WO2016162988A1 - Station de base, terminal, système de communication sans fil, procédé de commande de station de base, et procédé de commande de terminal - Google Patents
Station de base, terminal, système de communication sans fil, procédé de commande de station de base, et procédé de commande de terminal Download PDFInfo
- Publication number
- WO2016162988A1 WO2016162988A1 PCT/JP2015/061036 JP2015061036W WO2016162988A1 WO 2016162988 A1 WO2016162988 A1 WO 2016162988A1 JP 2015061036 W JP2015061036 W JP 2015061036W WO 2016162988 A1 WO2016162988 A1 WO 2016162988A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- terminal
- base station
- transmission timing
- transmission
- request signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1215—Wireless traffic scheduling for collaboration of different radio technologies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/14—Spectrum sharing arrangements between different networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W56/00—Synchronisation arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/02—Terminal devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
Definitions
- the present invention relates to a base station, a terminal, a wireless communication system, a base station control method, and a terminal control method.
- next-generation wireless communication technologies have been discussed in order to further increase the speed and capacity of wireless communication in wireless communication systems such as mobile phone systems.
- LTE Long Term Evolution
- LC Licensed Band Carrier
- UC Unlicensed band Carrier
- LAA when a terminal transmits UL (Up Link) to a base station in an unlicensed band, the base station transmits a UL grant requesting data transmission to the terminal via the licensed band. Then, for example, the base station executes LBT (Listen Before Talk) in the unlicensed band before the terminal performs transmission in the UL.
- LBT Listen Before Talk
- the base station When detecting an idle of the unlicensed band, the base station transmits a reservation signal to the unlicensed band until the terminal transmission timing, for example, in order to secure an unlicensed band that the terminal uses for UL data transmission. It is being considered.
- the terminal can perform UL data transmission using the unlicensed band after a predetermined period from the UL grant.
- the terminal when the busy state of the unlicensed band continues and the terminal does not receive the reservation signal in the unlicensed band by the timing of UL data transmission, the terminal receives, for example, UL data Cancel transmission. Thereby, the transmission opportunity of the data scheduled to be transmitted by the terminal is postponed until the predetermined period elapses from the UL grant transmitted from the base station next time. Therefore, the data transmission throughput in the UL from the terminal to the base station may be reduced.
- the present invention provides a base station, a terminal, a wireless communication system, a base station control method, and a terminal control method that can improve UL throughput in an unlicensed band.
- the base station disclosed in the present application is a base station that performs radio communication with a terminal using a dedicated band dedicated to a radio communication system having the base station and the terminal, and a shared band shared with other systems. And a request signal transmission unit, a determination unit, and a permission signal transmission unit.
- the request signal transmission unit is a request signal that requests the terminal to transmit data in the shared band, and transmits a request signal that specifies the first transmission timing of the terminal to the terminal.
- the determination unit determines whether the shared band is idle or busy. When the determination unit determines that the shared band is idle, the permission signal transmission unit transmits a permission signal that permits data transmission of the terminal in the shared band.
- the second transmission timing which is the next transmission timing when the terminal does not transmit data at the first transmission timing because the permission signal is not received, is the first transmission. Contains an offset specified in time relative to timing.
- UL throughput in an unlicensed band can be improved.
- FIG. 1 is a diagram illustrating an example of a wireless communication system.
- FIG. 2 is a diagram illustrating an example of the operation of the wireless communication system according to the first embodiment.
- FIG. 3 is a diagram illustrating an example of the operation of the wireless communication system according to the first embodiment.
- FIG. 4 is a block diagram illustrating an example of a base station according to the first embodiment.
- FIG. 5 is a block diagram illustrating an example of a terminal according to the first embodiment.
- FIG. 6 is a flowchart illustrating an example of the operation of the base station in the first embodiment.
- FIG. 7 is a flowchart illustrating an example of the operation of the terminal according to the first embodiment.
- FIG. 8 is a flowchart illustrating an example of the operation of the base station in the second embodiment.
- FIG. 1 is a diagram illustrating an example of a wireless communication system.
- FIG. 2 is a diagram illustrating an example of the operation of the wireless communication system according to the first embodiment.
- FIG. 3
- FIG. 9 is a flowchart illustrating an example of the operation of the terminal according to the second embodiment.
- FIG. 10 is a diagram illustrating an example of the operation of the wireless communication system according to the third embodiment.
- FIG. 11 is a block diagram illustrating an example of a terminal according to the third embodiment.
- FIG. 12 is a flowchart illustrating an example of the operation of the base station in the third embodiment.
- FIG. 13 is a flowchart illustrating an example of the operation of the terminal according to the third embodiment.
- FIG. 14 is a flowchart illustrating an example of the operation of the terminal according to the third embodiment.
- FIG. 15 is a diagram illustrating an example of a wireless communication device that implements the functions of a base station or a terminal.
- FIG. 1 is a diagram illustrating an example of a wireless communication system 10.
- the wireless communication system 10 includes a base station 20, a base station 22, and terminals 30a to 30f.
- the terminals 30a to 30f are collectively referred to as terminals 30 without being distinguished from each other.
- the base station 20 performs radio communication based on, for example, LTE.
- the base station 20 is, for example, an eNB (evolved Node B) in LTE.
- the terminal 30 is, for example, a UE (User Equipment) in LTE.
- the terminal 30 belongs to a cell managed by the base station 20, and communicates with the base station 20 in the cell.
- the base station 20 and the terminal 30 may be described as an LTE system.
- the base station 22 is a base station belonging to a system different from the LTE system to which the base station 20 belongs, for example.
- the base station 22 is, for example, a base station belonging to an LTE system of an operator different from the LTE system to which the base station 20 belongs, or a base station belonging to another communication system such as a wireless LAN system.
- the base station 20 uses a first band dedicated to the LTE system to which the base station 20 belongs, and a second band shared by the LTE system to which the base station 20 belongs and another communication system, to use the terminal in the cell. 30 to perform wireless communication.
- the first band is, for example, a 2 GHz band LC.
- the second band is, for example, a 5 GHz band UC.
- the first band is referred to as a licensed band
- the second band is referred to as an unlicensed band.
- the first band is assigned to, for example, PCC (Primary Component Carrier), and the second band is assigned to, for example, SCC (Secondary Component Carrier).
- the first band is a dedicated band of the LTE system to which the base station 20 belongs
- the second band is the LTE system to which the base station 20 belongs and the other communication system to which the base station 22 belongs. Shared bandwidth to be shared.
- reference numeral 21 indicates a range in which a radio wave transmitted from an arbitrary device reaches the base station 20 with an intensity determined to be busy by the carrier sense of the base station 20.
- Reference numeral 23 denotes a range in which a radio wave transmitted from an arbitrary device reaches the base station 22 with an intensity determined to be busy by the carrier sense of the base station 22.
- the base station 20 When the base station 20 requests the terminal 30 to transmit UL data using an unlicensed band, the base station 20 transmits an UL grant including resource information used for UL data transmission to the terminal 30 in the licensed band.
- the UL grant is an example of a request signal that requests the terminal 30 to transmit data to the base station 20. Then, the base station 20 executes LBT in the unlicensed band at a timing before the timing of UL data transmission by the terminal 30.
- the base station 20 determines that the unlicensed band is idle, the base station 20 transmits a permission signal to the unlicensed band.
- the permission signal is, for example, a CTS (Clear To Send) signal.
- the terminal 30 that has received the UL grant detects a permission signal in the unlicensed band, the terminal 30 performs UL data transmission using the resource of the unlicensed band specified by the UL grant.
- FIGS. 2 and 3 are diagrams illustrating an example of the operation of the wireless communication system 10 according to the first embodiment.
- FIG. 2 shows a case where idle of an unlicensed band is detected when the base station 20 executes LBT
- FIG. 3 shows a case where busy of an unlicensed band is detected when the base station 20 executes LBT. Show.
- the unlicensed band (UC) is divided into a plurality of subbands as shown in the lower part of FIGS. 2 and 3, for example.
- the unlicensed band is 20 MHz, for example, and is divided into 4 subbands every 5 MHz, for example.
- the base station 20 creates a UL grant 40-1 for requesting data transmission in the UL when a data transmission request to the terminal 30a and the terminal 30b is generated. Then, the base station 20 transmits the created UL grant 40-1 to the terminal 30a and the terminal 30b in the licensed band (LC). Similarly, when a data transmission request to terminal 30c and terminal 30d occurs, base station 20 transmits UL grant 40-2 to terminal 30c and terminal 30d in the licensed band. Similarly, when a data transmission request to the terminal 30e and the terminal 30f occurs, the base station 20 transmits the UL grant 40-3 to the terminal 30e and the terminal 30f in the licensed band.
