[go: up one dir, main page]

WO2014171295A1 - フロートガラスの製造方法と製造装置 - Google Patents

フロートガラスの製造方法と製造装置 Download PDF

Info

Publication number
WO2014171295A1
WO2014171295A1 PCT/JP2014/059042 JP2014059042W WO2014171295A1 WO 2014171295 A1 WO2014171295 A1 WO 2014171295A1 JP 2014059042 W JP2014059042 W JP 2014059042W WO 2014171295 A1 WO2014171295 A1 WO 2014171295A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
lift
out roll
pipe
glass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2014/059042
Other languages
English (en)
French (fr)
Inventor
田中 俊幸
高弘 木下
正徳 中野
嗣治 若松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AGC Inc
Original Assignee
Asahi Glass Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Glass Co Ltd filed Critical Asahi Glass Co Ltd
Priority to CN201480021754.3A priority Critical patent/CN105121366A/zh
Priority to KR1020157029653A priority patent/KR20150143503A/ko
Publication of WO2014171295A1 publication Critical patent/WO2014171295A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B18/00Shaping glass in contact with the surface of a liquid
    • C03B18/02Forming sheets
    • C03B18/16Construction of the float tank; Use of material for the float tank; Coating or protection of the tank wall
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B35/00Transporting of glass products during their manufacture, e.g. hot glass lenses, prisms
    • C03B35/14Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands
    • C03B35/16Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands by roller conveyors
    • C03B35/18Construction of the conveyor rollers ; Materials, coatings or coverings thereof
    • C03B35/181Materials, coatings, loose coverings or sleeves thereof

