WO2016080787A1 - Système et procédé de gestion de site de construction utilisant un dispositif intelligent - Google Patents
Système et procédé de gestion de site de construction utilisant un dispositif intelligent Download PDFInfo
- Publication number
- WO2016080787A1 WO2016080787A1 PCT/KR2015/012486 KR2015012486W WO2016080787A1 WO 2016080787 A1 WO2016080787 A1 WO 2016080787A1 KR 2015012486 W KR2015012486 W KR 2015012486W WO 2016080787 A1 WO2016080787 A1 WO 2016080787A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- smart device
- construction site
- site management
- server
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Definitions
- the present invention relates to construction site management, and more particularly, to a construction site management system and method using a smart device.
- the technical problem to be achieved by the present invention is to improve the shortcomings of the prior art, by performing the construction site management using a smart device (tablet PC, smart phone) and applications, such as a mobile-based smart device to improve productivity and efficiency To provide a construction site management system and method used.
- a smart device tablet PC, smart phone
- applications such as a mobile-based smart device
- a construction site management system that communicates with office terminals and smart devices,
- Database unit for storing field work data and information of the person in charge
- At the request of the office terminal or smart device includes the server for receiving the field work data uploaded and stored in the database unit, provided or converted to provide.
- the database unit The database unit,
- It includes a contact person DB for storing information of the office terminal and the smart device personnel.
- the field work material is characterized in that at least one of the drawings, photos, video, punch list, the detection document.
- the server The server,
- a drawing processor 111 for processing drawing data at the request of the office terminal or smart device
- a photo and video processing unit for processing photo and video data at the request of the office terminal or smart device
- a punch list processing unit for processing punch list data at the request of the office terminal or smart device
- a detection processing unit for processing the detection data in accordance with the request of the office terminal or smart device.
- the server is
- the apparatus further includes a video conference processing unit for processing a video conference at the request of the office terminal or smart device.
- the drawing processing unit may convert the drawing data into mobile data, receive and store the drawing marked up by the smart device, and transmit the same to a person to be shared.
- the photo and video processing unit accumulates and stores the photo or video data, converts the document into mobile data, receives and stores the photo and video data marked up by the smart device, and delivers them to the person to be shared. .
- the punch list processor may store the work instruction content and the action content input from the smart device and provide the stored work instruction content to the smart device or the office terminal.
- the detection processing unit may receive the detection document from the office terminal and transmit the detection document to the smart device, receive the detection content from the terminal of the supervision company according to the request of the smart device, and update the detection result.
- the video conference processing unit calls users to operate a conference, mark up a shared document, and share the features.
- the server processing punch list data according to a request of the office terminal or a smart device
- the server includes the step of processing the detection data at the request of the office terminal or smart device.
- the server further comprises the step of processing a video conference at the request of the office terminal or smart device.
- the drawing processing unit of the server may convert the drawing data into mobile data, receive and store the drawing marked up by the smart device, and transmit the same to the person to be shared.
- the photo and video processing unit of the server accumulates and stores photo or video data, converts the document into mobile data, receives and stores the photo and video data marked up by the smart device, and delivers them to the person to be shared. It is done.
- the punch list processing unit of the server may store the work instruction content and the action content input from the smart device and provide the stored work instruction content to the smart device or the office terminal.
- the detection processing unit of the server receiving the detection document from the office terminal to deliver to the smart device, receiving the detection content from the terminal of the supervision company according to the request of the smart device, characterized in that for updating the detection result .
- the video conference processing unit of the server may call users to operate a conference, mark up a shared document, and share the information.
- FIG. 1 is a block diagram of a construction site management system using a smart device according to an embodiment of the present invention.
- FIG. 2 is a block diagram of a smart device.
- FIG. 3 is a flowchart of a construction site management method using a smart device according to an embodiment of the present invention.
- FIG. 4 is a flowchart of a drawing process in a construction site management method using a smart device according to an embodiment of the present invention.
- FIG. 5 is a flowchart illustrating a process of processing photos and videos in a construction site management method using a smart device according to an embodiment of the present invention.