- LC licensed band
- the base station 20 transmits, for example, UL grant 40-1 in the subframe period t1, transmits UL grant 40-2 in the subframe period t2, and UL grant 40 in the subframe period t3. -3 is transmitted.
- the terminal 30 receives the permission signal in the unlicensed band by the first transmission timing after receiving the UL grant 40, the base station 20 in the unlicensed band at the first timing.
- the first transmission timing is, for example, timing after 4 subframes from the subframe in which the terminal 30 receives the UL grant 40.
- each UL grant 40 includes subband information, offset, and time limit information.
- the subband information included in the UL grant 40 indicates an unlicensed band subband used when the terminal 30 receiving the UL grant 40 performs UL data transmission.
- the offset is determined when the terminal 30 does not receive the permission signal before the first transmission timing after receiving the UL grant 40 and receives the permission signal after the first transmission timing. This is information for specifying the second transmission timing for performing data transmission.
- the second transmission timing is specified by a relative time from the first transmission timing, for example.
- the second transmission timing is specified in units of subframes, for example.
- the time limit information included in the UL grant 40 indicates a time limit for the terminal 30 that has received the UL grant 40 to wait for a permission signal.
- the time limit information is specified in units of subframes, for example, based on the subframe in which the UL grant 40 is transmitted.
- the time limit specified by the time limit information is, for example, the timing after 10 subframes from the subframe in which the UL grant 40 is transmitted.
- the time limit information may be specified by the number of times that a UL retransmission attempt is allowed.
- the base station 20 allocates a data transmission period in the UL to each terminal 30 in subframe units.
- the base station 20 performs scheduling so that data transmission from each terminal 30 is transmitted in successive subframes.
- the unlicensed band is also used in a communication system different from the LTE system to which the base station 20 belongs. For this reason, a period that can be continuously occupied for data transmission may be limited. In that case, the base station 20 performs scheduling so that data transmission from each terminal 30 is transmitted in consecutive subframes within a limited range.
- the base station 20 transmits the UL grant 40 in each successive subframe to each of the plurality of terminals 30 that perform data transmission using the same subband.
- the base station 20 assigns the same subband 1 to UL data transmission performed by the terminals 30a, 30c, and 30e, and is the same as UL data transmission performed by the terminals 30b, 30d, and 30f.
- Subband 2 is assigned.
- the base station 20 transmits UL grants 40-1 to 40-3 in successive subframe periods t1 to t3, respectively.
- the base station 20 After transmitting the UL grant 40, the base station 20 executes LBT in the unlicensed band after a predetermined time from the transmission of the UL grant 40 (for example, after 3 subframes). In the LBT, when it is confirmed that the idle state of the unlicensed band has continued for a predetermined backoff period 41, the base station 20 transmits a permission signal 42 to all subbands in the unlicensed band.
- the permission signal 42 includes, for example, the end timing of the SIFS (Short Inter Frame Space) period 43 after the transmission of the permission signal 42 is the timing of the boundary between the subframe in which the permission signal 42 is transmitted and the next subframe. Is sent to the unlicensed band.
- SIFS Short Inter Frame Space
- the terminal 30 When the terminal 30 receives the UL grant 40, the terminal 30 acquires the information on the subband of the unlicensed band used for the UL data transmission, the offset, and the time limit information from the UL grant 40. When the terminal 30 receives the permission signal 42 in the unlicensed band before the first transmission timing after receiving the UL grant 40, the terminal 30 designates the UL grant 40 at the first transmission timing. Data transmission is performed in the designated subband.
- the terminals 30a and 30b receive the UL grant 40-1 in the subframe period t4 between the first transmission timing and the subframe period t5 that is the first transmission timing.
- the permission signal 42 is received.
- the terminal 30a transmits UL data 44-1 in the subframe period t5, and the terminal 30b transmits UL data 45-1 in the subframe period t5.
- the terminals 30c and 30d receive the permission signal 42 during the period from the reception of the UL grant 40-2 to the subframe period t6 after a predetermined time.
- the terminal 30c transmits UL data 44-2 in the subframe period t6, and the terminal 30d transmits UL data 45-2 in the subframe period t6.
- the terminals 30e and 30f receive the permission signal 42 between the time when the UL grant 40-3 is received and before the subframe period t7 after a predetermined time.
- the terminal 30e transmits UL data 44-3 in the subframe period t7
- the terminal 30f transmits UL data 45-3 in the subframe period t7.
- the base station 20 uses the LBT to unlicense. Detects busy busy. Then, the base station 20 continues LBT in the unlicensed band. Then, for example, as shown in FIG. 3, when the idle of the unlicensed band is detected in the subframe period t5, the base station 20 confirms the continuation of the idle state during the predetermined backoff period 41, and then the unlicensed band. A permission signal 42 is transmitted.
- the terminals 30a and 30b receive the permission signal 42 before receiving the UL grant 40-1 and before the subframe period t5 including the first transmission timing after a predetermined time. do not do. Then, the terminals 30a and 30b receive the permission signal 42 in the subframe period t5 including the first transmission timing a predetermined time after receiving the UL grant 40-1.
- the terminal 30 uses the first transmission timing after a predetermined time from the reception of the UL grant 40-1 as a reference at the second transmission timing at which the time specified by the offset acquired from the UL grant 40-1 has elapsed. Data transmission to the base station 20 is performed.
- each UL grant 40 includes an offset that specifies a period of three subframes. Therefore, the terminals 30a and 30b use the subframe period t8 after a period of three subframes from the subframe period t5 as the second transmission timing with reference to the subframe period t5 after a predetermined time from the reception of the UL grant 40-1. As specified.
- the terminal 30a transmits UL data 44-1 in the subframe period t8, and the terminal 30b transmits UL data 45-1 in the subframe period t8.
- the offset value is set to the same value as the number of subframes continuously assigned as UL data transmission timing in the same subband.
- the number of subframes continuously allocated as UL data transmission timing in the same subband is three. Therefore, in the example of FIG. 3, the value of the offset is set to 3, for example.
- subframes continuously assigned as UL data transmission timings in the same subband are assigned to different terminals 30 respectively, but a plurality of consecutive subframes are assigned to one terminal 30. May be assigned.
- the terminals 30c to 30f receive the permission signal 42 during the period of the subframe after a predetermined time after receiving the UL grant 40. Therefore, the terminals 30c to 30f do not postpone transmission timing, and transmit UL data 44 and 45 in a subframe period after a predetermined time after receiving the UL grant 40.
- each terminal 30 when each terminal 30 does not receive the permission signal 42 by the first transmission timing after receiving the UL grant 40, it is designated by the offset in the UL grant 40 from the first transmission timing. Data transmission is performed at the second transmission timing when the period has elapsed. Thereby, when the terminal 30 does not receive the permission signal 42 by the first transmission timing after a predetermined time from the reception of the UL grant 40, the transmission opportunity of the terminal 30 is not designated again by the retransmission of the UL grant 40.
- the terminal 30 can perform UL data transmission. Thereby, the terminal 30 can obtain an opportunity for data transmission in the UL earlier than the timing after a predetermined time from the retransmission of the UL grant 40. Thereby, the throughput in UL can be improved.
- the offset value is set to the same value as the number of subframes continuously assigned as UL data transmission timing in the same subband.
- the offset value is set to the same value as the number of subframes continuously assigned as UL data transmission timing in the same subband.
- FIG. 4 is a block diagram illustrating an example of the base station 20 according to the first embodiment.
- the base station 20 includes a packet generation unit 200, a MAC (Media Access Control) scheduling unit 201, an uplink management unit 202, and an RRC (Radio Resource Control) control unit 203.
- the base station 20 includes a MAC / RLC (Radio Link Control) processing unit 204 and a carrier sense unit 205.
- the base station 20 includes a licensed band transmission unit 210, an unlicensed band transmission unit 220, an unlicensed band reception unit 230, a licensed band reception unit 240, an antenna 216, an antenna 226, an antenna 235, and an antenna 245.
- the antenna 216, the antenna 226, the antenna 235, and the antenna 245 are realized by separate antennas. However, as another example, these antennas may be realized by one antenna.
- the licensed band receiving unit 240 performs a process of decoding data from a signal received in the licensed band.
- the licensed band receiving unit 240 includes a decoding unit 241, a demodulation unit 242, an FFT processing unit 243, and a wireless processing unit 244.
- the wireless processing unit 244 performs wireless processing on a signal received via the antenna 245.
- the wireless processing performed by the wireless processing unit 244 includes, for example, processing for converting the frequency of a received signal from a licensed band frequency to a baseband frequency.
