数についても放電深度100%のサイクル数を積算して求めることが好ましい。積算サイクル数として、積算容量/初期容量の値を用いることにより、放電深度が100%未満の充放電が行われる場合でも正確な電池寿命の推定が可能である。
第2取得部13は、リチウムイオン二次電池20の所定の放電深度における開放電圧(以下、「OCV」という)を取得する。リチウムイオン二次電池20のOCVは、例えば負荷31及び外部電源との接続が遮断された状態で電圧計21によって計測される。第2取得部13は、電圧計21の計測値を取得し、記憶部11に記憶させる。各取得部は、積算サイクル数とOCVを関連付けて記憶部11に記憶させる。
OCVは、例えば放電深度100%の条件で測定される。好ましくは、放電深度100%において、放電後10分以上経過した時点(放電休止時間10分)で、OCVが測定される。より好ましくは放電後20分以上、特に好ましくは放電後30分以上経過した時点で、OCVが測定される。
第2取得部13は、例えば放電深度100%の充放電が行われたタイミングでOCVを取得する。放電深度100%の充放電が毎回行われる用途では、サイクル毎でOCVを取得して電池寿命の推定処理を行ってもよい。一般的には、放電深度100%の充放電は毎回行われないため、例えば数回の充放電につき1回の割合でOCVが取得される。システム30がノートパソコンである場合、寿命推定装置10は定期的に放電深度100%の使用を促す表示をモニターに出力させて、所定期間毎にOCVを取得してもよい。
第1算出部14は、所定期間におけるOCVの変化量を算出する。当該OCVの変化量が、2種類の推定式を切り替えるトリガーとなる。所定期間は、任意に設定できる。例えば、OCVが取得されたタイミングで、前回取得されたOCVを記憶部11から読み出してOCV変化量を算出する。この場合、OCVが取得される間隔が所定期間となる。
第1算出部14は、例えば現時点T2のOCV(以下、「OCV(T2)」とする)を、前回OCVが取得された時点T1のOCV(以下、「OCV(T1)」とする)から差し引いて、OCVの変化量(OCV(T2)-OCV(T1))を算出する。OCVの変化量は、正の値又は負の値として算出され、記憶部11に記憶される。
第2算出部15は、指数n1が0.9~1.1である式1、及び指数n2が0.4~0.6である式2に基づいて、リチウムイオン二次電池20の充放電可能な容量である残存容量を算出する。第2算出部15は、第1算出部14により算出されたOCVの変化量に基づいて、2種類の推定式のいずれかを選択し、選択した式を用いて残存容量を算出する。
式1は、直線則に基づく式である。
式1:残存容量=容量1-α×(積算サイクル数又は積算容量)n1
ここで、αは定数であり、容量1はリチウムイオン二次電池20の初期容量又は式2により算出された残存容量である。指数n1は、上述の通り0.9~1.1であり、例えば1.0である。式1の第2項である「α×(積算サイクル数又は積算容量)n1」は、劣化容量を求めるものであり、これを容量1から差し引くことで残存容量が得られる。α及びn1は、実際のリチウムイオン二次電池20を用いた充放電試験(放電深度100%の充放電試験)により求められ、記憶部11に予め記憶されている。α及びn1は、電池の種類(正極、負極、非水電解質等)、想定される使用環境等によって変化する。
ここで、αは定数であり、容量1はリチウムイオン二次電池20の初期容量又は式2により算出された残存容量である。指数n1は、上述の通り0.9~1.1であり、例えば1.0である。式1の第2項である「α×(積算サイクル数又は積算容量)n1」は、劣化容量を求めるものであり、これを容量1から差し引くことで残存容量が得られる。α及びn1は、実際のリチウムイオン二次電池20を用いた充放電試験(放電深度100%の充放電試験)により求められ、記憶部11に予め記憶されている。α及びn1は、電池の種類(正極、負極、非水電解質等)、想定される使用環境等によって変化する。
式2は、ルート則に基づく式である。
式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
ここで、βは定数であり、容量2はリチウムイオン二次電池20の初期容量又は式1により算出された残存容量である。指数n2は、上述の通り0.4~0.6であり、例えば0.5である。式2の第2項である「β×(積算サイクル数又は積算容量)n2」は、劣化容量を求めるものであり、これを容量2から差し引くことで残存容量が得られる。β及びn2は、実際のリチウムイオン二次電池20を用いた充放電試験により求められ、記憶部11に予め記憶されている。β及びn2は、電池の種類、想定される使用環境等によって変化する。