- FIG. 6 is a flowchart of punch list processing in the construction site management method using a smart device according to an embodiment of the present invention.
- FIG. 7 is a flowchart of a detection process in a construction site management method using a smart device according to an embodiment of the present invention.
- FIG. 8 is a flowchart illustrating video conference processing in a construction site management method using a smart device according to an embodiment of the present invention.
- FIG. 1 is a block diagram of a construction site management system using a smart device according to an embodiment of the present invention.
- the field work data and information of the person in charge Database unit 120 for storing the; It includes a server 110 for receiving the field work data uploaded and stored in the database unit 120, provided or converted to provide at the request of the office terminal 300 or the smart device 200.
- the database unit 120 includes a material DB 121 and a person in charge DB 122.
- the data DB 121 stores various field work data such as drawings, photos, videos, punch lists, and detection data.
- the person in charge DB 122 stores terminal information, mobile phone information, email information, etc. of the person in charge of the office terminal 300 and the smart device 200, the cooperative company and the supervisor.
- the server 110 the drawing processing unit 111 for processing the drawing data at the request of the office terminal 300 or smart device 200;
- a photo and video processor 112 for processing photo and video data at the request of the office terminal 300 or the smart device 200;
- a punch list processing unit 113 for processing punch list data at the request of the office terminal 300 or the smart device 200;
- a detection processor 114 for processing detection data at the request of the office terminal 300 or the smart device 200; It includes a video conference processing unit 115 for processing a video conference at the request of the office terminal 300 or the smart device 200.
- the drawing processing unit 111 converts the drawing data into mobile data, receives and stores the drawings marked up by the smart device 200, and delivers them to the person to be shared.
- the photo and video processing unit 112 accumulates and stores the photo or video data, converts the document into mobile data, receives and stores the photo and video data marked up by the smart device 200, and shares it with the person to be shared. It is characterized by transmitting.
- the punch list processor 113 may store the work instruction content and the action content input from the smart device 200 and provide the stored work instruction content to the smart device 200 or the office terminal 300.
- the detection processing unit 114 receives the detection document from the office terminal 300 and transmits the detected document to the smart device 200, and receives the detection content from the terminal of the supervision company at the request of the smart device 200. In this case, the detection result is updated.
- the video conference processing unit 115 calls the users to operate the conference, mark up the shared document, and share the features.
- FIG. 2 is a block diagram of a smart device.
- the smart device 200 includes a display unit 210, an input unit 220, a control unit 230, a communication unit 240, and a storage unit 250.
- the display unit 210 displays information.
- the input unit 220 includes a touch screen, a keypad, a keyboard, etc. for receiving a user's selection.
- the controller 230 executes an application related to drawings, photos, videos, punch lists, detection, and video conferences, and performs overall control.
- the storage unit 250 stores applications and data related to drawings, photos, videos, punch lists, detection, and video conferences.
- the communication unit 240 allows the control unit to communicate with the server 110.
- the operation of the smart device 200 is the operation of the components, which are well known in the art and will be described briefly.
- the configuration of the office terminal 300 or the partner terminal is similar to the smart device 200, the office terminal 300 may use a wired communication method.
- the service made in the following process is simply described as a service by the server 110 or an application for convenience.
- Figure 3 is an operation flowchart of a construction site work management method according to an embodiment of the present invention
- Figure 4 is a flow chart at the time of drawing processing in the construction site management method using a smart device according to an embodiment of the present invention.
- the user drives a smart device 200 such as a tablet PC to perform a construction site management task (S310) (S320).
- a smart device 200 such as a tablet PC to perform a construction site management task (S310) (S320).
- the desired application is selected from among various applications (S330).
- a site user may classify construction drawings, design books, and shop drawings (Shop DWG) according to each category, such as architecture, structure, civil engineering, facilities, and electricity, by using the office terminal 300 to categorize the server by item. Upload to 110 (S430).
