WO2013065667A1 - ヘリオスタット制御方法、ヘリオスタット制御装置、集熱設備、太陽熱集熱装置の運転方法、及び太陽熱集熱装置 - Google Patents
ヘリオスタット制御方法、ヘリオスタット制御装置、集熱設備、太陽熱集熱装置の運転方法、及び太陽熱集熱装置 Download PDFInfo
- Publication number
- WO2013065667A1 WO2013065667A1 PCT/JP2012/077982 JP2012077982W WO2013065667A1 WO 2013065667 A1 WO2013065667 A1 WO 2013065667A1 JP 2012077982 W JP2012077982 W JP 2012077982W WO 2013065667 A1 WO2013065667 A1 WO 2013065667A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- heliostat
- heat
- selection pattern
- casing
- state
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24S—SOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS
- F24S10/00—Solar heat collectors using working fluids
- F24S10/50—Solar heat collectors using working fluids the working fluids being conveyed between plates
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24S—SOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS
- F24S20/00—Solar heat collectors specially adapted for particular uses or environments
- F24S20/20—Solar heat collectors for receiving concentrated solar energy, e.g. receivers for solar power plants
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/40—Solar thermal energy, e.g. solar towers
- Y02E10/44—Heat exchange systems
Definitions
- the present invention relates to a heliostat control method, a heliostat control device, and a heat collection facility.
- the present invention also relates to a method for operating a solar heat collector that is applied to solar thermal power plants and chemical plants and collects and uses solar heat energy, and a solar heat collector.
- the heat collection equipment that selects and uses the necessary mirrors includes a process temperature and pressure and solar radiation intensity measurement unit, and a part to select (calculate) the necessary mirrors based on the measurement results of these measurement units.
- the light is incident while sequentially changing the mirrors.
- a solar heat collecting apparatus described in Patent Document 1 includes a casing having an opening through which sunlight reflected by a heliostat is incident, and a plurality of heat media that are arranged in the casing circumferential direction and in which a heat medium flows. Heat receiving pipe.
- Patent Document 1 describes that the operation control system of a solar heat receiver reflects the detection result of the outlet side gas temperature and the solar radiation intensity of the heat receiving pipe in the correction of the angle of the heliostat, the quantity used, and the like.
- the solar heat collecting apparatus described in Patent Document 1 creates temperature monitoring means for monitoring the temperature inside the casing, temperature data acquired by the temperature monitoring means, and a temperature distribution associating the temperature distribution with the temperature abnormal portion. Temperature processing means for performing analysis for extraction.
- the solar heat collecting apparatus described in Patent Document 1 includes a heliostat control unit that corrects an angle of an arbitrary heliostat based on the temperature abnormal portion obtained by the temperature processing unit.
- such a solar heat collecting apparatus 350 is provided with a heat receiving opening 352 in a casing 351 that houses a heat receiver (not shown), and light from a plurality of heliostats (not shown) receives heat. The light is incident from the opening 352 for use and used for power generation.
- the plurality of heliostats retreat from the condensing position where the plurality of heliostats are condensed in the heat receiving opening 352 to the retreat position, so that the reflected light R is irradiated with the reflected light R.
- Move to A51 At this time, the trajectory traced when the plurality of heliostats retract from the condensing position to the retracted position is only the pair of lateral directions X51 with respect to the heat receiving opening 352.
- An object of the present invention is to provide a heliostat control method, a heliostat control device, and a heat collection facility that can appropriately cope with a situation that changes from moment to moment and that can obtain a more appropriate amount of heat input and distribution of heat input. It is in.
- Another object of the present invention is to provide a solar heat collecting apparatus operating method and a solar heat collecting apparatus capable of preventing the partial increase in temperature of the heat receiver when the heliostat is replaced and improving the quality. It is in.
- a heliostat control method includes a heat receiver and a plurality of heliostats capable of switching ON / OFF of sunlight irradiation with respect to the heat receiver.
- a method for controlling a heliostat of a heat collecting facility that collects sunlight by receiving sunlight, and obtains a selection pattern that is a combination of ON / OFF of the plurality of heliostats based on at least weather information
- a heliostat control step for performing ON / OFF control of the plurality of heliostats according to the obtained selection pattern, and periodically executing the heliostat control step, and further determining the amount of heat received by the heat receiver.
- a form determining step for determining an execution form of the heliostat control step based on related information is provided.
- the execution period of the heliostat control step is determined as an execution form of the heliostat control step.
- the process of obtaining the selection pattern in the heliostat control step is executed. It is determined whether or not to end the process of obtaining the selection pattern by discarding the data in the process during the middle.
- a process for obtaining the selection pattern performed in the heliostat control step is performed. Decide whether to simplify.
- the heliostat control method is based on at least one of weather information, status information of the heat receiver, or information indicating the amount of heat to be supplied by the heat receiver. , Comprising a state determination step for determining whether the heat collection state of the heat collection facility is in a normal state or a processing required state, and in the form determination step, based on the determination result in the state determination step, An execution form of the heliostat control step is determined.
- the heliostat control device is a heliostat control device that controls a plurality of heliostats capable of switching ON / OFF of sunlight irradiation with respect to the heat receiver, and includes at least weather information.
- a heliostat control that obtains a selection pattern which is a combination of ON / OFF of the plurality of heliostats based on the obtained selection pattern and periodically repeats a process of performing ON / OFF control of the plurality of heliostats according to the obtained selection pattern
- a form determining unit for determining an execution form of the heliostat control unit.
- the morphological determination unit determines an execution cycle of the heliostat control unit as an execution mode of the heliostat control unit.
- the form determining unit may, as the execution form of the heliostat control unit, obtain data in the process when the heliostat control unit is executing a process for obtaining the selection pattern. It is determined whether or not to end the process of discarding and obtaining the selection pattern.
- the form determining unit determines whether or not to simplify the process for obtaining the selection pattern performed by the heliostat control unit as the execution form of the heliostat control unit. .
- the heliostat control device is based on at least one of weather information, state information of the heat receiver, or information indicating the amount of heat to be supplied by the heat receiver.
- a state determination unit that determines whether the heat collection state of the heat collection facility is in a normal state or a processing-necessary state, and the form determination unit determines whether the helio is based on a determination result of the state determination unit.
- the execution mode of the stat control unit is determined.
- the heat collecting facility includes any one of the above-described heliostat control devices.
- a method for operating a solar heat collecting apparatus includes a casing having an opening for entering light and housing a heat receiver therein, a tower in which the casing is disposed at the top, A plurality of heliostats that are arranged around the tower and reflect sunlight, and are switched to a condensing position where the reflected light of the heliostat is collected in the opening and a retreating position that escapes from the casing.
- a driving method of a solar heat collecting apparatus including a drive control unit that drives and controls a heliostat, based on the heat resistance strength of the casing and the power consumption required to drive the heliostat,
- the heliostat is driven and controlled so that the path followed by the reflected light of the heliostat is dispersed in a plurality of directions.
- the method for operating a solar heat collector is a path along the longitudinal direction on the casing under a constant attitude change speed when driving and controlling each heliostat.
- the heliostat that is a long distance from the casing is used, and for the reflected light that follows a path along the short direction on the casing, the heliostat that is a short distance from the casing is used.
- the path followed by the reflected light of the heliostat is up, down, left and right.
- a solar heat collecting apparatus includes a casing having an opening for entering light and housing a heat receiver therein, a tower in which the casing is disposed at the top, and a periphery of the tower A plurality of heliostats that reflect sunlight, and a heliostat that is switched between a condensing position where the reflected light of the heliostat is condensed in the opening and a retracting position for escaping out of the casing.
- the drive control unit for driving control Based on the drive control unit for driving control, the heat resistance strength of the casing, and the power consumption required to drive the heliostat, the path followed by the reflected light of the heliostat at the time of switching is distributed in a plurality of directions. And a control unit for driving and controlling the heliostat.
- control unit is configured to control the reflected light that follows a path along the longitudinal direction on the casing under a constant posture change speed when driving and controlling each heliostat.
- the path followed by the reflected light of the heliostat has two axes, upper, lower, left and right.
- the heliostat control method, the heliostat control device, and the heat collection facility of the present invention in the heat collection facility that selects and uses a necessary mirror, it is possible to appropriately cope with a situation that changes from moment to moment, and more appropriately.
- the amount of heat input and heat input distribution can be obtained.
- the effect of improving the quality by preventing the partial increase in temperature of the heat receiver when the heliostat is replaced can be achieved. Play.
- FIG. 1 is a schematic configuration diagram showing a configuration of a heat collecting facility in the first embodiment of the present invention.
- the heat collection facility of the present embodiment reflects sunlight with a heat receiver 20 irradiated with sunlight, a tower 60 on which the heat receiver 20 is fixed, and a reflecting mirror 11.
- a plurality of heliostats 10 that irradiate sunlight to the heat receiver 20, a direct solar radiation meter 40 that detects the amount of direct solar radiation, and a heliostat control device 100 that controls the plurality of heliostats 10.
- the heliostat control device 100 receives a command related to the amount of heat received by the heat receiver 20 (for example, a command value for the amount of heat received by the heat receiver 20 or a command value for the amount of power generated by the solar thermal power generation facility 1) from the host device 150. .
- the heat collection facility of this embodiment includes a compressor (not shown) that supplies air to the heat receiver 20, a gas turbine 50 that is driven by the air heated by the heat receiver 20, and power generation by driving the gas turbine 50.
- a solar thermal power generation facility 1 (not shown).
- the heat energy from the heat receiver 20 is used for generating electric energy, but the present embodiment is not limited to this, and this heat energy may be used for generating steam. In addition, it may be used as a heating source such as a reactor in a chemical plant.
- the heliostat 10 includes a reflecting mirror 11 that reflects sunlight, a support leg 12 that supports the reflecting mirror 11, and a drive controller 13 that directs the reflecting mirror 11 in a target direction.
- the plurality of heliostats 10 are scattered on the heliostat region F.
- the heliostat area F has a fan shape and is set so that the main part of the fan faces the south side. Further, the above-described tower 60 is built at the main position of the fan, and the heat receiver 20 is fixed on the north side of the upper portion of the tower 60.
- FIG. 2 is an explanatory diagram showing the outer shape of the heat receiver 20 when viewed from the side, together with the positional relationship with the piping inside the heat receiver 20.
- FIG. 3 is an explanatory diagram showing the outer shape of the heat receiver 20 as viewed from the front, together with the positional relationship with the piping inside the heat receiver 20.
- FIG. 4 is an explanatory diagram showing the outer shape of the heat receiver 20 as viewed from above, together with the positional relationship with the internal piping (header) and the opening of the case.
- the heat receiver 20 includes a heat receiving portion 21 that is irradiated with sunlight, and a casing 31 that covers the heat receiving portion 21.
- the heat receiving portion 21 includes an arc-shaped lower header 22, an arc-shaped upper header 23 disposed above the lower header 22, and a plurality of heat receiving tubes that extend in the vertical direction and connect the lower header 22 and the upper header 23. 24.
- the plurality of heat receiving tubes 24 are arranged in the circumferential direction in which the arc-shaped lower header 22 and the upper header 23 extend.
- the lower header 22 is connected to an inlet pipe 25 that sends the compressed air from the compressor described above to the lower header 22.
- the outlet pipe 26 that sends the heated air collected in the upper header 23 from the plurality of heat receiving pipes 24 to, for example, the above-described gas turbine is connected to the upper header 23.
- the heat receiving portion 21 is supported by the casing 31 or the tower 60 by a support tool 29.
- the casing 31 has a sector shape in accordance with the shapes of the lower header 22 and the upper header 23 whose arc shape is viewed from above.
- a top plate 32 that covers the upper side of the heat receiving unit 21, a side plate 33 that covers the side periphery of the heat receiving unit 21, an inclined plate 34 that is the main side of the fan-shaped casing 31 and covers the lower side of the heat receiving unit 21, and a fan-shaped casing 31 and a bottom plate 36 that covers the lower side of the heat receiving portion 21.
- the inclined plate 34 is inclined so as to be directed upward from the arc side of the fan-shaped casing 31 toward the main side.
- a circular opening 35 for guiding sunlight from the heliostat 10 is formed in the inclined plate 34 in the casing 31. For this reason, the penetrating direction of the opening 35 formed in the inclined plate 34 is obliquely upward.
- This casing 31 has an arc-side portion 33 s of the fan-shaped casing 31 facing the south side in the side plate 33, and this portion 33 s is fixed to the north side of the upper portion of the tower 60. Therefore, the main part of the fan-shaped casing 31 faces the north side, that is, the side on which the plurality of heliostats 10 are arranged. Moreover, the penetration direction of the opening 35 formed in the inclined plate 34 of the casing 31 is obliquely upward toward the upper side from the north side toward the south side.
- the fan-shaped heliostat region F is set on the north side which is the diagonally lower side opposite to the penetration direction with respect to the heat receiver 20, and a plurality of heliostats 10 are arranged in the heliostat region F. is doing.
- this embodiment is applicable to various heat collection facilities using a heliostat.
- the present embodiment can be applied to a heat collection facility installed in the Southern Hemisphere.
- the penetration direction of the opening 35 of the casing 31 may be obliquely upward toward the upper side from the south side toward the north side, and the diagonally lower side opposite to the penetration direction with respect to the heat receiver 20.
- a fan-shaped heliostat region F may be set on the south side, and a plurality of heliostats 10 may be arranged in the heliostat region F.
- a plurality of heliostats 10 may be arranged in a ring-shaped heliostat region centered on the heat receiver.
- FIG. 5 is a schematic block diagram showing a functional configuration of the heliostat control device 100.
- the heliostat control device 100 includes a weather information acquisition unit 111, a state information acquisition unit 112, a host device communication unit 113, a state determination unit 121, a cycle determination unit 122, and a heliostat control.
- the heliostat control device 100 performs ON / OFF control of each heliostat 10. More specifically, the heliostat control device 100 determines ON / OFF of each heliostat 10 based on various information such as the amount of direct solar radiation detected by the direct solar radiation meter 40. Then, the heliostat control device 100 focuses the sunlight on the heat receiver 20 (that is, reflects the sunlight into the opening 35 of the heat receiver 20) (reflection) on the heliostat 10 determined to be ON. A control signal for controlling to be a condensing position that is the inclination of the mirror 11 is transmitted.
- the heliostat control device 100 has a retracted position that is a position where the heliostat 10 determined to be OFF does not concentrate sunlight on the heat receiver 20 (that is, sunlight reflection does not hit the heat receiver 20).
- a control signal for controlling to be transmitted is transmitted.
- the weather information acquisition unit 111 acquires information indicating the amount of direct solar radiation detected by the direct solar radiation meter 40 (hereinafter referred to as “direct solar radiation amount information”) as weather information.
- the weather information acquired by the weather information acquisition unit 111 is not limited to the direct solar radiation amount information.
- the weather information acquisition unit 111 may acquire information indicating the atmospheric temperature around the heat receiver 20 as weather information in addition to the direct solar radiation amount information.
- the heliostat control unit 130 predicts changes in the temperature and pressure of the gas in the heat receiving pipe 24 based on the amount of direct solar radiation and the atmospheric temperature, and controls the heliostat 10 based on the prediction result. I can do it.
- the weather information acquisition unit 111 outputs the acquired weather information to the state determination unit 121, the cycle determination unit 122, and the heliostat control unit 130.
- the state information acquisition unit 112 as the state information of the heat receiver 20, for example, information indicating the surface temperature of the heat receiving tube 24 (hereinafter referred to as “surface temperature information” of the heat receiving tube 24), or the air in the heat receiving tube 24 Information indicating pressure (hereinafter referred to as “air pressure information” in the heat receiving pipe 24) is acquired from a sensor installed in the heat receiving pipe 24.
- the state information acquisition unit 112 outputs the acquired state information of the heat receiver 20 to the state determination unit 121, the cycle determination unit 122, and the heliostat control unit 130.
- the host device communication unit 113 communicates with the host device 150.
- the higher-level device communication unit 113 acquires information indicating the amount of heat that the heat receiver 20 should supply from the higher-level device 150.
- the information indicating the amount of heat to be supplied by the heat receiver 20 acquired by the higher-level device communication unit 113 may be information directly indicating the amount of heat to be supplied by the heat receiver 20 or indirectly. It may be information.
- the host device communication unit 113 acquires the power generation amount (supply power) target value of the solar thermal power generation facility 1 from the host device 150, and the heliostat control unit 130 generates the power generation amount target value according to a predetermined conversion method stored in advance. Therefore, the amount of heat to be supplied from the heat receiver 20 may be obtained.
- the host device communication unit 113 outputs the acquired information indicating the amount of heat to be supplied by the heat receiver 20 to the state determination unit 121, the cycle determination unit 122, and the heliostat control unit 130.
- the state determination unit 121 is based on at least one of weather information, state information of the heat receiver 20, or information indicating the amount of heat to be supplied by the heat receiver 20 as information related to the amount of heat received by the heat receiver 20. Then, it is determined whether the heat collection state of the solar thermal power generation facility 1 is in the normal state or in the processing required state. Then, the state determination unit 121 outputs the obtained determination result to the cycle determination unit 122 and the heliostat control unit 130.
- the required processing state here is a state in which the state of the heliostat 10 needs to be changed relatively abruptly (in comparison with the normal state). For example, when the surface temperature of the heat receiving tube 24, which is a metal tube, is increased, there may be a problem in strength or the metal surface may be oxidized. Therefore, when the state determination unit 121 detects that the surface temperature of the heat receiving pipe 24 is equal to or higher than a predetermined threshold temperature based on the surface temperature information of the heat receiving pipe 24 acquired by the state information acquisition unit 112, the solar thermal power generation facility It is determined that the heat collection state of 1 is in a state requiring processing. Here, the state determination unit 121 sets a temperature lower than the temperature at which the strength problem may occur in the heat receiving pipe 24 or the metal surface of the heat receiving pipe 24 may be oxidized by a predetermined threshold. The temperature is stored in advance.
- the state determination unit 121 detects that the pressure of the air in the heat receiving pipe 24 is equal to or higher than a predetermined threshold pressure based on the air pressure information in the heat receiving pipe 24 acquired by the state information acquisition unit 112, the solar heat It is determined that the heat collection state of the power generation facility 1 is in a state requiring processing.
- the state determination unit 121 stores in advance, as a predetermined threshold pressure, a pressure that is reduced by a margin from a pressure that may cause a problem in strength in the heat receiving pipe 24.
- the state determination unit 121 is based on information indicating the amount of heat to be supplied from the heat receiver 20 acquired by the higher-level device communication unit 113, and a predetermined threshold value that stores an increase in the amount of heat to be supplied by the heat receiver 20 in advance. If it detects that it became more than the amount of change, it will determine with the heat collection state of the solar thermal power generation equipment 1 being in a process required state.
- the normal state referred to here is a state that is not a state requiring processing.
- the information related to the amount of heat received by the heat receiver 20 here is information that may affect the amount of heat received by the heat receiver 20 or the amount of heat received by the heat receiver 20.
- meteorological information such as direct solar radiation information
- state information of the heat receiver 20 such as surface temperature information of the heat receiving pipe 24, a heat collection target value set in the heat receiver 20, and the like are related to the heat received by the heat receiver 20. It corresponds to the information to be.
- the cycle determination unit 122 determines an execution cycle (hereinafter, simply referred to as an execution cycle of the heliostat control unit 130) in which the heliostat control unit 130 performs processing based on information related to the amount of heat received by the heat receiver 20. To do. Specifically, in the cycle determination unit 122, the state determination unit 121 collects heat from the solar thermal power generation facility 1 based on information related to the amount of heat received by the heat receiver 20 (the state of the solar thermal power generation facility 1 related to heat collection). Is determined to be a process-necessary state, the execution cycle of the heliostat control unit 130 is made shorter than the cycle in the normal state. The cycle determination unit 122 outputs information indicating the determined execution cycle to the heliostat control unit 130.
- an execution cycle hereinafter, simply referred to as an execution cycle of the heliostat control unit 130.
- the heliostat control unit 130 obtains a selection pattern that is a combination of ON / OFF of the heliostat 10 based on at least weather information, and performs a process of performing ON / OFF control of each heliostat 10 according to the obtained selection pattern. Execute periodically and repeatedly.
- the selection pattern acquisition unit 131 obtains a selection pattern (a combination of ON / OFF of the heliostat 10 selected by the selection pattern acquisition unit 131) based on at least weather information.
- the selection pattern acquisition unit 131 is the weather information acquired by the weather information acquisition unit 111, the state information of the heat receiver 20 acquired by the state information acquisition unit 112, and the heat receiver acquired by the host device communication unit 113. Based on the information indicating the amount of heat to be supplied, simulations are performed for some ON / OFF combinations of each heliostat 10.