Definitions

  • the present invention relates to a float glass manufacturing method and manufacturing apparatus.
  • molten glass is continuously supplied to a horizontal liquid surface of a molten metal bath to form a strip-like glass (usually referred to as a glass ribbon). Is pulled out from the outlet side of the molten metal bath and drawn out of the molten metal bath. Next, the glass ribbon is transported by a transport roll (lift-out roll), carried into a slow cooling furnace, slowly cooled while being moved in the slow cooling furnace, and cut into a required length by a cutting device, thereby obtaining a plate-like float glass. Is manufacturing.
  • a transport roll lift-out roll
  • one surface of the glass is formed by the molten metal liquid surface, and the other surface of the glass is formed by spreading the molten glass on the molten metal. It can be made extremely high and is known as a production method suitable for mass production. For this reason, the float process is widely applied to the production of flat glass such as automotive glass and display glass.
  • FIG. 6 shows an example of a float glass manufacturing apparatus applied to this kind of float method.
  • the apparatus of this example includes a float bath 101 having a molten metal bath 100 of tin, and a downstream side of the float bath 101. It is comprised from the dross box 102 and the slow cooling furnace 103 installed in this. A plurality of lift-out rolls 105 are installed horizontally inside the dross box 102, and a plurality of layer rolls 106 are installed horizontally inside the slow cooling furnace 103 (see Patent Document 1). In the manufacturing apparatus shown in FIG.
  • the molten glass 107 is supplied to the bath surface of the molten metal bath 100 and stretched to a necessary thickness and width, and then the glass ribbon 108 is pulled out by the pulling force of the lift-out roll 105 to the slow cooling furnace 103 side. Can be transported.
  • a gas supply pipe 109 is laid in the vicinity of each lift-out roll 105 of the dross box 102, and a plurality of injection ports 109 a are formed in each gas supply pipe 109. Yes.
  • These gas supply pipes 109 are connected to a carbon-containing gas supply source 110 such as acetylene and a purge gas supply source 111 such as nitrogen gas.
  • a carbon-containing film can be formed on the surface side of the lift-out roll 105 by supplying a carbon-containing gas from the injection port 109 a of each gas supply pipe 109 to the surface side of the lift-out roll 105.
  • the carbon protective film is formed on the lift-out roll 105 because the lift-out roll 105 is in direct contact with the high-temperature glass ribbon 108. This is to prevent contamination.
  • a mixed gas of a carbon-containing gas such as acetylene gas and a purge gas such as nitrogen gas is ejected from the gas supply pipe 109 to form a carbon protective film on the surface of the lift-out roll 105. It was.
  • the interior space of the dross box 102 provided with the lift-out roll 105 is a space through which the high-temperature glass ribbon 108 passes, and the interior space of the float bath 101 in the previous stage is also at a high temperature. It is considered as a high temperature environment.
  • the carbon-containing gas is ejected from the gas supply pipe 109 under such a high temperature environment, a part of the acetylene gas undergoes a decomposition reaction while passing near the gas ejection part of the gas supply pipe 109, and the gas supply pipe 109
  • carbon is deposited inside and the gas supply pipe 109 is partially blocked.
  • since carbon is consumed inside the gas supply pipe 109, the amount of carbon deposited on the surface side of the lift-out roll 105 is reduced, and there is a possibility that a carbon film having a required thickness cannot be formed.
  • the carbon-containing gas can reach the lift-out roll 105 side before decomposition. I think that the. However, if the carbon-containing gas is injected toward the lift-out roll 105 at a high speed, the surface temperature of the lift-out roll 105 is lowered more than necessary, and as a result, the glass ribbon 108 may be cooled more than necessary.
  • the residence time under the lift-out roll 105 is short, the temperature of the carbon-containing gas does not increase, and the decomposition rate of acetylene deteriorates. May contaminate the surface.
  • the present inventors have studied the formation mechanism of the protective film formed on the surface of the lift-out roll, and have reached the present invention by paying attention to the supply temperature of the carbon-containing gas for forming the protective film.
  • the present invention has been made based on the above-mentioned background, and an object thereof is to provide a float glass manufacturing method and a manufacturing apparatus capable of efficiently forming a carbon protective film on the surface of a lift-out roll.
  • the float glass manufacturing method of the present invention is a float in which molten glass is supplied to a molten metal liquid surface to form a glass ribbon, and the glass ribbon is drawn out from the molten metal liquid surface by a lift-out roll and conveyed to the next process.
  • a glass manufacturing method wherein a hydrocarbon gas whose temperature is controlled to 400 ° C. or less is sent to the surface of the lift-out roll to form a carbon protective film on the surface of the lift-out roll, and a glass ribbon is formed by the lift-out roll. It is characterized by conveying. Since the hydrocarbon gas whose temperature is controlled to 400 ° C.
  • the hydrocarbon gas supplied to the surface of the said lift-out roll shall be 30% or more of density
  • a carbon protective film can be efficiently generated on the surface side of the lift-out roll.
  • a carbon protective film can be generated with the highest efficiency by sending hydrocarbon gas to the surface side of the lift-out roll with a high concentration.
  • the hydrocarbon gas is supplied by a gas pipe, the gas pipe is cooled by a refrigerant pipe provided along the gas pipe, and the temperature of the hydrocarbon gas flowing through the inside is controlled to 400 ° C. or lower. Can do.
  • the gas pipe is cooled by the refrigerant pipe, and the temperature of the hydrocarbon gas can be easily and reliably controlled to 400 ° C. or lower.
  • the decomposition of the hydrocarbon gas inside the gas pipe is suppressed to suppress the precipitation of carbon, and the unreacted hydrocarbon gas is efficiently supplied to the surface side of the lift-out roll to the surface side of the lift-out roll.
  • a carbon protective film can be formed efficiently.
  • a seal block is provided on the bottom side of the lift-out roll along the longitudinal direction of the lift-out roll, a gas pipe for conveying hydrocarbon gas is provided along the seal block, and the gas pipe is intermittently provided.
  • a seal block is provided along the longitudinal direction of the lift-out roll, and hydrocarbon gas is supplied to the surface side of the lift-out roll from a plurality of positions of the gas pipes installed along the seal block.
  • a carbon protective film can be uniformly formed on the entire surface along the surface.
  • the float glass manufacturing apparatus of the present invention includes a float bath that supplies molten glass to a molten metal liquid surface to form a glass ribbon, and a float glass that includes a lift-out roll that lifts and conveys the glass ribbon from the molten metal.
  • a pedestal provided along the longitudinal direction of the lift-out roll below the lift-out roll, a gas pipe for supplying a hydrocarbon gas provided along the pedestal, and the gas A gas that includes a refrigerant pipe provided along a pipe and a seal block that is disposed on the pedestal and that is close to the bottom of the lift-out roll, and that allows hydrocarbon gas from the gas pipe to flow inside the seal block A flow path is formed, and hydrocarbon gas supplied from the gas pipe is provided at the top of the seal block at the bottom of the lift-out roll.
  • Selfish ejection port for ejecting is formed, wherein the refrigerant pipe has a cooling capacity to control the temperature of the hydrocarbon gas flowing through the gas pipe to 400 ° C. or less.
  • the hydrocarbon gas whose temperature is controlled to 400 ° C. or lower is sent to the lift-out roll surface side through the gas pipe, it can be supplied to the lift-out roll surface side without decomposing the hydrocarbon gas inside the gas pipe. For this reason, a carbon protective film can be efficiently formed on the surface of the lift-out roll. In addition, since the deposition of carbon is difficult to occur inside the gas pipe, the inside of the gas pipe is not clogged with carbon deposits.
  • a refrigerant pipe can be installed along both sides of the gas pipe, and the gas pipe and the refrigerant pipe can be installed on the bottom side of the seal block via a sealing material.
  • a purge gas pipe for supplying a purge gas around the gas pipe and the refrigerant pipe can be provided in the vicinity of the gas pipe and the refrigerant pipe.
  • the hydrocarbon gas leaked from between the seal block and the pipe can be diluted with the purge gas, and carbon can be prevented from being generated between the spray unit including the seal block, the gas pipe and the refrigerant pipe and the base.
  • the decomposition of the hydrocarbon gas can be suppressed, a hydrocarbon gas having a high concentration can be supplied to the surface side of the lift-out roll. For this reason, a carbon protective film having a necessary thickness can be efficiently formed on the surface of the lift-out roll. Further, since no carbon deposit is deposited in the middle of the hydrocarbon gas supply path, the gas pipe is not clogged with carbon deposits. Therefore, the glass ribbon can be transported without being scratched or dusted using a lift-out roll provided with a carbon protective film having a target thickness.
  • FIG. 1 is a schematic diagram showing the overall configuration of the float glass manufacturing apparatus according to the first embodiment of the present invention.
  • FIG. 2 is a configuration diagram showing a lift-out roll provided in the manufacturing apparatus and the surrounding structure.
  • FIG. 3 is a configuration diagram showing a lift-out roll provided in the manufacturing apparatus, a pedestal and a gas supply pipe provided therebelow.
  • FIG. 4 is a diagram showing a device configuration in which the acetylene gas decomposition temperature was measured in the examples.
