[go: up one dir, main page]

WO2014042219A1 - 電力管理方法、電力管理装置およびプログラム - Google Patents

電力管理方法、電力管理装置およびプログラム Download PDF

Info

Publication number
WO2014042219A1
WO2014042219A1 PCT/JP2013/074724 JP2013074724W WO2014042219A1 WO 2014042219 A1 WO2014042219 A1 WO 2014042219A1 JP 2013074724 W JP2013074724 W JP 2013074724W WO 2014042219 A1 WO2014042219 A1 WO 2014042219A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
storage system
consumer
determination
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2013/074724
Other languages
English (en)
French (fr)
Inventor
洋二郎 野村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2014535591A priority Critical patent/JP6168060B2/ja
Priority to US14/427,395 priority patent/US9866026B2/en
Publication of WO2014042219A1 publication Critical patent/WO2014042219A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other DC sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other DC sources, e.g. providing buffering with light sensitive cells
    • H02J7/865
    • H02J2101/20
    • H02J2105/42
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Definitions

  • the present invention relates to a technique for managing power supply to consumers in a certain group, and in particular, performs overall power management for a plurality of consumers, and smoothes the power used in the group.
  • the present invention relates to a power management method, a power management apparatus, and a program that can be implemented.
  • Patent Document 1 discloses disposing a solar power generation device or a power storage system in a house, and outputting power from the solar power generation device to an external power system or charging the power storage system. Has been.
  • Patent Document 1 Although individual power management is performed for each house, etc., it is not considered at all that power management in the area is integrated. In particular, there are, of course, many customers who do not have a power storage system as well as customers who have a power storage system. Even so, it is difficult to smooth the power in the area.
  • the present invention provides a power management method, a power management apparatus, and a program capable of performing power management for a plurality of consumers in a certain group and smoothing power used in the group.
  • the purpose is to provide.
  • a power management method for managing power used by a first consumer having a power storage system and a second consumer not having a power storage system in a group, (A) collecting data relating to load power of the first and second consumers and obtaining total load power in the group; (B) determining whether the total load power is greater than or equal to a peak cut power; (C) if the determination in step (b) is Yes, determining whether the value of [total load power ⁇ peak cut power] is less than the load power of the first consumer; (D) If the determination in step (c) is Yes, discharging the power storage system with a value of [total load power ⁇ peak cut power]; A power management method.
  • the “first consumer” refers to a consumer having at least a power storage system, and includes a consumer having a power generation device such as a solar power generation device in addition to the power storage system. .
  • the “second consumer” refers to a consumer who does not have a power storage system or a solar power generation device.
  • Customer includes a house or building, a commercial facility, an industrial facility, a medical facility, and the like.
  • the time zone the length of one time zone can be arbitrarily set. For example, the length of one time zone may be several minutes to several tens of minutes or 1 hour to several hours. Moreover, each time slot
  • a power management method, a power management apparatus, and a program capable of centralizing power management for a plurality of consumers in a certain group and smoothing power used in the area can be provided.
  • the power management system 1 comprehensively manages power used in buildings 21 and houses 22 and 23. Electric power from the power plant 5 is supplied to the building 21 and the houses 22 and 23 via the power network 7. This power is called “grid power”.
  • buildings and houses are shown in FIG. 1, consumers such as commercial facilities such as stores and industrial facilities such as factories may be included.
  • group A in which the buildings 21 and the houses 22 and 23 exist is not particularly limited. For example, a predetermined area (a single area or a plurality of areas apart from each other) may be used. May be included).
  • Both the building 21 and the house 22 are provided with a power storage system 13 and a solar power generation device 15.
  • the consumer having the power storage system 13 and the solar power generation device 15 is referred to as “first consumer (3A)”.
  • the house 23 is not provided with either a power storage system or a solar power generation device.
  • such a consumer is referred to as a “second consumer (3B)”. Although only one second customer 3B is depicted in FIG. 1, there are naturally a plurality of such customers in the group.
  • the solar power generation device 15 is exemplified as an example of the power generation device, but other types of power generation devices such as a fuel cell may be used.
  • the solar power generation device may be referred to as “PV power generation device”, and the power from the PV power generation device may be referred to as “PV power generation power”.
  • FIG. 2 is a diagram schematically showing the configuration of the system of FIG.
  • the first consumer 3 ⁇ / b> A is configured such that grid power, PV generated power, or power storage system power is supplied to the load via the distribution board 10.
  • Reference numerals 13a and 15a denote power conditioners that play a role of converting direct current from the power storage system 13 and the PV power generation device 15 into alternating current power, respectively.
  • the system controller 25 provided in the first consumer 3A acquires various information in the consumer 3A (for example, information on load power, grid power, PV generated power, and power storage system power) and externals of the acquired information. And the operation control of the PV power generation device 15 and the power storage system 13 are performed.
  • the 1st consumer 3A may be provided with the GPS clock mechanism 26, and accurate time data is acquired in each consumer by this mechanism.
  • GPS clock mechanism may be used as long as accurate time data can be acquired.
  • the first consumer 3A mainly manages the following power and information: (A) Supply grid power to various electrical equipment in the building / house, (B) supplying PV generated power to various electrical equipment in the building / house, (C) supplying electricity from the storage system to various electrical equipment in the building / house, (D) charging the power storage system using grid power or PV generated power; (E) Transmitting information on power in buildings / housing to the outside through a network or the like.
  • the system controller 25 may have a network connection function, for example, and the controller itself may transmit information. Or the structure by which those information is transmitted outside via the server etc. which were provided in the building or the house may be sufficient.
  • the electrical storage system etc. since the electrical storage system etc. are not installed, it becomes the structure by which only grid electric power is supplied via the distribution board 10.
  • FIG. The power monitor 19 provided in the second consumer 3B performs various information acquisition (for example, information on load power and grid power) at the consumer, transmission of the acquired information to the outside, and the like. May be.
  • a GPS clock mechanism 26 is provided.
  • the following power and information management is mainly performed: (A) supplying grid power to various electrical devices in the house; (E) Transmitting information on load power in a house to the outside through a network or the like.