- categories such as architecture, structure, civil engineering, facilities, and electricity
- the server 110 receives and stores data uploaded to the folder designated by the person in charge of the project, such as drawings and design books, and stores the uploaded data classified by project / category. Thereafter, the image processing unit 111 of the server 110 is converted into a viewable image form on the mobile and stored in operation S421.
- a user of the smart device 200 such as a tablet may execute a drawing application to inquire a drawing related data in the server 110 (S410).
- Related data are largely divided into construction drawings, design books, and shop DWG, which can be inquired and viewed.
- the user of the smart device 200 requests a drawing inquiry and viewing by using a category that has a desired drawing, and the server 110 provides the requested drawing (S411).
- a user of the smart device 200 may search for a desired material based on a drawing title, drawing number, registrant, date, etc. using a detailed search function.
- the user of the smart device 200 When the user of the smart device 200 reads a drawing uploaded as a CAD file, the user may select a method of converting the image file into an image file and viewing the CAD file. Loading time can be shortened when reading with the converted image, and loading time is long when reading the original CAD, but the information in the drawings can be examined more precisely.
- the smart device 200 may mark up the contents desired by the user in the read drawings and store them in the terminal and the server 110 (S412 and S413). Markups can be used to draw lines, draw figures, enter text, measure dimensions (length, area), attach photos, videos, or documents. Photos and videos can be specified / attached on the drawing as icons, so you can know the exact location of the part.
- the communication shaded area (wireless communication deactivated area) markup is written, the corresponding content is stored in the device, and automatically uploaded to the server 110 when moving to the wireless communication activation area (S413).
- the markup contents updated by the server 110 can be viewed by both the user of the smart device 200 or the user of the office terminal 300 (S431, S414), and the markup contents read through the office terminal 300 can be printed. Is possible (S432). Local device Download can be saved and read for communication shaded area use.
- the markup content stored by the smart device 200 user can be shared with other users (S415).
- sharing the markup and designate a desired user our employees, business partners, ordering parties, etc.
- the contents of sharing are notified to the specified user in a push message in real time.
- the mobile device user can use the bookmark function to utilize the communication shade area (wireless communication disabled area) as needed.
- the bookmark function is a function of encrypting and downloading the drawings in the server 110 to the mobile device.
- the bookmark function can be stored by setting a desired category in a personal device (S416). Bookmarked data and local markup data are stored in the device can be used in quick viewing, communication shaded area (S417).
- the drawing stored as a bookmark function serves as a bookmark and compares the revision number with the server 110 drawing to check whether the latest drawing, and if the revision number is different to give an alarm, to prevent the construction by the old drawing.
- FIG. 5 is a flowchart of photographs and video processing in the construction site management method using the smart device 200 according to an embodiment of the present invention.
- the user of the smart device 200 may execute a PIC & Video Application to shoot / encrypt and store necessary pictures / videos while performing field work. 200 may be stored or uploaded to the server 110 (S710, S711).
- the user of the smart device 200 may generate and store a category in the server 110 or the smart device 200 so as to facilitate the smooth sharing and efficient picture / video management among the department members.
- the user may upload and upload 25 pictures at a time to the server 110 by taking pictures taken without using the PIC & Video Application (S721). ).
- the user of the smart device 200 or the user of the office terminal 300 may view the stored picture / video on the smart device 200 or the PC (S712 and S731).
- the user of the office terminal 300 requests the server 110 (S733), and selects a plurality of desired pictures from the pictures read from the server 110 and converts them into a photo site document format (S723).
- Office terminal 300 device user can immediately print out the converted photo paste (S734), by converting the file format, the user can modify the photo paste in the PC, the photo paste in the field Eliminate the inconvenience of having to make separately.
- Office terminal 300 users can convert to Excel, Word, PowerPoint, Korean, Adobe PDF files.
- the user of the smart device 200 may mark up the content desired by the user in the browsed picture and store it to the terminal and the server 110 (S714 and S715). Markup can be line drawing, drawing, text input, photo / video / document attachment.
- the markup content stored in the server 110 may be viewed in the smart device 200 or the office terminal 300 (S716, S735), and the markup content viewed in the office terminal 300 may be printed. (S736).