  • FIG. 5 is a graph showing the temperature dependence of the acetylene gas decomposition rate tested in the examples.
  • FIG. 6 is a configuration diagram illustrating an example of a conventional float glass manufacturing apparatus.
  • FIG. 7 is a configuration diagram showing an example structure of a carbon-containing gas supply pipe provided in the apparatus shown in FIG.
  • the float glass manufacturing apparatus 1 is configured so that the molten glass G supplied to the float bath 2 flows along the surface of molten tin (molten metal) 3 held in the float bath 2. It is configured as a device for forming a glass ribbon 5 in the form of a strip by flowing and pulling out the glass ribbon 5 with a lift-out roll 7 provided in the dross box section 6.
  • the glass ribbon 5 is taken out from the outlet portion of the dross box portion 6 and then drawn into the slow cooling furnace 10 by the layer roll 9 to be cooled and washed, and then cut into a predetermined size. A size float glass is obtained.
  • the molten glass G sent from the melting furnace (not shown) through the supply passage 11 is supplied to the inlet portion 2 a of the float bath 2 through the lip 12 provided at the terminal portion of the supply passage 11. Yes.
  • a front wheel 13 for adjusting the flow of the molten glass G is installed in the supply passage 11 on the upstream side of the lip 12.
  • the supply passage 11 and the float bath 2 are each configured by assembling a plurality of heat-resistant materials such as refractory bricks, but are simplified in FIG.
  • the float bath 2 is composed of a molten metal bath 2A filled with molten tin 3 and an upper structure 2B installed on the upper portion of the molten metal bath 2A.
  • the atmosphere is cut off as much as possible.
  • a front lintel (front wall) 15 is formed at the entrance 2 a of the float bath 2, and the upper portion of the front lintel 15 is connected to the ceiling wall 16.
  • a rear end wall 17 is provided on the downstream end side of the float bath 2 so as to be connected to the ceiling wall 16, and an outlet 18 of the glass ribbon 5 is formed in the rear end wall 17 at a position near the liquid level of the molten tin 3. ing.
  • the upper structure 2 ⁇ / b> B is configured by the front lintel 15, the ceiling wall 16, and the rear end wall 17.
  • the upper structure 2B is provided with a pipe (not shown), and a reducing mixed gas composed of hydrogen and nitrogen is supplied from the pipe, and the internal space of the float bath 2 is always maintained in a reducing atmosphere at atmospheric pressure or higher. .
  • the reducing atmosphere inside the float bath 2 slightly flows out from the outlet 18 from which the glass ribbon 5 is drawn to the dross box 6 side.
  • the dross box portion 6 provided on the rear stage side of the float bath 2 includes a lower casing 6A and an upper casing 6B.
  • three lift-out rolls 7 are provided horizontally on the lower casing 6A.
  • the lift-out roll 7 is schematically composed of, for example, a roll body portion made of quartz and a shaft that supports the roll body portion, and a protective film 7a made of carbon is formed on the peripheral surface of the body portion.
  • the number of liftout rolls 7 is not limited to three as in this embodiment, and any number of liftout rolls 7 may be provided as long as the glass ribbon 5 can be conveyed to the slow cooling furnace 10 side.
  • the lower casing 6 ⁇ / b> A is provided below the upper casing 6 ⁇ / b> B so as to connect the float bath 2 and the slow cooling furnace 10.
  • a wall-shaped pedestal 22 having a graphite seal block 21 at the upper part is arranged in order to block the air flow between the molten metal bathtub 2A and the slow cooling furnace 10.
  • the seal block 21 is provided on the upper portion of the base 22 so that the upper surface thereof is in contact with the roll surface of the lift-out roll 7, and the seal block 21 is partitioned so as to be somewhat airtight with the peripheral surface of the lift-out roll 7. ing.
  • the pedestal 22 is formed in a hollow wall shape from a thick metal piece such as ductile cast iron, and is erected so as to partition the inside of the lower casing 6A.
  • the upper casing 6B of the dross box section 6 is configured as a steel sealing gate, a ceiling wall 24 installed between the float bath 2 and the slow cooling furnace 10, and a stainless steel drape 25 suspended from the ceiling wall 24. And is installed on the upper side of the lower casing 6A.
  • the inner three drapes 25 are arranged along the upper position of the contact position between the three lift-out rolls 7 and the glass ribbon 5 moving thereabove. Yes. That is, these drapes 25 are arranged above the central axis of the lift-out roll 7 so as to cover the entire length in the longitudinal direction of the lift-out roll 7, and partition the internal space of the upper casing 6B into a plurality.
  • a plurality of layer rolls 9 are installed horizontally in the slow cooling furnace 10, and the glass ribbon 5 that has moved through the dross box portion 6 can be conveyed through the slow cooling furnace 10 by the plurality of layer rolls 9.
  • a combination of the base 22, the seal block 21, and the lift-out roll 7 is arranged at a predetermined interval in the transport direction of the three glass ribbons 5, so that The internal space of the lower casing 6A is divided into four regions.
  • a supply pipe 23 is disposed in each of these areas, and the supply pipe 23 is extended to the outside of the dross box portion 6 so that a non-oxidizing gas can be supplied to each area from a non-oxidizing gas supply source such as nitrogen gas. It is configured. Since both end portions of each lift-out roll 7 are disposed close to a side wall of the lower casing 6A (not shown), the lower casing 6A is a box-like region having an upper surface opened.
  • each lift-out roll 7 passes through the side wall of the lower casing 6A as it is, and in that case, the gap between the side wall and the lift-out roll 7 is made small so as to have a sealed structure as much as possible.
  • a structure in which the gap is formed and covered with a heat-resistant cloth or the like can be adopted.
  • a graphite seal block 21 is provided on the lower side of the lift-out roll 7 in the longitudinal direction of the lift-out roll 7 along the entire length thereof.
  • the seal block 21 is formed in a side-recessed long and narrow block shape having a groove 21a over its entire length at the center of the upper part thereof, so that the lift-out roll 7 can rotate while rubbing the bottom part against the upper side of the seal block 21. Is arranged.
  • a sealing material 34 such as a gasket made of a heat insulating material is provided on the lower side of the sealing block 21.
  • Two refrigerants having a rectangular cross section are provided under the sealing material 34. Pipes 33 and 33 and a gas pipe 35 having a rectangular cross section sandwiched between them are provided.
  • the gas pipe 35 from the gas supply source 37 is disposed along the entire length of the seal block 21 below the concave groove 21a of the seal block 21, and refrigerant pipes 33 and 33 for circulating a refrigerant such as water are installed on the left and right sides thereof. ing.
  • a purge gas pipe 36 having a rectangular cross section from the purge gas supply source 39 is installed below the refrigerant pipes 33 and 33 and the gas pipe 35 from the refrigerant supply source 38.
  • the lateral width of the purge gas pipe 36 is substantially equal to the lateral width of the refrigerant pipe 33, the gas pipe 35, and the refrigerant pipe 33.
  • the internal flow path of the purge gas pipe 36 is divided into two, and the purge gas pipe 36 has a structure in which two pipes having a rectangular cross section are integrated by welding.
  • a hollow wall-shaped pedestal 22 is provided below the seal block 21, and two refrigerant pipes 33, a gas pipe 35, and two purge gas pipes 36 are accommodated inside the pedestal 22.
  • the refrigerant pipe 33 needs to circulate a liquid refrigerant such as water
  • the refrigerant pipe 33 is configured by connecting one of the refrigerant pipes 33 as an outgoing pipe and the other as a return pipe and connecting the forward pipe and the distal end side of the return pipe.
  • the refrigerant can be circulated using the refrigerant pipes 33 and 33.
  • the purge gas pipes 36, 36, the gas pipe 35 and the refrigerant pipes 33, 33 are inserted from one side of the dross box portion 6, but may be inserted from both the left and right sides.
  • one side end of each gas pipe 35 penetrates the side wall of the dross box portion 6 and is led out to the outside of the dross box portion 6, and a supply source 37 of acetylene gas which is one kind of hydrocarbon gas outside. It is connected to the.
  • each refrigerant pipe 33, 33 passes through the side wall of the dross box 6 and is led out to the outside, connected to a circulation pump (not shown) for water supply / drainage, and circulates water through the refrigerant pipe 33, 33. It is possible to cool the gas pipe 35 disposed between them.
  • the purge gas pipe 36 is independent of other pipes, and the purge gas that has passed through the purge gas pipe 36 is supplied between the base 22 and the seal block 21.
  • the purge gas that has passed through the purge gas pipe 36 dilutes the hydrocarbon gas leaked from between the seal block 21 and the gas pipe 35, and carbon is generated between the spray unit including the seal block 21 and the gas pipe 35 and the base 22. It is provided for the purpose of preventing.
  • acetylene gas is used as one kind of hydrocarbon gas, but ethylene gas may be used.
  • a plurality of gas ejection portions 35a composed of nozzles and the like are formed at predetermined intervals in the gas pipe 35 positioned below the concave groove 21a of the seal block 21, and each gas ejection section of the gas pipe 35 is formed on the bottom surface side of the concave groove 21a.
  • Gas flow paths 21b connected to 35a and communicating with the bottom surface of the concave groove 21a are formed at predetermined intervals. In the example of FIG. 3, the upper end part of the gas flow path 21b is opened at the bottom surface of the concave groove 21a as the ejection port 21c.
  • the same amount of gas is generated from any of the gas ejection portions 35a arranged from one end side to the other end side in the longitudinal direction of the lift-out roll 7 by applying pressure loss to the entire nozzle for constituting the gas ejection portion 35a. It is preferable that the amount can be injected.
