WO2014048435A1 - Plant for manufacturing cement clinker - Google Patents

Plant for manufacturing cement clinker Download PDF

Info

Publication number
WO2014048435A1
WO2014048435A1 PCT/DK2013/050282 DK2013050282W WO2014048435A1 WO 2014048435 A1 WO2014048435 A1 WO 2014048435A1 DK 2013050282 W DK2013050282 W DK 2013050282W WO 2014048435 A1 WO2014048435 A1 WO 2014048435A1
Authority
WO
WIPO (PCT)
Prior art keywords
cyclone
gas
cyclone stage
stage
raw meal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/DK2013/050282
Other languages
French (fr)
Inventor
Peter Enemark RYDENG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FLSmidth AS
Original Assignee
FLSmidth AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FLSmidth AS filed Critical FLSmidth AS
Publication of WO2014048435A1 publication Critical patent/WO2014048435A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B7/00Rotary-drum furnaces, i.e. horizontal or slightly inclined
    • F27B7/20Details, accessories or equipment specially adapted for rotary-drum furnaces
    • F27B7/2016Arrangements of preheating devices for the charge
    • F27B7/2025Arrangements of preheating devices for the charge consisting of a single string of cyclones
    • F27B7/2033Arrangements of preheating devices for the charge consisting of a single string of cyclones with means for precalcining the raw material
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B7/00Hydraulic cements
    • C04B7/36Manufacture of hydraulic cements in general
    • C04B7/43Heat treatment, e.g. precalcining, burning, melting; Cooling
    • C04B7/432Preheating without addition of fuel