  • a power management device 60 is provided in order to comprehensively manage the power in the group A.
  • the power management apparatus 60 may include, for example, a server computer or the like, or a server computer.
  • the power management device 60 has at least the following functions: (A) A function for collecting data on load power (referred to as “load 1”) from each first consumer 3A, and data on load power (referred to as “load 2”) from each second consumer 3B. A function of collecting and a function of calculating “total load power” by summing the load 1 and the load 2; (A ′) a function of collecting data relating to PV generated power of each first consumer 3A, (B) a function for determining whether or not the value of [total load power ⁇ PV generated power] is equal to or greater than the peak cut power; (C) When the determination of (b) is Yes, it is determined whether or not the value of [total load power ⁇ PV generated power ⁇ peak cut power] is smaller than the value of [load 1 ⁇ PV generated power]. function, (D) A function of discharging the power storage system with a value of [total load power ⁇ PV generated power ⁇ peak cut power] when the determination in (c) is Yes.
  • the power management apparatus 60 may have a function of performing determination of power usage in the group A and demand response control (control for changing the power consumption pattern).
  • the server computer of the power management apparatus includes, for example, a communication unit 71, a display unit 72, an input unit 73, a processing unit 74, a storage unit 75, and the like, and each unit receives data via a bus.
  • the computer connected so that transmission / reception is possible may be sufficient.
  • the communication unit 71 is a part that performs external communication or the like via a network, and is realized by, for example, a network interface or the like.
  • the display unit 72 is a part that displays various data according to instructions from the processing unit, and is realized by, for example, a liquid crystal display.
  • the input unit 73 is a part where the user inputs various data, and is realized by, for example, a keyboard or a mouse.
  • the processing unit (processor unit) 74 performs data transfer between the units via a predetermined memory and performs various controls.
  • the storage unit 75 stores data from the processing unit and reads out the stored data, and is realized by, for example, an HDD (Hard Disk Drive), an SSD (Solid State Drive), or the like.
  • Each function as described above of the power management apparatus 60 may be achieved by executing the power management program in the storage unit 75 by the processing unit 74, for example.
  • the program may be stored in advance in a storage unit of a computer, supplied via a network such as the Internet, or stored in a predetermined storage medium. It may be supplied.
  • FIG. 4 is a flowchart showing a series of operations according to an embodiment.
  • FIG. 5 is a graph showing power smoothing in a group when the power management method of this embodiment is used.
  • time zones “1” to “16” correspond to time zones “1” to “16” in Table 1 below (the time is not shown in 24-hour display).
  • peak cut power is a power value serving as a reference for starting power supply from the power storage system in order to perform peak cut of power, and is set to “1.50” here.
  • Storage system discharge power represents the amount of power discharged from the storage system in group A, and its maximum output is set to “2.00”.
  • PV power generation is approximately constant at 0.90 throughout the entire time period.
  • the amount of power generated from the power storage system (shown as “power storage system”) is zero from time zone “1” to “4”, but increases after time zone “4”, peaking at time zone “10”.
  • a curve is drawn which decreases thereafter and increases again after the time zone “14”.
  • the sum of these grid powers 1 and 2 is the “total grid power” curve, which increases slowly from time zone “1” to “5” and remains constant from time zone “5” to “10”. After the time zone “11”, a curve that increases again in response to an increase in the grid power 2 is drawn.
  • step S1 the power management apparatus 60 collects “load 1” and “load 2” data from the first and second consumers 3A and 3B, and calculates “total load power”.
  • (load 1, load 2, total load power) (1.04, 0.9, 1.94).
  • step S2 PV generated power data is acquired from the first consumer 3A.
  • PV generated power 0.86.
  • step S9 it is determined whether or not the load 1 is equal to or greater than the PV generated power.
  • the load 1 is 1.04 and the PV generated power is 0.86 or more, so the determination in step S9 is Yes.
  • the power storage system is not discharged in the time zone “1” (step S10).
  • step S4 it is determined whether or not the value of [total load power ⁇ PV generated power ⁇ peak cut power] is smaller than the value of [load 1 ⁇ PV generated power].
  • step S5 the electricity storage system is discharged with a value of [total load power ⁇ PV generated power ⁇ peak cut power] of 0.11.
  • the “total grid power” is 1.50 which is the value of peak cut power.
  • step S1 the total load power of group A is calculated by the same procedure as described above.
  • (load 1, load 2, total load power) (1.64, 1.60, 3.24).
  • PV generated power (0.93) is obtained.
  • step S4 it is determined whether or not the value of [total load power ⁇ PV generated power ⁇ peak cut power] is smaller than the value of [load 1 ⁇ PV generated power].
  • the storage system is discharged at 0.71 which is the value of [Load 1-PV generated power] (step S8).
  • the grid power 1 is 0.00.
  • the amount of discharge of the power storage system is ⁇ 0.05 as a result of the calculation, which means that the power storage system is charged by the PV generated power.
  • step S6 when the determination in step S6 is Yes, the storage system is discharged with the maximum discharge power (step S7). If the determination in step S9 is No, the power storage system is discharged with the value of [Load 1-PV generated power] (Step S11). In this case, since the value of [Load 1-PV generated power] becomes negative, the power storage system is charged.
  • the power is targeted not only for the first consumer 3A having the power storage system but also for the second consumer 3B not having the power storage system.
  • Management is performed. That is, the total load power data in the group is collected (step S1), and then the discharge amount of the power storage system is appropriately determined in steps such as S4 and S5. As shown in “10”, the total grid power used in the group can be smoothed.
  • FIG. 6 is a graph showing the total grid power and the like in the group when conventional power management is performed.
  • the conventional method as shown in FIG. 6 (A), only a consumer with a power storage system is targeted, and when the load power reaches a predetermined threshold, the following power management is performed: While the electric power 1 is the peak cut electric power, the shortage is supplemented with the electric power from the power storage system.
  • no particular management is performed for a consumer without a power storage system (FIG. 6B). Therefore, the power used in the group in which the grid powers in FIGS. 6A and 6B are summed varies while greatly exceeding 1.50 as shown in FIG. 6C.
  • the total grid power used in the group can be smoothed, and the burden on the power plant and the like is reduced.
  • Each component described above does not necessarily need to be an independent entity.
  • a configuration in which a plurality of components are realized as one module a configuration in which one component is realized in a plurality of modules, a configuration in which a certain component is a part of another component, a certain component The structure etc. which a part of and a part of other component overlap may be sufficient.
  • each component is not limited to the description of the above embodiment, and may exist independently, may exist in combination, or may be configured separately. May be.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