  • the acetylene gas supplied from the gas pipe 35 to the lift-out roll 7 side is temperature-controlled to 400 ° C. or lower, and is preferably ejected after preheating to the highest possible temperature of 400 ° C. or lower. This is because the temperature of the acetylene gas is controlled to 400 ° C. or less so as to suppress the decomposition reaction of the acetylene gas in the gas pipe 35, and the temperature under the lift-out roll is lowered by the acetylene gas ejection, and the decomposition rate of acetylene This is to prevent the fall.
  • the dross box portion 6 is provided with a heater (not shown) so that the temperature of the glass ribbon 5 can be adjusted to a target temperature.
  • the molten glass G is supplied from the melting furnace to the supply passage 11 and the flow rate of the molten glass G flowing over the lip 12 is adjusted to the front tube.
  • the molten glass G is supplied onto the molten tin 3 at the inlet portion 2a of the float bath 2 while being adjusted by the amount of damming of the reel 13.
  • the molten glass G flowed on the molten tin 3 is formed into a strip-shaped glass ribbon 5 having a predetermined width and a predetermined thickness.
  • the glass ribbon 5 is pulled from the liquid surface of the molten tin 3 by the rotating lift-out roll 7 and moved to the dross box portion 6 side, and then the glass ribbon 5 is cooled while being conveyed through the slow cooling furnace 10 by the layer roll 9. After the glass ribbon 5 cooled in the slow cooling furnace 10 is cooled, the glass ribbon 5 is cut into a length and a width necessary for the cutting step, whereby a float glass having a desired width and length can be manufactured.
  • the glass ribbon 5 is formed while supplying the non-oxidizing gas from the supply pipe 23 to each region of the dross box portion 6. Since the glass ribbon 5 passes through the dross box 6 and a plurality of lift-out rolls 7 are provided inside the dross box 6, the inside of the dross box 6 is completely sealed. It cannot be. For this reason, the supply pipe 23 is provided to supply the non-oxidizing gas to the internal region of the dross box 6, and the internal region is positively pressured with the non-oxidizing gas, thereby preventing oxygen from entering the inside of the dross box 6. It is effective.
  • the inside of the dross box portion 6 will be described as a closed space.
  • the dross box portion 6 is connected to the float bath 2 and the slow cooling furnace 10 and the periphery of the bearing portion of the lift-out roll 7 also communicates with the outside. Some outgassing also occurs from these portions.
  • a state in which the dross box portion 6 is closed to such an extent that gas escape from these portions is collectively referred to as a closed space in the present embodiment.
  • the glass ribbon 5 is conveyed while the lift-out roll 7 is rotating in the dross box section 6 which is the above-described closed space, but the bottom of the lift-out roll 7 rotates while rubbing against the upper part of the seal block 21.
  • the glass ribbon 5 is transported by the lift-out roll 7, for example, when acetylene gas having a concentration of 100% is supplied from the gas ejection part 35 a of the gas pipe 35 to the concave groove 21 a side of the seal block 21, the acetylene gas flows into the concave groove 21 a. It reaches the surface of the lift-out roll 7 that extends along and rotates above it.
  • water as a refrigerant is circulated through the refrigerant pipes 33 and 33 to cool the acetylene gas flowing through the gas pipe 35 to 400 ° C. or lower, more preferably 300 ° C. or lower.
  • Most of the acetylene gas flowing inside the gas pipe 35 is not decomposed at 400 ° C. or lower, and hardly decomposes at 300 ° C. or lower, so that no carbon deposit is deposited inside the gas pipe 35. Therefore, when acetylene gas with a concentration of 100% is used, the acetylene gas with a concentration of 100% can be supplied almost as it is to the surface of the lift-out roll 7, and a carbon protective film can be efficiently applied to the surface of the lift-out roll 7. Can be formed.
  • the lower limit value of the acetylene gas to be cooled is preferably 0 ° C., because the temperature under the lift-out roll is lowered by the ejection of the acetylene gas, the acetylene decomposition rate is lowered, and it is difficult to form a carbon protective layer on the roll surface. ° C is more preferred.
  • acetylene gas leaking between the spray block including the seal block 21 and the gas pipe 35 and the pedestal 22 is diluted, and carbon is generated around these parts.
  • a carbon protective film having a required thickness can be formed on the surface of the lift-out roll 7 using the acetylene gas having a target concentration.
  • the concentration of acetylene gas is preferably 30% or more.
  • the carbon protective film has a temperature of around 650 ° C. inside the dross box section 6 and thus gradually burns during the continuous production of the glass ribbon 5 to reduce its thickness. For this reason, acetylene gas is continuously supplied to continuously generate a protective film, or after supplying acetylene gas for a certain period of time, the supply of acetylene gas is stopped for a certain period of time, and acetylene gas is sent again after a predetermined time has elapsed. It is preferable to produce a glass ribbon while repeating the operation of generating a protective film.
  • acetylene gas having a concentration of 100% when acetylene gas having a concentration of 100% is used, the operation of stopping the supply of acetylene gas after supplying for a predetermined time and supplying the acetylene gas again after a predetermined time has elapsed can be performed.
  • supplying acetylene gas having a concentration in the range of 30 to 100% it can be continuously supplied in accordance with the concentration of acetylene gas, or can be continuously operated by appropriately increasing or decreasing the supply amount.
  • the supply amount of acetylene gas when 100% concentration of acetylene gas is used, in order to generate a necessary amount of protective film on the surface of the lift-out roll 7, as an example, acetylene gas of about 1 L / min is supplied. Thus, a protective film having a necessary film thickness can be generated. If it is such a gas supply amount, the lift-out roll 7 is not cooled more than necessary, and the glass ribbon 5 is not cooled more than necessary. Further, if the gas supply amount is in the above range, the dust present inside the dross box portion 6 is not rolled up by the gas flow. Therefore, it is possible to produce the glass ribbon 5 while conveying the glass ribbon 5 without making it dirty.
  • the decomposition rate of acetylene gas was measured when the concentration of acetylene gas used for measurement was 100%, the flow rate was 0.1 L / min, and the temperature in the gas piping was 300, 400, 500, 600, 700, 800 ° C. .
  • the acetylene gas is decomposed, any compound such as hydrogen, ethylene, benzene, or methane is generated. Therefore, the decomposition rate can be measured according to the amount of these compounds produced. The result is shown in FIG.
  • acetylene gas reacts and decomposes at 700 to 800 ° C., and about half of the acetylene gas reacts and decomposes at 600 ° C. Moreover, it turns out that about several percent acetylene gas reacts and decomposes
  • the decomposition reaction of acetylene gas is an exothermic reaction, and once the decomposition reaction starts, there is a high possibility that the heat will be generated and the decomposition further proceeds.
  • the decomposition reaction can be expressed as, for example, C 2 H 2 ⁇ 2C + H 2 +55 kcal / mol. For this reason, in view of the results of FIG. 5, if the gas temperature when supplying acetylene gas can be maintained at 400 ° C. or lower, unreacted acetylene gas is supplied to the surface side of the lift-out roll with a concentration of almost 100%. I think I can do it.
  • the concentration of acetylene gas supplied to the above test was changed to 100, 80, 70, 60, 50, 40, 30, 20, and 10%, respectively, and a retest was performed to determine the reaction rate of acetylene gas. .
  • the heating temperature of the annular electric furnace 40 was 800 ° C.
  • Table 1 The results are shown in Table 1 below. In Table 1, in order to supply the same amount of acetylene gas to the lift-out roll side, the inflow volume is increased in accordance with the decrease in the acetylene concentration, in other words, the same amount is obtained by increasing the gas supply rate. Acetylene was supplied.
  • the inflow volume (gas supply amount) is 10 times that of the test with acetylene concentration of 100%.
  • the inflow volume indicates a ratio of the gas supply amount at each acetylene concentration when the gas supply amount under the condition of 100% acetylene concentration is 1.
  • the residence time indicates the ratio of the gas heating time at each acetylene concentration when the gas heating time under the condition of 100% acetylene concentration is 1.
  • the concentration-corresponding reaction rate indicates the rate at which acetylene contained in the gas at each acetylene concentration reacted.
  • the reaction rate indicates the ratio of the acetylene reaction amount per gas unit volume at each acetylene concentration when the reaction amount of acetylene per gas unit volume under the condition of acetylene concentration of 100% is 1.
  • this is assumed to be supplied at a rate of 1 L / min in the case of a test with an acetylene concentration of 100%, this is a gas supply amount of 20 L / min. Assuming that gas is supplied from the gas pipe to the dross box at a gas supply rate of 20 L / min, a fast gas flow is generated inside the dross box, and the seal block and liftout roll are cooled more than necessary. There is a risk that. Moreover, there is a possibility that dust is wound up inside the dross box portion.
  • the acetylene concentration it is preferable to set the acetylene concentration to 30% or more in order to secure a concentration-corresponding reaction rate of 60% or more and select a range in which the inflow volume is not increased more than necessary. Moreover, in order to ensure 70% or more in the reaction rate corresponding to the concentration and not to increase the inflow volume, it is more preferable to set the acetylene concentration to 50% or more.
  • the technology of the present invention can be widely applied to glass ribbon production technology in general by the float process.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
  • Chemical Vapour Deposition (AREA)