- the wireless processing unit 244 outputs the received signal subjected to the wireless processing to the FFT processing unit 243.
- the FFT processing unit 243 performs an FFT (Fast Fourier Transform) process on the reception signal output from the wireless processing unit 244. As a result, the received signal frequency-converted from the licensed band to the baseband is converted from the time domain to the frequency domain.
- the FFT processing unit 243 outputs the received signal on which the FFT processing has been performed to the demodulation unit 242.
- the demodulator 242 demodulates the received signal output from the FFT processor 243.
- Demodulation section 242 outputs the demodulated received signal to decoding section 241.
- the decoding unit 241 decodes the reception signal output from the demodulation unit 242.
- the decoding unit 241 then outputs the decoded data to the MAC / RLC processing unit 204.
- the unlicensed band receiving unit 230 performs a process of decoding data from a signal received in the unlicensed band.
- the unlicensed band receiving unit 230 includes a decoding unit 231, a demodulation unit 232, an FFT processing unit 233, and a wireless processing unit 234.
- the wireless processing unit 234 performs wireless processing on a signal received via the antenna 235.
- the wireless processing performed by the wireless processing unit 234 includes, for example, processing for converting the frequency of a received signal from an unlicensed band frequency to a baseband frequency.
- Radio processing section 234 outputs the received signal subjected to radio processing to FFT processing section 233 and carrier sense section 205.
- the FFT processing unit 233 performs FFT processing on the reception signal output from the wireless processing unit 234. As a result, the received signal frequency-converted from the unlicensed band to the baseband is converted from the time domain to the frequency domain.
- the FFT processing unit 233 outputs the received signal on which the FFT processing has been performed to the demodulation unit 232.
- the demodulator 232 demodulates the received signal output from the FFT processor 233. Demodulation section 232 then outputs the demodulated received signal to decoding section 231.
- the decoding unit 231 decodes the reception signal output from the demodulation unit 232. Then, the decoding unit 231 outputs the decoded data to the MAC / RLC processing unit 204.
- the carrier sense unit 205 measures the interference power in the unlicensed band based on the received signal output from the radio processing unit 234, and determines whether the unlicensed band is idle or busy based on the measurement result. To do. Then, the carrier sense unit 205 outputs the determination result to the uplink management unit 202.
- the carrier sense unit 205 receives, for example, timing information related to the start and end of carrier sense and information such as a predetermined idle period from the uplink management unit 202, and determines whether or not it has been determined to be idle by the delimiter timing. Reply to 202.
- the MAC / RLC processing unit 204 performs processing in the MAC layer and processing in the RLC layer based on the data output from the decoding unit 231 and the decoding unit 241.
- the MAC / RLC processing unit 204 outputs the data obtained by the processing of each layer to, for example, an upper apparatus of the base station 20. Further, the MAC / RLC processing unit 204 outputs the control information included in the data obtained by the processing of each layer to the RRC control unit 203.
- the RRC control unit 203 performs radio resource control based on the control information output from the MAC / RLC processing unit 204.
- the RRC control unit 203 generates control information based on radio resource control, and outputs the generated control information to the uplink management unit 202.
- the uplink management unit 202 controls the MAC layer based on the control information output from the RRC control unit 203. Further, when a data transmission request to the terminal 30 is generated, the uplink management unit 202 creates a UL grant that requests data transmission in the UL. And the uplink management part 202 transmits UL grant to the terminal 30 by outputting the control signal containing the produced UL grant to the multiplexing part 213 mentioned later.
- the UL grant includes subband information, offset, and time limit information used by the terminal 30 in UL data transmission.
- the offset designates the second transmission timing as a relative time from the first transmission timing, for example, by a 2-bit value. For example, when the 2-bit value is “01”, the offset indicates that the second transmission timing is a timing one subframe after the first transmission timing. For example, when the 2-bit value is “10”, the offset indicates that the second transmission timing is a timing two subframes after the first transmission timing. For example, when the 2-bit value is “11”, the offset indicates that the second transmission timing is a timing three subframes after the first transmission timing. For example, when the value of 2 bits is “00”, the offset is set so that the terminal 30 transmits the data when the terminal 30 does not receive the permission signal by the first transmission timing after the UL grant 40 is received. Indicates to cancel.
- the terminal 30 receives the UL grant 40 in which “11” is set as the offset, does not receive the permission signal by the first transmission timing after receiving the UL grant 40, and performs the first transmission.
- a permission signal is received after 7 subframes from the timing.
- the terminal 30 obtains a remainder obtained by dividing 7 by 3 that is the offset value, and subtracts the obtained value from 3 that is the offset value.
- the terminal 30 specifies a subframe period after the remaining number of subframe periods as the second transmission timing.
- the terminal 30 performs UL data transmission at the specified second transmission timing. Since the remainder obtained by dividing 7 by the offset value of 3 is 1, the terminal 30 performs UL data transmission, for example, in a subframe period two subframes after the subframe receiving the permission signal.
- time limit information for example, one of two types of time limits is specified by a 1-bit value. For example, when the value of 1 bit is “0”, the time limit information indicates that the timing after 5 subframes from the first transmission timing is the time limit. For example, when the value of 1 bit is “1”, the time limit information indicates that the time after 10 subframes from the first transmission timing is the time limit. In the present embodiment, the time limit information is valid when a value other than “00” is set for the offset. Note that an arbitrary value may be specified using 3 bits or more as the offset and time limit information.
- the uplink management unit 202 generates a permission signal after transmitting the UL grant to the terminal 30, and outputs the generated permission signal to the multiplexing unit 223 described later. Then, the uplink management unit 202 causes the carrier sense unit 205 to execute the unlicensed band LBT before the UL data transmission timing by the terminal 30. When the carrier sense unit 205 detects the idle of the unlicensed band, the carrier sense unit 205 instructs the IFFT processing unit 224 described later to transmit a transmission signal. Thereby, the permission signal is transmitted to the unlicensed band.
- the packet generator 200 generates a packet including user data output from a higher-level device. Then, the packet generation unit 200 outputs the generated packet to the MAC scheduling unit 201.
- the MAC scheduling unit 201 performs scheduling in the MAC layer for the packet output from the packet generation unit 200.
- the MAC scheduling unit 201 controls the output of the packet generated by the packet generation unit 200 to the licensed band transmission unit 210 or the unlicensed band transmission unit 220 based on the scheduling result.
- the licensed band transmission unit 210 performs processing for transmitting data in the licensed band.
- the licensed band transmission unit 210 includes an encoding unit 211, a modulation unit 212, a multiplexing unit 213, an IFFT (Inverse FFT) processing unit 214, and a wireless processing unit 215.
- IFFT Inverse FFT
- the encoding unit 211 encodes the packet data output from the MAC scheduling unit 201. Then, the encoding unit 211 outputs the encoded packet data to the modulation unit 212. The modulation unit 212 modulates the data output from the encoding unit 211. Modulation section 212 then outputs the modulated signal to multiplexing section 213.
- the multiplexing unit 213 multiplexes the control signal including the UL grant output from the uplink management unit 202 and the signal output from the modulation unit 212. Then, multiplexing section 213 outputs the multiplexed transmission signal to IFFT processing section 214.
- the IFFT processing unit 214 performs IFFT processing on the transmission signal output from the multiplexing unit 213. As a result, the transmission signal output from the multiplexing unit 213 is converted from the frequency domain to the time domain. IFFT processing section 214 outputs the transmission signal after IFFT processing to radio processing section 215.
- the wireless processing unit 215 performs wireless processing on the transmission signal output from the IFFT processing unit 214.
- the wireless processing performed by the wireless processing unit 215 includes, for example, processing for converting the frequency of a transmission signal from a baseband frequency to a licensed band frequency.
- the wireless processing unit 215 transmits the transmission signal after the wireless processing from the antenna 216.
- the unlicensed band transmission unit 220 performs processing for transmitting data in the unlicensed band.
- the unlicensed band transmission unit 220 includes an encoding unit 221, a modulation unit 222, a multiplexing unit 223, an IFFT processing unit 224, and a radio processing unit 225.
- the encoding unit 221 encodes the packet data output from the MAC scheduling unit 201. Then, the encoding unit 221 outputs the encoded packet data to the modulation unit 222.
- the modulation unit 222 modulates the packet data output from the encoding unit 221. Modulation section 222 then outputs the modulated signal to multiplexing section 223.
- the multiplexing unit 223 multiplexes the control signal including the permission signal output from the uplink management unit 202 and the signal output from the modulation unit 222. Then, multiplexing section 223 outputs the multiplexed transmission signal to IFFT processing section 224.
