WO2012002429A1 - 充放電制御装置 - Google Patents
充放電制御装置 Download PDFInfo
- Publication number
- WO2012002429A1 WO2012002429A1 PCT/JP2011/064903 JP2011064903W WO2012002429A1 WO 2012002429 A1 WO2012002429 A1 WO 2012002429A1 JP 2011064903 W JP2011064903 W JP 2011064903W WO 2012002429 A1 WO2012002429 A1 WO 2012002429A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rechargeable battery
- amount
- charge
- power
- limit value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/44—Methods for charging or discharging
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/02—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from AC mains by converters
- H02J7/04—Regulation of charging current or voltage
-
- H02J7/80—
-
- H02J7/865—
-
- H02J7/947—
-
- H02J2105/42—
-
- H02J2105/55—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/34—Arrangements for transfer of electric power between networks of substantially different frequency
-
- H02J7/82—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Definitions
- the present invention relates to a charge / discharge control device for controlling charge / discharge of a rechargeable battery.
- a secondary battery such as a lithium ion battery, a nickel hydride battery, or a lead battery is usually used.
- a lithium ion battery is attracting attention as a rechargeable battery for the above-described charging system because of its light weight, high capacity, and high output.
- the battery is fully charged at midnight when the electric area is low as a time when the power usage is low.
- the time zone for example, around noon
- the capacity deterioration is further increased, leading to further shortening of the battery life.
- the capacity deterioration means that even if the battery is fully charged, it cannot be charged to the initial fully charged capacity.
- the battery life is determined when the capacity is reduced to about 60% of the initial full charge capacity.
- the present invention has been made in view of such a situation, and an object thereof is to charge a rechargeable battery in a system that charges a rechargeable battery when the amount of power used is small and discharges from the rechargeable battery when the amount of power used is large.
- the purpose is to provide a technology for extending the service life.
- a charging / discharging control device is a charging / discharging control device that controls charging / discharging of a rechargeable battery, and predicts a power usage amount for each unit period, based on a prediction result by the prediction unit.
- a rechargeable battery control unit that controls the rechargeable battery to be charged with an excess power amount that exceeds the target power value within the unit period and discharged from the rechargeable battery during a time period that exceeds the target power value.
- the upper limit value of the charge amount for the full charge of the rechargeable battery is set, and the rechargeable battery control unit is predicted by the prediction unit when it is necessary to charge the rechargeable battery beyond the upper limit value.
- the battery is charged to the upper limit value during a time period when the amount of power used is small, and the portion exceeding the upper limit value is charged in a time period close to the time period exceeding the target power value.
- the charge amount is the current amount of electricity stored, and includes the absolute amount “Ah” of the charge amount in addition to the ratio to the full charge (charge state SOC: “%”).
- the state of charge SOC is the current charge amount of the storage battery (absolute amount “Ah”) / charge amount at full charge (absolute amount “Ah”).
- the life of the rechargeable battery can be extended in a system in which the rechargeable battery is charged when the amount of power used is small and discharged from the rechargeable battery when the amount of power used is large.
- FIG. 1 is a diagram for explaining a charge / discharge method according to an embodiment of the present invention.
- the upper graph in FIG. 1 shows the predicted power consumption per unit period in a certain facility, and the lower graph shows the charge amount per unit period corresponding to the predicted power consumption of the rechargeable battery installed in the facility. .
- the power consumption of the next day is predicted, and the predicted power consumption exceeds the target power value (here, contract power with the power company) (hereinafter referred to as excess power amount as appropriate (region c). (Refer to block a).
- target power value here, contract power with the power company
- the amount exceeding the upper limit value of the charge amount (for example, 80% of full charge) is charged immediately before the discharge time zone (see block b).
- the full charge period (see box d) of the rechargeable battery can be shortened as much as possible, and deterioration of the battery can be prevented.
- FIG. 2 is a diagram showing a configuration of a charge / discharge system 500 according to the embodiment of the present invention.
- the charge / discharge system 500 according to the present embodiment is installed in a facility such as a supermarket or a convenience store. However, this is not the case.
- the charging / discharging system 500 includes a charging / discharging control device 100, a rechargeable battery 200, a power receiving facility 210, a power meter 220, an AC / DC converter 230, and a power consuming device 300.
- a refrigerator 310, a showcase 320, and an air conditioner 330 are provided as the power consuming device 300.
- the rechargeable battery 200 is assumed to be a lithium ion battery in the present embodiment.
- the power receiving facility 210 takes commercial power (AC power) into the facility.
- the wattmeter 220 measures the actual power consumption of the power consuming equipment 300 in the facility and outputs it to the charge / discharge control device 100 (more precisely, the measurement unit 110 described later).
- an average value of power consumption per unit time (for example, 10 minutes) is defined as actual power consumption.