Abstract

 本発明は、リフトアウトロール表面の保護膜の原料となる炭化水素ガスを送るガス配管に目詰まりを生じさせない製造方法と製造装置の提供を目的とする。本発明は、溶融金属の液面に溶融ガラスを供給してガラスリボンを成形し、このガラスリボンを溶融金属の液面からリフトアウトロールで引き出して次工程に搬送するフロートガラスの製造方法であって、前記リフトアウトロールの表面に400℃以下に温度制御した炭化水素ガスを送って前記リフトアウトロールの表面に炭素の保護膜を形成し、前記リフトアウトロールでガラスリボンを搬送するフロートガラスの製造方法に関する。

Description

フロートガラスの製造方法と製造装置
 本発明は、フロートガラスの製造方法と製造装置に関する。
 フロート法によるガラスの製造方法においては、まず、溶融金属浴の水平な液面に溶融ガラスを連続的に供給して帯状のガラス(通常、ガラスリボンと称される)を形成し、このガラスリボンを溶融金属浴の出口側から引き上げて溶融金属浴の槽外へ引き出す。次いで、このガラスリボンを搬送ロール(リフトアウトロール)により搬送させて徐冷炉に搬入し、徐冷炉内を移動させながら徐冷し、切断装置により必要な長さに切断することで、板状のフロートガラスを製造している。
 上述のフロート法によるフロートガラスの製造方法は、ガラスの一面を溶融金属の液面によって形成し、溶融金属上に溶融ガラスを広げることによりガラスの他の面を形成するので、ガラスの平坦性を極めて高くすることが可能であり、大量生産にも好適な製造方法として知られている。このため、フロート法は、自動車用ガラス、ディスプレイ用ガラスなどの板ガラス生産に広く適用されている。
 図6は、この種フロート法に適用されるフロートガラス製造装置の一例を示し、この例の装置は、錫の溶融金属浴100を備えたフロ-トバス101と、このフロ-トバス101の下流側に設置されたドロスボックス102と徐冷炉103とから構成されている。ドロスボックス102の内部には複数のリフトアウトロール105が水平に設置され、徐冷炉103の内部には複数のレヤーロール106が水平に設置されている(特許文献1参照)。
 図6に示す製造装置において溶融金属浴100の浴面に溶融ガラス107を供給し、必要な厚さと幅に引き延ばした後、リフトアウトロール105の牽引力によりガラスリボン108を引き出して徐冷炉103の側に搬送できる。
 前述のフロートガラス製造装置において、図7に示すように、ドロスボックス102の各リフトアウトロール105の近傍にガス供給管109が敷設され、各ガス供給管109に複数の噴射口109aが形成されている。これらのガス供給管109にはアセチレン等の炭素含有ガスの供給源110と窒素ガス等のパージガスの供給源111が接続されている。そして、各ガス供給管109の噴射口109aからリフトアウトロール105の表面側に炭素含有ガスを供給することで、リフトアウトロール105の表面側に炭素の保護膜を形成できる構成となっている。
WO2009/014028号公報
 ところで、前記リフトアウトロール105に炭素の保護膜を形成するのは、高温のガラスリボン108に直接リフトアウトロール105が接触することから、ガラスリボン108との摩擦を減らし、ガラスリボン108に疵や汚れを生じさせないためである。
 図7に示す装置においては、従来、アセチレンガス等の炭素含有ガスと窒素ガスなどのパージガスとの混合ガスをガス供給管109から噴出し、リフトアウトロール105の表面に炭素の保護膜を形成していた。
 ところが、リフトアウトロール105を設けたドロスボックス102の内部空間は高温のガラスリボン108が通過する空間であり、また、前段のフロートバス101の内部空間も高温であるがために、650℃程度の高温環境とされている。このような高温環境下にガス供給管109から炭素含有ガスを噴出すると、ガス供給管109のガスの噴出部付近を通過する間にアセチレンガスの一部が分解反応を起こし、ガス供給管109の内部に炭素が堆積し、ガス供給管109が部分的に閉塞する問題があった。また、ガス供給管109の内部で炭素が消費されるため、リフトアウトロール105の表面側において炭素の析出量が少なくなり、必要な厚さの炭素膜を形成できない可能性を有していた。
 尚、ガス供給管109を通過する炭素含有ガスの流速を上げてガス供給管109を通過する時間を短縮すれば、炭素含有ガスを分解前にリフトアウトロール105側に到達させることも可能であると思われる。ところが、リフトアウトロール105に向けて炭素含有ガスを高速で噴射するとリフトアウトロール105の表面温度を必要以上に下げてしまい、ひいてはガラスリボン108を必要以上に冷やすおそれがある。また、ドロスボックス102の内部に炭素含有ガスを高速で噴射すると、リフトアウトロール105の下での滞留時間が短く、炭素含有ガスの温度が上がらずアセチレンの分解率が悪くなり、ガラスリボン108の表面を汚染するおそれがある。
 これらの背景に基づき、本発明者は、リフトアウトロールの表面に形成する保護膜の形成機構について研究し、保護膜形成用の炭素含有ガスの供給温度に着目することにより本願発明に到達した。
 本発明は前記背景に基づきなされたもので、リフトアウトロールの表面に効率良く炭素の保護膜を形成できるフロートガラスの製造方法と製造装置の提供を目的とする。
 本発明のフロートガラスの製造方法は、溶融金属の液面に溶融ガラスを供給してガラスリボンを成形し、このガラスリボンを溶融金属の液面からリフトアウトロールで引き出して次工程に搬送するフロートガラスの製造方法であって、前記リフトアウトロールの表面に400℃以下に温度制御した炭化水素ガスを送って前記リフトアウトロールの表面に炭素の保護膜を形成し、前記リフトアウトロールでガラスリボンを搬送することを特徴とする。
 400℃以下に温度制御した炭化水素ガスをリフトアウトロール表面側に送るので、炭化水素ガスを分解させることなくリフトアウトロール表面側にまで供給できる。このため、リフトアウトロールの表面に効率良く炭素の保護膜を形成できる。また、炭化水素ガスの供給路の途中で炭素の堆積物を析出させないため、その供給路の途中で炭素の堆積物で閉塞しない。
 本発明において、前記リフトアウトロールの表面に供給する炭化水素ガスを濃度30%以上とすることが好ましい。
 濃度30%以上の炭化水素ガスを用いて400℃以下に温度制御しつつ炭化水素ガスをリフトアウトロール側に送ることにより、炭化水素ガスの供給路の途中で炭化水素ガスの分解を抑制しつつリフトアウトロールの表面側において効率良く炭素の保護膜を生成できる。炭化水素ガスを高濃度としてリフトアウトロールの表面側に送ることで最も高い効率で炭素の保護膜を生成できる。
 本発明において、前記炭化水素ガスをガス配管によって供給し、該ガス配管に沿って設けた冷媒配管により前記ガス配管を冷却し、その内部を流れる炭化水素ガスの温度を400℃以下に制御することができる。
 冷媒配管によりガス配管を冷却し、炭化水素ガスの温度を400℃以下に容易かつ確実に制御できる。これにより、ガス配管の内部において炭化水素ガスの分解を抑制して炭素の析出を抑制し、リフトアウトロールの表面側に効率良く未反応の炭化水素ガスを供給してリフトアウトロールの表面側に効率良く炭素の保護膜を形成できる。
 本発明において、前記リフトアウトロールの底部側に該リフトアウトロールの長手方向に沿ってシールブロックを設け、該シールブロックに沿って炭化水素ガスの搬送を行うガス配管を設け、該ガス配管に間欠的に設けたガス噴出部から前記シールブロックの上部側に前記炭化水素ガスを導く複数のガス流路を設け、これらガス流路から前記リフトアウトロールの表面側に炭化水素ガスを噴出することで前記リフトアウトロールの表面に炭素の保護膜を形成することができる。
 リフトアウトロールの長手方向に沿うシールブロックを設け、シールブロックに沿って設置したガス配管の複数の位置からリフトアウトロールの表面側に炭化水素ガスを供給することで、リフトアウトロールの長手方向に沿ってその表面全域に均一に炭素の保護膜を形成できる。
 本発明のフロートガラスの製造装置は、溶融金属の液面に溶融ガラスを供給してガラスリボンを成形するフロートバスと、前記溶融金属からガラスリボンを持ち上げて搬送するリフトアウトロールを備えたフロートガラスの製造装置であって、前記リフトアウトロールの下方に該リフトアウトロールの長手方向に沿って設けられた台座と、該台座に沿って設けられた炭化水素ガスを供給するガス配管と、前記ガス配管に沿って設けられた冷媒配管と、前記台座上に配置されて前記リフトアウトロールの底部に近接するシールブロックとを備え、前記シールブロックの内部に前記ガス配管からの炭化水素ガスを流すガス流路が形成され、前記シールブロックの上部に前記ガス配管から供給される炭化水素ガスを前記リフトアウトロールの底部に向かって噴出する噴出口が形成され、前記冷媒配管が前記ガス配管内を流れる炭化水素ガスの温度を400℃以下に制御する冷却能力を有したことを特徴とする。
 400℃以下に温度制御した炭化水素ガスを、ガス配管を介しリフトアウトロール表面側に送るので、ガス配管の内部で炭化水素ガスを分解させることなくリフトアウトロール表面側に供給できる。このため、リフトアウトロールの表面に効率良く炭素の保護膜を形成できる。また、ガス配管の内部で炭素の析出が起こり難いため、ガス配管の内部が炭素の堆積物で詰まらない。
 本発明において、前記ガス配管の両側に沿うように冷媒配管が設置され、前記ガス配管及び前記冷媒配管が前記シールブロックの底部側にシール材を介し設置された構造にできる。
 ガス配管の両側に冷媒配管を設けることでガス配管の両側から効率良くガス配管を冷却でき、その内部を流れる炭化水素ガスを効率良く冷却できる。このため、ガス配管の途中で炭化水素ガスの分解を抑制できる。
 また、シール材を設けたので、炭化水素ガスがシールブロックと配管の間から漏れない。
 本発明において、前記ガス配管と前記冷媒配管の近傍に、前記ガス配管及び前記冷媒配管の周囲にパージガスを供給するパージガス配管が設置された構造にできる。
 シールブロックと配管の間から漏れた炭化水素ガスをパージガスで薄めることができ、シールブロック、ガス配管と冷媒配管等を含めた噴霧ユニットと台座の間にカーボンが生成するのを防止できる。
 本発明によれば、炭化水素ガスの分解を抑制できるので、濃度の高い炭化水素ガスをリフトアウトロールの表面側に供給できる。このため、リフトアウトロールの表面に必要な厚さの炭素の保護膜を効率よく形成できる。また、炭化水素ガスの供給路の途中で炭素の堆積物を析出させないため、ガス配管の内部を炭素の堆積物で詰まらせることがない。
 よって、目的厚さの炭素の保護膜を備えたリフトアウトロールを用いてガラスリボンに傷や塵を付けることなく、搬送できる。