- the IFFT processing unit 224 performs IFFT processing on the transmission signal output from the multiplexing unit 223. As a result, the transmission signal output from the multiplexing unit 223 is converted from the frequency domain to the time domain. IFFT processing section 224 outputs the transmission signal after IFFT processing to radio processing section 225 when instructed by carrier sense section 205 to transmit a transmission signal.
- the wireless processing unit 225 performs wireless processing on the transmission signal output from the IFFT processing unit 224.
- the wireless processing performed by the wireless processing unit 225 includes, for example, processing for converting the frequency of a transmission signal from a baseband frequency to an unlicensed band frequency.
- the wireless processing unit 225 transmits the transmission signal after the wireless processing from the antenna 226.
- FIG. 5 is a block diagram illustrating an example of the terminal 30 according to the first embodiment.
- the terminal 30 includes an antenna 300, a decoding unit 301, an RRC processing unit 304, an uplink management unit 305, an encoding / modulation unit 306, and a packet generation unit 307.
- the terminal 30 also includes a licensed band receiving unit 310, an unlicensed band receiving unit 320, an unlicensed band transmitting unit 330, and a licensed band transmitting unit 340.
- the antenna 300 may be provided separately for each of the licensed band receiving unit 310, the unlicensed band receiving unit 320, the unlicensed band transmitting unit 330, and the licensed band transmitting unit 340.
- the licensed band receiving unit 310 performs a process of demodulating data from a signal received in the licensed band.
- the licensed band receiving unit 310 includes a wireless processing unit 311, an FFT processing unit 312, and a demodulation unit 315.
- the wireless processing unit 311 performs wireless processing on a signal received via the antenna 300.
- the wireless processing performed by the wireless processing unit 311 includes, for example, processing for converting the frequency of a received signal from a licensed band frequency to a baseband frequency.
- Radio processing section 311 outputs the received signal after radio processing to FFT processing section 312.
- the FFT processing unit 312 performs an FFT process on the reception signal output from the wireless processing unit 311. As a result, the received signal output from the wireless processing unit 311 is converted from the time domain to the frequency domain. The FFT processing unit 312 outputs the received signal after the FFT processing to the demodulation unit 315.
- the demodulation unit 315 demodulates the received signal by performing equalization processing on the signal output from the FFT processing unit 312. Demodulation section 315 then outputs the received signal after demodulation to decoding section 301.
- the data decoded from the received signal demodulated by licensed band receiving section 310 includes a control signal including UL grant and the like.
- the unlicensed band receiving unit 320 performs a process of demodulating data from a signal received in the unlicensed band.
- the unlicensed band receiving unit 320 includes a wireless processing unit 321, an FFT processing unit 322, and a demodulation unit 325.
- the wireless processing unit 321 performs wireless processing on a signal received via the antenna 300.
- the wireless processing performed by the wireless processing unit 321 includes, for example, processing for converting the frequency of a received signal from an unlicensed band frequency to a baseband frequency.
- the wireless processing unit 321 outputs the reception signal after the wireless processing to the FFT processing unit 322.
- the FFT processing unit 322 performs FFT processing on the reception signal output from the wireless processing unit 321. Thereby, the reception signal output from the wireless processing unit 321 is converted from the time domain to the frequency domain. Then, FFT processing section 322 outputs the received signal after the FFT processing to demodulation section 325.
- the demodulator 325 demodulates the received signal by performing equalization processing on the signal output from the FFT processor 322. Demodulation section 325 then outputs the demodulated received signal to decoding section 301.
- the data decoded from the received signal demodulated by the unlicensed band receiving unit 320 includes a control signal including a permission signal and the like.
- the decoding unit 301 decodes user data and control signals from the received signals output from the licensed band receiving unit 310 and the unlicensed band receiving unit 320. Then, the decrypting unit 301 outputs the decrypted user data to, for example, an application processing unit (not shown) that performs processing based on the received data. Also, decoding section 301 outputs the decoded control signal to RRC processing section 304 and uplink management section 305.
- the control signal output to the uplink management unit 305 includes a UL grant and a permission signal.
- the RRC processing unit 304 performs radio resource control based on the control signal output from the decoding unit 301.
- the RRC processing unit 304 generates control information based on radio resource control, and outputs the generated control information to the uplink management unit 305.
- the uplink management unit 305 performs UL control based on the control information output from the RRC processing unit 304 and the control signal output from the decoding unit 301. For example, when the UL grant is output from the decoding unit 301, the uplink management unit 305 acquires, from the UL grant, information on an unlicensed band subband assigned to UL data transmission, an offset, and time limit information. To do.
- the uplink management unit 305 determines whether or not a permission signal has been output from the decoding unit 301 during a predetermined time after the UL grant is output from the decoding unit 301.
- the uplink management unit 305 Instruct the encoding / modulation unit 306 to transmit data.
- the uplink management unit 305 determines that the time limit indicated by the time limit information is reached. It is determined whether or not a permission signal is output from the decoding unit 301 during this period.
- the uplink management unit 305 performs UL data transmission based on the first transmission timing after receiving the UL grant. The second transmission timing is specified. Then, the uplink management unit 305 instructs the encoding / modulation unit 306 to transmit data at the specified second transmission timing.
- the uplink management unit 305 specifies 9 subframes after the first transmission timing as the second transmission timing.
- the uplink management unit 305 outputs resource allocation information used for UL data transmission to a frequency mapping unit 333 and a frequency mapping unit 343 described later.
- the packet generation unit 307 generates a packet including user data output from, for example, an application processing unit (not shown). Then, the packet generator 307 outputs the generated packet to the encoder / modulator 306. The encoding / modulation unit 306 performs encoding and modulation processing on the packet output from the packet generation unit 307. Then, encoding / modulation section 306 outputs the transmission signal subjected to the encoding and modulation processing to unlicensed band transmission section 330 or licensed band transmission section 340 in accordance with an instruction from uplink management section 305. .
- the licensed band transmission unit 340 performs processing for transmitting data in the licensed band.
- the licensed band transmission unit 340 includes a radio processing unit 341, an IFFT processing unit 342, a frequency mapping unit 343, an FFT processing unit 344, and a multiplexing unit 345.
- the multiplexing unit 345 multiplexes the control signal output from the uplink management unit 305 and the transmission signal output from the encoding / modulation unit 306. Then, multiplexing section 345 outputs the multiplexed transmission signal to FFT processing section 344.
- the FFT processing unit 344 performs FFT processing on the transmission signal output from the multiplexing unit 345. As a result, the transmission signal output from the multiplexing unit 345 is converted from the time domain to the frequency domain.
- the FFT processing unit 344 outputs the transmission signal after the FFT processing to the frequency mapping unit 343.
- the frequency mapping unit 343 performs frequency mapping on the transmission signal output from the FFT processing unit 344 based on the UL resource allocation information output from the uplink management unit 305. Then, frequency mapping section 343 outputs the transmission signal after the frequency mapping to IFFT processing section 342.
- the IFFT processing unit 342 performs IFFT processing on the transmission signal output from the frequency mapping unit 343. As a result, the transmission signal output from the frequency mapping unit 343 is converted from the frequency domain to the time domain. IFFT processing unit 342 outputs the transmission signal after IFFT processing to radio processing unit 341.
- the wireless processing unit 341 performs wireless processing on the transmission signal output from the IFFT processing unit 342.
- the wireless processing performed by the wireless processing unit 341 includes, for example, processing for converting the frequency of a transmission signal from a baseband frequency to a licensed band frequency.
- the wireless processing unit 341 transmits the transmission signal after the wireless processing via the antenna 300.
- the unlicensed band transmission unit 330 performs processing for transmitting data in the unlicensed band.
- the unlicensed band transmission unit 330 includes a wireless processing unit 331, an IFFT processing unit 332, a frequency mapping unit 333, an FFT processing unit 334, and a multiplexing unit 335.
- the multiplexing unit 335 multiplexes the control signal output from the uplink management unit 305 and the signal output from the encoding / modulation unit 306. Then, the multiplexing unit 335 outputs the multiplexed transmission signal to the FFT processing unit 334.
- the FFT processing unit 334 performs FFT processing on the transmission signal output from the multiplexing unit 335. As a result, the transmission signal output from the multiplexing unit 335 is converted from the time domain to the frequency domain.
- the FFT processing unit 334 outputs the transmission signal after the FFT processing to the frequency mapping unit 333.
- the frequency mapping unit 333 performs frequency mapping on the transmission signal output from the FFT processing unit 334 based on the UL resource allocation information output from the uplink management unit 305. Then, frequency mapping section 333 outputs the transmission signal after frequency mapping to IFFT processing section 332.