Definitions

  • the present invention relates to a plant for manufacturing cement clinker comprising a preheater for preheating cement raw meal by contact with hot gases which preheater comprises a number of cyclone stages which are connected in series via gas ducts, a heat treatment unit which comprises at least one inlet opening for introducing preheated raw meal from at least one preheater cyclone in a selected cyclone stage, where a gas outlet of said at least one preheater cyclone in the selected cyclone stage in a vertical plane is located at a higher level than a gas/meal inlet of the preceding cyclone stage as seen in the direction of movement of the cement raw meal.
  • a plant of the aforementioned kind for manufacturing cement is known for example from EP1322899.
  • raw meal is introduced into the gas duct for conducting hot gases from the second cyclone of the cyclone preheater to the first cyclone.
  • the raw meal is then preheated as it is led through the cyclones of the preheater in counterflow to a flow of hot exit gases from the subsequent calciner and kiln.
  • the preheated raw meal is extracted from the last cyclone of the preheater and introduced into the calciner for calcination therein.
  • this last cyclone of the preheater has been located at a higher level than the highest desired location of the intake point, whereas the next-to-last cyclone as seen in the direction of movement of the cement raw materials in order to keep the overall installation height of the preheater at a minimum has been located at lower level.
  • the gas duct connecting the gas outlet of the last cyclone with the gas/meal inlet of the next-to-last cyclone must include a downwardly directed section.
  • the selected cyclone stage comprises an additional cyclone which is placed in parallel to the other cyclone(s) in said cyclone stage and having in said vertical plane a gas outlet located at a lower level than said gas/material inlet of said preceding cyclone stage, and in that the gas ducts from the cyclones in the selected cyclone stage are merged into one single gas duct for conducting the mixed gases to said preceding cyclone stage.
  • the amount of raw meal, which is lifted to a higher level may be tailored the actual quantity needed for introduction at the higher located intake point.
  • a cyclone stage comprises two or more parallel cyclones of which at least one is located at a higher level
  • the pressure drop over this higher located cyclone will mutatis mutandis be higher, thus demanding some kind of means for regulating the gas flows through each cyclone in said cyclone stage.
  • Such means may be traditional damper devices placed in the respective gas ducts from at least some of the cyclones in said cyclone stage.
  • the raw meal being introduced into the gas from said selected cyclone stage is introduced into the gas duct from the additional cyclone before the gas ducts from the cyclones in the selected cyclone stage are merged into one single gas duct. In this way, the higher pressure drop over the higher located cyclone will in at least to a certain extent be balanced.
  • the heat treatment unit may be any kind of unit requiring the introduction of a certain amount of preheated raw meal.
  • the heat treatment unit may be mentioned a calciner for calcination of preheated raw meal and a waste combustion apparatus, such as the Hot Disc being marketed by the applicant of the present application.
  • a kiln plant for manufacturing cement clinker.
  • the plant comprises a cyclone preheater 6 with four cyclone stages 1 , 2, 3 and 4, which are connected in series and fed with gas/raw meal suspension via gas ducts 7, 8, 9 and 10.
  • the plant also comprises a heat treatment unit in form of a calciner 1 1 which comprises inlet openings 12 and 13 for introducing preheated raw meal from the cyclone stage 4, which calciner 1 1 is connected to a separating cyclone 5, a rotary kiln 14 and a clinker cooler 15.
  • cyclone stage (4) comprises a preheater cyclone (4b), which in a vertical plane is located at a higher level than a gas/meal inlet of the preceding cyclone stage (3) as seen in the direction of movement of the cement raw meal, hence facilitating introduction of preheated raw meal into the calciner 1 1 at a higher, preferably predetermined level.
  • the selected cyclone stage 4 comprises two parallel cyclones 4a and 4b, where cyclone 4a may be regarded as an additional cyclone, which has in a vertical plane a gas outlet located at a lower level than said gas/material inlet of the preceding cyclone stage 3, and that the gas ducts from the cyclones 4a and 4b in the selected cyclone stage 4 are merged into one single gas duct for conducting the mixed gases to said preceding cyclone stage 3.
  • cyclone 4b may be located at an arbitrary height relative to the other cyclone 4a in cyclone stage 4, while simultaneously ensuring that raw meal from a preceding cyclone stage 2 in an optimum way may be introduced into an upwardly flowing gas stream from cyclone 4a. Preheated raw meal from the selected cyclone stage 4 can therefore be introduced at any point into the calciner 1 1 unit without any use of special lifting equipment.
  • the amount of raw meal, which is lifted to a higher level may be tailored the actual quantity needed for introduction at the higher located intake point. Most often, during normal operation, only a minor part of the preheated raw meal from cyclone stage 4 needs to be lifted to a higher intake point of the calciner 1 1 , and thus cyclone 4b would normally be dimensioned relatively small compared to cyclone 4a.
  • the pressure drop over cyclone 4b will be higher than over 4a.
  • the raw meal from cyclone stage 2 being introduced into the gas from cyclone stage 4 is introduced into the gas duct from the cyclone 4a before the gas ducts from the cyclones 4a and 4b are merged into one single gas duct.
  • some kind of damper or restriction device 16 may be fitted in the gas duct from cyclone 4a.
  • the heat treatment unit is shown as a calciner 1 1 ; however it may in principle be any kind of unit requiring the introduction of a certain amount of preheated raw meal. Also, the plant may comprise more than one such unit.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Furnace Details (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Description