図1は、本発明に係る第一実施形態のフロートガラス製造装置の全体構成を示す概略図である。 図2は、同製造装置に設けられるリフトアウトロールとその周囲の構造を示す構成図である。 図3は、同製造装置に設けられるリフトアウトロールとその下方に設けられる台座およびガス供給管を示す構成図である。 図4は、実施例においてアセチレンガス分解温度を測定した装置構成を示す図である。 図5は、実施例において試験したアセチレンガス分解率の温度依存性を示すグラフである。 図6は、従来のフロートガラス製造装置の一例を示す構成図である。 図7は、図6に示す装置に設けられる炭素含有ガスの供給管の一例構造を示す構成図である。
 以下、添付図面を参照して本発明に係るフロートガラスの製造装置およびフロートガラスの製造方法の一実施形態について説明するが、本発明は以下に説明する実施形態に制限されるものではない。
 図1に示すように、本実施形態のフロートガラスの製造装置1は、フロートバス2に供給された溶融ガラスGを、フロートバス2に湛えられた溶融錫(溶融金属)3の表面に沿って流動させて帯板状のガラスリボン5を成形し、このガラスリボン5をドロスボックス部6に設けたリフトアウトロール7で引き出す装置として構成されている。本実施形態の装置においてガラスリボン5はドロスボックス部6の出口部から取り出された後、レヤーロール9にて徐冷炉10に引き込まれて冷却され、洗浄された後、所定の寸法に切断され、目的の大きさのフロートガラスが得られる。
 フロートバス2の入口部2aには、図示略の溶解炉から供給通路11を介し送られてきた溶融ガラスGが供給通路11の終端部に設けられたリップ12を介し供給されるようになっている。リップ12の上流側の供給通路11には溶融ガラスGの流れを調節するためのフロントツイール13が設置されている。前記供給通路11、フロートバス2はそれぞれ耐火レンガ等の耐熱材を複数組み付けて構成されるが、図1では簡略化して記載している。
 フロートバス2は、図1に示すように溶融錫3が満たされた溶融金属浴槽2Aと、該溶融金属浴槽2Aの上部に設置された上部構造体2Bとからなり、フロートバス2の内部が外部雰囲気とは極力遮断される構成とされている。
 フロートバス2の入口部2aにはフロントリンテル(前面壁)15が形成され、フロントリンテル15の上部が天井壁16に接続されている。フロートバス2の下流端側には後端壁17が天井壁16と接続するように設けられ、後端壁17において溶融錫3の液面近くの位置にガラスリボン5の出口部18が形成されている。フロートバス2においてフロントリンテル15と天井壁16と後端壁17とから上部構造体2Bが構成されている。
 上部構造体2Bには図示略のパイプが備えられ、このパイプから水素及び窒素からなる還元性混合ガスが供給され、フロートバス2の内部空間が常に大気圧以上の還元性雰囲気に保持されている。フロートバス2の内部の還元性雰囲気は、ガラスリボン5が引き出される出口部18からドロスボックス部6側にも若干流出するようになっている。
 フロートバス2の後段側に設けられているドロスボックス部6は、下部ケーシング6Aと上部ケーシング6Bからなり、本実施形態では下部ケーシング6Aに3つのリフトアウトロール7が水平に設けられている。リフトアウトロール7は、例えば石英で形成されたロール胴部とこのロール胴部を支持するシャフトから概略構成され、胴部の周面に炭素(カーボン)からなる保護膜7aが形成されている。リフトアウトロール7の設置本数は本実施形態のように3本に限らず、ガラスリボン5を徐冷炉10側に搬送できるならば何本設けてもよい。下部ケーシング6Aは、フロートバス2と徐冷炉10とを接続するように上部ケーシング6Bの下方に設けられている。
 前記リフトアウトロール7の下部には、溶融金属浴槽2Aと徐冷炉10との間の気流を遮断するために、グラファイト製のシールブロック21を上部に備えた壁状の台座22が配置されている。前記シールブロック21は、その上面をリフトアウトロール7のロール面と接するように台座22の上部に設けられ、シールブロック21がリフトアウトロール7の周面との間をある程度気密になるように仕切っている。前記台座22は、ダクタイル鋳鉄などの厚手の金属片から中空壁状に構成され、下部ケーシング6Aの内部を仕切るように立設されている。
 ドロスボックス部6の上部ケーシング6Bは鋼材製のシーリングゲートとして構成され、フロートバス2と徐冷炉10の間に設置された天井壁24と、この天井壁24から垂下されたステンレス鋼製のドレープ25とを備えて構成され、下部ケーシング6Aの上側に設置されている。天井壁24に垂下された複数のドレープ25のうち、内側の3つのドレープ25は、3つのリフトアウトロール7とその上方を移動するガラスリボン5との接触位置の上方に沿うように配置されている。即ち、これらのドレープ25はリフトアウトロール7の長手方向の全長に渡るようにリフトアウトロール7の中心軸の上方に配置され、上部ケーシング6Bの内部空間を複数に仕切っている。
 徐冷炉10にはレヤーロール9が水平に複数設置されており、ドロスボックス部6を通過して移動してきたガラスリボン5を複数のレヤーロール9によって徐冷炉10内を搬送できる。
 前記ドロスボックス部6の下部ケーシング6Aの内部には台座22とシールブロック21とリフトアウトロール7の組み合わせが3基ガラスリボン5の搬送方向に所定の間隔をあけて配置されているので、これらによって下部ケーシング6Aの内部空間は4つの領域に仕切られている。これらの領域にはそれぞれ供給管23が配置され、供給管23はドロスボックス部6の外部に延出されて窒素ガス等の非酸化性ガス供給源から各領域に非酸化性ガスを供給できるように構成されている。
 各リフトアウトロール7の両端部分は下部ケーシング6Aの図示略の側壁近くに近接配置されているので、下部ケーシング6Aは上面側が開口された箱状の領域とされている。なお、各リフトアウトロール7が、下部ケーシング6Aの側壁をそのまま貫通している構造を採用することもでき、その場合は、できるだけ密閉構造となるように側壁とリフトアウトロール7との隙間を小さく形成し、隙間については耐熱性のクロス等で覆う構造を採用できる。
 リフトアウトロール7の下部側にリフトアウトロール7の長手方向にその全長に沿ってグラファイト製のシールブロック21が設けられている。シールブロック21は、その上部中央側に全長に渡り凹溝21aを設けた側面凹型の細長いブロック状に形成され、シールブロック21の上部側に対しリフトアウトロール7がその底部を擦り付けつつ回転できるように配置されている。このシールブロック21の下方側には、図3に拡大して示すように、断熱材からなるガスケットなどのシール材34が設けられ、このシール材34の下に2本の横断面矩形状の冷媒配管33、33とそれらに挟まれた横断面矩形状のガス配管35が設けられている。
 ガス供給源37からのガス配管35はシールブロック21の凹溝21aの下方にシールブロック21の全長に沿って配置され、その左右両側に水などの冷媒を流通させる冷媒配管33、33が設置されている。また、冷媒供給源38からの冷媒配管33、33とガス配管35の下方に、パージガス供給源39からの横断面矩形状のパージガス配管36が設置されている。パージガス配管36の横幅は、冷媒配管33とガス配管35と冷媒配管33とが並んだ分の横幅と略等しくされている。パージガス配管36の内部流路は2つに区分され、パージガス配管36は2本の横断面矩形状の配管を溶接により一体化した構造とされている。
 シールブロック21の下方には、中空壁状の台座22が設けられ、2本の冷媒配管33とガス配管35と2本のパージガス配管36が台座22の内部側に収容されている。なお、冷媒配管33は水などの液体冷媒を循環させる必要があるので、冷媒配管33の一方を往管とし、他方を戻管として往管と戻管の先端側を接続して構成し、液体冷媒を冷媒配管33,33を用いて循環できる構造とされている。図2では、パージガス配管36,36、ガス配管35および冷媒配管33,33は、ドロスボックス部6の片側から挿入するようになっているが、左右両側から挿入するようにしてもよい。
 本実施形態では各ガス配管35の一側端がドロスボックス部6の側壁を貫通してドロスボックス部6の外部側に導出され、外部において炭化水素ガスの1種であるアセチレンガスの供給源37に接続されている。また、各冷媒配管33、33の一端側がドロスボックス部6の側壁を貫通して外部に導出され、給排水用の循環ポンプ(不図示)に接続され、冷媒配管33、33を介して水の循環を行うことでそれらの間に配置されているガス配管35を冷却できる。なお、パージガス配管36は他の配管とは独立され、パージガス配管36を通過したパージガスは台座22とシールブロック21の間に供給される。パージガス配管36を通過したパージガスは、シールブロック21とガス配管35の間から漏れた炭化水素ガスを薄めて、シールブロック21とガス配管35を含む噴霧ユニットと台座22の間にカーボンが生成することを防止する目的で設けられている。
 尚、本実施形態では、炭化水素ガスの1種として、アセチレンガスを用いたがエチレンガスを用いてもよい。
 前記シールブロック21の凹溝21aの下方に位置するガス配管35には所定の間隔でノズルなどからなるガス噴出部35aが複数形成され、凹溝21aの底面側にガス配管35の各ガス噴出部35aに接続し、凹溝21aの底面に連通するガス流路21bが所定の間隔で形成されている。図3の例では、ガス流路21bの上端部が噴出口21cとして凹溝21aの底面に開口されている。
 ガス配管35のガス噴出部35aからガス流路21bを介しアセチレンガスをシールブロック21の凹溝21a側に供給すると、アセチレンガスは凹溝21aに沿って広がり、その上方で回転しているリフトアウトロール7の表面に到達できる。なお、ガス配管35の長手方向に沿って複数のガス噴出部35aが形成されているので、リフトアウトロール7の長手方向に沿ってできるだけ均一に炭化水素ガスを供給することが好ましい。このためには、ガス噴出部35aを構成するためのノズル全体に圧損をつけてリフトアウトロール7の長手方向一端側から他端側に配列されたいずれのガス噴出部35aからも同程度のガス量を噴射できる構成とすることが好ましい。
 本実施形態においてガス配管35からリフトアウトロール7側に供給するアセチレンガスは、400℃以下に温度制御されており、400℃以下のできるだけ高い温度に予熱した後に噴出することが好ましい。これはアセチレンガスの温度を400℃以下に制御することでアセチレンガスのガス配管35内での分解反応を抑制するためと、アセチレンガスの噴出によってリフトアウトロール下の温度が下がり、アセチレンの分解率が下がるのを防ぐためである。
 ドロスボックス部6には図示略のヒータが設けられており、ガラスリボン5の温度を目的の温度に調節できるように構成されている。
 次に、前記構成のフロートガラスの製造装置1を用いてフロートガラスを製造する方法について説明する。