- the AC / DC converter 230 converts AC power supplied from a commercial power source into DC power and supplies it to the rechargeable battery 200.
- the DC power supplied from the rechargeable battery 200 is converted into AC power and supplied to the power consuming device 300 in the facility.
- the charging / discharging control device 100 controls charging / discharging of the rechargeable battery 200.
- the charge / discharge control device 100 includes a measurement unit 110, a learning data management unit 120, a learning data holding unit 130, a prediction unit 140, and a rechargeable battery control unit 150.
- These configurations can be realized by an arbitrary processor, memory, or other LSI in terms of hardware, and can be realized by a program loaded in the memory in terms of software, but here by their cooperation.
- Draw functional blocks Therefore, those skilled in the art will understand that these functional blocks can be realized in various forms by hardware only, software only, or a combination thereof.
- the measurement part 110 acquires environmental data for every fixed period (for example, 10 minutes).
- Environmental data includes temperature and humidity outside the facility, temperature and humidity inside the facility, and the like.
- the outside temperature an example of acquiring the temperature outside the facility (hereinafter referred to as the outside temperature) having a high correlation with the power consumption will be described in the present embodiment.
- the measurement part 110 acquires the actual power consumption of the power consumption apparatus 300 from the wattmeter 220 for every fixed period (for example, 10 minutes).
- the learning data management unit 120 registers the environmental data (outside temperature in the present embodiment) and actual power consumption acquired by the measurement unit 110 in the learning data holding unit 130 as learning data.
- FIG. 3 is a diagram illustrating an example of the data structure of the learning data holding unit 130.
- FIG. 3 shows an example in which a two-dimensional table using the time zone and the outside air temperature as parameters is constructed, and the measured actual power consumption is stored as learning data in each cell e in the table.
- the configuration may be such that the actual power consumption for the last 10 times is stored in each cell e.
- environmental conditions of the learning data in addition to the time zone, temperature, and humidity, other parameters such as audience data, visitor prediction, sale date, day of week, etc. can be used.
- the prediction unit 140 predicts the power consumption for each unit period. For example, the amount of power used per unit period of a certain day is predicted on the previous day. More specifically, the learning data of the power consumption (for example, actual power consumption) recorded using the time zone and at least one environmental condition (in this embodiment, the outside air temperature) as parameters, and the environmental condition for the unit period (this In the embodiment, a predicted value of outside air temperature) is acquired, and based on these values, the power consumption for each unit period is predicted.
- the learning data of the power consumption for example, actual power consumption
- the environmental condition for the unit period this In the embodiment, a predicted value of outside air temperature
- the prediction unit 140 obtains the next day's weather data (for each unit period in the present embodiment) from the weather database 400 constructed in an external server connected via a network (for example, the Internet). Get outside temperature). Based on the outside temperature for each unit period, the learning data holding unit 130 is referred to, and the power usage amount for each unit period on the next day is predicted.
- FIG. 4 is a diagram for explaining a process of predicting the power consumption for each unit period of the next day from the outside temperature for each unit period of the next day.
- the upper graph in FIG. 4 shows the outside temperature f for each unit period acquired from the weather database 400 on the next day.
- the lower graph shows a table storing the actual power consumption shown in FIG.
- the prediction unit 140 calculates the predicted power consumption for each time zone based on the data of the actual power consumption for the last 10 times stored in the cell of the table.
- a cell g painted in gray scale indicates a cell corresponding to the outside air temperature f for each unit period of the next day.
- the maximum value (or average value) of the actual power consumption for the last 10 past times is selected.
- the rechargeable battery control unit 150 charges the rechargeable battery 200 with an excess power amount that exceeds the target power value within the unit period (predicted date in the present embodiment) based on the prediction result by the prediction unit 140. Then, control is performed so that the rechargeable battery 200 is discharged in a time zone that exceeds the target power value.
- an upper limit value (for example, 80% in the present embodiment) of the charge amount with respect to the full charge of the rechargeable battery 200 according to the characteristics of the rechargeable battery 200 is set in advance.
- the degree of acceleration of the rechargeable battery varies depending on the amount of charge. In particular, when the battery is almost fully charged or when there is almost no charge, the degree of acceleration is greater than when the charge is medium.
- the upper limit value and the lower limit value to be described later are set so as to include a region where the degree of acceleration of deterioration is large. In this specification, this is expressed as the characteristics of the rechargeable battery.
- the power usage amount for each unit period predicted by the prediction unit 140 is smaller than that for other unit periods.
- the rechargeable battery 200 is charged to the upper limit value, and the portion exceeding the upper limit value is closer to the time zone in which the target power value is exceeded than the time zone in which the rechargeable battery 200 is charged to the upper limit value. Charge.
- the time period in which the power consumption is low may be considered as a time period in which the predicted power consumption does not exceed a predetermined set value, may be considered as a time period in which the cumulative total of the predicted power consumption is the smallest, or the predicted power consumption May be considered as a time zone including the least time.