ここで、βは定数であり、容量2はリチウムイオン二次電池20の初期容量又は式1により算出された残存容量である。指数n2は、上述の通り0.4~0.6であり、例えば0.5である。式2の第2項である「β×(積算サイクル数又は積算容量)n2」は、劣化容量を求めるものであり、これを容量2から差し引くことで残存容量が得られる。β及びn2は、実際のリチウムイオン二次電池20を用いた充放電試験により求められ、記憶部11に予め記憶されている。β及びn2は、電池の種類、想定される使用環境等によって変化する。
第2算出部15は、上述の通り、式1と式2を選択するためのトリガーとしてOCVの変化量を用いる。具体的には、OCVの変化量が正のときは式1を用いて残存容量を算出し、OCVの変化量が負のときは式2を用いて残存容量を算出する。つまり、第2算出部15は、OCVの変化量に基づいて記憶部11から適切な式を読み出し、2種類の式を使い分けて残存容量を算出する。
図2は、リチウムイオン二次電池20のOCVとサイクル数の関係を示す図である。図2に示す例では、サイクル数の増加に伴って、電池の使用開始初期ではOCVが次第に低下し、続いてOCVが次第に上昇し、その後OCVが再び低下している。本実施形態のリチウムイオン二次電池20は、OCVの変化量が、負から正に変化した後、正から負に変化する特性を有する。なお、OCVの推移は電池の種類によって異なり、使用開始初期からOCVが次第に上昇し、その後OCVが低下する場合もある。
図2に例示するようなOCVの推移を示すリチウムイオン二次電池20の場合、第2算出部15は、式2として式2-1及び式2-2を用い、式2-1、式1、式2-2の順に切り替えて残存容量を算出する。
式2-1及び式2-2は、下記の通りである。
式2-1:残存容量=初期容量-β1×(積算サイクル数又は積算容量)n2
式2-2:残存容量=容量2-β2×(積算サイクル数又は積算容量)n2
ここで、β1、β2は互いに異なる定数、容量2は式1により算出された残存容量である。指数n2は、0.4~0.6であり、好ましくは0.5である。β1、β2、及びn2は、実際のリチウムイオン二次電池20を用いた充放電試験により求められ、記憶部11に予め記憶されている。ここで、αは、例えば0.005~1、βは、例えば-10~30、β1は、例えば-10~30、β2は、例えば0~30を、利用することができる。
式2-2:残存容量=容量2-β2×(積算サイクル数又は積算容量)n2
ここで、β1、β2は互いに異なる定数、容量2は式1により算出された残存容量である。指数n2は、0.4~0.6であり、好ましくは0.5である。β1、β2、及びn2は、実際のリチウムイオン二次電池20を用いた充放電試験により求められ、記憶部11に予め記憶されている。ここで、αは、例えば0.005~1、βは、例えば-10~30、β1は、例えば-10~30、β2は、例えば0~30を、利用することができる。
図2に示す例では、OCVの変化量が、リチウムイオン二次電池20の使用開始時からサイクル数Naまで(期間P1)は負であり、サイクル数NaからNbまで(期間P2)は正であり、サイクル数Nbを超える(期間P3)と負になる。このため、期間P1で式2-1が、期間P2で式1が、期間P3で式2-2がそれぞれ使用される。この場合、式1の第1項である「容量1」には式2-1で算出された残存容量が使用される。
図3は、寿命推定装置10によるリチウムイオン二次電池20の寿命推定処理の手順の一例を示すフローチャートである。図3では、現時点T2における寿命推定処理の手順を示している。リチウムイオン二次電池20は、図2に示すOCV推移を示すものとする。
図3に例示するように、まず初めに、現時点T2におけるリチウムイオン二次電池20の積算サイクル数(T2)を取得する(S10)。この手順は、第1取得部12の機能により実行される。積算サイクル数(T2)には、上述のように、積算容量(T2)を初期容量で除した値を用いることが好適である。第1取得部12は、例えば記憶部11から積算容量(T2)及び初期容量を読み出し、積算容量(T2)/初期容量を算出する。なお、本推定処理において積算容量(T2)をそのまま用いることも可能である。
次に、リチウムイオン二次電池20のOCV(T2)を取得する(S11)。この手順は、第2取得部13の機能により実行される。OCV(T2)には、上述のように、放電深度100%において、放電後10分以上経過した時点で測定される値を用いることが好適である。第2取得部13は、例えば電圧計21から計測値(OCV(T2))を取得し、記憶部11に記憶させる。
次に、OCV(T2)とOCV(T1)からOCV変化量を算出する(S12)。この手順は、第1算出部14の機能により実行される。OCV(T1)は、前回T1に取得された値である。第1算出部14は、例えば記憶部11からOCV(T2)とOCV(T1)を読み出し、OCVの変化量(OCV(T2)-OCV(T1))を算出し、記憶部11に記憶させる。本推定処理に使用されるOCV変化量は、前回OCVが取得された時点T1から現時点T2(次にOCVが取得された時点)までの期間における変化量である。