- the selection pattern acquisition unit 131 converts each simulation result into several evaluation criteria such as the degree of conformity to the amount of heat to be supplied by the heat receiver 20, the surface temperature of the heat receiving pipe 24, and the pressure of air in the heat receiving pipe 24. The combination that is evaluated based on the above and obtains the highest evaluation result is taken as the selection pattern. Then, the selection pattern acquisition unit 131 outputs the obtained selection pattern to the control signal generation unit 132.
- the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern acquired by the selection pattern acquisition unit 131 and outputs the control signal to the control signal transmission unit 133.
- the control signal transmission unit 133 transmits the control signal generated by the control signal generation unit 132 to each heliostat 10. Accordingly, the heliostat control unit 130 (the control signal generation unit 132 and the control signal transmission unit 133) performs ON / OFF control of each heliostat 10 according to the selection pattern acquired by the selection pattern acquisition unit 131.
- the heliostat control device 100 includes, for example, a computer. More specifically, the weather information acquisition unit 111, the state information acquisition unit 112, the higher-level device communication unit 113, and the control signal transmission unit 133 are realized by a communication unit included in the computer. In addition, the cycle determination unit 122, the state determination unit 121, the selection pattern acquisition unit 131, and the control signal generation unit 132 are included in a central processing unit (CPU) included in the computer. This is realized by reading the program from the memory to be executed and executing it.
- CPU central processing unit
- the host device 150 is, for example, a control device for the solar thermal power generation facility 1, and transmits information indicating the amount of heat to be supplied by the heat receiver 20 to the heliostat control device 100.
- the cycle determination unit 122 and the selection pattern acquisition unit 131 are examples of a form determination unit in the present embodiment. That is, as described above, the cycle determination unit 122 determines the execution cycle of the heliostat control unit 130 based on the determination result of the state determination unit 121. In addition, as will be described later, the selection pattern acquisition unit 131 determines whether to discard the data in the currently executed heliostat selection calculation and end the heliostat selection calculation based on the determination result of the state determination unit 121. To do. As will be described later, the selection pattern acquisition unit 131 determines whether to simplify the heliostat selection calculation based on the determination result of the state determination unit 121.
- the cycle determination unit 122 determines the execution cycle of the heliostat control unit 130 and the selection pattern acquisition unit 131 determines the data in the currently executed heliostat selection calculation and terminates the heliostat selection calculation.
- the selection pattern acquisition unit 131 determines the execution mode of the heliostat control unit in this embodiment (execution mode in which the heliostat control unit performs processing). It is an example.
- FIG. 6 is an explanatory diagram of the relationship between the execution cycle and the operation timing of the solar thermal power generation facility 1 when the execution cycle is relatively long.
- the cycle determination unit 122 determines the execution cycle as a relatively long time p111, and the selection pattern acquisition unit 131 obtains a selection pattern of the heliostat 10 for each time p111 ( Hereinafter, this is referred to as “heliostat selection calculation”.
- the selection pattern acquisition unit 131 ends the heliostat selection calculation after time p112 from the start of the heliostat selection calculation, and acquires the selection pattern.
- the control signal generation unit 132 When the selection pattern acquisition unit 131 acquires the selection pattern, the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 sends the control signal to each heliostat 10. Send. And in each heliostat 10, the drive controller 13 starts the operation
- Each heliostat 10 is in a stationary state for a period of time p114 from the end of the operation until the operation is started again in accordance with the control signal transmitted from the control signal transmission unit 133 next time. During this time, each heliostat 10 stably radiates sunlight to the heat receiver 20. That is, during the time p114, the heat receiver 20 stably collects heat.
- FIG. 7 is an explanatory diagram of the relationship between the execution cycle and the operation timing of the solar thermal power generation facility 1 when the execution cycle is relatively short.
- the cycle determination unit 122 determines the execution cycle as a relatively short time p121, and the selection pattern acquisition unit 131 performs a heliostat selection calculation for each time p121.
- the selection pattern acquisition part 131 complete
- each heliostat 10 starts an operation of changing the angle of the reflecting mirror 11 in accordance with the control signal.
- the execution cycle is shorter than in the case of FIG. 6, each heliostat 10 receives the control signal with a shorter cycle than in the case of FIG. 6.
- the time for which each heliostat 10 stably irradiates sunlight to the heat receiver 20 is shorter than the time p114 in the case of FIG.
- the time during which the heliostat 10 stops and stably radiates sunlight to the heat receiver 20. Will disappear. That is, there is no time for the heat receiver 20 to collect heat stably.
- the execution period is long from the viewpoint of the heat receiver 20 stably collecting heat.
- FIG. 8 is an explanatory diagram of the relationship between the execution cycle and the operation timing of the solar thermal power generation facility 1 when the heat collection state of the solar thermal power generation facility 1 is in the required processing state.
- the cycle determination unit 122 determines the execution cycle as the time p ⁇ b> 111, and the selection pattern acquisition unit 131 performs the heliostat selection calculation for each time p ⁇ b> 111.
- the execution cycle is long as shown in FIG. 8 (time p111 in FIG. 8).
- the time from the occurrence of an event to the calculation of the heliostat selection corresponding to the event also becomes longer, and accordingly, the time until each heliostat 10 is operated in response to the event becomes longer.
- the execution cycle is short in order to appropriately correspond to the processing required state (that is, to quickly operate each heliostat 10 in response to the event).
- the surface temperature of the heat receiving pipe 24 exceeds the threshold temperature, or the inside of the heat receiving pipe 24 That the air pressure of the solar power generator 20 exceeds the threshold pressure, that the amount of heat received by the heat receiver 20 changes abruptly (particularly decreases), or that the power generation target value of the solar thermal power generation facility 1 changes abruptly (particularly increases).
- the cycle determination unit 122 sets the execution cycle to a relatively long time in the normal state, and sets the execution cycle to a relatively short time in the processing required state.
- FIG. 9 is an explanatory diagram illustrating an example of operation timing of the solar thermal power generation facility 1.
- the cycle determination unit 122 determines the execution cycle as a relatively long time p111, and the selection pattern acquisition unit 131 performs a heliostat selection calculation for each time p111.
- the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 A control signal is transmitted to each heliostat 10.
- each heliostat 10 the drive controller 13 starts the operation
- the operation is completed.
- Each heliostat 10 is in a stationary state for a period of time p114 from the end of the operation until the operation is started again according to the control signal transmitted from the control signal transmission unit 133 next time.
- the period determining unit 122 determines the execution period to be a relatively long time, so that each heliostat 10 stably radiates sunlight to the heat receiver 20, that is, The time for the heat receiver 20 to stably collect heat can be extended.
- the cycle determination unit 122 determines the execution cycle at a relatively short time p121, and the selection pattern acquisition unit 131 calculates the next heliostat selection calculation after the time p121. It is carried out. Thereby, the selection pattern acquisition unit 131 starts the heliostat selection calculation corresponding to the event after a time p141 that is relatively short (particularly, shorter than the time p131 in FIG. 8) from the occurrence of the event. In this way, in the required processing state, the cycle determining unit 122 determines the execution cycle to be a relatively short time, so that each heliostat 10 can be operated quickly in response to the event and appropriately respond to the required processing state. Can do.
- FIG. 10 is a timing chart showing an example of operation timing of the solar thermal power generation facility 1 in the example of FIG.
- the cycle determination unit 122 determines the execution cycle as a relatively long time p111, and the selection pattern acquisition unit 131 performs a heliostat selection calculation for each time p111.
- the selection pattern acquisition unit 131 first starts heliostat selection calculation at time t111.
- the selection pattern acquisition unit 131 ends the heliostat selection calculation and acquires the selection pattern.
- the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- the drive controller 13 starts an operation of changing the angle of the reflecting mirror 11 according to the control signal, and at time t113 after time p113 from the start of the operation, the angle of the reflecting mirror 11 is determined according to the control signal. The operation is completed as an angle.
- each heliostat 10 is in a stationary state.
- the period determining unit 122 determines the execution period to be a relatively long time, so that each heliostat 10 stably radiates sunlight to the heat receiver 20, and the heat receiver 20. Stably collects heat.
- the cycle determination unit 122 determines the execution cycle to be a relatively short time p121, and the selection pattern acquisition unit 131 starts the time p121 from the time t121 when the previous heliostat selection calculation was started. At a later time t131, heliostat selection calculation corresponding to the event is started. When the time p112 elapses from the start of the heliostat selection calculation, the selection pattern acquisition unit 131 ends the heliostat selection calculation and acquires the selection pattern. Then, the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- the drive controller 13 starts an operation of changing the angle of the reflecting mirror 11 according to the current control signal, and at time t133 after time p113 from the start of the operation, the reflection is reflected.
- the operation is completed by setting the angle of the mirror 11 to an angle corresponding to the control signal.
- the cycle determining unit 122 determines the execution cycle to be a relatively short time, so that each heliostat 10 can be operated quickly in response to the event and appropriately respond to the required processing state. Can do.
- the heat collection state of the heat receiver 20 is again in the normal state (that is, no new event has occurred after starting the heliostat selection calculation at time t132), and between time t133 and time p114.
- Each heliostat 10 is in a stationary state and stably radiates sunlight to the heat receiver 20. Thereby, the heat receiver 20 collects heat stably.
- FIG. 11 is a flowchart showing a processing procedure by which the heliostat control device 100 acquires a selection pattern.
- the heliostat control device 100 starts the processing of FIG. 11 when the power supply is connected (ON) and becomes an operating state.
- the weather information acquisition unit 111 acquires the direct solar radiation amount information detected by the direct solar radiation meter 40
- the state information acquisition unit 112 acquires the state information of the heat receiver 20, and the upper level
- the apparatus communication unit 113 acquires information indicating the amount of heat that the heat receiver 20 should supply (step S101).
- the state determination part 121 determines the heat collection state of the heat receiver 20 based on each information which the weather information acquisition part 111, the state information acquisition part 112, and the high-order apparatus communication part 113 acquired in step S101 (step). S102). For example, the state determination unit 121 determines that the surface temperature of the heat receiving pipe 24 (FIG. 2) is equal to or higher than the threshold temperature, the air pressure in the heat receiving pipe 24 is equal to or higher than the threshold pressure, and the amount of decrease in the amount of direct solar radiation. When any one or more of the amount of change or the increase in the amount of heat to be supplied by the heat receiver 20 exceeds the threshold change amount is detected, the heat collection state of the heat receiver 20 is required. The processing state is determined. On the other hand, when none of the above is detected, the state determination unit 121 determines that the heat collection state of the heat receiver 20 is the normal state.
- the cycle determination unit 122 When the state determination unit 121 determines that the heat collection state of the heat receiver 20 is the normal state (step S102: YES), the cycle determination unit 122 has a relatively long execution cycle based on the determination result of the state determination unit 121. Time is determined (for example, time p111 in FIG. 9), and the determined execution cycle is output to the heliostat control unit 130 (step S111).
- the selection pattern acquisition unit 131 determines whether or not the start time of the heliostat selection calculation has arrived based on the execution cycle determined by the cycle determination unit 122 (that is, the execution cycle after starting the previous heliostat selection calculation). Whether or not has elapsed (step S131).
- the selection pattern acquisition unit 131 performs the heliostat selection calculation to acquire the selection pattern, and generates the control signal for the obtained selection pattern.
- the data is output to the unit 132 (step S141).
- the selection pattern acquisition unit 131 performs simulation on 100 patterns among various ON / OFF patterns of the heliostat 10, selects the highest evaluation ON / OFF pattern as the selection pattern, and selects the control signal generation unit 132. Output to.
- control signal generation unit 132 generates a control signal for each heliostat 10 based on the selection pattern acquired by the selection pattern acquisition unit 131 and outputs the control signal to the control signal transmission unit 133 (step S142). Then, the control signal transmission unit 133 transmits the control signal output from the control signal generation unit 132 to each heliostat 10 (step S143). Each heliostat 10 operates according to the control signal output from the control signal generator 132 (changes the angle of the reflecting mirror 11). Then, it returns to step S101.
- step S102 determines in step S102 that the heat collection state of the heat receiver 20 is not a normal state (that is, a state requiring processing) (step S102: NO)
- step S102: NO the cycle determination unit 122 Based on the determination result of the determination unit 121, the execution cycle is determined to be a relatively short time (for example, the time p121 in FIG. 9), and the determined execution cycle is output to the heliostat control unit 130 (step S121). Thereafter, the process proceeds to step S131.
- the selection pattern acquisition part 131 determines that the start time of heliostat selection calculation has not come in step S131 (step S131: NO)
- the cycle determination unit 122 changes the execution cycle according to the situation, so that the heliostat control unit 130 can perform ON / OFF control of each heliostat 10 at a cycle according to the situation. .
- the solar thermal power generation equipment 1 can respond appropriately to the situation that changes from moment to moment, and can obtain a more appropriate amount of heat input and heat input distribution.
- the period determining unit 122 determines the execution period to be a relatively long period, so that each heliostat 10 stably irradiates the heat receiver 20 with sunlight, That is, the time for the heat receiver 20 to stably collect heat can be extended.
- the cycle determination unit 122 can determine the execution cycle to be a relatively short time, and can promptly operate each heliostat 10 in response to the event and appropriately respond to the processing required state. .
- the cycle determining unit 122 determines the execution cycle to be a relatively short time, and therefore it is possible to appropriately cope with a situation that changes from moment to moment.
- the period determination part 122 determines an execution period to comparatively long time, and each heliostat 10 irradiates sunlight stably with respect to the heat receiver 20, and more suitable heat input. And heat input distribution can be obtained.
- the cycle determination unit 122 determines the execution cycle to be a relatively short time, and each heliostat 10 quickly changes the angle of the reflecting mirror 11 to an angle corresponding to the event. Appropriate heat input and heat input distribution can be obtained.
- the cycle determination unit 122 may determine the execution cycle based on information other than the determination result of the state determination unit 121. For example, the period determining unit 122 sets the execution period to be relatively short in the morning and evening time periods when the change in the amount of sunlight irradiation is relatively large based on the time period, and the amount of sunlight irradiation is relatively stable. The execution period may be set relatively long during the daytime period. Thereby, the heliostat control part 130 can control a heliostat appropriately according to the change of sunlight irradiation amount.
- the state determination unit 121 determines that the heat collection state of the solar thermal power generation facility 1 is a processing required state
- the heliostat control unit 130 when the heliostat control unit 130 is executing a process for obtaining a selection pattern (ie, heliostat selection calculation), The heliostat control unit 130 may discard the data in the process and re-execute the process for obtaining the selection pattern. This point will be described with reference to FIGS.
- FIG. 12 is an explanatory diagram illustrating an example of operation timing of the solar thermal power generation facility 1 when the heliostat control unit 130 re-executes the heliostat selection calculation in the processing required state.
- the cycle determination unit 122 determines the execution cycle as the time p111, and the selection pattern acquisition unit 131 performs the heliostat selection calculation for each time p111.
- the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- Each heliostat 10 changes the angle of the reflecting mirror 11 in accordance with the control signal.
- the selection pattern acquisition unit 131 discards the data in the current heliostat selection calculation and responds to the event. Re-run the heliostat selection calculation.
- the heliostat selection calculation started by the selection pattern acquisition unit 131 before the event occurs is not appropriate for the event. For example, when the state determination unit 121 detects that the surface temperature of the heat receiving tube 24 is equal to or higher than the threshold temperature and determines that the processing is required, the selection pattern acquisition unit 131 receives the determination result when the determination result is obtained.
- a simulation is performed under the condition that the surface temperature of the heat pipe 24 is lower than the threshold temperature, and an evaluation value based on an evaluation standard that does not consider the surface temperature of the heat receiving pipe 24 for some of the ON / OFF patterns of the heliostat 10. It is possible that When the selection pattern acquisition unit 131 selects the ON / OFF pattern with the highest evaluation as the selection pattern based on the evaluation value, there is a possibility that the ON / OFF pattern that further increases the surface temperature of the heat receiving tube 24 is selected. high. Therefore, the selection pattern acquisition unit 131 discards the already obtained simulation evaluation result and newly performs simulation and evaluation under an evaluation criterion for reducing the surface temperature of the heat receiving tube 24. Thereby, the selection pattern acquisition part 131 can select the appropriate ON / OFF pattern according to the event as a selection pattern.
- the control signal generation unit 132 When the selection pattern acquisition unit 131 acquires a selection pattern corresponding to an event, the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 transmits the control signal to each heliostat. Send to Stat 10 Each heliostat 10 operates according to the control signal (adjusts the angle of the reflecting mirror 11).
- FIG. 13 is a timing chart showing an example of operation timing of the solar thermal power generation facility 1 in the example of FIG.
- the selection pattern acquisition unit 131 performs the heliostat selection calculation for each relatively long time (execution cycle) p111 as in the case of FIG. Then, the selection pattern acquisition unit 131 first starts the heliostat selection calculation at time t211 and ends the heliostat selection calculation and acquires the selection pattern when the time p112 elapses. Then, the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- the drive controller 13 starts an operation of changing the angle of the reflecting mirror 11 according to the control signal, and at time t213 after time p113 from the start of the operation, the angle of the reflecting mirror 11 is set according to the control signal. The operation is completed as an angle.
- the selection pattern acquisition unit 131 discards the data of heliostat selection calculation started at time t221 and performs heliostat selection calculation according to the event, unlike the case of FIG. .
- the selection pattern acquisition part 131 completes a heliostat selection calculation after the time p112, and acquires a selection pattern, and the control signal generation part 132 produces
- the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- Each heliostat 10 starts operating at time t232 in accordance with the control signal and completes operation at time t233 when time p113 has elapsed.
- each heliostat 10 is in a stationary state at time p114 until the drive controller 13 again operates based on the next control signal. In this state, each heliostat 10 stably irradiates sunlight to the heat receiver 20, and the heat receiver 20 stably collects heat.
- FIG. 14 is a flowchart showing a processing procedure in which the heliostat control device 100 acquires the selection pattern when the heliostat control unit 130 re-executes the processing for obtaining the selection pattern in the processing required state.
- the heliostat control device 100 starts the process of FIG. 14 when the power supply is connected and enters the operating state.
- steps S201 to S202 are the same as steps S101 to S102 of FIG.
- step S202 when the state determination unit 121 determines that the heat collection state of the heat receiver 20 is the normal state (step S202: YES), the selection pattern acquisition unit 131 performs a predetermined execution cycle (for example, in step S111 of FIG. 11). Based on the same time p111) as the period determined by the period determining unit 122, whether or not at least one of the start time of the heliostat selection calculation has arrived or the heliostat selection calculation is in progress is established. Determination is made (step S211).
- the selection pattern acquisition unit 131 When it is determined that the start time of the heliostat selection calculation has arrived or is in the middle of the heliostat selection calculation (step S211: YES), the selection pattern acquisition unit 131 performs part of the heliostat selection calculation (step S21). S221). For example, when the selection pattern acquisition unit 131 performs simulation for 100 ON / OFF patterns in the heliostat selection calculation, the selection pattern acquisition unit 131 performs processing for one pattern in step S221 for 10 patterns of the 100 patterns. Perform a simulation. Here, when the simulation has already been executed for several ON / OFF patterns, the selection pattern acquisition unit 131 continues the simulation for 10 patterns among the remaining ON / OFF patterns.
- the selection pattern acquisition unit 131 determines whether or not heliostat selection calculation has been completed (for example, whether or not simulation has been completed for all 100 ON / OFF patterns) (step S222). When it is determined that the heliostat selection calculation has been completed (step S222: YES), the process proceeds to step S241. Steps S241 and S242 are the same as steps S142 and S143 in FIG. After step S242, the process returns to step S201.
- step S202 determines in step S202 that the heat collection state of the heat receiver 20 is not a normal state (that is, a processing-necessary state) (step S202: NO)
- the selection pattern acquisition unit 131 A selection pattern is obtained by performing a heliostat selection calculation according to the event, and the obtained selection pattern is output to the control signal generation unit 132 (step S231).
- the selection pattern acquisition unit 131 discards data such as a simulation evaluation value in the heliostat selection calculation when the heliostat selection calculation is already being executed.
- the heliostat selection calculation is newly performed based on the latest weather information and state information obtained in step S201, information such as the target heat amount of the heat receiver 20, and the like.
- step S241 the process proceeds to step S241.
- step S211 when it is determined in step S211 that the start time of the heliostat selection calculation has not arrived and is not in the middle of the heliostat selection calculation (step S211: NO), the process returns to step S201. Moreover, also when it determines with not having completed heliostat selection calculation in step S222 (step S222: NO), it returns to step S201.