- the IFFT processing unit 332 performs IFFT processing on the transmission signal output from the frequency mapping unit 333. As a result, the transmission signal output from the frequency mapping unit 333 is converted from the frequency domain to the time domain. The IFFT processing unit 332 outputs the transmission signal after the IFFT processing to the wireless processing unit 331.
- the wireless processing unit 331 performs wireless processing on the transmission signal output from the IFFT processing unit 332.
- the wireless processing performed by the wireless processing unit 331 includes, for example, processing for converting the frequency of a transmission signal from a baseband frequency to an unlicensed band frequency.
- the wireless processing unit 331 transmits the transmission signal after the wireless processing via the antenna 300.
- FIG. 6 is a flowchart illustrating an example of the operation of the base station 20 according to the first embodiment.
- the uplink management unit 202 determines whether or not a data transmission request to the terminal 30 has occurred (S100). When a data transmission request to the terminal 30 is generated (S100: Yes), the uplink management unit 202 determines an offset value (S101). For example, the uplink management unit 202 determines the number of consecutive subframes assigned to data transmission in the same subband as an offset value.
- the uplink management unit 202 creates time limit information (S102). Then, the uplink management unit 202 creates a UL grant that includes the determined offset and the created time limit information, and includes information on the subbands of the unlicensed band to be allocated to UL data transmission. Then, the uplink management unit 202 determines whether it is the UL grant transmission timing (S103). When allocating consecutive subframes for data transmission, the uplink management unit 202 transmits UL grant at the timing of each successive subframe.
- the uplink management unit 202 executes the process shown in step S105.
- the uplink management unit 202 transmits the UL grant to the terminal 30 via the licensed band transmission unit 210 (S104). Then, the uplink management unit 202 determines whether it is the transmission timing of the permission signal (S105). The uplink management unit 202 determines that it is the transmission timing of the permission signal when, for example, a period of 3 subframes has elapsed from the subframe that transmitted the UL grant in step S104.
- the uplink management unit 202 executes the process shown in step S103 again.
- the uplink management unit 202 outputs the permission signal to the multiplexing unit 223 and instructs the carrier sense unit 205 to perform carrier sense.
- the carrier sense unit 205 performs carrier sense and determines whether or not the unlicensed band is idle (S106).
- the carrier sense unit 205 instructs the IFFT processing unit 224 to transmit a transmission signal. Thereby, a permission signal is transmitted to the unlicensed band (S107).
- the uplink management part 202 performs the process shown to step S100 again.
- the uplink management unit 202 refers to the time limit information included in the UL grant and determines whether or not the time limit has passed (S108). If the time limit has not elapsed (S108: No), the uplink management unit 202 executes the process shown in step S106 again. On the other hand, when the time limit has passed (S108: Yes), the uplink management unit 202 cancels the transmission of the permission signal (S109). And the uplink management part 202 performs the process shown to step S100 again.
- FIG. 7 is a flowchart illustrating an example of the operation of the terminal 30 in the first embodiment.
- the uplink management unit 305 determines whether or not the UL grant is received in the licensed band (S200). When the UL grant is received (S200: Yes), the uplink management unit 305 acquires offset and time limit information from the received UL grant (S201).
- the uplink management unit 305 determines whether a permission signal has been received (S202). When the permission signal has not been received (S202: No), the uplink management unit 305 determines whether or not the time limit indicated by the time limit information acquired from the UL grant has passed (S206). When the time limit has not elapsed (S206: No), the uplink management unit 305 executes the process shown in step S202 again. On the other hand, when the time limit has passed (S206: Yes), the uplink management unit 305 cancels the UL data transmission instructed by the UL grant, and executes the process shown in step S200 again.
- the uplink management unit 305 determines whether the reception timing of the permission signal is a timing before the first transmission timing after receiving the UL grant (S203). .
- the uplink management unit 305 transmits data in the UL in the subframe of the first transmission timing (S204). And the uplink management part 305 performs the process shown to step S200 again.
- the uplink management unit 305 transmits the second transmission timing after the time specified by the offset from the first transmission timing. Is identified. And the uplink management part 305 transmits data in UL by the subframe of the specified 2nd transmission timing (S205). And the uplink management part 305 performs the process shown to step S200 again.
- Example 1 was demonstrated. As is clear from the above description, according to the wireless communication system 10 of the present embodiment, it is possible to improve the UL throughput in the unlicensed band.
- the offset is included in the UL grant.
- the present embodiment is different from the first embodiment in that the offset is included in the permission signal.
- the functional blocks of the base station 20 and the terminal 30 are the same as the respective functional blocks described using FIG. 4 and FIG.
- FIG. 8 is a flowchart illustrating an example of the operation of the base station 20 according to the second embodiment.
- the uplink management unit 202 initializes a variable T indicating an offset to 0 (S300). Then, the uplink management unit 202 determines whether or not a data transmission request to the terminal 30 has occurred (S301). When a data transmission request to the terminal 30 is generated (S301: Yes), the uplink management unit 202 increases the variable T by 1 (S302) and creates time limit information (S303).
- the uplink management unit 202 creates a UL grant including the created time limit information and information on the subbands of the unlicensed band to be allocated to UL data transmission. Then, the uplink management unit 202 transmits the created UL grant to the terminal 30 via the licensed band transmission unit 210 (S304). And the uplink management part 202 performs the process shown to step S301 again.
- the uplink management unit 202 determines whether it is the transmission timing of the permission signal (S305). When it is not the transmission timing of the permission signal (S305: No), the uplink management unit 202 executes the process shown in step S301 again.
- the uplink management unit 202 determines the value of the variable T as the offset value (S306). Then, uplink management section 202 creates a permission signal including the determined offset value, and outputs the created permission signal to multiplexing section 223. Then, the uplink management unit 202 instructs the carrier sense unit 205 to perform carrier sense. The carrier sense unit 205 performs carrier sense and determines whether or not the unlicensed band is idle (S307).
- the carrier sense unit 205 instructs the IFFT processing unit 224 to transmit a transmission signal. Thereby, a permission signal is transmitted to the unlicensed band (S308). Then, the uplink management unit 202 initializes the value of the variable T to 0 (S311) and executes the process shown in step S301 again.
- the uplink management unit 202 refers to the time limit information included in the UL grant and determines whether or not the time limit has passed (S309). When the time limit has not elapsed (S309: No), the uplink management unit 202 executes the process shown in step S307 again. On the other hand, when the time limit has passed (S309: Yes), the uplink management unit 202 cancels the transmission of the permission signal (S310). Then, the uplink management unit 202 executes the process shown in step S311.
- FIG. 9 is a flowchart illustrating an example of the operation of the terminal 30 according to the second embodiment.
- the uplink management unit 305 determines whether or not the UL grant is received in the licensed band (S400). When the UL grant is received (S400: Yes), the uplink management unit 305 acquires time limit information from the received UL grant (S401).
- the uplink management unit 305 determines whether a permission signal has been received (S402).
- the uplink management unit 305 determines whether or not the time limit indicated by the time limit information acquired from the UL grant has passed (S407).
- the uplink management unit 305 executes the process shown in step S402 again.
- the uplink management unit 305 cancels the UL data transmission instructed by the UL grant, and executes the process shown in step S400 again.
- the uplink management unit 305 acquires an offset from the permission signal (S403). Then, the uplink management unit 305 determines whether or not the reception timing of the permission signal is a timing before the first transmission timing after receiving the UL grant (S404). When the reception timing of the permission signal is a timing before the first transmission timing (S404: Yes), the uplink management unit 305 transmits data in the subframe of the first transmission timing (S405). And the uplink management part 305 performs the process shown to step S400 again.
- the uplink management unit 305 performs the second operation after the time specified by the offset from the first transmission timing. Specify the transmission timing. And the uplink management part 305 transmits data in UL by the subframe of the specified 2nd transmission timing (S406). And the uplink management part 305 performs the process shown to step S400 again.
- the base station 20 performs unlicensed band LBT before the terminal 30 performs UL data transmission.
- the point which performs LBT of a licensed band differs from Example 1.
- FIG. 10 is a diagram illustrating an example of the operation of the wireless communication system 10 according to the third embodiment. Except for the points described below, the elements in FIG. 10 denoted by the same reference numerals as those in FIG. 2 or FIG. 3 are the same as those shown in FIG.
- each terminal 30 when each terminal 30 receives the UL grant 40 from the base station 20, the terminal 30 unloads a predetermined time before the first transmission timing after receiving the UL grant 40 (for example, one subframe before). Perform LBT in the licensed band. Then, after confirming that the unlicensed band idle has continued for a predetermined backoff period, each terminal 30 performs UL data transmission at the first transmission timing.