この電力管理方法は、グループ内において、蓄電システムを有している第1の需要家と蓄電システムを有していない第2の需要家とで使用される電力を管理するものであって、(a)第1および第2の需要家の負荷電力に関するデータを収集し、当該グループ内の総負荷電力を求めるステップと、(b)総負荷電力がピークカット電力以上であるか否か判定するステップと、(c)ステップ(b)での判定がYesの場合、[総負荷電力-ピークカット電力]の値が、第1の需要家の負荷電力よりも小さいか否かを判定するステップと、(d)ステップ(c)の判定がYesの場合に、[総負荷電力-ピークカット電力]の値で蓄電システムの放電を行うステップと、を有する。

Description

電力管理方法、電力管理装置およびプログラム
 本発明は、一定のグループ内の需要家への電力供給等を管理する技術に関し、特には、複数の需要家に対する電力管理を統括的に行い、そのグループ内で使用される電力の平滑化を図ることが可能な電力管理方法、電力管理装置およびプログラムに関する。
 近年、住宅やビルへの電力供給に関し、IT(information technology)技術を利用して電力の供給制御を行ったり、発電所からのグリッド電力に加え蓄電システムを併用したりすることが提案されている。例えば特許文献1では、住宅に太陽光発電装置や蓄電システムを配置すること、および、太陽光発電装置からの電力を外部の電力系統に出力したり蓄電システムの充電に使用したりすることが開示されている。
特開2011-078168
 しかしながら、特許文献1では、それぞれの住宅等については個別の電力管理が行われるものの、地域内の電力管理を統括的に行うことは何ら考慮されていない。特に、地域内には、当然ながら、蓄電システムを有している需要家だけではなく蓄電システムを有していない需要家も多数存在するところ、単に蓄電システムを有している需要家だけを管理したとしても地域内の電力の平滑化を図ることは困難である。
 そこで本発明は、一定のグループ内で複数の需要家に対する電力管理を統括的に行い、そのグループ内で使用される電力の平滑化を図ることが可能な電力管理方法、電力管理装置およびプログラムを提供することを目的とする。
 上記目的を達成するための本発明の一形態の電力管理方法は下記の通りである:
1.グループ内において、蓄電システムを有している第1の需要家と蓄電システムを有していない第2の需要家とで使用される電力を管理する電力管理方法であって、
(a)前記第1および第2の需要家の負荷電力に関するデータを収集し、当該グループ内の総負荷電力を求めるステップと、
(b)前記総負荷電力がピークカット電力以上であるか否か判定するステップと、
(c)前記ステップ(b)での判定がYesの場合、[総負荷電力-ピークカット電力]の値が、前記第1の需要家の負荷電力よりも小さいか否かを判定するステップと、
(d)前記ステップ(c)の判定がYesの場合に、[総負荷電力-ピークカット電力]の値で蓄電システムの放電を行うステップと、
 を有する、電力管理方法。
(用語の定義)
「第1の需要家」とは、少なくとも蓄電システムを有している需要家のことをいい、蓄電システムに加え例えば太陽光発電装置などの発電装置を有している需要家もこれに含まれる。
「第2の需要家」とは、蓄電システムや太陽光発電装置を有していない需要家のことをいう。
「需要家」には、住宅またはビルや、商業施設、工業施設、医療施設等が含まれる。
「時間帯」に関して、1つの時間帯の長さは任意に設定可能であり、例えば、1つの時間帯の長さを数分~数十分あるいは1時間~数時間などとしてもよい。また、各時間帯は必ずしも一定でなくてもよい。
 本発明によれば、一定のグループ内で複数の需要家に対する電力管理を統括的に行い、その地域内で使用される電力の平滑化を図ることが可能な電力管理方法、電力管理装置およびプログラムを提供することができる。
本発明の一形態の電力管理システムを示す模式図である。 図1のシステムの構成を模式的に示す図である。 電力管理装置の内部構成の一例を示すブロック図である。 本発明の一形態の電力管理方法一連の動作を示すフローチャートである。 本発明の一形態の電力管理方法を使用した場合の、グループにおける電力(総グリッド電力)の平滑化を示すグラフである。 従来の電力管理を行った場合のグループ内の総グリッド電力等を示すグラフである。
 本発明の実施の形態について図面を参照しながら説明する。なお、以下に説明する構成、機能、動作等は本発明の一形態に係るものであって、本発明を何ら限定するものではない。
 図1に示すように、この電力管理システム1は、ビル21や住宅22、23で使用される電力を統括的に管理するものである。ビル21、住宅22、23には、発電所5からの電力が電力網7を介して供給される。この電力は「グリッド電力」と呼ばれる。
 なお、図1ではビルや住宅のみが示されているが、店舗等の商業施設や、工場等の工業施設等の需要家が含まれていてもよい。また、ビル21や住宅22、23が存在する「グループA」としては、特に限定されるものではないが、例えば所定の地域(1つの地域であってもよいし、互いに離れた複数の地域であってもよい)等が挙げられる。
 ビル21や住宅22には、いずれも、蓄電システム13および太陽光発電装置15が備えられている。本実施形態では、このように蓄電システム13および太陽光発電装置15を有している需要家を「第1の需要家(3A)」を称する。一方、住宅23には蓄電システムおよび太陽光発電装置のいずれも備えられていない。本実施形態ではこのような需要家を「第2の需要家(3B)」と称する。なお、図1では第2の需要家3Bが1件のみ描かれているが、当然ながらこのような需要家はグループ内に複数存在する。