- the heliostat control unit 130 (selection pattern acquisition unit 131) is executing a process for obtaining a selection pattern. If so, the data in the process is discarded and the process for obtaining the selection pattern is terminated (stopped). Thereby, the selection pattern acquisition part 131 can complete
- the selection pattern acquisition part 131 newly performs the process which calculates
- the selection pattern acquisition unit 131 starts the heliostat selection calculation at the time t131 when the time p141 has elapsed from the event occurrence time t19, and completes the heliostat selection calculation after the time p112 from the time t131. Rather than acquiring the pattern, the process from the event occurrence to the selection pattern acquisition is quicker. Since the selection pattern acquisition unit 131 acquires the selection pattern corresponding to the event more quickly, each heliostat 10 can quickly adjust the reflecting mirror 11 according to the angle corresponding to the event. Therefore, the solar thermal power generation facility 1 can respond to the event more quickly.
- FIG. 15 is a timing chart showing an example of the operation timing of the solar thermal power generation facility 1 when the heliostat control unit 130 simplifies the heliostat selection calculation in the processing required state.
- the cycle determination unit 122 determines the execution cycle as a relatively long time.
- the simplification of the process for obtaining the selection pattern can be expected to have a greater effect when the time for which the selection pattern acquisition unit 131 performs the heliostat selection calculation (time p312 in the example of FIG. 15) is long. Therefore, in FIG. 15, the execution cycle of a relatively long time is a time p311 longer than the time p111 of FIG.
- the selection pattern acquisition unit 131 performs a heliostat selection calculation every time p311 determined by the cycle determination unit 122.
- the selection pattern acquisition unit 131 first starts the heliostat selection calculation at time t311, and ends the heliostat selection calculation when the time p312 elapses to acquire the selection pattern.
- the control signal generation unit 132 generates a control signal for each heliostat 10 according to the selection pattern, and the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- the drive controller 13 starts an operation of changing the angle of the reflecting mirror 11 according to the control signal, and at time t313 after time p313 from the start of the operation, the angle of the reflecting mirror 11 is set according to the control signal. The operation is completed as an angle.
- the cycle determination unit 122 determines the execution cycle to be a relatively short time p321, and the selection pattern acquisition unit 131 starts the time p321 from the time t321 when the previous heliostat selection calculation was started. At a later time t331, heliostat selection calculation corresponding to the event is started.
- the selection pattern acquisition unit 131 ends the heliostat selection calculation and acquires the selection pattern. For example, at the time p312 in the normal state, the selection pattern acquisition unit 131 performs simulation on 150 ON / OFF patterns in the heliostat selection calculation, whereas at the time p342 in the processing required state, the selection pattern acquisition unit 131 In the heliostat selection calculation, 50 ON / OFF patterns are simulated. Then, according to the selection pattern acquired by the selection pattern acquisition unit 131, the control signal generation unit 132 generates a control signal for each heliostat 10, and the control signal transmission unit 133 transmits the control signal to each heliostat 10.
- the selection pattern acquisition unit 131 acquires the selection pattern more quickly, and each heliostat 10 adjusts the angle of the reflecting mirror 11 according to the selection pattern, so that an accident can be prevented more reliably.
- the selection pattern acquisition unit 131 quickly acquires a selection pattern that reduces the heat collection amount of the heat receiver 20, and each heliostat 10 responds to the selection pattern.
- FIG. 16 is a flowchart showing a processing procedure in which the heliostat control device 100 acquires the selection pattern when the heliostat control unit 130 simplifies the heliostat selection calculation in the processing required state.
- the heliostat control device 100 starts the processing of FIG. 16 when the power supply is connected and enters the operating state.
- steps S301 to S311 are the same as steps S101 to S111 of FIG.
- the selection pattern acquisition unit 131 determines the number of ON / OFF patterns (hereinafter referred to as “determination pattern”) to be simulated by heliostat selection calculation based on the state determination unit 121 determining that the state is the normal state in step S302.
- a relatively large number is set (step S312).
- the selection pattern acquisition unit 131 sets the number of determination patterns to 150 patterns.
- Step S321 is the same as step S121 of FIG.
- the selection pattern acquisition unit 131 sets the number of determination patterns to be relatively small based on the determination by the state determination unit 121 that the processing is required in step S302 (step S322). For example, the selection pattern acquisition unit 131 sets the number of determination patterns to 50 patterns. After step S322, the process proceeds to step S331.
- Steps S331 to S343 are the same as steps S131 to S143 in FIG.
- the selection pattern acquisition unit 131 performs heliostat selection calculation according to the number of determination patterns set in step S312 or step S322. That is, in the normal state, the selection pattern acquisition unit 131 performs simulation for a relatively large number of determination patterns (for example, 150 patterns), and acquires an ON / OFF pattern having the highest evaluation value as a selection pattern. On the other hand, in the processing required state, the selection pattern acquisition unit 131 performs simulation for a relatively small number of determination patterns (for example, 50 patterns), and acquires the ON / OFF pattern with the highest evaluation value as the selection pattern.
- the selection pattern acquisition unit 131 sets the number of determination patterns to be relatively small and acquires the selection pattern more quickly, thereby preventing an accident more reliably. And if it will be in a normal state by execution of the said selection pattern, the selection pattern acquisition part 131 will set the number of selection patterns comparatively many, and will acquire a more accurate selection pattern.
- Each heliostat 10 adjusts the angle of the reflecting mirror 11 according to this selection pattern, whereby a more appropriate heat input amount and heat input distribution can be obtained.
- the method by which the selection pattern acquisition unit 131 switches the required time in the heliostat selection calculation is not limited to the method of switching the number of determination patterns.
- the selection pattern acquisition unit 131 terminates the heliostat selection calculation when an ON / OFF pattern equal to or higher than a predetermined evaluation is acquired, and the evaluation criterion for ending this heliostat selection calculation is normally set in the processing required state. You may make it set loosely rather than a state.
- the selection pattern acquisition unit 131 when the evaluation value of the ON / OFF pattern is smaller and the evaluation is higher, in the normal state, if the selection pattern acquisition unit 131 obtains an evaluation value of 100 or less, the evaluation value The heliostat selection calculation is terminated using the ON / OFF pattern as the selection pattern. On the other hand, in the processing-necessary state, if the selection pattern acquisition unit 131 obtains an evaluation value of 200 or less, the heliostat selection calculation is ended using the ON / OFF pattern of the evaluation value as the selection pattern. By setting the evaluation criteria gently in this way, the selection pattern acquisition unit 131 detects an ON / OFF pattern that satisfies the criteria relatively quickly (as compared to the normal state), and ends the heliostat selection calculation. be able to.
- the selection pattern acquisition unit 131 sets the heliostat selection calculation time to a relatively long time (for example, time p312 in FIG. 15), and various ON / OFF of the heliostat 10 within this time. A simulation is performed on the pattern, and the ON / OFF pattern with the highest evaluation value is acquired as the selected pattern.
- the selection pattern acquisition unit 131 sets the heliostat selection calculation time to a relatively short time (for example, time p342 in FIG. 15), and various ON / OFF of the heliostat 10 within this time.
- a simulation is performed on the pattern, and the ON / OFF pattern with the highest evaluation value is acquired as the selected pattern.
- the selection pattern acquisition unit 131 switches the required time in the heliostat selection calculation based on a criterion other than the number of determination patterns, an accident can be more reliably prevented as in the above, and the normal state More appropriate heat input and heat input distribution can be obtained.
- the selection pattern acquisition unit 131 may re-execute the heliostat selection calculation and simplify the heliostat selection calculation in the processing required state. For example, in step S231 of FIG. 14, the selection pattern acquisition unit 131 determines a relatively small number of determination patterns (the number of patterns smaller than the number of patterns for which simulation is performed before step S221 is repeated to complete the heliostat selection calculation). A simulation is performed, and the ON / OFF pattern with the highest evaluation value is acquired as a selection pattern.
- the selection pattern acquisition unit 131 re-executes the heliostat selection calculation and simplifies the heliostat selection calculation, so that the selection pattern acquisition unit 131 Furthermore, the selection pattern can be acquired quickly, and each heliostat 10 can quickly adjust the reflecting mirror 11 at an angle corresponding to the event according to the selection pattern. Therefore, the solar thermal power generation facility 1 can respond to the event more quickly.
- the selection pattern is acquired in the required processing state.
- the unit 131 may simplify the heliostat selection calculation. Also in this case, the selection pattern acquisition part 131 can acquire a selection pattern more rapidly by simplifying a heliostat selection calculation, and can prevent an accident more reliably. In addition, the selection pattern acquisition unit 131 simplifies the heliostat selection calculation, so that the load on the selection pattern acquisition unit 131 can be reduced.
- the selection pattern acquisition unit 131 may determine whether to simplify the heliostat selection calculation based on information other than the determination result of the state determination unit 121. For example, in the daytime period when the sunlight irradiation amount is relatively stable, the selection pattern acquisition unit 131 turns on the current heliostat selection calculation based on the selection pattern obtained by the previous heliostat selection calculation. It may be determined whether to simplify the heliostat selection calculation based on the time zone, such as simplifying the heliostat selection calculation by narrowing down / OFF pattern candidates. Also in this case, the selection pattern acquisition unit 131 can acquire the selection pattern more quickly by simplifying the heliostat selection calculation, and the solar thermal power generation facility 1 finishes the operation of the heliostat more quickly. And can collect heat stably. In addition, the selection pattern acquisition unit 131 simplifies the heliostat selection calculation, so that the load on the selection pattern acquisition unit 131 can be reduced.
- the heliostat control device 100 can be configured using a computer. Therefore, a program for realizing all or part of the functions of the heliostat control device 100 is recorded on a computer-readable recording medium, and the program recorded on the recording medium is read into a computer system and executed. You may process each part by.
- the “computer system” includes an OS and hardware such as peripheral devices. Further, the “computer system” includes a homepage providing environment (or display environment) if a WWW system is used.
- the “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM or a CD-ROM, and a hard disk incorporated in a computer system.
- the “computer-readable recording medium” dynamically holds a program for a short time like a communication line when transmitting a program via a network such as the Internet or a communication line such as a telephone line.
- a volatile memory in a computer system serving as a server or a client in that case and a program that holds a program for a certain period of time are also included.
- the program may be a program for realizing a part of the functions described above, and may be a program capable of realizing the functions described above in combination with a program already recorded in a computer system.
- the solar heat collector of each embodiment according to the present invention is an example of a solar heat collector that integrally includes a heat receiver and a gas turbine unit that generates power using a working fluid heated by the heat receiver. I will explain.
- the solar heat collecting apparatus 210 of 2nd embodiment which concerns on this invention is equipped with the casing 211 which accommodated the heat receiving device 213 with the opening part 212 for incident light inside, and the casing 211 in the upper part. And an arranged tower section (tower) 214.
- the solar heat collecting apparatus 210 includes a plurality of heliostats 215 that are arranged around the tower portion 214 and reflect sunlight (solar solar radiation), and a drive control unit 216 that drives and controls the heliostat 215.
- the solar heat collecting apparatus 210 includes a control unit 217 that gives a drive signal to the drive control unit 216.
- the solar thermal collector 210 is a dry area in the subtropical high pressure zone where the direct solar radiation from the sun is strong and close to a good regression line. Therefore, the solar heat collector 210 will be described in particular as a single-sided power generation device that is disposed in a high latitude region in the subtropical high-pressure zone. This embodiment is an example in the northern hemisphere region.
- the solar heat collector 210 reflects and collects sunlight irradiated to the heliostat field HF provided in the ground G toward the casing 211 by the heliostat 215 and receives heat by the heat receiver 213.
- the tower portion 214 is disposed on one end side (south end portion in the north-south direction) of the heliostat field HF.
- a gas turbine unit (GT) 220 is provided on the upper portion of the tower portion 214.
- the heliostat 215 is the other end side (north side) in the heliostat field HF, and is set in a fan shape in a region of a predetermined angle range centering on the tower portion 214.
- the plurality of heliostats 215 include a plurality of heliostats 222 that are distant from the casing 211 and a plurality of heliostats 223 that are close to the casing 211. In the southern hemisphere region, the arrangement direction of the tower portion 214 and the heliostat 215 is reversed.
- the working fluid (for example, air) heated by the heat received by the heat receiver 213 is supplied to the gas turbine unit 220 and used for power generation.
- the gas turbine unit 220 coaxially connects the compressor (not shown) that compresses the working fluid heated by the heat receiver 213, the turbine (not shown) that receives the working fluid compressed by the compressor, and the compressor and the turbine.
- a rotor (not shown) and a generator (not shown) connected to the rotor are provided. Then, the solar heat collector 210 generates electric power by rotating the generator by rotating the rotor with the working fluid received by the turbine.
- the drive control unit 216 moves the heliostats 222 and 223 when the heliostat is periodically replaced.
- the drive control unit 216 includes a condensing position B1 where the reflected light from the heliostats 222 and 223 is collected in the opening 212, and a retreat position where the reflected light from the heliostats 222 and 223 escapes outside the casing 211.
- the heliostats 222 and 223 are driven so as to be switched to B2.
- the control unit 217 Based on the heat resistance strength of the casing 211 and the power consumption required to drive the heliostats 222 and 223, the control unit 217 distributes the paths followed by the reflected light of the heliostats 222 and 223 in a plurality of directions at the time of switching. Thus, the heliostats 222 and 223 are driven and controlled.
- the heat resistance strength of the casing 211 and the power consumption required to drive the heliostats 222 and 223 are determined in advance and stored in the control unit 217.
- the speed and moving direction of the heliostat can be determined so that the heat applied to the casing from the reflected light that escapes does not exceed the upper limit of the heat resistance strength. In addition, it is preferable to select one that requires less driving power at that time.
- the control unit 217 controls the heliostats 222 and 223 under a constant posture change speed when driving and controlling the heliostats 222 and 223. That is, for the reflected light R11 that follows the path X11 along the longitudinal direction on the casing 211, the heliostat 222 that is far from the casing 211 is used. Therefore, the irradiation spot A11 is created by the reflected light R11 from the heliostat 222 that is a long distance from the casing 211. When the reflected light moves on the casing along the longitudinal direction of the casing, the casing receives a lot of reflected light (as an absolute amount), which is not preferable from the viewpoint of heat resistance of the casing. Therefore, it is evacuated promptly.
- a heliostat 223 that is a short distance from the casing 211 is used for the reflected light R12 that follows the path X12 along the short direction on the casing 211. Therefore, the irradiation spot A12 is created by the reflected light R12 from the heliostat 223 at a short distance from the casing 211.
- the casing will receive only a small amount of reflected light (as an absolute amount). There is no big problem. Therefore, it is not necessary to evacuate more quickly than necessary.
- the heliostat 222 which becomes a long distance from the casing 211, or the heliostat 223 which becomes a short distance from the casing 211.
- the irradiation spot A13 is created by the reflected light R13 from the heliostat 222 which is a long distance from the casing 211 or the heliostat 223 which is a short distance from the casing 211.
- the spot moving speed is a value obtained by multiplying the distance from the heliostat 222 to the opening 212 by the angular velocity of the heliostat 222, and the distance from the heliostat 223 to the opening 212 is multiplied by the angular speed of the heliostat 223. Value.
- the opening 212 that is, the heliostat 222 far away from the heat receiver 213 has a higher incidence and retraction speed than the heliostat 223 near the opening 212.
- the incidence and retraction paths of the heliostats 222 and 223 are dispersed all around. Therefore, it is possible to prevent partial increase in temperature of the internal element of the heat receiver 213 and the casing 211 when the heliostat is replaced.
- the switching is performed based on the heat resistance strength of the casing 211 and the power consumption required when driving the heliostats 222 and 223.
- the heliostats 222 and 223 are driven and controlled so that the paths followed by the reflected light of the heliostats 222 and 223 are sometimes dispersed in a plurality of directions. Therefore, according to the operation method of the solar heat collecting apparatus 210, it is possible to prevent the partial increase in the temperature of the heat receiver 213 when the heliostat is replaced and to improve the quality.
- the heliostat 222 that is a long distance from the casing 211 is used for the reflected light R11 that follows the path X11 along the longitudinal direction on the casing 211.
- the heliostat 223 which becomes a short distance from the casing 211 is used about the reflected light R12 which follows the path
- the path followed by the reflected light of the heliostat 222, 223 at the time of switching is based on the heat resistance strength of the casing 211 and the power consumption required to drive the heliostat 222, 223.
- the heliostats 222 and 223 are controlled to be distributed in a plurality of directions. Therefore, according to the solar heat collecting apparatus 210, it is possible to prevent a partial increase in the temperature of the heat receiver 213 when the heliostat is replaced and to improve the quality.
- the heliostat 222 that is a long distance from the casing 211 is used for the reflected light R11 that follows the path X11 along the longitudinal direction on the casing 211.
- the heliostat 223 which becomes a short distance from the casing 211 is used about the reflected light R12 which follows the path
- FIG. Therefore, according to the solar heat collecting apparatus 210, partial heat-up of the heat receiver 213 at the time of heliostat replacement can be prevented, and quality can be improved.
- the control unit 217 performs the reflected light R14 of the heliostats 222 and 223 when the heliostat is periodically replaced.
- the routes X14 and X15 followed by 15 are set on two axes, up, down, left and right.
- the solar heat collecting apparatus 230 uses a heliostat 222 that is a long distance from the casing 211 for the reflected light R14 that follows the path X14 along the longitudinal direction on the casing 211. Therefore, the irradiation spot A14 is created by the reflected light R14 from the heliostat 222 that is a long distance from the casing 211.
- the solar heat collector 230 uses a heliostat 223 that is a short distance from the casing 211 for the reflected light R15 that follows the path X15 along the short direction on the casing 211. For this reason, an irradiation spot A15 is created by the reflected light R15 from the heliostat 223 at a short distance from the casing 211.
- the control unit 217 sets the paths X14 and X15 followed by the reflected lights R14 and 15 of the heliostats 222 and 223 as two axes, up, down, left, and right. . Therefore, according to the operation method of the solar heat collecting apparatus 230, the electric power used by each heliostat 222, 223 can be suppressed.
- the control unit 217 sets the paths X14 and X15 followed by the reflected lights R14 and 15 of the heliostats 222 and 223 to the two axes, up, down, left, and right. Therefore, according to the solar heat collecting apparatus 230, the electric power used by each heliostat 222,223 can be suppressed.
- the partial increase in temperature of the heat receiver when the heliostat is replaced is prevented, thereby improving the quality.
- Can do it is possible to provide beneficial power generation using natural energy in consideration of the prevention of global warming and the suppression of the use of fossil fuel, and it can be said that the industrial applicability of this embodiment is great.
- the present invention relates to a heliostat control method, a heliostat control device, and a heat collection facility.
- ADVANTAGE OF THE INVENTION According to this invention, in the heat collecting equipment which selects and uses a required mirror, it can respond appropriately to the condition which changes every moment, and can obtain a more suitable heat input and heat input distribution.
- TECHNICAL FIELD The present invention relates to a method for operating a solar heat collector that is applied to a solar thermal power plant or chemical plant and collects and uses solar thermal energy, and a solar heat collector.