- the terminal 30 will perform a predetermined time before the second transmission timing specified by the offset. Postpones LBT. Then, when detecting the idle of the unlicensed band in the resumed LBT, the terminal 30 transmits the UL at the second transmission timing after the period specified by the offset included in the UL grant 40 from the first transmission timing. Send data.
- the terminals 30a and 30b Detects unlicensed band busy. Then, the terminals 30a and 30b receive the subframes before the subframe period t8 of the second transmission timing after the period specified by the offset (the period of 3 subframes in the example of FIG. 10) has elapsed from the subframe period t4. Wait for LBT until frame period t7.
- the terminals 30a and 30b resume LBT in the subframe period t7.
- the terminal 30a confirms the continuation of the idle state in the predetermined back-off period 48-1, and then the UL data 44-1 in the unlicensed band.
- the terminal 30b detects the idle of the unlicensed band in the subframe period t7, after confirming the continuation of the idle state in the predetermined back-off period 49-1, the UL data 45-1 is obtained in the unlicensed band. Send.
- the terminal 30 when the unlicensed band idle is not detected by the first transmission timing after the UL grant is received, the terminal 30 is connected after the period specified by the offset from the first transmission timing. Wait until a predetermined time before the second transmission timing. Then, the terminal 30 resumes LBT at a timing before the second transmission timing, and performs UL data transmission at the second transmission timing when unlicensed band idle is detected.
- the terminal 30 transmits the UL data after detecting the idle of the unlicensed band even if the UL grant is not retransmitted from the base station 20. Do. Thereby, the throughput of UL can be improved.
- the UL grant retransmission can be reduced, the processing load on the base station 20 can be reduced, and an increase in licensed band traffic can be suppressed.
- Base station 20 Since the base station 20 in the present embodiment is the same as the base station 20 in the first embodiment described in FIG. 4 except the points described below, detailed description thereof is omitted.
- the base station 20 in the present embodiment is different from the base station 20 in the first embodiment in that the carrier sense unit 205 is not included.
- the uplink management unit 202 in the present embodiment is different from the uplink management unit 202 in the first embodiment in that the grant signal is not transmitted after the UL grant is transmitted.
- FIG. 11 is a block diagram illustrating an example of the terminal 30 according to the third embodiment. Except for the points described below, in FIG. 11, elements denoted by the same reference numerals as those in FIG. 5 are the same as the elements described in FIG.
- the terminal 30 in the present embodiment is different from the terminal 30 in the first embodiment in that the terminal 30 includes a carrier sense unit 302.
- the carrier sense unit 302 measures the interference power in the unlicensed band based on the received signal output from the radio processing unit 321 of the unlicensed band receiving unit 320. Then, the carrier sense unit 302 determines whether the unlicensed band is idle or busy based on the measurement result. Then, the carrier sense unit 302 outputs the determination result to the uplink management unit 305.
- the carrier sense unit 302 receives, for example, timing information related to the start and end of carrier sense and information such as a predetermined idle period from the uplink management unit 305, and determines whether or not it has been determined to be idle before the delimiter timing. Reply to 305.
- the uplink management unit 305 When the UL management unit 305 receives a UL grant from the base station 20, the uplink management unit 305 acquires offset and time limit information from the UL grant.
- the time limit information indicates a time limit during which data transmission of the terminal 30 can be postponed.
- the uplink management unit 305 instructs the carrier sense unit 302 to perform carrier sense, and causes the LBT to be executed in the unlicensed band. If an unlicensed band idle is detected before the first transmission timing after receiving the UL grant, the uplink management unit 305 confirms that the idle has continued for a predetermined length of backoff period. To do.
- the uplink management unit 305 instructs the encoding / modulation unit 306 to transmit UL data at the first transmission timing.
- the carrier sense unit 302 instructs the IFFT processing unit 332 to transmit a transmission signal at the first transmission timing. Thereby, the transmission signal is transmitted to the unlicensed band at the first transmission timing.
- the uplink management unit 305 specifies the second transmission timing after the period specified by the offset from the first transmission timing. Then, uplink management section 305 instructs carrier sense section 302 to perform carrier sense at a timing that is a predetermined time before the identified second transmission timing, and causes LBT to be executed again in the unlicensed band.
- the uplink management section 305 instructs the encoding / modulation section 306 to transmit data at the second transmission timing.
- the carrier sense unit 302 instructs the IFFT processing unit 332 to transmit a transmission signal at the second transmission timing. Thereby, the transmission signal is transmitted to the unlicensed band at the second transmission timing.
- FIG. 12 is a flowchart illustrating an example of the operation of the base station 20 according to the third embodiment.
- the uplink management unit 202 determines whether or not a data transmission request to the terminal 30 has occurred (S500). When a data transmission request to the terminal 30 is generated (S500: Yes), the uplink management unit 202 determines an offset value (S501). For example, the uplink management unit 202 determines the number of consecutive subframes assigned to data transmission in the same subband as an offset value.
- the uplink management unit 202 creates time limit information (S502). Then, the uplink management unit 202 creates a UL grant that includes the determined offset and the created time limit information and includes information on the subbands of the unlicensed band to be allocated to UL data transmission. Then, the uplink management unit 202 transmits the created UL grant to the terminal 30 via the licensed band transmission unit 210 (S503). And the uplink management part 202 performs the process shown to step S500 again.
- the uplink management unit 305 determines whether or not the UL grant is received in the licensed band (S600). When the UL grant is received (S600: Yes), the uplink management unit 305 acquires offset and time limit information from the UL grant (S601). Then, the uplink management unit 305 initializes the variable k to 0 (S602). Then, the uplink management unit 305 waits from the first transmission timing after receiving the UL grant to a timing before a predetermined time (S603).
- the uplink management unit 305 instructs the carrier sense unit 302 to perform carrier sense.
- the carrier sense unit 302 performs carrier sense and determines whether or not the unlicensed band is idle (S604).
- the uplink management unit 305 determines whether or not the idle of the unlicensed band is detected before the first transmission timing (S605).
- the uplink management unit 305 transmits the UL data transmission to the encoding / modulation unit 306 at the first transmission timing. Instruct.
- the carrier sense unit 302 instructs the IFFT processing unit 332 to transmit a transmission signal at the first transmission timing. Accordingly, the transmission signal is transmitted to the unlicensed band at the first transmission timing (S606).
- the uplink management part 305 performs the process shown to step S600 again.
- the uplink management unit 305 encodes the UL data transmission at the second transmission timing by the encoding / modulation unit 306. To instruct.
- the second transmission timing is specified in step S609 described later.
- the carrier sense unit 302 instructs the IFFT processing unit 332 to transmit a transmission signal at the second transmission timing. Accordingly, the transmission signal is transmitted to the unlicensed band at the second transmission timing (S607).
- the uplink management part 305 performs the process shown to step S600 again.
- the uplink management unit 305 When the unlicensed band is busy (S604: No), the uplink management unit 305 increases the variable k by 1 (S608 in FIG. 14). Then, the uplink management unit 305 identifies the timing at which the time k times the offset has elapsed from the first transmission timing as the second transmission timing (S609). Then, the uplink management unit 305 determines whether or not the time limit indicated by the time limit information acquired from the UL grant has passed (S610). When the time limit has passed (S610: Yes), the uplink management unit 305 cancels the UL data transmission instructed by the UL grant (S611), and executes the process of step S600 shown in FIG. 13 again.
- the uplink management unit 305 determines whether or not the timing is a predetermined time before the second transmission timing identified in step S609 (S612). When the timing is not a predetermined time before the second transmission timing (S612: No), the uplink management unit 305 executes the process shown in step S610 again. On the other hand, when the timing is a predetermined time before the second transmission timing (S612: Yes), the uplink management unit 305 executes the process of step S604 illustrated in FIG. 13 again.
- the base station 20 and the terminal 30 in each embodiment described above can be realized by, for example, the wireless communication device 70 shown in FIG.
- FIG. 15 is a diagram illustrating an example of a wireless communication device 70 that implements the functions of the base station 20 or the terminal 30.
- the wireless communication device 70 includes, for example, a memory 71, a processor 72, an analog / digital converter (A / D) 73, a multiplier 74, an amplifier 75, an oscillator 76, a digital / analog converter (D / A) 77, a multiplier 78, An amplifier 79 and an antenna 80 are included.
- the wireless communication device 70 may include an interface for performing wired communication with an external communication device.
- the antenna 80 receives a radio signal and outputs the received signal to the amplifier 75.
- the antenna 80 transmits the signal output from the amplifier 79 to the outside.
- the amplifier 75 amplifies the signal received by the antenna 80 and outputs the amplified signal to the multiplier 74.