 なお、本実施形態では発電装置の一例として太陽光発電装置15を挙げたが、例えば燃料電池などのその他の種類の発電装置でもよい。
 以下の説明では太陽光発電装置を「PV発電装置」、PV発電装置からの電力を「PV発電電力」等と称することもある。
 図2は、図1のシステムの構成を模式的に示す図である。図2に示すように、第1の需要家3Aにおいては、負荷に対し、グリッド電力、PV発電電力、または蓄電システム電力が分電盤10経由で供給されるように構成されている。符号13a、15aはそれぞれ、蓄電システム13およびPV発電装置15からの直流電流を交流電力に変換する役割等を果たすパワーコンディショナである。
 第1の需要家3Aに設けられたシステムコントローラ25は、当該需要家3Aにおける各種情報の取得(例えば、負荷電力、グリッド電力、PV発電電力、蓄電システム電力に関する情報)や、取得した情報の外部への送信、および、PV発電装置15、および蓄電システム13の動作制御等を行う。
 第1の需要家3AにはGPS刻時機構26も設けられていてもよく、この機構により各需要家内で正確な時刻データが取得される。正確な時刻データを取得できるものであれば、当然ながら、GPS刻時機構以外にも他のデバイスを利用してもよい。
 第1の需要家3Aでは主に次のような電力および情報の管理が行われる:
(a)グリッド電力をビル/住宅内の各種電気機器に供給すること、
(b)PV発電電力をビル/住宅内の各種電気機器に供給すること、
(c)蓄電システム電力をビル/住宅内の各種電気機器に供給すること、
(d)グリッド電力またはPV発電電力を使用して蓄電システムを充電すること、
(e)ビル/住宅内の電力に関する情報等をネットワーク等を通じて外部に送信すること。
 上記(e)の機能については、システムコントローラ25が例えばネットワーク接続機能を有しており、コントローラ自身が情報を送信するものであってもよい。あるいは、ビルまたは住宅内に設けられたサーバ等を経由してそれらの情報が外部に送信される構成であってもよい。
 再び図1、図2を参照する。第2の需要家3Bでは、蓄電システム等が設置されていないので、グリッド電力のみが分電盤10経由で供給される構成となっている。第2の需要家3Bに設けられた電力モニター19は、当該需要家における各種情報の取得(例えば、負荷電力およびグリッド電力に関する情報)や、取得した情報の外部への送信等を行うものであってもよい。また、第1の需要家3A同様、GPS刻時機構26が設けられている。
 第2の需要家3Bでは主に次のような電力および情報の管理が行われる:
(a)グリッド電力を住宅内の各種電気機器に供給すること、
(e)住宅内の負荷電力の情報等をネットワーク等を通じて外部に送信すること。
 本実施形態の電力管理システム1には、図1、図2に示すように、グループA内の電力を統括的に管理するために電力管理装置60が設けられている。この電力管理装置60は、例えばサーバ用コンピュータ等を有するもの、または、サーバ用コンピュータからなるものであってもよい。
 電力管理装置60は、少なくとも次のような機能を有する:
(a)それぞれの第1の需要家3Aからの負荷電力に関するデータ(「負荷1」という)を収集する機能、それぞれの第2の需要家3Bから負荷電力に関するデータ(「負荷2」という)を収集する機能、および、負荷1と負荷2とを合計して「総負荷電力」を求める機能、
(a′)それぞれの第1の需要家3AのPV発電電力に関するデータを収集する機能、
(b)[総負荷電力-PV発電電力]の値がピークカット電力以上であるか否か判定する機能、
(c)上記(b)の判定がYesの場合、[総負荷電力-PV発電電力-ピークカット電力]の値が、[負荷1-PV発電電力]の値よりも小さいか否かを判定する機能、
(d)上記(c)の判定がYesの場合に、[総負荷電力-PV発電電力-ピークカット電力]の値で蓄電システムの放電を行う機能。
 また、電力管理装置60は、グループA内における電力利用状況の判定やデマンドレスポンス制御(電力消費パターンを変化させる制御)を行う機能等を有していてもよい。
 電力管理装置のサーバ用コンピュータは、図3に示すように、例えば、通信部71、表示部72、入力部73、処理部74、記憶部75などを有し、各部がバスを介してデータを送受信可能なように接続されたコンピュータであってもよい。通信部71は、ネットワークを介して外部通信等を行う部分であり、例えば、ネットワークインターフェース等によって実現される。表示部72は、処理部からの指示により様々なデータを表示する部分であり、例えば、液晶ディスプレイ等によって実現される。入力部73は、ユーザが各種データを入力する部分であり、例えば、キーボードやマウス等によって実現される。処理部(プロセッサ部)74は、所定のメモリを介して各部間のデータの受け渡しを行うととともに、各種の制御を行うものである。記憶部75は、処理部からデータを記憶したり、記憶したデータを読み出したりするものであり、例えば、HDD(Hard Disk Drive)やSSD(Solid State Drive)等によって実現される。なお、電力管理装置60の上述したような各機能は、例えば、記憶部75内の電力管理プログラムを処理部74で実行することにより達成されるものであってもよい。
 プログラムは、一例で、予めコンピュータの記憶部内に格納されたものであってもよいし、インターネット等のネットワーク経由で供給されるものであってもよいし、または、所定の記憶媒体に格納されて供給されるものであってもよい。
 以下、本実施形態における電力管理方法の一例について説明する。図4は一実施形態に係る一連の動作を示すフローチャートである。図5は、本実施形態の電力管理方法を使用した場合の、グループにおける電力の平滑化を示すグラフである。図5において、時間帯「1」~「16」は下記表1の時間帯「1」~「16」に対応している(時刻を24時間表示で示したものではない)。