- the time zone is usually a midnight time zone. In Japan, electricity charges are set cheaper in midnight hours than in normal hours (as of June 2010). Therefore, normally, the rechargeable battery control unit 150 will charge the rechargeable battery 200 to the upper limit value in a time zone in which the electricity rate is set lower than the normal time zone, and is expected to further reduce the power rate. it can.
- charging that exceeds the upper limit value starts so as to end at or just before the start time of the time zone that exceeds the target power value.
- it is a scheduled time zone. In this case, the time during which the rechargeable battery 200 is in a fully charged state can be shortened.
- a lower limit value for example, 50% in the present embodiment
- the ratio of the charge amount obtained by subtracting the excess power amount predicted by the prediction unit 140 from the current charge amount of the rechargeable battery 200 is equal to or higher than the lower limit value.
- the rechargeable battery 200 is not charged in advance.
- the ratio of the charge amount to the full charge of the rechargeable battery 200 is smaller than the lower limit value, charging is performed such that the charge amount after discharging the excess power amount becomes the lower limit value.
- the ratio of the excess power amount to the full charge amount is ((X / Y) ⁇ 100)%, the current charge amount relative to the full charge amount is ((Z / Y) ⁇ 100)%.
- the respective ratios are represented by x% and z%.
- FIG. 5 is a diagram for explaining a charge / discharge method in a case where charging does not exceed the upper limit value of the charge amount.
- FIG. 6 is a diagram for explaining a charging / discharging method when charging exceeding full charge is necessary.
- FIG. 7 is a diagram illustrating the relationship between the charging time of the rechargeable battery 200 and the amount of charge.
- the rechargeable battery control unit 150 charges the rechargeable battery 200. Control not to. This is for reducing the number of times of charging / discharging and preventing the capacity deterioration of the rechargeable battery 200.
- the rechargeable battery control unit 150 sets the charge amount after discharging the excess power amount to the lower limit value during a time period when the predicted power usage amount is small. (Lower limit value + x ⁇ z)% is charged so that
- the charging current depends on the charging characteristics of each rechargeable battery. However, in the time zone in which it is estimated that the target power value is exceeded by charging, the rechargeable battery control unit 150 decreases the charging current value so as not to exceed the target power value.
- the charging time is calculated from the charging characteristics of each battery (see FIG. 7). If the charging current value is lowered, the charging time is extended. For example, when the charging current value is halved, the charging time is estimated to be doubled. Based on the charging time, the rechargeable battery control unit 150 completes the charging by the time when the time period in which the power consumption is low (for example, the midnight time period (here, 23:00 to 7 o'clock)) ends. Start charging.
- the upper graph in FIG. 5 shows the predicted power consumption per unit period in the facility, and the lower graph shows the charge amount per unit period corresponding to the predicted power consumption of the rechargeable battery 200 installed in the facility.
- the prediction unit 140 predicts the power consumption of the next day, and the rechargeable battery control unit 150 charges the amount of excess power (see area i) with the predicted power consumption during a time period when the power consumption is low (see block h).
- the charging is completed by 7 am before the late night time charge is applied.
- charging beyond the upper limit is not necessary, and a full charging period does not occur.
- processing is performed as follows.
- the portion exceeding the above upper limit value (lower limit value + x ⁇ upper limit value)% is charged immediately before the discharge time zone (hereinafter referred to as second charge).
- the charging time of the second charging is also calculated from the charging characteristics of each rechargeable battery (see FIG. 7). Based on the charging time, the rechargeable battery control unit 150 starts charging so that the charging is completed immediately before the time period for discharging.
- the prediction unit 140 predicts the power consumption of the next day, and the rechargeable battery control unit 150 charges the amount of excess power (see area 1) with the predicted power consumption during a time period when the power consumption is low (see block j) (hereinafter referred to as “block j”).
- the first charge is completed by 7:00 am before the midnight time zone charge is applied.
- the first charging is performed within a range not exceeding the upper limit.
- the rechargeable battery control unit 150 performs the second charge immediately before the time period for discharging the portion exceeding the upper limit (see block k). Thereby, the full charge period (see box m) can be shortened.
- a lower limit value (for example, 20% in this embodiment) of the discharge amount with respect to the full charge of the rechargeable battery 200 may be set according to the characteristics of the rechargeable battery 200.
- the rechargeable battery control unit 150 performs discharge within a range that does not fall below the lower limit value of the discharge amount.
- the rechargeable battery 200 discharges in a range where z% does not fall below the first lower limit value of the discharge amount (FIG. 6). h). Thereby, capacity degradation due to overdischarge can be suppressed.
- the rechargeable battery control unit 150 includes a second lower limit value (for example, 10% in the present embodiment) of the discharge amount and a second lower limit discharge count (the second lower limit value when the discharge amount is lower than the first lower limit value). May be set.