PLANT FOR MANUFACTURING CEMENT CLINKER
The present invention relates to a plant for manufacturing cement clinker comprising a preheater for preheating cement raw meal by contact with hot gases which preheater comprises a number of cyclone stages which are connected in series via gas ducts, a heat treatment unit which comprises at least one inlet opening for introducing preheated raw meal from at least one preheater cyclone in a selected cyclone stage, where a gas outlet of said at least one preheater cyclone in the selected cyclone stage in a vertical plane is located at a higher level than a gas/meal inlet of the preceding cyclone stage as seen in the direction of movement of the cement raw meal.
A plant of the aforementioned kind for manufacturing cement is known for example from EP1322899. In this known plant, raw meal is introduced into the gas duct for conducting hot gases from the second cyclone of the cyclone preheater to the first cyclone. The raw meal is then preheated as it is led through the cyclones of the preheater in counterflow to a flow of hot exit gases from the subsequent calciner and kiln. In the known plant the preheated raw meal is extracted from the last cyclone of the preheater and introduced into the calciner for calcination therein. In order to enabling introduction of preheated raw meal from this last cyclone at a higher intake point of the calciner, this last cyclone of the preheater has been located at a higher level than the highest desired location of the intake point, whereas the next-to-last cyclone as seen in the direction of movement of the cement raw materials in order to keep the overall installation height of the preheater at a minimum has been located at lower level. In this way the gas duct connecting the gas outlet of the last cyclone with the gas/meal inlet of the next-to-last cyclone must include a downwardly directed section. This means that the raw meal from a cyclone preceding the next-to-last cyclone to be introduced into the gas flow in said gas duct either has to be introduced into a downwardly flowing gas stream or the gas duct has to include a U formed section, thus enabling the meal to be introduced into a upwardly flowing gas stream. As recognized by the skilled person both these alternatives are far from optimum. In the first alternative it is difficult to obtain proper suspension of the meal in the gases and thus obtaining the desired heat exchange, whereas in the second alternative meal will inevitably accumulate at the bottom of the U formed section. A further disadvantage by the known plant is that all the raw meal is lifted to the higher level although most often it is only a small portion that has to be introduced at a higher intake point of the heat treatment unit.
It is the objective of the present invention to provide a plant by means of which a desired amount of preheated raw meal from a selected cyclone stage of the preheater can be introduced into an intake point located at a higher level without causing the installation height of the preheater to be increased, where the above problems are eliminated or essentially reduced.
This is achieved by a plant of the kind mentioned in the introduction and being characterized in that the selected cyclone stage comprises an additional cyclone which is placed in parallel to the other cyclone(s) in said cyclone stage and having in said vertical plane a gas outlet located at a lower level than said gas/material inlet of said preceding cyclone stage, and in that the gas ducts from the cyclones in the selected cyclone stage are merged into one single gas duct for conducting the mixed gases to said preceding cyclone stage.
Hence, without affecting the installation height of the preheater, it will be possible to locate at least one of the cyclones of the selected cyclone stage at an arbitrary height relative to the other cyclone(s) in said cyclone stage, while simultaneously ensuring that raw meal from a preceding cyclone stage in an optimum way may be introduced into an upwardly flowing gas stream from said selected cyclone stage, i.e. in the gas duct from the additional cyclone. Preheated raw meal from the selected cyclone stage can therefore be introduced at any point into the heat treatment unit without any use of special lifting equipment. By proper mutually sizing of the cyclones of the selected cyclone stage, the amount of raw meal, which is lifted to a higher level, may be tailored the actual quantity needed for introduction at the higher located intake point. When a cyclone stage comprises two or more parallel cyclones of which at least one is located at a higher level, the pressure drop over this higher located cyclone will mutatis mutandis be higher, thus demanding some kind of means for regulating the gas flows through each cyclone in said cyclone stage. Such means may be traditional damper devices placed in the respective gas ducts from at least some of the cyclones in said cyclone stage. As an alternative or supplement, it is preferred that the raw meal being introduced into the gas from said selected cyclone stage is introduced into the gas duct from the additional cyclone before the gas ducts from the cyclones in the selected cyclone stage are merged into one single gas duct. In this way, the higher pressure drop over the higher located cyclone will in at least to a certain extent be balanced.
In principle, the heat treatment unit may be any kind of unit requiring the introduction of a certain amount of preheated raw meal. As non-limiting examples of the heat treatment unit may be mentioned a calciner for calcination of preheated raw meal and a waste combustion apparatus, such as the Hot Disc being marketed by the applicant of the present application.
The invention will now be described in further details with reference to drawing, the only figure of which shows a plant according to the invention.
In the figure is shown a kiln plant for manufacturing cement clinker. The plant comprises a cyclone preheater 6 with four cyclone stages 1 , 2, 3 and 4, which are connected in series and fed with gas/raw meal suspension via gas ducts 7, 8, 9 and 10. The plant also comprises a heat treatment unit in form of a calciner 1 1 which comprises inlet openings 12 and 13 for introducing preheated raw meal from the cyclone stage 4, which calciner 1 1 is connected to a separating cyclone 5, a rotary kiln 14 and a clinker cooler 15. As seen the figure cyclone stage (4) comprises a preheater cyclone (4b), which in a vertical plane is located at a higher level than a gas/meal inlet of the preceding cyclone stage (3) as seen in the direction of movement of the cement raw meal, hence facilitating introduction of preheated raw meal into the calciner 1 1 at a higher, preferably predetermined level. In order to enabling that a desired amount of preheated raw meal from a selected cyclone stage 4 of the preheater 6 can be introduced into an intake point 12 located at such a higher level without causing the installation height of the preheater to be increased and simultaneously ensuring that raw meal from a preceding cyclone stage 2 in an optimum way may be introduced into an upwardly flowing gas stream from said selected cyclone stage 4 it is suggested according to the invention that the selected cyclone stage 4 comprises two parallel cyclones 4a and 4b, where cyclone 4a may be regarded as an additional cyclone, which has in a vertical plane a gas outlet located at a lower level than said gas/material inlet of the preceding cyclone stage 3, and that the gas ducts from the cyclones 4a and 4b in the selected cyclone stage 4 are merged into one single gas duct for conducting the mixed gases to said preceding cyclone stage 3. Hence, without affecting the installation height of the preheater, cyclone 4b may be located at an arbitrary height relative to the other cyclone 4a in cyclone stage 4, while simultaneously ensuring that raw meal from a preceding cyclone stage 2 in an optimum way may be introduced into an upwardly flowing gas stream from cyclone 4a. Preheated raw meal from the selected cyclone stage 4 can therefore be introduced at any point into the calciner 1 1 unit without any use of special lifting equipment.
By proper mutually sizing of the cyclones 4a and 4b of the selected cyclone stage 4, the amount of raw meal, which is lifted to a higher level, may be tailored the actual quantity needed for introduction at the higher located intake point. Most often, during normal operation, only a minor part of the preheated raw meal from cyclone stage 4 needs to be lifted to a higher intake point of the calciner 1 1 , and thus cyclone 4b would normally be dimensioned relatively small compared to cyclone 4a.
In the shown plant, the pressure drop over cyclone 4b will be higher than over 4a. In order to balance this difference in pressure drop at least to a certain extent, the raw meal from cyclone stage 2 being introduced into the gas from cyclone stage 4 is introduced into the gas duct from the cyclone 4a before the gas ducts from the cyclones 4a and 4b are merged into one single gas duct. Further, some kind of damper or restriction device 16 may be fitted in the gas duct from cyclone 4a.
In the figure, the heat treatment unit is shown as a calciner 1 1 ; however it may in principle be any kind of unit requiring the introduction of a certain amount of preheated raw meal. Also, the plant may comprise more than one such unit.