- ADVANTAGE OF THE INVENTION According to this invention, the partial high temperature of the heat receiver at the time of heliostat replacement
- Period determination unit 130 ... Heliostat control unit 131 ... Selection pattern acquisition unit 132 ... Control signal generation unit 133 ... Control signal transmission unit 150 ... Host device 210 ... Solar thermal collector 211 ... casing 212 ... opening 213 ... heat receiver 214 ... tower (tower) 215 ... Heliostat 216 ... Drive controller 217 ... Controller 222 ... Heliostat 223 ... Heliostat 230 ... Solar heat collector
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Optical Elements Other Than Lenses (AREA)
Abstract
ヘリオスタット制御部は、少なくとも気象情報に基づいて、複数のヘリオスタットのON/OFFの組み合わせである選択パターンを求め、得られた選択パターンに従って複数のヘリオスタットのON/OFF制御を行う処理を周期的に繰り返し実行する。そして、形態決定部(周期決定部または選択パターン取得部)は、ヘリオスタット制御部の実行形態を決定する。ヘリオスタット制御部は、状況に応じた実行形態で各ヘリオスタットのON/OFF制御を行うことができ、これにより、時々刻々変化する状況に適切に対応でき、かつ、より適切な入熱量や入熱分布を得ることができる。
Description
本発明は、ヘリオスタット制御方法、ヘリオスタット制御装置および集熱設備に関する。また、本発明は、太陽熱発電プラントや化学プラントに適用されて太陽熱エネルギーを集熱して利用する太陽熱集熱装置の運転方法及び太陽熱集熱装置に関する。
本願は、2011年10月31日に日本に出願された特願2011-239073号、および特願2011-239724号に対して優先権を主張し、その内容をここに援用する。
本願は、2011年10月31日に日本に出願された特願2011-239073号、および特願2011-239724号に対して優先権を主張し、その内容をここに援用する。
太陽光を鏡によって集光し、熱を利用する集熱設備において、当該集熱設備の具備する全ての鏡を常に使用するのではなく、必要な鏡を選択して使用する集熱設備がある。この必要な鏡を選択して使用する集熱設備では、プロセスの温度および圧力や、日射強度の測定部と、これら測定部の測定結果に基づいて必要な鏡を選択(算出)する部分を備え、時々刻々変化する太陽の位置やプロセスの要求に対応して適切な入熱量や入熱分布を得るために、鏡を順次入れ替えながら入光させる。
例えば、特許文献1に記載の太陽熱集熱装置は、ヘリオスタットで反射される太陽光が入射する開口部を有するケーシングと、ケーシング内にケーシング周方向に配列するとともに内部に熱媒体が流通する複数の受熱管とを備えている。特許文献1には、太陽熱受熱器の運転制御システムが、受熱管の出側ガス温度や日射強度の検出結果を、ヘリオスタットの角度や使用数量などの補正に反映させることが記載されている。
さらに、特許文献1に記載の太陽熱集熱装置は、ケーシング内部の温度を監視する温度監視手段と、温度監視手段で取得した温度データとその位置を関連付けた温度分布を作成し、温度異常部を抽出する解析を行う温度処理手段と、を備える。特許文献1に記載の太陽熱集熱装置は、温度処理手段で得られた温度異常部に基づいて任意のヘリオスタットの角度を補正するヘリオスタット制御手段を備える。
さらに、特許文献1に記載の太陽熱集熱装置は、ケーシング内部の温度を監視する温度監視手段と、温度監視手段で取得した温度データとその位置を関連付けた温度分布を作成し、温度異常部を抽出する解析を行う温度処理手段と、を備える。特許文献1に記載の太陽熱集熱装置は、温度処理手段で得られた温度異常部に基づいて任意のヘリオスタットの角度を補正するヘリオスタット制御手段を備える。
特許文献1に記載の太陽熱集熱装置では、受熱管に使用する配管材料の使用限界(例えば920℃以上)となる部分や異常低温部などの温度異常が抽出されてヘリオスタット制御装置へ出力する。特許文献1は、異常ヘリオスタットを割り出し、その異常ヘリオスタットの向きを調整したり、ヘリオスタットの使用数を変更したりするといった機差の補正を行う。ところで、熱利用プロセスにおいて、受熱器の想定外の温度や圧力等、状態量の変動を検出した場合に、安定化や安全のためヘリオスタットを退避させる太陽熱集熱装置がある。図20に示すように、このような太陽熱集熱装置350は、不図示の受熱器を収容したケーシング351に受熱用開口部352を設けており、複数の不図示のヘリオスタットからの光が受熱用開口部352から入射されて発電に用いられる。太陽熱集熱装置350は、定期的なヘリオスタット入替時に、複数のヘリオスタットが受熱用開口部352内に集光される集光位置から退避位置まで退避移動することにより、反射光Rが照射スポットA51に移動する。このとき、複数のヘリオスタットが集光位置から退避位置に退避移動する際に辿る軌跡が受熱用開口部352に対する一対の横方向の方向X51のみである。
上記のような、必要な鏡を選択して使用する集熱設備において、日射量の急激な変化など時々刻々変化する状況に適切に対応するためには、鏡の入替を行う周期を短くすることが好ましい。一方、多数の鏡の使用/不使用パターンの中から適用するパターンを選択するための時間を充分に取ることが出来れば、より適切なパターンを選択して、より適切な入熱量や入熱分布を得ることができる。
ところで、特許文献1に記載の太陽熱集熱装置では、図20に示すように、複数のヘリオスタットが集光位置から退避位置に退避移動する際に辿る軌跡が受熱用開口部352に対する一対の横方向の方向X51のみである。そのため、太陽熱集熱装置350は、ヘリオスタット入替時に、受熱器を構成する内部エレメントが部分的に高温化してしまう場合がある。従って、太陽熱集熱装置350は、受熱器の温度制御が不安定になる可能性がある。
ところで、特許文献1に記載の太陽熱集熱装置では、図20に示すように、複数のヘリオスタットが集光位置から退避位置に退避移動する際に辿る軌跡が受熱用開口部352に対する一対の横方向の方向X51のみである。そのため、太陽熱集熱装置350は、ヘリオスタット入替時に、受熱器を構成する内部エレメントが部分的に高温化してしまう場合がある。従って、太陽熱集熱装置350は、受熱器の温度制御が不安定になる可能性がある。
本発明の目的は、時々刻々変化する状況に適切に対応でき、かつ、より適切な入熱量や入熱分布を得ることのできるヘリオスタット制御方法、ヘリオスタット制御装置および集熱設備を提供することにある。
また、本発明の目的は、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができる太陽熱集熱装置の運転方法及び太陽熱集熱装置を提供することにある。
また、本発明の目的は、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができる太陽熱集熱装置の運転方法及び太陽熱集熱装置を提供することにある。
本発明の第一の態様によれば、ヘリオスタット制御方法は、受熱器と、前記受熱器に対する太陽光照射のON/OFFを切替可能な複数のヘリオスタットとを具備して、前記ヘリオスタットの照射する太陽光を受けて前記受熱器が集熱する集熱設備のヘリオスタット制御方法であって、少なくとも気象情報に基づいて、前記複数のヘリオスタットのON/OFFの組み合わせである選択パターンを求め、得られた選択パターンに従って前記複数のヘリオスタットのON/OFF制御を行うヘリオスタット制御ステップを具備して、当該ヘリオスタット制御ステップを周期的に繰り返し実行し、さらに、前記受熱器の受熱量に関連する情報に基づいて、前記ヘリオスタット制御ステップの実行形態を決定する形態決定ステップを具備する。
本発明の第二の態様によれば、前記ヘリオスタット制御方法は、前記形態決定ステップにて、前記ヘリオスタット制御ステップの実行形態として、前記ヘリオスタット制御ステップの実行周期を決定する。
本発明の第三の態様によれば、前記ヘリオスタット制御方法は、前記形態決定ステップにて、前記ヘリオスタット制御ステップの実行形態として、前記ヘリオスタット制御ステップにて前記選択パターンを求める処理を実行中のときに当該処理におけるデータを破棄して前記選択パターンを求める処理を終了するか否かを決定する。
本発明の第四の態様によれば、前記ヘリオスタット制御方法は、前記形態決定ステップにて、前記ヘリオスタット制御ステップの実行形態として、前記ヘリオスタット制御ステップにて行う前記選択パターンを求める処理を簡略化するか否かを決定する。
本発明の第五の態様によれば、前記ヘリオスタット制御方法は、気象情報、前記受熱器の状態情報、または、前記受熱器が供給すべき熱量を示す情報の少なくともいずれか1つに基づいて、前記集熱設備の集熱状態が通常状態にあるか要処理状態にあるかを判定する状態判定ステップを具備し、前記形態決定ステップにて、前記状態判定ステップでの判定結果に基づいて、前記ヘリオスタット制御ステップの実行形態を決定する。
本発明の第六の態様によれば、ヘリオスタット制御装置は、受熱器に対する太陽光照射のON/OFFを切替可能な複数のヘリオスタットを制御するヘリオスタット制御装置であって、少なくとも気象情報に基づいて、前記複数のヘリオスタットのON/OFFの組み合わせである選択パターンを求め、得られた選択パターンに従って前記複数のヘリオスタットのON/OFF制御を行う処理を周期的に繰り返し実行するヘリオスタット制御部と、前記ヘリオスタット制御部の実行形態を決定する形態決定部と、を具備する。
本発明の第七の態様によれば、前記形態決部は、前記ヘリオスタット制御部の実行形態として、前記ヘリオスタット制御部の実行周期を決定する。
本発明の第八の態様によれば、前記形態決定部は、前記ヘリオスタット制御部の実行形態として、当該ヘリオスタット制御部が前記選択パターンを求める処理を実行中のときに当該処理におけるデータを破棄して前記選択パターンを求める処理を終了するか否かを決定する。
本発明の第九の態様によれば、前記形態決定部は、前記ヘリオスタット制御部の実行形態として、当該ヘリオスタット制御部の行う前記選択パターンを求める処理を簡略化するか否かを決定する。
本発明の第十の態様によれば、前記ヘリオスタット制御装置は、気象情報、前記受熱器の状態情報、または、前記受熱器が供給すべき熱量を示す情報の少なくともいずれか1つに基づいて、前記集熱設備の集熱状態が通常状態にあるか要処理状態にあるかを判定する状態判定部を具備し、前記形態決定部が、前記状態判定部の判定結果に基づいて、前記ヘリオスタット制御部の実行形態を決定する。
本発明の第十一の態様によれば、集熱設備は、上述のいずれかのヘリオスタット制御装置を具備する。
本発明の第十二の態様によれば、太陽熱集熱装置の運転方法は、入光用の開口部を備え内部に受熱器を収容したケーシングと、前記ケーシングを上部に配置するタワーと、前記タワーの周囲に配置され太陽光を反射させる複数のヘリオスタットと、前記ヘリオスタットの反射光が開口内に集光される集光位置とケーシング外に逃げる退避位置とに切替えて配置されるようにヘリオスタットを駆動制御する駆動制御部と、を備えた太陽熱集熱装置の運転方法において、前記ケーシングの耐熱強度と、前記ヘリオスタットを駆動する際に要する消費電力と、に基づき、前記切替時に前記ヘリオスタットの反射光の辿る経路が複数方向に分散されるように前記ヘリオスタットを駆動制御する。
本発明の第十三の態様によれば、太陽熱集熱装置の運転方法は、前記各ヘリオスタットを駆動制御する時の姿勢変化速度が一定の下、前記ケーシング上をその長手方向に沿う経路を辿る反射光については、前記ケーシングから遠距離となる前記ヘリオスタットを用い、前記ケーシング上をその短手方向に沿う経路を辿る反射光については、前記ケーシングから近距離となる前記ヘリオスタットを用いる。
本発明の第十四の態様によれば、太陽熱集熱装置の運転方法では、前記ヘリオスタットの反射光の辿る経路が上下左右の2軸である。
本発明の第十五の態様によれば、太陽熱集熱装置は、入光用の開口部を備え内部に受熱器を収容したケーシングと、前記ケーシングを上部に配置するタワーと、前記タワーの周囲に配置され太陽光を反射させる複数のヘリオスタットと、前記ヘリオスタットの反射光が開口内に集光される集光位置とケーシング外に逃げる退避位置とに切替えて配置されるようにヘリオスタットを駆動制御する駆動制御部と、前記ケーシングの耐熱強度と、前記ヘリオスタットを駆動する際に要する消費電力と、に基づき、前記切替時に前記ヘリオスタットの反射光の辿る経路が複数方向に分散されるように前記ヘリオスタットを駆動制御する制御部と、を備える。
本発明の第十六の態様によれば、前記制御部は、前記各ヘリオスタットを駆動制御する時の姿勢変化速度が一定の下、前記ケーシング上をその長手方向に沿う経路を辿る反射光については、前記ケーシングから遠距離となる前記ヘリオスタットを用い、前記ケーシング上をその短手方向に沿う経路を辿る反射光については、前記ケーシングから近距離となる前記ヘリオスタットを用いる。
本発明の第十七の態様によれば、前記太陽熱集熱装置では、前記ヘリオスタットの反射光の辿る経路が上下左右の2軸である。
本発明のヘリオスタット制御方法、ヘリオスタット制御装置および集熱設備によれば、必要な鏡を選択して使用する集熱設備において、時々刻々変化する状況に適切に対応でき、かつ、より適切な入熱量や入熱分布を得ることができる。
また、本発明に係る太陽熱集熱装置の運転方法及び太陽熱集熱装置によれば、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができるという効果を奏する。
また、本発明に係る太陽熱集熱装置の運転方法及び太陽熱集熱装置によれば、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができるという効果を奏する。
以下、図面を参照して、本発明の実施の形態について説明する。
図1は、本発明の第一実施形態における集熱設備の構成を示す概略構成図である。本実施形態の集熱設備は、図1に示すように、太陽光が照射される受熱器20と、この受熱器20が上部に固定されるタワー60と、反射鏡11で太陽光を反射して受熱器20に太陽光を照射する複数のヘリオスタット10と、直達日射量を検知する直達日射計40と、複数のヘリオスタット10を制御するヘリオスタット制御装置100と、を備えている。また、ヘリオスタット制御装置100は、上位装置150から受熱器20の受熱量に関する指令(例えば、受熱器20の受熱量の指令値、あるいは、太陽熱発電設備1の発電量の指令値)を受信する。
図1は、本発明の第一実施形態における集熱設備の構成を示す概略構成図である。本実施形態の集熱設備は、図1に示すように、太陽光が照射される受熱器20と、この受熱器20が上部に固定されるタワー60と、反射鏡11で太陽光を反射して受熱器20に太陽光を照射する複数のヘリオスタット10と、直達日射量を検知する直達日射計40と、複数のヘリオスタット10を制御するヘリオスタット制御装置100と、を備えている。また、ヘリオスタット制御装置100は、上位装置150から受熱器20の受熱量に関する指令(例えば、受熱器20の受熱量の指令値、あるいは、太陽熱発電設備1の発電量の指令値)を受信する。
さらに、本実施形態の集熱設備は、受熱器20に空気を供給する圧縮機(不図示)と、受熱器20で加熱された空気で駆動するガスタービン50と、ガスタービン50の駆動により発電する発電機(不図示)と、を備えており、太陽熱発電設備1を成している。なお、ここでは、受熱器20からの熱エネルギーを電気エネルギー発生に利用しているが、本実施形態はこれに限定されるものではなく、この熱エネルギーを蒸気発生のために利用してもよいし、化学プラント等における反応器等の加熱源等に利用してもよい。
ヘリオスタット10は、太陽光を反射する反射鏡11と、反射鏡11を支持する支持脚12と、反射鏡11を目的の方向に向ける駆動制御器13と、を有している。複数のヘリオスタット10は、ヘリオスタット領域F上に点在している。このヘリオスタット領域Fは、扇形を成し、扇の要が南側を向くように設定されている。また、この扇の要の位置には、前述のタワー60が建てられ、このタワー60の上部の北側に受熱器20が固定されている。
図2は、受熱器20を側面から見た場合の外形を、受熱器20の内部の配管との位置関係と共に示す説明図である。図3は、受熱器20を正面から見た場合の外形を、受熱器20の内部の配管との位置関係と共に示す説明図である。図4は、受熱器20を上から見た場合の外形を、内部の配管(ヘッダ)や、ケースの開口との位置関係と共に示す説明図である。
受熱器20は、図2~図4に示すように、太陽光が照射される受熱部21と、この受熱部21を覆うケーシング31と、を有している。
受熱器20は、図2~図4に示すように、太陽光が照射される受熱部21と、この受熱部21を覆うケーシング31と、を有している。
受熱部21は、円弧状の下部ヘッダ22と、この下部ヘッダ22の上方に配置されている円弧状の上部ヘッダ23と、鉛直方向に延び下部ヘッダ22と上部ヘッダ23とをつなぐ複数の受熱管24と、を有している。複数の受熱管24は、円弧状の下部ヘッダ22と上部ヘッダ23が延びている周方向に並んでいる。下部ヘッダ22には、例えば、前述した圧縮機からの圧縮空気を下部ヘッダ22に送る入口配管25が接続されている。また、上部ヘッダ23には、複数の受熱管24から上部ヘッダ23に集まった加熱空気を、例えば、前述したガスタービンに送る出口配管26が接続されている。この受熱部21は、支持具29により、ケーシング31又はタワー60に支持されている。
ケーシング31は、上方から見た形状が円弧状である下部ヘッダ22および上部ヘッダ23の形状に合わせて、扇形を成している。受熱部21の上方を覆う天板32と、受熱部21の側周を覆う側板33と、扇形のケーシング31の要側であって受熱部21の下方側を覆う傾斜板34と、扇形のケーシング31の弧側であって受熱部21の下方側を覆う底板36と、を有している。傾斜板34は、扇形のケーシング31の弧側から要側に向かうに連れて上側に向かうよう傾斜している。この傾斜板34には、ケーシング31内にヘリオスタット10からの太陽光を導くための円形の開口35が形成されている。このため、この傾斜板34に形成されている開口35の貫通方向は、斜め上方である。
このケーシング31は、側板33中で扇形のケーシング31の弧側の部分33sが南側を向き、この部分33sがタワー60の上部の北側に固定されている。よって、扇形のケーシング31の要側の部分は、北側、つまり、複数のヘリオスタット10が配置されている側を向いている。また、ケーシング31の傾斜板34に形成されている開口35の貫通方向は、北側から南側に向かうに連れて上側に向かう斜め上方になる。
なお、本実施形態では、北半球に設置される集熱設備の一例として、ケーシング31の開口35の貫通方向が北側から南側に向かうに連れて上側に向かう斜め上方である場合について説明している。このため、受熱器20を基準にして、この貫通方向の逆向きの斜め下方側となる北側に、扇形のヘリオスタット領域Fを設定し、このヘリオスタット領域F内に複数のヘリオスタット10を配置している。
ただし、本実施形態は、ヘリオスタットを用いる様々な集熱設備に適用可能である。例えば、南半球に設置される集熱設備にも本実施形態を適用可能である。この場合、ケーシング31の開口35の貫通方向が南側から北側に向かうに連れて上側に向かう斜め上方であってもよく、受熱器20を基準にして、この貫通方向の逆向きの斜め下方側となる南側に、扇形のヘリオスタット領域Fを設定し、このヘリオスタット領域F内に複数のヘリオスタット10を配置してもよい。
あるいは、北半球、南半球のいずれにおいても、ケーシングの開口が鉛直上方である場合には、受熱器を中心とするリング形のヘリオスタット領域内に複数のヘリオスタット10を配置してもよい。
ただし、本実施形態は、ヘリオスタットを用いる様々な集熱設備に適用可能である。例えば、南半球に設置される集熱設備にも本実施形態を適用可能である。この場合、ケーシング31の開口35の貫通方向が南側から北側に向かうに連れて上側に向かう斜め上方であってもよく、受熱器20を基準にして、この貫通方向の逆向きの斜め下方側となる南側に、扇形のヘリオスタット領域Fを設定し、このヘリオスタット領域F内に複数のヘリオスタット10を配置してもよい。
あるいは、北半球、南半球のいずれにおいても、ケーシングの開口が鉛直上方である場合には、受熱器を中心とするリング形のヘリオスタット領域内に複数のヘリオスタット10を配置してもよい。
図5は、ヘリオスタット制御装置100の機能構成を示す概略ブロック図である。
図5に示すように、ヘリオスタット制御装置100は、気象情報取得部111と、状態情報取得部112と、上位装置通信部113と、状態判定部121と、周期決定部122と、ヘリオスタット制御部130と、選択パターン取得部131と、制御信号生成部132と、制御信号送信部133とを具備する。
図5に示すように、ヘリオスタット制御装置100は、気象情報取得部111と、状態情報取得部112と、上位装置通信部113と、状態判定部121と、周期決定部122と、ヘリオスタット制御部130と、選択パターン取得部131と、制御信号生成部132と、制御信号送信部133とを具備する。
ヘリオスタット制御装置100は、各ヘリオスタット10のON/OFF制御を行う。
より具体的には、ヘリオスタット制御装置100は、直達日射計40が検知する直達日射量など各種情報に基づいて、各ヘリオスタット10のON/OFFを決定する。そして、ヘリオスタット制御装置100は、ONに決定したヘリオスタット10に対して、受熱器20に太陽光を集光させる(すなわち、太陽光を受熱器20の開口35内に反射させる)位置(反射鏡11の傾き)である集光位置となるよう制御する制御信号を送信する。また、ヘリオスタット制御装置100は、OFFに決定したヘリオスタット10に対して、受熱器20に太陽光を集光させない(すなわち、太陽光反射が受熱器20に当たらない)位置である退避位置となるよう制御する制御信号を送信する。
より具体的には、ヘリオスタット制御装置100は、直達日射計40が検知する直達日射量など各種情報に基づいて、各ヘリオスタット10のON/OFFを決定する。そして、ヘリオスタット制御装置100は、ONに決定したヘリオスタット10に対して、受熱器20に太陽光を集光させる(すなわち、太陽光を受熱器20の開口35内に反射させる)位置(反射鏡11の傾き)である集光位置となるよう制御する制御信号を送信する。また、ヘリオスタット制御装置100は、OFFに決定したヘリオスタット10に対して、受熱器20に太陽光を集光させない(すなわち、太陽光反射が受熱器20に当たらない)位置である退避位置となるよう制御する制御信号を送信する。
気象情報取得部111は、直達日射計40が検知した直達日射量を示す情報(以下、「直達日射量情報」と称する)を、気象情報として取得する。なお気象情報取得部111が取得する気象情報は、直達日射量情報に限らない。例えば、気象情報取得部111が、直達日射量情報に加えて、受熱器20の周囲における大気温度を示す情報を気象情報として取得するようにしてもよい。この場合、ヘリオスタット制御部130は、直達日射量や大気温度等に基づいて、受熱管24内の気体の温度や圧力の変化を予測し、予測結果に基づいてヘリオスタット10の制御を行うことが出来る。