- the second lower limit number of discharges can be changed depending on the characteristics of the rechargeable battery, and may be an absolute number or a number per unit period (for example, 10 times a year). In this case, the rechargeable battery control unit 150 may allow the discharge to the second lower limit value as long as the second lower limit discharge number is equal to or less than a predetermined number. In other words, the discharge amount may be discharged to a second lower limit value below the first lower limit value.
- FIG. 8 is a flowchart showing the overall operation of the charge / discharge system 500 according to the embodiment of the present invention. Details of each process will be described with reference to FIGS.
- the measurement unit 110 executes power value acquisition processing, and the learning data management unit 120 executes learning processing (S10).
- the prediction unit 140 executes a prediction process (S20).
- the rechargeable battery control unit 150 executes a charging process (S40).
- the rechargeable battery control unit 150 performs a discharge process (S50). The above processing is repeatedly executed.
- FIG. 9 is a flowchart showing details of the power value acquisition process and the learning process.
- the measurement unit 110 determines whether or not the sensor acquisition period has arrived (S11), and when it has arrived (Yes in S11), acquires the outside air temperature and actual power consumption (S12).
- the learning data management unit 120 stores the actual power consumption in the learning data cell for each environmental condition (in this embodiment, for each time zone and outside temperature) (S13).
- FIG. 10 is a flowchart showing details of the prediction process.
- the prediction unit 140 determines whether or not the prediction time specified by the user (for example, 23:00 on the previous day) has arrived (S21), and if it has arrived (Yes in S21), the weather data for the next day (this embodiment) Then, the outside temperature for each unit period is acquired (S22). From the meteorological data, the maximum value stored in the cell of the learning data for each time zone and outside temperature is extracted as predicted power (S23), and a predicted power consumption pattern is calculated (S24).
- the prediction unit 140 calculates an excess power amount based on the predicted power consumption pattern (S25), and calculates a discharge start time, a discharge end time, and a discharge pattern based on the calculated power consumption pattern (S26).
- the discharge pattern is an excess power amount per unit time obtained by subtracting the target power value from the predicted power consumption pattern.
- the prediction unit 140 compares the value obtained by subtracting the excess power amount from the current charge amount with the lower limit value of the charge amount (S27), and if the former is less than the latter (Yes in S27), the time when the power consumption is low
- the first charge amount charged in the belt is calculated (S28), and the charge start time and end time are calculated (S29). If the former is greater than or equal to the latter (No in S27), charging is not performed (S30). More specifically, invalid values are set for the first charge start time and the second charge start time.
- the prediction unit 140 compares the value obtained by adding the excess power amount to the current charge amount and the upper limit value of the charge amount when executing the first charge (S31). When the former exceeds the latter (Yes in S31), the second charge amount to be charged in the time zone immediately before the discharge is calculated (S32), and the charge start time and end time are calculated (S33). When the former is equal to or less than the latter (No in S31), the processes in steps S32 and 33 are skipped. Although not shown in FIG. 10, in a time zone in which it is estimated that charging exceeds the target power value, the charging current value is lowered and the charging time in that case is calculated.
- FIG. 11 is a flowchart showing details of the charging process.
- the rechargeable battery control unit 150 performs the first charge on the rechargeable battery 200 from the first charge start time to the end time (Yes in S41) (S42). During the other period (No in S41), the first charging is stopped (S43). Note that charging is not performed when an invalid value is set at the first charging start time.
- the rechargeable battery control unit 150 performs the second charge on the rechargeable battery 200 from the second charge start time to the end time (Yes in S44) (S45). During the other period (No in S44), the second charging is stopped (S46). Note that charging is not performed when an invalid value is set at the second charging start time.
- FIG. 12 is a flowchart showing details of the discharge process.
- the rechargeable battery control unit 150 discharges according to the discharge pattern from the discharge start time to the end time (Yes in S51) (S52). During the other period (No in S51), the discharge is stopped (S53).
- the rechargeable battery control unit 150 stops discharging (S55).
- the discharge is performed according to the discharge pattern.
- the full charge period is shortened in a system in which the rechargeable battery is charged when the amount of power used is small and discharged from the rechargeable battery when the amount of power used is large.
- the life of the rechargeable battery can be extended.
- the lifetime of a rechargeable battery can be extended by reducing the frequency
- the lifetime of a rechargeable battery can be extended by suppressing overdischarge.
- the electricity bill can be reduced.
- FIG. 13 is a diagram for explaining a charge / discharge method according to the first modification.
- a transition curve s indicates a power consumption pattern predicted at 23:00 on the previous day, for example.
- the transition curve r indicates a power consumption pattern predicted based on the latest weather information acquired from the weather database 400 at the morning time p (for example, 7:00) on that day.