- the markup content stored by the user of the smart device 200 may be shared with other users (S725).
- sharing the markup command specify the desired user (user who installed the application, such as our employees, business partners, etc.), and share the information.
- the punch list is selected among the above applications (S360).
- FIG. 6 is a flowchart of punch list processing in the construction site management method using the smart device 200 according to an embodiment of the present invention.
- the user of the smart device 200 accesses the Punch List Application and inputs necessary contents in order to instruct various cooperative companies in the field (S1010).
- the user of the smart device 200 may register a picture of a content that basically requires an action to be easily understood by a partner, and the picture may be taken or a picture stored in the terminal or a picture stored in the server 110. It can be registered (S1020).
- the user of the smart device 200 may display the location where the punch is generated by bringing up the drawings so as to easily explain to the cooperative company the location to be corrected and reworked.
- a user may attach a picture related to the corresponding part.
- Smart device (200) users can enter the supplier information, the supplier to be instructed when the Punch List is issued, the action classification (complement of the relevant part, rework order, additional personnel input), the deadline for the action as basic information, if necessary You can also add an approver, a supervisor, or a notifier.
- the issuer can be designated separately.
- Smart device 200 users can temporarily save the Punch List issuance to the device, when issuing to the partner, the issue is automatically stored in the server 110, push the issue to the coordinator of action Notification in real time to the message, so that quick action is taken from the partner (S1021).
- the smart device 400 user of the partner enters the action through the Punch List Application after taking the action on the field.
- the supplier user enters the content, attach a photograph after the action, and enter the action-related content, so that the action is clearly taken, and return the content to the Punch issuer (S1012).
- the server 110 updates and uploads the contents of the action to the pre-issued contents (S1022), and delivers the contents of the reply in a push message to the issuer in real time ( S1023)
- the issuer can check the contents in real time (S1013).
- the issuer can check the action contents returned by the supplier using the mobile device (S1014), determine whether the action was completed correctly on the action request, and approve the case and terminate the action. If is not completed, the contents can be rejected and the action can be instructed. Through this, clear work orders and construction quality can be improved.
- the smart device 200 user provides a chart function for conditional search and statistical analysis in the Punch issued list (S1015).
- Smart device 200 users can be stored in the device by using the local download Punch can be stored in the device frequently accessed data to the device more easily accessible, can be utilized in the communication shade area (S1024).
- the office user can read the Punch List issue / action case / action completion case through the office terminal 300 in real time (S1030).
- the user of the office terminal 300 may select a desired Punch content from among the contents of the Punch List read from the server 110 and convert it into a standard document format (S1031).
- the user of the office terminal 300 can directly print out the converted standard document format, and convert the file into a file format (S1025), so that the user can modify the corresponding document form on the PC, and in the field, the Punch List Eliminate the inconvenience of having to create a separate document.
- Office terminal 300 users can convert to Excel, Word, PowerPoint, Korean, Adobe PDF files.
- FIG. 7 is a flowchart of a detection process in a construction site management method using a smart device according to an embodiment of the present invention.
- a construction company requesting detection uploads a detection document form determined for each project to the server 110 through the office terminal 300 (S1730).
- the inspection documentation form will be shared with, and used with, the supervision to conduct future inspections.
- the inspection document refers to the inspection request, bill, checklist, and other forms agreed upon by the client, the supervisor, and each project (S1720).
- the smart device 200 user of the construction company requests the inspection to the supervision through the Inspection Application.
- the inspection request is requested, the registered inspection document form is retrieved and entered in the markup or key-in method so that the inspection is requested, so that a work time for preparing a separate document can be shortened (S1710).
- the contents are stored in the server 110, and the contents are delivered in real time to the target (supervision) receiving the request in a push message.
- the supervisor's smart device 200 user can check the content of the inspection request issued by the construction company through the Inspection Application (S1721).
- the supervisor's smart device 200 user can check the inspection request issued by the company staff in real time through a push message, and can check the information such as construction site, related drawings, etc. that the inspection request was made through the Inspection Application (S1740). ).