気象情報取得部111は、取得した気象情報を、状態判定部121と、周期決定部122と、ヘリオスタット制御部130とに出力する。
気象情報取得部111は、取得した気象情報を、状態判定部121と、周期決定部122と、ヘリオスタット制御部130とに出力する。
状態情報取得部112は、受熱器20の状態情報として、例えば、受熱管24の表面温度を示す情報(以下、受熱管24の「表面温度情報」と称する)や、受熱管24内の空気の圧力を示す情報(以下、受熱管24内の「空気圧情報」と称する)を、受熱管24に設置されたセンサから取得する。
状態情報取得部112は、取得した受熱器20の状態情報を、状態判定部121と、周期決定部122と、ヘリオスタット制御部130とに出力する。
状態情報取得部112は、取得した受熱器20の状態情報を、状態判定部121と、周期決定部122と、ヘリオスタット制御部130とに出力する。
上位装置通信部113は、上位装置150と通信を行う。特に、上位装置通信部113は、受熱器20が供給すべき熱量を示す情報を、上位装置150から取得する。なお、上位装置通信部113が取得する受熱器20が供給すべき熱量を示す情報は、受熱器20が供給すべき熱量を直接的に示す情報であってもよいし、あるいは、間接的に示す情報であってもよい。例えば、上位装置通信部113が、太陽熱発電設備1の発電量(供給電力)目標値を上位装置150から取得し、ヘリオスタット制御部130が、予め記憶する所定の変換方法に従って、発電量目標値から、受熱器20の供給すべき熱量を求めるようにしてもよい。
上位装置通信部113は、取得した受熱器20の供給すべき熱量を示す情報を、状態判定部121と、周期決定部122と、ヘリオスタット制御部130とに出力する。
上位装置通信部113は、取得した受熱器20の供給すべき熱量を示す情報を、状態判定部121と、周期決定部122と、ヘリオスタット制御部130とに出力する。
状態判定部121は、受熱器20の受熱量に関連する情報として、気象情報、受熱器20の状態情報、または、受熱器20が供給すべき熱量を示す情報の少なくともいずれか1つに基づいて、太陽熱発電設備1の集熱状態が通常状態にあるか要処理状態にあるかを判定する。そして、状態判定部121は、得られた判定結果を、周期決定部122とヘリオスタット制御部130とに出力する。
なお、ここでいう要処理状態は、ヘリオスタット10の状態を、比較的(通常状態の場合よりも)急激に変化させる必要がある状態である。
例えば、金属管である受熱管24の表面温度が高くなると、強度的な問題が生じる可能性や、金属表面が酸化する可能性がある。そこで、状態判定部121は、状態情報取得部112が取得する受熱管24の表面温度情報に基づいて、受熱管24の表面温度が所定の閾値温度以上となったことを検出すると、太陽熱発電設備1の集熱状態が要処理状態にあると判定する。ここで、状態判定部121は、受熱管24に強度的な問題が生じる可能性、または、受熱管24の金属表面が酸化する可能性のある温度から余裕分だけ低くした温度を、所定の閾値温度として予め記憶しておく。
例えば、金属管である受熱管24の表面温度が高くなると、強度的な問題が生じる可能性や、金属表面が酸化する可能性がある。そこで、状態判定部121は、状態情報取得部112が取得する受熱管24の表面温度情報に基づいて、受熱管24の表面温度が所定の閾値温度以上となったことを検出すると、太陽熱発電設備1の集熱状態が要処理状態にあると判定する。ここで、状態判定部121は、受熱管24に強度的な問題が生じる可能性、または、受熱管24の金属表面が酸化する可能性のある温度から余裕分だけ低くした温度を、所定の閾値温度として予め記憶しておく。
また、例えば、受熱管24内の空気の圧力が高くなると、強度的な問題が生じる可能性がある。そこで、状態判定部121は、状態情報取得部112が取得する受熱管24内の空気圧情報に基づいて、受熱管24内の空気の圧力が所定の閾値圧力以上となったことを検出すると、太陽熱発電設備1の集熱状態が要処理状態にあると判定する。ここで、状態判定部121は、受熱管24に強度的な問題が生じる可能性のある圧力から余裕分だけ小さくした圧力を、所定の閾値圧力として予め記憶しておく。
また、例えば、天候の急激な変化によりヘリオスタット10に対する直達日射量が急激に減少した場合、受熱器20の供給熱量を維持するためには、ヘリオスタット10のON/OFFパターン(ON/OFFの組み合わせ)を速やかに変化させる(ON状態のヘリオスタット10の数を増加させる)必要があることが考えられる。そこで、状態判定部121は、気象情報取得部111が取得する直達日射量情報に基づいて、直達日射量の減少量が、予め記憶する所定の閾値変化量以上となったことを検出すると、太陽熱発電設備1の集熱状態が要処理状態にあると判定する。
また、例えば、太陽熱発電設備1の発電量目標値が急激に増加し、受熱器20の供給すべき熱量が急激に増加した場合、当該熱量に速やかに到達するために、ヘリオスタット10のON/OFFパターンを速やかに変化させる(ON状態のヘリオスタット10の数を増加させる)ことが望ましい場合が考えられる。そこで、状態判定部121は、上位装置通信部113が取得する受熱器20の供給すべき熱量を示す情報に基づいて、受熱器20が供給すべき熱量の増加量が、予め記憶する所定の閾値変化量以上となったことを検出すると、太陽熱発電設備1の集熱状態が要処理状態にあると判定する。
なお、ここでいう通常状態は、要処理状態でない状態である。
また、ここでいう受熱器20の受熱量に関連する情報は、受熱器20の受熱量または受熱器20が目標とする受熱量に影響する可能性のある情報である。例えば、直達日射量情報などの気象情報や、受熱管24の表面温度情報など受熱器20の状態情報や、受熱器20に設定される集熱量目標値などが、受熱器20の受熱量に関連する情報に該当する。
また、ここでいう受熱器20の受熱量に関連する情報は、受熱器20の受熱量または受熱器20が目標とする受熱量に影響する可能性のある情報である。例えば、直達日射量情報などの気象情報や、受熱管24の表面温度情報など受熱器20の状態情報や、受熱器20に設定される集熱量目標値などが、受熱器20の受熱量に関連する情報に該当する。
周期決定部122は、受熱器20の受熱量に関連する情報に基づいて、ヘリオスタット制御部130が処理を行う実行周期(以下では単に、ヘリオスタット制御部130の実行周期と表記する)を決定する。具体的には、周期決定部122は、状態判定部121が、受熱器20の受熱量に関連する情報に基づいて、太陽熱発電設備1の集熱状態(集熱に関する太陽熱発電設備1の状態)を要処理状態と判定すると、ヘリオスタット制御部130の実行周期を通常状態における周期よりも短くする。
周期決定部122は、決定した実行周期を示す情報を、ヘリオスタット制御部130に出力する。
周期決定部122は、決定した実行周期を示す情報を、ヘリオスタット制御部130に出力する。
ヘリオスタット制御部130は、少なくとも気象情報に基づいて、ヘリオスタット10のON/OFFの組み合わせである選択パターンを求め、得られた選択パターンに従って各ヘリオスタット10のON/OFF制御を行う処理を、周期的に繰り返し実行する。
選択パターン取得部131は、少なくとも気象情報に基づいて、選択パターン(選択パターン取得部131が選択した、ヘリオスタット10のON/OFFの組み合わせ)を求める。具体的には、選択パターン取得部131は、気象情報取得部111が取得する気象情報や、状態情報取得部112が取得する受熱器20の状態情報や、上位装置通信部113が取得する受熱器20の供給すべき熱量を示す情報に基づいて、各ヘリオスタット10のON/OFFの組み合わせの幾つかについてシミュレーションを行う。そして、選択パターン取得部131は、各シミュレーション結果を、受熱器20の供給すべき熱量への適合度や、受熱管24の表面温度や、受熱管24内の空気の圧力など幾つかの評価基準に基づいて評価し、最も高い評価結果を得られた組み合わせを、選択パターンとする。そして、選択パターン取得部131は、得られた選択パターンを制御信号生成部132に出力する。
制御信号生成部132は、選択パターン取得部131が取得した選択パターンに従って、各ヘリオスタット10に対する制御信号を生成して、制御信号送信部133に出力する。
制御信号送信部133は、制御信号生成部132が生成した制御信号を各ヘリオスタット10に送信する。
これにより、ヘリオスタット制御部130(制御信号生成部132および制御信号送信部133)は、選択パターン取得部131が取得した選択パターンに従って各ヘリオスタット10のON/OFF制御を行う。
制御信号送信部133は、制御信号生成部132が生成した制御信号を各ヘリオスタット10に送信する。
これにより、ヘリオスタット制御部130(制御信号生成部132および制御信号送信部133)は、選択パターン取得部131が取得した選択パターンに従って各ヘリオスタット10のON/OFF制御を行う。
ここで、ヘリオスタット制御装置100は、例えばコンピュータを有して構成される。
より具体的には、気象情報取得部111と、状態情報取得部112と、上位装置通信部113と、制御信号送信部133とは、当該コンピュータの具備する通信部によって実現される。また、周期決定部122と、状態判定部121と、選択パターン取得部131と、制御信号生成部132とは、当該コンピュータの具備する中央処理装置(Central Processing Unit;CPU)が、当該コンピュータの具備するメモリからプログラムを読み出して実行することにより実現される。
より具体的には、気象情報取得部111と、状態情報取得部112と、上位装置通信部113と、制御信号送信部133とは、当該コンピュータの具備する通信部によって実現される。また、周期決定部122と、状態判定部121と、選択パターン取得部131と、制御信号生成部132とは、当該コンピュータの具備する中央処理装置(Central Processing Unit;CPU)が、当該コンピュータの具備するメモリからプログラムを読み出して実行することにより実現される。
上位装置150は、例えば太陽熱発電設備1全体に対する制御装置であり、受熱器20が供給すべき熱量を示す情報を、ヘリオスタット制御装置100に送信する。
なお、周期決定部122と、選択パターン取得部131とは、本実施形態における形態決定部の一例である。すなわち、上記のように、周期決定部122は、状態判定部121の判定結果に基づいて、ヘリオスタット制御部130の実行周期を決定する。また、後述するように、選択パターン取得部131は、状態判定部121の判定結果に基づいて、実行中のヘリオスタット選択計算におけるデータを破棄してヘリオスタット選択計算を終了するか否かを決定する。また、後述するように、選択パターン取得部131は、状態判定部121の判定結果に基づいて、ヘリオスタット選択計算を簡略化するか否かを決定する。
なお、周期決定部122が決定する、ヘリオスタット制御部130の実行周期と、選択パターン取得部131が決定する、実行中のヘリオスタット選択計算におけるデータを破棄してヘリオスタット選択計算を終了するか否かと、同じく選択パターン取得部131が決定する、ヘリオスタット選択計算を簡略化するか否かとは、本実施形態におけるヘリオスタット制御部の実行形態(ヘリオスタット制御部が処理を行う実行形態)の一例である。
次に、図6~図10を参照して、周期決定部122が決定する実行周期について説明する。まず、図6および図7を参照して、実行周期と、受熱器20の集熱の安定性との関係について説明する。
図6は、実行周期が比較的長い場合の、実行周期と太陽熱発電設備1の動作タイミングとの関係の説明図である。図6に示す例では、周期決定部122は、実行周期を比較的長い時間p111に決定しており、選択パターン取得部131は、当該時間p111毎に、ヘリオスタット10の選択パターンを求める処理(以下、「ヘリオスタット選択計算」と称する)を行っている。
そして、選択パターン取得部131は、ヘリオスタット選択計算開始から時間p112後にヘリオスタット選択計算を終了して選択パターンを取得する。
図6は、実行周期が比較的長い場合の、実行周期と太陽熱発電設備1の動作タイミングとの関係の説明図である。図6に示す例では、周期決定部122は、実行周期を比較的長い時間p111に決定しており、選択パターン取得部131は、当該時間p111毎に、ヘリオスタット10の選択パターンを求める処理(以下、「ヘリオスタット選択計算」と称する)を行っている。
そして、選択パターン取得部131は、ヘリオスタット選択計算開始から時間p112後にヘリオスタット選択計算を終了して選択パターンを取得する。
選択パターン取得部131が選択パターンを取得すると、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、各ヘリオスタット10において、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p113後に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。
なお、駆動制御器13が反射鏡11の角度を変化させるのに要する時間は、ヘリオスタット10と受熱器20との距離等によってヘリオスタット10毎に異なり得るが、説明を簡単にするために、一定時間p113後に動作を完了するものとしている。駆動制御器13が反射鏡11の角度を変化させるのに要する時間がヘリオスタット10毎に異なる場合にも、本実施形態を適用可能である。
なお、駆動制御器13が反射鏡11の角度を変化させるのに要する時間は、ヘリオスタット10と受熱器20との距離等によってヘリオスタット10毎に異なり得るが、説明を簡単にするために、一定時間p113後に動作を完了するものとしている。駆動制御器13が反射鏡11の角度を変化させるのに要する時間がヘリオスタット10毎に異なる場合にも、本実施形態を適用可能である。
各ヘリオスタット10は、動作を終了してから、次に制御信号送信部133から送信される制御信号に従って再び動作を開始するまでの時間p114の間、静止状態にある。この間、各ヘリオスタット10は、受熱器20に対して安定的に太陽光を照射する。すなわち、時間p114の間、受熱器20は安定的に集熱を行う。
図7は、実行周期が比較的短い場合の、実行周期と太陽熱発電設備1の動作タイミングとの関係の説明図である。図7に示す例では、周期決定部122は、実行周期を比較的短い時間p121に決定しており、選択パターン取得部131は、当該時間p121毎に、ヘリオスタット選択計算を行っている。そして、選択パターン取得部131は、図6の場合と同様、時間p112後にヘリオスタット選択計算を終了して選択パターンを取得する。
その後、図6の場合と同様、各ヘリオスタット10の駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始する。
ただし、図7では、図6の場合よりも実行周期が短いため、各ヘリオスタット10は、図6の場合よりも短い周期で制御信号を受信する。このため、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射する時間は、図6の場合の時間p114よりも短くなる。特に、図7の場合のように、各ヘリオスタット10が動作を完了する前に次の動作を開始すると、ヘリオスタット10が静止して受熱器20に対して安定的に太陽光を照射する時間は無くなってしまう。すなわち、受熱器20が安定的に集熱を行える時間がなくなってしまう。
以上、図6および図7を参照して説明したように、受熱器20が安定して集熱を行う観点からは、実行周期が長いことが好ましい。
ただし、図7では、図6の場合よりも実行周期が短いため、各ヘリオスタット10は、図6の場合よりも短い周期で制御信号を受信する。このため、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射する時間は、図6の場合の時間p114よりも短くなる。特に、図7の場合のように、各ヘリオスタット10が動作を完了する前に次の動作を開始すると、ヘリオスタット10が静止して受熱器20に対して安定的に太陽光を照射する時間は無くなってしまう。すなわち、受熱器20が安定的に集熱を行える時間がなくなってしまう。
以上、図6および図7を参照して説明したように、受熱器20が安定して集熱を行う観点からは、実行周期が長いことが好ましい。
一方、要処理状態に適切に対応するためには、実行周期が短いほうが好ましい。この点について、図8を参照して説明する。
図8は、太陽熱発電設備1の集熱状態が要処理状態となる場合の、実行周期と太陽熱発電設備1の動作タイミングとの関係の説明図である。図8において、図6の場合と同様、周期決定部122は、実行周期を時間p111に決定しており、選択パターン取得部131は、当該時間p111毎にヘリオスタット選択計算を行っている。
図8は、太陽熱発電設備1の集熱状態が要処理状態となる場合の、実行周期と太陽熱発電設備1の動作タイミングとの関係の説明図である。図8において、図6の場合と同様、周期決定部122は、実行周期を時間p111に決定しており、選択パターン取得部131は、当該時間p111毎にヘリオスタット選択計算を行っている。
ここで、太陽熱発電設備1の集熱状態が要処理状態となる事象(以下、単に「事象」と称する)が発生した場合、図8のように実行周期が長い(図8では時間p111)と、事象が発生してから当該事象に応じたヘリオスタット選択計算を行うまでの時間も長くなり、従って、事象に対応して各ヘリオスタット10を動作させるまでの時間が長くなってしまう。例えば、選択パターン取得部131がヘリオスタット選択計算を開始した直後に事象が発生すると、事象発生から当該事象に応じたヘリオスタット選択計算を開始するまでの時間p131は、実行周期p111とほぼ等しくなる。
従って、要処理状態に適切に対応するため(すなわち、事象に対応して速やかに各ヘリオスタット10を動作させるため)には、実行周期が短いほうが好ましい。
従って、要処理状態に適切に対応するため(すなわち、事象に対応して速やかに各ヘリオスタット10を動作させるため)には、実行周期が短いほうが好ましい。
なお、太陽熱発電設備1の集熱状態が要処理状態となる事象の例としては、上述のように、受熱管24(図2)の表面温度が閾値温度以上となることや、受熱管24内の空気圧が閾値圧力以上となることや、受熱器20の受熱量が急激に変化(特に減少)することや、太陽熱発電設備1の発電量目標値が急激に変化(特に増加)することなどが挙げられる。
以上説明したように、受熱器20が安定して集熱を行う観点からは、実行周期が長いことが好ましいのに対し、要処理状態に適切に対応するためには、実行周期が短いほうが好ましい。
そこで、周期決定部122は、通常状態において実行周期を比較的長い時間に設定し、要処理状態において実行周期を比較的短い時間に設定する。
そこで、周期決定部122は、通常状態において実行周期を比較的長い時間に設定し、要処理状態において実行周期を比較的短い時間に設定する。
図9は、太陽熱発電設備1の動作タイミングの例を示す説明図である。通常状態において、周期決定部122は、実行周期を比較的長い時間p111に決定しており、選択パターン取得部131は、当該時間p111毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131が、ヘリオスタット選択計算によって選択パターンを取得すると、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、各ヘリオスタット10において、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p113後に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。そして、各ヘリオスタット10は、動作を終了してから、次に制御信号送信部133から送信される制御信号に従って再び動作を開始するまでの時間p114の間、静止状態にある。
このように、通常状態においては、周期決定部122が実行周期を比較的長い時間に決定することで、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射する時間、すなわち、受熱器20が安定的に集熱を行う時間を長くすることができる。
このように、通常状態においては、周期決定部122が実行周期を比較的長い時間に決定することで、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射する時間、すなわち、受熱器20が安定的に集熱を行う時間を長くすることができる。
一方、事象が発生して要処理状態になると、周期決定部122は、実行周期を比較的短い時間p121に決定しており、選択パターン取得部131は、当該時間p121後に次のヘリオスタット選択計算を行っている。これにより、選択パターン取得部131は、事象発生から比較的短い(特に、図8の時間p131よりも短い)時間p141後に、事象に応じたヘリオスタット選択計算を開始している。
このように、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定することで、事象に対応して速やかに各ヘリオスタット10を動作させて要処理状態に適切に対応し得る。
このように、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定することで、事象に対応して速やかに各ヘリオスタット10を動作させて要処理状態に適切に対応し得る。
この太陽熱発電設備1の動作タイミングについて、図10を参照してさらに説明する。
図10は、図9の例における太陽熱発電設備1の動作タイミングの例を示すタイミングチャートである。
通常状態において、周期決定部122は、実行周期を比較的長い時間p111に決定しており、選択パターン取得部131は、当該時間p111毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131は、まず、時刻t111において、ヘリオスタット選択計算を開始している。
図10は、図9の例における太陽熱発電設備1の動作タイミングの例を示すタイミングチャートである。
通常状態において、周期決定部122は、実行周期を比較的長い時間p111に決定しており、選択パターン取得部131は、当該時間p111毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131は、まず、時刻t111において、ヘリオスタット選択計算を開始している。
ヘリオスタット選択計算開始から時間p112が経過すると、選択パターン取得部131は、ヘリオスタット選択計算を終了して選択パターンを取得する。そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、時刻t112に、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p113後の時刻t113に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。
その後、次の制御信号に基づいて駆動制御器13が再び動作する時刻t122までの時間p114において、各ヘリオスタット10は静止状態にある。このように、通常状態においては、周期決定部122が実行周期を比較的長い時間に決定することで、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射し、受熱器20は安定的に集熱を行う。
その後、次の制御信号に基づいて駆動制御器13が再び動作する時刻t122までの時間p114において、各ヘリオスタット10は静止状態にある。このように、通常状態においては、周期決定部122が実行周期を比較的長い時間に決定することで、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射し、受熱器20は安定的に集熱を行う。