- the prediction unit 140 calculates an excess power amount (refer to the region v) based on the power consumption pattern of the transition curve s, and charges in a time zone when the power consumption is low (see block o).
- the prediction unit 140 recalculates the excess power amount based on the power consumption pattern of the transition curve r re-predicted in the morning of the day. As a result of the recalculation, if the current amount of charge cannot cover the recalculated excess power amount, the amount that cannot be covered is charged immediately before discharging (see block p).
- the prediction unit 140 may recalculate the excess power amount and change the charge amount associated therewith. As described above, according to the first modification, it is possible to improve the prediction accuracy of the power consumption pattern, and to perform more optimized charge / discharge control.
- FIG. 14 is a diagram for explaining a charge / discharge method according to the second modification.
- an example of a midnight time zone where the electricity rate is low is given as a time zone where the power consumption is small.
- electricity charges differ between daytime power hours and late-night power hours, and late-night power is set at a lower price than daytime power, but there are cases where there is no difference in electricity charges during the time.
- the rechargeable battery control unit 150 based on the power usage amount for each unit period predicted by the prediction unit 140, by the time when the power usage amount starts to decrease or level off to rise. It is recommended to schedule the charging up to the upper limit.
- the upper graph in FIG. 14 shows the predicted power consumption per unit period in the facility, and the lower graph shows the charge amount per unit period corresponding to the predicted power consumption of the rechargeable battery 200 installed in the facility.
- the prediction unit 140 predicts the power consumption of the next day, and the rechargeable battery control unit 150 schedules the first charging to be completed immediately before the inclination of the predicted power consumption increases (see block t).
- the rechargeable battery control unit 150 performs the second charge immediately before the time period for discharging the portion exceeding the upper limit (see block u).
- charging can be performed without exceeding the target power value by performing constant current charging in a time zone where the amount of power used is small, and the charging time can be shortened.
- the charge / discharge system 500 is applied to a facility such as a store.
- the charge / discharge system 500 can also be applied to each home.
- 100 charge / discharge control device 110 measurement unit, 120 learning data management unit, 130 learning data holding unit, 140 prediction unit, 150 rechargeable battery control unit, 200 rechargeable battery, 210 power receiving equipment, 220 wattmeter, 230 AC / DC converter , 300 power consuming equipment, 310 refrigerator, 320 showcase, 330 air conditioner, 400 weather database, 500 charge / discharge system.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Power Engineering (AREA)
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
図3は、学習データ保持部130のデータ構造の一例を示す図である。図3では時間帯および外気温をパラメータとする二次元テーブルを構築し、当該テーブル内の各セルeに、計測された実消費電力が学習データとして格納される例を描いている。例えば、各セルeに直近過去10回分の実消費電力が格納される構成であってもよい。学習データの環境条件としては、時間帯・気温・湿度以外にも、それ以外の観客データ・来客予測・特売日・曜日等のパラメータも使うことができる。