Claims

Claims
1 . Plant for manufacturing cement clinker comprising a preheater (6) for preheating cement raw meal by contact with hot gases which preheater comprises a number of cyclone stages (1 , 2, 3, 4) which are connected in series via gas ducts (7, 8, 9, 10), a heat treatment unit (1 1 ) which comprises at least one inlet opening (12) for introducing preheated raw meal from at least one preheater cyclone (4b) in a selected cyclone stage (4), where a gas outlet of said at least one preheater cyclone (4b) in the selected cyclone stage (4) in a vertical plane is located at a higher level than a gas/meal inlet of the preceding cyclone stage (3) as seen in the direction of movement of the cement raw meal, characterized in that the selected cyclone stage (4) comprises an additional cyclone (4a) which is placed in parallel to the other cyclone(s) (4b) in said cyclone stage (4) and having in said vertical plane a gas outlet located at a lower level than said gas/material inlet of said preceding cyclone stage (3), and in that the gas ducts from the cyclones (4a, 4b) in the selected cyclone stage (4) are merged into one single gas duct for conducting the mixed gases to said preceding cyclone stage (3).
2. Plant according to claim 1 , characterized in that the raw meal being introduced into the gas from said selected cyclone stage (4) is introduced into the gas duct from the additional cyclone (4a) before the gas ducts from the cyclones (4a, 4b) in the selected cyclone stage (4) are merged into one single gas duct.
3. Plant according to claim 1 , characterized in that the heat treatment unit (1 1 ) is a calciner for calcination of preheated raw meal or a waste combustion apparatus.
PCT/DK2013/050282 2012-09-27 2013-09-05 Plant for manufacturing cement clinker Ceased WO2014048435A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DKPA201270589 2012-09-27
DKPA201270589 2012-09-27