 なお、以下の説明において、
「ピークカット電力」とは、電力のピークカットを行うために、蓄電システムからの電力供給を開始する基準となる電力値であり、ここでは「1.50」に設定されている。
「蓄電システム放電電力」とは、グループAにおける蓄電システムから放電される電力量を表し、その最大出力は「2.00」に設定してある。
Figure JPOXMLDOC01-appb-T000001
 表1に示されている状態を簡単に説明すると次の通りである:すなわち、第1の需要家における「負荷1」は、時間帯「1」~「7」までは増加し、時間帯「7」以降は減少するとともに時間帯14以降で再び増加するようなカーブを描いている。第2の需要家の「負荷2」については、時間帯1~5までは徐々に減少するが時間帯5以降は上昇して時間帯13、14付近でピークとなるようなカーブを描いている。これらの負荷1、2を合計したものが「総負荷電力」のカーブである。
 「PV発電電力」は、全時間帯を通じておよそ0.90でほぼ一定である。蓄電システムからの発電量(「蓄電システム」で示す)は、時間帯「1」~「4」まではゼロであるが時間帯「4」以降は増加し、時間帯「10」がピークとなりそれ以降減少し、時間帯「14」以降で再び増加するようなカーブを描いている。これらのグリッド電力1、2を合計したものが「総グリッド電力」のカーブであり、時間帯「1」~「5」までは緩やかに増加し、時間帯「5」~「10」では一定となり、時間帯「11」以降はグリッド電力2の増加に対応して再び増加するようなカーブを描いている。
 グループAにおける電力管理としては、蓄電システムからの放電量を適切にコントロールし、グループ内で使用される「総グリッド電力」の平滑化を図ることが、発電所への負担を低減する観点から好ましい。本実施形態では、図5の時間帯「5」~「10」においてそのような電力の平滑化が達成されている。
 以下、フローチャートに従って説明する。
〔時間帯「1」~「4」について〕
 これらの時間帯では、蓄電システムからの放電は行われず、グリッド電力およびPV発電電力のみが使用される。
 まず、ステップS1において、電力管理装置60が第1および第2の需要家3A、3Bから「負荷1」および「負荷2」のデータを収集し、「総負荷電力」を算出する。この時間帯では(負荷1、負荷2、総負荷電力)=(1.04、0.9、1.94)である。
 次いで、ステップS2において、第1の需要家3AからPV発電電力のデータを取得する。この時間帯では、PV発電電力=0.86である。
 次いで、ステップS3において、[総負荷電力-PV発電電力]の値がピークカット電力以上である否かの判定を行う。この時間帯では、1.94-0.86=1.08でピークカット電力1.5以上ではないので、ステップS3の判定はNoとなる。
 次いで、ステップS9に進み、負荷1がPV発電電力以上であるか否かの判定を行う。この時間帯では、負荷1は1.04でPV発電電力0.86以上であるので、ステップS9の判定はYesとなる。
 その結果、時間帯「1」では蓄電システムの放電は行われないこととなる(ステップS10)。グループ内の総負荷電力1.94は、グリッド電力1とグリッド電力2とを合計した総グリッド電力(0.18+0.90=1.08)とPV発電電力0.86とでまかなわれる。
 以降、時間帯「2」~「4」についても、上記同様のフローに従った電力管理が行われる。
〔時間帯「5」~「10」について〕
 これらの時間帯では、蓄電システムからの放電を行うことで、グループ内の総グリッド電力の平滑化が達成される。
 まず、ステップS1において、上記と同様の手順により、グループAの総負荷電力を算出する。この時間帯では(負荷1、負荷2、総負荷電力)=(2.04、0.50、2.54)である。そして、ステップS2においてPV発電電力(0.93)を求める。
 次いで、ステップS3において、[総負荷電力-PV発電電力]の値がピークカット電力以上である否かの判定を行う。この時間帯では、2.54-0.93=1.51でピークカット電力1.5以上であるので、ステップS3の判定はYesとなる。
 次いで、ステップS4に進み、[総負荷電力-PV発電電力-ピークカット電力]の値が[負荷1-PV発電電力]の値よりも小さいか否かの判定を行う。この時間帯では、[総負荷電力-PV発電電力-ピークカット電力]は2.54-0.93-1.50=0.11となり、(負荷1)2.04-PV発電電力0.93=1.11よりも小さいので、ステップS4の判定はYesとなる。
 その結果、ステップS5において、[総負荷電力-PV発電電力-ピークカット電力]の値0.11で蓄電システムの放電が行われることとなる。
 以上より、時間帯「5」では、グループ内の総負荷電力2.54は、グリッド電力1とグリッド電力2とを合計した総グリッド電力(1.00+0.50=1.50)と、PV発電電力0.93と、蓄電システム電力0.11とでまかなわれる。なお、「総グリッド電力」は、ピークカット電力の値である1.50となっている。
 以降、時間帯「6」~「10」についても、上記同様のフローに従った電力管理が行われる。したがってこれらの時間帯では、総グリッド電力が1.5の状態が継続し、グループAで使用される電力の平滑化が実現される。
〔時間帯「11」~「16」について〕
 これらの時間帯では、第1の需要家に対してはグリッド電力が使用されず、蓄電システムおよび太陽光発電装置からの電力のみが使用される。
 まず、ステップS1において上記と同様の手順により、グループAの総負荷電力を算出する。この時間帯では(負荷1、負荷2、総負荷電力)=(1.64、1.60、3.24)である。そして、ステップS2においてPV発電電力(0.93)を求める。