Claims (8)
- 充電池の充放電を制御する充放電制御装置であって、
単位期間毎の電力使用量を予測する予測部と、
前記予測部による予測結果にもとづいて、前記単位期間内において目標電力値を超過する分の超過電力量を放電するに足る電力量を前記充電池に充電し、前記目標電力値を超過する時間帯に前記充電池から超過電力量相当分を放電するよう制御する充電池制御部と、
を備え、
前記予測部は、外気温度をパラメータとして単位時間毎の電力使用量の学習データを構築し、外部サーバに構築された気象データベースから翌日の外気温度データを取得し、当該学習データ及び当該外気温度データから前記単位期間毎の電力使用量を予測し、
前記充電池制御部は、前記充電池の満充電に対する充電量の上限値が設定されており、前記上限値を超えて前記充電池に充電する必要がある場合、前記予測部により予測された電力使用量が少ない時間帯に、前記充電池を前記上限値まで充電し、前記上限値を超える分を、前記目標電力値を超過する時間帯に近い時間帯に充電することを特徴とする充放電制御装置。 - 前記充電池制御部には、前記充電池の満充電に対する充電量の下限値が設定されており、
前記充電池制御部は、前記充電池の現在の充電量から前記予測部により予測された超過電力量を減算した充電量が、前記下限値以上の場合、前記充電池への事前の充電を行わず、前記下限値未満の場合、前記超過電力量を放電した後の充電量が前記下限値になるように充電することを特徴とする請求項1に記載の充放電制御装置。 - 前記充電池制御部には、前記充電池の放電量の第1下限値が設定されており、
前記充電池制御部は、前記放電量の第1下限値を下回らない範囲で放電することを特徴とする請求項1または2に記載の充放電制御装置。 - 前記充電池制御部には、前記充電池の放電量の第1下限値より小さい第2下限値、および第2下限放電回数がさらに設定されており、
前記充電池制御部は、前記第2下限放電回数が所定回数以下の場合、前記第2下限値までの放電を許容することを特徴とする請求項3に記載の充放電制御装置。 - 前記充電池制御部は、電気料金が通常の時間帯より安価に設定された時間帯に、前記充電池を前記上限値まで充電することを特徴とする請求項1に記載の充放電制御装置。
- 前記充電池制御部は、前記予測部により予測された単位期間毎の電力使用量にもとづき、電力使用量が下降または横這いから上昇に転ずる時刻までに、前記上限値までの充電が完了するようスケジュールすることを特徴とする請求項1に記載の充放電制御装置。
- 前記予測部は、時間帯と少なくとも一つの環境条件をパラメータとして記録された電力使用量の学習データと、前記単位期間の前記環境条件の予測値を取得し、それらをもとに、前記単位期間毎の電力使用量を予測することを特徴とする請求項1に記載の充放電制御装置。
- 請求項1から7のいずれかに記載の制御装置を備えることを特徴とする冷凍機システム。
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2012522659A JP5485392B2 (ja) | 2010-06-30 | 2011-06-29 | 充放電制御装置 |
| EP11800891.1A EP2590298A4 (en) | 2010-06-30 | 2011-06-29 | Charge / discharge CONTROL DEVICE |
| CN2011800323924A CN102986113A (zh) | 2010-06-30 | 2011-06-29 | 充电/放电控制装置 |
| US13/807,910 US9071068B2 (en) | 2010-06-30 | 2011-06-29 | Charge/discharge control apparatus |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010-150303 | 2010-06-30 | ||
| JP2010150303 | 2010-06-30 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012002429A1 true WO2012002429A1 (ja) | 2012-01-05 |
Family
ID=45402134
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2011/064903 Ceased WO2012002429A1 (ja) | 2010-06-30 | 2011-06-29 | 充放電制御装置 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US9071068B2 (ja) |
| EP (1) | EP2590298A4 (ja) |
| JP (2) | JP5485392B2 (ja) |
| CN (1) | CN102986113A (ja) |
| WO (1) | WO2012002429A1 (ja) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014034007A1 (ja) * | 2012-08-30 | 2014-03-06 | パナソニック株式会社 | 電力制御装置、およびそれを用いた電力供給システム |
| JP2015012705A (ja) * | 2013-06-28 | 2015-01-19 | 株式会社エヌエフ回路設計ブロック | 電力貯蔵システム及びその運用方式 |
| WO2016002346A1 (ja) * | 2014-07-03 | 2016-01-07 | シャープ株式会社 | 電力制御システム及び電力制御装置 |
| JP2017046421A (ja) * | 2015-08-25 | 2017-03-02 | 住友電気工業株式会社 | 充放電制御装置及び制御プログラム |
Families Citing this family (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6012144B2 (ja) * | 2011-05-20 | 2016-10-25 | パナソニックエコソリューションズ電路株式会社 | 充電制御システム |
| JP5737409B2 (ja) * | 2011-08-23 | 2015-06-17 | 富士通株式会社 | 電力平準化制御装置および電力平準化制御方法 |
| US9511675B2 (en) * | 2013-09-13 | 2016-12-06 | Nissan North America, Inc. | Methods of decreasing peak energy consumption |
| CN103902004B (zh) * | 2014-03-24 | 2017-02-08 | 可牛网络技术(北京)有限公司 | 一种充电剩余时间计算方法、装置及移动设备 |
| FR3028684A1 (fr) | 2014-11-14 | 2016-05-20 | Orange | Technique de gestion de la consommation electrique dans un reseau de communication local |
| JP2016116401A (ja) * | 2014-12-17 | 2016-06-23 | 株式会社ピューズ | 電力負荷平準化装置 |
| CN107251359B (zh) * | 2015-02-09 | 2020-06-09 | 三菱电机株式会社 | 控制装置、控制系统、控制方法以及记录介质 |
| US10416211B2 (en) | 2015-02-19 | 2019-09-17 | Nec Corporation | Apparatus for estimating power consumption, method of estimating power consumption, and program |