 図1~3に示す構成の製造装置を用いてガラスリボン5を製造するには、溶融炉から溶融ガラスGを供給通路11に供給し、リップ12の上を流れる溶融ガラスGの流量をフロントツイール13の堰き止め量により調整しながらフロートバス2の入口部2aの溶融錫3上に溶融ガラスGを供給する。フロートバス2においては溶融錫3の上に流動させた溶融ガラスGを所定幅、所定厚さの帯板状のガラスリボン5に成形する。このガラスリボン5を回転するリフトアウトロール7で溶融錫3の液面から牽引してドロスボックス部6側に移動させ、次いでレヤーロール9により徐冷炉10の内部を搬送しながらガラスリボン5を冷却する。徐冷炉10において冷却されたガラスリボン5は冷却後、切断工程において必要な長さ、幅に切断することで目的の幅と長さのフロートガラスを製造できる。
 前記溶融錫3に溶融ガラスGを供給してガラスリボン5を成形する場合、ドロスボックス部6の各領域に供給管23から非酸化性ガスを供給しながらガラスリボン5を成形する。前記ドロスボックス部6の内部を貫通するようにガラスリボン5が通過し、ドロスボックス部6の内部に複数のリフトアウトロール7が設けられているので、ドロスボックス部6の内部を完全な密閉空間とすることはできない。このため、供給管23を設けてドロスボックス部6の内部領域に非酸化性ガスを供給し、内部領域を非酸化性ガスで正圧化し、ドロスボックス部6の内部に酸素の侵入を防止することが有効である。
 尚、本実施形態においてドロスボックス部6の内部を閉空間と説明するが、ドロスボックス部6はフロートバス2と徐冷炉10に接続され、リフトアウトロール7の軸受け部分周りも外部に通じているのでこれらの部分からも若干ガス抜けは生じる。以上まとめてこれらの部分からガス抜けを生じる程度にドロスボックス部6を閉じた状態を本実施形態では閉空間と称している。
 前述の閉空間となっているドロスボックス部6においてリフトアウトロール7が回転しつつガラスリボン5を搬送するが、リフトアウトロール7の底部はシールブロック21の上部と擦れながら回転する。
 リフトアウトロール7によりガラスリボン5を搬送する場合、一例としてガス配管35のガス噴出部35aから濃度100%のアセチレンガスをシールブロック21の凹溝21a側に供給すると、アセチレンガスは凹溝21aに沿って広がり、その上方で回転しているリフトアウトロール7の表面に到達する。更に、冷媒配管33、33を介して冷媒としての水を循環させてガス配管35を流れるアセチレンガスを400℃以下、より好ましくは300℃以下に冷却する。ガス配管35の内部を流れるアセチレンガスは400℃以下では大部分が分解せず、300℃以下ではほとんど分解しないので、ガス配管35の内部に炭素の堆積物が堆積することはない。このため、濃度100%のアセチレンガスを用いた場合、濃度100%のアセチレンガスをほぼそのままリフトアウトロール7の表面に供給することができ、リフトアウトロール7の表面に効率よく炭素の保護膜を形成できる。冷却するアセチレンガスの下限値は、アセチレンガスの噴出によってリフトアウトロール下の温度が下がり、アセチレンの分解率が低下しロール表面における炭素の保護層が形成しにくくなるため、0℃が好ましく、50℃がより好ましい。
 パージガス配管36からパージガスを台座22の内側に送ることにより、シールブロック21とガス配管35を含む噴霧ユニットと台座22の間に漏れ出るアセチレンガスを薄めてこれらの部分と周囲にカーボンが生成することを防止する。
 所望の濃度としたアセチレンガスをリフトアウトロール7側に送ることにより、目的の濃度のアセチレンガスを用いてリフトアウトロール7の表面に必要な厚さの炭素の保護膜を形成できる。アセチレンガスを供給する場合、アセチレンガスの濃度は30%以上とすることが好ましい。アセチレンガスの純度が低すぎる場合は、保護膜の形成割合が低すぎて十分な厚さの保護膜を形成できないおそれがある。
 尚、炭素の保護膜は、ドロスボックス部6の内部が650℃前後となっているのでガラスリボン5を連続生産している間、徐々に燃焼してその厚さが減少する。このため、アセチレンガスを連続的に供給して保護膜を連続的に生成するか、一定時間アセチレンガスを供給後、一定時間アセチレンガスの供給を停止し、所定時間経過後に再度アセチレンガスを送って保護膜を生成する操作を繰り返しながらガラスリボンを生産することが好ましい。
 一例として、濃度100%のアセチレンガスを用いた場合、所定時間供給後、アセチレンガスの供給を停止し、一定時間経過後再度アセチレンガスの供給を行う操作を繰り返し行うことができる。また、濃度30~100%の範囲のアセチレンガスを供給する場合、アセチレンガスの濃度に合わせて連続的に供給することや、供給量を適宜増減して連続運転することもできる。
 アセチレンガスの供給量については、濃度100%のアセチレンガスを用いる場合、リフトアウトロール7の表面に必要量の保護膜を生成するために、一例として、1L/分程度のアセチレンガスを供給することで必要な膜厚の保護膜を生成できる。この程度のガス供給量であるならば、リフトアウトロール7を必要以上に冷却することはなく、ガラスリボン5を必要以上に冷却することもない。また、上述の範囲のガス供給量であるならば、ドロスボックス部6の内部に存在する塵埃をガス流で巻き上げてしまうこともない。よって、ガラスリボン5を汚すことなく搬送しつつガラスリボン5を生産できる。
 以下、本発明に係る実施例を説明し、本願発明を更に説明する。
 図1~3に示す構成のガラスリボンの製造装置を用い、ドロスボックス部にガス配管を介しアセチレンガスを供給することを想定し、ガス配管を通過するアセチレンガスの分解挙動について試験した。
 図4に示す環状電気炉40を用意し、この環状電気炉40内部を通過するJIS規定のステンレス鋼であるSUS304製の供給配管41を設け、環状電気炉40を通過した供給配管41の末端を、電子イオン化法を利用した質量分析器(EI-MS)42に接続した。供給配管41の加熱される容積(環状電気炉40内を通る容積)は、0.15Lであった。
 測定用に用いるアセチレンガス濃度を濃度100%、流量0.1L/分として、ガス配管内の温度を300、400、500、600、700、800℃とした場合のアセチレンガスの分解率を測定した。
 アセチレンガスは分解すると、水素、エチレン、ベンゼンあるいはメタンなどのいずれかの化合物が発生するのでこれら化合物の生成量に応じて分解率を計測できる。
 その結果を図5に示す。
 図5に示す結果から、700~800℃ではほとんどのアセチレンガスが反応して分解し、600℃では半分程度のアセチレンガスが反応して分解する。また、500℃において数%程度のアセチレンガスが反応して分解することがわかる。 
 アセチレンガスの分解反応は、発熱反応であり、一端分解反応が始まると熱を発生して分解が更に進む可能性が高い。分解反応は、例えば、C→2C+H+55kcal/molと表記できる。
 このため、図5の結果から鑑み、アセチレンガスを供給する場合のガス温度を400℃以下に保持できるならば、ほぼ100%の濃度のまま未反応のアセチレンガスをリフトアウトロールの表面側に供給できると思われる。
 尚、濃度100%のアセチレンガスに代えて、Arガスを10%含有させた濃度90%のアセチレンガスを用いて上記と同様の試験を行ったところ、400℃以下の温度でアセチレンガスが分解しないことを確認できた。
 このため、図1~3に示すガラスリボンの製造装置を運転してガラスリボンを生産する場合、冷媒配管33,33によりガス配管35を冷却し、ガス配管35を介し400℃以下に冷却したアセチレンガスをリフトアウトロール7側に供給することで効率良く保護膜7aを生成できると思われる。また、より確実にアセチレンガスの分解反応を抑えるためには、300℃以下に冷却した状態でアセチレンガスをリフトアウトロール7側に供給することが好ましいと考えられる。
 次に、前述の試験に供給するアセチレンガスの濃度を100、80、70、60、50、40、30、20、10%にそれぞれ変更して再試験を行い、アセチレンガスの反応率を求めた。環状電気炉40の加熱温度は800℃とした。その結果を以下の表1に示す。なお、表1においては、リフトアウトロール側に同等量のアセチレンガスを供給するために、アセチレン濃度の低下に合わせて流入体積を増加し、言い換えると、ガスの供給速度を上げることで同等量のアセチレンを供給した。よって、アセチレン濃度100%の試験に対し、アセチレン濃度10%の試験では流入体積(ガス供給量)を10倍としている。
 具体的には、流入体積は、アセチレン濃度100%の条件におけるガス供給量を1としたときの、各アセチレン濃度におけるガス供給量の割合を示す。滞留時間は、アセチレン濃度100%の条件におけるガス加熱時間を1としたときの、各アセチレン濃度におけるガス加熱時間の割合を示す。濃度対応反応率は、各アセチレン濃度におけるガスに含まれるアセチレンが反応した割合を示す。反応率は、アセチレン濃度100%の条件におけるガス単位体積当たりのアセチレンの反応量を1としたときの、各アセチレン濃度におけるガス単位体積当たりのアセチレン反応量の割合を示す。
Figure JPOXMLDOC01-appb-T000001
 表1に示す結果から、アセチレン分解量を同じにして、ロール表面の炭素の保護層を同じ厚みにするために、アセチレン濃度を10%とした試験では、アセチレン供給量を同じにするためにアセチレン濃度100%の試験に対しガス供給量を10倍とするだけでは不十分である。このため、分解率が低くなる分を補うためにガス供給量をもっと多くする必要がある。すなわち、アセチレン濃度100%と10%では濃度対応反応率が100%から50%になっており、同じ量のアセチレンを分解させるためには、流入体積を20倍にする必要がある。これは、アセチレン濃度100%の試験の場合に1L/分の割合で供給すると仮定すると、20L/分のガス供給量となる。仮に、20L/分のガス供給量でガス配管からドロスボックス部にガスを供給すると仮定すると、ドロスボックス部の内部に速いガス流を生むこととなり、シールブロックやリフトアウトロールを必要以上に冷却してしまうおそれがある。また、ドロスボックス部の内部に塵埃を巻き上げるおそれもある。
 以上の結果に鑑み、濃度対応反応率において60%以上を確保し、流入体積を必要以上に増大しない範囲を選択するためには、アセチレン濃度を30%以上とすることが好ましい。また、濃度対応反応率において70%以上を確保し、流入体積を高くしないためには、アセチレン濃度50%以上とすることがより好ましい。
 本出願は、2013年4月16日出願の日本特許出願2013-085856に基づくものであり、その内容はここに参照として取り込まれる。
 本発明の技術は、フロート法によるガラスリボンの製造技術一般に広く適用できる。
 1…フロートガラスの製造装置、2…フロートバス、2A…溶融金属浴槽、3…溶融錫、5…ガラスリボン、6…ドロスボックス部、6A…下部ケーシング、6B…上部ケーシング、7…リフトアウトロール、9…レヤーロール、10…徐冷炉、21…シールブロック、21a…凹溝、21b…ガス流路、21c…噴出口、22…台座、23…供給管、33…冷媒配管、34…シール材、35…ガス配管、35a…ガス噴出部、36…パージガス配管、37…ガス供給源、38…冷媒供給源、39…パージガス供給源。