そして、S12で算出されたOCV変化量が正又は負のいずれであるかを判定する(S13)。この手順及び続くS14、S15の手順は、第2算出部15の機能により実行される。第2算出部15は、OCV変化量が正である場合、記憶部11から式1を読み出し、式1を用いて残存容量を算出する(S14)。一方、OCV変化量が負である場合は、記憶部11から式2を読み出し、式2を用いて残存容量を算出する(S15)。
本実施形態では、式2として式2-1と式2-2が使用されるため、例えばサイクル初期にOCV変化量が負である場合は、式2-1を用いて残存容量を算出する。他方、OCV変化量が正となり、その後再び負となった場合は、式2-2を用いて残存容量を算出する。
以上のように、上述の推定処理によれば、従来の方法と比較して、より正確な電池寿命の推定が可能である。寿命推定装置10によれば、OCVの推移に基づいて推定式を切り替えるという新たな手法を採用したことにより、実測値との乖離が殆どない高精度な寿命推定を行うことができる。
以下、図4~図6を参照しながら、実施形態の他の一例について説明する。
図4~図6を用いて説明する実施形態の他の一例では、推定式を切り替えるトリガーとして、OCV変化量の代わりに、放電休止後の電圧上昇幅(ΔV)の変化量を使用する。さらに、当該トリガーとして放電休止後の所定時間当りの電圧上昇率(dv/dt)の変化量を使用する。いずれの場合も、残存容量の算出には、上述の式1、式2(式2-1、式2-2)が使用される。また、推定措置の構成は図1に例示する寿命推定装置10と同じである。以下では、上述の実施形態と重複する説明は省略し、相違点について主に説明する。
ΔVを寿命推定に用いる場合、第2取得部13がΔVを取得し、第1算出部14がΔVの変化量を算出し、第2算出部15がΔVの変化量に基づいて式1又は式2を選択する。同様に、dv/dtを寿命推定に用いる場合、第2取得部13がdv/dtを取得し、第1算出部14がdv/dtの変化量を算出し、第2算出部15がdv/dtの変化量に基づいて式1又は式2を選択する。いずれの場合も、第1取得部12は、リチウムイオン二次電池20の使用開始時からの積算サイクル数、又は積算容量を取得する。なお、式1、式2のα、β、n1、及びn2は、OCV、ΔV、dv/dtを用いる場合でそれぞれ異なる。
図4は、リチウムイオン二次電池20の放電カーブを示す図である。図4では、放電終止電圧Vdまで放電したときの放電カーブを示している(電池の使用期間T1、T2で放電条件は同じ)。図4に例示するように、リチウムイオン二次電池20の放電カーブは、電池の使用期間(サイクル数)により、特に放電末端における形状が異なる。図4に示す例では、放電終止電圧Vdに達するまでの放電時間が、使用期間T2の方が使用期間T1の場合よりも短くなっている。
図5は、リチウムイオン二次電池20のOCVと放電後休止時間の関係を示す図である。図5に例示するように、リチウムイオン二次電池20は、放電後、負荷31及び外部電源から電池を切り離すと、休止時間と共にOCVが上昇し、例えば10分以上経過した時点でOCVが略一定となる。放電完了の直後におけるOCVと、例えば放電後10分経過した時点におけるOCVとの差が、図4及び図5に例示するΔVである。また、所定の休止時間におけるOCVの上昇率が、図5に例示するdv/dtである。
ΔV、dv/dtとしては、リチウムイオン二次電池20の放電深度が90%~100%で測定された値を用いることが好適である。ΔV、dv/dtは、例えば放電深度90%~100%において、放電休止後10秒間で測定される。放電深度が90%以上で測定された値を用いることで、第1算出部14によって算出されるΔV、dv/dtの変化量の差が大きくなり、寿命推定の精度が向上する。サイクル数の増加に伴う、ΔV、dv/dtの推移は、OCVの場合と同様であり、例えば図2に示すような推移となる。このため、OCVの代わりにΔV、dv/dtを用いた場合においても、OCVを用いた場合と同様の方法で電池寿命を推定することができる。
図6は、ΔVを用いた寿命推定処理の手順の一例を示すフローチャートである。図6では、現時点T2における寿命推定処理の手順を示している。リチウムイオン二次電池20は、図2に示すOCV推移と同様のΔV推移を示すものとする。
図6に例示するように、まず初めに、現時点T2におけるリチウムイオン二次電池20の積算サイクル数(T2)を取得する(S10)点は、OCVを用いる推定処理の場合と同じである。次に、本推定処理では、リチウムイオン二次電池20のΔV(T2)を取得する(S21)。この手順は、第2取得部13の機能により実行される。ΔV(T2)は、例えば放電深度90%において、放電休止後10秒間で測定される。続いて、ΔV(T2)とΔV(T1)からΔV変化量を算出する(S22)。この手順は、第1算出部14の機能により実行される。ΔV(T1)は、前回T1に取得された値である。