Publications (1)

Publication Number Publication Date
WO2014048435A1 true WO2014048435A1 (en) 2014-04-03

Family

ID=49117619

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DK2013/050282 Ceased WO2014048435A1 (en) 2012-09-27 2013-09-05 Plant for manufacturing cement clinker

Country Status (1)

Country Link
WO (1) WO2014048435A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019116350A1 (en) 2017-12-15 2019-06-20 Flsmidth A/S Cement raw meal separator apparatus and method of using same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3520056A1 (en) * 1985-06-04 1986-12-04 O & K Orenstein & Koppel Ag, 1000 Berlin Process for heat treatment of fine granular material
EP1322899B1 (en) * 2000-09-20 2006-12-13 F.L. Smidth A/S Plant for manufacturing cement clinker

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3520056A1 (en) * 1985-06-04 1986-12-04 O & K Orenstein & Koppel Ag, 1000 Berlin Process for heat treatment of fine granular material
EP1322899B1 (en) * 2000-09-20 2006-12-13 F.L. Smidth A/S Plant for manufacturing cement clinker

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019116350A1 (en) 2017-12-15 2019-06-20 Flsmidth A/S Cement raw meal separator apparatus and method of using same

Similar Documents

Publication Publication Date Title
US3864075A (en) Apparatus for burning granular or pulverous material
JP3730262B2 (en) Cement clinker manufacturing method and apparatus
RU2573657C2 (en) Method and device for processing wet wastes containing organic compounds
CN105283428A (en) Method and apparatus for manufacturing cement bricks
CN1953944A (en) Cement clinker production comprising partial removal of a flow of rotary kiln exhaust gas containing harmful substances
CA1055693A (en) Method and apparatus for heat treating pulverous raw materials
US3836323A (en) Pre-heating apparatus in rotary kiln plant
AU2008291392B2 (en) Process and plant for the thermal treatment of granular solids
WO2014048435A1 (en) Plant for manufacturing cement clinker
EP0048537B1 (en) Kiln plant for burning granular or pulverulent material
DK171324B1 (en) Installations for heat treatment of unitary material
RU2268447C2 (en) Installation for production of cement clinker
DK151873B (en) PLANT FOR HEAT TREATMENT OF CEMENTRAMEL
AU2001269387A1 (en) Plant for manufacturing cement clinker
Missalla et al. Significant improvement of energy efficiency at alunorte’s calcination facility
CN104259174B (en) For the method and apparatus reprocessing wet, to comprise organic principle waste material
US20110117510A1 (en) Method and Apparatus for Removing Dust Particulates From Preheated Particulate Material
RU30957U1 (en) Cyclone heat exchanger
MX2008001905A (en) Method for preheating cement raw meal, and method for carrying out said method
WO2011135468A1 (en) A plant for manufacturing cement
ITMI20112364A1 (en) APPARATUS FOR CLINKER PRODUCTION STARTING FROM A RAW MIXTURE INCLUDING A PREHEAT HEATER WITH CONTENT HEIGHT
MXPA99011129A (en) Method and apparatus for producing cement clinker
CS263258B1 (en) Incorporating heat treatment of dusty or finely grained material

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13758737

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 13758737

Country of ref document: EP

Kind code of ref document: A1