- the multiplier 74 multiplies the signal output from the amplifier 75 by the clock signal output from the oscillator 76, thereby converting the frequency of the received signal from the high frequency band to the baseband. Then, the multiplier 74 outputs the frequency-converted signal to the analog / digital converter 73.
- the analog / digital converter 73 converts the analog reception signal output from the multiplier 74 into a digital reception signal, and outputs the converted reception signal to the processor 72.
- the processor 72 controls the entire wireless communication device 70.
- the processor 72 can be realized by, for example, a CPU (Central Processing Unit) or a DSP (Digital Signal Processor).
- the processor 72 performs reception processing on the signal output from the analog-digital converter 73.
- the processor 72 generates a transmission signal and outputs the generated transmission signal to the digital-analog converter 77.
- the memory 71 includes, for example, a main memory and an auxiliary memory.
- the main memory is, for example, a RAM (Random Access Memory).
- the main memory is used as a work area for the processor 72.
- the auxiliary memory is a non-volatile memory such as a magnetic disk or a flash memory.
- Various programs for operating the processor 72 are stored in the auxiliary memory. The program stored in the auxiliary memory is loaded into the main memory and executed by the processor 72.
- the digital / analog converter 77 converts the digital transmission signal output from the processor 72 into an analog transmission signal, and outputs the converted transmission signal to the multiplier 78.
- the multiplier 78 multiplies the transmission signal converted by the digital-analog converter 77 by the clock signal output from the oscillator 76, thereby converting the frequency of the transmission signal from the baseband to the high frequency band. Then, the multiplier 78 outputs the frequency-converted transmission signal to the amplifier 79.
- the amplifier 79 amplifies the signal output from the multiplier 78 and transmits the amplified transmission signal to the outside via the antenna 80.
- the oscillator 76 generates a clock signal (continuous wave AC signal) having a predetermined frequency.
- the oscillator 76 outputs the generated clock signal to the multiplier 74 and the multiplier 78.
- the antennas 216, 226, 235, and 245 illustrated in FIG. 4 can be realized by the antenna 80, for example.
- the radio processing units 215, 225, 234, and 244 illustrated in FIG. 4 include, for example, an analog / digital converter 73, a multiplier 74, an amplifier 75, an oscillator 76, a digital / analog converter 77, a multiplier 78, and an amplifier 79. Can be realized. Further, the other configuration shown in FIG. 4 can be realized by the processor 72 and the memory 71, for example.
- the antenna 300 shown in FIG. 5 or 11 can be realized by the antenna 80, for example.
- 5 or 11 includes, for example, an analog-digital converter 73, a multiplier 74, an amplifier 75, an oscillator 76, a digital-analog converter 77, a multiplier 78, and the like. Further, it can be realized by the amplifier 79.
- the other configuration shown in FIG. 5 or FIG. 11 can be realized by the processor 72 and the memory 71, for example.
- the base station 20 transmits the UL grant to the terminal 30 in the licensed band, but the disclosed technology is not limited to this.
- the base station 20 may transmit the UL grant to the terminal 30 in an unlicensed band.
- the base station 20 executes LBT in the unlicensed band, and transmits the UL grant 40 to the terminal 30 after confirming that the bandwidth is free.
- the base station 20 may transmit the permission signal in the licensed band.
- the terminal 30 with poor reception quality of the radio wave transmitted from the base station 20 may fail to receive the UL grant or permission signal transmitted from the base station 20.
- a UL grant including an offset indicating a value other than 0 is transmitted to the terminal 30
- UL data transmission is not performed.
- the base station 20 waits for data transmission from the terminal 30 until the time limit specified by the time limit information included in the UL grant elapses. Therefore, if there is unreceived data for the UL grant, the UL grant transmission to the other terminals 30 is postponed. As a result, the UL throughput may decrease as a whole system.
- the UL grant transmitted to the terminal 30 with poor reception quality of the radio wave transmitted from the base station 20 may include information indicating that retransmission is not performed.
- information indicating that retransmission is not performed for example, an offset indicating a value of 0 may be used.
- the uplink management unit 202 transmits a UL grant and a permission signal, UL data transmission is performed. The number of times that there is no is measured for each terminal 30 as the number of failures. Then, it is conceivable that the uplink management unit 202 identifies the terminal 30 having the number of failures greater than the predetermined number as the terminal 30 having poor reception quality of the radio wave transmitted from the base station 20. In addition, even if the terminal 30 is identified as the terminal 30 with poor reception quality, the number of times of subsequent UL data transmission with respect to the transmission of the UL grant and the permission signal continuously exceeds the predetermined number of times. In addition, the identification as the terminal 30 with poor reception quality may be canceled.
- each device shown in the above-described embodiment is classified according to main processing contents in order to facilitate understanding of each device. Therefore, the disclosed technique is not limited by the component classification method or the name thereof.
- the configuration of each device shown in the above embodiment can be divided into more components according to the processing contents, or can be divided so that one component executes more processing.
- Each processing may be realized as processing by software, or may be realized by dedicated hardware such as ASIC (Application Specific Integrated Circuit).
- Base station 202 Uplink management unit 205 Carrier sense unit 210 Licensed band transmission unit 220 Unlicensed band transmission unit
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Priority Applications (9)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2015/061036 WO2016162988A1 (fr) | 2015-04-08 | 2015-04-08 | Station de base, terminal, système de communication sans fil, procédé de commande de station de base, et procédé de commande de terminal |
| CN202011246210.0A CN112312404B (zh) | 2015-04-08 | 2015-04-08 | 基站、终端、无线通信系统 |
| CN201580078376.7A CN107534983B (zh) | 2015-04-08 | 2015-04-08 | 基站、终端、无线通信系统、基站的控制方法和终端的控制方法 |
| JP2017511406A JP6477866B2 (ja) | 2015-04-08 | 2015-04-08 | 基地局、端末、無線通信システム、基地局の制御方法および端末の制御方法 |
| KR1020177027479A KR102018146B1 (ko) | 2015-04-08 | 2015-04-08 | 기지국, 단말기, 무선 통신 시스템, 기지국의 제어 방법 및 단말기의 제어 방법 |
| EP15888481.7A EP3282796B1 (fr) | 2015-04-08 | 2015-04-08 | Station de base, terminal, système de communication sans fil, procédé de commande de station de base |
| US15/708,731 US10588122B2 (en) | 2015-04-08 | 2017-09-19 | Wireless base station, wireless terminal, and wireless communication system for license assisted access |
| US16/750,584 US11160070B2 (en) | 2015-04-08 | 2020-01-23 | Wireless base station, wireless terminal, and wireless communication system for license assisted access |
| US17/462,436 US11716708B2 (en) | 2015-04-08 | 2021-08-31 | Base station, terminal, and wireless communication system, for license assisted access |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2015/061036 WO2016162988A1 (fr) | 2015-04-08 | 2015-04-08 | Station de base, terminal, système de communication sans fil, procédé de commande de station de base, et procédé de commande de terminal |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/708,731 Continuation US10588122B2 (en) | 2015-04-08 | 2017-09-19 | Wireless base station, wireless terminal, and wireless communication system for license assisted access |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2016162988A1 true WO2016162988A1 (fr) | 2016-10-13 |