また、時刻t19において事象が発生すると、周期決定部122は、実行周期を比較的短い時間p121に決定しており、選択パターン取得部131は、前回ヘリオスタット選択計算を開始した時刻t121から時間p121後の時刻t131に、事象に応じたヘリオスタット選択計算を開始している。
ヘリオスタット選択計算開始から時間p112が経過すると、選択パターン取得部131は、ヘリオスタット選択計算を終了して選択パターンを取得する。そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。
ヘリオスタット選択計算開始から時間p112が経過すると、選択パターン取得部131は、ヘリオスタット選択計算を終了して選択パターンを取得する。そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。
そして、前回の制御信号に従って動作中の時刻t132において、駆動制御器13が、今回の制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p113後の時刻t133に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。このように、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定することで、事象に対応して速やかに各ヘリオスタット10を動作させて要処理状態に適切に対応し得る。
その後、受熱器20の集熱状態は再び通常状態となっており(すなわち、時刻t132でヘリオスタット選択計算を開始した後、新たな事象は発生しておらず)、時刻t133から時間p114の間、各ヘリオスタット10は静止状態にあり、受熱器20に対して安定的に太陽光を照射する。これにより、受熱器20は安定的に集熱を行う。
次に、図11を参照してヘリオスタット制御装置100の動作について説明する。
図11は、ヘリオスタット制御装置100が選択パターンを取得する処理手順を示すフローチャートである。ヘリオスタット制御装置100は、電源を接続(ON)されて動作状態となると、図11の処理を開始する。
図11の処理において、まず、気象情報取得部111は、直達日射計40が検出した直達日射量情報を取得し、状態情報取得部112は、受熱器20の状態情報を取得し、また、上位装置通信部113は、受熱器20が供給すべき熱量を示す情報を取得する(ステップS101)。
図11は、ヘリオスタット制御装置100が選択パターンを取得する処理手順を示すフローチャートである。ヘリオスタット制御装置100は、電源を接続(ON)されて動作状態となると、図11の処理を開始する。
図11の処理において、まず、気象情報取得部111は、直達日射計40が検出した直達日射量情報を取得し、状態情報取得部112は、受熱器20の状態情報を取得し、また、上位装置通信部113は、受熱器20が供給すべき熱量を示す情報を取得する(ステップS101)。
次に、状態判定部121は、ステップS101において気象情報取得部111、状態情報取得部112および上位装置通信部113が取得した各情報に基づいて、受熱器20の集熱状態を判定する(ステップS102)。例えば、状態判定部121は、受熱管24(図2)の表面温度が閾値温度以上となったこと、受熱管24内の空気圧が閾値圧力以上となったこと、直達日射量の減少量が閾値変化量以上となったこと、あるいは、受熱器20が供給すべき熱量の増加量が、閾値変化量以上となったことのいずれか1つ以上を検出すると、受熱器20の集熱状態を要処理状態と判定する。一方、上記のいずれも検出しない場合、状態判定部121は、受熱器20の集熱状態を通常状態と判定する。
状態判定部121が、受熱器20の集熱状態を通常状態と判定した場合(ステップS102:YES)、周期決定部122は、状態判定部121の判定結果に基づいて、実行周期を比較的長い時間(例えば、図9の時間p111)に決定し、決定した実行周期をヘリオスタット制御部130に出力する(ステップS111)。
そして、選択パターン取得部131は、周期決定部122が決定した実行周期に基づいて、ヘリオスタット選択計算の開始時刻が到来したか否か(すなわち、前回ヘリオスタット選択計算を開始してから実行周期が経過したか否か)を判定する(ステップS131)。
ヘリオスタット選択計算の開始時刻が到来したと判定した場合(ステップS131:YES)、選択パターン取得部131は、ヘリオスタット選択計算を行って選択パターンを取得し、得られた選択パターンを制御信号生成部132に出力する(ステップS141)。例えば、選択パターン取得部131は、ヘリオスタット10の様々なON/OFFパターンのうち100通りのパターンについてシミュレーションを行い、最も評価の高いON/OFFパターンを選択パターンとして選択して制御信号生成部132に出力する。
ヘリオスタット選択計算の開始時刻が到来したと判定した場合(ステップS131:YES)、選択パターン取得部131は、ヘリオスタット選択計算を行って選択パターンを取得し、得られた選択パターンを制御信号生成部132に出力する(ステップS141)。例えば、選択パターン取得部131は、ヘリオスタット10の様々なON/OFFパターンのうち100通りのパターンについてシミュレーションを行い、最も評価の高いON/OFFパターンを選択パターンとして選択して制御信号生成部132に出力する。
次に、制御信号生成部132は、選択パターン取得部131の取得した選択パターンに基づいて、各ヘリオスタット10に対する制御信号を生成して制御信号送信部133に出力する(ステップS142)。そして、制御信号送信部133は、制御信号生成部132から出力された制御信号を各ヘリオスタット10に送信する(ステップS143)。各ヘリオスタット10は、制御信号生成部132から出力された制御信号に従って動作する(反射鏡11の角度を変化させる)。その後、ステップS101に戻る。
一方、ステップS102において、状態判定部121が、受熱器20の集熱状態を通常状態でない(すなわち、要処理状態である)と判定した場合(ステップS102:NO)、周期決定部122は、状態判定部121の判定結果に基づいて、実行周期を比較的短い時間(例えば、図9の時間p121)に決定し、決定した実行周期をヘリオスタット制御部130に出力する(ステップS121)。その後、ステップS131に進む。
また、ステップS131において、ヘリオスタット選択計算の開始時刻が到来していないと選択パターン取得部131が判定した場合(ステップS131:NO)、ステップS101に戻る。
また、ステップS131において、ヘリオスタット選択計算の開始時刻が到来していないと選択パターン取得部131が判定した場合(ステップS131:NO)、ステップS101に戻る。
以上のように、周期決定部122が、状況に応じて実行周期を変化させることで、ヘリオスタット制御部130は、状況に応じた周期で各ヘリオスタット10のON/OFF制御を行うことができる。これにより、太陽熱発電設備1は、時々刻々変化する状況に適切に対応でき、かつ、より適切な入熱量や入熱分布を得ることができる。
より具体的には、通常状態においては、周期決定部122が実行周期を比較的長い周期に決定することで、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射する時間、すなわち、受熱器20が安定的に集熱を行う時間を長くすることができる。一方、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定することで、事象に対応して速やかに各ヘリオスタット10を動作させて要処理状態に適切に対応し得る。
すなわち、事象が発生すると周期決定部122が実行周期を比較的短い時間に決定するので、時々刻々変化する状況に適切に対応できる。
かつ、通常状態においては、周期決定部122が実行周期を比較的長い時間に決定し、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射することで、より適切な入熱量や入熱分布を得ることができる。また、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定し、各ヘリオスタット10が、反射鏡11の角度を事象に応じた角度に速やかに変化させることで、より適切な入熱量や入熱分布を得ることができる。
より具体的には、通常状態においては、周期決定部122が実行周期を比較的長い周期に決定することで、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射する時間、すなわち、受熱器20が安定的に集熱を行う時間を長くすることができる。一方、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定することで、事象に対応して速やかに各ヘリオスタット10を動作させて要処理状態に適切に対応し得る。
すなわち、事象が発生すると周期決定部122が実行周期を比較的短い時間に決定するので、時々刻々変化する状況に適切に対応できる。
かつ、通常状態においては、周期決定部122が実行周期を比較的長い時間に決定し、各ヘリオスタット10が受熱器20に対して安定的に太陽光を照射することで、より適切な入熱量や入熱分布を得ることができる。また、要処理状態においては、周期決定部122が実行周期を比較的短い時間に決定し、各ヘリオスタット10が、反射鏡11の角度を事象に応じた角度に速やかに変化させることで、より適切な入熱量や入熱分布を得ることができる。
なお、周期決定部122が、状態判定部121の判定結果以外の情報に基づいて実行周期を決定するようにしてもよい。例えば、周期決定部122が、時間帯に基づいて、太陽光照射量の変化が比較的大きい朝夕の時間帯には実行周期を比較的短く設定し、太陽光照射量が比較的安定している昼の時間帯には実行周期を比較的長く設定するようにしてもよい。これにより、ヘリオスタット制御部130は、太陽光照射量の変化に応じて適切にヘリオスタットの制御を行い得る。
なお、状態判定部121が太陽熱発電設備1の集熱状態を要処理状態と判定した場合、ヘリオスタット制御部130が選択パターンを求める処理(すなわち、ヘリオスタット選択計算)を実行中のときは、ヘリオスタット制御部130が当該処理におけるデータを破棄して、選択パターンを求める処理を実行し直すようにしてもよい。この点について、図12~図14を参照して説明する。
図12は、要処理状態においてヘリオスタット制御部130がヘリオスタット選択計算を実行し直す場合の、太陽熱発電設備1の動作タイミングの例を示す説明図である。通常状態において、図9の場合と同様、周期決定部122は、実行周期を時間p111に決定しており、選択パターン取得部131は、当該時間p111毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131が選択パターンを取得すると、制御信号生成部132が当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、各ヘリオスタット10は、制御信号に従って反射鏡11の角度を変化させる。
一方、事象が発生し、状態判定部121が受熱器20の集熱状態を要処理状態と判定すると、選択パターン取得部131は、実行中のヘリオスタット選択計算におけるデータを破棄し、事象に応じたヘリオスタット選択計算を実行し直す。
ここで、選択パターン取得部131が事象発生前に開始したヘリオスタット選択計算は、事象に対して適切で無いことが考えられる。例えば、受熱管24の表面温度が閾値温度以上となったことを状態判定部121が検出して要処理状態と判定した場合、判定結果を得られた時点において、選択パターン取得部131は、受熱管24の表面温度が閾値温度未満であるという条件の下でシミュレーションを行い、ヘリオスタット10のON/OFFパターンの何通りかについて、受熱管24の表面温度に別段配慮しない評価基準に基づく評価値を得ていることが考えられる。選択パターン取得部131が、かかる評価値に基づいて最も評価の高いON/OFFパターンを選択パターンとして選択すると、受熱管24の表面温度をさらに上昇させるON/OFFパターンを選択してしまう可能性が高い。
そこで、選択パターン取得部131は、既に得ているシミュレーション評価結果を破棄して、受熱管24の表面温度を低下させる評価基準の下で新たにシミュレーションおよび評価を行う。これにより、選択パターン取得部131は、事象に応じた適切なON/OFFパターンを選択パターンとして選択し得る。
ここで、選択パターン取得部131が事象発生前に開始したヘリオスタット選択計算は、事象に対して適切で無いことが考えられる。例えば、受熱管24の表面温度が閾値温度以上となったことを状態判定部121が検出して要処理状態と判定した場合、判定結果を得られた時点において、選択パターン取得部131は、受熱管24の表面温度が閾値温度未満であるという条件の下でシミュレーションを行い、ヘリオスタット10のON/OFFパターンの何通りかについて、受熱管24の表面温度に別段配慮しない評価基準に基づく評価値を得ていることが考えられる。選択パターン取得部131が、かかる評価値に基づいて最も評価の高いON/OFFパターンを選択パターンとして選択すると、受熱管24の表面温度をさらに上昇させるON/OFFパターンを選択してしまう可能性が高い。
そこで、選択パターン取得部131は、既に得ているシミュレーション評価結果を破棄して、受熱管24の表面温度を低下させる評価基準の下で新たにシミュレーションおよび評価を行う。これにより、選択パターン取得部131は、事象に応じた適切なON/OFFパターンを選択パターンとして選択し得る。
選択パターン取得部131が事象に応じた選択パターンを取得すると、制御信号生成部132が、当該選択パターンに従ってヘリオスタット10毎の制御信号を生成し、制御信号送信部133が当該制御信号を各ヘリオスタット10に送信する。そして、各ヘリオスタット10は、制御信号に従って動作する(反射鏡11の角度を調整する)。
この太陽熱発電設備1の動作タイミングについて、図13を参照してさらに説明する。
図13は、図12の例における太陽熱発電設備1の動作タイミングの例を示すタイミングチャートである。
通常状態において、図10の場合と同様、選択パターン取得部131は、比較的長い時間(実行周期)p111毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131は、まず、時刻t211において、ヘリオスタット選択計算を開始し、時間p112が経過するとヘリオスタット選択計算を終了して選択パターンを取得する。
そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、時刻t212に、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p113後の時刻t213に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。
図13は、図12の例における太陽熱発電設備1の動作タイミングの例を示すタイミングチャートである。
通常状態において、図10の場合と同様、選択パターン取得部131は、比較的長い時間(実行周期)p111毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131は、まず、時刻t211において、ヘリオスタット選択計算を開始し、時間p112が経過するとヘリオスタット選択計算を終了して選択パターンを取得する。
そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、時刻t212に、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p113後の時刻t213に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。
一方、時刻t29において事象が発生すると、選択パターン取得部131は、図10の場合と異なり、時刻t221で開始したヘリオスタット選択計算のデータを破棄して、事象に応じたヘリオスタット選択計算を行う。そして、選択パターン取得部131は、時間p112の後にヘリオスタット選択計算を完了して選択パターンを取得し、制御信号生成部132は、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成する。そして、制御信号送信部133は、当該制御信号を各ヘリオスタット10に送信する。各ヘリオスタット10は、当該制御信号に従って、時刻t232に動作を開始し、時間p113経過した時刻t233に動作を完了する。
その後、次の制御信号に基づいて駆動制御器13が再び動作するまでの時間p114において、各ヘリオスタット10は静止状態にある。この状態において各ヘリオスタット10は受熱器20に対して安定的に太陽光を照射し、受熱器20は安定的に集熱を行う。
その後、次の制御信号に基づいて駆動制御器13が再び動作するまでの時間p114において、各ヘリオスタット10は静止状態にある。この状態において各ヘリオスタット10は受熱器20に対して安定的に太陽光を照射し、受熱器20は安定的に集熱を行う。
次に、図14を参照してヘリオスタット制御装置100の動作について説明する。
図14は、要処理状態においてヘリオスタット制御部130が選択パターンを求める処理を実行し直すようにした場合の、ヘリオスタット制御装置100が選択パターンを取得する処理手順を示すフローチャートである。図11の場合と同様、ヘリオスタット制御装置100は、電源を接続されて動作状態となると、図14の処理を開始する。
図14は、要処理状態においてヘリオスタット制御部130が選択パターンを求める処理を実行し直すようにした場合の、ヘリオスタット制御装置100が選択パターンを取得する処理手順を示すフローチャートである。図11の場合と同様、ヘリオスタット制御装置100は、電源を接続されて動作状態となると、図14の処理を開始する。
図14の処理において、ステップS201~S202は、図10のステップS101~S102と同様である。
ステップS202において、状態判定部121が受熱器20の集熱状態を通常状態と判定した場合(ステップS202:YES)、選択パターン取得部131は、所定の実行周期(例えば、図11のステップS111において周期決定部122が決定する周期と同様の時間p111)に基づいて、ヘリオスタット選択計算の開始時刻が到来した、または、ヘリオスタット選択計算の途中であるの少なくともいずれかが成立するか否かを判定する(ステップS211)。
ステップS202において、状態判定部121が受熱器20の集熱状態を通常状態と判定した場合(ステップS202:YES)、選択パターン取得部131は、所定の実行周期(例えば、図11のステップS111において周期決定部122が決定する周期と同様の時間p111)に基づいて、ヘリオスタット選択計算の開始時刻が到来した、または、ヘリオスタット選択計算の途中であるの少なくともいずれかが成立するか否かを判定する(ステップS211)。
ヘリオスタット選択計算の開始時刻が到来した、または、ヘリオスタット選択計算の途中であると判定した場合(ステップS211:YES)、選択パターン取得部131は、ヘリオスタット選択計算の一部を行う(ステップS221)。例えば、選択パターン取得部131がヘリオスタット選択計算において100パターンのON/OFFパターンについてシミュレーションを行う場合、選択パターン取得部131は、ステップS221の1回分の処理として、当該100パターンのうち10パターンについてシミュレーションを行う。ここで、幾つかのON/OFFパターンについて既にシミュレーションを実行済みの場合、選択パターン取得部131は、残りのON/OFFパターンのうち10パターンについて、引き続きシミュレーションを行う。
そして、選択パターン取得部131は、ヘリオスタット選択計算を完了したか否か(例えば、100パターンのON/OFFパターン全てについてシミュレーションを完了したか否か)を判定する(ステップS222)。
ヘリオスタット選択計算を完了したと判定した場合(ステップS222:YES)、ステップS241に進む。
ステップS241およびS242は、図11のステップS142およびS143と同様である。ステップS242の後、ステップS201に戻る。
ヘリオスタット選択計算を完了したと判定した場合(ステップS222:YES)、ステップS241に進む。
ステップS241およびS242は、図11のステップS142およびS143と同様である。ステップS242の後、ステップS201に戻る。
一方、ステップS202において、状態判定部121が受熱器20の集熱状態を通常状態で無い(すなわち、要処理状態である)と判定した場合(ステップS202:NO)、選択パターン取得部131は、事象に応じたヘリオスタット選択計算を行って選択パターンを取得し、得られた選択パターンを制御信号生成部132に出力する(ステップS231)。ステップS231で事象に応じたヘリオスタット選択計算を開始する際、選択パターン取得部131は、既にヘリオスタット選択計算を実行中のときは、当該ヘリオスタット選択計算におけるシミュレーション評価値などのデータを破棄し、ステップS201で得られた最新の気象情報や状態情報や受熱器20の目標熱量などの情報に基づいて、新たにヘリオスタット選択計算を行う。
ステップS231の後、ステップS241に進む。
ステップS231の後、ステップS241に進む。
一方、ステップS211において、ヘリオスタット選択計算の開始時刻が到来しておらず、かつ、ヘリオスタット選択計算の途中でないと判定した場合(ステップS211:NO)、ステップS201に戻る。
また、ステップS222において、ヘリオスタット選択計算を完了していないと判定した場合(ステップS222:NO)も、ステップS201に戻る。
また、ステップS222において、ヘリオスタット選択計算を完了していないと判定した場合(ステップS222:NO)も、ステップS201に戻る。
以上のように、状態判定部121が太陽熱発電設備1の集熱状態を要処理状態と判定した場合、ヘリオスタット制御部130(選択パターン取得部131)は、選択パターンを求める処理を実行中のときは、当該処理におけるデータを破棄して、当該選択パターンを求める処理を終了(中止)する。これにより、選択パターン取得部131は、事象を反映しておらず太陽熱発電設備1の状況に適合しない可能性の高い選択パターンを求める処理を終了することができ、当該選択パターン取得部131の負荷を軽減することができる。
また、選択パターン取得部131は、状態判定部121が太陽熱発電設備1の集熱状態を要処理状態と判定した場合、選択パターンを求める処理を新たに実行し直す。これにより、選択パターン取得部131は、事象発生後速やかにヘリオスタット選択計算を行って、事象に応じた選択パターンをより速やかに取得することが出来る。例えば、図13において、選択パターン取得部131は、事象発生時刻t29から時間p112の後にヘリオスタット選択計算を完了して選択パターンを取得している。これは、図10において、選択パターン取得部131が、事象発生時刻t19から時間p141経過した時刻t131にヘリオスタット選択計算を開始し、時刻t131から時間p112の後にヘリオスタット選択計算を完了して選択パターンを取得しているのよりも、事象発生から選択パターン取得までが速やかである。
選択パターン取得部131が、事象に応じた選択パターンをより速やかに取得することで、各ヘリオスタット10は、反射鏡11を事象に応じた角度により速やかに調整することが出来る。従って、太陽熱発電設備1は、より速やかに事象に対応することが出来る。
選択パターン取得部131が、事象に応じた選択パターンをより速やかに取得することで、各ヘリオスタット10は、反射鏡11を事象に応じた角度により速やかに調整することが出来る。従って、太陽熱発電設備1は、より速やかに事象に対応することが出来る。