- the supervisor's smart device 200 user proceeds with the detection of the construction site based on the content of the inspection request issued by our staff. At this time, without a separate output, by using the Inspection Application of the mobile device, the inspection can be easily performed while checking attached drawings, request contents, etc. when the inspection request.
- the user of the supervisor's smart device 200 executes an inspection application and inputs the result of the inspection, and then sends a result to the issuer by pressing a transmission button. At this time, in order to have a legal effect, the contractor attached to the detection request from the smart device 200 is directly signed and stored (S1741).
- the smart device 200 may be used to reply to the construction company (our employee) after internal approval.
- the detection result is automatically updated on an existing issue in the server 110 (S1722).
- the updated contents are notified of the updates in real time through a push message to the issuer (our staff) and the pre-specified notifier of the existing issue (S1723).
- the issuer (our staff) can check the results of the inspection from the supervisor in real time through the push message, and can confirm the details of the reply through the inspection application (S1711).
- the smart device 200 user and the user of the office terminal 300 of the company or the supervisor can read the detection issued content and the detection result in real time (S1731).
- the office terminal 300 user can select the desired inspection contents from the inspection contents read from the server 110 and convert them into a standard document format (S1731).
- the user of the office terminal 300 device can immediately print out the converted standard document format (S1733), and the server 110 converts the file format into a file format so that the user can modify the corresponding document form on the PC.
- the inconvenience of having to make separate detection documents was eliminated (S1724).
- Office terminal 300 users can convert to Excel, Word, PowerPoint, Korean, Adobe PDF files.
- a video conference is selected in the above application (S380).
- FIG. 8 is a flowchart illustrating video conference processing in a construction site management method using a smart device according to an embodiment of the present invention.
- a video conference application user may install and execute a corresponding application on a smart device 200 or a PC, and thus, a video conference without limitation of time and space is not limited to the smart device 200 or a PC device. You can proceed. After executing the video conference application, the user of the smart device 200 or the office terminal 300 may simply search for the employee's name and access the corresponding name to proceed with the video conference. The user who wants to conduct a video conference together can search for the same employee name and access it (S1910).
- Mobile device users who participated in video conferencing can search for and invite employees or business partners through the user invitation function. Invitees can receive a push massage with vibration or sound for 10 seconds and accept or decline like a call.
- the mobile device user who participated in the video conference can invite external users who are not registered in the server through the user invitation function (S1911, S1920, S1931).
- an SMS, a messenger installed in the smart device 200, an e-mail, or an alarm method can be invited to the user, thereby extending the scope of the video conference invitation.
- the user who receives the invitation receives an invitation message through a method specified by the user who requested the invitation (SMS, messenger installed in the smart device 200, E-Mail, alarm method, etc.) (S1912 and S1932).
- the invitation message includes a URL address, making it easy to access through the URL address.
- the user of the smart device 200 or the user of the office terminal 300 may display a document to be shared with the other party in a video conference room by sharing it on the screen (S1913 and S1921).
- the document to be shared is a document stored in the mobile device, a document stored in the office terminal 300 device, and a document stored in the server 110.
- the user who participated in the video conference can share the shared document together on the screen according to the sharing process of the server 110, and mark up the shared document through the line drawing function. Since the contents of the markup are shared with the video conference participants, it is possible to more accurately share and discuss information through document markup other than the conversation (S1915, S1916, S1922, S1935, and S1936).
- the construction site management can be performed on a mobile basis using an application of a smart device, etc., thereby improving productivity and efficiency.