そして、S22で算出されたΔV変化量が正又は負のいずれであるかを判定する(S23)。この手順及び続くS14、S15の手順は、第2算出部15の機能により実行される。第2算出部15は、ΔV変化量が正である場合、記憶部11から式1を読み出し、式1を用いて残存容量を算出する(S14)。一方、ΔV変化量が負である場合は、記憶部11から式2を読み出し、式2を用いて残存容量を算出する(S15)。なお、dv/dtを用いた推定処理についても、これと同様の手順で実行できる。
本発明は、リチウムイオン二次電池の寿命推定装置に利用できる。
10 リチウムイオン二次電池の寿命推定装置
11 記憶部
12 第1取得部
13 第2取得部
14 第1算出部
15 第2算出部
20 リチウムイオン二次電池
21 電圧計
22 電流計
23 充放電回路
24 コネクタ
30 システム
31 負荷
11 記憶部
12 第1取得部
13 第2取得部
14 第1算出部
15 第2算出部
20 リチウムイオン二次電池
21 電圧計
22 電流計
23 充放電回路
24 コネクタ
30 システム
31 負荷
Claims (5)
- リチウムイオン二次電池の残存寿命を推定する装置であって、
前記リチウムイオン二次電池の使用開始時からの積算サイクル数、又は積算容量を取得する第1取得部と、
前記リチウムイオン二次電池の所定放電深度における、開放電圧、又は放電休止後の電圧上昇幅、又は放電休止後の所定時間当りの電圧上昇率を取得する第2取得部と、
所定期間における、前記開放電圧の変化量、又は前記電圧上昇幅の変化量、又は前記電圧上昇率の変化量を算出する第1算出部と、
指数n1が0.9~1.1である式1、及び指数n2が0.4~0.6である式2に基づいて、前記リチウムイオン二次電池の充放電可能な容量である残存容量を算出する第2算出部と、
を備え、
前記第2算出部は、前記開放電圧の変化量、又は前記電圧上昇幅の変化量、又は前記電圧上昇率の変化量が正のときは式1を用いて前記残存容量を算出し、前記開放電圧の変化量、又は前記電圧上昇幅の変化量、又は前記電圧上昇率の変化量が負のときは式2を用いて前記残存容量を算出する、リチウムイオン二次電池の寿命推定装置。
式1:残存容量=容量1-α×(積算サイクル数又は積算容量)n1
式2:残存容量=容量2-β×(積算サイクル数又は積算容量)n2
ここで、α、βは互いに異なる定数、容量1は前記リチウムイオン二次電池の初期容量又は式2により算出された前記残存容量、容量2は前記初期容量又は式1により算出された前記残存容量である。 - 前記リチウムイオン二次電池は、前記開放電圧の変化量、又は前記電圧上昇幅の変化量、又は前記電圧上昇率の変化量が、負から正に変化した後、正から負に変化する特性を有し、
前記第2算出部は、式2として式2-1及び式2-2を用い、式2-1、式1、式2-2の順に切り替えて前記残存容量を算出する、請求項1に記載の寿命推定装置。
式2-1:残存容量=初期容量-β1×(積算サイクル数又は積算容量)n2
式2-2:残存容量=容量2-β2×(積算サイクル数又は積算容量)n2
ここで、β1、β2は互いに異なる定数、容量2は式1により算出された前記残存容量である。 - 前記積算サイクル数には、前記積算容量を前記初期容量で除した値が用いられる、請求項1又は2に記載の寿命推定装置。
- 前記開放電圧には、放電深度100%において、放電後10分以上経過した時点で測定された値が用いられる、請求項1~3のいずれか1項に記載の寿命推定装置。
- 前記電圧上昇幅及び前記電圧上昇率には、放電深度90%~100%で測定された値が用いられる、請求項1~3のいずれか1項に記載の寿命推定装置。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201780016537.9A CN108780931B (zh) | 2016-03-31 | 2017-02-02 | 锂离子二次电池的寿命估计装置 |
| JP2018508478A JP6655801B2 (ja) | 2016-03-31 | 2017-02-02 | リチウムイオン二次電池の寿命推定装置 |
| US16/141,118 US10895605B2 (en) | 2016-03-31 | 2018-09-25 | Life estimation apparatus for lithium ion secondary cell |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016072039 | 2016-03-31 | ||
| JP2016-072039 | 2016-03-31 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/141,118 Continuation US10895605B2 (en) | 2016-03-31 | 2018-09-25 | Life estimation apparatus for lithium ion secondary cell |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2017169088A1 true WO2017169088A1 (ja) | 2017-10-05 |
Family
ID=59962848
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2017/003773 Ceased WO2017169088A1 (ja) | 2016-03-31 | 2017-02-02 | リチウムイオン二次電池の寿命推定装置 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US10895605B2 (ja) |
| JP (1) | JP6655801B2 (ja) |
| CN (1) | CN108780931B (ja) |
| WO (1) | WO2017169088A1 (ja) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPWO2017169088A1 (ja) * | 2016-03-31 | 2019-02-07 | パナソニックIpマネジメント株式会社 | リチウムイオン二次電池の寿命推定装置 |
| WO2022024235A1 (ja) * | 2020-07-29 | 2022-02-03 | 株式会社日立ハイテク | 電池管理装置、電池管理方法 |
| WO2024042874A1 (ja) * | 2022-08-26 | 2024-02-29 | パナソニックIpマネジメント株式会社 | 電池の内部抵抗の測定方法 |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102458526B1 (ko) * | 2018-02-07 | 2022-10-25 | 주식회사 엘지에너지솔루션 | 배터리의 동작 상태에 따라 soc를 추정하는 장치 및 방법 |
| KR102521576B1 (ko) * | 2019-03-18 | 2023-04-12 | 주식회사 엘지에너지솔루션 | 배터리 관리 장치 |
| CN110058179B (zh) * | 2019-05-27 | 2021-08-06 | 爱驰汽车有限公司 | 基于容量衰减的soh估算方法、系统、设备及存储介质 |
| CN111007418B (zh) * | 2019-12-30 | 2020-12-29 | 电子科技大学 | 一种的锂电池剩余寿命预测方法 |
| CN113363605B (zh) * | 2020-03-03 | 2023-11-21 | 宁德新能源科技有限公司 | 放电方法、电子装置以及存储介质 |
| KR20220021248A (ko) * | 2020-08-13 | 2022-02-22 | 주식회사 엘지에너지솔루션 | 배터리 용량 추정 장치 및 방법 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011220900A (ja) * | 2010-04-12 | 2011-11-04 | Honda Motor Co Ltd | 電池劣化推定方法、電池容量推定方法、電池容量均等化方法、および電池劣化推定装置 |
| WO2015037184A1 (ja) * | 2013-09-11 | 2015-03-19 | 株式会社Gsユアサ | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム |
| JP2015059928A (ja) * | 2013-09-20 | 2015-03-30 | 株式会社Gsユアサ | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4144568B2 (ja) * | 2004-06-04 | 2008-09-03 | ソニー株式会社 | バッテリ残量検出システム、電子機器及びバッテリパック |
| US8159204B2 (en) * | 2008-09-29 | 2012-04-17 | Active-Semi, Inc. | Regulating current output from a buck converter without external current sensing |
| CN102213747B (zh) * | 2010-04-09 | 2015-05-27 | 深圳市比克电池有限公司 | 一种预测锂离子电池循环寿命的方法 |