| KR101750150B1 (ko) * | 2015-03-11 | 2017-07-04 | 엘에스산전 주식회사 | 전력 관리 시스템 |
| WO2016208319A1 (ja) | 2015-06-22 | 2016-12-29 | 三菱電機株式会社 | 蓄電池制御装置、蓄電池充放電システム、太陽光発電システム、および蓄電池制御方法 |
| KR102381582B1 (ko) * | 2015-06-23 | 2022-04-01 | 삼성전자 주식회사 | 스마트 그리드를 이용한 기지국 에너지 관리 방법 및 장치 |
| CN106896330B (zh) * | 2017-03-24 | 2019-05-17 | 东软集团股份有限公司 | 一种关于电池剩余电量的数据处理方法及装置 |
| CN107276108B (zh) * | 2017-06-28 | 2020-03-20 | 宁波三星医疗电气股份有限公司 | 一种配电方法及装置 |
| IT201700103604A1 (it) * | 2017-09-15 | 2019-03-15 | Integra Srl | Apparato e metodo per alimentare in modo continuato una rete elettrica di distribuzione |
| US20190137956A1 (en) * | 2017-11-06 | 2019-05-09 | Nec Laboratories America, Inc. | Battery lifetime maximization in behind-the-meter energy management systems |
| JP6696699B2 (ja) * | 2017-11-15 | 2020-05-20 | 株式会社東芝 | 電力制御装置、電力制御方法及び電力制御プログラム |
| US10958082B2 (en) * | 2018-04-25 | 2021-03-23 | Microsoft Technology Licensing, Llc | Intelligent battery cycling for lifetime longevity |
| DE102019125200B4 (de) * | 2019-09-19 | 2022-07-07 | Ibc Solar Ag | Verfahren zum Steuern eines Speichersystems und Energie-Management-System für ein Speichersystem |
| JP7259709B2 (ja) * | 2019-11-12 | 2023-04-18 | 東芝三菱電機産業システム株式会社 | エネルギーマネジメントシステム |
| FR3118339B1 (fr) * | 2020-12-23 | 2024-04-05 | Somfy Activites Sa | Procédé de gestion de puissance d’une batterie, dispositif de gestion de puissance électrique mettant en œuvre un tel procédé, et installation domotique comprenant un tel dispositif |
| CN112677769B (zh) * | 2020-12-28 | 2022-10-11 | 重庆大学 | 基于多因素融合的电池系统功率限值估算方法 |
| US20220407329A1 (en) * | 2021-06-16 | 2022-12-22 | Hewlett-Packard Development Company, L.P. | Battery charge regulation |
| CN117833391A (zh) * | 2023-11-27 | 2024-04-05 | 华为数字能源技术有限公司 | 一种储能装置及储能系统 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10300168A (ja) * | 1997-04-30 | 1998-11-13 | Sanden Corp | 圧縮機用電源制御装置 |
| JP2000253586A (ja) * | 1999-02-26 | 2000-09-14 | Sanyo Electric Co Ltd | 電池の充電方法と電源装置 |
| JP2009194947A (ja) | 2008-02-12 | 2009-08-27 | Kansai Electric Power Co Inc:The | 充放電深度管理装置及び方法、並びに、蓄電システム |
| JP2010016999A (ja) * | 2008-07-04 | 2010-01-21 | Meidensha Corp | 店舗用電力供給装置 |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2537784B2 (ja) * | 1985-12-13 | 1996-09-25 | 株式会社日立製作所 | 蓄熱冷暖房装置の運転制御方法 |
| JPH10300169A (ja) | 1997-04-25 | 1998-11-13 | Matsushita Refrig Co Ltd | 空気調和機 |
| JP3621853B2 (ja) | 1999-09-17 | 2005-02-16 | 株式会社日立製作所 | 電力供給システム |
| JP2002142378A (ja) * | 2000-10-31 | 2002-05-17 | Canon Inc | 充電装置、方法及び記憶媒体 |
| JP2003079054A (ja) * | 2001-08-31 | 2003-03-14 | Sanyo Electric Co Ltd | 蓄電池を備えた太陽光発電システム |
| JP2003189470A (ja) * | 2001-12-21 | 2003-07-04 | Yuasa Corp | ピークカット装置の運転方法 |
| JP2004094607A (ja) * | 2002-08-30 | 2004-03-25 | Matsushita Electric Ind Co Ltd | 携帯情報機器、及びその充電状態最適化方法とプログラム、並びに、電池管理サーバ、及びそれによる電池式電気機器の充電状態最適化方法とプログラム |
| JP4760766B2 (ja) * | 2006-05-16 | 2011-08-31 | 株式会社日立製作所 | ピークシフト管理サーバおよび電力需要量ピークシフト方法 |
| US7590472B2 (en) * | 2006-11-09 | 2009-09-15 | Gridpoint, Inc. | Energy arbitrage by load shifting |
| JP2009254221A (ja) | 2008-04-11 | 2009-10-29 | Kansai Electric Power Co Inc:The | 二次電池の充電方法 |
| JP5095495B2 (ja) * | 2008-05-20 | 2012-12-12 | 日本電信電話株式会社 | 電力システムおよびその制御方法 |
| EP2139090A1 (en) * | 2008-06-24 | 2009-12-30 | ABB Research Ltd. | Method for operating a battery energy storage system |
| US20100123436A1 (en) | 2008-11-14 | 2010-05-20 | Symbol Technologies, Inc. | Optimized lithium-ion battery charging |