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
L'invention concerne un système et un procédé de gestion de site de construction communiquant avec un terminal de bureau et un dispositif intelligent, comprenant : une unité de base de données permettant de stocker les ressources du travail de terrain et les informations sur les responsables ; et un serveur permettant de recevoir les ressources de travail de terrain téléchargées, de stocker les ressources de travail de terrain reçues, et de fournir ou convertir et fournir les ressources de travail de terrain stockées à la demande du terminal de bureau ou du dispositif intelligent. L'invention permet d'effectuer une gestion de site de construction à base mobile au moyen d'une tablette PC, d'une application, etc., ce qui permet d'obtenir une productivité améliorée et efficace.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR20140163768 | 2014-11-21 | ||
| KR10-2014-0163768 | 2014-11-21 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2016080787A1 true WO2016080787A1 (fr) | 2016-05-26 |
Family
ID=56014234
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2015/012486 Ceased WO2016080787A1 (fr) | 2014-11-21 | 2015-11-19 | Système et procédé de gestion de site de construction utilisant un dispositif intelligent |
Country Status (2)
| Country | Link |
|---|---|
| KR (1) | KR101713874B1 (fr) |
| WO (1) | WO2016080787A1 (fr) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114844884A (zh) * | 2022-07-04 | 2022-08-02 | 北京神州光大科技有限公司 | 用于it服务施工现场的信息处理方法及系统 |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101887056B1 (ko) | 2017-01-10 | 2018-09-10 | 주식회사 한화건설 | 검측 업무용 솔루션 제공 방법 및 시스템 |
| KR101963860B1 (ko) * | 2018-08-08 | 2019-04-01 | (주)에스에이티정보 | 스마트건설현장을 위한 클라우드 협업시스템 |
| KR102300807B1 (ko) | 2020-11-25 | 2021-09-10 | 더본테크(주) | 필드 데이터 입력을 통한 작업 레포트 자동 생성 시스템 |
| KR102363620B1 (ko) * | 2021-08-03 | 2022-02-16 | 주식회사 씨엠엑스 | 건축 설계 도면에 대한 상태 정보를 실시간으로 공유하기 위한 방법 및 이를 이용한 실시간 공유 지원 서버 |
| KR102717523B1 (ko) * | 2023-06-13 | 2024-10-15 | (주)평화이앤씨 | 공동 주택에서의 설비 자동 감리 방법, 장치 및 컴퓨터-판독 가능 기록 매체 |
| KR102729306B1 (ko) | 2023-10-17 | 2024-11-11 | (주)대우건설 | 메타버스를 활용한 3d 디지털 캐비넷시스템 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20030096146A (ko) * | 2003-11-19 | 2003-12-24 | (주)주앤아이시스템 | 무선 인터넷과 휴대용 정보통신 단말기를 이용한 모바일협업 시스템 및 그 구현 방법 |
| US20050198354A1 (en) * | 2003-09-18 | 2005-09-08 | Field2Base, Inc. | Job site communications systems, methods, and computer program products |
| KR20100035481A (ko) * | 2008-09-26 | 2010-04-05 | 대림산업 주식회사 | 개인 휴대용 단말기 및 지리정보시스템를 연계한 실시간 현장공사관리시스템 및 방법 |
| KR20100134238A (ko) * | 2009-06-15 | 2010-12-23 | 이재천 | 통합공사업그룹 운영시스템 및 방법 |
| JP2013225239A (ja) * | 2012-04-23 | 2013-10-31 | Yokohama Sekiyu Co Ltd | 図面情報管理システム |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20120079636A (ko) * | 2011-01-05 | 2012-07-13 | 주식회사 인프라웨어 | 다자간 회의에서 문서 작업 공유 방법 |
| KR101183898B1 (ko) * | 2011-04-05 | 2012-09-19 | 주식회사 센서웨이 | 스마트 폰 기반의 시공관리를 위한 작업보고서 자동화 시스템 |
| JP5755007B2 (ja) * | 2011-04-08 | 2015-07-29 | 株式会社セイコーアイ・インフォテック | 図面管理サーバ、図面管理プログラム、及び図面管理システム |
-
2015
- 2015-11-19 KR KR1020150162686A patent/KR101713874B1/ko active Active
- 2015-11-19 WO PCT/KR2015/012486 patent/WO2016080787A1/fr not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050198354A1 (en) * | 2003-09-18 | 2005-09-08 | Field2Base, Inc. | Job site communications systems, methods, and computer program products |
| KR20030096146A (ko) * | 2003-11-19 | 2003-12-24 | (주)주앤아이시스템 | 무선 인터넷과 휴대용 정보통신 단말기를 이용한 모바일협업 시스템 및 그 구현 방법 |
| KR20100035481A (ko) * | 2008-09-26 | 2010-04-05 | 대림산업 주식회사 | 개인 휴대용 단말기 및 지리정보시스템를 연계한 실시간 현장공사관리시스템 및 방법 |
| KR20100134238A (ko) * | 2009-06-15 | 2010-12-23 | 이재천 | 통합공사업그룹 운영시스템 및 방법 |
| JP2013225239A (ja) * | 2012-04-23 | 2013-10-31 | Yokohama Sekiyu Co Ltd | 図面情報管理システム |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114844884A (zh) * | 2022-07-04 | 2022-08-02 | 北京神州光大科技有限公司 | 用于it服务施工现场的信息处理方法及系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR101713874B1 (ko) | 2017-03-09 |
| KR20160061271A (ko) | 2016-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2016080787A1 (fr) | Système et procédé de gestion de site de construction utilisant un dispositif intelligent | |
| WO2014171676A1 (fr) | Procédé et dispositif pour obtenir un retour d'informations de réseau | |
| WO2020067585A1 (fr) | Procédé et appareil d'affichage d'un site de discussion en ligne liée à une application de messagerie | |
| WO2015020451A1 (fr) | Procédé permettant de fournir un service de transmission de contenu en utilisant des imprimés | |
| WO2016208951A1 (fr) | Procédé de fourniture de service de messages pour fournir un service de messages via un forum ouvert de dialogue en ligne correspondant à des informations de liaison, et serveur de messages et terminal pour l'exécuter | |
| WO2014065444A1 (fr) | Système de collaboration utilisant un réseau public ouvert | |
| WO2014112809A1 (fr) | Procédé et appareil de partage de contenu | |
| WO2016126018A1 (fr) | Procédé, système et support d'enregistrement pour gérer des contenus de conversation dans une messagerie | |
| EP3718087A1 (fr) | Procédé et appareil de gestion de contenu dans un système de réalité augmentée | |
| WO2024096146A1 (fr) | Procédé de recommandation d'utilisateur au moyen de données de production et de données d'utilisation, et appareil associé | |
| WO2013069885A1 (fr) | Système et procédé de partage d'informations d'application | |
| CN102385501A (zh) | 显示控制装置及由显示控制装置执行的控制方法 | |
| JP2016162286A (ja) | 情報処理システム、情報処理方法、情報処理装置及びプログラム | |
| JP7039903B2 (ja) | 情報処理システム、情報処理装置、プログラム及び画面共有端末制御方法 | |
| WO2023171973A1 (fr) | Appareil et procédé de gestion de jetons non fongibles sur la base d'une chaîne de blocs | |
| WO2013147484A1 (fr) | Système permettant d'utiliser des tickets de file d'attente et son procédé d'utilisation | |
| WO2016093652A2 (fr) | Procédé de fourniture de service d'album familial permettant d'utiliser un album familial en permettant aux membres d'une famille d'accéder à un serveur cloud par un numéro de téléphone | |
| WO2020111488A1 (fr) | Dispositif électronique, serveur et procédé de fonctionnement pour enregistrer un dispositif ido | |
| JP7380140B2 (ja) | 情報処理システム、サーバ、方法、プログラム、および情報処理装置 | |
| WO2016093631A1 (fr) | Appareil terminal et procédé de recherche de contenus | |
| CN114638197B (zh) | 信息处理方法、装置、电子设备和存储介质 | |
| US12126936B2 (en) | Information processing apparatus and computer readable medium | |
| JP7459649B2 (ja) | クラウドシステム、情報処理システム、ユーザ登録方法 | |
| WO2012077984A9 (fr) | Procédé de création de contenu numérique sur la base d'un réseau social, procédé de partage du contenu numérique, et système de création de contenu numérique et système de partage de contenu numérique utilisant ce procédé | |
| KR20060030631A (ko) | 공유앨범 서비스 장치 및 방법 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15862039 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 18/09/2017) |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 15862039 Country of ref document: EP Kind code of ref document: A1 |