なお、状態判定部121が太陽熱発電設備1の集熱状態を要処理状態と判定した場合、ヘリオスタット制御部130が、選択パターンを求める処理(すなわち、ヘリオスタット選択計算)を簡略化するようにしてもよい。この点について、図15および図16を参照して説明する。
図15は、要処理状態においてヘリオスタット制御部130がヘリオスタット選択計算を簡略化する場合の、太陽熱発電設備1の動作タイミングの例を示すタイミングチャートである。
図15は、要処理状態においてヘリオスタット制御部130がヘリオスタット選択計算を簡略化する場合の、太陽熱発電設備1の動作タイミングの例を示すタイミングチャートである。
通常状態において、図10の場合と同様、周期決定部122は、実行周期を比較的長い時間に決定している。
ここで、選択パターンを求める処理の簡略化は、選択パターン取得部131がヘリオスタット選択計算を行う時間(図15の例では、時間p312)が長い場合に、より大きな効果を期待し得る。そこで、図15では、比較的長い時間の実行周期が、図10の時間p111よりも長い時間p311となっている。
但し、実行周期が時間p111の場合(図10の場合)を含め様々な実行周期において、選択パターン取得部131が選択パターンを求める処理を簡略化することによる効果を得られる。
ここで、選択パターンを求める処理の簡略化は、選択パターン取得部131がヘリオスタット選択計算を行う時間(図15の例では、時間p312)が長い場合に、より大きな効果を期待し得る。そこで、図15では、比較的長い時間の実行周期が、図10の時間p111よりも長い時間p311となっている。
但し、実行周期が時間p111の場合(図10の場合)を含め様々な実行周期において、選択パターン取得部131が選択パターンを求める処理を簡略化することによる効果を得られる。
通常状態において、選択パターン取得部131は、周期決定部122が決定した時間p311毎にヘリオスタット選択計算を行っている。そして、選択パターン取得部131は、まず、時刻t311において、ヘリオスタット選択計算を開始し、時間p312が経過するとヘリオスタット選択計算を終了して選択パターンを取得する。
そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、時刻t312に、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p313後の時刻t313に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。
そして、制御信号生成部132が、当該選択パターンに従って各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。そして、時刻t312に、駆動制御器13が、制御信号に従って反射鏡11の角度を変化させる動作を開始し、動作開始から時間p313後の時刻t313に、反射鏡11の角度を制御信号に応じた角度として当該動作を完了する。
また、時刻t39において事象が発生すると、周期決定部122は、実行周期を比較的短い時間p321に決定しており、選択パターン取得部131は、前回ヘリオスタット選択計算を開始した時刻t321から時間p321後の時刻t331に、事象に応じたヘリオスタット選択計算を開始している。
そして、時間p312よりも短い時間p342が経過すると、選択パターン取得部131は、ヘリオスタット選択計算を終了して選択パターンを取得する。例えば、通常状態の時間p312では、選択パターン取得部131がヘリオスタット選択計算において150パターンのON/OFFパターンについてシミュレーションを行うのに対し、要処理状態の時間p342では、選択パターン取得部131は、ヘリオスタット選択計算において50パターンのON/OFFパターンについてシミュレーションを行う。
そして、選択パターン取得部131の取得した選択パターンに従って、制御信号生成部132が各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。
そして、選択パターン取得部131の取得した選択パターンに従って、制御信号生成部132が各ヘリオスタット10に対する制御信号を生成し、制御信号送信部133が、当該制御信号を各ヘリオスタット10に送信する。
シミュレーションを行うパターン数が減ることで、選択パターン取得部131が取得する選択パターンの精度(気象の状況や、受熱器20の状態や、受熱器20の集熱量目標値に対する選択パターンの適合度)が低下するものの、選択パターン取得部131がより速やかに選択パターンを取得し、各ヘリオスタット10が当該選択パターンに応じて反射鏡11の角度を調整することで、事故をより確実に防止し得る。
例えば、受熱器20内の空気圧が閾値圧力以上になった場合、選択パターン取得部131が受熱器20の集熱量を減少させる選択パターンを速やかに取得し、各ヘリオスタット10が当該選択パターンに応じて反射鏡11の角度を調整することで、受熱器20内の空気圧のさらなる上昇を速やかに抑制することができ、受熱管24の破損をより確実に防止し得る。
例えば、受熱器20内の空気圧が閾値圧力以上になった場合、選択パターン取得部131が受熱器20の集熱量を減少させる選択パターンを速やかに取得し、各ヘリオスタット10が当該選択パターンに応じて反射鏡11の角度を調整することで、受熱器20内の空気圧のさらなる上昇を速やかに抑制することができ、受熱管24の破損をより確実に防止し得る。
次に、図16を参照してヘリオスタット制御装置100の動作について説明する。
図16は、要処理状態においてヘリオスタット制御部130がヘリオスタット選択計算を簡略化する場合の、ヘリオスタット制御装置100が選択パターンを取得する処理手順を示すフローチャートである。図11の場合と同様、ヘリオスタット制御装置100は、電源を接続されて動作状態となると、図16の処理を開始する。
図16は、要処理状態においてヘリオスタット制御部130がヘリオスタット選択計算を簡略化する場合の、ヘリオスタット制御装置100が選択パターンを取得する処理手順を示すフローチャートである。図11の場合と同様、ヘリオスタット制御装置100は、電源を接続されて動作状態となると、図16の処理を開始する。
図16の処理において、ステップS301~S311は、図11のステップS101~S111と同様である。ステップS311の後、選択パターン取得部131は、状態判定部121がステップS302で通常状態と判定したことに基づいて、ヘリオスタット選択計算にてシミュレーションを行うON/OFFパターン数(以下、「判定パターン数」と称する)を、比較的多く設定する(ステップS312)。例えば、選択パターン取得部131は、判定パターン数を150パターンに設定する。
ステップS312の後、ステップS331に進む。
ステップS312の後、ステップS331に進む。
また、ステップS321は、図11のステップS121と同様である。ステップS321の後、選択パターン取得部131は、状態判定部121がステップS302で要処理状態と判定したことに基づいて、判定パターン数を、比較的少なく設定する(ステップS322)。例えば、選択パターン取得部131は、判定パターン数を50パターンに設定する。
ステップS322の後、ステップS331に進む。
ステップS322の後、ステップS331に進む。
ステップS331~S343は、図11のステップS131~S143と同様である。
なお、ステップS341において、選択パターン取得部131は、ステップS312またはステップS322で設定した判定パターン数に応じてヘリオスタット選択計算を行う。
すなわち、通常状態において、選択パターン取得部131は、比較的多い判定パターン数(例えば150パターン)についてシミュレーションを行い、評価値の最も高いON/OFFパターンを選択パターンとして取得する。一方、要処理状態において、選択パターン取得部131は、比較的少ない判定パターン数(例えば50パターン)についてシミュレーションを行い、評価値の最も高いON/OFFパターンを選択パターンとして取得する。
なお、ステップS341において、選択パターン取得部131は、ステップS312またはステップS322で設定した判定パターン数に応じてヘリオスタット選択計算を行う。
すなわち、通常状態において、選択パターン取得部131は、比較的多い判定パターン数(例えば150パターン)についてシミュレーションを行い、評価値の最も高いON/OFFパターンを選択パターンとして取得する。一方、要処理状態において、選択パターン取得部131は、比較的少ない判定パターン数(例えば50パターン)についてシミュレーションを行い、評価値の最も高いON/OFFパターンを選択パターンとして取得する。
以上のように、要処理状態において、選択パターン取得部131が、判定パターン数を比較的少なく設定し、より速やかに選択パターンを取得することで、事故をより確実に防止し得る。
そして、当該選択パターンの実行により通常状態となれば、選択パターン取得部131は、選択パターン数を比較的多く設定して、より精度の高い選択パターンを取得する。この選択パターンに応じて各ヘリオスタット10が反射鏡11の角度を調整することで、より適切な入熱量や入熱分布を得ることができる。
そして、当該選択パターンの実行により通常状態となれば、選択パターン取得部131は、選択パターン数を比較的多く設定して、より精度の高い選択パターンを取得する。この選択パターンに応じて各ヘリオスタット10が反射鏡11の角度を調整することで、より適切な入熱量や入熱分布を得ることができる。
なお、選択パターン取得部131がヘリオスタット選択計算における所要時間を切り替える方法は、判定パターン数を切り替える方法に限らない。
例えば、選択パターン取得部131が、所定の評価以上のON/OFFパターンを取得した時点でヘリオスタット選択計算を終了するようにし、このヘリオスタット選択計算を終了する評価基準を、要処理状態において通常状態よりも緩やかに設定するようにしてもよい。より具体的な例を挙げると、ON/OFFパターンの評価値が小さいほど高評価である場合に、通常状態では、選択パターン取得部131が、100以下の評価値を得られれば当該評価値のON/OFFパターンを選択パターンとしてヘリオスタット選択計算を終了するようにする。一方、要処理状態では、選択パターン取得部131が、200以下の評価値を得られれば当該評価値のON/OFFパターンを選択パターンとしてヘリオスタット選択計算を終了するようにする。
このように評価基準を緩やかに設定することで、選択パターン取得部131が、基準を満たすON/OFFパターンを比較的(通常状態の場合よりも)速やかに検出し、ヘリオスタット選択計算を終了することができる。
例えば、選択パターン取得部131が、所定の評価以上のON/OFFパターンを取得した時点でヘリオスタット選択計算を終了するようにし、このヘリオスタット選択計算を終了する評価基準を、要処理状態において通常状態よりも緩やかに設定するようにしてもよい。より具体的な例を挙げると、ON/OFFパターンの評価値が小さいほど高評価である場合に、通常状態では、選択パターン取得部131が、100以下の評価値を得られれば当該評価値のON/OFFパターンを選択パターンとしてヘリオスタット選択計算を終了するようにする。一方、要処理状態では、選択パターン取得部131が、200以下の評価値を得られれば当該評価値のON/OFFパターンを選択パターンとしてヘリオスタット選択計算を終了するようにする。
このように評価基準を緩やかに設定することで、選択パターン取得部131が、基準を満たすON/OFFパターンを比較的(通常状態の場合よりも)速やかに検出し、ヘリオスタット選択計算を終了することができる。
あるいは、選択パターン取得部131がヘリオスタット選択計算を開始してからの経過時間に基づいて、ヘリオスタット選択計算を完了するようにしてもよい。この場合、通常状態では、選択パターン取得部131はヘリオスタット選択計算の時間を比較的長い時間(例えば、図15の時間p312)に設定し、この時間内でヘリオスタット10の様々なON/OFFパターンについてシミュレーションを行い、最も評価値の高いON/OFFパターンを選択パターンとして取得する。一方、要処理状態では、選択パターン取得部131はヘリオスタット選択計算の時間を比較的短い時間(例えば、図15の時間p342)に設定し、この時間内でヘリオスタット10の様々なON/OFFパターンについてシミュレーションを行い、最も評価値の高いON/OFFパターンを選択パターンとして取得する。
このように、選択パターン取得部131が判定パターン数以外の基準に基づいてヘリオスタット選択計算における所要時間を切り替える場合も、上記と同様、事故をより確実に防止することができ、また、通常状態においてより適切な入熱量や入熱分布を得ることができる。
このように、選択パターン取得部131が判定パターン数以外の基準に基づいてヘリオスタット選択計算における所要時間を切り替える場合も、上記と同様、事故をより確実に防止することができ、また、通常状態においてより適切な入熱量や入熱分布を得ることができる。
なお、要処理状態において、選択パターン取得部131が、ヘリオスタット選択計算を実行し直し、かつ、ヘリオスタット選択計算を簡略化するようにしてもよい。例えば、図14のステップS231において、選択パターン取得部131は、比較的少ない判定パターン数(ステップS221を繰り返してヘリオスタット選択計算を完了するまでにシミュレーションを実行するパターン数よりも少ないパターン数)についてシミュレーションを行い、評価値の最も高いON/OFFパターンを選択パターンとして取得する。
このように、要処理状態において、選択パターン取得部131が、ヘリオスタット選択計算を実行し直し、かつ、ヘリオスタット選択計算を簡略化することで、事象発生時において、選択パターン取得部131は、さらに速やかに選択パターンを取得することができ、各ヘリオスタット10は、当該選択パターンに従って、反射鏡11を事象に応じた角度により速やかに調整することが出来る。従って、太陽熱発電設備1は、より速やかに事象に対応することが出来る。
なお、ヘリオスタット制御部130が一定周期でヘリオスタット10のON/OFF制御を行う場合(例えば、ヘリオスタット制御装置100が、周期決定部122を具備しない場合)に、要処理状態において選択パターン取得部131がヘリオスタット選択計算を簡略化するようにしてもよい。この場合も、選択パターン取得部131は、ヘリオスタット選択計算を簡略化することで、より速やかに選択パターンを取得することができ、事故をより確実に防止し得る。また、選択パターン取得部131がヘリオスタット選択計算を簡略化することで、選択パターン取得部131の負荷を軽減させることができる。
なお、選択パターン取得部131が、状態判定部121の判定結果以外の情報に基づいて、ヘリオスタット選択計算を簡略化するか否かを決定するようにしてもよい。例えば、太陽光照射量が比較的安定している昼の時間帯において、選択パターン取得部131が、前回のヘリオスタット選択計算で得られた選択パターンに基づいて、今回のヘリオスタット選択計算におけるON/OFFパターンの候補を絞り込むことで、ヘリオスタット選択計算を簡略化するなど、時間帯に基づいて、ヘリオスタット選択計算を簡略化するか否かを決定するようにしてもよい。
この場合も、選択パターン取得部131は、ヘリオスタット選択計算を簡略化することで、より速やかに選択パターンを取得することができ、太陽熱発電設備1は、より速やかにヘリオスタットの動作を終了して安定的に集熱を行い得る。また、選択パターン取得部131がヘリオスタット選択計算を簡略化することで、選択パターン取得部131の負荷を軽減させることができる。
この場合も、選択パターン取得部131は、ヘリオスタット選択計算を簡略化することで、より速やかに選択パターンを取得することができ、太陽熱発電設備1は、より速やかにヘリオスタットの動作を終了して安定的に集熱を行い得る。また、選択パターン取得部131がヘリオスタット選択計算を簡略化することで、選択パターン取得部131の負荷を軽減させることができる。
なお、上述したように、ヘリオスタット制御装置100はコンピュータを用いて構成し得る。従って、ヘリオスタット制御装置100の全部または一部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより各部の処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。
また、「コンピュータシステム」は、WWWシステムを利用している場合であれば、ホームページ提供環境(あるいは表示環境)も含むものとする。
また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD-ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含むものとする。また上記プログラムは、前述した機能の一部を実現するためのものであっても良く、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
また、「コンピュータシステム」は、WWWシステムを利用している場合であれば、ホームページ提供環境(あるいは表示環境)も含むものとする。
また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD-ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含むものとする。また上記プログラムは、前述した機能の一部を実現するためのものであっても良く、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
以下、本実施形態に係る太陽熱集熱装置の運転方法及び太陽熱集熱装置について図面を参照して説明する。なお、本発明に係る各実施形態の太陽熱集熱装置は、受熱器と、受熱器により加熱された作動流体を用いて発電を行うガスタービンユニットと、を一体的に備える太陽熱集熱装置を例にして説明する。
図17に示すように、本発明に係る第二実施形態の太陽熱集熱装置210は、入光用の開口部212を備えて内部に受熱器213を収容したケーシング211と、ケーシング211を上部に配置したタワー部(タワー)214と、を備える。また、太陽熱集熱装置210は、タワー部214の周囲に配置して太陽光(太陽日射)を反射する複数のヘリオスタット215と、ヘリオスタット215を駆動制御する駆動制御部216と、を備える。そして、太陽熱集熱装置210は、駆動制御部216へ駆動信号を与える制御部217を備える。
太陽熱集熱装置210は、地球上で立地に適する場所が、太陽からの直達日射が強く良好な回帰線に近い亜熱帯高圧帯の乾燥地域である。そこで、太陽熱集熱装置210は、特に亜熱帯高圧帯の中における高緯度地域に配置される片側配置方式の発電装置について説明する。なお、本実施形態は、北半球地域での実施例である。
太陽熱集熱装置210は、グランドGに設けられたヘリオスタットフィールドHFに照射される太陽光をヘリオスタット215によりケーシング211に向けて反射集光して受熱器213により受熱する。タワー部214は、ヘリオスタットフィールドHFの一端側(南北方向における南側端部)に配置されている。タワー部214の上部には、ガスタービンユニット(GT)220が設けられている。これに対して、ヘリオスタット215は、ヘリオスタットフィールドHFにおける他端側(北側)であって、タワー部214を中心にして所定の角度範囲の領域において扇形状に設定されている。ここで、複数のヘリオスタット215は、ケーシング211から遠距離となる複数のヘリオスタット222と、ケーシング211から近距離となる複数のヘリオスタット223と、を含む。なお、南半球地域では、タワー部214とヘリオスタット215の配置方位が逆になる。
太陽熱集熱装置210では、受熱器213で受熱した熱により加熱された作動流体(例えば、空気)は、ガスタービンユニット220に送給されて発電に用いる。ガスタービンユニット220は、受熱器213で加熱した作動流体を圧縮する不図示の圧縮機と、圧縮機で圧縮された作動流体を受ける不図示のタービンと、圧縮機とタービンとを同軸で連結する不図示のロータと、ロータに接続した不図示の発電機とを備える。そして、太陽熱集熱装置210は、タービンが受けた作動流体によりロータが回転することにより、発電機を回転駆動して発電する。
駆動制御部216は、定期的なヘリオスタット入替時に、ヘリオスタット222,223を移動させる。具体的に、駆動制御部216は、ヘリオスタット222,223からの反射光が開口部212内に集光する集光位置B1とヘリオスタット222,223からの反射光がケーシング211外に逃げる退避位置B2とに切替えて配置するようにヘリオスタット222,223を駆動する。制御部217は、ケーシング211の耐熱強度と、ヘリオスタット222,223を駆動する際に要する消費電力と、に基づき、切替時にヘリオスタット222,223の反射光の辿る経路が複数方向に分散されるようにヘリオスタット222,223を駆動制御する。ケーシング211の耐熱強度およびヘリオスタット222,223を駆動する際に要する消費電力は、あらかじめ定められており、制御部217に格納されている。制御の具体手法としては、例えば、逃げる反射光からケーシングが浴びる熱が、耐熱強度上限を超えないように、ヘリオスタットの速度や移動方向を決める等が考えられる。尚且つそのときの駆動電力が少なくて済むものを選択するのが好ましい。
次に、定期的なヘリオスタット入替時の太陽熱集熱装置210の運転方法について説明する。図18に示すように、制御部217は、各ヘリオスタット222,223を駆動制御する時の姿勢変化速度が一定の下において各ヘリオスタット222,223を制御する。すなわち、ケーシング211上をその長手方向に沿う経路X11を辿る反射光R11については、ケーシング211から遠距離となるヘリオスタット222を用いる。そのため、ケーシング211から遠距離となるヘリオスタット222からの反射光R11により照射スポットA11を創生する。ケーシングの長手方向に沿って反射光がケーシング上を移動しているきは、ケーシングはたくさん反射光を浴びる(絶対量として)ことになるので、ケーシングの耐熱性の観点からすると、好ましくない。したがって、速やかに退避させている。
また、ケーシング211上をその短手方向に沿う経路X12を辿る反射光R12については、ケーシング211から近距離となるヘリオスタット223を用いる。そのため、ケーシング211から近距離となるヘリオスタット223からの反射光R12により照射スポットA12を創生する。ケーシングの短手方向に沿って反射光がケーシング上を移動しているときは、ケーシングは少ししか反射光を浴びない(絶対量として)ことになるので、ケーシングの耐熱性の観点からは、それほど大きな問題はない。したがって、あえて必要以上に速やかに退避させなくてもよい。
そして、ケーシング211上をその長手方向と短手方向との間に沿う経路X13を辿る反射光R13については、ケーシング211から遠距離となるヘリオスタット222またはケーシング211から近距離となるヘリオスタット223を用いる。そのため、ケーシング211から遠距離となるヘリオスタット222またはケーシング211から近距離となるヘリオスタット223からの反射光R13により照射スポットA13を創生する。
このとき、スポット移動速度は、ヘリオスタット222から開口部212までの距離にヘリオスタット222の角速度を乗じた値であり、ヘリオスタット223から開口部212までの距離にヘリオスタット223の角速度を乗じた値である。そのため、開口部212、すなわち、受熱器213から遠距離のヘリオスタット222の方が、開口部212から近距離のヘリオスタット223よりも、入射、退避速度が速くなる。これにより、ヘリオスタット222,223の入射、退避経路が全周に分散する。従って、ヘリオスタット入替時に受熱器213の内部エレメントおよびケーシング211の部分的高温化を防止できる。
以上、説明したように、第二実施形態の太陽熱集熱装置210の運転方法によれば、ケーシング211の耐熱強度と、ヘリオスタット222,223を駆動する際に要する消費電力と、に基づき、切替時にヘリオスタット222,223の反射光の辿る経路が複数方向に分散されるようにヘリオスタット222,223を駆動制御する。従って、太陽熱集熱装置210の運転方法によれば、ヘリオスタット入替時の受熱器213の部分的な高温化を防止して品質の向上を図ることができる。
また、太陽熱集熱装置210の運転方法によれば、ケーシング211上をその長手方向に沿う経路X11を辿る反射光R11については、ケーシング211から遠距離となるヘリオスタット222を用いる。そして、太陽熱集熱装置210の運転方法によれば、ケーシング211上をその短手方向に沿う経路X12を辿る反射光R12については、ケーシング211から近距離となるヘリオスタット223を用いる。従って、太陽熱集熱装置210の運転方法によれば、ヘリオスタット入替時の受熱器213の部分的な高温化を防止して品質の向上を図ることができる。
そして、太陽熱集熱装置210によれば、ケーシング211の耐熱強度と、ヘリオスタット222,223を駆動する際に要する消費電力と、に基づき、切替時にヘリオスタット222,223の反射光の辿る経路が複数方向に分散されるようにヘリオスタット222,223を駆動制御する。従って、太陽熱集熱装置210によれば、ヘリオスタット入替時の受熱器213の部分的な高温化を防止して品質の向上を図ることができる。
さらに、太陽熱集熱装置210によれば、ケーシング211上をその長手方向に沿う経路X11を辿る反射光R11については、ケーシング211から遠距離となるヘリオスタット222を用いる。そして、太陽熱集熱装置210によれば、ケーシング211上をその短手方向に沿う経路X12を辿る反射光R12については、ケーシング211から近距離となるヘリオスタット223を用いる。従って、太陽熱集熱装置210によれば、ヘリオスタット入替時の受熱器213の部分的な高温化を防止して、品質の向上を図ることができる。
次に、本発明に係る第三実施形態の太陽熱集熱装置の運転方法及び太陽熱集熱装置について説明する。なお、以下の第三実施形態において、前述した第二実施形態と重複する構成要素や機能的に同様な構成要素については、図中に同一符号あるいは相当符号を付することによって説明を簡略化あるいは省略する。
図19に示すように、本発明に係る第三実施形態の太陽熱集熱装置230の運転方法は、定期的なヘリオスタット入替時において、制御部217は、ヘリオスタット222,223の反射光R14,15の辿る経路X14,X15を上下左右の2軸に設定している。
太陽熱集熱装置230は、ケーシング211上をその長手方向に沿う経路X14を辿る反射光R14については、ケーシング211から遠距離となるヘリオスタット222を用いる。
そのため、ケーシング211から遠距離となるヘリオスタット222からの反射光R14により照射スポットA14を創生する。
そのため、ケーシング211から遠距離となるヘリオスタット222からの反射光R14により照射スポットA14を創生する。
また、太陽熱集熱装置230は、ケーシング211上をその短手方向に沿う経路X15を辿る反射光R15については、ケーシング211から近距離となるヘリオスタット223を用いる。そのため、ケーシング211から近距離となるヘリオスタット223からの反射光R15により照射スポットA15を創生する。
第三実施形態の太陽熱集熱装置230の運転方法によれば、制御部217が、ヘリオスタット222,223の反射光R14,15の辿る経路X14,X15を上下左右の2軸に設定している。従って、太陽熱集熱装置230の運転方法によれば、各ヘリオスタット222,223の使用電力を抑制できる。
また、太陽熱集熱装置230によれば、制御部217が、ヘリオスタット222,223の反射光R14,15の辿る経路X14,X15を上下左右の2軸に設定している。従って、太陽熱集熱装置230によれば、各ヘリオスタット222,223の使用電力を抑制できる。
以上述べたように、本実施形態の太陽熱集熱装置の運転方法及び太陽熱集熱装置によれば、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができる。以上の結果として、地球温暖化の防止、化石燃料の使用抑制の観点を考慮して自然エネルギーを利用した有益な発電を提供でき、本実施形態の産業上の利用可能性は大きいといえる。
以上、本発明の好ましい実施形態を説明したが、本発明は上記の実施形態に限定されることはない。本発明の趣旨を逸脱しない範囲で、構成の付加、省略、置換、およびその他の変更が可能である。本発明は前述した説明によって限定されることはなく、添付のクレームの範囲によってのみ限定される。
本発明は、ヘリオスタット制御方法、ヘリオスタット制御装置および集熱設備に関する。本発明によれば、必要な鏡を選択して使用する集熱設備において、時々刻々変化する状況に適切に対応でき、かつ、より適切な入熱量や入熱分布を得ることができる。
本発明は、太陽熱発電プラントや化学プラントに適用されて太陽熱エネルギーを集熱して利用する太陽熱集熱装置の運転方法及び太陽熱集熱装置に関する。本発明によれば、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができる。
本発明は、太陽熱発電プラントや化学プラントに適用されて太陽熱エネルギーを集熱して利用する太陽熱集熱装置の運転方法及び太陽熱集熱装置に関する。本発明によれば、ヘリオスタット入替時の受熱器の部分的な高温化を防止して、品質の向上を図ることができる。
1…太陽熱発電設備
10…ヘリオスタット
11…反射鏡
12…支持脚
13…駆動制御器
20…受熱器
21…受熱部
22…下部ヘッダ
23…上部ヘッダ
24…受熱管
25…入口配管
26…出口配管
29…支持具
31…ケーシング
32…天板
33…側板
34…傾斜板
35…開口
36…底板
40…直達日射計
50…ガスタービン
60…タワー
100…ヘリオスタット制御装置
111…気象情報取得部
112…状態情報取得部
113…上位装置通信部
121…状態判定部
122…周期決定部
130…ヘリオスタット制御部
131…選択パターン取得部
132…制御信号生成部
133…制御信号送信部
150…上位装置
210…太陽熱集熱装置
211…ケーシング
212…開口部
213…受熱器
214…タワー部(タワー)
215…ヘリオスタット
216…駆動制御部
217…制御部
222…ヘリオスタット
223…ヘリオスタット
230…太陽熱集熱装置
10…ヘリオスタット
11…反射鏡
12…支持脚
13…駆動制御器
20…受熱器
21…受熱部
22…下部ヘッダ
23…上部ヘッダ
24…受熱管
25…入口配管
26…出口配管
29…支持具
31…ケーシング
32…天板
33…側板
34…傾斜板
35…開口
36…底板
40…直達日射計
50…ガスタービン
60…タワー
100…ヘリオスタット制御装置
111…気象情報取得部
112…状態情報取得部
113…上位装置通信部
121…状態判定部
122…周期決定部
130…ヘリオスタット制御部
131…選択パターン取得部
132…制御信号生成部
133…制御信号送信部
150…上位装置
210…太陽熱集熱装置
211…ケーシング
212…開口部
213…受熱器
214…タワー部(タワー)
215…ヘリオスタット
216…駆動制御部
217…制御部
222…ヘリオスタット
223…ヘリオスタット
230…太陽熱集熱装置
Claims (17)
- 受熱器と、前記受熱器に対する太陽光照射のON/OFFを切替可能な複数のヘリオスタットとを具備して、前記ヘリオスタットの照射する太陽光を受けて前記受熱器が集熱する集熱設備のヘリオスタット制御方法であって、
少なくとも気象情報に基づいて、前記複数のヘリオスタットのON/OFFの組み合わせである選択パターンを求め、得られた選択パターンに従って前記複数のヘリオスタットのON/OFF制御を行うヘリオスタット制御ステップを具備して、当該ヘリオスタット制御ステップを周期的に繰り返し実行し、
さらに、前記ヘリオスタット制御ステップの実行形態を決定する形態決定ステップを具備するヘリオスタット制御方法。 - 請求項1に記載のヘリオスタット制御方法であって、
前記形態決定ステップにて、前記ヘリオスタット制御ステップの実行形態として、前記ヘリオスタット制御ステップの実行周期を決定するヘリオスタット制御方法。 - 請求項1または請求項2に記載のヘリオスタット制御方法であって、
前記形態決定ステップにて、前記ヘリオスタット制御ステップの実行形態として、前記ヘリオスタット制御ステップにて前記選択パターンを求める処理を実行中のときに当該処理におけるデータを破棄して前記選択パターンを求める処理を終了するか否かを決定するヘリオスタット制御方法。 - 請求項1から3のいずれか一項に記載のヘリオスタット制御方法であって、
前記形態決定ステップにて、前記ヘリオスタット制御ステップの実行形態として、前記ヘリオスタット制御ステップにて行う前記選択パターンを求める処理を簡略化するか否かを決定するヘリオスタット制御方法。 - 請求項1から4のいずれか一項に記載のヘリオスタット制御方法であって、
気象情報、前記受熱器の状態情報、または、前記受熱器が供給すべき熱量を示す情報の少なくともいずれか1つに基づいて、前記集熱設備の集熱状態が通常状態にあるか要処理状態にあるかを判定する状態判定ステップを具備し、
前記形態決定ステップにて、前記状態判定ステップでの判定結果に基づいて、前記ヘリオスタット制御ステップの実行形態を決定するヘリオスタット制御方法。 - 受熱器に対する太陽光照射のON/OFFを切替可能な複数のヘリオスタットを制御するヘリオスタット制御装置であって、
少なくとも気象情報に基づいて、前記複数のヘリオスタットのON/OFFの組み合わせである選択パターンを求め、得られた選択パターンに従って前記複数のヘリオスタットのON/OFF制御を行う処理を周期的に繰り返し実行するヘリオスタット制御部と、
前記ヘリオスタット制御部の実行形態を決定する形態決定部と、
を具備するヘリオスタット制御装置。 - 請求項6に記載のヘリオスタット制御装置であって、
前記形態決部は、前記ヘリオスタット制御部の実行形態として、前記ヘリオスタット制御部の実行周期を決定するヘリオスタット制御装置。 - 請求項6または請求項7に記載のヘリオスタット制御装置であって、
前記形態決定部は、前記ヘリオスタット制御部の実行形態として、当該ヘリオスタット制御部が前記選択パターンを求める処理を実行中のときに当該処理におけるデータを破棄して前記選択パターンを求める処理を終了するか否かを決定するヘリオスタット制御装置。 - 請求項6から8のいずれか一項に記載のヘリオスタット制御装置であって、
前記形態決定部は、前記ヘリオスタット制御部の実行形態として、当該ヘリオスタット制御部の行う前記選択パターンを求める処理を簡略化するか否かを決定するヘリオスタット制御装置。 - 請求項6から9のいずれか一項に記載のヘリオスタット制御装置であって、
気象情報、前記受熱器の状態情報、または、前記受熱器が供給すべき熱量を示す情報の少なくともいずれか1つに基づいて、前記集熱設備の集熱状態が通常状態にあるか要処理状態にあるかを判定する状態判定部を具備し、
前記形態決定部が、前記状態判定部の判定結果に基づいて、前記ヘリオスタット制御部の実行形態を決定するヘリオスタット制御装置。 - 請求項6から10のいずれか一項に記載のヘリオスタット制御装置を具備する集熱設備。
- 入光用の開口部を備え内部に受熱器を収容したケーシングと、
前記ケーシングを上部に配置するタワーと、
前記タワーの周囲に配置され太陽光を反射させる複数のヘリオスタットと、
前記ヘリオスタットの反射光が開口内に集光される集光位置とケーシング外に逃げる退避位置とに切替えて配置されるようにヘリオスタットを駆動制御する駆動制御部と、を備えた太陽熱集熱装置の運転方法において、
前記ケーシングの耐熱強度と、前記ヘリオスタットを駆動する際に要する消費電力と、に基づき、前記切替時に前記ヘリオスタットの反射光の辿る経路が複数方向に分散されるように前記ヘリオスタットを駆動制御する太陽熱集熱装置の運転方法。 - 請求項12に記載の太陽熱集熱装置の運転方法において、
前記各ヘリオスタットを駆動制御する時の姿勢変化速度が一定の下、前記ケーシング上をその長手方向に沿う経路を辿る反射光については、前記ケーシングから遠距離となる前記ヘリオスタットを用い、前記ケーシング上をその短手方向に沿う経路を辿る反射光については、前記ケーシングから近距離となる前記ヘリオスタットを用いる太陽熱集熱装置の運転方法。 - 請求項12または請求項13に記載の太陽熱集熱装置の運転方法において、
前記ヘリオスタットの反射光の辿る経路が上下左右の2軸である太陽熱集熱装置の運転方法。 - 入光用の開口部を備え内部に受熱器を収容したケーシングと、
前記ケーシングを上部に配置するタワーと、
前記タワーの周囲に配置され太陽光を反射させる複数のヘリオスタットと、
前記ヘリオスタットの反射光が開口内に集光される集光位置とケーシング外に逃げる退避位置とに切替えて配置されるようにヘリオスタットを駆動制御する駆動制御部と、
前記ケーシングの耐熱強度と、前記ヘリオスタットを駆動する際に要する消費電力と、に基づき、前記切替時に前記ヘリオスタットの反射光の辿る経路が複数方向に分散されるように前記ヘリオスタットを駆動制御する制御部と、を備える太陽熱集熱装置。 - 請求項15に記載の太陽熱集熱装置において、
前記制御部は、前記各ヘリオスタットを駆動制御する時の姿勢変化速度が一定の下、前記ケーシング上をその長手方向に沿う経路を辿る反射光については、前記ケーシングから遠距離となる前記ヘリオスタットを用い、前記ケーシング上をその短手方向に沿う経路を辿る反射光については、前記ケーシングから近距離となる前記ヘリオスタットを用いる太陽熱集熱装置。 - 請求項15または請求項16に記載の太陽熱集熱装置において、
前記ヘリオスタットの反射光の辿る経路が上下左右の2軸である太陽熱集熱装置。
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011-239724 | 2011-10-31 | ||
| JP2011239073A JP2013096626A (ja) | 2011-10-31 | 2011-10-31 | 太陽熱集熱装置における運転方法及び太陽熱集熱装置 |
| JP2011-239073 | 2011-10-31 | ||
| JP2011239724A JP2013096636A (ja) | 2011-10-31 | 2011-10-31 | ヘリオスタット制御方法、ヘリオスタット制御装置および集熱設備 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2013065667A1 true WO2013065667A1 (ja) | 2013-05-10 |
Family
ID=48192014
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2012/077982 Ceased WO2013065667A1 (ja) | 2011-10-31 | 2012-10-30 | ヘリオスタット制御方法、ヘリオスタット制御装置、集熱設備、太陽熱集熱装置の運転方法、及び太陽熱集熱装置 |
Country Status (1)
| Country | Link |
|---|---|
| WO (1) | WO2013065667A1 (ja) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014148259A1 (ja) * | 2013-03-18 | 2014-09-25 | バブコック日立株式会社 | 太陽熱集熱システム |
| CN120444762A (zh) * | 2025-06-10 | 2025-08-08 | 烟台航空液压控制有限责任公司 | 一种基于温度控制的光热发电系统镜面追光角度控制系统及方法 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003229594A (ja) * | 2002-01-31 | 2003-08-15 | Hideo Kawada | ソーラーシステム可動架台による太陽電池の発電能力向上に関するカワタ式太陽追尾方法。 |
| WO2010013632A1 (ja) * | 2008-07-31 | 2010-02-04 | コスモ石油株式会社 | マルチタワービームダウン式集光システムにおける太陽光の集光方法 |
| US20100139644A1 (en) * | 2008-10-29 | 2010-06-10 | Brightsource Industries (Israel), Ltd. | Heliostat calibration |
| JP2011163594A (ja) * | 2010-02-05 | 2011-08-25 | Mitsubishi Heavy Ind Ltd | 太陽熱受熱器の運転制御システムおよび運転制御方法 |
| JP2011185558A (ja) * | 2010-03-10 | 2011-09-22 | Sharp Corp | 太陽熱利用装置 |
-
2012
- 2012-10-30 WO PCT/JP2012/077982 patent/WO2013065667A1/ja not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003229594A (ja) * | 2002-01-31 | 2003-08-15 | Hideo Kawada | ソーラーシステム可動架台による太陽電池の発電能力向上に関するカワタ式太陽追尾方法。 |
| WO2010013632A1 (ja) * | 2008-07-31 | 2010-02-04 | コスモ石油株式会社 | マルチタワービームダウン式集光システムにおける太陽光の集光方法 |
| US20100139644A1 (en) * | 2008-10-29 | 2010-06-10 | Brightsource Industries (Israel), Ltd. | Heliostat calibration |
| JP2011163594A (ja) * | 2010-02-05 | 2011-08-25 | Mitsubishi Heavy Ind Ltd | 太陽熱受熱器の運転制御システムおよび運転制御方法 |
| JP2011185558A (ja) * | 2010-03-10 | 2011-09-22 | Sharp Corp | 太陽熱利用装置 |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014148259A1 (ja) * | 2013-03-18 | 2014-09-25 | バブコック日立株式会社 | 太陽熱集熱システム |
| JP6033405B2 (ja) * | 2013-03-18 | 2016-11-30 | 三菱日立パワーシステムズ株式会社 | 太陽熱集熱システム |
| US9903613B2 (en) | 2013-03-18 | 2018-02-27 | Mitsubishi Hitachi Power Systems, Ltd. | Solar heat collection system |
| CN120444762A (zh) * | 2025-06-10 | 2025-08-08 | 烟台航空液压控制有限责任公司 | 一种基于温度控制的光热发电系统镜面追光角度控制系统及方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Ruelas et al. | A mathematical model to develop a Scheffler-type solar concentrator coupled with a Stirling engine | |
| KR101195740B1 (ko) | 태양광 발전 장치 및 그의 태양광 추적 방법 | |
| KR101253338B1 (ko) | 태양광 추적 시스템의 백트래킹 방법 및 그 시스템 | |
| CN102112822A (zh) | 多塔下射式集光系统的太阳光收集方法 | |
| JP2007103713A (ja) | 追尾型太陽光発電システム、その制御方法及びその制御プログラム | |
| CN102077035A (zh) | 定日镜的校正方法及其校正装置 | |
| EA026763B1 (ru) | Система сбора тепловой солнечной энергии | |
| US20110252797A1 (en) | Gas turbine plant, heat receiver, power generating device, and sunlight collecting system associated with solar thermal electric generation system | |
| JP5684556B2 (ja) | 太陽光集熱装置 | |
| WO2013065667A1 (ja) | ヘリオスタット制御方法、ヘリオスタット制御装置、集熱設備、太陽熱集熱装置の運転方法、及び太陽熱集熱装置 | |
| JP2010286200A (ja) | 太陽熱集光器 | |
| CN103850900A (zh) | 具有独立过热器的集中式太阳能发电设备 | |
| Ruelas et al. | Opto–geometric performance of fixed-focus solar concentrators | |
| KR101013636B1 (ko) | 태양광 전송장치 및 그것의 제어방법 | |
| WO2011096339A1 (ja) | 太陽熱受熱器 | |
| JP5232627B2 (ja) | 太陽光集光システム | |
| JP5698101B2 (ja) | 太陽光集熱装置および太陽光集熱装置の太陽自動追尾方法 | |
| JP2015140937A (ja) | 太陽熱集熱装置およびその軌道補正方法 | |
| JP2011163594A (ja) | 太陽熱受熱器の運転制御システムおよび運転制御方法 | |
| JP2013096636A (ja) | ヘリオスタット制御方法、ヘリオスタット制御装置および集熱設備 | |
| JP5135202B2 (ja) | 太陽光集光システム | |
| JP5687043B2 (ja) | 太陽光集熱装置 | |
| Bekele et al. | Analysis of solar irradiance variation on heat flux and temperature distribution for a dish concentrator receiver | |
| US8763397B1 (en) | Device and process to reduce pressure and temperature loss from a solar thermal receiver | |
| CN103471265B (zh) | 基于分时竞争机制的日光定向反射控制装置及控制方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12845906 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 12845906 Country of ref document: EP Kind code of ref document: A1 |