| JP5570782B2 (ja) * | 2009-10-16 | 2014-08-13 | 三洋電機株式会社 | 電源装置及びこれを備える車両並びに電源装置の充放電制御方法 |
-
2011
- 2011-06-29 WO PCT/JP2011/064903 patent/WO2012002429A1/ja not_active Ceased
- 2011-06-29 US US13/807,910 patent/US9071068B2/en not_active Expired - Fee Related
- 2011-06-29 CN CN2011800323924A patent/CN102986113A/zh active Pending
- 2011-06-29 EP EP11800891.1A patent/EP2590298A4/en not_active Withdrawn
- 2011-06-29 JP JP2012522659A patent/JP5485392B2/ja not_active Expired - Fee Related
-
2014
- 2014-02-17 JP JP2014027596A patent/JP2014131477A/ja active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10300168A (ja) * | 1997-04-30 | 1998-11-13 | Sanden Corp | 圧縮機用電源制御装置 |
| JP2000253586A (ja) * | 1999-02-26 | 2000-09-14 | Sanyo Electric Co Ltd | 電池の充電方法と電源装置 |
| JP2009194947A (ja) | 2008-02-12 | 2009-08-27 | Kansai Electric Power Co Inc:The | 充放電深度管理装置及び方法、並びに、蓄電システム |
| JP2010016999A (ja) * | 2008-07-04 | 2010-01-21 | Meidensha Corp | 店舗用電力供給装置 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP2590298A4 |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014034007A1 (ja) * | 2012-08-30 | 2014-03-06 | パナソニック株式会社 | 電力制御装置、およびそれを用いた電力供給システム |
| JP2014050198A (ja) * | 2012-08-30 | 2014-03-17 | Panasonic Corp | 電力制御装置、およびそれを用いた電力供給システム |
| JP2015012705A (ja) * | 2013-06-28 | 2015-01-19 | 株式会社エヌエフ回路設計ブロック | 電力貯蔵システム及びその運用方式 |
| WO2016002346A1 (ja) * | 2014-07-03 | 2016-01-07 | シャープ株式会社 | 電力制御システム及び電力制御装置 |
| JP2017046421A (ja) * | 2015-08-25 | 2017-03-02 | 住友電気工業株式会社 | 充放電制御装置及び制御プログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102986113A (zh) | 2013-03-20 |
| JP5485392B2 (ja) | 2014-05-07 |
| EP2590298A4 (en) | 2014-05-21 |
| JPWO2012002429A1 (ja) | 2013-08-29 |
| JP2014131477A (ja) | 2014-07-10 |
| US9071068B2 (en) | 2015-06-30 |
| US20130099751A1 (en) | 2013-04-25 |
| EP2590298A1 (en) | 2013-05-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5485392B2 (ja) | 充放電制御装置 | |
| CN110870130B (zh) | 蓄电池系统充电控制装置、蓄电池系统以及蓄电池充电控制方法 | |
| JP6554410B2 (ja) | 電力貯蔵システム管理装置、電力貯蔵システム管理方法、電力貯蔵システム | |
| CN102439782B (zh) | 用于自然能源利用系统的铅蓄电池和铅蓄电池系统 | |
| JP6103170B1 (ja) | 蓄電池制御装置、蓄電池充放電システム、太陽光発電システム、および蓄電池制御方法 | |
| US10074987B2 (en) | Storage battery management device, storage battery, method of managing storage battery, and storage medium | |
| JP6942295B1 (ja) | 充放電計画作成装置、指令装置、電力系統管理システム、端末装置、蓄電システム、充放電システム、蓄電池、電気自動車、充放電計画作成方法および充放電計画作成プログラム | |
| US20140009117A1 (en) | Electrical storage system and mobile body | |
| EP2506387B1 (en) | Charge control device, charge control method, program, and system | |
| CN112368904A (zh) | 行动生成装置、蓄电元件评价装置、计算机程序、学习方法以及评价方法 | |
| JP7184060B2 (ja) | 電力監視制御装置、電力監視制御方法、および制御プログラム | |
| JP2017028869A (ja) | 需給計画作成装置、プログラム | |
| KR20160078174A (ko) | 나트륨계 배터리의 충전상태 추정 시스템 및 그 방법 | |
| JP5452461B2 (ja) | 充電システム、充電方法及びプログラム | |
| US10554065B2 (en) | Battery control apparatus | |
| JP7740332B2 (ja) | 充放電管理装置、充放電管理方法、及びプログラム | |
| WO2021048920A1 (ja) | 蓄電池管理システム | |
| JP6971158B2 (ja) | 電力管理装置及びプログラム | |
| WO2018105645A1 (ja) | 運転制御システム及びその制御方法 | |
| JP7257107B2 (ja) | 二次電池制御装置および二次電池制御方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 201180032392.4 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11800891 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2012522659 Country of ref document: JP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2011800891 Country of ref document: EP |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13807910 Country of ref document: US |