 次いで、ステップS3において、[総負荷電力-PV発電電力]の値がピークカット電力以上である否かの判定を行う。この時間帯では、3.24-0.93=3.21でピークカット電力1.5以上であるので、ステップS3の判定はYesとなる。
 次いで、ステップS4に進み、[総負荷電力-PV発電電力-ピークカット電力]の値が[負荷1-PV発電電力]の値よりも小さいか否かの判定を行う。この時間帯では、[総負荷電力-PV発電電力-ピークカット電力]は3.24-0.93-1.50=0.81となり、(負荷1)1.64-PV発電電力0.93=0.71よりも小さくはないので、ステップS4の判定はNoとなる。
 次いで、ステップS6に進み、[負荷1-PV発電電力]の値が蓄電システムの最大放電電力(ここでは2.0)以上であるか否かの判定を行う。この時間帯では、1.64-0.93=0.71で最大放電電力2.0以上ではないので、ステップS6の判定Noとなる。
 その結果、[負荷1-PV発電電力]の値である0.71で蓄電システムの放電が行われることとなる(ステップS8)。一方、グリッド電力1は0.00となる。
 以上より、時間帯「11」では、グループ内の総負荷電力3.24は、グリッド電力1とグリッド2とを合計した総グリッド電力(0.00+1.60=1.60)と、PV発電電力0.93と、蓄電システム電力0.71とでまかなわれる。
 以降、時間帯「12」~「16」についても、上記同様のフローに従った電力管理が行われる。なお、時間帯「14」では、計算の結果、蓄電システムの放電量が-0.05となっているが、これは蓄電システムがPV発電電力によって充電されることを意味している。
 なお、図5には表れていないが、ステップS6での判定がYesの場合には、最大放電電力で蓄電システムの放電が行われる(ステップS7)。また、ステップS9での判定がNoの場合には[負荷1-PV発電電力]の値で蓄電システムの放電が行われる(ステップS11)。なお、この場合、[負荷1-PV発電電力]の値がマイナスになるので、蓄電システムが充電されることとなる。
 以上説明したような本実施形態の電力管理方法によれば、蓄電システムを有している第1の需要家3Aだけではなく蓄電システムを有していない第2の需要家3Bをも対象として電力の管理が行われる。すなわち、そのグループにおける総負荷電力のデータを収集し(ステップS1)、次いでS4、S5のようなステップで蓄電システムの放電量を適切に決定するものであるので、図5の時間帯「5」~「10」に示したように、そのグループで使用される総グリッド電力の平滑化を図ることができる。
 図6は、従来の電力管理を行った場合のグループ内の総グリッド電力等を示すグラフである。従来の方法では、図6(A)のように蓄電システム有りの需要家のみを対象とし、負荷電力が所定の閾値に達した場合に、次のような電力管理が実施される:すなわち、グリッド電力1をピークカット電力としつつ、不足分を蓄電システムからの電力で補うというものである。他方、蓄電システム無しの需要家(図6(B))については特に管理は行わない。したがって、図6(A)および(B)のグリッド電力を合計したグループ内で使用される電力は、図6(C)に示すように1.50を大きく上回りながら変動することとなる。
 これに対して、本実施形態によれば、上記の通り、そのグループで使用される総グリッド電力の平滑化を図ることができ、発電所等に対する負担が軽減されることとなる。
 以上、本発明の一形態について説明したが、本発明は上記に限定されるものではなく種々変更可能である。例えば:
(a)上記説明ではPV発電電力を利用する例について説明した。しかしながら、蓄電システムのみを有しPV発電装置は有していない需要家を「第1の需要家」として、上述したような方法を実施することも可能である。また、夜間のようなPV電力を利用できない場合においても、本発明は有効である。
(b)図1および図2では、1つの電力管理装置60のみが描かれている。しかしながら、電力管理装置60は物理的に1つの装置として構成されている必要はなく、複数台のコンピュータ(ネットワークを通じて互いに接続されたものであってもよい)を用いて電力管理装置を構成することも可能である。
(b)表1や図5に示した各種電力の数値(例えば、ピークカット電力の値など)は任意に変更可能である。
 なお、本明細書は、上記実施形態で説明した方法を装置またはプログラムの発明として表現したものをも開示する。
 以上に説明した各構成要素は、必ずしも個々に独立した存在である必要はない。例えば、複数の構成要素が1つのモジュールとして実現されている構成、1つの構成要素が複数のモジュールで実現されている構成、ある構成要素が他の構成要素の一部である構成、ある構成要素の一部と他の構成要素の一部とが重複している構成等であってもよい。
 また、上記フローチャートに示した動作の順番は、本発明を何ら限定するものではなく本発明の動作の順番は内容的に支障しない範囲で変更することができる。また、ある動作の実行中に他の動作が発生すること、ある動作の実行タイミングと他の動作の実行タイミングとの一部ないし全部が重複していること等が許容される。各構成要素の物理的な構成は、以上の実施の形態の記載に限定されることはなく、独立して存在しても良いし、組み合わされて存在しても良いしまたは分離して構成されても良い。
1 電力管理システム
3A 第1の需要家
3B 第2の需要家
5 発電所
7 電力網
13 蓄電システム
15 太陽光発電装置
19 電力モニター
21 ビル
22、23 住宅
25 システムコントローラ
26 GPS刻時機構
60 電力管理装置

Claims (15)

  1.  グループ内において、蓄電システムを有している第1の需要家と蓄電システムを有していない第2の需要家とで使用される電力を管理するための電力管理装置であって、
    (a)前記第1および第2の需要家の負荷電力に関するデータを収集し、当該グループ内の総負荷電力を求める手段と、
    (b)前記総負荷電力がピークカット電力以上であるか否か判定する手段と、
    (c)前記ステップ(b)での判定がYesの場合、[総負荷電力-ピークカット電力]の値が、前記第1の需要家の負荷電力よりも小さいか否かを判定する手段と、
    (d)前記ステップ(c)の判定がYesの場合に、[総負荷電力-ピークカット電力]の値で蓄電システムの放電を行う手段と、
     を有する、電力管理装置。
  2.  さらに、
    (e)前記(c)での判定がNoの場合に、前記第1の需要家の負荷電力が蓄電システムの最大放出電力以上であるか否かを判定する手段と、
    (d1)前記(e)での判定がYesの場合に、最大放電電力で前記蓄電システムを放電する手段と、
    (d2)前記(e)での判定がNoの場合に、前記第1の需要家の負荷電力で前記蓄電システムを放電する手段と、
     を有する請求項1に記載の電力管理装置。
  3.  前記第1の需要家に発電装置が備えられており、
     さらに、
    (a′)前記第1の需要家の発電装置からの電力(「発電電力」という)のデータを収集する手段を有し、
     前記手段(b)は、[総負荷電力-発電電力]の値がピークカット電力以上であるか否か判定し、
     前記手段(d)は、前記(c)での判定がYesの場合に、[総負荷電力-総発電電力-ピークカット電力]の値で蓄電システムの放電を行う、
     請求項1または2に記載の電力管理装置。
  4.  前記手段(e)は、[第1の需要家の負荷電力-発電電力]の値が蓄電システムの最大放出電力以上であるか否かを判定し、
     前記手段(d3)は、前記ステップ(e)の判定がNoの場合に、[第1の需要家の負荷電力-発電電力]の値で前記蓄電システムを放電する、
     請求項3に記載の電力管理装置。
  5.  前記発電装置が太陽光発電装置である、請求項3または4に記載の電力管理装置。
  6.  グループ内において、蓄電システムを有している第1の需要家と蓄電システムを有していない第2の需要家とで使用される電力を管理する電力管理方法であって、
    (a)前記第1および第2の需要家の負荷電力に関するデータを収集し、当該グループ内の総負荷電力を求めるステップと、
    (b)前記総負荷電力がピークカット電力以上であるか否か判定するステップと、
    (c)前記ステップ(b)での判定がYesの場合、[総負荷電力-ピークカット電力]の値が、前記第1の需要家の負荷電力よりも小さいか否かを判定するステップと、
    (d)前記ステップ(c)の判定がYesの場合に、[総負荷電力-ピークカット電力]の値で蓄電システムの放電を行うステップと、
     を有する、電力管理方法。
  7.  さらに、
    (e)前記ステップ(c)の判定がNoの場合に、前記第1の需要家の負荷電力が蓄電システムの最大放出電力以上であるか否かを判定するステップと、
    (d1)前記ステップ(e)の判定がYesの場合に、最大放電電力で前記蓄電システムを放電するステップと、
    (d2)前記ステップ(e)の判定がNoの場合に、前記第1の需要家の負荷電力で前記蓄電システムを放電するステップと、
     を有する請求項6に記載の電力管理方法。
  8.  前記第1の需要家に発電装置が備えられており、
     さらに、
    (a′)前記第1の需要家の発電装置からの電力(「発電電力」という)のデータを収集するステップを有し、
     前記ステップ(b)では、[総負荷電力-発電電力]の値がピークカット電力以上であるか否か判定し、
     前記ステップ(d)では、前記ステップ(c)の判定がYesの場合に、[総負荷電力-総発電電力-ピークカット電力]の値で蓄電システムの放電を行う、
     請求項6または7に記載の電力管理方法。
  9.  前記ステップ(e)では、[第1の需要家の負荷電力-発電電力]の値が蓄電システムの最大放出電力以上であるか否かを判定し、
     前記ステップ(d3)では、前記ステップ(e)の判定がNoの場合に、[第1の需要家の負荷電力-発電電力]の値で前記蓄電システムを放電する、
     請求項8に記載の電力管理方法。
  10.  前記発電装置が太陽光発電装置である、請求項8または9に記載の電力管理方法。
  11.  グループ内において、蓄電システムを有している第1の需要家と蓄電システムを有していない第2の需要家とで使用される電力を管理するためのプログラムであって、
     コンピュータに、
    (a)前記第1および第2の需要家の負荷電力に関するデータを収集し、当該グループ内の総負荷電力を求めるステップと、
    (b)前記総負荷電力がピークカット電力以上であるか否か判定するステップと、
    (c)前記ステップ(b)での判定がYesの場合、[総負荷電力-ピークカット電力]の値が、前記第1の需要家の負荷電力よりも小さいか否かを判定するステップと、
    (d)前記ステップ(c)の判定がYesの場合に、[総負荷電力-ピークカット電力]の値で蓄電システムの放電を行うステップと、
     を実行させる、プログラム。
  12.  さらに、
     コンピュータに、
    (e)前記ステップ(c)の判定がNoの場合に、前記第1の需要家の負荷電力が蓄電システムの最大放出電力以上であるか否かを判定するステップと、
    (d1)前記ステップ(e)の判定がYesの場合に、最大放電電力で前記蓄電システムを放電するステップと、
    (d2)前記ステップ(e)の判定がNoの場合に、前記第1の需要家の負荷電力で前記蓄電システムを放電するステップと、
     を実行させる、請求項11に記載のプログラム。
  13.  前記第1の需要家に発電装置が備えられており、
     さらに、
     コンピュータに、
    (a′)前記第1の需要家の太陽光発電装置からの電力(「発電電力」という)のデータを収集するステップを実行させ、
     前記ステップ(b)では、[総負荷電力-発電電力]の値がピークカット電力以上であるか否か判定し、
     前記ステップ(d)では、前記ステップ(c)の判定がYesの場合に、[総負荷電力-総PV発電電力-ピークカット電力]の値で蓄電システムの放電を行う、
     請求項11または12に記載のプログラム。
  14.  前記ステップ(e)では、[第1の需要家の負荷電力-発電電力]の値が蓄電システムの最大放出電力以上であるか否かを判定し、
     前記ステップ(d3)では、前記ステップ(e)の判定がNoの場合に、[第1の需要家の負荷電力-発電電力]の値で前記蓄電システムを放電する、
     請求項13に記載のプログラム。
  15.  前記発電装置が太陽光発電装置である、請求項13または14に記載のプログラム。
     