Family
ID=57072225
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2015/061036 Ceased WO2016162988A1 (fr) | 2015-04-08 | 2015-04-08 | Station de base, terminal, système de communication sans fil, procédé de commande de station de base, et procédé de commande de terminal |
Country Status (6)
| Country | Link |
|---|---|
| US (3) | US10588122B2 (fr) |
| EP (1) | EP3282796B1 (fr) |
| JP (1) | JP6477866B2 (fr) |
| KR (1) | KR102018146B1 (fr) |
| CN (2) | CN112312404B (fr) |
| WO (1) | WO2016162988A1 (fr) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018534876A (ja) * | 2015-11-17 | 2018-11-22 | ノキア ソリューションズ アンド ネットワークス オサケユキチュア | アップリンクスケジュール指定の2段階シグナリング |
| JPWO2021215109A1 (fr) * | 2020-04-21 | 2021-10-28 |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101905981B1 (ko) * | 2016-10-07 | 2018-10-10 | 현대자동차주식회사 | 차량의 모터 통합 제어 방법 및 그 시스템 |
| US10470048B2 (en) * | 2017-01-17 | 2019-11-05 | Qualcomm Incorporated | Dynamic time-division duplexing (TDD) in new radio-spectrum sharing (NR-SS) and self-contained subframe structure |
| KR102315778B1 (ko) * | 2017-05-04 | 2021-10-22 | 삼성전자 주식회사 | 무선 통신 시스템에서 상향링크 전송시간 식별 방법 및 장치 |
| CN111030788B (zh) * | 2018-10-10 | 2022-05-31 | 上海朗帛通信技术有限公司 | 一种被用于无线通信的用户设备、基站中的方法和装置 |
| US20220386180A1 (en) * | 2019-10-04 | 2022-12-01 | Nippon Telegraph And Telephone Corporation | Control apparatus, wireless communication system, communication control method and program |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014027495A1 (fr) * | 2012-08-13 | 2014-02-20 | ソニー株式会社 | Dispositif de commande de télécommunication, dispositif terminal et procédé de commande de télécommunication |
Family Cites Families (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101567837B (zh) * | 2008-04-24 | 2011-10-26 | 中兴通讯股份有限公司 | 一种媒体流链路分配方法和系统 |
| WO2010093183A2 (fr) | 2009-02-11 | 2010-08-19 | 엘지전자 주식회사 | Procédé de transmission de signal de liaison montante et d'informations en retour, et appareil de relais utilisant le procédé |
| US9084195B2 (en) * | 2010-04-01 | 2015-07-14 | Nokia Technologies Oy | Multiple timing advance and carrier aggregation |
| WO2012109790A1 (fr) * | 2011-02-17 | 2012-08-23 | Renesas Mobile Corporation | Porteuse avec région de commande de liaison descendante configurable |
| CN103430467B (zh) * | 2011-03-11 | 2016-05-11 | Lg电子株式会社 | 终端在应用了载波聚合技术的无线通信系统中发送/接收信号的方法和装置 |
| US9973967B2 (en) | 2011-12-15 | 2018-05-15 | Nokia Solutions And Networks Oy | Radio operations in a carrier aggregation system |
| KR101967169B1 (ko) * | 2012-05-16 | 2019-04-09 | 삼성전자주식회사 | 디바이스간 네트워크에서 동기화 방법 및 장치 |
| US9100941B2 (en) * | 2012-05-24 | 2015-08-04 | Nokia Solutions And Networks Oy | Using unique preambles for D2D communications in LTE |
| US9019874B2 (en) * | 2012-06-27 | 2015-04-28 | Nokia Corporation | Method, apparatus, and computer program product for resolving hidden node in synchronized DCF based channel access |
| US20140177537A1 (en) * | 2012-12-21 | 2014-06-26 | Research In Motion Limited | User-equipment-managed direct device to device communications |
| JP6116240B2 (ja) * | 2012-12-28 | 2017-04-19 | キヤノン株式会社 | 送信装置、送信方法、及びプログラム |
| US9949292B2 (en) * | 2013-09-11 | 2018-04-17 | Qualcomm Incorporated | Coupling uplink and downlink CCA in LTE-U |
| US9743432B2 (en) * | 2013-09-23 | 2017-08-22 | Qualcomm Incorporated | LTE-U uplink waveform and variable multi-subframe scheduling |
| CN104333902B (zh) * | 2014-11-06 | 2018-05-15 | 东莞宇龙通信科技有限公司 | 数据同步方法、同步系统、具有基站功能的设备和终端 |
| EP3018938B1 (fr) * | 2014-11-07 | 2020-09-16 | Panasonic Intellectual Property Corporation of America | Système pour accès assisté sous licence LTE dans des bandes non autorisées |
| JP6259161B2 (ja) * | 2015-03-17 | 2018-01-10 | 京セラ株式会社 | ユーザ端末、基地局、及び通信制御方法 |
| US20180302795A1 (en) * | 2015-06-05 | 2018-10-18 | Ntt Docomo, Inc. | User terminal, radio base station and radio communication method |
-
2015
- 2015-04-08 WO PCT/JP2015/061036 patent/WO2016162988A1/fr not_active Ceased
- 2015-04-08 CN CN202011246210.0A patent/CN112312404B/zh active Active
- 2015-04-08 KR KR1020177027479A patent/KR102018146B1/ko active Active
- 2015-04-08 CN CN201580078376.7A patent/CN107534983B/zh active Active
- 2015-04-08 EP EP15888481.7A patent/EP3282796B1/fr active Active
- 2015-04-08 JP JP2017511406A patent/JP6477866B2/ja active Active
-
2017
- 2017-09-19 US US15/708,731 patent/US10588122B2/en active Active
-
2020
- 2020-01-23 US US16/750,584 patent/US11160070B2/en active Active
-
2021
- 2021-08-31 US US17/462,436 patent/US11716708B2/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014027495A1 (fr) * | 2012-08-13 | 2014-02-20 | ソニー株式会社 | Dispositif de commande de télécommunication, dispositif terminal et procédé de commande de télécommunication |
Non-Patent Citations (6)
| Title |
|---|
| COOLPAD: "Consideration on the UL scheduling design for LAA", 3GPP TSG RAN WG1 MEETING #80 R1-150511, 13 February 2015 (2015-02-13), XP050933719 * |
| FUJITSU: "Design of LAA UL transmission", 3GPP TSG RAN WG1 MEETING #80 R1-150186, 13 February 2015 (2015-02-13), XP050933400 * |
| INSTITUTE FOR INFORMATION INDUSTRY (III: "On the Design of LAA Uplink Transmission", 3GPP TSG RAN WG1 MEETING #80BIS R1-151973, 24 April 2015 (2015-04-24), XP050934826 * |
| INTEL CORPORATION: "On the LAA uplink: scheduling, LBT, and HARQ", 3GPP TSG RAN WG1 MEETING #80 R1-150507, 13 February 2015 (2015-02-13), XP050933715 * |
| KYOCERA: "LAA UL Design", 3GPP TSG RAN WG1 MEETING #80BIS R1-151464, 24 April 2015 (2015-04-24), XP050934336 * |
| SAMSUNG: "Discussion on UL transmission for LAA", 3GPP TSG RAN WG1 #80 R1-150368, 13 February 2015 (2015-02-13), XP050933577 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018534876A (ja) * | 2015-11-17 | 2018-11-22 | ノキア ソリューションズ アンド ネットワークス オサケユキチュア | アップリンクスケジュール指定の2段階シグナリング |
| JP2020054000A (ja) * | 2015-11-17 | 2020-04-02 | ノキア ソリューションズ アンド ネットワークス オサケユキチュア | アップリンクスケジュール指定の2段階シグナリング |
| JPWO2021215109A1 (fr) * | 2020-04-21 | 2021-10-28 | ||
| WO2021215109A1 (fr) * | 2020-04-21 | 2021-10-28 | ソニーグループ株式会社 | Dispositif de communication et procédé de communication |
| JP7632457B2 (ja) | 2020-04-21 | 2025-02-19 | ソニーグループ株式会社 | 通信装置及び通信方法 |
| US12477542B2 (en) | 2020-04-21 | 2025-11-18 | Sony Group Corporation | Communication device and communication method |
Also Published As
| Publication number | Publication date |
|---|---|
| US20210400647A1 (en) | 2021-12-23 |
| CN107534983A (zh) | 2018-01-02 |
| US20180007674A1 (en) | 2018-01-04 |
| EP3282796B1 (fr) | 2021-12-29 |
| CN107534983B (zh) | 2020-12-11 |
| EP3282796A4 (fr) | 2018-04-04 |
| US11716708B2 (en) | 2023-08-01 |
| KR102018146B1 (ko) | 2019-09-04 |
| KR20170123663A (ko) | 2017-11-08 |
| US20200163070A1 (en) | 2020-05-21 |
| US10588122B2 (en) | 2020-03-10 |
| US11160070B2 (en) | 2021-10-26 |
| EP3282796A1 (fr) | 2018-02-14 |
| CN112312404A (zh) | 2021-02-02 |
| CN112312404B (zh) | 2023-10-24 |
| JP6477866B2 (ja) | 2019-03-06 |
| JPWO2016162988A1 (ja) | 2018-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6394793B2 (ja) | 基地局、端末、無線通信システム、基地局の制御方法および端末の制御方法 | |
| JP6477866B2 (ja) | 基地局、端末、無線通信システム、基地局の制御方法および端末の制御方法 | |
| US11206647B2 (en) | Wireless communications system, base station, and terminal | |
| JP6500914B2 (ja) | 無線通信システムおよび端末装置 | |
| JP6358338B2 (ja) | 無線通信システム、基地局装置および端末装置 | |
| WO2015170392A1 (fr) | Systeme de communication sans fil, terminal, station de base et procede de traitement |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15888481 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2017511406 Country of ref document: JP Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 20177027479 Country of ref document: KR Kind code of ref document: A |
|
| REEP | Request for entry into the european phase |
Ref document number: 2015888481 Country of ref document: EP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |