[go: up one dir, main page]

WO2016013781A1 - Procédé pour transmettre des données de liaison montante dans une cellule de bande non autorisée, et appareil correspondant - Google Patents

Procédé pour transmettre des données de liaison montante dans une cellule de bande non autorisée, et appareil correspondant Download PDF

Info

Publication number
WO2016013781A1
WO2016013781A1 PCT/KR2015/006996 KR2015006996W WO2016013781A1 WO 2016013781 A1 WO2016013781 A1 WO 2016013781A1 KR 2015006996 W KR2015006996 W KR 2015006996W WO 2016013781 A1 WO2016013781 A1 WO 2016013781A1
Authority
WO
WIPO (PCT)
Prior art keywords
unlicensed band
band cell
harq
uplink
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2015/006996
Other languages
English (en)
Korean (ko)
Inventor
홍성표
최우진
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KT Corp
Original Assignee
KT Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020150090831A external-priority patent/KR20160013508A/ko
Application filed by KT Corp filed Critical KT Corp
Publication of WO2016013781A1 publication Critical patent/WO2016013781A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/24Radio transmission systems, i.e. using radiation field for communication between two or more posts
    • H04B7/26Radio transmission systems, i.e. using radiation field for communication between two or more posts at least one of which is mobile
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/04Error control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling

Definitions

  • the present invention relates to a method and apparatus for uplink data transmission of a terminal. More particularly, the present invention relates to a method and an apparatus for transmitting and receiving data using an unlicensed band frequency.
  • LTE Long Term Evolution
  • LTE-Advanced of the current 3GPP series are high-speed and large-capacity communication systems that can transmit and receive various data such as video and wireless data beyond voice-oriented services.
  • the development of technology capable of transferring large amounts of data is required.
  • As a method for transmitting a large amount of data data can be efficiently transmitted using a plurality of cells.
  • the terminal may perform wireless communication with a plurality of base stations.
  • the present invention devised in the above-described background proposes a method and apparatus for quickly transmitting a terminal while transmitting uplink data in an unlicensed band cell while maintaining coexistence with other communication systems.
  • the present invention is to propose the operation of the terminal and the base station when the unlicensed band cell for the uplink data transmission is unavailable period.
  • a method for transmitting uplink data by a user equipment comprising: configuring a carrier aggregation including an unlicensed band cell using a frequency shared by at least one communication system and in an unlicensed band cell.
  • Receiving scheduling information for uplink transmission of the UE determining whether the unlicensed band cell is an available interval; and if the unlicensed band cell is an available interval, transmitting uplink data based on the scheduling information.
  • the present invention provides a method for receiving a base station uplink data, comprising the steps of configuring a carrier aggregation in the terminal including an unlicensed band cell using a frequency shared by one or more communication systems and uplink in the unlicensed band cell
  • the method includes transmitting scheduling information for transmission and receiving uplink data transmitted from the terminal based on the scheduling information and whether the unlicensed band cell is available.
  • the present invention provides a terminal for transmitting uplink data, including the unlicensed band cell using a frequency shared by one or more communication systems, the control unit for configuring carrier aggregation and scheduling for uplink transmission in the unlicensed band cell If the receiving unit for receiving the information and the unlicensed band cell is an available period, including a transmitting unit for transmitting uplink data based on the scheduling information, the control unit provides a terminal device for further determining whether the unlicensed band cell is available period do.
  • the present invention provides a base station for receiving uplink data, including an unlicensed band cell using a frequency shared by one or more communication systems to control the uplink transmission in the unlicensed band cell and the control unit to configure carrier aggregation
  • the present invention provides a base station apparatus including a transmitter for transmitting scheduling information for receiving and a receiver for receiving uplink data transmitted from a terminal based on scheduling information and whether an unlicensed band cell is available.
  • the present invention provides an effect of transmitting and receiving uplink data in an unlicensed band cell and quickly transmitting and receiving while maintaining coexistence with other communication systems.
  • the present invention when the uplink data is transmitted, the present invention provides an effect that can be accurately transmitted even when the corresponding unlicensed band cell is unavailable.
  • 1 is a view for explaining the ETSI LBT related standards.
  • FIG. 2 is a diagram for describing an uplink HARQ operation.
  • FIG. 3 is a diagram illustrating an example of unlicensed band cell merging to which the present invention can be applied.
  • FIG. 4 is a view for explaining the operation of the terminal according to an embodiment of the present invention.
  • FIG. 5 is a diagram illustrating an uplink data transmission processing procedure of a terminal according to another embodiment of the present invention.
  • FIG. 6 is a diagram for explaining an uplink data transmission processing procedure according to another embodiment of the present invention.
  • FIG. 7 is a diagram for explaining an uplink data transmission processing procedure according to another embodiment of the present invention.
  • FIG. 8 is a diagram illustrating a section of an unlicensed band cell of the present invention.
  • FIG. 9 is a diagram illustrating an uplink data transmission processing procedure of a terminal according to another embodiment of the present invention.
  • FIG. 10 is a view for explaining the operation of the base station according to another embodiment of the present invention.
  • FIG. 11 is a view for explaining a terminal configuration according to another embodiment of the present invention.
  • FIG. 12 is a view for explaining the configuration of a base station according to another embodiment of the present invention.
  • the wireless communication system in the present invention is widely deployed to provide various communication services such as voice, packet data, and the like.
  • the wireless communication system includes a user equipment (UE) and a base station (base station, BS, or eNB).
  • a user terminal is a generic concept meaning a terminal in wireless communication.
  • user equipment (UE) in WCDMA, LTE, and HSPA, as well as mobile station (MS) in GSM, user terminal (UT), and SS It should be interpreted as a concept that includes a subscriber station, a wireless device, and the like.
  • a base station or a cell generally refers to a station that communicates with a user terminal, and includes a Node-B, an evolved Node-B, an Sector, a Site, and a BTS.
  • Other terms such as a base transceiver system, an access point, a relay node, a remote radio head (RRH), a radio unit (RU), and a small cell may be called.
  • RRH remote radio head
  • RU radio unit
  • a base station or a cell is a generic meaning indicating some areas or functions covered by a base station controller (BSC) in CDMA, a Node-B in WCDMA, an eNB or a sector (site) in LTE, and the like. It should be interpreted as, and it is meant to cover all the various coverage areas such as megacell, macrocell, microcell, picocell, femtocell and relay node, RRH, RU, small cell communication range.
  • BSC base station controller
  • the base station may be interpreted in two senses. i) the device providing the megacell, the macrocell, the microcell, the picocell, the femtocell, the small cell in relation to the wireless area, or ii) the wireless area itself. In i) all devices which provide a given wireless area are controlled by the same entity or interact with each other to cooperatively configure the wireless area to direct the base station.
  • the base station may indicate the radio area itself to receive or transmit a signal from a viewpoint of a user terminal or a neighboring base station.
  • megacells macrocells, microcells, picocells, femtocells, small cells, RRHs, antennas, RUs, low power nodes (LPNs), points, eNBs, transmit / receive points, transmit points, and receive points are collectively referred to as base stations. do.
  • the user terminal and the base station are two transmitting and receiving entities used to implement the technology or technical idea described in this specification in a comprehensive sense and are not limited by the terms or words specifically referred to.
  • the user terminal and the base station are two types of uplink or downlink transmitting / receiving subjects used to implement the technology or the technical idea described in the present invention, and are used in a generic sense and are not limited by the terms or words specifically referred to.
  • the uplink (Uplink, UL, or uplink) refers to a method for transmitting and receiving data to the base station by the user terminal
  • the downlink (Downlink, DL, or downlink) means to transmit and receive data to the user terminal by the base station It means the way.
  • CDMA Code Division Multiple Access
  • TDMA Time Division Multiple Access
  • FDMA Frequency Division Multiple Access
  • OFDMA Orthogonal Frequency Division Multiple Access
  • OFDM-FDMA OFDM-TDMA
  • OFDM-CDMA OFDM-CDMA
  • One embodiment of the present invention can be applied to resource allocation in the fields of asynchronous wireless communication evolving to LTE and LTE-Advanced through GSM, WCDMA, HSPA, and synchronous wireless communication evolving to CDMA, CDMA-2000 and UMB.
  • the present invention should not be construed as being limited or limited to a specific wireless communication field, but should be construed as including all technical fields to which the spirit of the present invention can be applied.
  • the uplink transmission and the downlink transmission may use a time division duplex (TDD) scheme that is transmitted using different times, or may use a frequency division duplex (FDD) scheme that is transmitted using different frequencies.
  • TDD time division duplex
  • FDD frequency division duplex
  • a standard is configured by configuring uplink and downlink based on one carrier or a pair of carriers.
  • the uplink and the downlink include a Physical Downlink Control CHannel (PDCCH), a Physical Control Format Indicator CHannel (PCFICH), a Physical Hybrid ARQ Indicator CHannel (PHICH), a Physical Uplink Control CHannel (PUCCH), an Enhanced Physical Downlink Control CHannel (EPDCCH), and the like.
  • Control information is transmitted through the same control channel, and data is configured by a data channel such as a physical downlink shared channel (PDSCH) and a physical uplink shared channel (PUSCH).
  • PDSCH physical downlink shared channel
  • PUSCH physical uplink shared channel
  • control information may also be transmitted using an enhanced PDCCH (EPDCCH or extended PDCCH).
  • EPDCCH enhanced PDCCH
  • extended PDCCH extended PDCCH
  • a cell means a component carrier having a coverage of a signal transmitted from a transmission / reception point or a signal transmitted from a transmission point or a transmission / reception point, and the transmission / reception point itself. Can be.
  • a wireless communication system to which embodiments are applied may be a coordinated multi-point transmission / reception system (CoMP system) or a coordinated multi-antenna transmission scheme in which two or more transmission / reception points cooperate to transmit a signal.
  • antenna transmission system a cooperative multi-cell communication system.
  • the CoMP system may include at least two multiple transmission / reception points and terminals.
  • the multiple transmit / receive point is at least one having a base station or a macro cell (hereinafter referred to as an eNB) and a high transmission power or a low transmission power in a macro cell region, which is wired controlled by an optical cable or an optical fiber to the eNB. May be RRH.
  • an eNB a base station or a macro cell
  • a high transmission power or a low transmission power in a macro cell region which is wired controlled by an optical cable or an optical fiber to the eNB. May be RRH.
  • downlink refers to a communication or communication path from a multiple transmission / reception point to a terminal
  • uplink refers to a communication or communication path from a terminal to multiple transmission / reception points.
  • a transmitter may be part of multiple transmission / reception points, and a receiver may be part of a terminal.
  • a transmitter may be part of a terminal, and a receiver may be part of multiple transmission / reception points.
  • a situation in which a signal is transmitted and received through a channel such as a PUCCH, a PUSCH, a PDCCH, an EPDCCH, and a PDSCH may be expressed in the form of 'sending and receiving a PUCCH, a PUSCH, a PDCCH, an EPDCCH, and a PDSCH.
  • a description of transmitting or receiving a PDCCH or transmitting or receiving a signal through the PDCCH may be used as a meaning including transmitting or receiving an EPDCCH or transmitting or receiving a signal through the EPDCCH.
  • the physical downlink control channel described below may mean PDCCH or EPDCCH, and may also be used to include both PDCCH and EPDCCH.
  • the EPDCCH which is an embodiment of the present invention, may be applied to the portion described as the PDCCH, and the EPDCCH may be applied to the portion described as the EPDCCH as an embodiment of the present invention.
  • high layer signaling described below includes RRC signaling for transmitting RRC information including an RRC parameter.
  • the eNB performs downlink transmission to the terminals.
  • the eNB includes downlink control information and an uplink data channel (eg, a physical downlink shared channel (PDSCH), which is a primary physical channel for unicast transmission, and scheduling required to receive the PDSCH.
  • a physical downlink control channel (PDCCH) for transmitting scheduling grant information for transmission on a physical uplink shared channel (PUSCH) may be transmitted.
  • PUSCH physical uplink shared channel
  • a frequency band not exclusively used by a specific communication system or a specific operator is described as an unlicensed band frequency or an unlicensed band.
  • a wireless LAN communication system such as Wi-Fi and a mobile communication system share and use the same frequency band
  • the corresponding frequency band is described as an unlicensed band frequency.
  • the mobile communication system will be described using LTE or LTE-Advanced as an example.
  • a cell using an unlicensed band frequency in a mobile communication system is described as an unlicensed band cell.
  • Unlicensed bands are of lower quality than licensed bands, but they are expected to provide sufficient value to operators with limited bandwidth by utilizing the unlicensed bands by complementing the licensed bands.
  • LTE Long Term Evolution
  • WiFi Wireless Fidelity
  • a technology that can be used fairly by coexistence (coexistence) in the E-UTRAN must be provided.
  • coexistence coexistence
  • LTE and WiFi technologies for example, must be able to be used fairly.
  • a technology that can be used fairly by coexistence (coexistence) in the E-UTRAN must be provided.
  • multiple operators should be able to use unlicensed bands.
  • E-UTRAN must provide a technology that can be used fairly by co-existence of multiple operators in the unlicensed band, but there is currently no technology for this in LTE.
  • 1 is a view for explaining the ETSI LBT related standards.
  • LBT List before Talk
  • ETSI EN 301 893 for frame-based equipment defined by ETSI (e.g., equipment having a structure with a fixed timing for transmitting and receiving structures)
  • CCA Clear Channel Assessment
  • the UE or the AP should not transmit on the channel during the next fixed frame period considering that the channel is occupied. If the channel is clear (for example, if the energy level is lower than the CCA threshold), the equipment can transmit during the channel occupancy time. The total time the equipment can transmit on a given channel without reassessing the channel's availability is called the channel occupancy time. The channel occupancy time should be in the range of 1 ms to 10 ms.
  • the minimum idle period should be at least 5% of the channel occupancy time used by the equipment during the current fixed frame period. If the equipment wants to continue the transmission, the CCA process must be repeated.
  • the UE In order to transmit on the UL-SCH, the UE must have a valid uplink grant that is dynamically configured on the PDCCH or received within a random access response or configured semi-persistently. However, this may not be the case when non-adaptive HARQ retransmission is performed.
  • the terminal delivers HARQ information associated with an uplink grant to an HARQ entity.
  • the terminal has a respective HARQ entity for each serving cell with uplink.
  • the HARQ entity has a parallel HARQ process that allows for continuous transmission while waiting for HARQ feedback for successful or failed reception of previous transmissions.
  • the HARQ process may mean a processor configured in a HARQ entity to perform an operation for continuously transmitting or an independent individual procedure for performing a specific operation in order.
  • the HARQ entity identifies the HARQ process in which the transmission will occur.
  • the HARQ entity also routes HARQ feedback, MCS and resources carried by the physical layer to the appropriate HARQ process.
  • the HARQ entity identifies the HARQ process associated with each TTI and, if an uplink grant is indicated for each identified HARQ process, obtains a MAC PDU from the "Multiplexing and assembly" entity, MAC PDU, uplink grant and Deliver HARQ information to the identified HARQ process and instruct the identified HARQ process to trigger transmission.
  • TTI bundling is configured, the same HARQ process is invoked for each transmission that is part of the same bundle.
  • HARQ retransmission within one bundle is non-adaptive. It is triggered without waiting for feedback from a previous transmission according to the TTI bundle size (TTI_BUNDLE_SIZE). The HARQ feedback of the bundle is only received for the last TTI of the bundle. Retransmission of a TTI bundle is likewise a TTI bundle.
  • TTI bundling is not supported if the terminal (or MAC entity) is configured with at least one SCells with uplink.
  • FIG. 2 is a diagram for describing an uplink HARQ operation.
  • Uplink HARQ in E-UTRAN has the following characteristics.
  • uplink data transmission in the nth subframe causes PHICH transmission in the n + 4 subframe.
  • the timing relationship varies according to downlink-uplink allocation.
  • uplink data transmission in the nth subframe causes PHICH transmission in the n + k (k is 4 or more) subframe.
  • n + k represents an uplink subframe in which Acknowledgment is to be transmitted from the UE.
  • the timing relationship between uplink grant reception and uplink data transmission is fixed.
  • FDD when the UE detects PDCCH / EPDCCH and / or PHICH transmission having DCI format 0/4 in the nth subframe, the corresponding PUSCH in the n + 4 subframe according to the PDCCH / EPDCCH and PHICH information.
  • the UE shall upon detection on a given serving cell of a PDCCH / EPDCCH with DCI format 0/4 and / or a PHICH transmission in subframe n intended for the UE, adjust the corresponding PUSCH transmission in subframe n + 4 according to the PDCCH / EPDCCH and PHICH information).
  • n + k sub according to the PDCCH / EPDCCH and PHICH information. Adjust the corresponding PUSCH in the frame.
  • k is provided in Table 8-2 of 3GPP document TS36.213 (For TDD UL / DL configurations 1-6 and normal HARQ operation, the UE shall upon detection of a PDCCH / EPDCCH with uplink DCI format and / or a PHICH transmission in subframe n intended for the UE, adjust the corresponding PUSCH transmission in subframe n + k, with k given in Table 8-2 in TS36.213, according to the PDCCH / EPDCCH and PHICH information).
  • Retransmission for each HARQ process occurs at a predefined time for the initial transmission. For example, if uplink data transmission of the nth subframe is not successfully received, retransmission is required for n + 8 subframes for the FDD.
  • the maximum number of retransmissions may be configured for each terminal.
  • Downlink ACK / NACK for uplink (re) transmission can be sent over PHICH.
  • the UE If the PDCCH for the UE is correctly received regardless of the contents of the HARQ feedback (ACK or NACK), the UE follows the request of the PDCCH to the UE. That is, the terminal performs transmission or retransmission. (Regardless of the content of the HARQ feedback (ACK or NACK), when a PDCCH for the UE is correctly received, the UE follows what the PDCCH asks the UE to do i.e.perform a transmission or a retransmission (referred to as adaptive retransmission)
  • HARQ feedback indicates whether the UE performs retransmission. (When no PDCCH addressed to the C-RNTI of the UE is detected, the HARQ feedback dictates how the UE performs retransmissions:
  • NACK the UE performs a non-adaptive retransmission i.e. a retransmission on the same uplink resource as previously used by the same process;
  • ACK the UE does not perform any UL (re) transmission and keeps the data in the HARQ buffer.
  • a PDCCH is then required to perform a retransmission i.e. a non-adaptive retransmission cannot follow.
  • the conventional E-UTRAN does not provide a function for satisfying the LBT requirement of the unlicensed band. Therefore, uplink data could not be transmitted by combining LBT operations in the terminal.
  • the UE performs uplink transmission after a predetermined (processing) time after receiving an uplink grant from the base station. Therefore, when the unlicensed band is to be used in the E-UTRAN, even if the UE receives an uplink grant from the base station, it is necessary to perform LBT before the uplink transmission. Accordingly, the terminal should detect whether the radio link is available for a certain period of time, and stop the uplink data transmission when the use of the radio link is detected.
  • E-UTRAN did not provide this behavior.
  • E-UTRAN is based on synchronous HARQ retransmission
  • a failure of uplink data transmission / retransmission may cause a delay of a certain time.
  • the synchronous HARQ retransmission if the UE fails to transmit, even if the time to perform retransmission (subframe) falls within an unavailable interval (eg, an idle period or an unavailable time or gap), the UE may perform non-adaptive retransmission. There was a problem that could be done.
  • the terminal of the present invention may perform radio link detection, channel occupancy detection, collision detection, or energy detection during a detection time, a detection time, or a listening time to perform an LBT operation. For example, the terminal may determine whether the energy level of the corresponding band exceeds a specific threshold for energy detection.
  • energy detection is performed for a predetermined time with respect to the LBT operation of the aforementioned terminal.
  • This description is meant to include the above-described detection time or detection time or listening time, respectively, and should be understood to include both radio link detection channel occupancy detection or collision detection. That is, the following briefly describes an operation of performing energy detection for a predetermined time, but is not limited thereto.
  • the present invention devised to solve this problem is to provide an uplink data transmission / retransmission method that satisfies the LBT constraint.
  • an object of the present invention is to provide a method for effectively retransmitting uplink data when the terminal fails to perform uplink transmission / retransmission due to LBT.
  • an unlicensed frequency band may be used based on LTE
  • a case where a small cell is used in an indoor or outdoor hot spot established by an individual operator may be considered.
  • Release 10 or Release 11 Carrier Aggregation (CA) technology based on a single base station may be used.
  • CA Carrier Aggregation
  • the primary cell may use the licensed band frequency, and the unlicensed frequency band may be used for the merged secondary cell.
  • two base station-based Release 12 Dual Connectivity technology can be used.
  • dual connectivity technology one or more cells of the master base station cell group or the primary cell in the master base station cell group or the master base station cell group may use the licensed band frequency.
  • One or more cells of the secondary base station cell group or the secondary base station cell group may use an unlicensed band frequency.
  • FIG. 3 is a diagram illustrating an example of unlicensed band cell merging to which the present invention can be applied.
  • an unlicensed band cell may be used for downlink transmission only or may be used for both uplink and downlink transmission.
  • one or more unlicensed band cells using an unlicensed frequency band may be configured to transmit data through the unlicensed band.
  • the unlicensed band cell may be used for downlink only.
  • an unlicensed band cell can be used for uplink and downlink data transmission.
  • the base station and the terminal of the present invention can be applied to various embodiments as follows to effectively perform LBT-based uplink data transmission / retransmission.
  • Each embodiment described below may be used independently, or may be used in combination with each other.
  • FIG. 4 is a view for explaining the operation of the terminal according to an embodiment of the present invention.
  • a terminal comprises the steps of configuring a carrier aggregation including an unlicensed band cell using a frequency shared by one or more communication systems and receiving scheduling information for uplink transmission in the unlicensed band cell And determining whether the unlicensed band cell is an available interval and transmitting uplink data based on scheduling information if the unlicensed band cell is an available interval.
  • the terminal of the present invention includes a step of configuring carrier aggregation including an unlicensed band cell using a frequency shared by one or more communication systems (S410).
  • the terminal may configure carrier aggregation using the licensed band cell and the unlicensed band cell according to the configuration of the base station.
  • the terminal may receive configuration information necessary for configuring carrier aggregation from the base station.
  • the terminal may transmit / receive data with the base station using the configured licensed band cell and unlicensed band cell.
  • the unlicensed band cell may be set to uplink or downlink.
  • the terminal of the present invention includes the step of receiving scheduling information for uplink transmission in the unlicensed band cell (S420).
  • the terminal may receive scheduling information for uplink data transmission in the unlicensed band cell from the base station.
  • the scheduling information includes uplink grant information.
  • the terminal of the present invention includes the step of determining whether the unlicensed band cell is available interval (S430). As described above, the terminal may determine whether the radio link or the radio channel of the unlicensed band cell is available. To this end, the terminal may check whether energy detection or radio link occupancy / collision for the corresponding unlicensed band cell. That is, the terminal may perform the same operation as the radio link energy detection in the above-described LBT procedure.
  • the present invention includes transmitting uplink data based on the scheduling information (S440).
  • the terminal may or may not transmit uplink data through the unlicensed band cell according to the determination result of step S530.
  • a hybrid automatic repeat request (HARQ) entity of the terminal is a HARQ process for performing uplink data transmission, Medium Access Control (MAC) Protocol Data Unit (PDU), up One or more of a link grant (UL grant) and HARQ information may be carried.
  • MAC Medium Access Control
  • PDU Protocol Data Unit
  • UL grant link grant
  • HARQ information may be carried.
  • the terminal may transmit uplink data to the base station in the corresponding unlicensed band cell.
  • the terminal may transmit uplink data when the unlicensed band cell becomes an available period through an asynchronous retransmission procedure.
  • the terminal may determine whether the next transmission time interval (TTI) is an available interval, and may transmit uplink data when the unlicensed band cell becomes an available interval.
  • TTI transmission time interval
  • the maximum value of the next TTI may be set by the base station.
  • Example 1 After performing an LBT after instructing the HARQ process to generate a transmission to the physical layer
  • FIG. 5 is a diagram illustrating an uplink data transmission processing procedure of a terminal according to another embodiment of the present invention.
  • the present invention may instruct the HARQ process to generate a transmission to the physical layer, and then perform LBT.
  • the terminal delivers HARQ information associated with an uplink grant or uplink grant received at the physical layer to the HARQ entity or the MAC layer (S510).
  • the UE has a TTL, a serving cell to which the TAG in which the timeAlignmentTimer operates, and each grant received in the TTI has an uplink grant for the corresponding TTI and the serving cell.
  • the terminal may transmit HARQ information associated with the uplink grant to the HARQ entity.
  • the terminal may transmit HARQ information associated with the uplink grant to the HARQ entity.
  • the terminal transmits a MAC PDU to be transmitted with the uplink grant or the uplink grant associated with the uplink grant indicated for the TTI to the given TTI through the HARQ entity to the HARQ process to generate a transmission to the corresponding TTI (S520).
  • the UE instructs that the HARQ process identified through the HARQ entity triggers a new transmission or generates an adaptive retransmission (S520). If the uplink grant is not indicated for the corresponding HARQ process and the corresponding TTI and the HARQ buffer is not empty, the identified HARQ process may instruct to generate non-adaptive retransmission.
  • the HARQ entity identifies the HARQ process for which the transmission will occur.
  • the HARQ process can be identified through the HARQ process ID included in the received HARQ information.
  • the HARQ process can be identified based on timing information. Can be.
  • the HARQ entity routes the received HARQ feedback, MCS and resources to the appropriate HARQ process.
  • the HARQ entity For each TTI, the HARQ entity identifies the HARQ process associated with that TTI. For each identified HARQ process, the HARQ entity obtains a MAC PDU to be transmitted from the "Multiplexing and assembly" entity when certain conditions are satisfied, and delivers the MAC PDU, uplink grant, and HARQ information to the identified HARQ process. . In addition, the HARQ entity instructs the identified HARQ process to trigger the transmission.
  • the specific condition is that when an uplink grant is indicated to the corresponding HARQ process and the corresponding TTI, when the received grant is provided with the NDI toggled relative to the value for the previous transmission of this HARQ process, the associated HARQ information, or It may be one of the cases where the HARQ buffer received and identified on the PDCCH for that C-RNTI is empty.
  • the HARQ process instructs to generate the transmission according to the uplink grant stored with the current redundancy version to the physical layer in order to generate the uplink transmission (S530).
  • the HARQ process increases the current redundancy version by 1 (S540).
  • Each HARQ process is associated with one HARQ buffer.
  • Each HARQ process maintains a 'CURRENT_TX_NB' state variable indicating the number of transmissions to occur for the MAC PDU of the current buffer and a 'HARQ_FEEDBACK' state variable indicating the HARQ feedback for the MAC PDU of the current buffer.
  • the order of the redundancy version is 0, 2, 3, 1.
  • the variable 'CURRENT_IRV' is an index in redundancy version order.
  • the new transmission is performed with the MCS indicated on the PDCCH on the resource.
  • Adaptive transmission is performed with the MCS indicated on the PDCCH on the resource. If non-adaptive transmission is used, non-adaptive transmission is performed with the same MCS that was used for previously made transmission attempts on the same resource.
  • the terminal is configured with the maximum number of HARQ transmission information.
  • the terminal is configured with maximum timer information for HARQ transmission.
  • the HARQ process sets the 'CURRENT_TX_NB' to 0, sets the 'CURRENT_IRV' to 0, stores the MAC PDU in the associated HARQ buffer, received from the HARQ entity. At least one of an operation of storing an uplink grant and an operation of setting 'HARQ_FEEDBACK' to NACK is performed, and a transmission described below is generated.
  • the HARQ process performs an operation of incrementing 'CURRENT_TX_NB' by 1 and generates a transmission described below. If the HARQ entity requests adaptive retransmission, storing the uplink grant received from the HARQ entity, setting 'CURRENT_IRV' to an index corresponding to the redundancy version value provided in the HARQ information, and 'HARQ_FEEDBACK' to NACK. Perform at least one of the setting operations, and generate a transmission as described below. Otherwise, if the HARQ request requested non-adaptive retransmission, the transmission described below is generated when 'HARQ_FEEDBACK' is NACK.
  • the HARQ process does not have a measurement gap at that transmission time, and in the case of retransmission, if the retransmission does not collide with the transmission for the MAC PDU obtained from the Msg3 buffer at this TTI, the 'CURRENT_IRV' at the physical layer. Instructs to generate a transmission according to the stored uplink grant with a redundancy version corresponding to the value, and increments 'CURRENT_IRV' by one.
  • the terminal or the physical layer detects or detects a radio link for a predetermined time (S550).
  • the MAC layer eg, HARQ entity or HARQ process
  • the MAC layer may perform step S550.
  • the terminal If the occupancy or collision is detected on the radio link or the energy level exceeds a certain threshold value, the terminal does not perform uplink transmission to the corresponding TTI (S560). For example, the physical layer does not perform the indicated transmission.
  • the terminal If the occupancy or collision is not detected on the radio link or if the energy level is lower than a specific threshold value, the terminal performs uplink transmission to the corresponding TTI (S570).
  • a terminal may have a channel occupancy time in a range of 1 ms to 10 ms that can be transmitted on a given channel without re-evaluating channel availability.
  • the base station does not re-evaluate the availability of the radio link when the terminal succeeds in evaluating the availability of the radio link for uplink transmission or when the radio link energy is detected and no occupancy or collision is detected on the radio link.
  • a transmission time for performing link transmission may be configured in the terminal or related information may be provided to the terminal.
  • the base station may configure a transmission time for the terminal to perform the uplink transmission without re-evaluating the availability of the radio link, or may provide related information to the terminal.
  • the base station may allow to re-evaluate the availability of the radio link at every uplink transmission time.
  • the terminal may configure a state variable for checking whether to perform radio link energy detection in the unlicensed band cell. For example, the terminal sets the aforementioned state variable to 0 in the TTI to perform initial uplink transmission of the unlicensed band cell. If the occupancy or collision is not detected on the radio link in the radio link energy detection for the TTI to perform the initial uplink transmission, or if the energy level does not exceed a certain threshold value, the state variable according to the TTI elapsed by the TTI configured in the base station. To increase.
  • the state variable is reset to zero at the next TTI.
  • radio link energy sensing is performed.
  • the radio link energy sensing step is performed as in the embodiments included in the present invention.
  • the terminal may not be able to transmit the uplink at the actual uplink time even when the terminal receives the uplink grant according to the LBT requirement or the maximum channel occupancy requirement.
  • the terminal when the terminal receives the uplink grant and stores the MAC PDU in the HARQ buffer to trigger a new transmission, a delay may occur in the transmission of the MAC PDU.
  • Example 2 Instructs HARQ Process to Generate Transmission to Physical Layer After Checking Energy Detection
  • FIG. 6 is a diagram for explaining an uplink data transmission processing procedure according to another embodiment of the present invention.
  • the physical layer of the terminal transmits the HARQ information associated with the received uplink grant or uplink grant to the HARQ entity or MAC layer (S610). For example, in a situation in which the UE has a C-RNTI, the UE has a TTL, a serving cell to which the TAG in which the timeAlignmentTimer operates, and each grant received in the TTI has an uplink grant for the corresponding TTI and the serving cell. When received on the PDCCH for the C-RNTI that the terminal has, it may transmit HARQ information associated with the uplink grant to the HARQ entity. Alternatively, when the uplink grant for the corresponding TTI is received through a random access response, the terminal may transmit HARQ information associated with the uplink grant to the HARQ entity.
  • the terminal transmits a MAC PDU to be transmitted with the uplink grant or the uplink grant associated with the uplink grant indicated for the TTI to the given TTI through the HARQ entity to the HARQ process to generate a transmission to the corresponding TTI (S620).
  • the UE instructs the HARQ process identified through the HARQ entity to trigger a new transmission or generate an adaptive retransmission (S620). If the uplink grant is not indicated for the corresponding HARQ process and the corresponding TTI and the HARQ buffer is not empty, the identified HARQ process may instruct to generate non-adaptive retransmission.
  • the HARQ entity identifies the HARQ process for which the transmission will occur.
  • the HARQ process can be identified through the HARQ process ID included in the received HARQ information.
  • the HARQ process can be identified based on the timing information. Can be.
  • the HARQ entity routes the received HARQ feedback, MCS and resources to the appropriate HARQ process.
  • the HARQ entity For each TTI, the HARQ entity identifies the HARQ process associated with that TTI. For each identified HARQ process, the HARQ entity obtains a MAC PDU to be transmitted from the "Multiplexing and assembly" entity when certain conditions are satisfied, and delivers the MAC PDU, uplink grant, and HARQ information to the identified HARQ process. . In addition, the HARQ entity instructs the identified HARQ process to trigger the transmission.
  • the specific condition is that when an uplink grant is indicated to the corresponding HARQ process and the corresponding TTI, when the received grant is provided with the NDI toggled relative to the value for the previous transmission of this HARQ process, the associated HARQ information, or It may be one of the cases where the HARQ buffer received and identified on the PDCCH for that C-RNTI is empty.
  • the terminal may additionally instruct the radio link energy detection of the unlicensed band cell in step S620.
  • the terminal may instruct radio link energy detection of the unlicensed band cell before step S620.
  • radio link energy detection of an unlicensed band cell may be performed before step S610 or step S610 or between steps S610 and S620.
  • the terminal may detect the occupancy / collision of the corresponding radio link through the radio link energy detection of the unlicensed band cell (S630).
  • the terminal does not perform uplink transmission (S640). That is, the procedure may be terminated without performing uplink transmission for the corresponding uplink grant.
  • the corresponding MAC PDU is not stored in the HARQ buffer to trigger a new transmission.
  • the MAC PDU obtained from the "Multiplexing and assembly” entity is returned.
  • the terminal performs uplink transmission. That is, when the radio link energy detection indication for the unlicensed band cell is performed before step S620, for each TTI, the HARQ entity identifies the HARQ process associated with the TTI, and for the identified HARQ process, the " Multiplexing and assembly " entity.
  • the MAC PDU can be obtained from the UE, the uplink grant and the MAC PDU can be transmitted to the HARQ process, and the transmission / retransmission generation can be instructed.
  • the terminal may instruct the transmission to the physical layer (S650). If necessary, an operation of increasing the redundancy version may be performed (S660). Through this, the terminal performs a physical layer transmission step.
  • the terminal or the physical layer in the cell using the unlicensed frequency band detects or detects the radio link for a predetermined time (S630).
  • the MAC layer eg, HARQ entity or HARQ process
  • the terminal or the physical layer in the cell using the unlicensed frequency band detects or detects the radio link for a predetermined time (S630).
  • the MAC layer eg, HARQ entity or HARQ process
  • the terminal may not perform the uplink transmission (S640). In this case, the redundancy version (or 'CURRENT_IRV') can be maintained.
  • the HARQ process may set HARQ feedback to ACK.
  • the HARQ process may set HARQ feedback ('HARQ_FEEDBACK') to ACK at the time of detecting the occupancy / collision on the radio link for the transmission. If the non-adaptive retransmission is performed, the UE may perform non-adaptive transmission for the uplink transmission that did not perform the uplink transmission on the next transmission opportunity (for example, the n + 8th subframe). To this end, the HARQ process may maintain a state variable indicating that occupancy / collision is detected on the wireless link or that the energy level has not performed an uplink transmission above a certain threshold.
  • the terminal may perform uplink transmission.
  • the HARQ entity identifies the HARQ process associated with the corresponding TTI and, for the identified HARQ process, obtains a MAC PDU to send from the "Multiplexing and assembly" entity, forwards the uplink grant and the MAC PDU to the HARQ process and transmits / The retransmission can be instructed.
  • the HARQ process may instruct the physical layer to generate the transmission according to the uplink grant stored with the current redundancy version (S650).
  • the HARQ process may increase the current redundancy version by 1 (S660).
  • the HARQ process may collide with the transmission for the MAC PDU obtained from the Msg3 buffer in this TTI if no measurement gap exists at the time of that uplink transmission, and in the case of retransmission. If no occupancy / collision is detected on the wireless link, the physical layer is instructed to generate a transmission according to the stored uplink grant with a redundancy version corresponding to the value of 'CURRENT_IRV', and if not, performs non-adaptive retransmission. If it is, increase the 'CURRENT_IRV' by 1.
  • the UE may perform HARQ feedback ('HARQ_FEEDBACK') at the HARQ feedback reception time for the corresponding uplink transmission. Can be set to ACK.
  • HARQ_FEEDBACK' HARQ feedback
  • the base station may perform adaptive retransmission through the uplink grant. That is, it is possible to perform asynchronous adaptive retransmission through the uplink grant for the unlicensed band cell.
  • the adaptive retransmission may be performed at another time without performing the retransmission at the time for performing the retransmission (for example, the n + 8th subframe).
  • adaptive retransmission may be performed at a time (eg, n + 16th subframe) to perform the next retransmission.
  • an asynchronous adaptive retransmission may be performed at any time after the base station recognizes this uplink transmission reception failure.
  • Example 3 Instructs HARQ Process to Generate Transmission to Physical Layer After Checking Energy Detection
  • FIG. 7 is a diagram for explaining an uplink data transmission processing procedure according to another embodiment of the present invention.
  • the terminal performs an operation similar to the steps of FIGS. 5 and 6 described above. That is, the steps S710 to S730 and the steps S750 and S760 are the same as the operations of the uplink grant delivery, transmission / retransmission generation instruction, occupancy / collision check, physical layer transmission indication, and redundancy version increment operation of FIGS. 5 and 6. .
  • the base station knows when the terminal fails to perform uplink transmission according to the LBT requirement, or when the terminal detects an occupancy / collision on the radio link or when the energy level does not perform the uplink transmission above a certain threshold. You may or may not know.
  • the base station can know that the uplink transmission of the terminal is not performed, it may be better for the terminal and the base station to maintain the redundancy version (or 'CURRENT_IRV'). Or, even if the base station does not know that the uplink transmission is not performed, it may be better for the terminal and the base station to maintain the redundancy version (or 'CURRENT_IRV').
  • the terminal applies a specific redundancy version order whenever retransmission is performed. For example, redundancy version 0 for new transmissions, redundancy version 2 for the first retransmission, redundancy version 3 for the second retransmission, and redundancy version 1 for the third retransmission.
  • redundancy version 0 for new transmissions
  • redundancy version 2 for the first retransmission
  • redundancy version 3 for the second retransmission
  • redundancy version 1 for the third retransmission.
  • the terminal and the base station perform encoding and decoding by using the redundancy version for the transmission.
  • the terminal determines the redundancy version to be applied to the next retransmission using 'CURRENT_IRV'.
  • the UE increases the redundancy version without performing the uplink transmission, some of the above-described redundancy version may be omitted and transmission may cause performance degradation.
  • a small cell environment in which CA or dual connectivity is used may typically be a case where the terminal speed is low and the number of terminals handled by the base station is small, so it may be undesirable to use some of the redundancy versions to use the next redundancy version. .
  • the base station may know that the terminal did not perform the uplink transmission in the idle period or the unavailable time, which will be described below. In this case, the base station may maintain the redundancy version (or 'CURRENT_IRV') without increasing it.
  • the base station knows that the UE did not perform the uplink transmission by confirming that the next redundancy version is used as the previous transmission / retransmission for the (next) retransmission and thus does not increase the redundancy version (or 'CURRENT_IRV'). You can keep it.
  • the base station includes information indicating the occupancy / collision detection on the radio link in the scheduling information, or receives information indicating that the uplink transmission was not performed due to the LBT at the corresponding transmission / retransmission time from the terminal. By doing so, it may be known that the terminal has not performed the uplink transmission.
  • the UE may transmit information indicating that uplink transmission has not been performed due to LBT to the base station through a PCell or another licensed band cell.
  • the base station may maintain without increasing the redundancy version when the base station can know that the uplink is not transmitted.
  • the base station does not know that the uplink transmission is not performed according to the LBT operation of the terminal, an additional processing procedure may be required. Since the UE and the base station must perform encoding and decoding using the same redundancy version, it may be necessary to match the order of the redundancy versions according to the transmission / retransmission order. Thus, even if no occupancy / collision is detected on the wireless link or the uplink transmission is not performed when the energy level exceeds a certain threshold, increasing the redundancy version (or increasing 'CURRENT_IRV' by 1) may be allowed. Through this, when the transmission or the random retransmission fails due to the LBT, the terminal and the base station can be processed with the same redundancy version at the next transmission opportunity.
  • FIG. 8 is a diagram illustrating a section of an unlicensed band cell of the present invention.
  • the LBT requirement for frame based equipment requires that the minimum Idle Period should be at least 5% of the channel occupancy time used by the equipment during the current fixed frame period. Therefore, if the UE occupies and uses a certain time channel, it should not perform transmission for another predetermined time after that (for example, 1 ms). Similarly, when an operator uses an unlicensed frequency band, there may be an unavailable time / unavailable gap for coexistence with other technologies or with other operators.
  • any operator may configure an unlicensed band cell in a frequency band of an unlicensed spectrum to support LTE or LTE-Advanced terminal of the corresponding operator.
  • a time period is called an available period of an unlicensed band cell.
  • a time period in which a corresponding unlicensed band cell cannot be configured or used is referred to as an unavailable period.
  • this is also for convenience of description and the name is not limited.
  • Information related to the available interval of the unlicensed band cell for the terminal may be indicated by the base station.
  • the base station may indicate the start time and duration of the available interval through a licensed band cell such as a PCell of the terminal.
  • the base station may configure or pre-set the start time or period of the available interval through the licensed band cell or the unlicensed band cell of the terminal through an RRC message, MAC CE, PDCCH, or the like.
  • the uplink HARQ according to the prior art in the E-UTRAN is based on synchronous HARQ retransmission. For example, if uplink data transmission of the nth subframe is not successfully received, retransmission is required for n + 8 subframes for the FDD.
  • the HARQ entity identifies the HARQ process associated with the TTI. And for each identified HARQ process, if the uplink grant is not indicated to the corresponding HARQ process and the corresponding TTI, and if the HARQ buffer of the corresponding HARQ process is not empty, then the identified HARQ process is non-adaptive. May instruct to generate a retransmission.
  • the terminal may perform non-adaptive retransmission if the HARQ buffer of the HARQ process is not empty. Since the HARQ buffer stores the MAC PDU when the HARQ entity requests a new transmission and is flushed when the MAC is reset or the maximum number of HARQ transmissions is reached, non-adaptive retransmission may be performed when the transmission fails.
  • the specific idle period or unavailable period may be known to both the terminal and the base station.
  • another particular idle period or unavailable period may be known only to the terminal.
  • the HARQ entity may indicate not to generate non-adaptive retransmissions.
  • the HARQ process may not instruct the physical layer to generate a transmission.
  • the UL-SCH transmission may not be performed. That is, according to the LBT requirement or the maximum channel occupancy requirement, the synchronized non-adaptive retransmission of the uplink HARQ according to the prior art may not be performed in the unlicensed band cell.
  • the HARQ entity may instruct the identified HARQ process not to generate non-adaptive retransmission.
  • the terminal may transmit information indicating that uplink transmission has not been performed due to an idle period or an unavailable period to a base station through a PCell or another licensed band cell. Through this, the base station may obtain information on a specific idle period or unavailable period that only the terminal knows. In addition, through this, the terminal and the base station may maintain the same redundancy version at the retransmission opportunity.
  • HARQ feedback cannot be received.
  • non-adaptive retransmission may occur continuously. For example, if an uplink transmission or retransmission cannot be performed because the time of any transmission or retransmission overlaps with an idle period or an unavailable period, if the base station knows information about the idle period or the unavailable period, it is unnecessary. Transmission of HARQ feedback may be restricted. However, even in this case, since the UE has the MAC PDU in the HARQ buffer and the HARQ feedback is set to NACK, the UE may perform retransmission in the next retransmission subframe.
  • the terminal ACKs HARQ feedback ('HARQ_FEEDBACK') at the HARQ feedback reception time for the corresponding uplink transmission. Can be set.
  • the base station successfully receives the uplink transmission of the terminal, it is possible to prevent the retransmission of unnecessary uplink transmission of the terminal.
  • the base station does not receive the uplink transmission of the terminal, it may be to perform the adaptive retransmission through the uplink grant. That is, by setting the HARQ feedback value to ACK, the terminal may perform adaptive retransmission at different times according to the uplink grant without performing retransmission at the time for retransmission.
  • the UE may perform adaptive retransmission at the time (eg, n + 16th subframe) to perform the next retransmission.
  • the terminal may perform asynchronous adaptive retransmission at any time after recognizing that the base station has failed to receive the uplink transmission.
  • FIG. 9 is a diagram illustrating an uplink data transmission processing procedure of a terminal according to another embodiment of the present invention.
  • E-UTRAN is based on synchronous HARQ retransmission, there is a problem that can cause a delay of time if the uplink data transmission or retransmission fails. If the UE fails to uplink transmission or retransmission due to the occupancy / collision occurring temporarily in the unlicensed frequency band, there may be a problem that the transmission speed of the terminal decreases due to an increase in delay.
  • the terminal of the present invention detects the occupancy or collision on the radio link or when the uplink transmission is not performed to a specific TTI when the energy level exceeds a certain threshold value, the corresponding uplink data is available at the next transmission time. Can transmit Alternatively, the terminal may transmit the corresponding uplink data at the next available transmission time on the received uplink grant. Alternatively, the terminal may transmit data (MAC PDU) not performing uplink transmission to the specific TTI described above at a possible time during the transmission time. In summary, the terminal may use asynchronous retransmission with uplink HARQ of the unlicensed band cell.
  • the base station When the terminal does not perform uplink transmission to a specific TTI by the LBT operation, the base station sends a higher layer message (for example, configuration information for transmitting uplink data that has not been transmitted to the specific TTI within a predetermined time). , An RRC reconfiguration message).
  • a higher layer message for example, configuration information for transmitting uplink data that has not been transmitted to the specific TTI within a predetermined time.
  • An RRC reconfiguration message For convenience of description, when uplink transmission is not performed to a specific TTI by the LBT operation, configuration information for transmitting uplink data that has not been transmitted to the specific TTI within a predetermined time is referred to as "unlicensed band. Maximum retransmission time range associated with the cell's LBT operation.
  • the base station may instruct the terminal to set the configuration information through the L1 / L2 signaling message.
  • the configuration information may be included in the information configuring the unlicensed band cell and may be indicated, or may be indicated in the related MAC configuration information. Alternatively, the configuration information may be indicated through other information.
  • the terminal may transmit uplink data that could not be transmitted at the next available transmission time, the next available transmission time on the received uplink grant, or a later transmission time using the corresponding configuration information. For example, when the maximum retransmission time range configuration information (or configuration information) related to the LBT operation of the unlicensed band cell is configured in the terminal, the base station may transmit uplink scheduling grants for a plurality of subframes / TTIs.
  • the base station when the base station does not perform the uplink transmission by the LBT operation to the corresponding subframe / TTI within the maximum retransmission time range associated with the LBT operation of the unlicensed band cell, It may allow (or know) to attempt uplink transmission in the next subframe / TTI.
  • the terminal when the above configuration information is configured in the terminal, when the terminal does not perform the uplink transmission by the LBT operation to the corresponding subframe / TTI within the maximum retransmission time range associated with the LBT operation of the unlicensed band cell, A control may be made to attempt uplink transmission in a subframe / TTI.
  • the terminal transmits HARQ information associated with the received uplink grant or uplink grant to the HARQ entity or the MAC layer (S910).
  • the UE has a TTL, a serving cell to which the TAG in which the timeAlignmentTimer operates, and each grant received in the TTI has an uplink grant for the corresponding TTI and the serving cell.
  • the terminal may transmit HARQ information associated with the uplink grant to the HARQ entity.
  • the terminal may transmit HARQ information associated with the uplink grant to the HARQ entity.
  • the terminal transmits a MAC PDU to be transmitted with the uplink grant or the uplink grant associated with the uplink grant indicated for the TTI to the given TTI through the HARQ entity to the HARQ process to generate a transmission to the corresponding TTI (S920).
  • the UE instructs the HARQ process identified through the HARQ entity to trigger a new transmission or generate an adaptive retransmission (S920).
  • the HARQ entity For example, for a given TTI, if an uplink grant is indicated for that TTI, the HARQ entity identifies the HARQ process for which the transmission will occur. The HARQ process is identified through the HARQ process ID included in the received HARQ information. In addition, the HARQ entity routes the received HARQ feedback, MCS and resources to the appropriate HARQ process.
  • the HARQ entity For each TTI, the HARQ entity identifies the HARQ process associated with that TTI. For example, the HARQ entity identifies the HARQ process through the HARQ process ID included in the received HARQ information. The HARQ entity satisfies a specific condition for each identified HARQ process, and if there is data in the asynchronous HARQ buffer, acquires a MAC PDU to be transmitted from the asynchoronous HARQ buffer, and identifies the MAC PDU, uplink grant and HARQ information. And instruct the identified HARQ process to trigger the transmission.
  • the HARQ entity obtains the MAC PDU to transmit from the "Multiplexing and assembly" entity and forwards the MAC PDU, uplink grant and HARQ information to the identified HARQ process. And instruct the identified HARQ process to trigger the transmission.
  • the specific condition is that if the uplink grant is indicated to the corresponding HARQ process and the corresponding TTI, if the received grant is provided with the NDI toggled relative to the value for the previous transmission of this HARQ process, the associated HARQ information, It means a condition that satisfies one of the case where the received HARQ buffer received on the PDCCH for the C-RNTI is empty and there is no previous NDI for the corresponding HARQ process.
  • the asynchoronous HARQ buffer described above will be described separately below.
  • the terminal may additionally instruct the radio link energy detection of the unlicensed band cell in step S920.
  • the terminal may instruct radio link energy detection of the unlicensed band cell before step S920.
  • the radio link energy detection indication of the unlicensed band cell may be performed before step S910 or step S910 or between steps S910 and S920.
  • the HARQ entity may have an indication of radio link energy sensing of an unlicensed band cell.
  • the HARQ entity first performs the step of instructing radio link energy detection of an unlicensed band cell. If the occupancy / collision is detected on the radio link or the energy level exceeds a certain threshold, the terminal does not perform uplink transmission.
  • the procedure may be terminated without performing uplink transmission for the corresponding uplink grant.
  • the terminal when the UE detects radio link energy at the corresponding uplink transmission time with respect to the received uplink grant, the terminal does not store the MAC PDU in the HARQ buffer to trigger a new transmission. Or, return the MAC PDU obtained from the "Multiplexing and assembly” entity. Or, do not acquire a MAC PDU to transmit from the "Multiplexing and assembly” entity. In this way, MAC PDUs not used for new transmissions at the corresponding uplink transmission time can be quickly transmitted to the next transmission opportunity.
  • the UE or the physical layer detects or detects a radio link for a predetermined time (S930).
  • the MAC layer eg, HARQ entity or HARQ process
  • the MAC layer may perform step S930.
  • the terminal may perform uplink transmission.
  • the HARQ process may instruct the physical layer to generate a transmission according to an uplink grant stored with a current redundancy version in order to generate an uplink transmission (S950).
  • the HARQ process may increase the current redundancy version by 1 (S960).
  • the HARQ entity identifies the HARQ process associated with the TTI and, for the identified HARQ process, “Multiplexing and assembly Obtain the MAC PDU to transmit from the entity, forward the uplink grant and the MAC PDU to the HARQ process, and direct the transmission / retransmission generation.
  • the terminal may not perform the uplink transmission / retransmission (S940).
  • the HARQ process may transfer information stored in the HARQ buffer to a temporary asynchronous HARQ buffer and flush the HARQ buffer.
  • the HARQ process may set the HARQ buffer as an asynchronous HARQ buffer.
  • the Asynchronous HARQ buffer may be used by the HARQ entity at the next available transmission time, the next available transmission time on the received uplink grant, or the next retransmission time range associated with the LBT operation of the unlicensed band cell configured by the base station.
  • the contents of the asynchronous HARQ buffer may be stored as the HARQ buffer of the identified HARQ process to be delivered to the corresponding TTI, and the asynchronous HARQ buffer may be flushed.
  • the HARQ process may maintain a HARQ buffer. If the base station receives the data, the base station may trigger a new transmission for the HARQ process. The UE may store a new MAC PDU in the HARQ buffer when a new transmission for the corresponding HARQ process is triggered. If the base station does not receive the data, the base station may instruct an adaptive retransmission for the HARQ process. The UE may perform adaptive retransmission through the HARQ buffer stored for the corresponding HARQ process in the maximum retransmission time range associated with the LBT operation of the unlicensed band cell.
  • the HARQ process increases the 'CURRENT_TX_NB' by 1, stores the uplink grant received from the HARQ entity, and transmits the 'CURRENT_IRV' to the HARQ information.
  • One or more of the operation of setting an index corresponding to a version value, setting 'HARQ_FEEDBACK' to NACK, and increasing a variable representing the maximum retransmission time range state related to LBT operation of an unlicensed band cell by 1 Can be.
  • variable representing the maximum retransmission time range state associated with LBT operation of an unlicensed band cell is set to 0 on an LBT initial attempt or an initial transmission attempt that is toggled to NDI, and then incremented by 1 depending on the transmission attempt associated with the LBT operation of an unlicensed band cell. Can be.
  • the UE may perform HARQ retransmission in the next subframe in a maximum retransmission time range related to LBT operation of an unlicensed band cell without HARQ feedback or explicit scheduling grant. For example, in the first subframe / TTI of the maximum retransmission time range associated with LBT operation of an unlicensed band cell, if occupancy / collision is detected on the radio link or the energy level does not perform uplink transmission above a certain threshold, An uplink transmission may be attempted in the second consecutive subframe / TTI of the maximum retransmission time range associated with the LBT operation of the unlicensed band cell.
  • this operation may be repeatedly performed until a subframe in which TTI bundling is set. For example, if the maximum retransmission time range related to LBT operation of an unlicensed band cell is set to 4 subframes, uplink transmissions up to 4 subframes / TTIs may be attempted even if uplink transmissions are not performed for 3 consecutive LBT reasons. Can be.
  • the prior art TTI bundling was applicable only to the case where the SCell is not configured at the cell boundary where the radio environment is not good.
  • the LBT succeeds (e.g., when the energy level is lower than a specific threshold) within the maximum retransmission time range related to the LBT operation of the unlicensed band cell described above.
  • the UE may be configured not to perform uplink transmission in the remaining subframe in the maximum retransmission time range related to the LBT operation of the unlicensed band cell.
  • the uplink configuration information (ul-SCH-Config) is included in the MAC-MainConfig information element. Therefore, when the terminal is configured through a single base station, since the terminal has one MAC-MainConfig, the terminal is configured with one value for each parameter regardless of the cell (s) to be configured. When the terminal is configured through two base stations through the dual connectivity, the terminal has two MAC-MainConfig, so each base station is configured with one value for each parameter regardless of the cell (s) configured in each base station.
  • a cell using an unlicensed frequency band may have an LBT constraint. If there are many collisions in the unlicensed frequency band, it may be desirable to make the retransmission by the ARQ function of the RLC layer faster than to perform the retransmission up to HARQ maximum retransmission (current default value of E-UTRAN is 5). This allows retransmission through the PCell.
  • the maximum number of HARQ transmissions (maxHARQ-Tx) of the unlicensed frequency band cell may be set separately from other cells (for example, PCell) or Mac-MainConfig.
  • the unlicensed band cell may set the maximum transmission timeout instead of the maximum number of transmissions to flush the HARQ buffer.
  • FIG. 10 is a view for explaining the operation of the base station according to another embodiment of the present invention.
  • a base station In a method for receiving uplink data, a base station according to another embodiment of the present invention comprises a step of configuring carrier aggregation in a terminal including an unlicensed band cell using a frequency shared by one or more communication systems and an unlicensed band cell. And transmitting scheduling information for uplink transmission in the UE and receiving the uplink data transmitted from the terminal based on the scheduling information and whether the unlicensed band cell is available.
  • the base station of the present invention includes a step of configuring carrier aggregation in a terminal including an unlicensed band cell using a frequency shared by one or more communication systems (S1010).
  • the base station may configure carrier aggregation in the terminal using an unlicensed band cell and a licensed band cell.
  • the base station may transmit information necessary for configuring carrier aggregation to the terminal to the terminal.
  • the base station includes the step of transmitting the scheduling information for uplink transmission in the unlicensed band cell (S1020).
  • the base station may transmit scheduling information necessary for the terminal to transmit the uplink data in the unlicensed band cell.
  • the scheduling information may include uplink grants and the like.
  • the base station includes receiving the uplink data transmitted from the terminal based on the scheduling information and whether the unlicensed band cell is available (S1030).
  • the base station may receive the uplink data transmitted at a possible time by performing the LBT operation prior to receiving the uplink data.
  • a hybrid automatic repeat request (HARQ) entity of the terminal is a HARQ process for performing uplink data transmission when an unlicensed band cell is available, and a medium access control (MAC) protocol data unit (PDU) and an uplink grant.
  • MAC medium access control
  • One or more of (UL grant) and HARQ information may be delivered. This allows the base station to receive uplink data.
  • the uplink data may be data transmitted when the unlicensed band cell becomes available through an asynchronous retransmission procedure when the unlicensed band cell is unavailable.
  • the uplink data may be data transmitted when the unlicensed band cell becomes an available interval by determining whether the next transmission time interval (TTI) is an available interval.
  • TTI transmission time interval
  • the maximum value of the next TTI may be a value set by the base station, and the base station may transmit the corresponding value to the terminal.
  • the maximum value of the next TTI may indicate the maximum retransmission time range associated with the LBT operation of the unlicensed band cell described above.
  • the base station may perform all of the base station operations required for the terminal to implement each of the above-described embodiments.
  • the present invention uses an unlicensed band cell in an E-UTRAN, whereby the terminal detects a radio link before uplink transmission and transmits / retransmits the uplink so that the terminal efficiently uplinks while satisfying the LBT constraint. Provides the effect of performing a transfer.
  • FIG. 11 is a view for explaining a terminal configuration according to another embodiment of the present invention.
  • the terminal 1100 of the present invention includes an unlicensed band cell using a frequency shared by one or more communication systems and performs uplink transmission in the unlicensed band cell and the control unit 1110 constituting carrier aggregation.
  • the receiving unit 1130 for receiving the scheduling information for and the unlicensed band cell is an available period, and includes a transmitting unit 1120 for transmitting uplink data based on the scheduling information
  • the control unit 1110 is used by the unlicensed band cell It further comprises a configuration for determining whether or not the possible section.
  • the controller 1110 is a HARQ process in which a hybrid automatic repeat request (HARQ) entity of the terminal 1100 performs uplink data transmission when an unlicensed band cell is available, and a medium access control (MAC) protocol data unit (PDU). ), One or more of an UL grant and HARQ information can be controlled.
  • HARQ hybrid automatic repeat request
  • MAC medium access control
  • control unit 1110 detects the energy of the radio link of the unlicensed band cell before the uplink data transmission necessary to perform the above-described invention, and according to the result of the overall terminal of the retransmission of the uplink data Control the operation.
  • the transmitter 1120 may transmit uplink data when the unlicensed band cell becomes an available interval through an asynchronous retransmission procedure.
  • the transmitter 1120 may determine whether the next TTI is an available interval, and may transmit uplink data when the unlicensed band cell becomes an available interval.
  • the maximum value of the next TTI is a value set by the base station.
  • the transmitter 1130 transmits uplink control information, data, and a message to a base station through a corresponding channel.
  • the receiver 1130 receives downlink control information, data, and a message from a base station through a corresponding channel. In addition, the receiver 1130 may receive necessary configuration information, indication information, etc. from the base station according to each embodiment.
  • FIG. 12 is a view for explaining the configuration of a base station according to another embodiment of the present invention.
  • the base station 1200 of the present invention includes an unlicensed band cell using a frequency shared by one or more communication systems and a control unit 1210 constituting carrier aggregation in a terminal and an uplink in an unlicensed band cell.
  • the control unit 1210 detects the energy of the radio link of the unlicensed band cell before the uplink data transmission by the terminal required to perform the above-described present invention, and performs an overall retransmission of the uplink data according to the result. To control the operation.
  • the receiver 1230 may receive the transmitted data as uplink data when the unlicensed band cell becomes an available section through an asynchronous retransmission procedure. In addition, when the unlicensed band cell is an unusable section, the receiver 1230 determines whether the next transmission time interval (TTI) is an available section and receives the transmitted data as uplink data when the unlicensed band cell is an available section. can do.
  • TTI next transmission time interval
  • the controller 1210 may set the maximum value of the following TTI.
  • the transmitter 1220 and the receiver 1230 are used to transmit and receive signals, messages, and data necessary for carrying out the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

La présente invention concerne un procédé pour transmettre des données de liaison montante d'un terminal, et un appareil correspondant. Plus particulièrement, la présente invention concerne un procédé et un appareil pour transmettre et recevoir des données à l'aide d'une bande de fréquences non autorisée. En particulier, la présente invention concerne un procédé et un appareil pour transmettre, par un terminal, des données de liaison montante, le procédé comprenant les étapes consistant : à configurer une agrégation de porteuses comprenant une cellule de bande non autorisée qui utilise une fréquence partagée par un ou plusieurs systèmes de communication ; à recevoir des informations de planification pour une transmission en liaison montante dans la cellule de bande non autorisée ; à déterminer si la cellule de bande non autorisée se trouve ou non dans une section disponible ; et à transmettre les données de liaison montante sur la base des informations de planification si la cellule de bande non autorisée se trouve dans une section disponible.
PCT/KR2015/006996 2014-07-25 2015-07-07 Procédé pour transmettre des données de liaison montante dans une cellule de bande non autorisée, et appareil correspondant Ceased WO2016013781A1 (fr)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR10-2014-0094984 2014-07-25
KR20140094984 2014-07-25
KR10-2015-0090831 2015-06-26
KR1020150090831A KR20160013508A (ko) 2014-07-25 2015-06-26 비면허대역 셀에서 업링크 데이터를 전송하는 방법 및 그 장치

Publications (1)

Publication Number Publication Date
WO2016013781A1 true WO2016013781A1 (fr) 2016-01-28

Family

ID=55163280

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2015/006996 Ceased WO2016013781A1 (fr) 2014-07-25 2015-07-07 Procédé pour transmettre des données de liaison montante dans une cellule de bande non autorisée, et appareil correspondant

Country Status (1)

Country Link
WO (1) WO2016013781A1 (fr)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017164647A1 (fr) * 2016-03-23 2017-09-28 주식회사 윌러스표준기술연구소 Procédé d'accès de canal de liaison montante à une bande sans licence dans un système de communication sans fil, et dispositif associé
WO2017165405A3 (fr) * 2016-03-22 2018-08-23 Intel IP Corporation Coexistence de transmissions de liaison montante sans autorisation et programmées
CN109565877A (zh) * 2016-08-18 2019-04-02 Lg 电子株式会社 在支持未授权频带的无线通信系统中通过多个未授权分量载波发送上行链路信号的方法和支持该方法的设备
CN111095837A (zh) * 2017-09-11 2020-05-01 上海诺基亚贝尔股份有限公司 用于上行链路传输的方法和装置
EP3761744A1 (fr) * 2016-04-22 2021-01-06 Telefonaktiebolaget LM Ericsson (publ) Procédés et dispositifs permettant d'effectuer des transmissions non planifiees de liaison montante en bande sans licence
WO2023050571A1 (fr) * 2021-09-29 2023-04-06 天翼数字生活科技有限公司 Procédé de liaison terrestre à bande de fréquences de croisement sans fil, et système
US11968680B2 (en) 2016-03-25 2024-04-23 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system and apparatus for same
US11991746B2 (en) 2016-03-30 2024-05-21 Wilus Institute Of Standards And Technology Inc. Channel access method, device and system in unlicensed band

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013006988A1 (fr) * 2011-07-14 2013-01-17 Renesas Mobile Corporation Procédés et appareils de fourniture d'une technique de partage de temps flexible sur une bande sans licence d'un système
WO2013167557A1 (fr) * 2012-05-07 2013-11-14 Nokia Siemens Networks Oy Fonctionnement dans des bandes partagées
WO2013179095A1 (fr) * 2012-05-31 2013-12-05 Nokia Corporation Coexistence de réseau lte exploité dans une bande sans licence
KR20130138826A (ko) * 2011-04-25 2013-12-19 엘지전자 주식회사 캐리어 병합을 위한 자원 구성 방법 및 이를 위한 장치
US20140044105A1 (en) * 2012-08-10 2014-02-13 Research In Motion Limited TD LTE Secondary Component Carrier in Unlicensed Bands

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130138826A (ko) * 2011-04-25 2013-12-19 엘지전자 주식회사 캐리어 병합을 위한 자원 구성 방법 및 이를 위한 장치
WO2013006988A1 (fr) * 2011-07-14 2013-01-17 Renesas Mobile Corporation Procédés et appareils de fourniture d'une technique de partage de temps flexible sur une bande sans licence d'un système
WO2013167557A1 (fr) * 2012-05-07 2013-11-14 Nokia Siemens Networks Oy Fonctionnement dans des bandes partagées
WO2013179095A1 (fr) * 2012-05-31 2013-12-05 Nokia Corporation Coexistence de réseau lte exploité dans une bande sans licence
US20140044105A1 (en) * 2012-08-10 2014-02-13 Research In Motion Limited TD LTE Secondary Component Carrier in Unlicensed Bands

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017165405A3 (fr) * 2016-03-22 2018-08-23 Intel IP Corporation Coexistence de transmissions de liaison montante sans autorisation et programmées
US11973701B2 (en) 2016-03-23 2024-04-30 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system, and device therefor
WO2017164647A1 (fr) * 2016-03-23 2017-09-28 주식회사 윌러스표준기술연구소 Procédé d'accès de canal de liaison montante à une bande sans licence dans un système de communication sans fil, et dispositif associé
US10757717B2 (en) 2016-03-23 2020-08-25 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system, and device therefor
US12192126B2 (en) 2016-03-23 2025-01-07 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system, and device therefor
US11330609B2 (en) 2016-03-23 2022-05-10 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system, and device therefor
US12501445B2 (en) 2016-03-25 2025-12-16 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system and apparatus for same
US11968680B2 (en) 2016-03-25 2024-04-23 Wilus Institute Of Standards And Technology Inc. Method for uplink channel access to unlicensed band in wireless communication system and apparatus for same
US11991746B2 (en) 2016-03-30 2024-05-21 Wilus Institute Of Standards And Technology Inc. Channel access method, device and system in unlicensed band
EP3761744A1 (fr) * 2016-04-22 2021-01-06 Telefonaktiebolaget LM Ericsson (publ) Procédés et dispositifs permettant d'effectuer des transmissions non planifiees de liaison montante en bande sans licence
US11943772B2 (en) 2016-04-22 2024-03-26 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatuses for performing unscheduled uplink transmissions on an unlicensed band
CN109565877B (zh) * 2016-08-18 2022-07-08 Lg 电子株式会社 在支持未授权频带的无线通信系统中通过多个未授权分量载波发送上行链路信号的方法和支持该方法的设备
CN109565877A (zh) * 2016-08-18 2019-04-02 Lg 电子株式会社 在支持未授权频带的无线通信系统中通过多个未授权分量载波发送上行链路信号的方法和支持该方法的设备
US11394504B2 (en) 2017-09-11 2022-07-19 Nokia Technologies Oy Method and apparatus for uplink transmission
CN111095837A (zh) * 2017-09-11 2020-05-01 上海诺基亚贝尔股份有限公司 用于上行链路传输的方法和装置
WO2023050571A1 (fr) * 2021-09-29 2023-04-06 天翼数字生活科技有限公司 Procédé de liaison terrestre à bande de fréquences de croisement sans fil, et système

Similar Documents

Publication Publication Date Title
WO2019098663A1 (fr) Procédé et appareil permettant de déclasser une transmission de paquets dupliqués dans un système de communication sans fil
WO2023128730A1 (fr) Procédé de commande d'opération de changement de cellule, et dispositif associé
WO2023128731A1 (fr) Procédé et appareil pour fournir une opération de changement de cellule
WO2016013781A1 (fr) Procédé pour transmettre des données de liaison montante dans une cellule de bande non autorisée, et appareil correspondant
WO2023128726A1 (fr) Procédé de changement de cellule et dispositif associé
WO2018012874A1 (fr) Équipement utilisateur et procédé de transmission de signal de liaison montante
WO2014204202A1 (fr) Procédés tdm ul pour agrégation de porteuses inter-noeuds b évolués
WO2012169837A2 (fr) Appareil et procédé permettant d'effectuer un accès aléatoire dans un système de communication sans fil
WO2018217021A1 (fr) Procédé et équipement d'utilisateur permettant d'exécuter une procédure d'accès aléatoire
WO2020189932A1 (fr) Procédé pour réaliser une communication à l'aide d'un réseau non terrestre, et appareil associé
WO2014163288A1 (fr) Procédé servant à réaliser une attribution de priorité de canal logique et son dispositif de communication
WO2018186667A1 (fr) Procédé de fonctionnement d2d d'un terminal dans un système de communication sans fil, et terminal utilisant le procédé
WO2016048073A1 (fr) Procédé de transmission de signal d2d, et appareil correspondant
WO2013168917A1 (fr) Procédé et appareil pour transmettre et recevoir des données à l'aide d'une pluralité de porteuses dans un système de communication mobile
WO2014112850A1 (fr) Procédé et appareil pour fournir efficacement des informations de configuration de duplexage par répartition dans le temps à un équipement utilisateur et à déterminer le chronométrage de transmission sens montant dans un système de communication mobile supportant le duplexage par répartition dans le temps
WO2020045920A1 (fr) Procédé et dispositif de traitement d'un échec d'accès à un canal dans une bande sans licence
WO2016126029A1 (fr) Procédé pour appliquer une nouvelle configuration de pucch dans un système d'agrégation de porteuses, et dispositif associé
WO2013162345A1 (fr) Procédé et dispositif permettant de réaliser une communication entre dispositifs dans un système de communication sans fil
WO2015046976A1 (fr) Procédé et appareil d'émission et de réception de données au moyen de plusieurs porteuses dans un système de communication mobile
WO2014027804A1 (fr) Canal de commande de liaison montante, et procédé et appareil de commande de transmission de signal de référence sonore
WO2015111965A1 (fr) Système et procédé de transmission de données de priorité d'une pluralité de stations de base
WO2018230995A1 (fr) Procédé d'exécution d'une procédure d'accès aléatoire dans un système de communication sans fil et dispositif associé
WO2021187933A1 (fr) Procédé et dispositif de commande de nœud de relais
WO2015020478A1 (fr) Procédé pour transmettre et recevoir une requête de planification dans un système de communication sans fil, terminal et station de base
WO2021230614A1 (fr) Procédé et appareil de transmission de données de liaison montante

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15825171

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC ( EPO FORM 1205A DATED 10/05/2017 )

122 Ep: pct application non-entry in european phase

Ref document number: 15825171

Country of ref document: EP

Kind code of ref document: A1