PCT/JP2013/074724 2012-09-12 2013-09-12 電力管理方法、電力管理装置およびプログラム Ceased WO2014042219A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2014535591A JP6168060B2 (ja) 2012-09-12 2013-09-12 電力管理方法、電力管理装置およびプログラム
US14/427,395 US9866026B2 (en) 2012-09-12 2013-09-12 Method of managing electric power, power management device and program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012200392 2012-09-12
JP2012-200392 2012-09-12

Publications (1)

Publication Number Publication Date
WO2014042219A1 true WO2014042219A1 (ja) 2014-03-20

Family

ID=50278328

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/074724 Ceased WO2014042219A1 (ja) 2012-09-12 2013-09-12 電力管理方法、電力管理装置およびプログラム

Country Status (3)

Country Link
US (1) US9866026B2 (ja)
JP (1) JP6168060B2 (ja)
WO (1) WO2014042219A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017034968A (ja) * 2015-07-30 2017-02-09 積水化学工業株式会社 電力管理方法
JP2018019482A (ja) * 2016-07-26 2018-02-01 株式会社グローバルエンジニアリング 電力制御システム、電力制御方法及び電力制御装置
JP2019030087A (ja) * 2017-07-27 2019-02-21 東京瓦斯株式会社 電力制御システム
WO2023067944A1 (ja) * 2021-10-22 2023-04-27 株式会社Nttドコモ 電力制御システム

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5891931B2 (ja) * 2012-04-27 2016-03-23 ソニー株式会社 表示制御装置、表示制御方法、表示制御プログラムおよび携帯端末
CN105408898B (zh) * 2013-03-15 2019-05-28 弗兰克公司 测量数据的自动记录和图形生成
JP6678244B2 (ja) * 2016-08-24 2020-04-08 京セラ株式会社 電力管理サーバ、電力管理方法及び電力管理システム
US9914548B1 (en) 2017-02-22 2018-03-13 Imagik International Corporation USB power management and load distribution system
CN109713701B (zh) * 2019-02-01 2022-08-30 国网江苏省电力有限公司 叠加控制的电池储能网荷互动方法、终端、系统及介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008118805A (ja) * 2006-11-07 2008-05-22 Meidensha Corp 分散電源システム
JP2008306832A (ja) * 2007-06-07 2008-12-18 Kansai Electric Power Co Inc:The 電力貯蔵システム
JP2011078168A (ja) * 2009-09-29 2011-04-14 Panasonic Electric Works Co Ltd 電力管理システム
JP2012095455A (ja) * 2010-10-27 2012-05-17 Nomura Research Institute Ltd 制御装置および制御方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003244840A (ja) 2001-12-14 2003-08-29 Furukawa Electric Co Ltd:The 負荷平準化装置
JP4711917B2 (ja) 2006-09-08 2011-06-29 西日本旅客鉄道株式会社 電力貯蔵装置
JP5178783B2 (ja) 2010-07-07 2013-04-10 中国電力株式会社 電力需給調整システム及び電力需給調整方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008118805A (ja) * 2006-11-07 2008-05-22 Meidensha Corp 分散電源システム
JP2008306832A (ja) * 2007-06-07 2008-12-18 Kansai Electric Power Co Inc:The 電力貯蔵システム
JP2011078168A (ja) * 2009-09-29 2011-04-14 Panasonic Electric Works Co Ltd 電力管理システム
JP2012095455A (ja) * 2010-10-27 2012-05-17 Nomura Research Institute Ltd 制御装置および制御方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017034968A (ja) * 2015-07-30 2017-02-09 積水化学工業株式会社 電力管理方法
JP2018019482A (ja) * 2016-07-26 2018-02-01 株式会社グローバルエンジニアリング 電力制御システム、電力制御方法及び電力制御装置
JP2019030087A (ja) * 2017-07-27 2019-02-21 東京瓦斯株式会社 電力制御システム
WO2023067944A1 (ja) * 2021-10-22 2023-04-27 株式会社Nttドコモ 電力制御システム

Also Published As

Publication number Publication date
US9866026B2 (en) 2018-01-09
US20150244173A1 (en) 2015-08-27
JP6168060B2 (ja) 2017-07-26
JPWO2014042219A1 (ja) 2016-08-18

Similar Documents

Publication Publication Date Title
JP6168060B2 (ja) 電力管理方法、電力管理装置およびプログラム
JP6168061B2 (ja) 電力管理方法、電力管理装置およびプログラム
JP6699719B2 (ja) 制御装置、発電制御装置、制御方法、システム、及び、プログラム
JP6239631B2 (ja) 管理システム、管理方法、管理プログラム及び記録媒体
US20130282193A1 (en) Method and system to co-optimize utilization of demand response and energy storage resources
US20090240964A1 (en) Method and apparatus for holistic power management to dynamically and automatically turn servers, network equipment and facility components on and off inside and across multiple data centers based on a variety of parameters without violating existing service levels
JP6135763B2 (ja) 充電電力制御方法、充電電力制御システムおよびプログラム
Lee et al. A mathematical technique for hybrid power system design with energy loss considerations
US20100332873A1 (en) Power Supply Engagement and Method Therefor
JP2019516340A (ja) マイクログリッドを調整するためのシステムおよび方法
KR20170139018A (ko) 다중 에너지 소스를 위한 전력 수요 관리
US10103575B2 (en) Power interchange management system and power interchange management method for maintaining a balance between power supply and demand
WO2017149617A1 (ja) 制御装置、需給調整制御装置、蓄電装置、出力制御装置、需給調整システム、制御方法、需給調整方法及びプログラム
Bajracharyay et al. Economic analysis of a data center virtual power plant participating in demand response
WO2016084313A1 (ja) 電力需要調整システム、需要調整装置、グループ生成装置及びグループ生成方法
WO2017163934A1 (ja) 電力制御システム、制御装置、制御方法およびコンピュータプログラム
JP7245625B2 (ja) 受電点電力予測装置、受電点電力予測方法、およびプログラム
CN117937486A (zh) 电网管理方法、装置、设备以及存储介质
US20190137960A1 (en) Calculating method of configuration cost of power system
JP7226581B2 (ja) 制御装置、制御方法及びプログラム
EP4084278A1 (en) Power management system and power management method
Shinohara et al. Development of an integrated control system using notebook PC batteries for reducing peak power demand
CN114565302A (zh) 电力系统调度方法、装置、设备及介质
JP7099018B2 (ja) 達成率表示制御装置、達成率表示制御方法およびコンピュータプログラム
JP2017103862A (ja) 電力推定装置、電力推定方法及び電力推定プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13837185

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014535591

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14427395

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13837185

Country of ref document: EP

Kind code of ref document: A1