| WO2012144060A1 (ja) * | 2011-04-22 | 2012-10-26 | トヨタ自動車株式会社 | 充電装置および充電方法 |
| CN102655549B (zh) * | 2012-01-31 | 2014-03-12 | 吕林波 | 一种电池剩余时间及容量估算的方法 |
| JP5874543B2 (ja) | 2012-06-08 | 2016-03-02 | 株式会社Gsユアサ | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム |
| CN103399276B (zh) * | 2013-07-25 | 2016-01-20 | 哈尔滨工业大学 | 一种锂离子电池容量估计及剩余循环寿命预测方法 |
| CN103389472B (zh) * | 2013-08-01 | 2015-09-16 | 哈尔滨工业大学 | 一种基于nd-ar模型的锂离子电池循环寿命的预测方法 |
| CN103954915B (zh) * | 2014-05-16 | 2017-02-01 | 哈尔滨工业大学 | 基于概率集成的锂离子电池剩余寿命间接预测方法 |
| CN104198947A (zh) * | 2014-09-02 | 2014-12-10 | 奇瑞汽车股份有限公司 | 一种锂离子电池剩余容量的估算系统及方法 |
| CN105068011B (zh) * | 2015-07-29 | 2018-08-03 | 中国汽车技术研究中心 | 一种用于估算和修正锰酸锂串联电池包soc值的方法 |
| CN108780931B (zh) * | 2016-03-31 | 2021-03-02 | 松下知识产权经营株式会社 | 锂离子二次电池的寿命估计装置 |
-
2017
- 2017-02-02 CN CN201780016537.9A patent/CN108780931B/zh active Active
- 2017-02-02 JP JP2018508478A patent/JP6655801B2/ja active Active
- 2017-02-02 WO PCT/JP2017/003773 patent/WO2017169088A1/ja not_active Ceased
-
2018
- 2018-09-25 US US16/141,118 patent/US10895605B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011220900A (ja) * | 2010-04-12 | 2011-11-04 | Honda Motor Co Ltd | 電池劣化推定方法、電池容量推定方法、電池容量均等化方法、および電池劣化推定装置 |
| WO2015037184A1 (ja) * | 2013-09-11 | 2015-03-19 | 株式会社Gsユアサ | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム |
| JP2015059928A (ja) * | 2013-09-20 | 2015-03-30 | 株式会社Gsユアサ | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPWO2017169088A1 (ja) * | 2016-03-31 | 2019-02-07 | パナソニックIpマネジメント株式会社 | リチウムイオン二次電池の寿命推定装置 |
| WO2022024235A1 (ja) * | 2020-07-29 | 2022-02-03 | 株式会社日立ハイテク | 電池管理装置、電池管理方法 |
| JPWO2022024235A1 (ja) * | 2020-07-29 | 2022-02-03 | ||
| JP7390490B2 (ja) | 2020-07-29 | 2023-12-01 | 株式会社日立ハイテク | 電池管理装置、電池管理方法 |
| WO2024042874A1 (ja) * | 2022-08-26 | 2024-02-29 | パナソニックIpマネジメント株式会社 | 電池の内部抵抗の測定方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108780931B (zh) | 2021-03-02 |
| CN108780931A (zh) | 2018-11-09 |
| JP6655801B2 (ja) | 2020-02-26 |
| US20190025381A1 (en) | 2019-01-24 |
| US10895605B2 (en) | 2021-01-19 |
| JPWO2017169088A1 (ja) | 2019-02-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6655801B2 (ja) | リチウムイオン二次電池の寿命推定装置 | |
| US10371757B2 (en) | Post-deterioration performance estimating apparatus and post-deterioration performance estimating method for energy storage device, and energy storage system | |
| CN104698385B (zh) | 电池状态计算装置和电池状态计算方法 | |
| EP3232216B1 (en) | Energy storage element state estimation device and energy storage element state estimation method | |
| JP6656383B2 (ja) | バッテリーセルの性能テスト装置及び方法 | |
| JP5874543B2 (ja) | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム | |
| JP5994521B2 (ja) | 状態推定装置、開放電圧特性生成方法 | |
| US10274545B2 (en) | Calculation apparatus and method for calculating relationship between charge amount and potential | |
| JP6372490B2 (ja) | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム | |
| CN107431255A (zh) | 蓄电池控制装置、控制方法、程序、蓄电系统、电力系统 | |
| KR20220034543A (ko) | 배터리의 충전상태를 추정하는 방법 | |
| JP2017125813A (ja) | 蓄電素子管理装置、蓄電素子モジュール、車両および蓄電素子管理方法 | |
| US20170199250A1 (en) | Apparatus and method for estimating open circuit voltage | |
| EP3657190A1 (en) | Estimation device, power storage device, estimation method, and computer program | |
| JP2012122817A (ja) | 非水電解質二次電池の可逆容量推定方法、寿命予測方法、可逆容量推定装置、寿命予測装置及び蓄電システム | |
| JP7169917B2 (ja) | 二次電池の制御装置及び二次電池の制御方法 | |
| JP6672351B2 (ja) | 算出装置及び算出方法 | |
| KR101473156B1 (ko) | 2차전지의 수명 예측장치 및 방법 | |
| JP2020149774A (ja) | 二次電池システム、二次電池、および組電池システム | |
| JP2013253940A (ja) | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム | |
| JP6206031B2 (ja) | 蓄電素子の寿命推定装置、寿命推定方法及び蓄電システム | |
| JP5935524B2 (ja) | 蓄電素子の劣化後容量推定装置、劣化後容量推定方法及び蓄電システム | |
| JP6062919B2 (ja) | 電気化学バッテリを最適に充電するための方法 | |
| JP2021071321A (ja) | Soc推定装置、蓄電装置及びsoc推定方法 | |
| JP2018119828A (ja) | 電池パック |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| ENP | Entry into the national phase |
Ref document number: 2018508478 Country of ref document: JP Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17773637 Country of ref document: EP Kind code of ref document: A1 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 17773637 Country of ref document: EP Kind code of ref document: A1 |