Claims (7)

  1.  溶融金属の液面に溶融ガラスを供給してガラスリボンを成形し、このガラスリボンを溶融金属の液面からリフトアウトロールで引き出して次工程に搬送するフロートガラスの製造方法であって、
     前記リフトアウトロールの表面に400℃以下に温度制御した炭化水素ガスを送って前記リフトアウトロールの表面に炭素の保護膜を形成し、前記リフトアウトロールでガラスリボンを搬送するフロートガラスの製造方法。
  2.  前記リフトアウトロールの表面に供給する炭化水素ガスを濃度30%以上とする請求項1に記載のフロートガラスの製造方法。
  3.  前記炭化水素ガスをガス配管によって供給し、該ガス配管に沿って設けた冷媒配管により前記ガス配管を冷却し、その内部を流れる炭化水素ガスの温度を400℃以下に制御する請求項1または請求項2に記載のフロートガラスの製造方法。
  4.  前記リフトアウトロールの底部側に該リフトアウトロールの長手方向に沿ってシールブロックを設け、該シールブロックに沿って炭化水素ガスの搬送を行うガス配管を設け、該ガス配管に間欠的に設けたガス噴出部から前記シールブロックの上部側に前記炭化水素ガスを導く複数のガス流路を設け、これらガス流路から前記リフトアウトロールの表面側に炭化水素ガスを噴出することで前記リフトアウトロールの表面に炭素の保護膜を形成する請求項1~3のいずれか一項に記載のフロートガラスの製造方法。
  5.  溶融金属の液面に溶融ガラスを供給してガラスリボンを成形するフロートバスと、前記溶融金属からガラスリボンを持ち上げて搬送するリフトアウトロールを備えたフロートガラスの製造装置であって、
     前記リフトアウトロールの下方に該リフトアウトロールの長手方向に沿って設けられた台座と、該台座に沿って設けられた炭化水素ガスを供給するガス配管と、前記ガス配管に沿って設けられた冷媒配管と、前記台座上に配置されて前記リフトアウトロールの底部に近接するシールブロックとを備え、
     前記シールブロックの内部に前記ガス配管からの炭化水素ガスを流すガス流路が形成され、前記シールブロックの上部に前記ガス配管から供給される炭化水素ガスを前記リフトアウトロールの底部に向かって噴出する噴出口が形成され、前記冷媒配管が前記ガス配管内を流れる炭化水素ガスの温度を400℃以下に制御する冷却能力を有したフロートガラスの製造装置。
  6.  前記ガス配管の両側に沿うように冷媒配管が設置され、前記ガス配管及び前記冷媒配管が前記シールブロックの底部側にシール材を介し設置された請求項5に記載のフロートガラスの製造装置。
  7.  前記ガス配管と前記冷媒配管の近傍に、前記ガス配管及び前記冷媒配管の周囲にパージガスを供給するパージガス配管が設置された請求項5または6に記載のフロートガラスの製造装置。
PCT/JP2014/059042 2013-04-16 2014-03-27 フロートガラスの製造方法と製造装置 Ceased WO2014171295A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201480021754.3A CN105121366A (zh) 2013-04-16 2014-03-27 浮法玻璃的制造方法和制造装置
KR1020157029653A KR20150143503A (ko) 2013-04-16 2014-03-27 플로트 유리의 제조 방법과 제조 장치

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-085856 2013-04-16
JP2013085856A JP2016117594A (ja) 2013-04-16 2013-04-16 フロートガラスの製造方法と製造装置

Publications (1)

Publication Number Publication Date
WO2014171295A1 true WO2014171295A1 (ja) 2014-10-23

Family

ID=51731247

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/059042 Ceased WO2014171295A1 (ja) 2013-04-16 2014-03-27 フロートガラスの製造方法と製造装置

Country Status (4)

Country Link
JP (1) JP2016117594A (ja)
KR (1) KR20150143503A (ja)
CN (1) CN105121366A (ja)
WO (1) WO2014171295A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7666147B2 (ja) 2021-06-09 2025-04-22 Agc株式会社 フロートガラス製造方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6838530B2 (ja) * 2017-09-01 2021-03-03 Agc株式会社 フロートガラス製造装置、及びフロートガラス製造方法
CN109231810B (zh) * 2018-11-30 2023-08-22 中建材玻璃新材料研究院集团有限公司 一种用于过渡辊台的擦辊装置
CN115178968B (zh) * 2022-07-12 2023-08-11 蚌埠凯盛工程技术有限公司 一种玻璃浮法线密封箱辊子支座及其加工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000212751A (ja) * 1999-01-19 2000-08-02 Mitsubishi Electric Corp 薄膜形成装置
WO2009014028A1 (ja) * 2007-07-23 2009-01-29 Asahi Glass Co., Ltd. フロートガラスの製造方法及びフロートガラスの製造設備

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070286954A1 (en) * 2006-06-13 2007-12-13 Applied Materials, Inc. Methods for low temperature deposition of an amorphous carbon layer
JP5446819B2 (ja) * 2009-12-14 2014-03-19 旭硝子株式会社 フロートガラスの製造方法および製造装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000212751A (ja) * 1999-01-19 2000-08-02 Mitsubishi Electric Corp 薄膜形成装置
WO2009014028A1 (ja) * 2007-07-23 2009-01-29 Asahi Glass Co., Ltd. フロートガラスの製造方法及びフロートガラスの製造設備

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7666147B2 (ja) 2021-06-09 2025-04-22 Agc株式会社 フロートガラス製造方法

Also Published As

Publication number Publication date
JP2016117594A (ja) 2016-06-30
CN105121366A (zh) 2015-12-02
KR20150143503A (ko) 2015-12-23

Similar Documents

Publication Publication Date Title
KR101383603B1 (ko) 플로트 유리 제조 장치 및 방법
CN101754937B (zh) 浮法玻璃制造方法及浮法玻璃制造设备
JP5311142B2 (ja) ガラス板の製造方法およびその製造装置
TWI645043B (zh) 氣體注入裝置及倂入同一氣體注入裝置之基板處理室
WO2014171295A1 (ja) フロートガラスの製造方法と製造装置
JP5099265B2 (ja) 連続溶融めっき及び連続焼鈍の兼用設備
JPS6124352B2 (ja)
US8136374B2 (en) Float bath system for manufacturing float glass and cooling method of the same
JP2011251893A (ja) フロートガラスのための徐冷装置及び方法
EP2960347B1 (en) Continuous annealing device and continuous hot-dip galvanising device for steel strip
TW201433548A (zh) 漂浮玻璃之成形裝置、及漂浮玻璃之製造方法
JPS59205463A (ja) ストリツプに酸化可能皮膜を連続施工する方法及び装置
KR20130143252A (ko) 판유리 제조장치 및 제조방법
JP2004010945A (ja) 連続浸炭炉
US4817701A (en) Method and apparatus for horizontal continuous casting
JP2018515688A (ja) 反応制御のための方法及び装置
WO2013179862A1 (ja) フロートガラスの成形装置、及びフロートガラスの製造方法
CN113046681B (zh) 一种提高空腔工件渗碳层厚度均匀性的装置及方法
CN107641796B (zh) 制程设备及化学气相沉积制程
CN105339520B (zh) 钢板的熔融镀锌和连续退火的兼用处理设备
EP4401909A1 (en) Trailing gas nozzle with integrated gas cooling
JP2006010268A (ja) 熱処理装置
JP5435473B2 (ja) 超電導薄膜の成膜方法
TWI609988B (zh) 製程設備及化學氣相沉積製程
JP4888916B2 (ja) 溶融炉、薄板製造装置および薄板製造方法

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480021754.3

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14785320

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20157029653

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14785320

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP